Vous êtes sur la page 1sur 34

we focus on your process

MECONTROL Systems MECONTROL Air

Page 1

Presentation

we focus on your process

Our Target: Reliable Drift Free Measurement with

low maintenance, high accuracy


Page 2

we focus on your process

System Application for Boiler Optimization


MECONTROL
Steam generator

Air

Primary air

Secondary air

Burner

Air preheater

Electric precipitator

Flue gas

Coal bunker Pulverized fuel

Intermed. Flyash bunker


Fly ash Coal mill FD-Fans Excess Air

Page 4

we focus on your process

Issues with Air Flow Measurement Calibration? Linearity? Drift (Jamming)? Accuracy in short pipe sections?

Flow straighteners (delta P loss)?

Page 5

MECONTROL Air Measurement Principle velocity


Signal Sensor 1
Air Duct or Pipe Signature Signal Sensor 2

we focus on your process

Sensor 1
X(t)

Sensor 2 S=const.
Y(t)=X(t-T)

correlation

Correlation

T=-26 ms Optimum of correlation

Time T Example S=54 cm T=26 ms w=20,8 m/s (average velocity of the air !)

Page 6

we focus on your process

MECONTROL Air Installation overview


Air duct Measurement cabinet

Sensor 1

Sensor box (per burner)


max. 4 Sensors/2 channels 4 x Sensor signals

Sensor 2

Power supply 24 VAC

Sensor 3/4

230 VDC Power supply

Connection to the DCS

Page 7

we focus on your process

MECONTROL Air Sensor + Connecting Piece

Page 8

we focus on your process

Gas Flow Measurement Sensor

Page 9

we focus on your process

Sensor Mounting Adapter

Approx 1.5

Page 10

we focus on your process

Local Sensor Box


2 Channel Capability
16 x 12

Mounted within 50 feet of sensors Signal Amplification NEMA 4 Rated Located within 1000 of Control Cabinet

Page 11

we focus on your process

Control Cabinet
48 Channel Capability
63 x 24 x 79

4, 8, 16 & 32 Channel also available Error Indicators NEMA 4 Rated Data Communication:
Modem, FTP, PROFIBUS, MODBUS, Others upon request

40-80 F Temp Required


Page 12

we focus on your process

Single Air Flow Sensor Location


Niederaussem Station, Germany

Single Channel
2 sensors (antennas)

Page 13

Multiple Air Flow Sensor Locations


Niederaussem Station, Germany

we focus on your process

3 channels

Page 14

we focus on your process

PS Iskenderun, Turkey:
Main plant data: (2 x 600 MW), erected 2003/2004

24 burners, double wall fired:


Measurement of:

-windbox secondary air system,


-core air system with short duct runs,

-primary dirty air per burner.


Page 15

we focus on your process

Reference of Measurement against Venturi

Page 16

we focus on your process

Page 17

we focus on your process

Challenges: - short inlet sections of secondary air - downstream flap dampers - air stratification in ducts

Damper

Burner 32 Burner 35 Burner 31 Burner 36

Burner 33 Burner 34

Page 18

we focus on your process

Iskenderun

04-10-27
60000

MECONTROL Air Secondary Air Measurement Channels

PROMECON
we focus on your process

50000

40000

[m/h]

30000

20000

10000

0 06:00

07:12 SecABrn32Out SecABrn34Out

08:24 SecABrn32In SecABrn34In

09:36 SecABrn33Out SecABrn35Upper

10:48 SecABrn33In SecABrn35lower

12:00

Page 19

Measuring core air into the burners: Challenges: extremely short measurement sections

we focus on your process

Page 20

Core air duct work:

we focus on your process

Installation of MECONTROL Air measurement: main core air duct individual burner core air

Page 21

we focus on your process

Individual core air flow position


Air flow balance: for proof of plausibility plant demanded a balance to be made of main duct measurements versus individual core air measurement at each burner.

Page 22

Check of accuracy by mass flow balance


Iskenderun

we focus on your process

04-10-17
60000

MECONTROL Air Summecheck Core Air

PROMECON
we focus on your process

50000

40000

[m/h]

30000

20000

10000

0 00:00

02:24

04:48

07:12

09:36

12:00

14:24

16:48

19:12

21:36

00:00

Sum Total core Air Front Sum Total core Air Rear

Sum burner core Air Front Sum burner core Air Rear

Page 23

we focus on your process

Uneven distribution of core air


Iskenderun

04-10-27
10000

MECONTROL Air Core Air Burner

PROMECON
we focus on your process

9000

8000

7000

6000
[m/h]

5000

4000

3000

2000

1000

0 06:00

07:12

08:24 CoreABrn31 CoreABrn34

09:36 CoreABrn32 CoreABrn35

10:48 CoreABrn33 CoreABrn36

12:00

Page 24

we focus on your process

Measurement of primary air out of the pulverizer


Iskenderun

measurement of dirty air flow in indivual burner lines subtraction of steam.


