Vous êtes sur la page 1sur 1

.

00

.5 0
161.07 RIDGE 175.240

162.43
162

164
00
160.75
00
OS NORTH 20.0
162.51

10.0
161.06 161.09 16INSERT
4.50 1
164.17

00
9
161.36 4.2
16

164 164.
50

20.0
.10
161.36 164.60 162.14 4.

.60
.09
16

162

81

164
160.91 164.51

3.

164.11
00
164.09 162.54

16
162.28
000

17
160.

30.0
5
161.44 4.3
16
161.08 162.25 0 37
.6 4.

164
4 16
162.08 16 164.10

99.1

.39
161.27 162.25

16 4.16
16
00

3.9
10.0

00
.20
164.33

1
162.1 164.39

4.5
8
0

39
JP5

162

16622.5

16
1
164.17

4.
90.0
161.00

116621.94
. 21

16
161.49

164.35
162.63

.378
161.11 PLOT 195 164.54

162.53
164

162.38
00
161.79
162.20 FFL 162.425 164 1

.70
.28
162.39 .4 8 64.4

4.4
161.08 164.35 1

80.0

16

164
164.33
D9

16
161.70 162.30 162.44 162.59
000

00
ROA
161.23

4.5
162.30 150. 164.08 164.53

7
16
16
PLOT 196

70.0
BINS

4 .1
4.3
.30
161.42 FFL 162.650 PLOTS 180-194

2
1
FFL 162.575

.80
2

162
.5

00
43

21
162.40 164 FFL 165.200

162.48
162.71
.

1 4.3
64

164
1646.5
164.16 1 RIDGE 175.040 0

116622.4
0.00
60.0

164
161.64
161.63
PLOT 160

.32
.265

.19
164
00

FFL 162.425 161.99

162.48
161.09
162.5

162.62
162.260

164.36
161.575

.40
0

164.72
161.22
Tree Protection
Tree Protection

162
PLOT 197 162.49
161.28 161.36
162.380
AWAITING FOUNDATION 164.43 162.72
Area
Area

16622.73
FFL 162.800

164.6

164.2
.53
162.52
PLOT 161 161.91 162.47 DESIGN

164.7
000

1
162.220 161.64

9
162.73
FFL 162.650 140.
00 162.490

0
161.800
50.0 162.6
1
PLOT 1198
62.49 164.31

.50
60

FFL 162.800

16
161.86

162.64
162
162.

4.
164.5

76
1
162.13 16 164.9

4.6
4. 4

7
16
53

4
PLOT 97 161.39

4.4
162.450 16 164.60
PLOT 162 4.

16
161.43
FFL 162.800 161.56
161.545 3 162.85
8
.70

FFL 162.800 162.55


PLOT 151 14
162.490 165.

0
164.42
162

.6
161.78 162.16 164.73
FFL 162.845 161.950 162.57

162.82
162.72

162
PLOT 199
161.56
FFL 163.050 164.45
000
PLOT 163 130. .88 162.92

0
164

Tarmac Road

4.4
FFL 162.800 164.31
00 162.600

16
40.0 PLOT 162 162.10
PLOT 96 162.175

162.78
162.43 164.58
FFL 162.800 GL 162.920 162.610
.80

161.39
PLOT 200 16
162

4.

.70
FFL 162.050 50

162
161.53
PLOT 163

163.05
161.60 162.600
161.83 162.41 162.68 162.66
GL 162.995 PLOT 164 164.62
161.545 FFL 163.050 163.09
162.720 162.85
.90

161.68 162.200
162

162.20
000 163.10
PLOT 152 120. PLOT 201
00 FFL 163.070
30.0 FFL 162.250

.80
162.64
PLOT 164 162.850 PLOT 165 16

162

163.07
163.103.1

163
GL 163.070
161.82 FFL 163.050 2

12
3.

.17
16
161.84 162.870 162.200

162.98
JP4

163.13
PLOT 164 161.97 162.40 162.87162.92
PLOT 202
.00

16

16

163.5
GL 163.220 163.01

.90
3.2

2.
FFL 162.250 163.41 5

98
163

162.71 163.56

162

4
163.37
163.15

163.16
PLOT 165 162.24 6
162.8
GL 163.220 PLOT 166

16

163.1
162.900
000 PO

3.1
FFL 163.250
161.93
110.

2
PLOT 165 163.14

2
162.930 .79 JP6
00 162.400 162 163.00
20.0

163
GL 163.295 163.08 163.29
162.17 162.98

.11
PLOT 94
.10

PLOT 153

7
16

2.7
FFL 163.575 PLOT 95 161.995
163

FFL 163.295 3.

