Analisa waktu/durasi pekerjaan install kolom

Posisi mobile crane Posisi kolom Posisi stock area Jarak MC ke


Segmen Lantai Titik
X (cm) Y (cm) Xk (cm) Yk (cm) Xc (cm) Yc (cm) Kolom
a b c e f g h g h
1 A-0A 525 500 0 800 1650 200 604.67
1 A-0 525 500 300 800 1650 200 375.00
1 A-1 525 500 750 800 1650 200 375.00
1 A-2 525 500 1200 800 1650 200 738.66
1 A-3 1200 500 1650 800 1650 200 540.83
1 A-4 1200 500 2100 800 1650 200 948.68
1 A-5 2100 500 2550 800 1650 200 540.83
A 1
1
A-6
A-7
2100
2100
500
500
3000
3450
800
800
1650
1650
200
200
948.68
1382.93
1 A-8 3450 500 3900 800 3450 200 540.83
1 A-9 3450 500 4350 800 3450 200 948.68
1 A-10 3450 500 4800 800 3450 200 1382.93
1 A-11 4800 500 5250 800 3450 200 540.83
1 A-12 4800 500 5700 800 3450 200 948.68
1 A-13 4800 500 6000 800 3450 200 1236.93

A' 1
1
A'-0
A'-12
525
4800
500
500
300
5700
1070
1070
1650
3450
200
200
612.80
1065.32
1 B-0A 525 500 0 1340 1650 200 990.57
1 B-0 525 500 300 1340 1650 200 869.61
1 B-1 525 500 750 1340 1650 200 869.61
1 B-2 525 500 1200 1340 1650 200 1077.60
1 B-3 1200 500 1650 1340 1650 200 952.94
1 B-4 1200 500 2100 1340 1650 200 1231.10
1 B-5 2100 500 2550 1340 1650 200 952.94
B 1
1
B-6
B-7
2100
2100
500
500
3000
3450
1340
1340
1650
1650
200
200
1231.10
1590.00
1 B-8 3450 500 3900 1340 3450 200 952.94
1 B-9 3450 500 4350 1340 3450 200 1231.10
1 B-10 3450 500 4800 1340 3450 200 1590.00
1 B-11 4800 500 5250 1340 3450 200 952.94
1 B-12 4800 500 5700 1340 3450 200 1231.10
1 B-13 4800 500 6000 1340 3450 200 1464.79
1 B'-0A 525 500 0 1760 1650 200 1365.00
1 B'-0 525 500 300 1760 1650 200 1279.93
1 B'-5 2100 500 2550 1760 1650 200 1337.95
B' 1
1
B'-6
B'-7
2100
2100
500
500
3000
3450
1760
1760
1650
1650
200
200
1548.42
1846.65
1 B'-12 4800 500 5700 1760 3450 200 1548.42
1 B'-13 4800 500 6000 1760 3450 200 1740.00
Jarak SA ke Jarak (d) Sudut
MC Swing

1164.31 559.64 162.82


1164.31 789.31 139.39
1164.31 789.31 65.65
1164.31 425.65 36.48
540.83 0.00 57.65
540.83 407.85 42.39
540.83 0.00 199.44
540.83 407.85 214.7
540.83 842.10 220.6
300.00 240.83 123.69
300.00 648.68 108.43
300.00 1082.93 102.53
1382.93 842.10 158.84
1382.93 434.25 174.1
1382.93 146.00 178.53
1164.31 551.51 124.07
1382.93 317.61 160.18
1164.31 173.75 134.53
1164.31 294.70 117.53
1164.31 294.70 87.51
1164.31 86.71 75.07
540.83 412.11 85.79
540.83 690.26 66.88
540.83 412.11 171.3
540.83 690.26 190.21
540.83 1049.17 201.248
300.00 652.94 151.83
300.00 931.10 132.92
300.00 1290.00 121.8
1382.93 429.99 130.7
1382.93 151.83 149.52
1382.93 81.86 157.54
1164.31 200.69 125.14
1164.31 115.62 112.65
540.83 797.11 162.78
540.83 1007.59 178.67
540.83 1305.81 191.13
1382.93 165.49 138.53
1382.93 357.07 146.15
WAKTU BERANGKAT
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
(m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
1 A-0A 83.8 1.5 0.0179 1152 162.82 0.141337 83.8
1 A-0B 83.8 1.5 0.0179 1152 38.65 0.03355 83.8
1 A-0 83.8 1.5 0.0179 1152 139.39 0.120998 83.8
1 A-1 83.8 1.5 0.0179 1152 65.65 0.056988 83.8
1 A-2 83.8 1.5 0.0179 1152 36.48 0.031667 83.8
1 A-3 83.8 1.5 0.0179 1152 57.65 0.050043 83.8
1 A-4 83.8 1.5 0.0179 1152 42.39 0.036797 83.8
1 A-5 83.8 1.5 0.0179 1152 199.44 0.173125 83.8
A 1
1
A-6
A-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
214.7
220.6
0.186372
0.191493
83.8
83.8
1 A-8 83.8 1.5 0.0179 1152 123.69 0.10737 83.8
1 A-9 83.8 1.5 0.0179 1152 108.43 0.094123 83.8
1 A-10 83.8 1.5 0.0179 1152 102.53 0.089002 83.8
1 A-11 83.8 1.5 0.0179 1152 158.84 0.137882 83.8
1 A-12 83.8 1.5 0.0179 1152 174.1 0.151128 83.8
1 A-12A 83.8 1.5 0.0179 1152 15.95 0.013845 83.8
1 A-13 83.8 1.5 0.0179 1152 178.53 0.154974 83.8

A' 1
1
A'-0
A'-12
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
124.07
160.18
0.1077
0.139045
83.8
83.8
1 B-0A 83.8 1.5 0.0179 1152 134.53 0.11678 83.8
1 B-0B 83.8 1.5 0.0179 1152 38.65 0.03355 83.8
1 B-0 83.8 1.5 0.0179 1152 117.53 0.102023 83.8
1 B-1 83.8 1.5 0.0179 1152 87.51 0.075964 83.8
1 B-2 83.8 1.5 0.0179 1152 75.07 0.065165 83.8
1 B-3 83.8 1.5 0.0179 1152 85.79 0.07447 83.8
1 B-4 83.8 1.5 0.0179 1152 66.88 0.058056 83.8
1 B-5 83.8 1.5 0.0179 1152 171.3 0.148698 83.8
B 1
1
B-6
B-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
190.21
201.248
0.165113
0.174694
83.8
83.8
1 B-8 83.8 1.5 0.0179 1152 151.83 0.131797 83.8
1 B-9 83.8 1.5 0.0179 1152 132.92 0.115382 83.8
1 B-10 83.8 1.5 0.0179 1152 121.8 0.105729 83.8
1 B-11 83.8 1.5 0.0179 1152 130.7 0.113455 83.8
1 B-12 83.8 1.5 0.0179 1152 149.52 0.129792 83.8
1 B-12A 83.8 1.5 0.0179 1152 15.95 0.013845 83.8
1 B-13 83.8 1.5 0.0179 1152 157.54 0.136753 83.8
1 B'-0A 83.8 1.5 0.0179 1152 125.14 0.108628 83.8
1 B'-0 83.8 1.5 0.0179 1152 112.65 0.097786 83.8
1 B'-5 83.8 1.5 0.0179 1152 162.78 0.141302 83.8
B' 1 B'-6 83.8 1.5 0.0179 1152 178.67 0.155095 83.8
B' 1 B'-7 83.8 1.5 0.0179 1152 191.13 0.165911 83.8
1 B'-12 83.8 1.5 0.0179 1152 138.53 0.120252 83.8
1 B'-13 83.8 1.5 0.0179 1152 146.15 0.126866 83.8

WAKTU PULANG
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
(m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
1 A-0A 144.5 3.2 0.022145 1152 162.82 0.141337 144.5
1 A-0B 144.5 3.2 0.022145 1152 38.65 0.03355 144.5
1 A-0 144.5 3.2 0.022145 1152 139.39 0.120998 144.5
1 A-1 144.5 3.2 0.022145 1152 65.65 0.056988 144.5
1 A-2 144.5 3.2 0.022145 1152 36.48 0.031667 144.5
1 A-3 144.5 3.2 0.022145 1152 57.65 0.050043 144.5
1 A-4 144.5 3.2 0.022145 1152 42.39 0.036797 144.5
1 A-5 144.5 3.2 0.022145 1152 199.44 0.173125 144.5
A 1
1
A-6
A-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
214.7
220.6
0.186372
0.191493
144.5
144.5
1 A-8 144.5 3.2 0.022145 1152 123.69 0.10737 144.5
1 A-9 144.5 3.2 0.022145 1152 108.43 0.094123 144.5
1 A-10 144.5 3.2 0.022145 1152 102.53 0.089002 144.5
1 A-11 144.5 3.2 0.022145 1152 158.84 0.137882 144.5
1 A-12 144.5 3.2 0.022145 1152 174.1 0.151128 144.5
1 A-12A 144.5 3.2 0.022145 1152 15.95 0.013845 144.5
1 A-13 144.5 3.2 0.022145 1152 178.53 0.154974 144.5

A' 1
1
A'-0
A'-12
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
124.07
160.18
0.1077
0.139045
144.5
144.5
1 B-0A 144.5 3.2 0.022145 1152 134.53 0.11678 144.5
1 B-0B 144.5 3.2 0.022145 1152 38.65 0.03355 144.5
1 B-0 144.5 3.2 0.022145 1152 117.53 0.102023 144.5
1 B-1 144.5 3.2 0.022145 1152 87.51 0.075964 144.5
1 B-2 144.5 3.2 0.022145 1152 75.07 0.065165 144.5
1 B-3 144.5 3.2 0.022145 1152 85.79 0.07447 144.5
1 B-4 144.5 3.2 0.022145 1152 66.88 0.058056 144.5
1 B-5 144.5 3.2 0.022145 1152 171.3 0.148698 144.5
B 1
1
B-6
B-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
190.21
201.248
0.165113
0.174694
144.5
144.5
1 B-8 144.5 3.2 0.022145 1152 151.83 0.131797 144.5
1 B-9 144.5 3.2 0.022145 1152 132.92 0.115382 144.5
1 B-10 144.5 3.2 0.022145 1152 121.8 0.105729 144.5
1 B-11 144.5 3.2 0.022145 1152 130.7 0.113455 144.5
1 B-12 144.5 3.2 0.022145 1152 149.52 0.129792 144.5
1 B-12A 144.5 3.2 0.022145 1152 15.95 0.013845 144.5
1 B-13 144.5 3.2 0.022145 1152 157.54 0.136753 144.5
1 B'-0A 144.5 3.2 0.022145 1152 125.14 0.108628 144.5

B'
1 B'-0 144.5 3.2 0.022145 1152 112.65 0.097786 144.5
1 B'-5 144.5 3.2 0.022145 1152 162.78 0.141302 144.5
B' 1
1
B'-6
B'-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
178.67
191.13
0.155095
0.165911
144.5
144.5
1 B'-12 144.5 3.2 0.022145 1152 138.53 0.120252 144.5
1 B'-13 144.5 3.2 0.022145 1152 146.15 0.126866 144.5
LANDING HOISTING
WAKTU Segmen Lantai Titik
h t TOTAL v h t
(m) (menit) (menit) (m/menit) (m) (menit)
0 0 0.159237 2 A-0A 83.8 1.5 0.0179
0 0 0.05145 2 A-0B 83.8 1.5 0.0179
0 0 0.138898 2 A-0 83.8 1.5 0.0179
0 0 0.074888 2 A-1 83.8 1.5 0.0179
0 0 0.049566 2 A-2 83.8 1.5 0.0179
0 0 0.067943 2 A-3 83.8 1.5 0.0179
0 0 0.054697 2 A-4 83.8 1.5 0.0179
0 0 0.191025 2 A-5 83.8 1.5 0.0179
0
0
0
0
0.204271
0.209393
A 2
2
A-6
A-7
83.8
83.8
1.5
1.5
0.0179
0.0179
0 0 0.12527 2 A-8 83.8 1.5 0.0179
0 0 0.112023 2 A-9 83.8 1.5 0.0179
0 0 0.106901 2 A-10 83.8 1.5 0.0179
0 0 0.155782 2 A-11 83.8 1.5 0.0179
0 0 0.169028 2 A-12 83.8 1.5 0.0179
0 0 0.031745 2 A-12A 83.8 1.5 0.0179
0 0 0.172874 2 A-13 83.8 1.5 0.0179
0
0
0
0
0.125599
0.156945 A' 2
2
A'-0
A'-12
83.8
83.8
1.5
1.5
0.0179
0.0179
0 0 0.134679 2 B-0A 83.8 1.5 0.0179
0 0 0.05145 2 B-0B 83.8 1.5 0.0179
0 0 0.119922 2 B-0 83.8 1.5 0.0179
0 0 0.093863 2 B-1 83.8 1.5 0.0179
0 0 0.083065 2 B-2 83.8 1.5 0.0179
0 0 0.09237 2 B-3 83.8 1.5 0.0179
0 0 0.075955 2 B-4 83.8 1.5 0.0179
0 0 0.166598 2 B-5 83.8 1.5 0.0179
0
0
0
0
0.183013
0.192594
B 2
2
B-6
B-7
83.8
83.8
1.5
1.5
0.0179
0.0179
0 0 0.149697 2 B-8 83.8 1.5 0.0179
0 0 0.133282 2 B-9 83.8 1.5 0.0179
0 0 0.123629 2 B-10 83.8 1.5 0.0179
0 0 0.131355 2 B-11 83.8 1.5 0.0179
0 0 0.147691 2 B-12 83.8 1.5 0.0179
0 0 0.031745 2 B-12A 83.8 1.5 0.0179
0 0 0.154653 2 B-13 83.8 1.5 0.0179
0 0 0.126528 2 B'-0A 83.8 1.5 0.0179
0 0 0.115686 2 B'-0 83.8 1.5 0.0179
0 0 0.159202 2 B'-5 83.8 1.5 0.0179
0 0 0.172995 B' 2 B'-6 83.8 1.5 0.0179
0 0 0.183811
B' 2 B'-7 83.8 1.5 0.0179
0 0 0.138151 2 B'-12 83.8 1.5 0.0179
0 0 0.144766 2 B'-13 83.8 1.5 0.0179

LANDING HOISTING
WAKTU Segmen Lantai Titik
h t TOTAL v h t
(m) (menit) (menit) (m/menit) (m) (menit)
1.5 0.010381 0.173863 2 A-0A 144.5 6 0.041522
1.5 0.010381 0.066076 2 A-0B 144.5 6 0.041522
1.5 0.010381 0.153524 2 A-0 144.5 6 0.041522
1.5 0.010381 0.089514 2 A-1 144.5 6 0.041522
1.5 0.010381 0.064193 2 A-2 144.5 6 0.041522
1.5 0.010381 0.082569 2 A-3 144.5 6 0.041522
1.5 0.010381 0.069323 2 A-4 144.5 6 0.041522
1.5 0.010381 0.205651 2 A-5 144.5 6 0.041522
1.5
1.5
0.010381
0.010381
0.218897
0.224019
A 2
2
A-6
A-7
144.5
144.5
6
6
0.041522
0.041522
1.5 0.010381 0.139896 2 A-8 144.5 6 0.041522
1.5 0.010381 0.126649 2 A-9 144.5 6 0.041522
1.5 0.010381 0.121528 2 A-10 144.5 6 0.041522
1.5 0.010381 0.170408 2 A-11 144.5 6 0.041522
1.5 0.010381 0.183654 2 A-12 144.5 6 0.041522
1.5 0.010381 0.046371 2 A-12A 144.5 6 0.041522
1.5 0.010381 0.1875 2 A-13 144.5 6 0.041522
1.5
1.5
0.010381
0.010381
0.140226
0.171571 A' 2
2
A'-0
A'-12
144.5
144.5
6
6
0.041522
0.041522
1.5 0.010381 0.149305 2 B-0A 144.5 6 0.041522
1.5 0.010381 0.066076 2 B-0B 144.5 6 0.041522
1.5 0.010381 0.134549 2 B-0 144.5 6 0.041522
1.5 0.010381 0.108489 2 B-1 144.5 6 0.041522
1.5 0.010381 0.097691 2 B-2 144.5 6 0.041522
1.5 0.010381 0.106996 2 B-3 144.5 6 0.041522
1.5 0.010381 0.090582 2 B-4 144.5 6 0.041522
1.5 0.010381 0.181224 2 B-5 144.5 6 0.041522
1.5
1.5
0.010381
0.010381
0.197639
0.20722
B 2
2
B-6
B-7
144.5
144.5
6
6
0.041522
0.041522
1.5 0.010381 0.164323 2 B-8 144.5 6 0.041522
1.5 0.010381 0.147908 2 B-9 144.5 6 0.041522
1.5 0.010381 0.138255 2 B-10 144.5 6 0.041522
1.5 0.010381 0.145981 2 B-11 144.5 6 0.041522
1.5 0.010381 0.162318 2 B-12 144.5 6 0.041522
1.5 0.010381 0.046371 2 B-12A 144.5 6 0.041522
1.5 0.010381 0.169279 2 B-13 144.5 6 0.041522
1.5 0.010381 0.141154 2 B'-0A 144.5 6 0.041522

B'
1.5 0.010381 0.130312 2 B'-0 144.5 6 0.041522
1.5 0.010381 0.173828 2 B'-5 144.5 6 0.041522
1.5
1.5
0.010381
0.010381
0.187621
0.198437
B' 2
2
B'-6
B'-7
144.5
144.5
6
6
0.041522
0.041522
1.5 0.010381 0.152778 2 B'-12 144.5 6 0.041522
1.5 0.010381 0.159392 2 B'-13 144.5 6 0.041522
SLEWING LANDING
WAKTU Segmen Lantai
v d t v h t TOTAL
(m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
1152 162.82 0.141337 83.8 3.2 0.038186 0.197423 3
1152 38.65 0.03355 83.8 3.2 0.038186 0.089636 3
1152 139.39 0.120998 83.8 3.2 0.038186 0.177084 3
1152 65.65 0.056988 83.8 3.2 0.038186 0.113074 3
1152 36.48 0.031667 83.8 3.2 0.038186 0.087753 3
1152 57.65 0.050043 83.8 3.2 0.038186 0.106129 3
1152 42.39 0.036797 83.8 3.2 0.038186 0.092883 3
1152 199.44 0.173125 83.8 3.2 0.038186 0.229211 3
1152
1152
214.7
220.6
0.186372 83.8
0.191493 83.8
3.2
3.2
0.038186
0.038186
0.242457
0.247579
A 3
3
1152 123.69 0.10737 83.8 3.2 0.038186 0.163456 3
1152 108.43 0.094123 83.8 3.2 0.038186 0.150209 3
1152 102.53 0.089002 83.8 3.2 0.038186 0.145088 3
1152 158.84 0.137882 83.8 3.2 0.038186 0.193968 3
1152 174.1 0.151128 83.8 3.2 0.038186 0.207214 3
1152 15.95 0.013845 83.8 3.2 0.038186 0.069931 3
1152 178.53 0.154974 83.8 3.2 0.038186 0.21106 3
1152
1152
124.07
160.18
0.1077 83.8
0.139045 83.8
3.2
3.2
0.038186
0.038186
0.163786
0.195131 A' 3
3
1152 134.53 0.11678 83.8 3.2 0.038186 0.172865 3
1152 38.65 0.03355 83.8 3.2 0.038186 0.089636 3
1152 117.53 0.102023 83.8 3.2 0.038186 0.158108 3
1152 87.51 0.075964 83.8 3.2 0.038186 0.132049 3
1152 75.07 0.065165 83.8 3.2 0.038186 0.121251 3
1152 85.79 0.07447 83.8 3.2 0.038186 0.130556 3
1152 66.88 0.058056 83.8 3.2 0.038186 0.114141 3
1152 171.3 0.148698 83.8 3.2 0.038186 0.204784 3
1152
1152
190.21
201.248
0.165113 83.8
0.174694 83.8
3.2
3.2
0.038186
0.038186
0.221199
0.23078
B 3
3
1152 151.83 0.131797 83.8 3.2 0.038186 0.187883 3
1152 132.92 0.115382 83.8 3.2 0.038186 0.171468 3
1152 121.8 0.105729 83.8 3.2 0.038186 0.161815 3
1152 130.7 0.113455 83.8 3.2 0.038186 0.169541 3
1152 149.52 0.129792 83.8 3.2 0.038186 0.185878 3
1152 15.95 0.013845 83.8 3.2 0.038186 0.069931 3
1152 157.54 0.136753 83.8 3.2 0.038186 0.192839 3
1152 125.14 0.108628 83.8 3.2 0.038186 0.164714 3
1152 112.65 0.097786 83.8 3.2 0.038186 0.153872 3
1152 162.78 0.141302 83.8 3.2 0.038186 0.197388 3
1152 178.67 0.155095 83.8 3.2 0.038186 0.211181 B' 3
1152 191.13 0.165911 83.8 3.2 0.038186 0.221997
B' 3
1152 138.53 0.120252 83.8 3.2 0.038186 0.176338 3
1152 146.15 0.126866 83.8 3.2 0.038186 0.182952 3

SLEWING LANDING
WAKTU Segmen Lantai
v d t v h t TOTAL
(m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
1152 162.82 0.141337 144.5 1.5 0.010381 0.19324 3
1152 38.65 0.03355 144.5 1.5 0.010381 0.085453 3
1152 139.39 0.120998 144.5 1.5 0.010381 0.172901 3
1152 65.65 0.056988 144.5 1.5 0.010381 0.108891 3
1152 36.48 0.031667 144.5 1.5 0.010381 0.08357 3
1152 57.65 0.050043 144.5 1.5 0.010381 0.101947 3
1152 42.39 0.036797 144.5 1.5 0.010381 0.0887 3
1152 199.44 0.173125 144.5 1.5 0.010381 0.225028 3
1152
1152
214.7
220.6
0.186372 144.5
0.191493 144.5
1.5
1.5
0.010381
0.010381
0.238275
0.243396
A 3
3
1152 123.69 0.10737 144.5 1.5 0.010381 0.159273 3
1152 108.43 0.094123 144.5 1.5 0.010381 0.146026 3
1152 102.53 0.089002 144.5 1.5 0.010381 0.140905 3
1152 158.84 0.137882 144.5 1.5 0.010381 0.189785 3
1152 174.1 0.151128 144.5 1.5 0.010381 0.203032 3
1152 15.95 0.013845 144.5 1.5 0.010381 0.065749 3
1152 178.53 0.154974 144.5 1.5 0.010381 0.206877 3
1152
1152
124.07
160.18
0.1077 144.5
0.139045 144.5
1.5
1.5
0.010381
0.010381
0.159603
0.190948 A' 3
3
1152 134.53 0.11678 144.5 1.5 0.010381 0.168683 3
1152 38.65 0.03355 144.5 1.5 0.010381 0.085453 3
1152 117.53 0.102023 144.5 1.5 0.010381 0.153926 3
1152 87.51 0.075964 144.5 1.5 0.010381 0.127867 3
1152 75.07 0.065165 144.5 1.5 0.010381 0.117068 3
1152 85.79 0.07447 144.5 1.5 0.010381 0.126374 3
1152 66.88 0.058056 144.5 1.5 0.010381 0.109959 3
1152 171.3 0.148698 144.5 1.5 0.010381 0.200601 3
1152
1152
190.21
201.248
0.165113 144.5
0.174694 144.5
1.5
1.5
0.010381
0.010381
0.217016
0.226598
B 3
3
1152 151.83 0.131797 144.5 1.5 0.010381 0.1837 3
1152 132.92 0.115382 144.5 1.5 0.010381 0.167285 3
1152 121.8 0.105729 144.5 1.5 0.010381 0.157632 3
1152 130.7 0.113455 144.5 1.5 0.010381 0.165358 3
1152 149.52 0.129792 144.5 1.5 0.010381 0.181695 3
1152 15.95 0.013845 144.5 1.5 0.010381 0.065749 3
1152 157.54 0.136753 144.5 1.5 0.010381 0.188657 3
1152 125.14 0.108628 144.5 1.5 0.010381 0.160532 3