MECONTROL Air Primary Airflow

PROMECON
we focus on your process

04-10-27
25000

20000

15000
[m/h]

10000

5000

0 06:00

07:12

08:24 Burner31 Burner35 Burner32 Burner36

09:36 Burner33

10:48 Burner34

12:00

Page 25

Final result of measurement: the secondary air windbox causes main air imbalance

we focus on your process

31

32

33

34

35

36
Page 26

we focus on your process

Coal mill at Vattenfall Europe: Power Station Reuter West/Berlin Actual data from: September 2005
Pulverized Fuel Primary Air

Main Cabinet

Mill 30

Reference: Mr. Thorsten Thimme

230 VAC Power supply

Conne ction to the DCS

Page 27

we focus on your process

Individual Air flows out of the mill at standardized T and P


11.09.2005

MECONTROL Air Particle Velocity Mill 30

PROMECON
we foc us on your proc ess

30,0

200,0 180,0

25,0

160,0 140,0 120,0

[Nm/h]

15,0

100,0 80,0

10,0

60,0 40,0 20,0

5,0

0,0 00:00

01:12
Burner 31

02:24
Burner 32 Burner 33

03:36
Burner 34

04:48
Class. Temp

0,0 06:00

Class Temp [C]


Page 28

20,0

we focus on your process

Balance of Sum Coal Pipes and Venturi is equal


Bewag_D_M 30_PL 11.09.2005

PROMECON MECONTROL Air we foc us on your proc ess Primary Air and Particle Velocity Measurement Mill 30

45000 40000

40,0 35,0 30,0


Feeder [t/h]
Page 29

[Nm/h]

35000 30000 25000

25,0 20,0

20000 15000 10000 5000 0 0:00:00


Venturi

15,0 10,0 5,0 0,0 6:00:00

1:12:00

2:24:00

3:36:00

4:48:00
Feeder

Sum Coalpipes-Brden

we focus on your process

Track Record
Since 2001: Over 200 installed

Never calibrated
Never cleaned Temperatures up to 2000o F
Page 30

we focus on your process

MECONTROL Air References


Schwenk Zementwerk in Bernburg 2002
measurement of 13 Air flows including Tertiary Air at 1100C

Vattenfall/BEWAG KW Reuter West Unit D, Berlin 2003


Replacement of all 32 conventional Venturi measurements, boiler safety relevant certification (AK3, SIL1) by TV Berlin

Vattenfall/BEWAG KW Reuter West Unit E, Berlin 2003


Replacement of all 32 conventional Venturi measurements, boiler safety relevant certification (AK3, SIL1) by TV Berlin

RWE/Rheinbraun KW Niederauem Unit G,Bergh.2003


Retrofit of 48 measurement locations including primary and secondary air flows
Page 31

we focus on your process

RWE/Rheinbraun KW Niederauem Unit A,Bergh.2004


Retrofit of 32 measurement locations including primary and secondary air flows

RWE/Rheinbraun KW Niederauem Unit E,Bergh.2004


Retrofit of 32 measurement locations including primary and secondary air flows

HOLCIM Texas, Midlothian, 2005


Retrofit of 8 Measurement locations including raw gas and tertiary air

Reliant Energy Niles Power Station, 2006


Measurement of 4 locations on the flue gas side

Thyssen Krupp Steel, Werk Duisburg, 2006


7 measurement locations downstream of steel converter
Page 32

we focus on your process

Southern Company 2005


Retrofit of exhaust gas measurement at 1000 oC and 25 bar pressure in refractory lined coal gasifier

Ashgrove Cement Utah, 2005


Measurement of 8 locations, raw gas as well as tertiary air

Dayton Power and Light, 2006


Retrofit of 8 mills with primary air flow measurement

Vattenfall Kraftwerk Jnschwalde, Unit D2, 2005


Retrofit of 16 measurement locations including primary and secondary air on a ventilation mill by ALSTOM for mill balancing and intelligent control.

EVN Kraftwerk Drnrohr 2004,


Retrofit of 32 burner pipes with velocity measurement for better primary air control.
Page 33

we focus on your process

Steag/Isken Power Station Iskenderun, 2005


16 Measurements of secondary air as well as 6 measurements of coal flow and primary air for better Air balancing

EDF, Power Station West Burton, 2005


16 measurements for measuring OFA of a reburn system (Installed by General Electric)

TXU, Power Station Monticello USA, 2 Units 2006


2 x 10 Measurements for primary air flow.

E2 Power Station Stigsnaes, DK, 2006


12 Measurements for measurement of OFA installed by General Electric

Page 34

we focus on your process

RWE Kraftwerk Niederauem, Unit H, 2006,


measurement of 40 locations secondary as well as primary air flow

Vattenfall Kraftwerk Reuter West Unit D, 2006,

measurement of 4x PA before as well as 16x PA after the pulverizer

Vattenfall Kraftwerk Reuter West Unit E, 2006,

measurement of 4x PA before as well as 16x PA after the pulverizer