Vous êtes sur la page 1sur 51

Indias Leading Integrated Infrastructure Services Company

www.feedbackventures.com

L&T Infrastructure Finance Co. Ltd. Presentation on Opportunities

August 23, 2007

Scope of Work
S No 1 2 3 4 5 6 Terms of Reference Sector Overview Target Markets Technology Choice Learning from Recent Bid Strategies Opportunity Mapping of Target Projects Detailed Report Timeline May 30 August 25 June 19 June 25 August 25 September 30

01/05/2012

Energy Division

Structure
Hydro Generation Opportunities Coal based Generation Opportunities
Case II Bidding Opportunities Domestic Coal Imported Coal

Gas based Generation Opportunities Summary and Way forward

01/05/2012

Energy Division

Hydro Generation Opportunities

Hydro Opportunity at a Glance


14 GW

Conventional hydroelectric potential (i.e. reservoir or run-ofthe-river)


50 GW

20 GW 20 GW

Indus Basin 34 GW Ganga Basin 21 GW Central River System 4 GW South India (West Flow) 9 GW East-flowing Rivers of Southern India 15 GW Brahmaputra Basin 66 GW

In addition Potential of 148 GW


94 GW pumped-storage type 7 GW small, mini & micro type

Pre-feasibility report for 162 nos. conventional hydropower schemes aggregating to 50 GW mainly in Northern and North-Eastern states
01/05/2012

Energy Division

Opportunities in Various States


MoP along with CEA and State Govts initiated Pre-Feasibility Studies for 162 Projects (50,560 MW)
Detailed Survey & Investigation
State Andhra Pradesh Arunachal Pradesh Chattisgarh Himachal Pradesh Jammu & Kashmir Karnataka Kerala Maharashtra Manipur Meghalaya Madhya Pradesh Nagaland Projects 3 42 4 12 13 5 2 9 3 9 1 3 Capacity 705 25690 580 3750 2981 830 205 1780 407 1490 60 970

DPR Formulation
Develop an order of attractiveness/viability Projects to be implemented over 11th and 12th Plans

In addition, respective states are also encouraging additional projects

Orissa
Sikkim Uttaranchal Mizoram Total

4
10 39 3 162

1188
1680 6374 1870 50560

01/05/2012

Energy Division

Basic Economics
Given the nature of the project sites, its a given that:
Host state may not contract for the power Market needs to be on merchant basis; Understanding of trading market important Transmission charge & future pricing would play key role on economics Regulatory aspects tend to become important elements of project structuring

Project economics need to be based on above realities

01/05/2012

Energy Division

Specific Opportunities

Himachal Pradesh
Was one of the first states to initiate development Projects awarded under
MoU Route: 5 -100 MW
Specified Upfront Premium: 1L/MW for 5-50 MW; 2L/MW for 50-100 MW

Bid Route: > 100 MW


Upfront Premium to be bid in addition to free power Premium seen in the range of 15-90 L/MW

Most projects now on BOT basis

Limited assistance provided by the state


No Single window clearance Land Acquisition local opposition Transmission being encouraged by developers themselves

01/05/2012

10

Energy Division

Opportunities - HP
Chenab River Spiti River Rohtang Pass

Potential of 20 GW
6,150 MW Operational
IPPs: 386 MW Baspa 300 MW; Malana 86 MW

*
Bulk of remaining opportunities in the districts of Lahaul & Spiti, Kinnaur and Chamba

6,533 MW Under development


IPPs: 1811 MW (30 Projects)

7,253 MW yet to be allotted


60-715 MW Under bidding for some time Most projects are at a much higher altitude (above 4,500 mtrs), along the Chenab and Spiti rivers in districts of Lahaul & Spiti, Chamba and Kinnaur PLFs are relatively poor (~30%)

Abandoned:450 MW
Secondary opportunities the only option in the state
Energy Division

