Académique Documents
Professionnel Documents
Culture Documents
AC Supply System
Presentation outline
Importance of Elect System for Auxiliary Classification of Auxiliaries Choice of Voltage for Aux Aux. Power supply system Emergency AC Supply
Rating (to decide Voltage) Location (to decide the Feeding Point)
Change-over schemes & Alternate Power Supply arrangement to ensure Reliability
Miscellaneous Elements
Generators
List of Boards / Feeding Points arrived at based on Location of Load Centers / Systems Quantity & Rating of Transformers calculated based on Load & Operational Requirements Rating of Board Calculated based on the Operating Load & Transformer Rating
Three
Three
Three
Earthed through Resistance of 6.35 to Limit E/F Current to 300A 20kV 60kV (peak) 40kA (rms) 28kV 75kV (peak) 10kV 40kV (peak)
UAT-B
6.6 KV
SB
ESP TRF-A X X B.C. USS-B USS-A X Air Compr Trf Turb MCC Blr MCC TMCC
Fdr to DMP Serv Clarif Trf Water S/Serv. SWGR 1)SWYD Serv Trf.-B Trf-1 2)Ash Handl T/F 1600KVA
From DG SWGR
Unit Service Transformer Dyn11 C.B. 415 V MCC/PCCM edium Voltage SFU To ACDB To PMCC Magnetic Contactor To PMCC CB To ACDB SFU Magnetic Contactor
Motor Feeder
Motor Feeder
DG-1
DG-3
DG-2
X X X
DG SWGR-1
DG SWGR-2
EMCC
(1) AOP-1 (2) Em. Lighting Trf. (3) TVDC Reserve Supply (4) UPS Ch. (5) Scanner Air Fan (6) BVDC Reserve Supply (7) AC Seal Oil Pump (8) Air Heater Lub Oil Panel (9) Jacking Oil Pump (10) Stator Water Pump-B (11) Barring Gear (12) +26 v DC ATRS Ch. B (13) -26V DC ATRS Ch.B (14) 26V DC FSSS Ch. B (15) 26V DC DDC Ch. A
USS A
(1) Unit Em. SWGR (2) Boiler MCC (3) BVDC A (4) Turb. MCC A (5) 220V Dc Ch. A (6) +24 DC ATRS Ch. A (7) -24V DC ATRS Ch.A (8) Turb ACDB A (9) +24 V DDCMIS Ch. B (10) Gen Control Panel (11) Boiler ACDB A a) Grav. Feeder A,B, C,D,E,F b) S/B MCC Feeder-1 c) INC From USS B (12) MOT Centrifuge
USS B
(1) UPS Ch. (3) TVDC (5) Turb MCC B (7) Boiler ACDB B (2) +24V FSSS Ch. (4) Boiler MCC B (6) Turb ACDS B
THANK YOU !