B'
1152 112.65 0.097786 144.5 1.5 0.010381 0.14969 3
1152 162.78 0.141302 144.5 1.5 0.010381 0.193205 3
1152
1152
178.67
191.13
0.155095
0.165911
144.5
144.5
1.5
1.5
0.010381
0.010381
0.206999
0.217815
B' 3
3
1152 138.53 0.120252 144.5 1.5 0.010381 0.172155 3
1152 146.15 0.126866 144.5 1.5 0.010381 0.178769 3
HOISTING SLEWING LANDING
Titik
v h t v d t v h t
(m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit)
A-0A 83.8 1.5 0.0179 1152 162.82 0.141337 83.8 6 0.071599
A-0B 83.8 1.5 0.0179 1152 38.65 0.03355 83.8 6 0.071599
A-0 83.8 1.5 0.0179 1152 139.39 0.120998 83.8 6 0.071599
A-1 83.8 1.5 0.0179 1152 65.65 0.056988 83.8 6 0.071599
A-2 83.8 1.5 0.0179 1152 36.48 0.031667 83.8 6 0.071599
A-3 83.8 1.5 0.0179 1152 57.65 0.050043 83.8 6 0.071599
A-4 83.8 1.5 0.0179 1152 42.39 0.036797 83.8 6 0.071599
A-5 83.8 1.5 0.0179 1152 199.44 0.173125 83.8 6 0.071599
A-6 83.8 1.5 0.0179 1152 214.7 0.186372 83.8 6 0.071599
A-7 83.8 1.5 0.0179 1152 220.6 0.191493 83.8 6 0.071599
A-8 83.8 1.5 0.0179 1152 123.69 0.10737 83.8 6 0.071599
A-9 83.8 1.5 0.0179 1152 108.43 0.094123 83.8 6 0.071599
A-10 83.8 1.5 0.0179 1152 102.53 0.089002 83.8 6 0.071599
A-11 83.8 1.5 0.0179 1152 158.84 0.137882 83.8 6 0.071599
A-12 83.8 1.5 0.0179 1152 174.1 0.151128 83.8 6 0.071599
A-12A 83.8 1.5 0.0179 1152 15.95 0.013845 83.8 6 0.071599
A-13 83.8 1.5 0.0179 1152 178.53 0.154974 83.8 6 0.071599
A'-0 83.8 1.5 0.0179 1152 124.07 0.1077 83.8 6 0.071599
A'-12 83.8 1.5 0.0179 1152 160.18 0.139045 83.8 6 0.071599
B-0A 83.8 1.5 0.0179 1152 134.53 0.11678 83.8 6 0.071599
B-0B 83.8 1.5 0.0179 1152 38.65 0.03355 83.8 6 0.071599
B-0 83.8 1.5 0.0179 1152 117.53 0.102023 83.8 6 0.071599
B-1 83.8 1.5 0.0179 1152 87.51 0.075964 83.8 6 0.071599
B-2 83.8 1.5 0.0179 1152 75.07 0.065165 83.8 6 0.071599
B-3 83.8 1.5 0.0179 1152 85.79 0.07447 83.8 6 0.071599
B-4 83.8 1.5 0.0179 1152 66.88 0.058056 83.8 6 0.071599
B-5 83.8 1.5 0.0179 1152 171.3 0.148698 83.8 6 0.071599
B-6 83.8 1.5 0.0179 1152 190.21 0.165113 83.8 6 0.071599
B-7 83.8 1.5 0.0179 1152 201.248 0.174694 83.8 6 0.071599
B-8 83.8 1.5 0.0179 1152 151.83 0.131797 83.8 6 0.071599
B-9 83.8 1.5 0.0179 1152 132.92 0.115382 83.8 6 0.071599
B-10 83.8 1.5 0.0179 1152 121.8 0.105729 83.8 6 0.071599
B-11 83.8 1.5 0.0179 1152 130.7 0.113455 83.8 6 0.071599
B-12 83.8 1.5 0.0179 1152 149.52 0.129792 83.8 6 0.071599
B-12A 83.8 1.5 0.0179 1152 15.95 0.013845 83.8 6 0.071599
B-13 83.8 1.5 0.0179 1152 157.54 0.136753 83.8 6 0.071599
B'-0A 83.8 1.5 0.0179 1152 125.14 0.108628 83.8 6 0.071599
B'-0 83.8 1.5 0.0179 1152 112.65 0.097786 83.8 6 0.071599
B'-5 83.8 1.5 0.0179 1152 162.78 0.141302 83.8 6 0.071599
B'-6 83.8 1.5 0.0179 1152 178.67 0.155095 83.8 6 0.071599
B'-7 83.8 1.5 0.0179 1152 191.13 0.165911 83.8 6 0.071599
B'-12 83.8 1.5 0.0179 1152 138.53 0.120252 83.8 6 0.071599
B'-13 83.8 1.5 0.0179 1152 146.15 0.126866 83.8 6 0.071599

HOISTING SLEWING LANDING


Titik
v h t v d t v h t
(m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit)
A-0A 144.5 8.8 0.0609 1152 162.82 0.141337 144.5 1.5 0.010381
A-0B 144.5 8.8 0.0609 1152 38.65 0.03355 144.5 1.5 0.010381
A-0 144.5 8.8 0.0609 1152 139.39 0.120998 144.5 1.5 0.010381
A-1 144.5 8.8 0.0609 1152 65.65 0.056988 144.5 1.5 0.010381
A-2 144.5 8.8 0.0609 1152 36.48 0.031667 144.5 1.5 0.010381
A-3 144.5 8.8 0.0609 1152 57.65 0.050043 144.5 1.5 0.010381
A-4 144.5 8.8 0.0609 1152 42.39 0.036797 144.5 1.5 0.010381
A-5 144.5 8.8 0.0609 1152 199.44 0.173125 144.5 1.5 0.010381
A-6 144.5 8.8 0.0609 1152 214.7 0.186372 144.5 1.5 0.010381
A-7 144.5 8.8 0.0609 1152 220.6 0.191493 144.5 1.5 0.010381
A-8 144.5 8.8 0.0609 1152 123.69 0.10737 144.5 1.5 0.010381
A-9 144.5 8.8 0.0609 1152 108.43 0.094123 144.5 1.5 0.010381
A-10 144.5 8.8 0.0609 1152 102.53 0.089002 144.5 1.5 0.010381
A-11 144.5 8.8 0.0609 1152 158.84 0.137882 144.5 1.5 0.010381
A-12 144.5 8.8 0.0609 1152 174.1 0.151128 144.5 1.5 0.010381
A-12A 144.5 8.8 0.0609 1152 15.95 0.013845 144.5 1.5 0.010381
A-13 144.5 8.8 0.0609 1152 178.53 0.154974 144.5 1.5 0.010381
A'-0 144.5 8.8 0.0609 1152 124.07 0.1077 144.5 1.5 0.010381
A'-12 144.5 8.8 0.0609 1152 160.18 0.139045 144.5 1.5 0.010381
B-0A 144.5 8.8 0.0609 1152 134.53 0.11678 144.5 1.5 0.010381
B-0B 144.5 8.8 0.0609 1152 38.65 0.03355 144.5 1.5 0.010381
B-0 144.5 8.8 0.0609 1152 117.53 0.102023 144.5 1.5 0.010381
B-1 144.5 8.8 0.0609 1152 87.51 0.075964 144.5 1.5 0.010381
B-2 144.5 8.8 0.0609 1152 75.07 0.065165 144.5 1.5 0.010381
B-3 144.5 8.8 0.0609 1152 85.79 0.07447 144.5 1.5 0.010381
B-4 144.5 8.8 0.0609 1152 66.88 0.058056 144.5 1.5 0.010381
B-5 144.5 8.8 0.0609 1152 171.3 0.148698 144.5 1.5 0.010381
B-6 144.5 8.8 0.0609 1152 190.21 0.165113 144.5 1.5 0.010381
B-7 144.5 8.8 0.0609 1152 201.248 0.174694 144.5 1.5 0.010381
B-8 144.5 8.8 0.0609 1152 151.83 0.131797 144.5 1.5 0.010381
B-9 144.5 8.8 0.0609 1152 132.92 0.115382 144.5 1.5 0.010381
B-10 144.5 8.8 0.0609 1152 121.8 0.105729 144.5 1.5 0.010381
B-11 144.5 8.8 0.0609 1152 130.7 0.113455 144.5 1.5 0.010381
B-12 144.5 8.8 0.0609 1152 149.52 0.129792 144.5 1.5 0.010381
B-12A 144.5 8.8 0.0609 1152 15.95 0.013845 144.5 1.5 0.010381
B-13 144.5 8.8 0.0609 1152 157.54 0.136753 144.5 1.5 0.010381
B'-0A 144.5 8.8 0.0609 1152 125.14 0.108628 144.5 1.5 0.010381
B'-0 144.5 8.8 0.0609 1152 112.65 0.097786 144.5 1.5 0.010381
B'-5 144.5 8.8 0.0609 1152 162.78 0.141302 144.5 1.5 0.010381
B'-6 144.5 8.8 0.0609 1152 178.67 0.155095 144.5 1.5 0.010381
B'-7 144.5 8.8 0.0609 1152 191.13 0.165911 144.5 1.5 0.010381
B'-12 144.5 8.8 0.0609 1152 138.53 0.120252 144.5 1.5 0.010381
B'-13 144.5 8.8 0.0609 1152 146.15 0.126866 144.5 1.5 0.010381
HOISTING SLEWING
WAKTU Segmen Lantai Titik
TOTAL v h t v d
(menit) (m/menit) (m) (menit) (m/menit) derajat
0.230836 4 A-0A 83.8 1.5 0.0179 1152 162.82
0.123049 4 A-0B 83.8 1.5 0.0179 1152 38.65
0.210497 4 A-0 83.8 1.5 0.0179 1152 139.39
0.146487 4 A-1 83.8 1.5 0.0179 1152 65.65
0.121165 4 A-2 83.8 1.5 0.0179 1152 36.48
0.139542 4 A-3 83.8 1.5 0.0179 1152 57.65
0.126296 4 A-4 83.8 1.5 0.0179 1152 42.39
0.262624 4 A-5 83.8 1.5 0.0179 1152 199.44
0.27587
0.280992
A 4
4
A-6
A-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
214.7
220.6
0.196869 4 A-8 83.8 1.5 0.0179 1152 123.69
0.183622 4 A-9 83.8 1.5 0.0179 1152 108.43
0.178501 4 A-10 83.8 1.5 0.0179 1152 102.53
0.227381 4 A-11 83.8 1.5 0.0179 1152 158.84
0.240627 4 A-12 83.8 1.5 0.0179 1152 174.1
0.103344 4 A-12A 83.8 1.5 0.0179 1152 15.95
0.244473 4 A-13 83.8 1.5 0.0179 1152 178.53
0.197198
0.228544 A' 4
4
A'-0
A'-12
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
124.07
160.18
0.206278 4 B-0A 83.8 1.5 0.0179 1152 134.53
0.123049 4 B-0B 83.8 1.5 0.0179 1152 38.65
0.191521 4 B-0 83.8 1.5 0.0179 1152 117.53
0.165462 4 B-1 83.8 1.5 0.0179 1152 87.51
0.154664 4 B-2 83.8 1.5 0.0179 1152 75.07
0.163969 4 B-3 83.8 1.5 0.0179 1152 85.79
0.147554 4 B-4 83.8 1.5 0.0179 1152 66.88
0.238197 4 B-5 83.8 1.5 0.0179 1152 171.3
0.254612
0.264193
B 4
4
B-6
B-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
190.21
201.248
0.221296 4 B-8 83.8 1.5 0.0179 1152 151.83
0.204881 4 B-9 83.8 1.5 0.0179 1152 132.92
0.195228 4 B-10 83.8 1.5 0.0179 1152 121.8
0.202954 4 B-11 83.8 1.5 0.0179 1152 130.7
0.21929 4 B-12 83.8 1.5 0.0179 1152 149.52
0.103344 4 B-12A 83.8 1.5 0.0179 1152 15.95
0.226252 4 B-13 83.8 1.5 0.0179 1152 157.54
0.198127 4 B'-0A 83.8 1.5 0.0179 1152 125.14
0.187285 4 B'-0 83.8 1.5 0.0179 1152 112.65
0.230801 4 B'-5 83.8 1.5 0.0179 1152 162.78
0.244594 B' 4 B'-6 83.8 1.5 0.0179 1152 178.67
0.25541
B' 4 B'-7 83.8 1.5 0.0179 1152 191.13
0.209751 4 B'-12 83.8 1.5 0.0179 1152 138.53
0.216365 4 B'-13 83.8 1.5 0.0179 1152 146.15

HOISTING SLEWING
WAKTU Segmen Lantai Titik
TOTAL v h t v d
(menit) (m/menit) (m) (menit) (m/menit) derajat
0.212617 4 A-0A 144.5 11.6 0.080277 1152 162.82
0.104831 4 A-0B 144.5 11.6 0.080277 1152 38.65
0.192279 4 A-0 144.5 11.6 0.080277 1152 139.39
0.128268 4 A-1 144.5 11.6 0.080277 1152 65.65
0.102947 4 A-2 144.5 11.6 0.080277 1152 36.48
0.121324 4 A-3 144.5 11.6 0.080277 1152 57.65
0.108077 4 A-4 144.5 11.6 0.080277 1152 42.39
0.244405 4 A-5 144.5 11.6 0.080277 1152 199.44
0.257652
0.262773
A 4
4
A-6
A-7
144.5
144.5
11.6
11.6
0.080277 1152
0.080277 1152
214.7
220.6
0.17865 4 A-8 144.5 11.6 0.080277 1152 123.69
0.165404 4 A-9 144.5 11.6 0.080277 1152 108.43
0.160282 4 A-10 144.5 11.6 0.080277 1152 102.53
0.209162 4 A-11 144.5 11.6 0.080277 1152 158.84
0.222409 4 A-12 144.5 11.6 0.080277 1152 174.1
0.085126 4 A-12A 144.5 11.6 0.080277 1152 15.95
0.226254 4 A-13 144.5 11.6 0.080277 1152 178.53
0.17898
0.210325 A' 4
4
A'-0
A'-12
144.5
144.5
11.6
11.6
0.080277 1152
0.080277 1152
124.07
160.18
0.18806 4 B-0A 144.5 11.6 0.080277 1152 134.53
0.104831 4 B-0B 144.5 11.6 0.080277 1152 38.65
0.173303 4 B-0 144.5 11.6 0.080277 1152 117.53
0.147244 4 B-1 144.5 11.6 0.080277 1152 87.51
0.136445 4 B-2 144.5 11.6 0.080277 1152 75.07
0.145751 4 B-3 144.5 11.6 0.080277 1152 85.79
0.129336 4 B-4 144.5 11.6 0.080277 1152 66.88
0.219978 4 B-5 144.5 11.6 0.080277 1152 171.3
0.236393
0.245975
B 4
4
B-6
B-7
144.5
144.5
11.6
11.6
0.080277 1152
0.080277 1152
190.21
201.248
0.203077 4 B-8 144.5 11.6 0.080277 1152 151.83
0.186662 4 B-9 144.5 11.6 0.080277 1152 132.92
0.177009 4 B-10 144.5 11.6 0.080277 1152 121.8
0.184735 4 B-11 144.5 11.6 0.080277 1152 130.7
0.201072 4 B-12 144.5 11.6 0.080277 1152 149.52
0.085126 4 B-12A 144.5 11.6 0.080277 1152 15.95
0.208034 4 B-13 144.5 11.6 0.080277 1152 157.54
0.179909 4 B'-0A 144.5 11.6 0.080277 1152 125.14

B'
0.169067 4 B'-0 144.5 11.6 0.080277 1152 112.65
0.212582 4 B'-5 144.5 11.6 0.080277 1152 162.78
0.226376
0.237192
B' 4
4
B'-6
B'-7
144.5
144.5
11.6
11.6
0.080277
0.080277
1152
1152
178.67
191.13
0.191532 4 B'-12 144.5 11.6 0.080277 1152 138.53
0.198147 4 B'-13 144.5 11.6 0.080277 1152 146.15
SLEWING LANDING HOISTING
WAKTU Segmen Lantai Titik
t v h t TOTAL v
(menit) (m/menit) (m) (menit) (menit) (m/menit)
0.141337 83.8 8.8 0.105012 0.264249 5 A-0A 83.8
0.03355 83.8 8.8 0.105012 0.156462 5 A-0B 83.8
0.120998 83.8 8.8 0.105012 0.24391 5 A-0 83.8
0.056988 83.8 8.8 0.105012 0.1799 5 A-1 83.8
0.031667 83.8 8.8 0.105012 0.154578 5 A-2 83.8
0.050043 83.8 8.8 0.105012 0.172955 5 A-3 83.8
0.036797 83.8 8.8 0.105012 0.159709 5 A-4 83.8
0.173125 83.8 8.8 0.105012 0.296037 5 A-5 83.8
0.186372 83.8
0.191493 83.8
8.8
8.8
0.105012
0.105012
0.309283
0.314405
A 5
5
A-6
A-7
83.8
83.8
0.10737 83.8 8.8 0.105012 0.230281 5 A-8 83.8
0.094123 83.8 8.8 0.105012 0.217035 5 A-9 83.8
0.089002 83.8 8.8 0.105012 0.211913 5 A-10 83.8
0.137882 83.8 8.8 0.105012 0.260794 5 A-11 83.8
0.151128 83.8 8.8 0.105012 0.27404 5 A-12 83.8
0.013845 83.8 8.8 0.105012 0.136757 5 A-12A 83.8
0.154974 83.8 8.8 0.105012 0.277886 5 A-13 83.8
0.1077 83.8
0.139045 83.8
8.8
8.8
0.105012
0.105012
0.230611
0.261957 A' 5
5
A'-0
A'-12
83.8
83.8
0.11678 83.8 8.8 0.105012 0.239691 5 B-0A 83.8
0.03355 83.8 8.8 0.105012 0.156462 5 B-0B 83.8
0.102023 83.8 8.8 0.105012 0.224934 5 B-0 83.8
0.075964 83.8 8.8 0.105012 0.198875 5 B-1 83.8
0.065165 83.8 8.8 0.105012 0.188077 5 B-2 83.8
0.07447 83.8 8.8 0.105012 0.197382 5 B-3 83.8
0.058056 83.8 8.8 0.105012 0.180967 5 B-4 83.8
0.148698 83.8 8.8 0.105012 0.27161 5 B-5 83.8
0.165113 83.8
0.174694 83.8
8.8
8.8
0.105012
0.105012
0.288025
0.297606
B 5
5
B-6
B-7
83.8
83.8
0.131797 83.8 8.8 0.105012 0.254709 5 B-8 83.8
0.115382 83.8 8.8 0.105012 0.238294 5 B-9 83.8
0.105729 83.8 8.8 0.105012 0.228641 5 B-10 83.8
0.113455 83.8 8.8 0.105012 0.236367 5 B-11 83.8
0.129792 83.8 8.8 0.105012 0.252703 5 B-12 83.8
0.013845 83.8 8.8 0.105012 0.136757 5 B-12A 83.8
0.136753 83.8 8.8 0.105012 0.259665 5 B-13 83.8
0.108628 83.8 8.8 0.105012 0.23154 5 B'-0A 83.8
0.097786 83.8 8.8 0.105012 0.220698 5 B'-0 83.8
0.141302 83.8 8.8 0.105012 0.264214 5 B'-5 83.8
0.155095 83.8 8.8 0.105012 0.278007 B' 5 B'-6 83.8
0.165911 83.8 8.8 0.105012 0.288823
B' 5 B'-7 83.8
0.120252 83.8 8.8 0.105012 0.243163 5 B'-12 83.8
0.126866 83.8 8.8 0.105012 0.249778 5 B'-13 83.8

SLEWING LANDING HOISTING


WAKTU Segmen Lantai Titik
t v h t TOTAL v
(menit) (m/menit) (m) (menit) (menit) (m/menit)
0.141337 144.5 1.5 0.010381 0.231994 5 A-0A 144.5
0.03355 144.5 1.5 0.010381 0.124208 5 A-0B 144.5
0.120998 144.5 1.5 0.010381 0.211656 5 A-0 144.5
0.056988 144.5 1.5 0.010381 0.147645 5 A-1 144.5
0.031667 144.5 1.5 0.010381 0.122324 5 A-2 144.5
0.050043 144.5 1.5 0.010381 0.140701 5 A-3 144.5
0.036797 144.5 1.5 0.010381 0.127454 5 A-4 144.5
0.173125 144.5 1.5 0.010381 0.263782 5 A-5 144.5
0.186372 144.5
0.191493 144.5
1.5
1.5
0.010381
0.010381
0.277029
0.28215
A 5
5
A-6
A-7
144.5
144.5
0.10737 144.5 1.5 0.010381 0.198027 5 A-8 144.5
0.094123 144.5 1.5 0.010381 0.184781 5 A-9 144.5
0.089002 144.5 1.5 0.010381 0.179659 5 A-10 144.5
0.137882 144.5 1.5 0.010381 0.228539 5 A-11 144.5
0.151128 144.5 1.5 0.010381 0.241786 5 A-12 144.5
0.013845 144.5 1.5 0.010381 0.104503 5 A-12A 144.5
0.154974 144.5 1.5 0.010381 0.245631 5 A-13 144.5
0.1077 144.5
0.139045 144.5
1.5
1.5
0.010381
0.010381
0.198357
0.229703 A' 5
5
A'-0
A'-12
144.5
144.5
0.11678 144.5 1.5 0.010381 0.207437 5 B-0A 144.5
0.03355 144.5 1.5 0.010381 0.124208 5 B-0B 144.5
0.102023 144.5 1.5 0.010381 0.19268 5 B-0 144.5
0.075964 144.5 1.5 0.010381 0.166621 5 B-1 144.5
0.065165 144.5 1.5 0.010381 0.155822 5 B-2 144.5
0.07447 144.5 1.5 0.010381 0.165128 5 B-3 144.5
0.058056 144.5 1.5 0.010381 0.148713 5 B-4 144.5
0.148698 144.5 1.5 0.010381 0.239355 5 B-5 144.5
0.165113 144.5
0.174694 144.5
1.5
1.5
0.010381
0.010381
0.25577
0.265352
B 5
5
B-6
B-7
144.5
144.5
0.131797 144.5 1.5 0.010381 0.222454 5 B-8 144.5
0.115382 144.5 1.5 0.010381 0.206039 5 B-9 144.5
0.105729 144.5 1.5 0.010381 0.196387 5 B-10 144.5
0.113455 144.5 1.5 0.010381 0.204112 5 B-11 144.5
0.129792 144.5 1.5 0.010381 0.220449 5 B-12 144.5
0.013845 144.5 1.5 0.010381 0.104503 5 B-12A 144.5
0.136753 144.5 1.5 0.010381 0.227411 5 B-13 144.5
0.108628 144.5 1.5 0.010381 0.199286 5 B'-0A 144.5

B'
0.097786 144.5 1.5 0.010381 0.188444 5 B'-0 144.5
0.141302 144.5 1.5 0.010381 0.23196 5 B'-5 144.5
0.155095
0.165911
144.5
144.5
1.5
1.5
0.010381
0.010381
0.245753
0.256569
B' 5
5
B'-6
B'-7
144.5
144.5
0.120252 144.5 1.5 0.010381 0.210909 5 B'-12 144.5
0.126866 144.5 1.5 0.010381 0.217524 5 B'-13 144.5
HOISTING SLEWING LANDING
WAKTU
h t v d t v h t TOTAL
(m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
1.5 0.0179 1152 162.82 0.141337 83.8 11.6 0.138425 0.297661
1.5 0.0179 1152 38.65 0.03355 83.8 11.6 0.138425 0.189875
1.5 0.0179 1152 139.39 0.120998 83.8 11.6 0.138425 0.277323
1.5 0.0179 1152 65.65 0.056988 83.8 11.6 0.138425 0.213312
1.5 0.0179 1152 36.48 0.031667 83.8 11.6 0.138425 0.187991
1.5 0.0179 1152 57.65 0.050043 83.8 11.6 0.138425 0.206368
1.5 0.0179 1152 42.39 0.036797 83.8 11.6 0.138425 0.193121
1.5 0.0179 1152 199.44 0.173125 83.8 11.6 0.138425 0.32945
1.5 0.0179 1152 214.7 0.186372 83.8 11.6 0.138425 0.342696
1.5 0.0179 1152 220.6 0.191493 83.8 11.6 0.138425 0.347818
1.5 0.0179 1152 123.69 0.10737 83.8 11.6 0.138425 0.263694
1.5 0.0179 1152 108.43 0.094123 83.8 11.6 0.138425 0.250448
1.5 0.0179 1152 102.53 0.089002 83.8 11.6 0.138425 0.245326
1.5 0.0179 1152 158.84 0.137882 83.8 11.6 0.138425 0.294207
1.5 0.0179 1152 174.1 0.151128 83.8 11.6 0.138425 0.307453
1.5 0.0179 1152 15.95 0.013845 83.8 11.6 0.138425 0.17017
1.5 0.0179 1152 178.53 0.154974 83.8 11.6 0.138425 0.311299
1.5 0.0179 1152 124.07 0.1077 83.8 11.6 0.138425 0.264024
1.5 0.0179 1152 160.18 0.139045 83.8 11.6 0.138425 0.29537
1.5 0.0179 1152 134.53 0.11678 83.8 11.6 0.138425 0.273104
1.5 0.0179 1152 38.65 0.03355 83.8 11.6 0.138425 0.189875
1.5 0.0179 1152 117.53 0.102023 83.8 11.6 0.138425 0.258347
1.5 0.0179 1152 87.51 0.075964 83.8 11.6 0.138425 0.232288
1.5 0.0179 1152 75.07 0.065165 83.8 11.6 0.138425 0.22149
1.5 0.0179 1152 85.79 0.07447 83.8 11.6 0.138425 0.230795
1.5 0.0179 1152 66.88 0.058056 83.8 11.6 0.138425 0.21438
1.5 0.0179 1152 171.3 0.148698 83.8 11.6 0.138425 0.305022
1.5 0.0179 1152 190.21 0.165113 83.8 11.6 0.138425 0.321437
1.5 0.0179 1152 201.248 0.174694 83.8 11.6 0.138425 0.331019
1.5 0.0179 1152 151.83 0.131797 83.8 11.6 0.138425 0.288121
1.5 0.0179 1152 132.92 0.115382 83.8 11.6 0.138425 0.271707
1.5 0.0179 1152 121.8 0.105729 83.8 11.6 0.138425 0.262054
1.5 0.0179 1152 130.7 0.113455 83.8 11.6 0.138425 0.269779
1.5 0.0179 1152 149.52 0.129792 83.8 11.6 0.138425 0.286116
1.5 0.0179 1152 15.95 0.013845 83.8 11.6 0.138425 0.17017
1.5 0.0179 1152 157.54 0.136753 83.8 11.6 0.138425 0.293078
1.5 0.0179 1152 125.14 0.108628 83.8 11.6 0.138425 0.264953
1.5 0.0179 1152 112.65 0.097786 83.8 11.6 0.138425 0.254111
1.5 0.0179 1152 162.78 0.141302 83.8 11.6 0.138425 0.297627
1.5 0.0179 1152 178.67 0.155095 83.8 11.6 0.138425 0.31142
1.5 0.0179 1152 191.13 0.165911 83.8 11.6 0.138425 0.322236
1.5 0.0179 1152 138.53 0.120252 83.8 11.6 0.138425 0.276576
1.5 0.0179 1152 146.15 0.126866 83.8 11.6 0.138425 0.283191