01/05/2012

11

Projects in HP
Project Name Lambadug (25 MW) Bharmour (50 MW) Bajoli Holi (180 MW) Dhaula Sidh (40 MW) Harsar (60 MW) Jhangi Thopan (480 MW) Thopan Powari (480 MW) Bara Bangahal (180 MW) Developer Himachal Consortium Power Ltd. Soffimat France GMR Infrastructure Ltd, Hyderabad GVK Industries Ltd, Secunderabad Soffimat France Brakel Kinnaur Power Pvt. Ltd Brakel Kinnaur Power Pvt. Ltd Malana Power (LNJ Bhilwara Group) Status Implementation agreement (IA) to be signed in line with New Hydro Power Policy Implementation agreement (IA) to be signed in line with New Hydro Power Policy Upfront premium paid: Rs. 90 lakh/MW. Under construction Implementation agreement (IA) to be signed in line with New Hydro Power Policy HP Govt has allowed Brakel to combine two mega ventures viz. Thopan Powari and Jhangi Thopan into a two-stage project Selected in ICB; Letter of award after HP cabinet approval in Aug/Sep 07

01/05/2012

12

Energy Division

Projects in HP..Contd
Project Name Kutehr (260 MW) Karcham Wangtoo (1000 MW) Tidong-I (100 MW) Allain Duhangan (192 MW) Budhil (70 MW) Chango Yangthang (140MW) Chhatru (108 MW) Developer D. S. Constructions, New Delhi Jaypee Karcham Hydro Corp. Ltd., New Delhi Nuziveedu Seeds, Hyderabad AD Hydro Power Ltd, NOIDA (LNJ Bhilwara Group) LANCO Green Power Pvt. Ltd., Hyderabad Malana Power (LNJ Bhilwara Group) DCM Infrastructure, Delhi Status Awarded in Jan 2007; preparation of DPR in progress DPR approved by HP Govt; TEC clearance received from CEA; project is under construction MOU signed with HPSEB; DPR is in process DPR ready and approved; Clearance from MOEF Recd; project stuck for last two years due to local opposition PPA signed with PTC; Project under construction Selected in ICB and on verge of allotment; letter of award after HP cabinet approval in Aug/Sep 07 Selected in ICB and on verge of allotment; letter of award after HP cabinet approval in Aug/Sep 07

01/05/2012

13

Energy Division

Uttarakhand
Was also one of the first states to initiate development Projects awarded only under Bidding
However, upfront premiums lower than HP

Relatively better support provided by the state


Transmission partly being undertaken by State entity

01/05/2012

14

Energy Division

Opportunities - Uttarakhand
Potential of 20 GW
Region with bulk of hydro potential is located

2,808 3,581 8,052 5,733

MW MW MW MW

operational under construction under development yet to be allotted

Largely accounted by just two projects on the Indo-Nepal border whose development would necessarily be under Central sector

Uttaranchal hydro story practically over;


Virtually all of the promising big projects (> 100 MW) and most of the promising mediums-sized projects (25 100 MW) stand allotted

Secondary opportunities possible


~700 MW worth of projects awarded to non-credible entities by Uttar Pradesh Govt in 1990s (prior to formation of Uttaranchal state)

01/05/2012

Secondary opportunities the only option in the state


Energy Division

15

Projects in Uttarakhand
Project Name Urthing Sobla (280 MW) Developer Reliance Energy Status The project was questioned for seeking environmental clearance before starting a preliminary survey but state govt has supported developer; EIA Studies completed The Project Development Agreement signed with the Govt. of Uttarakhand DPR under preparation; Project Development Agreement (PDA) to be signed soon
Uttarakhand Govt will invite bids within next 6-12 months Uttarakhand Govt will invite bids within next 6-12 months

Alaknanda (Badrinath) (140 MW) GMR Energy Mori-Hanol (63 MW) Tayal Energy (KSL and Industries Ltd.), Chandigarh
To be decided To be decided

Bagoli (72 MW) Ramganga Dam (66 MW)

01/05/2012

16

Energy Division

Arunachal Pradesh
Potential of 50 GW
East Siang, West Siang, Upper Subansari, Lower Subansari Dists is where bulk of hydro potential is located

416 MW operational 2,600 MW under development 9,719 MW allocated to IPPs (14 projects) 15,000 MW with central PSUs 22, 593 MW Yet to be allotted

