Vous êtes sur la page 1sur 14

Guide Bund

Guide Bund

Luni River

Luni Bridge

Luni Bridge

Project Details
1. Location : NH-15 (Jaisalmer-Barmer-Sanchore Section) Km. 258 - 259 (0/0 at Jaisalmer) : Major Bridge 754 Mtr. : 710.24 Lacs : Rehabilitation of Luni Bridge including RCC jacketing to piers and pier caps, replacement of expansion joints, wearing coat, damaged railing and epoxy painting etc.

2. Length 3. Sanctioned Amount 4. Scope of Work

5. Period of Completion : 8 Months

History of Luni Bridge


1. Year of Construction : I Phase 1970 (12 Spans) II Phase 1977 (12 Spans) 2. Total Length 3. Total Spans 4. Nature of major damages 754 m 24 (32.24 m) a. Wide Cracks in piers and pier caps b. Cracks in Deck Slab c. Expansion joints completely non functional d. RCC Wearing Coat Damaged e. Railing Damaged f. Scouring Near Piers

Technical Proposals

1. Wide Cracks in piers : 25 cm. RCC Jacketing. and pier caps 2. Cracks in Deck Slab : Repair with epoxy grout and applying apoxy mortar. 3. Expansion joints completely non functional 4. RCC Wearing Coat Damaged 5. Railing Damaged : Replacement of expansion joints by strip seal joints. : BC with mastic asphalt. : Replacement with steel railing

6. Scouring Near Piers : Boulders / Quarry stone apron

SI.

Type of Equipment

List of Plant & Equipment to be deployed on Contract Work


Maximum age as on 1/1/2010 Contract Package Size Upto Rs. 50 Million Rs. 51-200 Million Rs.201-500 Million Rs. 501-1000 Million & Above

1 2 3 4 5 6

Tipper Trucks Motor Grader Front end Loader Smooth Wheeled Roller Vibratory Roller Hot Mix Plant with Electronic Controls (Minimum 40-60 TPH Capacity) Paver Finisher Water Tanker Bitumen Sprayer Concrete Mixes with Integral Weigh Batching facility Concrete Batching and Mixing

5-7 5 5 5 5 5

5 1 1 2 1 1

7 8 9 10 11

5 5 5-7 5 5

1 3 1 1

As per MoRTH Circular Dt. 27.11.2009 1

CONSTRUCTION PROGRAME OF PROJECT


1 Aug. '10 1 2 2 Sept '10 1 2 3 Oct '10 1 2 9 MO N T H S 3 5 Nov '10 Dec '10 1 2 1 2 6 Jan '11 1 2 7 Feb '11 1 2 8 Mar '11 1 2

S.N.
1 2 3 4 5 6 7 8 9 10 11 12 13

ITEM / DESCRIPTION
Guinting on Concrete RCC Grade M-35 for jacketing Applying two coats of epoxy Removal of existing wearing coat Mastic asphalt wearing course Slab seal type of expansion joint Structural steel work Boulder/ quarry stone apron Stone pitching on slopes Byepass-Earth Work/GSB and WBM Byepass - Carpet Singages and marking etc Miscellaneous Work

Variation in BSR & Present Market Analysis


S.N. Major Item BSR Rate Rate as per present market Difference in % Remark

1 Guinting on 1057.00 p/sqm Concrete 2 25mm Mastic Asphalt

1477.00 p/sqm

39.73

Higher rate due to distant location and specialized nature of work Due to increase in cost of mastic asphalt and remote location of bridge More lead of material, remote location, less quantum of work, more cost of shuttering and specialized nature of work More lead of material stone and bajri More lead of stones

420.00 p/sqm 504.00 p/sqm

20.00

3 M-30 Grade 3779.00 p/cum concrete for jacketing 4 Stone Masonry 5 Boulders / quarry stone apron 6 Stone Pitching

4775.00 p/cum

26.35

2353.00 p/cum 1253.00 p/cum

2701.00 p/cum 1544.00 p/cum

14.78 23.22

628.00 p/cum 947.00 p/cum

50.70

More lead of stones

Amount of Unbalanced BID Cost of Work as per Rate Analysis Cost of Work offered by Bidder Unbalance Bid Amount % difference between lowest offer and Rate Analysis Amount = = = = 713.19 Lacs 644.84 Lacs 68.35 Lacs 9.58%

Thank You.