HOISTING SLEWING LANDING


WAKTU
h t v d t v h t TOTAL
(m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
14.6 0.101038 1152 162.82 0.141337 144.5 1.5 0.010381 0.252755
14.6 0.101038 1152 38.65 0.03355 144.5 1.5 0.010381 0.144969
14.6 0.101038 1152 139.39 0.120998 144.5 1.5 0.010381 0.232417
14.6 0.101038 1152 65.65 0.056988 144.5 1.5 0.010381 0.168407
14.6 0.101038 1152 36.48 0.031667 144.5 1.5 0.010381 0.143085
14.6 0.101038 1152 57.65 0.050043 144.5 1.5 0.010381 0.161462
14.6 0.101038 1152 42.39 0.036797 144.5 1.5 0.010381 0.148216
14.6 0.101038 1152 199.44 0.173125 144.5 1.5 0.010381 0.284544
14.6 0.101038 1152 214.7 0.186372 144.5 1.5 0.010381 0.29779
14.6 0.101038 1152 220.6 0.191493 144.5 1.5 0.010381 0.302912
14.6 0.101038 1152 123.69 0.10737 144.5 1.5 0.010381 0.218788
14.6 0.101038 1152 108.43 0.094123 144.5 1.5 0.010381 0.205542
14.6 0.101038 1152 102.53 0.089002 144.5 1.5 0.010381 0.20042
14.6 0.101038 1152 158.84 0.137882 144.5 1.5 0.010381 0.249301
14.6 0.101038 1152 174.1 0.151128 144.5 1.5 0.010381 0.262547
14.6 0.101038 1152 15.95 0.013845 144.5 1.5 0.010381 0.125264
14.6 0.101038 1152 178.53 0.154974 144.5 1.5 0.010381 0.266393
14.6 0.101038 1152 124.07 0.1077 144.5 1.5 0.010381 0.219118
14.6 0.101038 1152 160.18 0.139045 144.5 1.5 0.010381 0.250464
14.6 0.101038 1152 134.53 0.11678 144.5 1.5 0.010381 0.228198
14.6 0.101038 1152 38.65 0.03355 144.5 1.5 0.010381 0.144969
14.6 0.101038 1152 117.53 0.102023 144.5 1.5 0.010381 0.213441
14.6 0.101038 1152 87.51 0.075964 144.5 1.5 0.010381 0.187382
14.6 0.101038 1152 75.07 0.065165 144.5 1.5 0.010381 0.176584
14.6 0.101038 1152 85.79 0.07447 144.5 1.5 0.010381 0.185889
14.6 0.101038 1152 66.88 0.058056 144.5 1.5 0.010381 0.169474
14.6 0.101038 1152 171.3 0.148698 144.5 1.5 0.010381 0.260117
14.6 0.101038 1152 190.21 0.165113 144.5 1.5 0.010381 0.276532
14.6 0.101038 1152 201.248 0.174694 144.5 1.5 0.010381 0.286113
14.6 0.101038 1152 151.83 0.131797 144.5 1.5 0.010381 0.243216
14.6 0.101038 1152 132.92 0.115382 144.5 1.5 0.010381 0.226801
14.6 0.101038 1152 121.8 0.105729 144.5 1.5 0.010381 0.217148
14.6 0.101038 1152 130.7 0.113455 144.5 1.5 0.010381 0.224874
14.6 0.101038 1152 149.52 0.129792 144.5 1.5 0.010381 0.24121
14.6 0.101038 1152 15.95 0.013845 144.5 1.5 0.010381 0.125264
14.6 0.101038 1152 157.54 0.136753 144.5 1.5 0.010381 0.248172
14.6 0.101038 1152 125.14 0.108628 144.5 1.5 0.010381 0.220047
14.6 0.101038 1152 112.65 0.097786 144.5 1.5 0.010381 0.209205
14.6 0.101038 1152 162.78 0.141302 144.5 1.5 0.010381 0.252721
14.6 0.101038 1152 178.67 0.155095 144.5 1.5 0.010381 0.266514
14.6 0.101038 1152 191.13 0.165911 144.5 1.5 0.010381 0.27733
14.6 0.101038 1152 138.53 0.120252 144.5 1.5 0.010381 0.23167
14.6 0.101038 1152 146.15 0.126866 144.5 1.5 0.010381 0.238285
Segmen Lantai Titik WAKTU SLEWING INSTALL KEMBALI WAKTU Segmen
MUAT TOTAL
(menit) (menit) (menit) (menit) (menit)
1 A-0A 5 0.159237 15.68 0.173863 21.0131
1 A-0B 5 0.05145 15.68 0.066076 20.79753
1 A-0 5 0.138898 15.68 0.153524 20.97242
1 A-1 5 0.074888 15.68 0.089514 20.8444
1 A-2 5 0.049566 15.68 0.064193 20.79376
1 A-3 5 0.067943 15.68 0.082569 20.83051
1 A-4 5 0.054697 15.68 0.069323 20.80402
1 A-5 5 0.191025 15.68 0.205651 21.07668
A 1
1
A-6
A-7
5
5
0.204271 15.68
0.209393 15.68
0.218897
0.224019
21.10317
21.11341
A
1 A-8 5 0.12527 15.68 0.139896 20.94517
1 A-9 5 0.112023 15.68 0.126649 20.91867
1 A-10 5 0.106901 15.68 0.121528 20.90843
1 A-11 5 0.155782 15.68 0.170408 21.00619
1 A-12 5 0.169028 15.68 0.183654 21.03268
1 A-12A 5 0.031745 15.68 0.046371 20.75812
1 A-13 5 0.172874 15.68 0.1875 21.04037

A' 1
1
A'-0
A'-12
5
5
0.125599 15.68
0.156945 15.68
0.140226
0.171571
20.94583
21.00852 A'
1 B-0A 5 0.134679 15.68 0.149305 20.96398
1 B-0B 5 0.05145 15.68 0.066076 20.79753
1 B-0 5 0.119922 15.68 0.134549 20.93447
1 B-1 5 0.093863 15.68 0.108489 20.88235
1 B-2 5 0.083065 15.68 0.097691 20.86076
1 B-3 5 0.09237 15.68 0.106996 20.87937
1 B-4 5 0.075955 15.68 0.090582 20.84654
1 B-5 5 0.166598 15.68 0.181224 21.02782
B 1
1
B-6
B-7
5
5
0.183013 15.68
0.192594 15.68
0.197639
0.20722
21.06065
21.07981
B
1 B-8 5 0.149697 15.68 0.164323 20.99402
1 B-9 5 0.133282 15.68 0.147908 20.96119
1 B-10 5 0.123629 15.68 0.138255 20.94188
1 B-11 5 0.131355 15.68 0.145981 20.95734
1 B-12 5 0.147691 15.68 0.162318 20.99001
1 B-12A 5 0.031745 15.68 0.046371 20.75812
1 B-13 5 0.154653 15.68 0.169279 21.00393
1 B'-0A 5 0.126528 15.68 0.141154 20.94768
1 B'-0 5 0.115686 15.68 0.130312 20.926
1 B'-5 5 0.159202 15.68 0.173828 21.01303
B' 1 B'-6 5 0.172995 15.68 0.187621 21.04062 B'
B' 1 B'-7 5 0.183811 15.68 0.198437 21.06225
B'
1 B'-12 5 0.138151 15.68 0.152778 20.97093
1 B'-13 5 0.144766 15.68 0.159392 20.98416

20.94878
Lantai Titik WAKTU SLEWING INSTALL KEMBALI WAKTU Segmen Lantai
MUAT TOTAL
(menit) (menit) (menit) (menit) (menit)
2 A-0A 5 0.197423 15.68 0.19324 21.07066 3
2 A-0B 5 0.089636 15.68 0.085453 20.85509 3
2 A-0 5 0.177084 15.68 0.172901 21.02999 3
2 A-1 5 0.113074 15.68 0.108891 20.90196 3
2 A-2 5 0.087753 15.68 0.08357 20.85132 3
2 A-3 5 0.106129 15.68 0.101947 20.88808 3
2 A-4 5 0.092883 15.68 0.0887 20.86158 3
2 A-5 5 0.229211 15.68 0.225028 21.13424 3
2
2
A-6
A-7
5
5
0.242457 15.68
0.247579 15.68
0.238275
0.243396
21.16073
21.17098
A 3
3
2 A-8 5 0.163456 15.68 0.159273 21.00273 3
2 A-9 5 0.150209 15.68 0.146026 20.97624 3
2 A-10 5 0.145088 15.68 0.140905 20.96599 3
2 A-11 5 0.193968 15.68 0.189785 21.06375 3
2 A-12 5 0.207214 15.68 0.203032 21.09025 3
2 A-12A 5 0.069931 15.68 0.065749 20.81568 3
2 A-13 5 0.21106 15.68 0.206877 21.09794 3
2
2
A'-0
A'-12
5
5
0.163786 15.68
0.195131 15.68
0.159603
0.190948
21.00339
21.06608 A' 3
3
2 B-0A 5 0.172865 15.68 0.168683 21.02155 3
2 B-0B 5 0.089636 15.68 0.085453 20.85509 3
2 B-0 5 0.158108 15.68 0.153926 20.99203 3
2 B-1 5 0.132049 15.68 0.127867 20.93992 3
2 B-2 5 0.121251 15.68 0.117068 20.91832 3
2 B-3 5 0.130556 15.68 0.126374 20.93693 3
2 B-4 5 0.114141 15.68 0.109959 20.9041 3
2 B-5 5 0.204784 15.68 0.200601 21.08538 3
2
2
B-6
B-7
5
5
0.221199 15.68
0.23078 15.68
0.217016
0.226598
21.11821
21.13738
B 3
3
2 B-8 5 0.187883 15.68 0.1837 21.05158 3
2 B-9 5 0.171468 15.68 0.167285 21.01875 3
2 B-10 5 0.161815 15.68 0.157632 20.99945 3
2 B-11 5 0.169541 15.68 0.165358 21.0149 3
2 B-12 5 0.185878 15.68 0.181695 21.04757 3
2 B-12A 5 0.069931 15.68 0.065749 20.81568 3
2 B-13 5 0.192839 15.68 0.188657 21.0615 3
2 B'-0A 5 0.164714 15.68 0.160532 21.00525 3
2 B'-0 5 0.153872 15.68 0.14969 20.98356 3
2 B'-5 5 0.197388 15.68 0.193205 21.07059 3
2 B'-6 5 0.211181 15.68 0.206999 21.09818 B' 3
2 B'-7 5 0.221997 15.68 0.217815 21.11981
B' 3
2 B'-12 5 0.176338 15.68 0.172155 21.02849 3
2 B'-13 5 0.182952 15.68 0.178769 21.04172 3
21.00634
Titik WAKTU SLEWING INSTALL KEMBALI WAKTU Segmen Lantai Titik
MUAT TOTAL
(menit) (menit) (menit) (menit) (menit)
A-0A 5 0.230836 15.68 0.212617 21.12345 4 A-0A
A-0B 5 0.123049 15.68 0.104831 20.90788 4 A-0B
A-0 5 0.210497 15.68 0.192279 21.08278 4 A-0
A-1 5 0.146487 15.68 0.128268 20.95475 4 A-1
A-2 5 0.121165 15.68 0.102947 20.90411 4 A-2
A-3 5 0.139542 15.68 0.121324 20.94087 4 A-3
A-4 5 0.126296 15.68 0.108077 20.91437 4 A-4
A-5 5 0.262624 15.68 0.244405 21.18703 4 A-5
A-6
A-7
5
5
0.27587 15.68
0.280992 15.68
0.257652
0.262773
21.21352
21.22377
A 4
4
A-6
A-7
A-8 5 0.196869 15.68 0.17865 21.05552 4 A-8
A-9 5 0.183622 15.68 0.165404 21.02903 4 A-9
A-10 5 0.178501 15.68 0.160282 21.01878 4 A-10
A-11 5 0.227381 15.68 0.209162 21.11654 4 A-11
A-12 5 0.240627 15.68 0.222409 21.14304 4 A-12
A-12A 5 0.103344 15.68 0.085126 20.86847 4 A-12A
A-13 5 0.244473 15.68 0.226254 21.15073 4 A-13
A'-0
A'-12
5
5
0.197198 15.68
0.228544 15.68
0.17898
0.210325
21.05618
21.11887 A' 4
4
A'-0
A'-12
B-0A 5 0.206278 15.68 0.18806 21.07434 4 B-0A
B-0B 5 0.123049 15.68 0.104831 20.90788 4 B-0B
B-0 5 0.191521 15.68 0.173303 21.04482 4 B-0
B-1 5 0.165462 15.68 0.147244 20.99271 4 B-1
B-2 5 0.154664 15.68 0.136445 20.97111 4 B-2
B-3 5 0.163969 15.68 0.145751 20.98972 4 B-3
B-4 5 0.147554 15.68 0.129336 20.95689 4 B-4
B-5 5 0.238197 15.68 0.219978 21.13817 4 B-5
B-6
B-7
5
5
0.254612 15.68
0.264193 15.68
0.236393
0.245975
21.171
21.19017
B 4
4
B-6
B-7
B-8 5 0.221296 15.68 0.203077 21.10437 4 B-8
B-9 5 0.204881 15.68 0.186662 21.07154 4 B-9
B-10 5 0.195228 15.68 0.177009 21.05224 4 B-10
B-11 5 0.202954 15.68 0.184735 21.06769 4 B-11
B-12 5 0.21929 15.68 0.201072 21.10036 4 B-12
B-12A 5 0.103344 15.68 0.085126 20.86847 4 B-12A
B-13 5 0.226252 15.68 0.208034 21.11429 4 B-13
B'-0A 5 0.198127 15.68 0.179909 21.05804 4 B'-0A
B'-0 5 0.187285 15.68 0.169067 21.03635 4 B'-0
B'-5 5 0.230801 15.68 0.212582 21.12338 4 B'-5
B'-6 5 0.244594 15.68 0.226376 21.15097 B' 4 B'-6
B'-7 5 0.25541 15.68 0.237192 21.1726
B' 4 B'-7
B'-12 5 0.209751 15.68 0.191532 21.08128 4 B'-12
B'-13 5 0.216365 15.68 0.198147 21.09451 4 B'-13
21.05913

RATA RATA WAKTU SIKLUS 21.08587


WAKTU SLEWING INSTALL KEMBALI WAKTU Segmen Lantai Titik WAKTU
MUAT TOTAL MUAT
(menit) (menit) (menit) (menit) (menit) (menit)
5 0.264249 15.68 0.231994 21.17624 5 A-0A 5
5 0.156462 15.68 0.124208 20.96067 5 A-0B 5
5 0.24391 15.68 0.211656 21.13557 5 A-0 5
5 0.1799 15.68 0.147645 21.00754 5 A-1 5
5 0.154578 15.68 0.122324 20.9569 5 A-2 5
5 0.172955 15.68 0.140701 20.99366 5 A-3 5
5 0.159709 15.68 0.127454 20.96716 5 A-4 5
5 0.296037 15.68 0.263782 21.23982 5 A-5 5
5
5
0.309283 15.68
0.314405 15.68
0.277029
0.28215
21.26631
21.27656
A 5
5
A-6
A-7
5
5
5 0.230281 15.68 0.198027 21.10831 5 A-8 5
5 0.217035 15.68 0.184781 21.08182 5 A-9 5
5 0.211913 15.68 0.179659 21.07157 5 A-10 5
5 0.260794 15.68 0.228539 21.16933 5 A-11 5
5 0.27404 15.68 0.241786 21.19583 5 A-12 5
5 0.136757 15.68 0.104503 20.92126 5 A-12A 5
5 0.277886 15.68 0.245631 21.20352 5 A-13 5
5
5
0.230611 15.68
0.261957 15.68
0.198357
0.229703
21.10897
21.17166 A' 5
5
A'-0
A'-12
5
5
5 0.239691 15.68 0.207437 21.12713 5 B-0A 5
5 0.156462 15.68 0.124208 20.96067 5 B-0B 5
5 0.224934 15.68 0.19268 21.09761 5 B-0 5
5 0.198875 15.68 0.166621 21.0455 5 B-1 5
5 0.188077 15.68 0.155822 21.0239 5 B-2 5
5 0.197382 15.68 0.165128 21.04251 5 B-3 5
5 0.180967 15.68 0.148713 21.00968 5 B-4 5
5 0.27161 15.68 0.239355 21.19096 5 B-5 5
5
5
0.288025 15.68
0.297606 15.68
0.25577
0.265352
21.22379
21.24296
B 5
5
B-6
B-7
5
5
5 0.254709 15.68 0.222454 21.15716 5 B-8 5
5 0.238294 15.68 0.206039 21.12433 5 B-9 5
5 0.228641 15.68 0.196387 21.10503 5 B-10 5
5 0.236367 15.68 0.204112 21.12048 5 B-11 5
5 0.252703 15.68 0.220449 21.15315 5 B-12 5
5 0.136757 15.68 0.104503 20.92126 5 B-12A 5
5 0.259665 15.68 0.227411 21.16708 5 B-13 5
5 0.23154 15.68 0.199286 21.11083 5 B'-0A 5
5 0.220698 15.68 0.188444 21.08914 5 B'-0 5
5 0.264214 15.68 0.23196 21.17617 5 B'-5 5
5 0.278007 15.68 0.245753 21.20376 B' 5 B'-6 5
5 0.288823 15.68 0.256569 21.22539
B' 5 B'-7 5
5 0.243163 15.68 0.210909 21.13407 5 B'-12 5
5 0.249778 15.68 0.217524 21.1473 5 B'-13 5
21.11192
SLEWING INSTALL KEMBALI WAKTU
TOTAL
(menit) (menit) (menit) (menit)
0.297661 15.68 0.252755 21.23042
0.189875 15.68 0.144969 21.01484
0.277323 15.68 0.232417 21.18974
0.213312 15.68 0.168407 21.06172
0.187991 15.68 0.143085 21.01108
0.206368 15.68 0.161462 21.04783
0.193121 15.68 0.148216 21.02134
0.32945 15.68 0.284544 21.29399
0.342696 15.68 0.29779 21.32049
0.347818 15.68 0.302912 21.33073
0.263694 15.68 0.218788 21.16248
0.250448 15.68 0.205542 21.13599
0.245326 15.68 0.20042 21.12575
0.294207 15.68 0.249301 21.22351
0.307453 15.68 0.262547 21.25
0.17017 15.68 0.125264 20.97543
0.311299 15.68 0.266393 21.25769
0.264024 15.68 0.219118 21.16314
0.29537 15.68 0.250464 21.22583
0.273104 15.68 0.228198 21.1813
0.189875 15.68 0.144969 21.01484
0.258347 15.68 0.213441 21.15179
0.232288 15.68 0.187382 21.09967
0.22149 15.68 0.176584 21.07807
0.230795 15.68 0.185889 21.09668
0.21438 15.68 0.169474 21.06385
0.305022 15.68 0.260117 21.24514
0.321437 15.68 0.276532 21.27797
0.331019 15.68 0.286113 21.29713
0.288121 15.68 0.243216 21.21134
0.271707 15.68 0.226801 21.17851
0.262054 15.68 0.217148 21.1592
0.269779 15.68 0.224874 21.17465
0.286116 15.68 0.24121 21.20733
0.17017 15.68 0.125264 20.97543
0.293078 15.68 0.248172 21.22125
0.264953 15.68 0.220047 21.165
0.254111 15.68 0.209205 21.14332
0.297627 15.68 0.252721 21.23035
0.31142 15.68 0.266514 21.25793
0.322236 15.68 0.27733 21.27957
0.276576 15.68 0.23167 21.18825
0.283191 15.68 0.238285 21.20148
21.16609
SUDUT SWING BALOK ARAH X (HORISONTAL)

Posisi mobile crane Posisi balok Posisi stock area Jarak MC


Segmen Lantai Titik
X (cm) Y (cm) Xk (cm) Yk (cm) Xc (cm) Yc (cm) ke balok
a b c e f g h g h i
1 A-0A-0 525 500 150 800 1650 200 480.23
1 A-0-1 525 500 412.5 800 1650 200 320.40
1 A-1-2 525 500 862.5 800 1650 200 451.56
1 A-2-3 525 500 1312.5 800 1650 200 842.71
1 A-3-4 2100 500 1762.5 800 1650 200 451.56
1 A-4-5 2100 500 2212.5 800 1650 200 320.40

A 1
1
A-5-6
A-6-7
2100
2100
500
500
2662.5
3112.5
800
800
1650
1650
200
200
637.50
1056.01
1 A-7-8 3450 500 3562.5 800 3450 200 320.40
1 A-8-9 3450 500 4012.5 800 3450 200 637.50
1 A-9-10 3450 500 4462.5 800 3450 200 1056.01
1 A-10-11 4800 500 4912.5 800 3450 200 320.40
1 A-11-12 4800 500 5362.5 800 3450 200 637.50
1 A-12-13 4800 500 5512.5 800 3450 200 773.08
1 A-0A-0 525 500 150 1340 1650 200 919.90
1 A-0-1 525 500 412.5 1340 1650 200 847.50
1 A-1-2 525 500 862.5 1340 1650 200 905.27
1 A-2-3 525 500 1312.5 1340 1650 200 1151.41
1 A-3-4 2100 500 1762.5 1340 1650 200 905.27
1 A-4-5 2100 500 2212.5 1340 1650 200 847.50

B 1
1
A-5-6
A-6-7
2100
2100
500
500
2662.5
3112.5
1340
1340
1650
1650
200
200
1010.94
1315.58
1 A-7-8 3450 500 3562.5 1340 1650 200 847.50
1 A-8-9 3450 500 4012.5 1340 1650 200 1010.94
1 A-9-10 3450 500 4462.5 1340 3450 200 1315.58
1 A-10-11 4800 500 4912.5 1340 3450 200 847.50
1 A-11-12 4800 500 5362.5 1340 3450 200 1010.94
1 A-12-13 4800 500 5512.5 1340 3450 200 1101.48
1 B'-0A-A 525 500 0 1760 1650 200 1365.00

B' 1
1
B'-5-6
B'-6-7
2100
2100
500
500
2662.5
3112.5
1760
1760
1650
1650
200
200
1379.86
1616.40
1 B'-12-13 4800 500 5512.5 1760 3450 200 1447.50
SUDUT SWING BALOK ARAH Y (VERTIKAL)
Posisi mobile crane Posisi balok Posisi stock area Jarak MC
Segmen Lantai Titik
X (cm) Y (cm) Xk (cm) Yk (cm) Xc (cm) Yc (cm) ke balok
a b c e f g h g h i
1 0A-A-B 525 500 0 1070 1650 200 774.94
1 0-A-B 525 500 300 1070 1650 200 612.80
1 1-A-B 525 500 750 1070 1650 200 612.80
1 2-A-B 525 500 1200 1070 1650 200 883.47
1 3-A-B 1200 500 1650 1070 1650 200 726.22
1 4-A-B 1200 500 2100 1070 1650 200 1065.32
1 5-A-B 2100 500 2550 1070 1650 200 726.22
A-B 1 6-A-B
7-A-B
2100
2100
500
500
3000
3450
1070
1070
1650
1650
200
200
1065.32
1465.40
1 8-A-B 3450 500 3900 1070 3450 200 726.22
1 9-A-B 3450 500 4350 1070 3450 200 1065.32
1 10-A-B 3450 500 4800 1070 3450 200 1465.40
1 11-A-B 4800 500 5250 1070 3450 200 726.22
1 12-A-B 4800 500 5700 1070 3450 200 1065.32
1 13-A-B 4800 500 6000 1070 3450 200 1328.50
1 0A-B-B' 525 500 0 1550 1650 200 1173.94
0-B-B' 525 500 300 1550 1650 200 1073.84

B-B' 1
1
5-B-B'
6-B-B'
2100
2100
500
500
2550
3000
1550
1550
1650
1650
200
200
1142.37
1382.93
1 7-B-B' 2100 500 3450 1550 1650 200 1710.26
1 12-B-B' 4800 500 5700 1550 3450 200 1382.93
1 13-B-B' 4800 500 6000 1550 3450 200 1594.52
Jarak SA Sudut
Jarak (d)
ke MC Swing
j k l
1164.31 684.08 153.87
1164.31 843.91 123.05
1164.31 712.75 53.88
1164.31 321.61 33.34
540.83 89.27 65.66
540.83 -220.43 163.66
540.83 96.67 205.07
540.83 515.18 216.46
300.00 20.40 159.47
300.00 337.50 118.06
300.00 756.01 106.67
1382.93 1062.53 123.06
1382.93 745.43 164.47
1382.93 609.85 169.75
1164.31 244.41 126.58
1164.31 316.81 110.16
1164.31 259.05 124.42
1164.31 12.90 59.35
540.83 -364.43 92.06
540.83 306.67 106.33
540.83 470.11 80.15
540.83 774.75 193.45
1824.83 -977.33 150.76
1824.83 -813.89 176.94
300.00 1015.58 129.69
1382.93 -535.43 172.37
1382.93 -371.99 146.19
1382.93 281.45 142.84
1164.31 200.69 125.14
540.83 839.02 167.19
540.83 1075.57 181.92
1382.93 64.57 132.02