The most promising state in terms of untapped potential PFRs available for 42 schemes with aggregate capacity of 27,293 MW Tremendous scope for tapping primary opportunities MoUs still an option

01/05/2012

Number of Opportunities available


Energy Division

17

Projects in Arunachal
Project Name Tato-II HEP (700 MW) Siyom HEP (1000 MW) Hirong HEP (500 MW) Naying HEP (1000 MW) Developer Reliance Energy, Mumbai Reliance Energy, Mumbai Jaiprakash Associates, Delhi DS Construction, Delhi Status Signed MoU with Arunachal Pradesh Govt. Signed agreement with Arunachal Pradesh Govt. Signed agreement with GoArPr GoArPr may hold 11 per cent equity DPR under preparation Scheduled completion in eight years with a concession period of 40 years. Developer with GoArPr will incorporate an SPV GoArPr to hold 11 per cent. Developer with GoArPr will incorporate an SPV GoArPr to hold 11 per cent. MoU signed with GoArPr to set up the project on BOOT basis; DPR Prepared Received Stage I environmental clearance MoU signed with GoArPr to set up the project on BOOT basis;

Siang Lower HEP (1600 MW) Talong (300 MW)

Jaiprakash Associates, Delhi GMR Energy, Hyderabad

Kameng Dam (600 MW)

KSK Electricity Financing

01/05/2012

18

Energy Division

Projects in ArunachalContd
Project Name Nyamjung chhu Stage I (98 MW) Nyamjung chhu Stage II (97 MW) Nyamjung chhu Stage III (95 MW) Kameng-II (600 MW) Kalai-I (1450 MW) Hutong-II (1250 MW) Developer Bhilwara Energy, NOIDA Bhilwara Energy, NOIDA Bhilwara Energy, NOIDA Status MoU Signed with GoArPr MoU Signed with GoArPr MoU Signed with GoArPr

Mountain Falls India Pvt Ltd Mountain Falls India Pvt Ltd Mountain Falls India Pvt Ltd

Project to be developed as RoR instead of Storage Type Project to be developed as RoR instead of Storage Type Project to be developed as RoR instead of Storage Type

01/05/2012

19

Energy Division

Sikkim
North Dist., where bulk of hydro potential is located

Potential of 8 GW
3,910 MW under development 4,090 MW yet to be allotted

Some primary opportunities also available through the MoU route Several secondary opportunities possible due to lack of credibility of original allottees Hydel power a major revenue source for state govt Local opposition to hydro projects increasing in recent times

01/05/2012

Primary Opportunities still a possibility


Energy Division

20

Projects in Sikkim
Project Name Sada Mangder (71 MW) Developer Gati Infrastructures Ltd., Hyderabad Status Entered into an agreement with Sikkim Power Development Corporation Limited for development on BOOT basis; DPR Ready Entered into an agreement with SPDCL for development on BOOT basis; DPR Ready Entered into an agreement with SPDCL for development on BOOT basis; DPR Ready Under investigation DPR Ready DPR Ready Under investigation Under investigation Under investigation Under investigation Under investigation

Chujachen (99 MW) Bhasmey (51 MW) Teesta I (320 MW) Teesta II (330 MW) Teesta III (1200 MW) Teesta VI (360 MW) Rangit II (60 MW) Rangit IV (60 MW) Dikchu (90 MW) Panan (105 MW)
01/05/2012

Gati Infrastructures Ltd., Hyderabad Gati Infrastructures Ltd., Hyderabad SMEC Pvt. Ltd., New Delhi Him Urja Pvt. Ltd., Delhi Teesta Urja Limited, Delhi Lanco Energy Pvt. Ltd., Hyderabad Gammon India Ltd., Mumbai Jal Power Corporation Ltd., Hyderabad Sneha Kinetic Power Projects Ltd., Hyderabad Nagarjuna Holdings Pvt. Ltd., Hyderabad