16
FFL 163.575 162.25 16 00 162.94
PLOT 167 162.52 1622.6
163.050 162.68 .7 6

162.
7 FFL 163.250 9 163.27
PLOT 166 162.4 162.625 163.6 1
.52
246 163.31

163.7
162.
16

83
GL 163.295

163.
38
163.140

1163.
162.

3.
16291

4
16136.437.1

35
16
D6
162
.20

162.34

.10
ROA

56
163.
163.26
.59
1
.30

2.6

5
163

163.39
3.3
163
163.050 163.13 163.
50

33
16

162.22 16
00

0
PLOT 154 162.445 00.0

0.00
162.14 162.41 1 163.41
FFL 163.520 163.00
ROA

00
10.0 162.45

163.
163.200 163.38 163.50
0

162.59 53

35
163
162. 1
0

162.6
D9

.41
10.0

163.1
.30

162.66 0
.20
163.40 163.37
163

16

16
162.55 PLOT 203
163

2.
2.

00

82
79

16
163.40

3.2 FFL 163.375


20.0

.04 163.20 4 163.41


163
162
.39 162.42 163.13
162.83
163.07

00

162.96 163.31
56 163.30
163.
30.0
60.000

0 163.4 162.97
PLOT 204
3.2 0 163.55 0 .0
2
00
16 3.3 90.0 FFL 163.600
50.000

3
163.48

16 163.26
40.000

16 8
.30

0 2
0.00 3.

163.
16
163

0.000
6

.50

48
3.0

163 163.22 163.63


163.1
16

.71 163.50 PLOT 168


16
3 3.34 PLOT 205
16 FFL 163.375
4

162.97 163.11 163.46


163.15 FFL 163.600
163.180 162.750
.40

.55 163.22 163.400 163.56


16633.40
163

163.25 9
1 .9 PLOT 169
162
163.40 16 FFL 163.600 PLOT 206
3.3
PLOT 132 2 162.975 FFL 163.825
36 163.430 163.180 163.20 00 163.58
163. FFL 163.700
163.40 PLOT 134
PLOT 155 80.0
FFL 163.775 163.33
FFL 163.700
PLOT 131 10.000 163.150 PLOT 170
163.32 163.53
.50

FFL 163.700 PLOT 133 FFL 163.600

163.7
163.500
163

FFL 163.700
163.60

162.975
163.250

4
PLOT 169
163.38
GL 163.775 PLOT 207
163.64 FFL 163.975
163.33 163.580 PLOT 171
.60

PLOT 170 FFL 163.825


163

GL 163.775 163.400 163.200


ROA

163.70

163.58 163.225 163.51


00
70.0
PLOT 156 163.720 PLOT 208
163.80
D7

163.51 00
20.0 GL 163.850 FFL 163.975
163.72
PLOT 156
FFL 163.850 163.46
PLOT 172
.70

163.56
163.630 FFL 163.975
163

PLOT 171
163.350
GL 163.925 PO
163.25 163.59
163.730 163.25
163.350 PLOT 209
163.80

PLOT 172 FFL 164.175


163.225 PLOT 173 163.57
GL 163.925 0 0
163.23 FFL 163.975 60.0
PLOT 157 163.630
.80

30.0 FFL 163.925 163.46


00
163

PLOT 157 PLOT 210


163.770
GL 164.000 FFL 164.175 163.72

163.49 163.60
PLOT 173 163.73
GL 164.000 PLOT 174
.90

163.830 FFL 164.175


163

PLOT 142 163.47 163.74


163.55 163.550
PLOT 141 FFL 164.000 PLOT 173
163.90

163.880
PLOT 138 FFL 164.000 GL 164.000 00
FFL 164.150 163.44
PLOT 140
163.36
50.0 PLOT 211
FFL 164.070 163.550
FFL 164.375
PLOT 139 163.34 PLOT 175 163.73
40.0 PLOT 174
FFL 164.070 00 FFL 164.175
.00

GL 164.075
163.450 163.800
164

PLOT 158
163.63 PLOT 212
163.59 FFL 164.075
0

FFL 164.375
0.00

PLOT 158 163.880


163.50 GL 164.075
164.00

.10

.75
00

PLOT 176 163


164

163.52 PLOT 175


10.0

163.65 PLOT 213


164.000 FFL 164.375 00
GL 164.150 40.0 FFL 164.375 .91
16 4.00 163.750 163
0

163.4
D 8 163
.61
0

ROA
3
20.0

50.0
0 0 PLOT 176 163.950 8
163.68 3.9 89
163 GL 164.150 16 163.
163.44 16 .69 PLOT 177
3.5
16

.20
00

10 FFL 164.375 PLOT 214


164.10

164.
8
3.5

0
16

4.0
30.0

164

163.750 16 FFL 164.600


0
3.6

0
.9 164.000
7

3
16 163.62 163.73
163 164.030 163.950 30
.50 PLOT 178 4. . 63 163
.72
FFL 164.375 16 163
9
4.0
163.82 16
164.20

PLOT 150 163.58 163.750 00


30.0
16

164.000 3
FFL 164.175 163.970 4.1
4 .1

16
PLO 4.025
GL 1

16
163.

