Académique Documents
Professionnel Documents
Culture Documents
The 1966 Forth Road Bridge cost 20 million Inflated to the year 2016 the bridge should cost under 400 million So why was it price at over 4,200 million? d Not the longest Not the widest deck Not the longest span Not the highest Not the most towers Not the longest viaducts Not environmentally difficult
Issue 5a 12/10/2009 omnie@tiscali.co.uk
Around 25th from the top Others have 6 and 8 lanes Around 7th from the top Millau bridge is 4 times higher , the Millau has 7 Only 3 Many are MILES long No earthquakes/ tornados
1
First a wee bit history 4th April 2000 Holyrood Building Debate A presentation was arranged prior to the debate
SECTION 1
FO R T H R E P LA C E M E N T C R O S S I G N T h e M U LT I O D A L o p ti n co st M o 4 . 2 2 B ilo n li
Stays
Towers
MULTIMODAL
The average cost is under 200K per metre The FRC was 1 million pounds per metre
3.5.3 What They Typically Cost The typical cost of a cable stayed bridge ranges from $4,500 to $5,000 per Square metre
11
The Pearl Bridge Japan Opened in 1998 for $4,300 Why is it so expensive The worlds longest suspension bridge -3,910 m
Earthquakes (8.5 Richter scale) TMD pendulums Tornadoes (180mph) hinged-girder system Fierce sea currents
12
SECTION 2
13
Forth Bridge
14
Artificial Island
7,850 metres
4050 metres
15
16.4 Km
16
An artificial island constructed to join the tunnel and the bridge The Island is some 4 Km long The FRC is 2.7Km long
17
An4 km tunnel forhad to be A artificial island shipping constructed access the water to across join the tunnel and the bridge The Tunnel has road and rail The Island is some 4 Km long It is submerged into the dredged The FRC is bed. long sea 2.7Km
18
The Bridge Road & Rail (multimodal) The worlds longest - 5 MILES
19
The Oresund Crossing cost 4.1 Billion * The Forth Crossing cost was priced at 4.2 Billion The Oresund Project took 5 years; and the FRC???
5 years
20
SCOTTISH GOVERNMENT.
Expressed astonishment
SECTION 3
The multimodal option was dropped in Dec 2008
TH E SEV ER N B R I G E D
22
to 2.34 billion
23
C O M PA R I G T H E FR C W I H T H E S E V E R N N T BRI G E D
24
Second Severn Crossing The 1964 bridge cost 10 Million The 1996 bridge cost 480 Million
The 2016
Second Severn Crossing Did the Welsh get value for money at 810 million The average cost per metre is 200k, this is 150k 4.5k
26
The Original Forth Bridge was built in 1966 costing 20M At current costs - 300M The FORTH REPLACEMENT CROSSING FRC is 8% longer equates to 324M So where do they arrive at 2,3400M???
The 1966 bridge cost 20 Million A pro-rate 2016 bridge should cost under 500 Million
Are the Scots getting value for money at 2320 million? The average cost per metre is 200k, this is The average cost per sq metre is 4.5k, this is 850k 32k
28
hit has land Scot port back IS IS rans .T ALYS L and R AN ICIA THEI PERF DING U Second S Severn Crossing FORTH REPLACEMENT CROSSING SLEA MI
29
30
Q E II Forth
10%
longer
and only 6 %
Highest Bridge in the world over 270 metres high 7 remarkable tower Broke many world records in technology
32
Vasco de Gama
Forth
18 months in construction. 6 lanes & 10 miles long . ALL FOR 40% OF THE COST
33
STONECUTTERS FRC cotland... Dual 3-lanecosts are ALL INCLUSIVE Carries Stonecutters highway Dual 3-lane highway Profit with other similar mpared favourably Designer ARUP ARUP Contingencies Financing Design Cable-stayed bridge Cable-Stayed Bridge Risk Taxes Total length 1,600 m 2,700 m
stru
Forth Height
Stonecutters crossing
245 million
34
35
36
CONCLUSION
....more expensive than a bridge...
598M
from
ving forward
Jan 2005
to
Dec 2007
TENFOLD
Finance and Sustainable Growth Secretary John Swinney Scottish Parliament Wednesday, December 19, 2007
Eurotunnel
38
8 Km
6.6 ! ! ! ! ! Billion IS H
IO T
CHANNEL TUNNEL
OT
NE O
AR P
IA L
EN M
AR T
AN I
ES U
10.2 Billion
ED N
50 Km
39
40
No Date Source
1 2 3 4 5 Jun 04 FETA Jan 05 Faber and Maunsell
Cost
500 m 500 m
Feb 07 Scottish Government 1,000+ m Dec 07 Scottish Government 2,790 to 3,630 m Jan 08 Scottish Government 3,250 to 4.220 m
WHY??
41