21

Energy Division

Projects in Sikkim..Contd
Project Name Rangyong (200 MW) Rongnichu Storage (141 MW) Jorethang Loop HEP (95 MW) Talem (60 MW) Developer BSCPL - SCL Joint Venture, Hyderabad Chhattisgarh Electricity Company Ltd., Raipur DANS IT System Pvt. Ltd., Delhi SMEC Pvt. Ltd., Delhi Status Under investigation Under investigation Group Company of RKM Powergen Under investigation Under investigation

01/05/2012

22

Energy Division

Bhutan
Hydro power potential: 30 GW
Safe and exploitable: 16 GW
Sarbhang and Mangde Dists. is where bulk of hydro potential is located

700 MW in operation; Ongoing Tala project (170 MW X 6 = 1,020 MW)


Example of successful cooperation between govt agencies of both countries

MoU for Punatsangchhu project (145 MW x 6 = 870 MW) signed b/w GoI and GoBhutan on Sep 2003 Under Development
Mangde Chu hydro project (360 MW): Feasibility study completed; Sunkosh Multipurpose Project (4,060 MW): DPR completed by Central Water Commission of India (CWCI); project to comprise two damsone for power generation, other to feed irrigation canal

Hydro power export to India accounts for > 45% of Bhutan govts revenues

01/05/2012

Primary Opportunities still a possibility


Energy Division

23

Success Story - Malana


Has promoted three hydropower projects
15 MW Tawa Project in MP; 86 MW Malana Project in HP 192 MW Allain-Duhangan in HP under development
Opposition from locals and NGOs for last 2 years

86 MW Malana Project

Project commissioned in 30 months 2 years ahead of committed schedule and 6 months ahead of internal, aggressive schedule

R&R

Not a single project-affected family displaced! Massive afforestation drive around the project site Annual PLF of 49.1%

Just bagged
180 MW Bara-Bangahal 140 MW Chango-Yangthan (Spiti river) projects

Hydrological risk insurance cover of Rs 10 crore towards loss of profit


Capex incurred on project: Rs 350 crore Contracted to sell power at Rs 2.45/unit to Delhi & Rajasthan IRR in excess of 30% even at such low tariffs

LNJ Bhilwara group on track to have 600 MW hydropower assets by 2012 Bhilwara Energy, holding company for SPV, today boasts of an enterprise value of Rs 1,230 crore;

01/05/2012

24

Energy Division

Key Developers in Hydro Segment


Indian Developers
LNJ Bhilwara Group
Malana Power Bhilwara Energy

KSK Energy GMR Energy Gati Infrastructure Jai Prakash Associates DS Constructions

International Developers
Brakel Corporation, Netherlands SMEC, Australia Soffimat, France
01/05/2012

25

Energy Division

Coal Based Generation Opportunities

Case II Bidding Opportunities


Ongoing bid processes in a number of target markets Domestic Coal
Uttar Pradesh: 4000 MW (3 projects) Karnataka: 3000 MW (3 projects) Punjab: 3000 MW (2 projects) Maharashtra: One project being planned
Expected to be linked to captive coalmine

Fuel to be arranged by the Procurer

Opportunities are attractive provided Procurer is able to arrange coal


UP & Punjab have been promised a coal allocation; no formal approval as yet

Imported Coal
Maharastra: 1600 MW (1 project) UMPPs: AP, Maharashtra & Karnataka
01/05/2012

Case I Opportunities available in Gujarat, Karnataka and Maharashtra


Energy Division

27

Coal Reserves & Case II Projects


Case II Projects need to viewed with market assessment
Billion Tonnes Coal Reserves Lignite Reserves Proven 95.87 4.18 Indicated 119.77 20.26 Inferred 37.67 13.84 Total 253.30 38.27

Suitable location for untied projects


Lignite Reserves Coal Reserves Case II Sites Blocks for Case II UMPP Sites

Coal Resources in Billion Tonnes Proved Indicated Inferred Total Share 6.77% Andhra Pradesh 8.40 6.16 2.58 17.15 0.04% Arunachal Pradesh 0.03 0.04 0.02 0.09 0.15% Assam 0.32 0.03 0.03 0.38 0.06% Bihar 0.16 0.16 Chhattisgarh 9.57 27.43 4.44 41.44 16.36% Jharkhand 36.15 31.41 6.34 73.90 29.17% 7.80% Madhya Pradesh 7.57 9.26 2.94 19.76 3.58% Maharashtra 4.65 2.43 1.99 9.08 0.18% Meghalaya 0.12 0.04 0.30 0.46 0.01% Nagaland 0.00 0.00 0.02 0.02 Orissa 16.91 30.79 14.30 62.00 24.48% 0.42% Uttar Pradesh 0.77 0.30 1.06 10.98% West Bengal 11.38 11.88 4.55 27.82 Total 95.87 119.77 37.67 253.30