LEGEND 164.15
163

59.9 163.60
PLOT 179 4.
4
163

T 14
61

41
6

PLOT 149 163.900 0


.9

BASE OF CONSTRUCTION 163.750


FFL 164.600 9
7
.68

163.57 64 .9 5164.38
LEVELS (PRIVATE PARKING) GL 164.175 163. .06 63 164.15 4.1
9
PLO1 4.025
GL 1163

1
162.850 164 16
(See C12549 C046 PLOT 144
Construction 163.73 16 164.40
164.120
D1
T631.746

163. .80

3.9
6 .68

FFL 164.175
ROA16164.0
Details 2) 5
163
PLO .025
GL 1

66

164.00

BASE OF CONSTRUCTION
4

3. 8 164.12
0
.81

PLOT 143 LEVELS (PRIVATE SHARED PLOT 159 97


0.00

163.87 4
162.850 163.900 .20 4.2
.10
163
T 14

16
64

FFL 164.175DRIVE) (See C12549 C046 FFL 164.250 164


164

164.300 164.16
.50

Construction Details 2) 163.625 164.4


3

164.43
164

0
.000

0 164.23
0
162.850 FOUNDATION FORMATION LEVEL
163.74 to 04 REV C2)
163.71
163.84 163.900 20.0
164.50
10

163.78 (See C12549 S-L-01


ad
Ro
163.73 ac
GARDEN FORMATION LEVEL 164.17 m
00

163.61 9 r
4.2 Ta
163.7

163.900 163.97 16 .23


164

0
20.0

(Assumed 200mm Topsoil) 164


.5 164
163.60 .00 164.60
0

4
.09 4.17

16
.6
9

4
163.9
81

1:3 EMBANKMENT
164
16

(Maximum Slope 1:3) 163.95


16

164.51
3.

164.675

64
164.11

163.
4.

00

163.88 164.09
164.3
16
9

164.31
05

163.96
3.6
163.

30.0
75

.35
16

16 64

64
32.9
9

1
4. .49

NOTES: 163.61 1
1

62

1. All Works are to be constructed in accordance with BANES Council and the Project: Drawing Title:
Highways Agency's Specification for Highway Works (SHW) March 1998 as BANKING INDICATIVE ONLY
amended published by The Stationary Office
2. All levels relate to the survey which is to Ordnance datum. Dimensions not to be
scaled.
MULBERRY PARK, BATH TRANCHE 1
3. Street lighting, illuminated traffic signs, bollards and associated works shall
comply with BANES Council 'Specification for Street Lighting'.
FOXHILL PLOT FORMATION LEVELS
4. Use of this drawing does not absolve the client from his responsibilities under
the Health and Safety: The Construction Design and Management Regulations
Over Court Barns, Over Lane, Almondsbury,
PHASE 1 (CURO DEVELOPMENT)
2015. The Principle Designer is required to contact Hydrock Consultants prior to
Bristol, BS32 4DF.
permitting this drawing to be used in connection with any construction works.
5. This drawing is based on the latest Architects design layout received.
6. All works shown have been designed in accordance with Building Regs Part M.
TEL: 01454 619 533 FAX: 01454 614 125 or visit
www.hydrock.com Client:
Project Number: C12549
7. All underbuild, and retaining wall heights shown are the anticipated maximum
Drawn: Checked: Scale @ A1: Drawn Date: First Issue:
finished height required.
8. All step shown are to have 150mm rising and 280mm going dimensions up to a
This drawing is the copyright of Hydrock Ltd. No liability will be
accepted for any amendments to this drawing either printed or
digital by parties other than Hydrock.
CURO ENTERPRISE LTD RFS JLH 1:200 20/05/2016 23/05/2016
maximum of 12 steps per flight.
9. All levels immediately adjacent to the rear access are assumed to be 150mm B 24/05/16 Banking and levels amended. HJR JLH
Notes:
below finished floor level.
10. All works shown are designed to minimize works required adjacent to existing A 20/05/16 Issued for INFORMATION. RFS JLH
All dimensions are to be checked on site before the commencement of works.
Any discrepancies are to be reported to the Architect & Engineer for
Drawing Status. INFORMATION
Trees. verification. Figured dimensions only are to be taken from this drawing.This
11. Where external ground levels are higher than the DPC tanking will be required.
Rev Date Description By Ckd drawing is to be read in conjunction with all relevant Engineers' and Service
Engineers' drawings and specifications. This drawing is copyright.
Drawing No.
12549 - C060 Revision
B

Vous aimerez peut-être aussi