Jarak SA Jarak (d) Sudut


ke MC Swing
j k l
1164.31 389.38 145.17
1164.31 551.51 124.07
1164.31 551.51 80.99
1164.31 280.84 52.69
540.83 185.39 75.66
540.83 524.48 56.29
540.83 185.39 181.41
540.83 524.48 200.8
540.83 924.57 210.25
300.00 426.22 141.71
300.00 765.32 122.33
300.00 1165.40 112.88
1382.93 656.71 140.81
1382.93 317.61 160.2
1382.93 54.44 167.13
1164.31 9.62 129.1
1164.31 90.48 114.63
540.83 601.53 166.36
540.83 842.10 183.73
540.83 1169.43 195.25
1382.93 0.00 143.12
1382.93 211.59 151.34
WAKTU BERANGKAT
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
1 A-0A-0 83.8 1.5 0.018 1152 153.87 0.134 83.8
1 A-0-1 83.8 1.5 0.018 1152 123.05 0.107 83.8
1 A-1-2 83.8 1.5 0.018 1152 53.88 0.047 83.8
1 A-2-3 83.8 1.5 0.018 1152 33.34 0.029 83.8
1 A-3-4 83.8 1.5 0.018 1152 65.66 0.057 83.8
1 A-4-5 83.8 1.5 0.018 1152 163.66 0.142 83.8

A 1
1
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
205.07
216.46
0.178
0.188
83.8
83.8
1 A-7-8 83.8 1.5 0.018 1152 159.47 0.138 83.8
1 A-8-9 83.8 1.5 0.018 1152 118.06 0.102 83.8
1 A-9-10 83.8 1.5 0.018 1152 106.67 0.093 83.8
1 A-10-11 83.8 1.5 0.018 1152 123.06 0.107 83.8
1 A-11-12 83.8 1.5 0.018 1152 164.47 0.143 83.8
1 A-12-13 83.8 1.5 0.018 1152 169.75 0.147 83.8
1 A-0A-0 83.8 1.5 0.018 1152 126.58 0.110 83.8
1 A-0-1 83.8 1.5 0.018 1152 110.16 0.096 83.8
1 A-1-2 83.8 1.5 0.018 1152 124.42 0.108 83.8
1 A-2-3 83.8 1.5 0.018 1152 59.35 0.052 83.8
1 A-3-4 83.8 1.5 0.018 1152 92.06 0.080 83.8
1 A-4-5 83.8 1.5 0.018 1152 106.33 0.092 83.8

B 1
1
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
80.15
193.45
0.070
0.168
83.8
83.8
1 A-7-8 83.8 1.5 0.018 1152 150.76 0.131 83.8
1 A-8-9 83.8 1.5 0.018 1152 176.94 0.154 83.8
1 A-9-10 83.8 1.5 0.018 1152 129.69 0.113 83.8
1 A-10-11 83.8 1.5 0.018 1152 172.37 0.150 83.8
1 A-11-12 83.8 1.5 0.018 1152 146.19 0.127 83.8
1 A-12-13 83.8 1.5 0.018 1152 142.84 0.124 83.8
1 B'-0A-A 83.8 1.5 0.018 1152 125.14 0.109 83.8

B' 1
1
B'-5-6
B'-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
167.19
181.92
0.145
0.158
83.8
83.8
1 B'-12-13 83.8 1.5 0.018 1152 132.02 0.115 83.8
1 0A-A-B 83.8 1.5 0.018 1152 145.17 0.126 83.8
1 0-A-B 83.8 1.5 0.018 1152 124.07 0.108 83.8
1 1-A-B 83.8 1.5 0.018 1152 80.99 0.070 83.8
1 2-A-B 83.8 1.5 0.018 1152 52.69 0.046 83.8
1 3-A-B 83.8 1.5 0.018 1152 75.66 0.066 83.8
1 4-A-B 83.8 1.5 0.018 1152 56.29 0.049 83.8
1 5-A-B 83.8 1.5 0.018 1152 181.41 0.157 83.8
A-B 1 6-A-B
7-A-B
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
200.8
210.25
0.174
0.183
83.8
83.8
A-B
1 8-A-B 83.8 1.5 0.018 1152 141.71 0.123 83.8
1 9-A-B 83.8 1.5 0.018 1152 122.33 0.106 83.8
1 10-A-B 83.8 1.5 0.018 1152 112.88 0.098 83.8
1 11-A-B 83.8 1.5 0.018 1152 140.81 0.122 83.8
1 12-A-B 83.8 1.5 0.018 1152 160.2 0.139 83.8
1 13-A-B 83.8 1.5 0.018 1152 167.13 0.145 83.8
1 0A-B-B' 83.8 1.5 0.018 1152 129.1 0.112 83.8
1 0-B-B' 83.8 1.5 0.018 1152 114.63 0.100 83.8
1 5-B-B' 83.8 1.5 0.018 1152 166.36 0.144 83.8
B-B' 1
1
6-B-B'
7-B-B'
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
183.73
195.25
0.159
0.169
83.8
83.8
1 12-B-B' 83.8 1.5 0.018 1152 143.12 0.124 83.8
1 13-B-B' 83.8 1.5 0.018 1152 151.34 0.131 83.8
WAKTU PULANG
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
1 A-0A-0 144.5 0 0.000 1152 153.87 0.134 144.5
1 A-0-1 144.5 0 0.000 1152 123.05 0.107 144.5
1 A-1-2 144.5 0 0.000 1152 53.88 0.047 144.5
1 A-2-3 144.5 0 0.000 1152 33.34 0.029 144.5
1 A-3-4 144.5 0 0.000 1152 65.66 0.057 144.5
1 A-4-5 144.5 0 0.000 1152 163.66 0.142 144.5

A 1
1
A-5-6
A-6-7
144.5
144.5
0
0
0.000
0.000
1152
1152
205.07
216.46
0.178
0.188
144.5
144.5
1 A-7-8 144.5 0 0.000 1152 159.47 0.138 144.5
1 A-8-9 144.5 0 0.000 1152 118.06 0.102 144.5
1 A-9-10 144.5 0 0.000 1152 106.67 0.093 144.5
1 A-10-11 144.5 0 0.000 1152 123.06 0.107 144.5
1 A-11-12 144.5 0 0.000 1152 164.47 0.143 144.5
1 A-12-13 144.5 0 0.000 1152 169.75 0.147 144.5
1 A-0A-0 144.5 0 0.000 1152 126.58 0.110 144.5
1 A-0-1 144.5 0 0.000 1152 110.16 0.096 144.5
1 A-1-2 144.5 0 0.000 1152 124.42 0.108 144.5
1 A-2-3 144.5 0 0.000 1152 59.35 0.052 144.5
1 A-3-4 144.5 0 0.000 1152 92.06 0.080 144.5
1 A-4-5 144.5 0 0.000 1152 106.33 0.092 144.5

B 1
1
A-5-6
A-6-7
144.5
144.5
0
0
0.000
0.000
1152
1152
80.15
193.45
0.070
0.168
144.5
144.5
1 A-7-8 144.5 0 0.000 1152 150.76 0.131 144.5
1 A-8-9 144.5 0 0.000 1152 176.94 0.154 144.5
1 A-9-10 144.5 0 0.000 1152 129.69 0.113 144.5
1 A-10-11 144.5 0 0.000 1152 172.37 0.150 144.5
1 A-11-12 144.5 0 0.000 1152 146.19 0.127 144.5
1 A-12-13 144.5 0 0.000 1152 142.84 0.124 144.5
1 B'-0A-A 144.5 0 0.000 1152 125.14 0.109 144.5

B' 1
1
B'-5-6
B'-6-7
144.5
144.5
0
0
0.000
0.000
1152
1152
167.19
181.92
0.145
0.158
144.5
144.5
1 B'-12-13 144.5 0 0.000 1152 132.02 0.115 144.5
1 0A-A-B 144.5 0 0.000 1152 145.17 0.126 144.5
1 0-A-B 144.5 0 0.000 1152 124.07 0.108 144.5
1 1-A-B 144.5 0 0.000 1152 80.99 0.070 144.5
1 2-A-B 144.5 0 0.000 1152 52.69 0.046 144.5
1 3-A-B 144.5 0 0.000 1152 75.66 0.066 144.5
1 4-A-B 144.5 0 0.000 1152 56.29 0.049 144.5
1 5-A-B 144.5 0 0.000 1152 181.41 0.157 144.5
A-B 1 6-A-B
7-A-B
144.5
144.5
0
0
0.000
0.000
1152
1152
200.8
210.25
0.174
0.183
144.5
144.5
1 8-A-B 144.5 0 0.000 1152 141.71 0.123 144.5
1 9-A-B 144.5 0 0.000 1152 122.33 0.106 144.5
1 10-A-B 144.5 0 0.000 1152 112.88 0.098 144.5
1 11-A-B 144.5 0 0.000 1152 140.81 0.122 144.5
1 12-A-B 144.5 0 0.000 1152 160.2 0.139 144.5
1 13-A-B 144.5 0 0.000 1152 167.13 0.145 144.5
1 0A-B-B' 144.5 0 0.000 1152 129.1 0.112 144.5
1 0-B-B' 144.5 0 0.000 1152 114.63 0.100 144.5
1 5-B-B' 144.5 0 0.000 1152 166.36 0.144 144.5
B-B' 1
1
6-B-B'
7-B-B'
144.5
144.5
0
0
0.000
0.000
1152
1152
183.73
195.25
0.159
0.169
144.5
144.5
1 12-B-B' 144.5 0 0.000 1152 143.12 0.124 144.5
1 13-B-B' 144.5 0 0.000 1152 151.34 0.131 144.5
LANDING HOISTING
WAKTU Segmen Lantai Titik
h t TOTAL v h t
(m) (menit) (menit) a b c (m/menit) (m) (menit)
0 0 0.151 2 A-0A-0 83.8 1.5 0.018
0 0 0.125 2 A-0-1 83.8 1.5 0.018
0 0 0.065 2 A-1-2 83.8 1.5 0.018
0 0 0.047 2 A-2-3 83.8 1.5 0.018
0 0 0.075 2 A-3-4 83.8 1.5 0.018
0 0 0.160 2 A-4-5 83.8 1.5 0.018
0
0
0
0
0.196
0.206 A 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
0 0 0.156 2 A-7-8 83.8 1.5 0.018
0 0 0.120 2 A-8-9 83.8 1.5 0.018
0 0 0.110 2 A-9-10 83.8 1.5 0.018
0 0 0.125 2 A-10-11 83.8 1.5 0.018
0 0 0.161 2 A-11-12 83.8 1.5 0.018
0 0 0.165 2 A-12-13 83.8 1.5 0.018
0 0 0.128 2 A-0A-0 83.8 1.5 0.018
0 0 0.114 2 A-0-1 83.8 1.5 0.018
0 0 0.126 2 A-1-2 83.8 1.5 0.018
0 0 0.069 2 A-2-3 83.8 1.5 0.018
0 0 0.098 2 A-3-4 83.8 1.5 0.018
0 0 0.110 2 A-4-5 83.8 1.5 0.018
0
0
0
0
0.087
0.186 B 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
0 0 0.149 2 A-7-8 83.8 1.5 0.018
0 0 0.171 2 A-8-9 83.8 1.5 0.018
0 0 0.130 2 A-9-10 83.8 1.5 0.018
0 0 0.168 2 A-10-11 83.8 1.5 0.018
0 0 0.145 2 A-11-12 83.8 1.5 0.018
0 0 0.142 2 A-12-13 83.8 1.5 0.018
0 0 0.127 2 B'-0A-A 83.8 1.5 0.018
0
0
0
0
0.163
0.176 B' 2
2
B'-5-6
B'-6-7
83.8
83.8
1.5
1.5
0.018
0.018
0 0 0.133 2 B'-12-13 83.8 1.5 0.018
0 0 0.144 2 0A-A-B 83.8 1.5 0.018
0 0 0.126 2 0-A-B 83.8 1.5 0.018
0 0 0.088 2 1-A-B 83.8 1.5 0.018
0 0 0.064 2 2-A-B 83.8 1.5 0.018
0 0 0.084 2 3-A-B 83.8 1.5 0.018
0 0 0.067 2 4-A-B 83.8 1.5 0.018
0 0 0.175 2 5-A-B 83.8 1.5 0.018
0
0
0
0
0.192
0.200
A-B 2
2
6-A-B
7-A-B
83.8
83.8
1.5
1.5
0.018
0.018
A-B
0 0 0.141 2 8-A-B 83.8 1.5 0.018
0 0 0.124 2 9-A-B 83.8 1.5 0.018
0 0 0.116 2 10-A-B 83.8 1.5 0.018
0 0 0.140 2 11-A-B 83.8 1.5 0.018
0 0 0.157 2 12-A-B 83.8 1.5 0.018
0 0 0.163 2 13-A-B 83.8 1.5 0.018
0 0 0.130 2 0A-B-B' 83.8 1.5 0.018
0 0 0.117 2 0-B-B' 83.8 1.5 0.018
0 0 0.162 2 5-B-B' 83.8 1.5 0.018
0
0
0
0
0.177
0.187
B-B' 2
2
6-B-B'
7-B-B'
83.8
83.8
1.5
1.5
0.018
0.018
0 0 0.142 2 12-B-B' 83.8 1.5 0.018
0 0 0.149 2 13-B-B' 83.8 1.5 0.018

LANDING HOISTING
WAKTU Segmen Lantai Titik
h t TOTAL v h t
(m) (menit) (menit) a b c (m/menit) (m) (menit)
1.5 0.010381 0.144 2 A-0A-0 144.5 3.2 0.022
1.5 0.010381 0.117 2 A-0-1 144.5 3.2 0.022
1.5 0.010381 0.057 2 A-1-2 144.5 3.2 0.022
1.5 0.010381 0.039 2 A-2-3 144.5 3.2 0.022
1.5 0.010381 0.067 2 A-3-4 144.5 3.2 0.022
1.5 0.010381 0.152 2 A-4-5 144.5 3.2 0.022
1.5
1.5
0.010381
0.010381
0.188
0.198 A 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022
0.022
1.5 0.010381 0.149 2 A-7-8 144.5 3.2 0.022
1.5 0.010381 0.113 2 A-8-9 144.5 3.2 0.022
1.5 0.010381 0.103 2 A-9-10 144.5 3.2 0.022
1.5 0.010381 0.117 2 A-10-11 144.5 3.2 0.022
1.5 0.010381 0.153 2 A-11-12 144.5 3.2 0.022
1.5 0.010381 0.158 2 A-12-13 144.5 3.2 0.022
1.5 0.010381 0.120 2 A-0A-0 144.5 3.2 0.022
1.5 0.010381 0.106 2 A-0-1 144.5 3.2 0.022
1.5 0.010381 0.118 2 A-1-2 144.5 3.2 0.022
1.5 0.010381 0.062 2 A-2-3 144.5 3.2 0.022
1.5 0.010381 0.090 2 A-3-4 144.5 3.2 0.022
1.5 0.010381 0.103 2 A-4-5 144.5 3.2 0.022
1.5
1.5
0.010381
0.010381
0.080
0.178 B 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022
0.022
1.5 0.010381 0.141 2 A-7-8 144.5 3.2 0.022
1.5 0.010381 0.164 2 A-8-9 144.5 3.2 0.022
1.5 0.010381 0.123 2 A-9-10 144.5 3.2 0.022
1.5 0.010381 0.160 2 A-10-11 144.5 3.2 0.022
1.5 0.010381 0.137 2 A-11-12 144.5 3.2 0.022
1.5 0.010381 0.134 2 A-12-13 144.5 3.2 0.022
1.5 0.010381 0.119 2 B'-0A-A 144.5 3.2 0.022
1.5
1.5
0.010381
0.010381
0.156
0.168 B' 2
2
B'-5-6
B'-6-7
144.5
144.5
3.2
3.2
0.022
0.022
1.5 0.010381 0.125 2 B'-12-13 144.5 3.2 0.022
1.5 0.010381 0.136 2 0A-A-B 144.5 3.2 0.022
1.5 0.010381 0.118 2 0-A-B 144.5 3.2 0.022
1.5 0.010381 0.081 2 1-A-B 144.5 3.2 0.022
1.5 0.010381 0.056 2 2-A-B 144.5 3.2 0.022
1.5 0.010381 0.076 2 3-A-B 144.5 3.2 0.022
1.5 0.010381 0.059 2 4-A-B 144.5 3.2 0.022
1.5 0.010381 0.168 2 5-A-B 144.5 3.2 0.022
1.5
1.5
0.010381
0.010381
0.185
0.193
A-B 2
2
6-A-B
7-A-B
144.5
144.5
3.2
3.2
0.022
0.022
1.5 0.010381 0.133 2 8-A-B 144.5 3.2 0.022
1.5 0.010381 0.117 2 9-A-B 144.5 3.2 0.022
1.5 0.010381 0.108 2 10-A-B 144.5 3.2 0.022
1.5 0.010381 0.133 2 11-A-B 144.5 3.2 0.022
1.5 0.010381 0.149 2 12-A-B 144.5 3.2 0.022
1.5 0.010381 0.155 2 13-A-B 144.5 3.2 0.022
1.5 0.010381 0.122 2 0A-B-B' 144.5 3.2 0.022
1.5 0.010381 0.110 2 0-B-B' 144.5 3.2 0.022
1.5 0.010381 0.155 2 5-B-B' 144.5 3.2 0.022
1.5
1.5
0.010381
0.010381
0.170
0.180
B-B' 2
2
6-B-B'
7-B-B'
144.5
144.5
3.2
3.2
0.022
0.022
1.5 0.010381 0.135 2 12-B-B' 144.5 3.2 0.022
1.5 0.010381 0.142 2 13-B-B' 144.5 3.2 0.022
SLEWING LANDING
WAKTU Segmen Lantai
v d t v h t TOTAL
(m/menit) derajat (menit) (m/menit) (m) (menit) (menit) a b
1152 153.87 0.134 83.8 3.2 0.038186 0.190 3
1152 123.05 0.107 83.8 3.2 0.038186 0.163 3
1152 53.88 0.047 83.8 3.2 0.038186 0.103 3
1152 33.34 0.029 83.8 3.2 0.038186 0.085 3
1152 65.66 0.057 83.8 3.2 0.038186 0.113 3
1152 163.66 0.142 83.8 3.2 0.038186 0.198 3
1152
1152
205.07
216.46
0.178
0.188
83.8
83.8
3.2
3.2
0.038186 0.234
0.038186 0.244 A 3
3
1152 159.47 0.138 83.8 3.2 0.038186 0.195 3
1152 118.06 0.102 83.8 3.2 0.038186 0.159 3
1152 106.67 0.093 83.8 3.2 0.038186 0.149 3
1152 123.06 0.107 83.8 3.2 0.038186 0.163 3
1152 164.47 0.143 83.8 3.2 0.038186 0.199 3
1152 169.75 0.147 83.8 3.2 0.038186 0.203 3
1152 126.58 0.110 83.8 3.2 0.038186 0.166 3
1152 110.16 0.096 83.8 3.2 0.038186 0.152 3
1152 124.42 0.108 83.8 3.2 0.038186 0.164 3
1152 59.35 0.052 83.8 3.2 0.038186 0.108 3
1152 92.06 0.080 83.8 3.2 0.038186 0.136 3
1152 106.33 0.092 83.8 3.2 0.038186 0.148 3
1152
1152
80.15
193.45
0.070
0.168
83.8
83.8
3.2
3.2
0.038186 0.126
0.038186 0.224 B 3
3
1152 150.76 0.131 83.8 3.2 0.038186 0.187 3
1152 176.94 0.154 83.8 3.2 0.038186 0.210 3
1152 129.69 0.113 83.8 3.2 0.038186 0.169 3
1152 172.37 0.150 83.8 3.2 0.038186 0.206 3
1152 146.19 0.127 83.8 3.2 0.038186 0.183 3
1152 142.84 0.124 83.8 3.2 0.038186 0.180 3
1152 125.14 0.109 83.8 3.2 0.038186 0.165 3
1152
1152
167.19
181.92
0.145
0.158
83.8
83.8
3.2
3.2
0.038186 0.201
0.038186 0.214 B' 3
3
1152 132.02 0.115 83.8 3.2 0.038186 0.171 3
1152 145.17 0.126 83.8 3.2 0.038186 0.182 3
1152 124.07 0.108 83.8 3.2 0.038186 0.164 3
1152 80.99 0.070 83.8 3.2 0.038186 0.126 3
1152 52.69 0.046 83.8 3.2 0.038186 0.102 3
1152 75.66 0.066 83.8 3.2 0.038186 0.122 3
1152 56.29 0.049 83.8 3.2 0.038186 0.105 3
1152 181.41 0.157 83.8 3.2 0.038186 0.214 3
1152
1152
200.8
210.25
0.174
0.183
83.8
83.8
3.2
3.2
0.038186 0.230
0.038186 0.239
A-B 3
3
A-B
1152 141.71 0.123 83.8 3.2 0.038186 0.179 3
1152 122.33 0.106 83.8 3.2 0.038186 0.162 3
1152 112.88 0.098 83.8 3.2 0.038186 0.154 3
1152 140.81 0.122 83.8 3.2 0.038186 0.178 3
1152 160.2 0.139 83.8 3.2 0.038186 0.195 3
1152 167.13 0.145 83.8 3.2 0.038186 0.201 3
1152 129.1 0.112 83.8 3.2 0.038186 0.168 3
1152 114.63 0.100 83.8 3.2 0.038186 0.156 3
1152 166.36 0.144 83.8 3.2 0.038186 0.200 3
1152
1152
183.73
195.25
0.159
0.169
83.8
83.8
3.2
3.2
0.038186
0.038186
0.216
0.226
B-B' 3
3
1152 143.12 0.124 83.8 3.2 0.038186 0.180 3
1152 151.34 0.131 83.8 3.2 0.038186 0.187 3

