What is VSM?...motivation Team members Objective setting Stages in VSM @ CEAT Bhandup Current VSM P-P and P-Q Analysis CT to T-T Alignment Future VSM Projects identified Expected Benefits
What is VSM
It is a tool that helps in understanding flow of material and information as a product makes its way To Visualize complete stream in a snapshot Identify resource constraints Helps in removing bottlenecks
Removes redundancy/obsolescence
Imparts robustness to meet customer deliveries on time
What is VSM
Quantifies Lead time
Team Members
A Team comprising: Mr. Ram mohan Mr. R.K Das Mr. Nilesh Karekar Mr. Ramakant Verma Mr. Vijay Panzade Mr. Ankur Singh had been entrusted upon the task of value stream mapping Ceat Bhandup Plant and come up with an improvement plan
Objective Setting
Underlying Plant level Objective identified for VSM is:
Current StateVSM
A final current state or as is map has been arrived at after refining it a number of times. Accounted various department level metrics such as: Actual cycle Time (C/T) Change over time (C/O) Breakdown (B/D) Accidents/man-days lost Scrap Space Efficiencies Manpower deployment Material handling equipments
Redundant SKUs have also been identified for disposal after logistics consent using last 3 years data.
59J curing 5 and PCI (5) 59J Band 1 building (1) Others (3) 1
Expected Benefits
Achieving 100% clip for 59J stream
Production Capability
120000
Number of tyres/month
100000 80000 60000 40000 20000 0 Current capability Proposed capability Current capability, 79505
Expected Benefits
Curing - Cycle Time reduction by 35% for 59J LUG family and 25% for RIB family.
Cycle Time Reduction - curing (59J LUG) sub family
Cycle Times 60 Current CT-TT, 1.29 Reduced CT-TT, 0.85 Current C/T, 56 0.6
20
Cycle Times
CT/TT 1.2
50
Cycle Times in secs.
40
0.8
0.8
30
30
20
Reduced C/T, 37
0.4 0.2 0
10
10
Expected Benefits
Cycle Time reduction by 26% in Tire Building M/C.
Cycle Time Reduction in Tyre Building
600
CYCLE TIMES CT/TT
1.4 CT/TT, 1.15 1.2 1 CT/TT, 0.85 0.8 0.6 Current C/T, 480 Reduced C/T, 354 0.4 0.2 0 Current C/T Reduced C/T
Expected Benefits
Manpower rationalization After automation in 59J (Dusting) manpower can be trimmed down by 60%
Man Power Reduction
35 30
Man Power/Day
25 20 15 10 5 0 Current Manpower Manpower post Automation Manpower post Automation, 12 Current Manpower , 30
Expected Benefits
Improved safety in operations due to automated band inserter
Man Power Reduction
250 200
Man Power/Day
150 100 50 0
Expected Benefits
Power Consumption reduction by 3.18% Fuel Consumption reduction by 16.2%
Power Consumption
Fuel Consumption
3.695 3.690
Power Rs/Kg
3.685 4.000 3.800 3.600 3.400 3.200 3.680 3.675 3.670 3.665 3.660 Power Rs/Kg Power Rs/Kg, 3.670 Power Rs/Kg
Fuel Rs/Kg
Fuel Rs/Kg
Expected Benefits
Tire Scrap reduction by 31.3% Fabric Scrap reduction by 6.9%
Tyre Scrap
0.250 0.200
% Value YTD
% Value YTD
FabricScrap
0.190 0.185 0.180 0.175 0.170 0.165 Proposed Scrap %, 0.175 Current Scrap %, 0.188
Current Scrap %
Proposed Scrap %
Current Scrap %
Proposed Scrap %
Thank You!!!