State

Lignite 01/05/2012
28

is not suitable for transportation and is typically utilised at the pit head
Energy Division

Specific Opportunities
Shortlisting Criteria
Financial and Technical Capability of the Developer Status of Input Arrangement Size of the Project Current Status of Implementation Environment Management Capability

01/05/2012

29

Energy Division

Target Domestic Coal Projects


1 2 3
3
1 4 1 44 A B 36 5 7 CE 7

Abhijeet Group Baidyanath Power KSK Energy Lanco Group Malaxmi Group Aryan Coal KVK Energy EMCO Energy Adhunik Thermal Energy DB Power Bhushan Energy JLD Yavatmal Energy Monnet Ispat & Energy

4 5 6 7 8 A B C D
Lignite Reserves Coal Reserves

8 13 D 2

01/05/2012

30

Energy Division

Imported Coal
Projects in Gujarat Visa Power CLP India Adani Power Sanghi Industries Videocon JSW Power DD-DNH Bid Route Pipavav, Amreli Rampar, Kutch Dahej, Bharuch Abdasa, Kutch Ningada, Amreli Junagadh Navsari 1000 MW 1400 MW 2000 MW 1200 MW 600 MW 1000 MW 1000 MW

Major activity in Gujarat, Maharashtra, Karnataka, Tamil Nadu and AP


Initiate Action
Wait & Watch Ignore as of now

Projects in Maharashtra Patni Projects Tata Power Reliance Energy Raigad Raigad Raigad 270 MW 1600 MW 1200 MW Project in Andhra Pradesh Hinduja National Power UMPP Projects in Karnataka Nagarjuna UMPP Mangalore Tadri 1015 MW 4000 MW Project in Tamil Nadu Cuddalore Power (IL&FS)
01/05/2012

JSW Energy
UMPP

Ratnagiri
Dighe

1200 MW
4000 MW

Vishakhapatnam Krishnapatnam Krishnapatnam

1040 MW 4000 MW 270 MW

Simhapuri Energy

Cuddalore Tuticorin

4000 MW 1200 MW

Unnicornn Power

31

Energy Division

Gas Based Generation Opportunities

Current Scenario
Limited number of gas plants being developed Activity expected near to landfall points and along with proposed gas pipelines Key Developers may include
GSPC Group of Companies Reliance Industries Andhra Pradesh based Gas Plant Developers Other E&P Companies
01/05/2012

33

Energy Division

Summary and Way Forward

Key Success Factors


Factor
Expertise/Skills

Level of Importance
Medium

Remarks
In-house expertise exists for EPC, Mining

Market
Fuel

High
High

Need for 20 GW capacity in the coming 10 years


MOST Critical for thermal plants

Competition/Entry barriers
Environment Management

Medium
High

Aggressive competition
Dependent on fuel

01/05/2012

35

Energy Division

Way Forward
Clarity on Target
Establish Size and Region preferences Comfort with joint development? Target of primary or secondary or both?

Build a Pipeline of projects Primary and Secondary


Outline a broad mechanism for Project Identification Identifying local coordinators
With reach across the states Capable of concluding deals in the past typically success based

Target interesting opportunities


Identify projects and conducting initial feasibility before approaching stakeholders Govt/Developer Initiate talks with Stakeholders to conduct Due Diligence Finalise Investment/Development Decision

01/05/2012

36

Energy Division

Indias Leading Integrated Infrastructure Services Company

www.feedbackventures.com

Abhijeet Group
Group Companies
Jayaswal Neco Corporate Ispat Alloys Abhijeet Infrastructure Jas Toll Road Company

Projects under development


150 MW Coal Fired MIHAN CPP 540 MW Coal Fired Chitarpur Project
Linked to Captive Mine

1200 MW Coal Fired in Bhagalpur, Bihar


Likely to get a shared block for Power Generation in Jharkhand (share: 135 MT)

Engaged in:
Ferro Alloys and Steel Scrap Core Infrastructure like Roads, Bridges, Mines etc.