SLEWING LANDING
WAKTU Segmen Lantai
v d t v h t TOTAL
(m/menit) derajat (menit) (m/menit) (m) (menit) (menit) a b
1152 153.87 0.134 144.5 1.5 0.010381 0.166 3
1152 123.05 0.107 144.5 1.5 0.010381 0.139 3
1152 53.88 0.047 144.5 1.5 0.010381 0.079 3
1152 33.34 0.029 144.5 1.5 0.010381 0.061 3
1152 65.66 0.057 144.5 1.5 0.010381 0.090 3
1152 163.66 0.142 144.5 1.5 0.010381 0.175 3
1152
1152
205.07
216.46
0.178
0.188
144.5
144.5
1.5
1.5
0.010381 0.211
0.010381 0.220 A 3
3
1152 159.47 0.138 144.5 1.5 0.010381 0.171 3
1152 118.06 0.102 144.5 1.5 0.010381 0.135 3
1152 106.67 0.093 144.5 1.5 0.010381 0.125 3
1152 123.06 0.107 144.5 1.5 0.010381 0.139 3
1152 164.47 0.143 144.5 1.5 0.010381 0.175 3
1152 169.75 0.147 144.5 1.5 0.010381 0.180 3
1152 126.58 0.110 144.5 1.5 0.010381 0.142 3
1152 110.16 0.096 144.5 1.5 0.010381 0.128 3
1152 124.42 0.108 144.5 1.5 0.010381 0.141 3
1152 59.35 0.052 144.5 1.5 0.010381 0.084 3
1152 92.06 0.080 144.5 1.5 0.010381 0.112 3
1152 106.33 0.092 144.5 1.5 0.010381 0.125 3
1152
1152
80.15
193.45
0.070
0.168
144.5
144.5
1.5
1.5
0.010381 0.102
0.010381 0.200 B 3
3
1152 150.76 0.131 144.5 1.5 0.010381 0.163 3
1152 176.94 0.154 144.5 1.5 0.010381 0.186 3
1152 129.69 0.113 144.5 1.5 0.010381 0.145 3
1152 172.37 0.150 144.5 1.5 0.010381 0.182 3
1152 146.19 0.127 144.5 1.5 0.010381 0.159 3
1152 142.84 0.124 144.5 1.5 0.010381 0.157 3
1152 125.14 0.109 144.5 1.5 0.010381 0.141 3
1152
1152
167.19
181.92
0.145
0.158
144.5
144.5
1.5
1.5
0.010381
0.010381
0.178
0.190 B' 3
3
1152 132.02 0.115 144.5 1.5 0.010381 0.147 3
1152 145.17 0.126 144.5 1.5 0.010381 0.159 3
1152 124.07 0.108 144.5 1.5 0.010381 0.140 3
1152 80.99 0.070 144.5 1.5 0.010381 0.103 3
1152 52.69 0.046 144.5 1.5 0.010381 0.078 3
1152 75.66 0.066 144.5 1.5 0.010381 0.098 3
1152 56.29 0.049 144.5 1.5 0.010381 0.081 3
1152 181.41 0.157 144.5 1.5 0.010381 0.190 3
1152
1152
200.8
210.25
0.174
0.183
144.5
144.5
1.5
1.5
0.010381
0.010381
0.207
0.215
A-B 3
3
1152 141.71 0.123 144.5 1.5 0.010381 0.156 3
1152 122.33 0.106 144.5 1.5 0.010381 0.139 3
1152 112.88 0.098 144.5 1.5 0.010381 0.131 3
1152 140.81 0.122 144.5 1.5 0.010381 0.155 3
1152 160.2 0.139 144.5 1.5 0.010381 0.172 3
1152 167.13 0.145 144.5 1.5 0.010381 0.178 3
1152 129.1 0.112 144.5 1.5 0.010381 0.145 3
1152 114.63 0.100 144.5 1.5 0.010381 0.132 3
1152 166.36 0.144 144.5 1.5 0.010381 0.177 3
1152
1152
183.73
195.25
0.159
0.169
144.5
144.5
1.5
1.5
0.010381
0.010381
0.192
0.202
B-B' 3
3
1152 143.12 0.124 144.5 1.5 0.010381 0.157 3
1152 151.34 0.131 144.5 1.5 0.010381 0.164 3
HOISTING SLEWING LANDING
Titik
v h t v d t v h t
c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit)
A-0A-0 83.8 1.5 0.018 1152 153.87 0.134 83.8 6 0.071599
A-0-1 83.8 1.5 0.018 1152 123.05 0.107 83.8 6 0.071599
A-1-2 83.8 1.5 0.018 1152 53.88 0.047 83.8 6 0.071599
A-2-3 83.8 1.5 0.018 1152 33.34 0.029 83.8 6 0.071599
A-3-4 83.8 1.5 0.018 1152 65.66 0.057 83.8 6 0.071599
A-4-5 83.8 1.5 0.018 1152 163.66 0.142 83.8 6 0.071599
A-5-6 83.8 1.5 0.018 1152 205.07 0.178 83.8 6 0.071599
A-6-7 83.8 1.5 0.018 1152 216.46 0.188 83.8 6 0.071599
A-7-8 83.8 1.5 0.018 1152 159.47 0.138 83.8 6 0.071599
A-8-9 83.8 1.5 0.018 1152 118.06 0.102 83.8 6 0.071599
A-9-10 83.8 1.5 0.018 1152 106.67 0.093 83.8 6 0.071599
A-10-11 83.8 1.5 0.018 1152 123.06 0.107 83.8 6 0.071599
A-11-12 83.8 1.5 0.018 1152 164.47 0.143 83.8 6 0.071599
A-12-13 83.8 1.5 0.018 1152 169.75 0.147 83.8 6 0.071599
A-0A-0 83.8 1.5 0.018 1152 126.58 0.110 83.8 6 0.071599
A-0-1 83.8 1.5 0.018 1152 110.16 0.096 83.8 6 0.071599
A-1-2 83.8 1.5 0.018 1152 124.42 0.108 83.8 6 0.071599
A-2-3 83.8 1.5 0.018 1152 59.35 0.052 83.8 6 0.071599
A-3-4 83.8 1.5 0.018 1152 92.06 0.080 83.8 6 0.071599
A-4-5 83.8 1.5 0.018 1152 106.33 0.092 83.8 6 0.071599
A-5-6 83.8 1.5 0.018 1152 80.15 0.070 83.8 6 0.071599
A-6-7 83.8 1.5 0.018 1152 193.45 0.168 83.8 6 0.071599
A-7-8 83.8 1.5 0.018 1152 150.76 0.131 83.8 6 0.071599
A-8-9 83.8 1.5 0.018 1152 176.94 0.154 83.8 6 0.071599
A-9-10 83.8 1.5 0.018 1152 129.69 0.113 83.8 6 0.071599
A-10-11 83.8 1.5 0.018 1152 172.37 0.150 83.8 6 0.071599
A-11-12 83.8 1.5 0.018 1152 146.19 0.127 83.8 6 0.071599
A-12-13 83.8 1.5 0.018 1152 142.84 0.124 83.8 6 0.071599
B'-0A-A 83.8 1.5 0.018 1152 125.14 0.109 83.8 6 0.071599
B'-5-6 83.8 1.5 0.018 1152 167.19 0.145 83.8 6 0.071599
B'-6-7 83.8 1.5 0.018 1152 181.92 0.158 83.8 6 0.071599
B'-12-13 83.8 1.5 0.018 1152 132.02 0.115 83.8 6 0.071599
0A-A-B 83.8 1.5 0.018 1152 145.17 0.126 83.8 6 0.071599
0-A-B 83.8 1.5 0.018 1152 124.07 0.108 83.8 6 0.071599
1-A-B 83.8 1.5 0.018 1152 80.99 0.070 83.8 6 0.071599
2-A-B 83.8 1.5 0.018 1152 52.69 0.046 83.8 6 0.071599
3-A-B 83.8 1.5 0.018 1152 75.66 0.066 83.8 6 0.071599
4-A-B 83.8 1.5 0.018 1152 56.29 0.049 83.8 6 0.071599
5-A-B 83.8 1.5 0.018 1152 181.41 0.157 83.8 6 0.071599
6-A-B 83.8 1.5 0.018 1152 200.8 0.174 83.8 6 0.071599
7-A-B 83.8 1.5 0.018 1152 210.25 0.183 83.8 6 0.071599
8-A-B 83.8 1.5 0.018 1152 141.71 0.123 83.8 6 0.071599
9-A-B 83.8 1.5 0.018 1152 122.33 0.106 83.8 6 0.071599
10-A-B 83.8 1.5 0.018 1152 112.88 0.098 83.8 6 0.071599
11-A-B 83.8 1.5 0.018 1152 140.81 0.122 83.8 6 0.071599
12-A-B 83.8 1.5 0.018 1152 160.2 0.139 83.8 6 0.071599
13-A-B 83.8 1.5 0.018 1152 167.13 0.145 83.8 6 0.071599
0A-B-B' 83.8 1.5 0.018 1152 129.1 0.112 83.8 6 0.071599
0-B-B' 83.8 1.5 0.018 1152 114.63 0.100 83.8 6 0.071599
5-B-B' 83.8 1.5 0.018 1152 166.36 0.144 83.8 6 0.071599
6-B-B' 83.8 1.5 0.018 1152 183.73 0.159 83.8 6 0.071599
7-B-B' 83.8 1.5 0.018 1152 195.25 0.169 83.8 6 0.071599
12-B-B' 83.8 1.5 0.018 1152 143.12 0.124 83.8 6 0.071599
13-B-B' 83.8 1.5 0.018 1152 151.34 0.131 83.8 6 0.071599

HOISTING SLEWING LANDING


Titik
v h t v d t v h t
c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit)
A-0A-0 144.5 6 0.042 1152 153.87 0.134 144.5 1.5 0.010381
A-0-1 144.5 6 0.042 1152 123.05 0.107 144.5 1.5 0.010381
A-1-2 144.5 6 0.042 1152 53.88 0.047 144.5 1.5 0.010381
A-2-3 144.5 6 0.042 1152 33.34 0.029 144.5 1.5 0.010381
A-3-4 144.5 6 0.042 1152 65.66 0.057 144.5 1.5 0.010381
A-4-5 144.5 6 0.042 1152 163.66 0.142 144.5 1.5 0.010381
A-5-6 144.5 6 0.042 1152 205.07 0.178 144.5 1.5 0.010381
A-6-7 144.5 6 0.042 1152 216.46 0.188 144.5 1.5 0.010381
A-7-8 144.5 6 0.042 1152 159.47 0.138 144.5 1.5 0.010381
A-8-9 144.5 6 0.042 1152 118.06 0.102 144.5 1.5 0.010381
A-9-10 144.5 6 0.042 1152 106.67 0.093 144.5 1.5 0.010381
A-10-11 144.5 6 0.042 1152 123.06 0.107 144.5 1.5 0.010381
A-11-12 144.5 6 0.042 1152 164.47 0.143 144.5 1.5 0.010381
A-12-13 144.5 6 0.042 1152 169.75 0.147 144.5 1.5 0.010381
A-0A-0 144.5 6 0.042 1152 126.58 0.110 144.5 1.5 0.010381
A-0-1 144.5 6 0.042 1152 110.16 0.096 144.5 1.5 0.010381
A-1-2 144.5 6 0.042 1152 124.42 0.108 144.5 1.5 0.010381
A-2-3 144.5 6 0.042 1152 59.35 0.052 144.5 1.5 0.010381
A-3-4 144.5 6 0.042 1152 92.06 0.080 144.5 1.5 0.010381
A-4-5 144.5 6 0.042 1152 106.33 0.092 144.5 1.5 0.010381
A-5-6 144.5 6 0.042 1152 80.15 0.070 144.5 1.5 0.010381
A-6-7 144.5 6 0.042 1152 193.45 0.168 144.5 1.5 0.010381
A-7-8 144.5 6 0.042 1152 150.76 0.131 144.5 1.5 0.010381
A-8-9 144.5 6 0.042 1152 176.94 0.154 144.5 1.5 0.010381
A-9-10 144.5 6 0.042 1152 129.69 0.113 144.5 1.5 0.010381
A-10-11 144.5 6 0.042 1152 172.37 0.150 144.5 1.5 0.010381
A-11-12 144.5 6 0.042 1152 146.19 0.127 144.5 1.5 0.010381
A-12-13 144.5 6 0.042 1152 142.84 0.124 144.5 1.5 0.010381
B'-0A-A 144.5 6 0.042 1152 125.14 0.109 144.5 1.5 0.010381
B'-5-6 144.5 6 0.042 1152 167.19 0.145 144.5 1.5 0.010381
B'-6-7 144.5 6 0.042 1152 181.92 0.158 144.5 1.5 0.010381
B'-12-13 144.5 6 0.042 1152 132.02 0.115 144.5 1.5 0.010381
0A-A-B 144.5 6 0.042 1152 145.17 0.126 144.5 1.5 0.010381
0-A-B 144.5 6 0.042 1152 124.07 0.108 144.5 1.5 0.010381
1-A-B 144.5 6 0.042 1152 80.99 0.070 144.5 1.5 0.010381
2-A-B 144.5 6 0.042 1152 52.69 0.046 144.5 1.5 0.010381
3-A-B 144.5 6 0.042 1152 75.66 0.066 144.5 1.5 0.010381
4-A-B 144.5 6 0.042 1152 56.29 0.049 144.5 1.5 0.010381
5-A-B 144.5 6 0.042 1152 181.41 0.157 144.5 1.5 0.010381
6-A-B 144.5 6 0.042 1152 200.8 0.174 144.5 1.5 0.010381
7-A-B 144.5 6 0.042 1152 210.25 0.183 144.5 1.5 0.010381
8-A-B 144.5 6 0.042 1152 141.71 0.123 144.5 1.5 0.010381
9-A-B 144.5 6 0.042 1152 122.33 0.106 144.5 1.5 0.010381
10-A-B 144.5 6 0.042 1152 112.88 0.098 144.5 1.5 0.010381
11-A-B 144.5 6 0.042 1152 140.81 0.122 144.5 1.5 0.010381
12-A-B 144.5 6 0.042 1152 160.2 0.139 144.5 1.5 0.010381
13-A-B 144.5 6 0.042 1152 167.13 0.145 144.5 1.5 0.010381
0A-B-B' 144.5 6 0.042 1152 129.1 0.112 144.5 1.5 0.010381
0-B-B' 144.5 6 0.042 1152 114.63 0.100 144.5 1.5 0.010381
5-B-B' 144.5 6 0.042 1152 166.36 0.144 144.5 1.5 0.010381
6-B-B' 144.5 6 0.042 1152 183.73 0.159 144.5 1.5 0.010381
7-B-B' 144.5 6 0.042 1152 195.25 0.169 144.5 1.5 0.010381
12-B-B' 144.5 6 0.042 1152 143.12 0.124 144.5 1.5 0.010381
13-B-B' 144.5 6 0.042 1152 151.34 0.131 144.5 1.5 0.010381
HOISTING SLEWING
WAKTU Segmen Lantai Titik
TOTAL v h t v d
(menit) a b c (m/menit) (m) (menit) (m/menit) derajat
0.223 4 A-0A-0 83.8 1.5 0.018 1152 153.87
0.196 4 A-0-1 83.8 1.5 0.018 1152 123.05
0.136 4 A-1-2 83.8 1.5 0.018 1152 53.88
0.118 4 A-2-3 83.8 1.5 0.018 1152 33.34
0.146 4 A-3-4 83.8 1.5 0.018 1152 65.66
0.232 4 A-4-5 83.8 1.5 0.018 1152 163.66
0.268
0.277 A 4
4
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
205.07
216.46
0.228 4 A-7-8 83.8 1.5 0.018 1152 159.47
0.192 4 A-8-9 83.8 1.5 0.018 1152 118.06
0.182 4 A-9-10 83.8 1.5 0.018 1152 106.67
0.196 4 A-10-11 83.8 1.5 0.018 1152 123.06
0.232 4 A-11-12 83.8 1.5 0.018 1152 164.47
0.237 4 A-12-13 83.8 1.5 0.018 1152 169.75
0.199 4 A-0A-0 83.8 1.5 0.018 1152 126.58
0.185 4 A-0-1 83.8 1.5 0.018 1152 110.16
0.198 4 A-1-2 83.8 1.5 0.018 1152 124.42
0.141 4 A-2-3 83.8 1.5 0.018 1152 59.35
0.169 4 A-3-4 83.8 1.5 0.018 1152 92.06
0.182 4 A-4-5 83.8 1.5 0.018 1152 106.33
0.159
0.257 B 4
4
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
80.15
193.45
0.220 4 A-7-8 83.8 1.5 0.018 1152 150.76
0.243 4 A-8-9 83.8 1.5 0.018 1152 176.94
0.202 4 A-9-10 83.8 1.5 0.018 1152 129.69
0.239 4 A-10-11 83.8 1.5 0.018 1152 172.37
0.216 4 A-11-12 83.8 1.5 0.018 1152 146.19
0.213 4 A-12-13 83.8 1.5 0.018 1152 142.84
0.198 4 B'-0A-A 83.8 1.5 0.018 1152 125.14
0.235
0.247 B' 4
4
B'-5-6
B'-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
167.19
181.92
0.204 4 B'-12-13 83.8 1.5 0.018 1152 132.02
0.216 4 0A-A-B 83.8 1.5 0.018 1152 145.17
0.197 4 0-A-B 83.8 1.5 0.018 1152 124.07
0.160 4 1-A-B 83.8 1.5 0.018 1152 80.99
0.135 4 2-A-B 83.8 1.5 0.018 1152 52.69
0.155 4 3-A-B 83.8 1.5 0.018 1152 75.66
0.138 4 4-A-B 83.8 1.5 0.018 1152 56.29
0.247 4 5-A-B 83.8 1.5 0.018 1152 181.41
0.264
0.272
A-B 4
4
6-A-B
7-A-B
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
200.8
210.25
A-B
0.213 4 8-A-B 83.8 1.5 0.018 1152 141.71
0.196 4 9-A-B 83.8 1.5 0.018 1152 122.33
0.187 4 10-A-B 83.8 1.5 0.018 1152 112.88
0.212 4 11-A-B 83.8 1.5 0.018 1152 140.81
0.229 4 12-A-B 83.8 1.5 0.018 1152 160.2
0.235 4 13-A-B 83.8 1.5 0.018 1152 167.13
0.202 4 0A-B-B' 83.8 1.5 0.018 1152 129.1
0.189 4 0-B-B' 83.8 1.5 0.018 1152 114.63
0.234 4 5-B-B' 83.8 1.5 0.018 1152 166.36
0.249
0.259
B-B' 4
4
6-B-B'
7-B-B'
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
183.73
195.25
0.214 4 12-B-B' 83.8 1.5 0.018 1152 143.12
0.221 4 13-B-B' 83.8 1.5 0.018 1152 151.34

HOISTING SLEWING
WAKTU Segmen Lantai Titik
TOTAL v h t v d
(menit) a b c (m/menit) (m) (menit) (m/menit) derajat
0.185 4 A-0A-0 144.5 1.5 0.010 1152 153.87
0.159 4 A-0-1 144.5 1.5 0.010 1152 123.05
0.099 4 A-1-2 144.5 1.5 0.010 1152 53.88
0.081 4 A-2-3 144.5 1.5 0.010 1152 33.34
0.109 4 A-3-4 144.5 1.5 0.010 1152 65.66
0.194 4 A-4-5 144.5 1.5 0.010 1152 163.66
0.230
0.240 A 4
4
A-5-6
A-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
205.07
216.46
0.190 4 A-7-8 144.5 1.5 0.010 1152 159.47
0.154 4 A-8-9 144.5 1.5 0.010 1152 118.06
0.144 4 A-9-10 144.5 1.5 0.010 1152 106.67
0.159 4 A-10-11 144.5 1.5 0.010 1152 123.06
0.195 4 A-11-12 144.5 1.5 0.010 1152 164.47
0.199 4 A-12-13 144.5 1.5 0.010 1152 169.75
0.162 4 A-0A-0 144.5 1.5 0.010 1152 126.58
0.148 4 A-0-1 144.5 1.5 0.010 1152 110.16
0.160 4 A-1-2 144.5 1.5 0.010 1152 124.42
0.103 4 A-2-3 144.5 1.5 0.010 1152 59.35
0.132 4 A-3-4 144.5 1.5 0.010 1152 92.06
0.144 4 A-4-5 144.5 1.5 0.010 1152 106.33
0.121
0.220 B 4
4
A-5-6
A-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
80.15
193.45
0.183 4 A-7-8 144.5 1.5 0.010 1152 150.76
0.205 4 A-8-9 144.5 1.5 0.010 1152 176.94
0.164 4 A-9-10 144.5 1.5 0.010 1152 129.69
0.202 4 A-10-11 144.5 1.5 0.010 1152 172.37
0.179 4 A-11-12 144.5 1.5 0.010 1152 146.19
0.176 4 A-12-13 144.5 1.5 0.010 1152 142.84
0.161 4 B'-0A-A 144.5 1.5 0.010 1152 125.14
0.197
0.210 B' 4
4
B'-5-6
B'-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
167.19
181.92
0.167 4 B'-12-13 144.5 1.5 0.010 1152 132.02
0.178 4 0A-A-B 144.5 1.5 0.010 1152 145.17
0.160 4 0-A-B 144.5 1.5 0.010 1152 124.07
0.122 4 1-A-B 144.5 1.5 0.010 1152 80.99
0.098 4 2-A-B 144.5 1.5 0.010 1152 52.69
0.118 4 3-A-B 144.5 1.5 0.010 1152 75.66
0.101 4 4-A-B 144.5 1.5 0.010 1152 56.29
0.209 4 5-A-B 144.5 1.5 0.010 1152 181.41
0.226
0.234
A-B 4
4
6-A-B
7-A-B
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
200.8
210.25
0.175 4 8-A-B 144.5 1.5 0.010 1152 141.71
0.158 4 9-A-B 144.5 1.5 0.010 1152 122.33
0.150 4 10-A-B 144.5 1.5 0.010 1152 112.88
0.174 4 11-A-B 144.5 1.5 0.010 1152 140.81
0.191 4 12-A-B 144.5 1.5 0.010 1152 160.2
0.197 4 13-A-B 144.5 1.5 0.010 1152 167.13
0.164 4 0A-B-B' 144.5 1.5 0.010 1152 129.1
0.151 4 0-B-B' 144.5 1.5 0.010 1152 114.63
0.196 4 5-B-B' 144.5 1.5 0.010 1152 166.36
0.211
0.221
B-B' 4
4
6-B-B'
7-B-B'
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
183.73
195.25
0.176 4 12-B-B' 144.5 1.5 0.010 1152 143.12
0.183 4 13-B-B' 144.5 1.5 0.010 1152 151.34
SLEWING LANDING HOISTING
WAKTU Segmen Lantai Titik
t v h t TOTAL v
(menit) (m/menit) (m) (menit) (menit) a b c (m/menit)
0.134 83.8 8.8 0.105012 0.256 5 A-0A-0 83.8
0.107 83.8 8.8 0.105012 0.230 5 A-0-1 83.8
0.047 83.8 8.8 0.105012 0.170 5 A-1-2 83.8
0.029 83.8 8.8 0.105012 0.152 5 A-2-3 83.8
0.057 83.8 8.8 0.105012 0.180 5 A-3-4 83.8
0.142 83.8 8.8 0.105012 0.265 5 A-4-5 83.8
0.178
0.188
83.8
83.8
8.8
8.8
0.105012 0.301
0.105012 0.311 A 5
5
A-5-6
A-6-7
83.8
83.8
0.138 83.8 8.8 0.105012 0.261 5 A-7-8 83.8
0.102 83.8 8.8 0.105012 0.225 5 A-8-9 83.8
0.093 83.8 8.8 0.105012 0.216 5 A-9-10 83.8
0.107 83.8 8.8 0.105012 0.230 5 A-10-11 83.8
0.143 83.8 8.8 0.105012 0.266 5 A-11-12 83.8
0.147 83.8 8.8 0.105012 0.270 5 A-12-13 83.8
0.110 83.8 8.8 0.105012 0.233 5 A-0A-0 83.8
0.096 83.8 8.8 0.105012 0.219 5 A-0-1 83.8
0.108 83.8 8.8 0.105012 0.231 5 A-1-2 83.8
0.052 83.8 8.8 0.105012 0.174 5 A-2-3 83.8
0.080 83.8 8.8 0.105012 0.203 5 A-3-4 83.8
0.092 83.8 8.8 0.105012 0.215 5 A-4-5 83.8
0.070
0.168
83.8
83.8
8.8
8.8
0.105012 0.192
0.105012 0.291 B 5
5
A-5-6
A-6-7
83.8
83.8
0.131 83.8 8.8 0.105012 0.254 5 A-7-8 83.8
0.154 83.8 8.8 0.105012 0.277 5 A-8-9 83.8
0.113 83.8 8.8 0.105012 0.235 5 A-9-10 83.8
0.150 83.8 8.8 0.105012 0.273 5 A-10-11 83.8
0.127 83.8 8.8 0.105012 0.250 5 A-11-12 83.8
0.124 83.8 8.8 0.105012 0.247 5 A-12-13 83.8
0.109 83.8 8.8 0.105012 0.232 5 B'-0A-A 83.8
0.145
0.158
83.8
83.8
8.8
8.8
0.105012 0.268
0.105012 0.281 B' 5
5
B'-5-6
B'-6-7
83.8
83.8
0.115 83.8 8.8 0.105012 0.238 5 B'-12-13 83.8
0.126 83.8 8.8 0.105012 0.249 5 0A-A-B 83.8
0.108 83.8 8.8 0.105012 0.231 5 0-A-B 83.8
0.070 83.8 8.8 0.105012 0.193 5 1-A-B 83.8
0.046 83.8 8.8 0.105012 0.169 5 2-A-B 83.8
0.066 83.8 8.8 0.105012 0.189 5 3-A-B 83.8
0.049 83.8 8.8 0.105012 0.172 5 4-A-B 83.8
0.157 83.8 8.8 0.105012 0.280 5 5-A-B 83.8
0.174
0.183
83.8
83.8
8.8
8.8
0.105012 0.297
0.105012 0.305
A-B 5
5
6-A-B
7-A-B
83.8
83.8
A-B
0.123 83.8 8.8 0.105012 0.246 5 8-A-B 83.8
0.106 83.8 8.8 0.105012 0.229 5 9-A-B 83.8
0.098 83.8 8.8 0.105012 0.221 5 10-A-B 83.8
0.122 83.8 8.8 0.105012 0.245 5 11-A-B 83.8
0.139 83.8 8.8 0.105012 0.262 5 12-A-B 83.8
0.145 83.8 8.8 0.105012 0.268 5 13-A-B 83.8
0.112 83.8 8.8 0.105012 0.235 5 0A-B-B' 83.8
0.100 83.8 8.8 0.105012 0.222 5 0-B-B' 83.8
0.144 83.8 8.8 0.105012 0.267 5 5-B-B' 83.8
0.159
0.169
83.8
83.8
8.8
8.8
0.105012
0.105012
0.282
0.292
B-B' 5
5
6-B-B'
7-B-B'
83.8
83.8
0.124 83.8 8.8 0.105012 0.247 5 12-B-B' 83.8
0.131 83.8 8.8 0.105012 0.254 5 13-B-B' 83.8

