Problem Statement
Low Productivity on the Extrusion Press 350T
Business Case
Company is having Two Extrusion Presses of 350T & 250 T. The Capital Cost of the machine is very high. There is strong demand for the extruded axle shafts. If we can increase the productivity by 10% we can create additional capacity of 20,000 axle shafts pa.
Goal Statement
To bring down the the Set Up time from current average 176 mins to 90 mins. To eliminate the Straightening Process after Cold Extrusion.
Mileston es
Month Sl. Activities No . 1 Identifying the Work Related Problem 2 Selection of Problem 3 Define Problem 4 Analysis of Problem 5 Identification of Causes 6 Finding out the Root Causes 7 Data Analysis 8 Developing Solution 9 Foreseeing possible resistance 10 Trial implementation & CHECK DO PLAN Apr - May Jun Jul 11 Aug-11 11 W W W W W W W W W W W W 1-2 3-4 1-2 3-4 1-2 3-4 1-2 3-4 1-2 3-4 1-2 3-4
Process Mapping
Problem Focus
MEASUREMENT
MACHINE
TOOLING
Set Up Symptoms
Set Up Process-As Is
BEFORE
Actions Implemented
AFTER
1. Fixed Plate installed instead of movable to control the distortions. 2. This plate accommodate all models. 3. This reduced the Set Up time. 1. The thickness of the OCD ring increased 1. The thickness of the Die Clamping Plate reduced
Straightening
Run Out on Extruded Axle Shafts found varying from 4~5 mm against the required 1~1.5mm
High Run Out is on account axle shaft being dragged by ram non-uniformly after cold extrusion.
Average Production per month 20,757 Cost of Straightening Rs 2.00 Total Monthly Cost Rs 41,514.4 0
Yearly Saving
Rs Lacs
Distortion Analysis
Distortion on pieces on account of pieces getting dragged by Top and Bottom movable Plates. This demands for the Straightening operation after Cold Extrusion Fixed Plate placed that does not allow any transverse movement of axle shaft during the backward movement of RAM.
BEFORE
AFTER
Before
After
19
S.N Set Up Activities Time in o. Mins 1 UNSCREWING OF MOVABLE PLATES (2 IN 10.00 NO.) 2 UNSCREWING OF RESTING BLOCKS(4 IN 36.00 NO.) 3 UNSCREWING OF OCD RINGS 10.00 4 UNCREWING OF DIE CLAMPING PLATES 12.00 5 UNLOADING OF SPACERS/DIES 20.00 6 LOADING OF NEW DIES/SPACERS 20.00 7 SCREWING OF DIE CLAMPING PLATES 10.00 8 SCREWING OF OCD RINGS 10.00 9 SCREWING OF RESTING BLOCKS(4 IN NO.) 40.00 10 SCREWING OF MOVABLE PLATES (2 IN NO.) 10.00 176
10.00 15.00 -
90
Gains
1 2 3 4 5 6 7
SET UP TIME REDUCED FROM AVG 176 mins TO 90 mins REDUCING SET UP TIME ON AN AVERAGE CREATED CAPACITY OF ADDITIONAL 20,000 AXLE SHAFTS PER YEAR. ELIMINATION OF THE STRAIGHTENING PROCESS THAT LEADS TO ANNUAL SAVING OF AROUND Rs. 5 LACS PER ANNUM LEAD TIME FOR THE TOTAL PROCESS REDUCED COST OF THE SET UP REDUCED ON ACCOUNT OF LESS CONSUMTION OF TOOLINGS SIMLIFICATION OF THE SET UP PROCESS LEADS TO HIGH MORALE OF OPERATORS. THE RESULTS CAN BE IMPLEMENTED ON 250 T PRESS ALSOHORIZONTAL DEPLOYMENT
Cost of Project
S. No.
Equipment Material cost of new Plates Fabrication of Plates Cost of Ring Plates-new
1 2 3
Total
14,050.00
NEW PLATE
RING PLATE
Month
Run Time
Down Time
Hrs
Numbers
Hrs 81
Hrs
Hrs
Jan-11 600 Feb-11 600 Mar-11 600 Apr-11 600 May-11 600
10 2 7 26 6
45 31 39 39 36
Month
Run Time
Down Time
Hrs
Numbers
Hrs
Hrs
Hrs
No's
JUL-11
600
524 32,55 8
42
25
26
97
62