1215 MW Coal Fired JLD Mega Project


JV with Lokmat (Darda) Group

Coal blocks already allocated


Three in Jharkhand One in Chattisgarh All for Iron & Steel End Use

01/05/2012

38

Energy Division

Baidyanath Energy
1000 MW plant being proposed Part of the Baidyanath Ayurvedic Group Based on a set of mines in WCL area Looking to develop coal based plant aggregate other allottees

01/05/2012

39

Energy Division

KSK Energy
Unique Model for Power Development
Group Captives for Industrial Consumers

Operational Projects
Captives
43 MW Coal Fired Arasmeta Captive Power (Lafarge) 26 MW Gas Fired Coromandel Electric (Captive to India Cements)

JV with Lehmann Brothers for investments in power sector Forayed into backward integration to assure fuel supply for projects

Group Captives
43 MW Coal Fired Sitapuram Power 58 MW Gas Fired SAI Regency Power

IPP
22 MW Liquid Fired in Kerala

Merchant
20 MW Gas Fired RVK Energy (Customers include APTransco, India Cements, Essar and Zuari Chemicals)

Projects under Development


Group Captive
540 MW Wardha Power Company: FSA with GMDC

Captive
135 MW VS Lignite Power Lignite Block

IPP:
01/05/2012

1000 MW Power Plant in Chattisgarh: FSA with GMDC Could increase to 2000 MW
Energy Division

40

Lanco Group
Started with gas based projects in AP Is also developing Hydro projects Aggressive pricing based on innovative strategies Operational Projects
IPP
368 MW Gas Fired Kondapalli Power 120 MW Gas Fired Aban Power Two Biomass Projects totaling to 18 MW Two Wind Projects totaling to 13 MW

Projects under Development


600 MW Coal Fired Lanco Amarkantak
Likely to be allocated a 211 MT block in Chattisgarh for Amarkantak

1000 MW Anpara C project


FC likely in the near future

1015 MW Imported Coal Fired Nagarjuna Power 300 MW Coal Fired Pathadi Project Five Hydro Projects totaling to 650 MW

01/05/2012

41

Energy Division

Malaxmi Group
Promoted by Y Harish Chandra Prasad, Ex-Head, Lancos Power Division
Foray into Power and Infrastructure

Existing Capacity
82 MW Coal Fired CPP in AP
Being expanded to 114 MW

30 MW Coal Fired CPP in Orissa


Being expanded to 94 MW

9 MW Bagasse based Cogen Plant

Project under Implementation


600 MW Coal Fired Nava Bharat Power in Orissa
JV with Nava Bharat Group (Engaged in Iron & Steel and Ferro Alloys) To be expanded to 1200 MW Likely to obtain Coal Block Allocation for around 550 MW in Orissa

250 MW Imported Coal Fired Simhapuri Energy


JV with Madhucon Projects Limited

01/05/2012

42

Energy Division

Aryan Coal Beneficiations


Coal Washeries Operators currently washing coal for
Power stations in Gujarat, Maharashtra, Karnataka and Rajasthan Industrial Consumers like cement plants, steel plants etc

Total washing capacity of around 15 MTPA


Expansion plans to add another 6 MTPA

Project under Implementation


240 MW Washery Rejects based power plant in Chattisgarh Already contracted to supply 200 MW to Gujarat through competitive bidding at a levelised tariff of Rs 2.25 per unit Fuel Arrangement
Coal Washery Rejects from own washery Coal Washery Rejects from other washeries Linkage from Coal India Limited

01/05/2012

43

Energy Division

KVK Energy
Started as a merchant plant operator in AP Installed Capacity of 89 MW
Group Captive
28 MW Gas Fired MMS Steel & Power

