SAFETY TEAM
SSP03/F01 Model Method Statement
Revision History:
Revision
Date
Description
Revision: 0
Date
: 05/01/07
Page
: Page 1 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
1. Details
Company/Contractor Name
Contract/Project Name....................................................................................................................
Contract No..
2. Description of works
What is to be carried out? (full description)
What location on site is it to be carried out in? (Site Address, Floor Level etc.)
Duration?
Revision: 0
Date
: 05/01/07
Page
: Page 2 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
3. Resources
Materials required? (i.e. plasterboard, bricks, adhesives etc.)
Personnel? (what trades are required, what training do they need, i.e. Advanced Scaffolding,
Certificate to erect towers, Confined Space training, Manual handling etc.)
Supervision? (who will supervise the works, what special training do they have?)
4. Assessment of Risks
What risks will the work place present? (i.e. falls from height, confined space, trip hazards,
electrocution etc.)
What risks will the activity present? (i.e. falls of persons and materials, COSHH, Manual
Handling, Noise, electrocution, etc.)
Access? (i.e. what access equipment will be used and what are the risks, including existing
structure).
Others? (what are the risks to other trades, to building occupiers and to the public in general)
NB A Full Separate Site Specific Risk Assessment Must Be Prepared And Attached
Revision: 0
Date
: 05/01/07
Page
: Page 3 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
5. Control Measures
(For each identified risk detail the precautions that will be put in place i.e. fall prevention, trained
personnel, permits to work, no go zones, environmental controls etc.)
7. Emergency Arrangements
(What to do if things go wrong? i.e. rescue for falls in a harness, escape of toxic substance etc.)
Revision: 0
Date
: 05/01/07
Page
: Page 4 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
9. Information to
Who will be informed of the methods to be employed? (operatives, other trades building
occupiers etc.)
Revision: 0
Date
: 05/01/07
Page
: Page 5 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
11. Attachments
(list any attachments here, i.e. drawings Risk assessments, COSHH assessments, Noise
Assessments, training certificates, etc.)
Revision: 0
Date
: 05/01/07
Page
: Page 6 of 7
LUSAIL DEVELOPMENT
SAFETY TEAM
SSP03/F01 Model Method Statement
2)
3)
Resources required
personnel
supervision
plant / equipment
materials
4)
5)
6)
7)
8)
9)
10)
Revision: 0
Date
: 05/01/07
Page
: Page 7 of 7