Téléversements
Welding Process Control - PR - 0XX 100% ont trouvé ce document utileWeld Procedure Specification - PR - 0XX 0% ont trouvé ce document utileSockolet Gap Control Threaded Joints - PR - 0XX 0% ont trouvé ce document utileWeld Repair - PR - 0XX 0% ont trouvé ce document utileBQ-ZUL-0XX10 Welding Consumable Control 0% ont trouvé ce document utileShop and Field Fabrication - PR - 0XX 0% ont trouvé ce document utileQCP 045 Field Engg Control Procedure (Zuluf Water Supply Facilities B.I. No. 10-12322) Submitted 0% ont trouvé ce document utileBin Quraya Holding Co. ةضباقلا هعيرق نب ةكرش: QCP-45 Quality Control Procedure Field Engineering Change Control Procedure 0% ont trouvé ce document utileQCP 02 Project Inspection - Testing of Purchased Materials (Zuluf Water Supply Facilities B.I. No. 10-12322) 100% ont trouvé ce document utileSATIP-K-001-09 - Through Wall Window Mounted Air Co 0% ont trouvé ce document utileQCP 050 Concrete Finishing (Zuluf Water Supply Facilities B.I. No. 10-12322) Submitted 0% ont trouvé ce document utile