SLEWING LANDING HOISTING


WAKTU Segmen Lantai Titik
t v h t TOTAL v
(menit) (m/menit) (m) (menit) (menit) a b c (m/menit)
0.134 144.5 8.8 0.0609 0.205 5 A-0A-0 144.5
0.107 144.5 8.8 0.0609 0.178 5 A-0-1 144.5
0.047 144.5 8.8 0.0609 0.118 5 A-1-2 144.5
0.029 144.5 8.8 0.0609 0.100 5 A-2-3 144.5
0.057 144.5 8.8 0.0609 0.128 5 A-3-4 144.5
0.142 144.5 8.8 0.0609 0.213 5 A-4-5 144.5
0.178
0.188
144.5
144.5
8.8
8.8
0.0609
0.0609
0.249
0.259 A 5
5
A-5-6
A-6-7
144.5
144.5
0.138 144.5 8.8 0.0609 0.210 5 A-7-8 144.5
0.102 144.5 8.8 0.0609 0.174 5 A-8-9 144.5
0.093 144.5 8.8 0.0609 0.164 5 A-9-10 144.5
0.107 144.5 8.8 0.0609 0.178 5 A-10-11 144.5
0.143 144.5 8.8 0.0609 0.214 5 A-11-12 144.5
0.147 144.5 8.8 0.0609 0.219 5 A-12-13 144.5
0.110 144.5 8.8 0.0609 0.181 5 A-0A-0 144.5
0.096 144.5 8.8 0.0609 0.167 5 A-0-1 144.5
0.108 144.5 8.8 0.0609 0.179 5 A-1-2 144.5
0.052 144.5 8.8 0.0609 0.123 5 A-2-3 144.5
0.080 144.5 8.8 0.0609 0.151 5 A-3-4 144.5
0.092 144.5 8.8 0.0609 0.164 5 A-4-5 144.5
0.070
0.168
144.5
144.5
8.8
8.8
0.0609
0.0609
0.141
0.239 B 5
5
A-5-6
A-6-7
144.5
144.5
0.131 144.5 8.8 0.0609 0.202 5 A-7-8 144.5
0.154 144.5 8.8 0.0609 0.225 5 A-8-9 144.5
0.113 144.5 8.8 0.0609 0.184 5 A-9-10 144.5
0.150 144.5 8.8 0.0609 0.221 5 A-10-11 144.5
0.127 144.5 8.8 0.0609 0.198 5 A-11-12 144.5
0.124 144.5 8.8 0.0609 0.195 5 A-12-13 144.5
0.109 144.5 8.8 0.0609 0.180 5 B'-0A-A 144.5
0.145
0.158
144.5
144.5
8.8
8.8
0.0609
0.0609
0.216
0.229 B' 5
5
B'-5-6
B'-6-7
144.5
144.5
0.115 144.5 8.8 0.0609 0.186 5 B'-12-13 144.5
0.126 144.5 8.8 0.0609 0.197 5 0A-A-B 144.5
0.108 144.5 8.8 0.0609 0.179 5 0-A-B 144.5
0.070 144.5 8.8 0.0609 0.142 5 1-A-B 144.5
0.046 144.5 8.8 0.0609 0.117 5 2-A-B 144.5
0.066 144.5 8.8 0.0609 0.137 5 3-A-B 144.5
0.049 144.5 8.8 0.0609 0.120 5 4-A-B 144.5
0.157 144.5 8.8 0.0609 0.229 5 5-A-B 144.5
0.174
0.183
144.5
144.5
8.8
8.8
0.0609
0.0609
0.246
0.254
A-B 5
5
6-A-B
7-A-B
144.5
144.5
0.123 144.5 8.8 0.0609 0.194 5 8-A-B 144.5
0.106 144.5 8.8 0.0609 0.177 5 9-A-B 144.5
0.098 144.5 8.8 0.0609 0.169 5 10-A-B 144.5
0.122 144.5 8.8 0.0609 0.194 5 11-A-B 144.5
0.139 144.5 8.8 0.0609 0.210 5 12-A-B 144.5
0.145 144.5 8.8 0.0609 0.216 5 13-A-B 144.5
0.112 144.5 8.8 0.0609 0.183 5 0A-B-B' 144.5
0.100 144.5 8.8 0.0609 0.171 5 0-B-B' 144.5
0.144 144.5 8.8 0.0609 0.216 5 5-B-B' 144.5
0.159
0.169
144.5
144.5
8.8
8.8
0.0609
0.0609
0.231
0.241
B-B' 5
5
6-B-B'
7-B-B'
144.5
144.5
0.124 144.5 8.8 0.0609 0.196 5 12-B-B' 144.5
0.131 144.5 8.8 0.0609 0.203 5 13-B-B' 144.5
HOISTING SLEWING LANDING
WAKTU
h t v d t v h t TOTAL
(m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
1.5 0.018 1152 153.87 0.134 83.8 11.6 0.138425 0.290
1.5 0.018 1152 123.05 0.107 83.8 11.6 0.138425 0.263
1.5 0.018 1152 53.88 0.047 83.8 11.6 0.138425 0.203
1.5 0.018 1152 33.34 0.029 83.8 11.6 0.138425 0.185
1.5 0.018 1152 65.66 0.057 83.8 11.6 0.138425 0.213
1.5 0.018 1152 163.66 0.142 83.8 11.6 0.138425 0.298
1.5 0.018 1152 205.07 0.178 83.8 11.6 0.138425 0.334
1.5 0.018 1152 216.46 0.188 83.8 11.6 0.138425 0.344
1.5 0.018 1152 159.47 0.138 83.8 11.6 0.138425 0.295
1.5 0.018 1152 118.06 0.102 83.8 11.6 0.138425 0.259
1.5 0.018 1152 106.67 0.093 83.8 11.6 0.138425 0.249
1.5 0.018 1152 123.06 0.107 83.8 11.6 0.138425 0.263
1.5 0.018 1152 164.47 0.143 83.8 11.6 0.138425 0.299
1.5 0.018 1152 169.75 0.147 83.8 11.6 0.138425 0.304
1.5 0.018 1152 126.58 0.110 83.8 11.6 0.138425 0.266
1.5 0.018 1152 110.16 0.096 83.8 11.6 0.138425 0.252
1.5 0.018 1152 124.42 0.108 83.8 11.6 0.138425 0.264
1.5 0.018 1152 59.35 0.052 83.8 11.6 0.138425 0.208
1.5 0.018 1152 92.06 0.080 83.8 11.6 0.138425 0.236
1.5 0.018 1152 106.33 0.092 83.8 11.6 0.138425 0.249
1.5 0.018 1152 80.15 0.070 83.8 11.6 0.138425 0.226
1.5 0.018 1152 193.45 0.168 83.8 11.6 0.138425 0.324
1.5 0.018 1152 150.76 0.131 83.8 11.6 0.138425 0.287
1.5 0.018 1152 176.94 0.154 83.8 11.6 0.138425 0.310
1.5 0.018 1152 129.69 0.113 83.8 11.6 0.138425 0.269
1.5 0.018 1152 172.37 0.150 83.8 11.6 0.138425 0.306
1.5 0.018 1152 146.19 0.127 83.8 11.6 0.138425 0.283
1.5 0.018 1152 142.84 0.124 83.8 11.6 0.138425 0.280
1.5 0.018 1152 125.14 0.109 83.8 11.6 0.138425 0.265
1.5 0.018 1152 167.19 0.145 83.8 11.6 0.138425 0.301
1.5 0.018 1152 181.92 0.158 83.8 11.6 0.138425 0.314
1.5 0.018 1152 132.02 0.115 83.8 11.6 0.138425 0.271
1.5 0.018 1152 145.17 0.126 83.8 11.6 0.138425 0.282
1.5 0.018 1152 124.07 0.108 83.8 11.6 0.138425 0.264
1.5 0.018 1152 80.99 0.070 83.8 11.6 0.138425 0.227
1.5 0.018 1152 52.69 0.046 83.8 11.6 0.138425 0.202
1.5 0.018 1152 75.66 0.066 83.8 11.6 0.138425 0.222
1.5 0.018 1152 56.29 0.049 83.8 11.6 0.138425 0.205
1.5 0.018 1152 181.41 0.157 83.8 11.6 0.138425 0.314
1.5 0.018 1152 200.8 0.174 83.8 11.6 0.138425 0.331
1.5 0.018 1152 210.25 0.183 83.8 11.6 0.138425 0.339
1.5 0.018 1152 141.71 0.123 83.8 11.6 0.138425 0.279
1.5 0.018 1152 122.33 0.106 83.8 11.6 0.138425 0.263
1.5 0.018 1152 112.88 0.098 83.8 11.6 0.138425 0.254
1.5 0.018 1152 140.81 0.122 83.8 11.6 0.138425 0.279
1.5 0.018 1152 160.2 0.139 83.8 11.6 0.138425 0.295
1.5 0.018 1152 167.13 0.145 83.8 11.6 0.138425 0.301
1.5 0.018 1152 129.1 0.112 83.8 11.6 0.138425 0.268
1.5 0.018 1152 114.63 0.100 83.8 11.6 0.138425 0.256
1.5 0.018 1152 166.36 0.144 83.8 11.6 0.138425 0.301
1.5 0.018 1152 183.73 0.159 83.8 11.6 0.138425 0.316
1.5 0.018 1152 195.25 0.169 83.8 11.6 0.138425 0.326
1.5 0.018 1152 143.12 0.124 83.8 11.6 0.138425 0.281
1.5 0.018 1152 151.34 0.131 83.8 11.6 0.138425 0.288

HOISTING SLEWING LANDING


WAKTU
h t v d t v h t TOTAL
(m) (menit) (m/menit) derajat (menit) (m/menit) (m) (menit) (menit)
1.5 0.010 1152 153.87 0.134 144.5 11.6 0.080277 0.224
1.5 0.010 1152 123.05 0.107 144.5 11.6 0.080277 0.197
1.5 0.010 1152 53.88 0.047 144.5 11.6 0.080277 0.137
1.5 0.010 1152 33.34 0.029 144.5 11.6 0.080277 0.120
1.5 0.010 1152 65.66 0.057 144.5 11.6 0.080277 0.148
1.5 0.010 1152 163.66 0.142 144.5 11.6 0.080277 0.233
1.5 0.010 1152 205.07 0.178 144.5 11.6 0.080277 0.269
1.5 0.010 1152 216.46 0.188 144.5 11.6 0.080277 0.279
1.5 0.010 1152 159.47 0.138 144.5 11.6 0.080277 0.229
1.5 0.010 1152 118.06 0.102 144.5 11.6 0.080277 0.193
1.5 0.010 1152 106.67 0.093 144.5 11.6 0.080277 0.183
1.5 0.010 1152 123.06 0.107 144.5 11.6 0.080277 0.197
1.5 0.010 1152 164.47 0.143 144.5 11.6 0.080277 0.233
1.5 0.010 1152 169.75 0.147 144.5 11.6 0.080277 0.238
1.5 0.010 1152 126.58 0.110 144.5 11.6 0.080277 0.201
1.5 0.010 1152 110.16 0.096 144.5 11.6 0.080277 0.186
1.5 0.010 1152 124.42 0.108 144.5 11.6 0.080277 0.199
1.5 0.010 1152 59.35 0.052 144.5 11.6 0.080277 0.142
1.5 0.010 1152 92.06 0.080 144.5 11.6 0.080277 0.171
1.5 0.010 1152 106.33 0.092 144.5 11.6 0.080277 0.183
1.5 0.010 1152 80.15 0.070 144.5 11.6 0.080277 0.160
1.5 0.010 1152 193.45 0.168 144.5 11.6 0.080277 0.259
1.5 0.010 1152 150.76 0.131 144.5 11.6 0.080277 0.222
1.5 0.010 1152 176.94 0.154 144.5 11.6 0.080277 0.244
1.5 0.010 1152 129.69 0.113 144.5 11.6 0.080277 0.203
1.5 0.010 1152 172.37 0.150 144.5 11.6 0.080277 0.240
1.5 0.010 1152 146.19 0.127 144.5 11.6 0.080277 0.218
1.5 0.010 1152 142.84 0.124 144.5 11.6 0.080277 0.215
1.5 0.010 1152 125.14 0.109 144.5 11.6 0.080277 0.199
1.5 0.010 1152 167.19 0.145 144.5 11.6 0.080277 0.236
1.5 0.010 1152 181.92 0.158 144.5 11.6 0.080277 0.249
1.5 0.010 1152 132.02 0.115 144.5 11.6 0.080277 0.205
1.5 0.010 1152 145.17 0.126 144.5 11.6 0.080277 0.217
1.5 0.010 1152 124.07 0.108 144.5 11.6 0.080277 0.198
1.5 0.010 1152 80.99 0.070 144.5 11.6 0.080277 0.161
1.5 0.010 1152 52.69 0.046 144.5 11.6 0.080277 0.136
1.5 0.010 1152 75.66 0.066 144.5 11.6 0.080277 0.156
1.5 0.010 1152 56.29 0.049 144.5 11.6 0.080277 0.140
1.5 0.010 1152 181.41 0.157 144.5 11.6 0.080277 0.248
1.5 0.010 1152 200.8 0.174 144.5 11.6 0.080277 0.265
1.5 0.010 1152 210.25 0.183 144.5 11.6 0.080277 0.273
1.5 0.010 1152 141.71 0.123 144.5 11.6 0.080277 0.214
1.5 0.010 1152 122.33 0.106 144.5 11.6 0.080277 0.197
1.5 0.010 1152 112.88 0.098 144.5 11.6 0.080277 0.189
1.5 0.010 1152 140.81 0.122 144.5 11.6 0.080277 0.213
1.5 0.010 1152 160.2 0.139 144.5 11.6 0.080277 0.230
1.5 0.010 1152 167.13 0.145 144.5 11.6 0.080277 0.236
1.5 0.010 1152 129.1 0.112 144.5 11.6 0.080277 0.203
1.5 0.010 1152 114.63 0.100 144.5 11.6 0.080277 0.190
1.5 0.010 1152 166.36 0.144 144.5 11.6 0.080277 0.235
1.5 0.010 1152 183.73 0.159 144.5 11.6 0.080277 0.250
1.5 0.010 1152 195.25 0.169 144.5 11.6 0.080277 0.260
1.5 0.010 1152 143.12 0.124 144.5 11.6 0.080277 0.215
1.5 0.010 1152 151.34 0.131 144.5 11.6 0.080277 0.222
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
ring balk A-0A-0 83.8 1.5 0.018 1152 153.87 0.134 83.8
ring balk A-0-1 83.8 1.5 0.018 1152 123.05 0.107 83.8
ring balk A-1-2 83.8 1.5 0.018 1152 53.88 0.047 83.8
ring balk A-2-3 83.8 1.5 0.018 1152 33.34 0.029 83.8
ring balk A-3-4 83.8 1.5 0.018 1152 65.66 0.057 83.8
ring balk A-4-5 83.8 1.5 0.018 1152 163.66 0.142 83.8

A ring balk
ring balk
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
205.07
216.46
0.178
0.188
83.8
83.8
ring balk A-7-8 83.8 1.5 0.018 1152 159.47 0.138 83.8
ring balk A-8-9 83.8 1.5 0.018 1152 118.06 0.102 83.8
ring balk A-9-10 83.8 1.5 0.018 1152 106.67 0.093 83.8
ring balk A-10-11 83.8 1.5 0.018 1152 123.06 0.107 83.8
ring balk A-11-12 83.8 1.5 0.018 1152 164.47 0.143 83.8
ring balk A-12-13 83.8 1.5 0.018 1152 169.75 0.147 83.8
ring balk A-0A-0 83.8 1.5 0.018 1152 126.58 0.110 83.8
ring balk A-0-1 83.8 1.5 0.018 1152 110.16 0.096 83.8
ring balk A-1-2 83.8 1.5 0.018 1152 124.42 0.108 83.8
ring balk A-2-3 83.8 1.5 0.018 1152 59.35 0.052 83.8
ring balk A-3-4 83.8 1.5 0.018 1152 92.06 0.080 83.8
ring balk A-4-5 83.8 1.5 0.018 1152 106.33 0.092 83.8

B ring balk
ring balk
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
80.15
193.45
0.070
0.168
83.8
83.8
ring balk A-7-8 83.8 1.5 0.018 1152 150.76 0.131 83.8
ring balk A-8-9 83.8 1.5 0.018 1152 176.94 0.154 83.8
ring balk A-9-10 83.8 1.5 0.018 1152 129.69 0.113 83.8
ring balk A-10-11 83.8 1.5 0.018 1152 172.37 0.150 83.8
ring balk A-11-12 83.8 1.5 0.018 1152 146.19 0.127 83.8
ring balk A-12-13 83.8 1.5 0.018 1152 142.84 0.124 83.8
ring balk B'-0A-A 83.8 1.5 0.018 1152 125.14 0.109 83.8

B' ring balk B'-5-6


ring balk B'-6-7
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
167.19
181.92
0.145
0.158
83.8
83.8
ring balk B'-12-13 83.8 1.5 0.018 1152 132.02 0.115 83.8
ring balk 0A-A-B 83.8 1.5 0.018 1152 145.17 0.126 83.8
ring balk 0-A-B 83.8 1.5 0.018 1152 124.07 0.108 83.8
ring balk 1-A-B 83.8 1.5 0.018 1152 80.99 0.070 83.8
ring balk 2-A-B 83.8 1.5 0.018 1152 52.69 0.046 83.8
ring balk 3-A-B 83.8 1.5 0.018 1152 75.66 0.066 83.8
ring balk 4-A-B 83.8 1.5 0.018 1152 56.29 0.049 83.8
ring balk 5-A-B 83.8 1.5 0.018 1152 181.41 0.157 83.8
A-B ring balk
ring balk
6-A-B
7-A-B
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
200.8
210.25
0.174
0.183
83.8
83.8
A-B
ring balk 8-A-B 83.8 1.5 0.018 1152 141.71 0.123 83.8
ring balk 9-A-B 83.8 1.5 0.018 1152 122.33 0.106 83.8
ring balk 10-A-B 83.8 1.5 0.018 1152 112.88 0.098 83.8
ring balk 11-A-B 83.8 1.5 0.018 1152 140.81 0.122 83.8
ring balk 12-A-B 83.8 1.5 0.018 1152 160.2 0.139 83.8
ring balk 13-A-B 83.8 1.5 0.018 1152 167.13 0.145 83.8
ring balk 0A-B-B' 83.8 1.5 0.018 1152 129.1 0.112 83.8
ring balk 0-B-B' 83.8 1.5 0.018 1152 114.63 0.100 83.8
ring balk 5-B-B' 83.8 1.5 0.018 1152 166.36 0.144 83.8
B-B' ring balk
ring balk
6-B-B'
7-B-B'
83.8
83.8
1.5
1.5
0.018
0.018
1152
1152
183.73
195.25
0.159
0.169
83.8
83.8
ring balk 12-B-B' 83.8 1.5 0.018 1152 143.12 0.124 83.8
ring balk 13-B-B' 83.8 1.5 0.018 1152 151.34 0.131 83.8

HOISTING SLEWING LANDING


Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
ring balk A-0A-0 144.5 1.5 0.010 1152 153.87 0.134 144.5
ring balk A-0-1 144.5 1.5 0.010 1152 123.05 0.107 144.5
ring balk A-1-2 144.5 1.5 0.010 1152 53.88 0.047 144.5
ring balk A-2-3 144.5 1.5 0.010 1152 33.34 0.029 144.5
ring balk A-3-4 144.5 1.5 0.010 1152 65.66 0.057 144.5
ring balk A-4-5 144.5 1.5 0.010 1152 163.66 0.142 144.5

A ring balk
ring balk
A-5-6
A-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
205.07
216.46
0.178
0.188
144.5
144.5
ring balk A-7-8 144.5 1.5 0.010 1152 159.47 0.138 144.5
ring balk A-8-9 144.5 1.5 0.010 1152 118.06 0.102 144.5
ring balk A-9-10 144.5 1.5 0.010 1152 106.67 0.093 144.5
ring balk A-10-11 144.5 1.5 0.010 1152 123.06 0.107 144.5
ring balk A-11-12 144.5 1.5 0.010 1152 164.47 0.143 144.5
ring balk A-12-13 144.5 1.5 0.010 1152 169.75 0.147 144.5
ring balk A-0A-0 144.5 1.5 0.010 1152 126.58 0.110 144.5
ring balk A-0-1 144.5 1.5 0.010 1152 110.16 0.096 144.5
ring balk A-1-2 144.5 1.5 0.010 1152 124.42 0.108 144.5
ring balk A-2-3 144.5 1.5 0.010 1152 59.35 0.052 144.5
ring balk A-3-4 144.5 1.5 0.010 1152 92.06 0.080 144.5
ring balk A-4-5 144.5 1.5 0.010 1152 106.33 0.092 144.5

B ring balk
ring balk
A-5-6
A-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
80.15
193.45
0.070
0.168
144.5
144.5
ring balk A-7-8 144.5 1.5 0.010 1152 150.76 0.131 144.5
ring balk A-8-9 144.5 1.5 0.010 1152 176.94 0.154 144.5
ring balk A-9-10 144.5 1.5 0.010 1152 129.69 0.113 144.5
ring balk A-10-11 144.5 1.5 0.010 1152 172.37 0.150 144.5
ring balk A-11-12 144.5 1.5 0.010 1152 146.19 0.127 144.5
ring balk A-12-13 144.5 1.5 0.010 1152 142.84 0.124 144.5
ring balk B'-0A-A 144.5 1.5 0.010 1152 125.14 0.109 144.5

B' ring balk B'-5-6


ring balk B'-6-7
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
167.19
181.92
0.145
0.158
144.5
144.5
ring balk B'-12-13 144.5 1.5 0.010 1152 132.02 0.115 144.5
ring balk 0A-A-B 144.5 1.5 0.010 1152 145.17 0.126 144.5
ring balk 0-A-B 144.5 1.5 0.010 1152 124.07 0.108 144.5
ring balk 1-A-B 144.5 1.5 0.010 1152 80.99 0.070 144.5
ring balk 2-A-B 144.5 1.5 0.010 1152 52.69 0.046 144.5
ring balk 3-A-B 144.5 1.5 0.010 1152 75.66 0.066 144.5
ring balk 4-A-B 144.5 1.5 0.010 1152 56.29 0.049 144.5
ring balk 5-A-B 144.5 1.5 0.010 1152 181.41 0.157 144.5
A-B ring balk
ring balk
6-A-B
7-A-B
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
200.8
210.25
0.174
0.183
144.5
144.5
ring balk 8-A-B 144.5 1.5 0.010 1152 141.71 0.123 144.5
ring balk 9-A-B 144.5 1.5 0.010 1152 122.33 0.106 144.5
ring balk 10-A-B 144.5 1.5 0.010 1152 112.88 0.098 144.5
ring balk 11-A-B 144.5 1.5 0.010 1152 140.81 0.122 144.5
ring balk 12-A-B 144.5 1.5 0.010 1152 160.2 0.139 144.5
ring balk 13-A-B 144.5 1.5 0.010 1152 167.13 0.145 144.5
ring balk 0A-B-B' 144.5 1.5 0.010 1152 129.1 0.112 144.5
ring balk 0-B-B' 144.5 1.5 0.010 1152 114.63 0.100 144.5
ring balk 5-B-B' 144.5 1.5 0.010 1152 166.36 0.144 144.5
B-B' ring balk 6-B-B'
ring balk 7-B-B'
144.5
144.5
1.5
1.5
0.010
0.010
1152
1152
183.73
195.25
0.159
0.169
144.5
144.5
ring balk 12-B-B' 144.5 1.5 0.010 1152 143.12 0.124 144.5
ring balk 13-B-B' 144.5 1.5 0.010 1152 151.34 0.131 144.5
LANDING
WAKTU
h t TOTAL
(m) (menit) (menit)
14.6 0.174224 0.326
14.6 0.174224 0.299
14.6 0.174224 0.239
14.6 0.174224 0.221
14.6 0.174224 0.249
14.6 0.174224 0.334
14.6 0.174224 0.370
14.6 0.174224 0.380
14.6 0.174224 0.331
14.6 0.174224 0.295
14.6 0.174224 0.285
14.6 0.174224 0.299
14.6 0.174224 0.335
14.6 0.174224 0.339
14.6 0.174224 0.302
14.6 0.174224 0.288
14.6 0.174224 0.300
14.6 0.174224 0.244
14.6 0.174224 0.272
14.6 0.174224 0.284
14.6 0.174224 0.262
14.6 0.174224 0.360
14.6 0.174224 0.323
14.6 0.174224 0.346
14.6 0.174224 0.305
14.6 0.174224 0.342
14.6 0.174224 0.319
14.6 0.174224 0.316
14.6 0.174224 0.301
14.6 0.174224 0.337
14.6 0.174224 0.350
14.6 0.174224 0.307
14.6 0.174224 0.318
14.6 0.174224 0.300
14.6 0.174224 0.262
14.6 0.174224 0.238
14.6 0.174224 0.258
14.6 0.174224 0.241
14.6 0.174224 0.350
14.6 0.174224 0.366
14.6 0.174224 0.375
14.6 0.174224 0.315
14.6 0.174224 0.298
14.6 0.174224 0.290
14.6 0.174224 0.314
14.6 0.174224 0.331
14.6 0.174224 0.337
14.6 0.174224 0.304
14.6 0.174224 0.292
14.6 0.174224 0.337
14.6 0.174224 0.352
14.6 0.174224 0.362
14.6 0.174224 0.316
14.6 0.174224 0.323

