Summary CEAC
Destratification charge
Cure charge
Discharge curves
2
Reminder CEAC
3
Charging profile for OPzS solar batteries CEAC
4
Charging profile for OPzS solar batteries CEAC
5
OPzS Solar maintenance CEAC
6
OPzS Solar maintenance CEAC
Level topping up
The mantenance frequency for solar batteries is very low, it is inferior to
the maintenance required by the charge controller
But at each visit to the site it will be good to top up the batteries
Switch charging profile including morning gas charge
1 year
Switch profile with set points at 2,23Vand 2,27V, with use of Fulmix
device
Frequency 2 to 5 years
7
OPzS Solar maintenance CEAC
8
OPzS Solar maintenance CEAC
9
OPzS Solar maintenance CEAC
Destratification charge :
At least weekly when no Fulmix or morning gassing
Levels :
Leave voltage up to 2,60V or maintain over 2,45V during 3 to 5 hours
10
OPzS Solar maintenance CEAC
Cure charging
If the battery is deeply discharged > 35% DOD, a cure charging must
be conducted
In case the battery remains discharged for a long period, a cure charge
is required.
11
OPzS Solar maintenance CEAC
12
OPzS Solar Discharge curves CEAC
Élément SOLAR
2.10
Régimes de décharge
0.004 C100
0.008 C100
2.05
0.01 C100
0.014 C100
0.019 C100
2.00
0.035 C100
0.0075 C100
1.95
1.90
1.85
1.80
1 10 100 1000