Académique Documents
Professionnel Documents
Culture Documents
Guide Bund
Luni River
Luni Bridge
Luni Bridge
Project Details
1. Location : NH-15 (Jaisalmer-Barmer-Sanchore Section) Km. 258 - 259 (0/0 at Jaisalmer) : Major Bridge 754 Mtr. : 710.24 Lacs : Rehabilitation of Luni Bridge including RCC jacketing to piers and pier caps, replacement of expansion joints, wearing coat, damaged railing and epoxy painting etc.
Technical Proposals
1. Wide Cracks in piers : 25 cm. RCC Jacketing. and pier caps 2. Cracks in Deck Slab : Repair with epoxy grout and applying apoxy mortar. 3. Expansion joints completely non functional 4. RCC Wearing Coat Damaged 5. Railing Damaged : Replacement of expansion joints by strip seal joints. : BC with mastic asphalt. : Replacement with steel railing
SI.
Type of Equipment
1 2 3 4 5 6
Tipper Trucks Motor Grader Front end Loader Smooth Wheeled Roller Vibratory Roller Hot Mix Plant with Electronic Controls (Minimum 40-60 TPH Capacity) Paver Finisher Water Tanker Bitumen Sprayer Concrete Mixes with Integral Weigh Batching facility Concrete Batching and Mixing
5-7 5 5 5 5 5
5 1 1 2 1 1
7 8 9 10 11
5 5 5-7 5 5
1 3 1 1
S.N.
1 2 3 4 5 6 7 8 9 10 11 12 13
ITEM / DESCRIPTION
Guinting on Concrete RCC Grade M-35 for jacketing Applying two coats of epoxy Removal of existing wearing coat Mastic asphalt wearing course Slab seal type of expansion joint Structural steel work Boulder/ quarry stone apron Stone pitching on slopes Byepass-Earth Work/GSB and WBM Byepass - Carpet Singages and marking etc Miscellaneous Work
1477.00 p/sqm
39.73
Higher rate due to distant location and specialized nature of work Due to increase in cost of mastic asphalt and remote location of bridge More lead of material, remote location, less quantum of work, more cost of shuttering and specialized nature of work More lead of material stone and bajri More lead of stones
20.00
3 M-30 Grade 3779.00 p/cum concrete for jacketing 4 Stone Masonry 5 Boulders / quarry stone apron 6 Stone Pitching
4775.00 p/cum
26.35
14.78 23.22
50.70
Amount of Unbalanced BID Cost of Work as per Rate Analysis Cost of Work offered by Bidder Unbalance Bid Amount % difference between lowest offer and Rate Analysis Amount = = = = 713.19 Lacs 644.84 Lacs 68.35 Lacs 9.58%
Thank You.