LANDING
WAKTU
h t TOTAL
(m) (menit) (menit)
14.6 0.101038 0.245
14.6 0.101038 0.218
14.6 0.101038 0.158
14.6 0.101038 0.140
14.6 0.101038 0.168
14.6 0.101038 0.253
14.6 0.101038 0.289
14.6 0.101038 0.299
14.6 0.101038 0.250
14.6 0.101038 0.214
14.6 0.101038 0.204
14.6 0.101038 0.218
14.6 0.101038 0.254
14.6 0.101038 0.259
14.6 0.101038 0.221
14.6 0.101038 0.207
14.6 0.101038 0.219
14.6 0.101038 0.163
14.6 0.101038 0.191
14.6 0.101038 0.204
14.6 0.101038 0.181
14.6 0.101038 0.279
14.6 0.101038 0.242
14.6 0.101038 0.265
14.6 0.101038 0.224
14.6 0.101038 0.261
14.6 0.101038 0.238
14.6 0.101038 0.235
14.6 0.101038 0.220
14.6 0.101038 0.257
14.6 0.101038 0.269
14.6 0.101038 0.226
14.6 0.101038 0.237
14.6 0.101038 0.219
14.6 0.101038 0.182
14.6 0.101038 0.157
14.6 0.101038 0.177
14.6 0.101038 0.160
14.6 0.101038 0.269
14.6 0.101038 0.286
14.6 0.101038 0.294
14.6 0.101038 0.234
14.6 0.101038 0.218
14.6 0.101038 0.209
14.6 0.101038 0.234
14.6 0.101038 0.250
14.6 0.101038 0.256
14.6 0.101038 0.223
14.6 0.101038 0.211
14.6 0.101038 0.256
14.6 0.101038 0.271
14.6 0.101038 0.281
14.6 0.101038 0.236
14.6 0.101038 0.243
WAKTU SIKLUS BALOK
WAKTU Waktu Moving WAKTU
Segmen Lantai Titik SLEWING INSTALL KEMBALI
MUAT Crane TOTAL
a b c (menit) (menit) (menit) (menit) (menit) (menit)
1 A-0A-0 5.00 0.15 15.68 0.14 20.98
1 A-0-1 5.00 0.12 15.68 0.12 20.92
1 A-1-2 5.00 0.06 15.68 0.06 20.80
1 A-2-3 5.00 0.05 15.68 0.04 20.77
1 A-3-4 5.00 16.16 0.07 15.68 0.07 36.98
1 A-4-5 5.00 0.16 15.68 0.15 20.99

A 1
1
A-5-6
A-6-7
5.00
5.00
0.20
0.21
15.68
15.68
0.19
0.20
21.06
21.08
1 A-7-8 5.00 16.68 0.16 15.68 0.15 37.67
1 A-8-9 5.00 0.12 15.68 0.11 20.91
1 A-9-10 5.00 0.11 15.68 0.10 20.89
1 A-10-11 5.00 0.12 15.68 0.12 20.92
1 A-11-12 5.00 0.16 15.68 0.15 20.99
1 A-12-13 5.00 0.17 15.68 0.16 21.00
1 A-0A-0 5.00 16.68 0.13 15.68 0.12 37.61
1 A-0-1 5.00 0.11 15.68 0.11 20.90
1 A-1-2 5.00 0.13 15.68 0.12 20.92
1 A-2-3 5.00 0.07 15.68 0.06 20.81
1 A-3-4 5.00 16.68 0.10 15.68 0.09 37.55
1 A-4-5 5.00 0.11 15.68 0.10 20.89

B 1
1
A-5-6
A-6-7
5.00
5.00
0.09
0.19
15.68
15.68
0.08
0.18
20.85
21.04
1 A-7-8 5.00 16.68 0.15 15.68 0.14 37.65
1 A-8-9 5.00 0.17 15.68 0.16 21.02
1 A-9-10 5.00 0.13 15.68 0.12 20.93
1 A-10-11 5.00 16.68 0.17 15.68 0.16 37.69
1 A-11-12 5.00 0.14 15.68 0.14 20.96
1 A-12-13 5.00 0.14 15.68 0.13 20.96
1 B'-0A-A 5.00 16.68 0.13 15.68 0.12 37.61

B' 1
1
B'-5-6
B'-6-7
5.00
5.00
0.16
0.18
15.68
15.68
0.16
0.17
21.00
21.02
1 B'-12-13 5.00 16.68 0.13 15.68 0.12 37.62
1 0A-A-B 5.00 16.68 0.14 15.68 0.14 37.64
1 0-A-B 5.00 0.13 15.68 0.12 20.92
1 1-A-B 5.00 0.09 15.68 0.08 20.85
1 2-A-B 5.00 0.06 15.68 0.06 20.80
1 3-A-B 5.00 16.68 0.08 15.68 0.08 37.52
1 4-A-B 5.00 0.07 15.68 0.06 20.81
1 5-A-B 5.00 0.18 15.68 0.17 21.02
A-B 1 6-A-B
7-A-B
5.00
5.00
0.19
0.20
15.68
15.68
0.18
0.19
21.06
21.07
A-B
1 8-A-B 5.00 16.68 0.14 15.68 0.13 37.63
1 9-A-B 5.00 0.12 15.68 0.12 20.92
1 10-A-B 5.00 0.12 15.68 0.11 20.90
1 11-A-B 5.00 16.68 0.14 15.68 0.13 37.63
1 12-A-B 5.00 0.16 15.68 0.15 20.99
1 13-A-B 5.00 0.16 15.68 0.16 21.00
1 0A-B-B' 5.00 16.68 0.13 15.68 0.12 37.61
1 0-B-B' 5.00 0.12 15.68 0.11 20.91
1 5-B-B' 5.00 16.68 0.16 15.68 0.15 37.68
B-B' 1
1
6-B-B'
7-B-B'
5.00
5.00
0.18
0.19
15.68
15.68
0.17
0.18
21.03
21.05
1 12-B-B' 5.00 16.68 0.14 15.68 0.13 37.64
1 13-B-B' 5.00 0.15 15.68 0.14 20.97
25.57
WAKTU WAKTU
Segmen Lantai Titik SLEWING INSTALL KEMBALI
MUAT TOTAL
a b c (menit) (menit) (menit) (menit) (menit)
2 A-0A-0 5.00 0.19 15.68 0.17 21.04
2 A-0-1 5.00 0.16 15.68 0.14 20.98
2 A-1-2 5.00 0.10 15.68 0.08 20.86
2 A-2-3 5.00 0.09 15.68 0.06 20.83
2 A-3-4 5.00 0.11 15.68 0.09 20.88
2 A-4-5 5.00 0.20 15.68 0.17 21.05

A 2
2
A-5-6
A-6-7
5.00
5.00
0.23
0.24
15.68
15.68
0.21
0.22
21.12
21.14
2 A-7-8 5.00 0.19 15.68 0.17 21.05
2 A-8-9 5.00 0.16 15.68 0.14 20.97
2 A-9-10 5.00 0.15 15.68 0.13 20.95
2 A-10-11 5.00 0.16 15.68 0.14 20.98
2 A-11-12 5.00 0.20 15.68 0.18 21.05
2 A-12-13 5.00 0.20 15.68 0.18 21.06
2 A-0A-0 5.00 0.17 15.68 0.14 20.99
2 A-0-1 5.00 0.15 15.68 0.13 20.96
2 A-1-2 5.00 0.16 15.68 0.14 20.98
2 A-2-3 5.00 0.11 15.68 0.08 20.87
2 A-3-4 5.00 0.14 15.68 0.11 20.93
2 A-4-5 5.00 0.15 15.68 0.12 20.95

B 2
2
A-5-6
A-6-7
5.00
5.00
0.13
0.22
15.68
15.68
0.10
0.20
20.91
21.10
2 A-7-8 5.00 0.19 15.68 0.16 21.03
2 A-8-9 5.00 0.21 15.68 0.19 21.08
2 A-9-10 5.00 0.17 15.68 0.15 20.99
2 A-10-11 5.00 0.21 15.68 0.18 21.07
2 A-11-12 5.00 0.18 15.68 0.16 21.02
2 A-12-13 5.00 0.18 15.68 0.16 21.02
2 B'-0A-A 5.00 0.16 15.68 0.14 20.99

B' 2
2
B'-5-6
B'-6-7
5.00
5.00
0.20
0.21
15.68
15.68
0.18
0.19
21.06
21.08
2 B'-12-13 5.00 0.17 15.68 0.15 21.00
2 0A-A-B 5.00 0.18 15.68 0.16 21.02
2 0-A-B 5.00 0.16 15.68 0.14 20.98
2 1-A-B 5.00 0.13 15.68 0.10 20.91
2 2-A-B 5.00 0.10 15.68 0.08 20.86
2 3-A-B 5.00 0.12 15.68 0.10 20.90
2 4-A-B 5.00 0.10 15.68 0.08 20.87
2 5-A-B 5.00 0.21 15.68 0.19 21.08
A-B 2
2
6-A-B
7-A-B
5.00
5.00
0.23
0.24
15.68
15.68
0.21
0.22
21.12
21.13
A-B
2 8-A-B 5.00 0.18 15.68 0.16 21.01
2 9-A-B 5.00 0.16 15.68 0.14 20.98
2 10-A-B 5.00 0.15 15.68 0.13 20.96
2 11-A-B 5.00 0.18 15.68 0.15 21.01
2 12-A-B 5.00 0.20 15.68 0.17 21.05
2 13-A-B 5.00 0.20 15.68 0.18 21.06
2 0A-B-B' 5.00 0.17 15.68 0.14 20.99
2 0-B-B' 5.00 0.16 15.68 0.13 20.97
2 5-B-B' 5.00 0.20 15.68 0.18 21.06
B-B' 2
2
6-B-B'
7-B-B'
5.00
5.00
0.22
0.23
15.68
15.68
0.19
0.20
21.09
21.11
2 12-B-B' 5.00 0.18 15.68 0.16 21.02
2 13-B-B' 5.00 0.19 15.68 0.16 21.03
21.00
WAKTU WAKTU
Segmen Lantai Titik SLEWING INSTALL KEMBALI Segmen
MUAT TOTAL
a b c (menit) (menit) (menit) (menit) (menit) a
3 A-0A-0 5.00 0.22 15.68 0.19 21.09
3 A-0-1 5.00 0.20 15.68 0.16 21.04
3 A-1-2 5.00 0.14 15.68 0.10 20.91
3 A-2-3 5.00 0.12 15.68 0.08 20.88
3 A-3-4 5.00 0.15 15.68 0.11 20.94
3 A-4-5 5.00 0.23 15.68 0.19 21.11

A 3
3
A-5-6
A-6-7
5.00
5.00
0.27
0.28
15.68
15.68
0.23
0.24
21.18
21.20 A
3 A-7-8 5.00 0.23 15.68 0.19 21.10
3 A-8-9 5.00 0.19 15.68 0.15 21.03
3 A-9-10 5.00 0.18 15.68 0.14 21.01
3 A-10-11 5.00 0.20 15.68 0.16 21.04
3 A-11-12 5.00 0.23 15.68 0.19 21.11
3 A-12-13 5.00 0.24 15.68 0.20 21.12
3 A-0A-0 5.00 0.20 15.68 0.16 21.04
3 A-0-1 5.00 0.19 15.68 0.15 21.01
3 A-1-2 5.00 0.20 15.68 0.16 21.04
3 A-2-3 5.00 0.14 15.68 0.10 20.92
3 A-3-4 5.00 0.17 15.68 0.13 20.98
3 A-4-5 5.00 0.18 15.68 0.14 21.01

B 3
3
A-5-6
A-6-7
5.00
5.00
0.16
0.26
15.68
15.68
0.12
0.22
20.96
21.16 B
3 A-7-8 5.00 0.22 15.68 0.18 21.08
3 A-8-9 5.00 0.24 15.68 0.21 21.13
3 A-9-10 5.00 0.20 15.68 0.16 21.05
3 A-10-11 5.00 0.24 15.68 0.20 21.12
3 A-11-12 5.00 0.22 15.68 0.18 21.08
3 A-12-13 5.00 0.21 15.68 0.18 21.07
3 B'-0A-A 5.00 0.20 15.68 0.16 21.04

B' 3
3
B'-5-6
B'-6-7
5.00
5.00
0.23
0.25
15.68
15.68
0.20
0.21
21.11
21.14 B'
3 B'-12-13 5.00 0.20 15.68 0.17 21.05
3 0A-A-B 5.00 0.22 15.68 0.18 21.07
3 0-A-B 5.00 0.20 15.68 0.16 21.04
3 1-A-B 5.00 0.16 15.68 0.12 20.96
3 2-A-B 5.00 0.14 15.68 0.10 20.91
3 3-A-B 5.00 0.16 15.68 0.12 20.95
3 4-A-B 5.00 0.14 15.68 0.10 20.92
3 5-A-B 5.00 0.25 15.68 0.21 21.14
A-B 3
3
6-A-B
7-A-B
5.00
5.00
0.26
0.27
15.68
15.68
0.23
0.23
21.17
21.19
A-B
A-B A-B
3 8-A-B 5.00 0.21 15.68 0.17 21.07
3 9-A-B 5.00 0.20 15.68 0.16 21.03
3 10-A-B 5.00 0.19 15.68 0.15 21.02
3 11-A-B 5.00 0.21 15.68 0.17 21.07
3 12-A-B 5.00 0.23 15.68 0.19 21.10
3 13-A-B 5.00 0.23 15.68 0.20 21.11
3 0A-B-B' 5.00 0.20 15.68 0.16 21.05
3 0-B-B' 5.00 0.19 15.68 0.15 21.02
3 5-B-B' 5.00 0.23 15.68 0.20 21.11
B-B' 3
3
6-B-B'
7-B-B'
5.00
5.00
0.25
0.26
15.68
15.68
0.21
0.22
21.14
21.16
B-B'
3 12-B-B' 5.00 0.21 15.68 0.18 21.07
3 13-B-B' 5.00 0.22 15.68 0.18 21.08
21.06
WAKTU WAKTU
Lantai Titik SLEWING INSTALL KEMBALI Segmen Lantai
MUAT TOTAL
b c (menit) (menit) (menit) (menit) (menit) a b
4 A-0A-0 5.00 0.26 15.68 0.20 21.14 5
4 A-0-1 5.00 0.23 15.68 0.18 21.09 5
4 A-1-2 5.00 0.17 15.68 0.12 20.97 5
4 A-2-3 5.00 0.15 15.68 0.10 20.93 5
4 A-3-4 5.00 0.18 15.68 0.13 20.99 5
4 A-4-5 5.00 0.26 15.68 0.21 21.16 5
4
4
A-5-6
A-6-7
5.00
5.00
0.30
0.31
15.68
15.68
0.25
0.26
21.23
21.25 A 5
5
4 A-7-8 5.00 0.26 15.68 0.21 21.15 5
4 A-8-9 5.00 0.23 15.68 0.17 21.08 5
4 A-9-10 5.00 0.22 15.68 0.16 21.06 5
4 A-10-11 5.00 0.23 15.68 0.18 21.09 5
4 A-11-12 5.00 0.27 15.68 0.21 21.16 5
4 A-12-13 5.00 0.27 15.68 0.22 21.17 5
4 A-0A-0 5.00 0.23 15.68 0.18 21.09 5
4 A-0-1 5.00 0.22 15.68 0.17 21.07 5
4 A-1-2 5.00 0.23 15.68 0.18 21.09 5
4 A-2-3 5.00 0.17 15.68 0.12 20.98 5
4 A-3-4 5.00 0.20 15.68 0.15 21.03 5
4 A-4-5 5.00 0.22 15.68 0.16 21.06 5
4
4
A-5-6
A-6-7
5.00
5.00
0.19
0.29
15.68
15.68
0.14
0.24
21.01
21.21 B 5
5
4 A-7-8 5.00 0.25 15.68 0.20 21.14 5
4 A-8-9 5.00 0.28 15.68 0.22 21.18 5
4 A-9-10 5.00 0.24 15.68 0.18 21.10 5
4 A-10-11 5.00 0.27 15.68 0.22 21.17 5
4 A-11-12 5.00 0.25 15.68 0.20 21.13 5
4 A-12-13 5.00 0.25 15.68 0.20 21.12 5
4 B'-0A-A 5.00 0.23 15.68 0.18 21.09 5
4
4
B'-5-6
B'-6-7
5.00
5.00
0.27
0.28
15.68
15.68
0.22
0.23
21.16
21.19 B' 5
5
4 B'-12-13 5.00 0.24 15.68 0.19 21.10 5
4 0A-A-B 5.00 0.25 15.68 0.20 21.13 5
4 0-A-B 5.00 0.23 15.68 0.18 21.09 5
4 1-A-B 5.00 0.19 15.68 0.14 21.01 5
4 2-A-B 5.00 0.17 15.68 0.12 20.97 5
4 3-A-B 5.00 0.19 15.68 0.14 21.01 5
4 4-A-B 5.00 0.17 15.68 0.12 20.97 5
4 5-A-B 5.00 0.28 15.68 0.23 21.19 5
4
4
6-A-B
7-A-B
5.00
5.00
0.30
0.31
15.68
15.68
0.25
0.25
21.22
21.24
A-B 5
5
A-B
4 8-A-B 5.00 0.25 15.68 0.19 21.12 5
4 9-A-B 5.00 0.23 15.68 0.18 21.09 5
4 10-A-B 5.00 0.22 15.68 0.17 21.07 5
4 11-A-B 5.00 0.25 15.68 0.19 21.12 5
4 12-A-B 5.00 0.26 15.68 0.21 21.15 5
4 13-A-B 5.00 0.27 15.68 0.22 21.16 5
4 0A-B-B' 5.00 0.23 15.68 0.18 21.10 5
4 0-B-B' 5.00 0.22 15.68 0.17 21.07 5
4 5-B-B' 5.00 0.27 15.68 0.22 21.16 5
4
4
6-B-B'
7-B-B'
5.00
5.00
0.28
0.29
15.68
15.68
0.23
0.24
21.19
21.21
B-B' 5
5
4 12-B-B' 5.00 0.25 15.68 0.20 21.12 5
4 13-B-B' 5.00 0.25 15.68 0.20 21.14 5
21.11

waktu siklus install balok


WAKTU WAKTU
Titik SLEWING INSTALL KEMBALI Segmen Lantai Titik
MUAT TOTAL
c (menit) (menit) (menit) (menit) (menit) a b c
A-0A-0 5.00 0.29 15.68 0.22 21.19 ring balk A-0A-0
A-0-1 5.00 0.26 15.68 0.20 21.14 ring balk A-0-1
A-1-2 5.00 0.20 15.68 0.14 21.02 ring balk A-1-2
A-2-3 5.00 0.19 15.68 0.12 20.98 ring balk A-2-3
A-3-4 5.00 0.21 15.68 0.15 21.04 ring balk A-3-4
A-4-5 5.00 0.30 15.68 0.23 21.21 ring balk A-4-5
A-5-6
A-6-7
5.00
5.00
0.33
0.34
15.68
15.68
0.27
0.28
21.28
21.30 A ring balk
ring balk
A-5-6
A-6-7
A-7-8 5.00 0.29 15.68 0.23 21.20 ring balk A-7-8
A-8-9 5.00 0.26 15.68 0.19 21.13 ring balk A-8-9
A-9-10 5.00 0.25 15.68 0.18 21.11 ring balk A-9-10
A-10-11 5.00 0.26 15.68 0.20 21.14 ring balk A-10-11
A-11-12 5.00 0.30 15.68 0.23 21.21 ring balk A-11-12
A-12-13 5.00 0.30 15.68 0.24 21.22 ring balk A-12-13
A-0A-0 5.00 0.27 15.68 0.20 21.15 ring balk A-0A-0
A-0-1 5.00 0.25 15.68 0.19 21.12 ring balk A-0-1
A-1-2 5.00 0.26 15.68 0.20 21.14 ring balk A-1-2
A-2-3 5.00 0.21 15.68 0.14 21.03 ring balk A-2-3
A-3-4 5.00 0.24 15.68 0.17 21.09 ring balk A-3-4
A-4-5 5.00 0.25 15.68 0.18 21.11 ring balk A-4-5
A-5-6
A-6-7
5.00
5.00
0.23
0.32
15.68
15.68
0.16
0.26
21.07
21.26 B ring balk
ring balk
A-5-6
A-6-7
A-7-8 5.00 0.29 15.68 0.22 21.19 ring balk A-7-8
A-8-9 5.00 0.31 15.68 0.24 21.23 ring balk A-8-9
A-9-10 5.00 0.27 15.68 0.20 21.15 ring balk A-9-10
A-10-11 5.00 0.31 15.68 0.24 21.23 ring balk A-10-11
A-11-12 5.00 0.28 15.68 0.22 21.18 ring balk A-11-12
A-12-13 5.00 0.28 15.68 0.21 21.17 ring balk A-12-13
B'-0A-A 5.00 0.26 15.68 0.20 21.14 ring balk B'-0A-A
B'-5-6
B'-6-7
5.00
5.00
0.30
0.31
15.68
15.68
0.24
0.25
21.22
21.24 B' ring balk B'-5-6
ring balk B'-6-7
B'-12-13 5.00 0.27 15.68 0.21 21.16 ring balk B'-12-13
0A-A-B 5.00 0.28 15.68 0.22 21.18 ring balk 0A-A-B
0-A-B 5.00 0.26 15.68 0.20 21.14 ring balk 0-A-B
1-A-B 5.00 0.23 15.68 0.16 21.07 ring balk 1-A-B
2-A-B 5.00 0.20 15.68 0.14 21.02 ring balk 2-A-B
3-A-B 5.00 0.22 15.68 0.16 21.06 ring balk 3-A-B
4-A-B 5.00 0.21 15.68 0.14 21.02 ring balk 4-A-B
5-A-B 5.00 0.31 15.68 0.25 21.24 ring balk 5-A-B
6-A-B
7-A-B
5.00
5.00
0.33
0.34
15.68
15.68
0.26
0.27
21.28
21.29
A-B ring balk
ring balk
6-A-B
7-A-B
A-B
8-A-B 5.00 0.28 15.68 0.21 21.17 ring balk 8-A-B
9-A-B 5.00 0.26 15.68 0.20 21.14 ring balk 9-A-B
10-A-B 5.00 0.25 15.68 0.19 21.12 ring balk 10-A-B
11-A-B 5.00 0.28 15.68 0.21 21.17 ring balk 11-A-B
12-A-B 5.00 0.30 15.68 0.23 21.21 ring balk 12-A-B
13-A-B 5.00 0.30 15.68 0.24 21.22 ring balk 13-A-B
0A-B-B' 5.00 0.27 15.68 0.20 21.15 ring balk 0A-B-B'
0-B-B' 5.00 0.26 15.68 0.19 21.13 ring balk 0-B-B'
5-B-B' 5.00 0.30 15.68 0.24 21.22 ring balk 5-B-B'
6-B-B'
7-B-B'
5.00
5.00
0.32
0.33
15.68
15.68
0.25
0.26
21.25
21.27
B-B' ring balk
ring balk
6-B-B'
7-B-B'
12-B-B' 5.00 0.28 15.68 0.21 21.18 ring balk 12-B-B'
13-B-B' 5.00 0.29 15.68 0.22 21.19 ring balk 13-B-B'
21.16

us install balok 21.85


WAKTU WAKTU
SLEWING INSTALL KEMBALI
MUAT TOTAL
(menit) (menit) (menit) (menit) (menit)
5.00 0.33 15.68 0.24 21.25
5.00 0.30 15.68 0.22 21.20
5.00 0.24 15.68 0.16 21.08
5.00 0.22 15.68 0.14 21.04
5.00 0.25 15.68 0.17 21.10
5.00 0.33 15.68 0.25 21.27
5.00 0.37 15.68 0.29 21.34
5.00 0.38 15.68 0.30 21.36
5.00 0.33 15.68 0.25 21.26
5.00 0.29 15.68 0.21 21.19
5.00 0.28 15.68 0.20 21.17
5.00 0.30 15.68 0.22 21.20
5.00 0.33 15.68 0.25 21.27
5.00 0.34 15.68 0.26 21.28
5.00 0.30 15.68 0.22 21.20
5.00 0.29 15.68 0.21 21.17
5.00 0.30 15.68 0.22 21.20
5.00 0.24 15.68 0.16 21.09
5.00 0.27 15.68 0.19 21.14
5.00 0.28 15.68 0.20 21.17
5.00 0.26 15.68 0.18 21.12
5.00 0.36 15.68 0.28 21.32
5.00 0.32 15.68 0.24 21.25
5.00 0.35 15.68 0.27 21.29
5.00 0.30 15.68 0.22 21.21
5.00 0.34 15.68 0.26 21.28
5.00 0.32 15.68 0.24 21.24
5.00 0.32 15.68 0.24 21.23
5.00 0.30 15.68 0.22 21.20
5.00 0.34 15.68 0.26 21.27
5.00 0.35 15.68 0.27 21.30
5.00 0.31 15.68 0.23 21.21
5.00 0.32 15.68 0.24 21.24
5.00 0.30 15.68 0.22 21.20
5.00 0.26 15.68 0.18 21.12
5.00 0.24 15.68 0.16 21.08
5.00 0.26 15.68 0.18 21.11
5.00 0.24 15.68 0.16 21.08
5.00 0.35 15.68 0.27 21.30
5.00 0.37 15.68 0.29 21.33
5.00 0.37 15.68 0.29 21.35
5.00 0.32 15.68 0.23 21.23
5.00 0.30 15.68 0.22 21.20
5.00 0.29 15.68 0.21 21.18
5.00 0.31 15.68 0.23 21.23
5.00 0.33 15.68 0.25 21.26
5.00 0.34 15.68 0.26 21.27
5.00 0.30 15.68 0.22 21.21
5.00 0.29 15.68 0.21 21.18
5.00 0.34 15.68 0.26 21.27
5.00 0.35 15.68 0.27 21.30
5.00 0.36 15.68 0.28 21.32
5.00 0.32 15.68 0.24 21.23
5.00 0.32 15.68 0.24 21.25
21.22
SUDUT SWING PLAT LANTAI
Posisi mobile crane Posisi plat lantai Posisi stock area Jarak MC
Segmen Lantai Titik
X (cm) Y (cm) Xk (cm) Yk (cm) Xc (cm) Yc (cm) ke plat
a b c d e f g h i j
1 A-0-1 525 500 515.5 882.5 1650 200 382.62
1 A-1-2 525 500 946.5 882.5 1650 200 569.18
1 A-2-3 525 500 1377.5 882.5 1650 200 934.38
1 A-3-4 2100 500 1808.5 882.5 1650 200 480.91
1 A-4-5 2100 500 2239.5 882.5 1650 200 407.14

