Mr. Fawad Naseer (2011-MIN-14) Bilal Ahmed Sabir Shah Imtiaz Azam Mazhar Ali (2011-MIN-36) (2011-MIN-43) (2011-MIN-54) (2011-MIN-72) Rasool Bakhsh (2011-MIN-41)
INTRODUCTION
Thar Coal is located in Thar District, About 400 km east of Karachi, covers area of 9100 Square kilometers. Discovered in 1991 by Geological Survey of Pakistan. 4th largest coal reserves of the world Thar containing Lignite B coal with the quantity of 200 billion tons
5/28/12
Uses of Lignite
Lignite Coal
Combustion (Steam)
Gasification
CO H2 Coal to Liquid
Ash Tar Naphta Phenol Catechols Carbon Dioxide Dephenolized Cresylic Acid
5/28/12
holes. holes.
Gallium:
357 samples from 32 drill 193 samples from 33 drill 228 samples from 28 drill
Uranium:
holes.
Benzene:
holes.
is 46.77%.
Volatile Fixed
Sulphur
There are 4 blocks divided in the area of 9100 square kilometers. There are 4 different companies working on each block. Block-II is given to Sindh Engro Coal Mining Company. Block III-A is given to Cougar Energy (UK). Block V is also in the supervision of Cougar Energy. Oracle Field is working on Block-VI
5/28/12
Status of Blocks
Status
Bankable Feasibility completed Project financing activity continued. 31st August 2010
Block-II Sindh Engro Coal Mining Company (JV: 40% Sindh Government; 60% Engro) 2X600 Power Plant planned Open Pit Mining @ 6.5 Mtpa Block III-A Cougar Energy (UK) 400 MW Planned Under Ground Coal Gasification Project Ergo Exergy Technology planned Block-V UCG Project Under Ground Coal Gasification Project 2X50 MW IGCC Power Plant Planned Block-VI Oracle Coalfields, PLC (UK) Strip mining; MoU signed with KESC for 300MW
Unit gasifier design prepared, Technical team mobilized and desktop studies under process. Drilling in Process by GSP Test Burn Planned April 2011 Geotechnical drilling in process through DRD BFS completion June 2011 ESIA completed
1010
Underground
coal gasification is carried out in thar coal fields under the supervision of Dr Sumer Mubarik Mund. of UGC Coal Gasification YouTube.webm
Video
.Underground
It is working on the Block-II. They are working on Open Pit Mining Power Plant is Planned for this block. Project Financing activity is still continues. will generate electricity.
They
They Unit
are working on Underground Coal Gasification Project. gasify Design Prepared. in process by GSP.
Drilling
It It
is the British Mining company, totally ORACLE works on Coal Mines. is also working in Thar coal Project on Block-VI. Working on Strip Mining. Geotechnical Drilling is in Process.
methane gas.
reveal availability of no
Coal Self
Dust: Each coal bed possess explosive natural dust explosion. Combustion Trial of Coal: All the coals are self combustion types. Ratio: 5.30 upwards
Stripping
develop Thar Coal as a major source of power generation for Energy & Economic Security of the country and as a Hub of Petro Chemical Industry. generate at least 10,000 MW by 2020. proven reserves with attractive incentives and Higher returns for investors friendly policies & environment
To
Huge
Business
Electricity = 2.3 dollar per watt = 2.7 dollar per watt = 3.2 dollar per watt = 3.5 dollar per watt
desert contains the world 4th largest coal reserves. to Sindh Engro Coal Mining Company:
According
175 Billion Ton total Thar coal reserves are more than Saudi arabian & Iranian Oil Reserves and equal to Pakistans total gas reserves.
Entire Thar Coal Reserves can be used to generate 100,000 MW of electricity for over 200 years.
q q
Thar project brings largest investment in the history of Pakistan. Thar coal project creates 60000 jobs.
5/28/12
Lease has been issued to SECMC for Block II. Mine construction is targeted to start by 2013 & lignite production by 2016. has declared Thar Coal fields as Special Economic Zone and Thar Coal Projects are exempted for 30 years from all taxes.
GoP
INITIATIVES BY SINDH GOVERNMENT FOR Zero percent customs duties on import THAR COAL PROJECT
of coal mining equipment and machinery including vehicles for site use. on withholding tax to shareholders on dividend for initial 30 years.
Exemption
Exemption
on withholding tax obtaining of goods and services during project construction and operations. of facilitation to investors and provide them security for investment.
Provision
Highlights of Thar Thar desert area is approximately Coal Field 22,000 sq.km.
Coal
field area is 9,100 sq.km. Drill Holes is 217. deposit is 175.506 billion tons
Total
Coal
RAILWAY LINK Pakistan railway has been engaged by GoS to prepare feasibility for broad gauge rail link from Port Qasim to Islamkot. LODGE AT THAR Lodge at Thar with 20-bedded accommodation to facilitate foreign and local investors is being constructed at Islamkot. PROVISION OF CANAL WATER: The GoS has planned to construct a water carrier to provide 300 Cusecs water to Thar.
5/28/12
Chairman Vice-Chairman Member Member Member Member Member Member Member Member Member Member/Secretary
Federal Minister for Water & Power Federal Minister for Law and Justice Provincial Minister (Irrigation & Power) Provincial Minister (Revenue & Relief) Female MNA from Thar Region Chief Secretary, Govt. of Sindh One eminent Person
Federal Secretary, Ministry of Water and Power Member Secretary, Coal & Energy Development Dept.
Thar today
5/28/12
www.sindhcoal.gos.pk
Thar Tomorrow
Thar