Introduction Drilling and blasting Explosives Crusher plant Cost analysis
Click to edit Master subtitle style
5/1/12
field
in
the
5/1/12
Aim
General quarrying procedure For the one year we are going to operate the plant 312 days and the quarry 300 days. operate the plant 26 days
Click to edit Master subtitle style
5/1/12
Rock dimensions
5/1/12
Dimensions of rock are very useful details to estimate the lifetime, monthly production, no of blasts per subtitle style Click to edit Master day and etc. below mentioned four dimensions of
5/1/12
Quarry is advanced using horizontal bench method using four separated benches and two working lines.
Click to edit Master subtitle style
5/1/12
Opportunities created
50
job
opportunities
are
5/1/12
Organizational structure
5/1/12
Work force
Transportation system
1 Front of end loaders to for dump
5/1/12
loading trucks
rocks
5/1/12
machinery
create wastes as can office operations. subtitle style Click to edit Master Each of the guide sheets has
Purchase the largest practical container (containers usually end up as waste), but do not Purchase more than is needed. Purchase the least toxic or hazardous product available. Check the material safety data Sheets for products you purchase. If the
Click to edit Master subtitle style product is toxic or hazardous,
5/1/12
ask your
supplier for alternatives. See if the supplier can take back excess
5/1/12
Inspect storage areas regularly for leaks. Make sure all items are clearly labeled. Store products in original containers. Store wastes separately and be sure they are properly labeled to make it easier to reuse or recycle them. Store items that could leak in a place
Click to edit Master be contained where leaks will subtitle style
and easily
5/1/12
piles and quarry have been well defined to minimize the freight traffic in the
crusher plant site and parking points.
Crusher plant is 150m away from the administration segment. style Click to edit Master subtitle
Production and the Life time of the quarry Production is depending on the demand of the outside (buyers) and the production rate of the
Click to edit machinesMaster subtitle style screens, (crushers,
5/1/12
loader).
5/1/12
= 850000
Life to timeMaster subtitle style of the quarry Click edit 850000/6172.84 = 137.7 months
Drilling
Staggered pattern
5/1/12
5/1/12
Parameters Diameter of blast hole = 40 mm (D) Depth of hole = 3 m (L) Drill angle = 800 (horizontal
Click to edit Master subtitle style
angle)
Spacing = 1.6m
5/1/12
Total Cost
Rs 180,000 Rs.150,000.00 Rs.63, 000.00 Rs.3800.00
Hoses Rs 50,000.00 Click to edit Master subtitle style Additional Parts Rs. 11,900.00
5/1/12
Other cost
Mode of cost Diesel Monthly Total cost 2,250.00
Oil for compressor 12,600.00 Oil for jack hammers Labor 6,050.00 240,000.00
5/1/12
Explosive
Explosive cost
Monthly usage Monthly cost(Rs.)
Dynamite 130Kg
5/1/12
NH4NO3
1700Kg
Fuel
136l
Electric detonators
1200
Cost analysis
Assets Fixed Assets Land Buildings Vehicles Furniture Tools Plant Machinery Installation cost Other cost Rs. 125,000,000.00 Rs. 6,100,000.00
5/1/12
Rs. 114,200,000.00 Rs. 2,620,000.00 Rs. Rs. Rs. 8,000,000.00 3,500,400.00 6,500,000.00
Rs. 268,688,982.00
5/1/12
Currentassets
Inventories Rs. 10,000,000.00 Rs.
25,
Rs.152,650,800.00
Unit Operation Drilling cost Blasting cost Loading cost Hauling cost Crushing cost Testing
5/1/12
Total
46,870,976.00
Cost of Sales
=(46,870,976.00 +
Forecasted income statement for 2011 Revenue Cost of sales Gross profit Discounts Royalty 1% 152,650,800.00 (41,370,976.00) 111,279,824.00 500,000.00 (1,526,508.00) (7,463,600.00) (8,717,600.00)
5/1/12
4,000,000.00) 90,072,116.00