Merchant
20 MW Gas Fired RVK Energy (JV with KSK)

IPP
21 MW LSHS Fired Karasgod Power 15 MW KVK Bio-Energy Power 9 MW Paschim Hydro Energy

Projects under implementation


300 MW KVK Nilachal Power in Orissa 63 MW Coal/Coal Rejects Fired SV Power in Chattisgarh 600 MW Coal Fired Lanco Amarkantak (KVK has 10% stake) 15 MW Nagarjuna Hydro Project
01/05/2012

44

Energy Division

EMCO Energy
Subsidiary of EMCO Limited a leading Transmission & Distribution Equipment Company Developing a 520 MW Coal Fired Project in Chandrapur District
Coal Linkage obtained; attempting block allocation Applied for water linkage

01/05/2012

45

Energy Division

Expected Coal Block Allottees


Adhunik Thermal Energy
Adhunik Group engaged in Iron & Steel, Ferro Alloys & Cement Developing 1000 MW project near Jamshedpur Expected to get a 140 MT block in Jharkhand

RKM Powergen
Part of Raipur Steel and Alloys Group Developing a 1050 MW project in Janjgir Dist, Chattisgarh Expected to get a third of 450 MT block in Chattisgarh

DB Power
Part of the Dainik Bhaskar Group Developing a 1000 MW project in Janjgir Dist, Chattisgarh Expected to get a 90 MT block in Chattisgarh

Bhushan Energy
Part of Bhushan Steel Limited Developing a 2000 MW project in Angul, Orissa Expected to get a 50% of a 410 MT coal block in Jharkhand
01/05/2012

46

Energy Division

Expected Coal Block Allottees


JLD Yavatmal Energy
Part of Lokmat (Darda) Group Developing a 1215 MW project in Yavatmal Dist, Maharashtra
In JV with Abhijeet Group MoU with IDFC for equity stake

Fuel Arrangement
Expected to get a fourth of 450 MT block in Chattisgarh Same block as RKM Powergen

Monnet Ispat & Energy


Developing a 1005 MW project in Angul, Orissa Expected to get a third of 360 MT block in Orissa

01/05/2012

47

Energy Division

VISA Power
Part of Visa Group engaged in Iron & Steel, Mineral Mining and Coal & Minerals Import Has signed MoUs with:
Gujarat: 1000 MW Imported Coal based Plant Orissa: 1000 MW Coal Based Plant
Also developing a port in Orissa; Shall provide back up fuel to the plant

Chattisgarh: 1000 MW Coal based Plant


Currently trying for linkage/coal block

Group serious about power venture


Has hired ex-NTPC and ex-PGCIL personnel Looking to use Coal Import experience for the power projects

01/05/2012

48

Energy Division

Sanghi Industries
Group into Cement, Textiles and Allied Industries Setting up a 1200 MW Imported Coal Based Station in Kutch Region in Gujarat Operates a Captive Jetty for the Cement Plant in close vicinity

01/05/2012

49

Energy Division

Videocon Industries
Major consumer durables players
Has diversified into energy sector with Exploration & Production in Oil & Gas Has bagged RAAVA oil & gas field in JV with Command Petroleum Holdings, Australia

Developing a 600 MW Imported Coal based project in Amreli District


Had participated in Gujarat Bid Processes Has submitted land acquisition application

01/05/2012

50

Energy Division

JSW Power
Part of Jindal South West (JSW) Group Operational Project
260 MW Coal/Corex Gas Fired IPP in Karnataka

Developing three power projects


Rajasthan: 1000 MW Lignite Fired Raj West Power
FSA with Barmer Lignite Mining Company, a JV between Raj West Power and RSSML Major part of land acquired PPA signed with state utilities

Maharashtra: 1200 MW Imported Coal Based JSW Ratnagiri Energy Limited


Captive Jetty approved by MMB BTG package awarded to Shanghai Electric, China Participating in Case I Bids Financial Closure achieved

Gujarat: 1000 MW Imported Coal Based Project in Junagadh


Applications for Land, Water, Captive Jetty Made Consultant appointed for Environmental Studies
01/05/2012

51

Energy Division