A 1
1
A-5-6
A-6-7
2100
2100
500
500
2670.5
3101.5
882.5
882.5
1650
1650
200
200
686.86
1072.06
1 A-7-8 3450 500 3532.5 882.5 3450 200 391.30
1 A-8-9 3450 500 3963.5 882.5 3450 200 640.30
1 A-9-10 3450 500 4394.5 882.5 3450 200 1019.01
1 A-10-11 4800 500 4825.5 882.5 3450 200 383.35
1 A-11-12 4800 500 5256.5 882.5 3450 200 595.57
1 A-0-1 525 500 515.5 1047.5 1650 200 547.58
1 A-1-2 525 500 946.5 1047.5 1650 200 690.95
1 A-2-3 525 500 1377.5 1047.5 1650 200 1013.17
1 A-3-4 2100 500 1808.5 1047.5 1650 200 620.26
1 A-4-5 2100 500 2239.5 1047.5 1650 200 564.99

A' 1
1
A-5-6
A-6-7
2100
2100
500
500
2670.5
3101.5
1047.5
1047.5
1650
1650
200
200
790.71
1141.38
1 A-7-8 3450 500 3532.5 1047.5 3450 200 553.68
1 A-8-9 3450 500 3963.5 1047.5 3450 200 750.63
1 A-9-10 3450 500 4394.5 1047.5 3450 200 1091.71
1 A-10-11 4800 500 4825.5 1047.5 3450 200 548.09
1 A-11-12 4800 500 5256.5 1047.5 3450 200 712.85
1 A-0-1 525 500 515.5 1212.5 1650 200 712.56
1 A-1-2 525 500 946.5 1212.5 1650 200 827.84
1 A-2-3 525 500 1377.5 1212.5 1650 200 1111.04
1 A-3-4 2100 500 1808.5 1212.5 1650 200 769.82
1 A-4-5 2100 500 2239.5 1212.5 1650 200 726.03

A'' 1
1
A-5-6
A-6-7
2100
2100
500
500
2670.5
3101.5
1212.5
1212.5
1650
1650
200
200
912.76
1229.09
1 A-7-8 3450 500 3532.5 1212.5 3450 200 717.26
1 A-8-9 3450 500 3963.5 1212.5 3450 200 878.26
1 A-9-10 3450 500 4394.5 1212.5 3450 200 1183.10
1 A-10-11 4800 500 4825.5 1212.5 3450 200 712.96
1 A-11-12 4800 500 5256.5 1212.5 3450 200 846.20
1 A-0A-0 525 500 150 1377.5 1650 200 954.27
1 A-0-1 525 500 515.5 1377.5 1650 200 877.55
1 A-1-2 525 500 946.5 1377.5 1650 200 973.48

B
1 A-2-3 525 500 1377.5 1377.5 1650 200 1223.42
1 A-3-4 2100 500 1808.5 1377.5 1650 200 924.65
1 A-4-5 2100 500 2239.5 1377.5 1650 200 888.52

B 1
1
A-5-6
A-6-7
2100
2100
500
500
2670.5
3101.5
1377.5
1377.5
1650
1650
200
200
1046.65
1331.54
1 A-7-8 3450 500 3532.5 1377.5 1650 200 881.37
1 A-8-9 3450 500 3963.5 1377.5 1650 200 1016.70
1 A-9-10 3450 500 4394.5 1377.5 3450 200 1289.22
1 A-10-11 4800 500 4825.5 1377.5 3450 200 877.87
1 A-11-12 4800 500 5256.5 1377.5 3450 200 989.14
1 A-12-13 4800 500 5406.5 1377.5 3450 200 1066.70
1 B'-0A-A 525 500 150 1591.5 1650 200 1154.12

B' 1
1
B'-5-6
B'-6-7
2100
2100
500
500
2670.5
3101.5
1591.5
1591.5
1650
1650
200
200
1231.60
1481.34
1 B'-12-13 4800 500 5406.5 1591.5 3450 200 1248.69
Jarak SA Sudut
ke MC Swing
k l
1164.31 103.952 -40.26316 88.578
1164.31 54.73 0.907473 42.2
1164.31 36.71 0.44868 24.18
540.83 76.646 -1.312178 52.686
540.83 163.167 2.741935 69.963
540.83 199.308 0.670465 33.822
540.83 212.223 0.381927 20.907
300.00 167.828 4.636364 77.828
300.00 126.686 0.744888 36.686
300.00 112.05 0.404976 22.05
1382.93 106.34 15 86.19
1382.93 152.567 0.837897 39.963
1164.31 103.53 -57.63158 89
1164.31 64.94 1.298932 52.41
1164.31 45.23 0.642229 32.7
540.83 85.93 -1.878216 61.97
540.83 157.43 3.924731 75.7
540.83 189.3 0.959684 43.83
540.83 204.45 0.54668 28.68
300.00 171.44 6.636364 81.44
300.00 136.83 1.066212 46.83
300.00 120.11 0.579672 30.11
1382.93 105.2 21.47059 87.33
1382.93 142.36 1.199343 50.17
1164.31 103.29 -75 89.24
1164.31 71.93 1.690391 59.4
1164.31 52.43 0.835777 39.9
540.83 91.71 -2.444254 67.75
540.83 154.21 5.107527 78.92
540.83 181.79 1.248904 51.34
540.83 197.72 0.711433 35.41
300.00 173.39 8.636364 83.39
300.00 144.23 1.387537 54.23
300.00 127.01 0.754367 37.01
1382.93 104.58 27.94118 87.95
1382.93 135.17 1.560789 57.36
1164.31 125.66 -2.34 66.86
1164.31 102.53 -92.36842 0
1164.31 128.18 2.081851 64.34
1164.31 58.33 1.029326 45.81
540.83 95.58 -3.010292 71.62
540.83 104.93 6.290323 80.97
540.83 80.93 1.538124 56.97
540.83 191.91 0.876186 41.22
1824.83 148.5 10.63636 84.63
1824.83 173.46 1.708861 59.67
300.00 132.89 0.929063 42.89
1382.93 178.34 34.41176 88.34
1382.93 152.51 1.922234 62.51
1382.93 137.13 1.446826 55.4
1164.31 121.48 -2.910667 71.04
540.83 170.73 1.913234 62.4
540.83 185.66 1.089865 47.47
1382.93 131.58 1.79967 60.95
WAKTU BERANGKAT
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
2 A-0-1 83.8 1.5 0.0179 1152 103.952 0.090236 83.8
2 A-1-2 83.8 1.5 0.0179 1152 54.73 0.047509 83.8
2 A-2-3 83.8 1.5 0.0179 1152 36.71 0.031866 83.8
2 A-3-4 83.8 1.5 0.0179 1152 76.646 0.066533 83.8
2 A-4-5 83.8 1.5 0.0179 1152 163.167 0.141638 83.8

A 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
199.308 0.17301
212.223 0.184221
83.8
83.8
2 A-7-8 83.8 1.5 0.0179 1152 167.828 0.145684 83.8
2 A-8-9 83.8 1.5 0.0179 1152 126.686 0.10997 83.8
2 A-9-10 83.8 1.5 0.0179 1152 112.05 0.097266 83.8
2 A-10-11 83.8 1.5 0.0179 1152 106.34 0.092309 83.8
2 A-11-12 83.8 1.5 0.0179 1152 152.567 0.132437 83.8
2 A-0-1 83.8 1.5 0.0179 1152 103.53 0.08987 83.8
2 A-1-2 83.8 1.5 0.0179 1152 64.94 0.056372 83.8
2 A-2-3 83.8 1.5 0.0179 1152 45.23 0.039262 83.8
2 A-3-4 83.8 1.5 0.0179 1152 85.93 0.074592 83.8
2 A-4-5 83.8 1.5 0.0179 1152 157.43 0.136658 83.8

A' 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
189.3 0.164323
204.45 0.177474
83.8
83.8
2 A-7-8 83.8 1.5 0.0179 1152 171.44 0.148819 83.8
2 A-8-9 83.8 1.5 0.0179 1152 136.83 0.118776 83.8
2 A-9-10 83.8 1.5 0.0179 1152 120.11 0.104262 83.8
2 A-10-11 83.8 1.5 0.0179 1152 105.2 0.091319 83.8
2 A-11-12 83.8 1.5 0.0179 1152 142.36 0.123576 83.8
2 A-0-1 83.8 1.5 0.0179 1152 103.29 0.089661 83.8
2 A-1-2 83.8 1.5 0.0179 1152 71.93 0.062439 83.8
2 A-2-3 83.8 1.5 0.0179 1152 52.43 0.045512 83.8
2 A-3-4 83.8 1.5 0.0179 1152 91.71 0.079609 83.8
2 A-4-5 83.8 1.5 0.0179 1152 154.21 0.133863 83.8

A'' 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
181.79 0.157804
197.72 0.171632
83.8
83.8
2 A-7-8 83.8 1.5 0.0179 1152 173.39 0.150512 83.8
2 A-8-9 83.8 1.5 0.0179 1152 144.23 0.1252 83.8
2 A-9-10 83.8 1.5 0.0179 1152 127.01 0.110252 83.8
2 A-10-11 83.8 1.5 0.0179 1152 104.58 0.090781 83.8
2 A-11-12 83.8 1.5 0.0179 1152 135.17 0.117335 83.8
2 A-0A-0 83.8 1.5 0.0179 1152 125.66 0.10908 83.8
2 A-0-1 83.8 1.5 0.0179 1152 102.53 0.089002 83.8
2 A-1-2 83.8 1.5 0.0179 1152 128.18 0.111267 83.8
2 A-2-3 83.8 1.5 0.0179 1152 58.33 0.050634 83.8
2 A-3-4 83.8 1.5 0.0179 1152 95.58 0.082969 83.8

B
2 A-4-5 83.8 1.5 0.0179 1152 104.93 0.091085 83.8

B 2
2
A-5-6
A-6-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
80.93
191.91
0.070252
0.166589
83.8
83.8
2 A-7-8 83.8 1.5 0.0179 1152 148.5 0.128906 83.8
2 A-8-9 83.8 1.5 0.0179 1152 173.46 0.150573 83.8
2 A-9-10 83.8 1.5 0.0179 1152 132.89 0.115356 83.8
2 A-10-11 83.8 1.5 0.0179 1152 178.34 0.154809 83.8
2 A-11-12 83.8 1.5 0.0179 1152 152.51 0.132387 83.8
2 A-12-13 83.8 1.5 0.0179 1152 137.13 0.119036 83.8
2 B'-0A-A 83.8 1.5 0.0179 1152 121.48 0.105451 83.8

B' 2
2
B'-5-6
B'-6-7
83.8
83.8
1.5
1.5
0.0179
0.0179
1152
1152
170.73
185.66
0.148203
0.161163
83.8
83.8
2 B'-12-13 83.8 1.5 0.0179 1152 131.58 0.114219 83.8
WAKTU PULANG
HOISTING SLEWING LANDING
Segmen Lantai Titik
v h t v d t v
a b c (m/menit) (m) (menit) (m/menit) derajat (menit) (m/menit)
2 A-0-1 144.5 3.2 0.022145 1152 103.952 0.090236 144.5
2 A-1-2 144.5 3.2 0.022145 1152 54.73 0.047509 144.5
2 A-2-3 144.5 3.2 0.022145 1152 36.71 0.031866 144.5
2 A-3-4 144.5 3.2 0.022145 1152 76.646 0.066533 144.5
2 A-4-5 144.5 3.2 0.022145 1152 163.167 0.141638 144.5

A 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
199.308
212.223
0.17301
0.184221
144.5
144.5
2 A-7-8 144.5 3.2 0.022145 1152 167.828 0.145684 144.5
2 A-8-9 144.5 3.2 0.022145 1152 126.686 0.10997 144.5
2 A-9-10 144.5 3.2 0.022145 1152 112.05 0.097266 144.5
2 A-10-11 144.5 3.2 0.022145 1152 106.34 0.092309 144.5
2 A-11-12 144.5 3.2 0.022145 1152 152.567 0.132437 144.5
2 A-0-1 144.5 3.2 0.022145 1152 103.53 0.08987 144.5
2 A-1-2 144.5 3.2 0.022145 1152 64.94 0.056372 144.5
2 A-2-3 144.5 3.2 0.022145 1152 45.23 0.039262 144.5
2 A-3-4 144.5 3.2 0.022145 1152 85.93 0.074592 144.5
2 A-4-5 144.5 3.2 0.022145 1152 157.43 0.136658 144.5

A' 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
189.3
204.45
0.164323
0.177474
144.5
144.5
2 A-7-8 144.5 3.2 0.022145 1152 171.44 0.148819 144.5
2 A-8-9 144.5 3.2 0.022145 1152 136.83 0.118776 144.5
2 A-9-10 144.5 3.2 0.022145 1152 120.11 0.104262 144.5
2 A-10-11 144.5 3.2 0.022145 1152 105.2 0.091319 144.5
2 A-11-12 144.5 3.2 0.022145 1152 142.36 0.123576 144.5
2 A-0-1 144.5 3.2 0.022145 1152 103.29 0.089661 144.5
2 A-1-2 144.5 3.2 0.022145 1152 71.93 0.062439 144.5
2 A-2-3 144.5 3.2 0.022145 1152 52.43 0.045512 144.5
2 A-3-4 144.5 3.2 0.022145 1152 91.71 0.079609 144.5

A''
2 A-4-5 144.5 3.2 0.022145 1152 154.21 0.133863 144.5

A'' 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
181.79
197.72
0.157804
0.171632
144.5
144.5
2 A-7-8 144.5 3.2 0.022145 1152 173.39 0.150512 144.5
2 A-8-9 144.5 3.2 0.022145 1152 144.23 0.1252 144.5
2 A-9-10 144.5 3.2 0.022145 1152 127.01 0.110252 144.5
2 A-10-11 144.5 3.2 0.022145 1152 104.58 0.090781 144.5
2 A-11-12 144.5 3.2 0.022145 1152 135.17 0.117335 144.5
2 A-0A-0 144.5 3.2 0.022145 1152 125.66 0.10908 144.5
2 A-0-1 144.5 3.2 0.022145 1152 102.53 0.089002 144.5
2 A-1-2 144.5 3.2 0.022145 1152 128.18 0.111267 144.5
2 A-2-3 144.5 3.2 0.022145 1152 58.33 0.050634 144.5
2 A-3-4 144.5 3.2 0.022145 1152 95.58 0.082969 144.5
2 A-4-5 144.5 3.2 0.022145 1152 104.93 0.091085 144.5

B 2
2
A-5-6
A-6-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
80.93
191.91
0.070252
0.166589
144.5
144.5
2 A-7-8 144.5 3.2 0.022145 1152 148.5 0.128906 144.5
2 A-8-9 144.5 3.2 0.022145 1152 173.46 0.150573 144.5
2 A-9-10 144.5 3.2 0.022145 1152 132.89 0.115356 144.5
2 A-10-11 144.5 3.2 0.022145 1152 178.34 0.154809 144.5
2 A-11-12 144.5 3.2 0.022145 1152 152.51 0.132387 144.5
2 A-12-13 144.5 3.2 0.022145 1152 137.13 0.119036 144.5
2 B'-0A-A 144.5 3.2 0.022145 1152 121.48 0.105451 144.5

B' 2
2
B'-5-6
B'-6-7
144.5
144.5
3.2
3.2
0.022145
0.022145
1152
1152
170.73
185.66
0.148203
0.161163
144.5
144.5
2 B'-12-13 144.5 3.2 0.022145 1152 131.58 0.114219 144.5
LANDING
WAKTU
h t TOTAL
(m) (menit) (menit)
3.2 0.038186 0.146322
3.2 0.038186 0.103595
3.2 0.038186 0.087952
3.2 0.038186 0.122619
3.2 0.038186 0.197724
3.2 0.038186 0.229096
3.2 0.038186 0.240307
3.2 0.038186 0.20177
3.2 0.038186 0.166056
3.2 0.038186 0.153352
3.2 0.038186 0.148395
3.2 0.038186 0.188523
3.2 0.038186 0.145956
3.2 0.038186 0.112457
3.2 0.038186 0.095348
3.2 0.038186 0.130678
3.2 0.038186 0.192744
3.2 0.038186 0.220409
3.2 0.038186 0.23356
3.2 0.038186 0.204905
3.2 0.038186 0.174862
3.2 0.038186 0.160348
3.2 0.038186 0.147405
3.2 0.038186 0.179662
3.2 0.038186 0.145747
3.2 0.038186 0.118525
3.2 0.038186 0.101598
3.2 0.038186 0.135695
3.2 0.038186 0.189949
3.2 0.038186 0.21389
3.2 0.038186 0.227718
3.2 0.038186 0.206598
3.2 0.038186 0.181286
3.2 0.038186 0.166338
3.2 0.038186 0.146867
3.2 0.038186 0.173421
3.2 0.038186 0.165166
3.2 0.038186 0.145088
3.2 0.038186 0.167353
3.2 0.038186 0.10672
3.2 0.038186 0.139055
3.2 0.038186 0.147171
3.2 0.038186 0.126338
3.2 0.038186 0.222674
3.2 0.038186 0.184992
3.2 0.038186 0.206659
3.2 0.038186 0.171442
3.2 0.038186 0.210895
3.2 0.038186 0.188473
3.2 0.038186 0.175122
3.2 0.038186 0.161537
3.2 0.038186 0.204289
3.2 0.038186 0.217249
3.2 0.038186 0.170305

LANDING
WAKTU
h t TOTAL
(m) (menit) (menit)
1.5 0.010381 0.122762
1.5 0.010381 0.080035
1.5 0.010381 0.064392
1.5 0.010381 0.099059
1.5 0.010381 0.174164
1.5 0.010381 0.205536
1.5 0.010381 0.216747
1.5 0.010381 0.17821
1.5 0.010381 0.142496
1.5 0.010381 0.129792
1.5 0.010381 0.124835
1.5 0.010381 0.164963
1.5 0.010381 0.122396
1.5 0.010381 0.088897
1.5 0.010381 0.071788
1.5 0.010381 0.107118
1.5 0.010381 0.169184
1.5 0.010381 0.196849
1.5 0.010381 0.21
1.5 0.010381 0.181345
1.5 0.010381 0.151302
1.5 0.010381 0.136788
1.5 0.010381 0.123845
1.5 0.010381 0.156102
1.5 0.010381 0.122187
1.5 0.010381 0.094965
1.5 0.010381 0.078038
1.5 0.010381 0.112135
1.5 0.010381 0.166389
1.5 0.010381 0.19033
1.5 0.010381 0.204158
1.5 0.010381 0.183038
1.5 0.010381 0.157726
1.5 0.010381 0.142778
1.5 0.010381 0.123307
1.5 0.010381 0.149861
1.5 0.010381 0.141606
1.5 0.010381 0.121528
1.5 0.010381 0.143793
1.5 0.010381 0.08316
1.5 0.010381 0.115495
1.5 0.010381 0.123611
1.5 0.010381 0.102778
1.5 0.010381 0.199114
1.5 0.010381 0.161432
1.5 0.010381 0.183099
1.5 0.010381 0.147882
1.5 0.010381 0.187335
1.5 0.010381 0.164913
1.5 0.010381 0.151562
1.5 0.010381 0.137977
1.5 0.010381 0.180729
1.5 0.010381 0.193689
1.5 0.010381 0.146745
Segmen Lantai Titik WAKTU SLEWING INSTALL KEMBALI WAKTU
MUAT TOTAL
a b c (menit) (menit) (menit) (menit) (menit)
2 A-0-1 5 0.146322 13.56 0.122762 18.82908
2 A-1-2 5 0.103595 13.56 0.080035 18.74363
2 A-2-3 5 0.087952 13.56 0.064392 18.71234
2 A-3-4 5 0.122619 13.56 0.099059 18.78168
2 A-4-5 5 0.197724 13.56 0.174164 18.93189

A 2
2
A-5-6
A-6-7
5
5
0.229096 13.56
0.240307 13.56
0.205536
0.216747
18.99463
19.01705
2 A-7-8 5 0.20177 13.56 0.17821 18.93998
2 A-8-9 5 0.166056 13.56 0.142496 18.86855
2 A-9-10 5 0.153352 13.56 0.129792 18.84314
2 A-10-11 5 0.148395 13.56 0.124835 18.83323
2 A-11-12 5 0.188523 13.56 0.164963 18.91349
2 A-0-1 5 0.145956 13.56 0.122396 18.82835
2 A-1-2 5 0.112457 13.56 0.088897 18.76135
2 A-2-3 5 0.095348 13.56 0.071788 18.72714
2 A-3-4 5 0.130678 13.56 0.107118 18.7978
2 A-4-5 5 0.192744 13.56 0.169184 18.92193

A' 2
2
A-5-6
A-6-7
5
5
0.220409 13.56
0.23356 13.56
0.196849
0.21
18.97726
19.00356
2 A-7-8 5 0.204905 13.56 0.181345 18.94625
2 A-8-9 5 0.174862 13.56 0.151302 18.88616
2 A-9-10 5 0.160348 13.56 0.136788 18.85714
2 A-10-11 5 0.147405 13.56 0.123845 18.83125
2 A-11-12 5 0.179662 13.56 0.156102 18.89576
2 A-0-1 5 0.145747 13.56 0.122187 18.82793
2 A-1-2 5 0.118525 13.56 0.094965 18.77349
2 A-2-3 5 0.101598 13.56 0.078038 18.73964
2 A-3-4 5 0.135695 13.56 0.112135 18.80783
2 A-4-5 5 0.189949 13.56 0.166389 18.91634

A'' 2
2
A-5-6
A-6-7
5
5
0.21389 13.56
0.227718 13.56
0.19033
0.204158
18.96422
18.99188
2 A-7-8 5 0.206598 13.56 0.183038 18.94964
2 A-8-9 5 0.181286 13.56 0.157726 18.89901
2 A-9-10 5 0.166338 13.56 0.142778 18.86912
2 A-10-11 5 0.146867 13.56 0.123307 18.83017
2 A-11-12 5 0.173421 13.56 0.149861 18.88328
2 A-0A-0 5 0.165166 13.56 0.141606 18.86677
2 A-0-1 5 0.145088 13.56 0.121528 18.82662
2 A-1-2 5 0.167353 13.56 0.143793 18.87115
2 A-2-3 5 0.10672 13.56 0.08316 18.74988

B
2 A-3-4 5 0.139055 13.56 0.115495 18.81455
2 A-4-5 5 0.147171 13.56 0.123611 18.83078

B 2
2
A-5-6
A-6-7
5
5
0.126338
0.222674
13.56
13.56
0.102778
0.199114
18.78912
18.98179
2 A-7-8 5 0.184992 13.56 0.161432 18.90642
2 A-8-9 5 0.206659 13.56 0.183099 18.94976
2 A-9-10 5 0.171442 13.56 0.147882 18.87932
2 A-10-11 5 0.210895 13.56 0.187335 18.95823
2 A-11-12 5 0.188473 13.56 0.164913 18.91339
2 A-12-13 5 0.175122 13.56 0.151562 18.88668
2 B'-0A-A 5 0.161537 13.56 0.137977 18.85951

B' 2
2
B'-5-6
B'-6-7
5
5
0.204289
0.217249
13.56
13.56
0.180729
0.193689
18.94502
18.97094
2 B'-12-13 5 0.170305 13.56 0.146745 18.87705 18.87356
VOLUME VOLUME waktu siklus siklus produksi/ JML. TIAP
NO TYPE (Kg) siklus @jam @jam jam GEDUNG
(m3) (menit)

K4 0.3975 954 21.085871 2.1341305 2 1240.2 220


K4A 0.387 928.8 21.085871 2.1341305 2 1207.44 100
KOLOM K4TA 0.3945 946.8 21.085871 2.1341305 2 1230.84 10
I
K4TB 0.3945 946.8 21.085871 2.1341305 2 1230.84 10
K4S 0.3945 946.8 21.085871 2.1341305 2 1230.84 5
TOTAL (jam)
Total hari yang dibutuhkan untuk install kolom dengan 8 jam kerja
Durasi
(jam)

169.23077 44 33.84615
76.923077 20 15.38462
7.6923077 2 1.538462
7.6923077 2 1.538462
3.8461538 1 0.769231
265.38462 53.07692
37.912088 106.1538 13.26923
NO TYPE VOLUME (m3) VOLUME (Kg) waktu siklus
(menit) Siklus @jam siklus @jam produksi/jam JML. TIAP
GEDUNG

B1=B1B 0.558 1339.2 25.57 1.759875 2 1740.96 120


B1F 0.25425 610.2 25.57 1.759875 2 793.26 20
B1G 0.25425 610.2 25.57 1.759875 2 793.26 10
B1H 0.25425 610.2 25.57 1.759875 2 793.26 5
B1I 0.25425 610.2 25.57 1.759875 2 793.26 5
B2 0.47925 1150.2 25.57 1.759875 2 1495.26 120
B3A 0.47925 1150.2 25.57 1.759875 2 1495.26 50
B3B 0.47925 1150.2 25.57 1.759875 2 1495.26 50
B3C 0.47925 1150.2 25.57 1.759875 2 1495.26 5
B3D 0.47925 1150.2 25.57 1.759875 2 1495.26 5
B3E 0.47925 1150.2 25.57 1.759875 2 1495.26 5
B3F 0.47925 1150.2 25.57 1.759875 2 1495.26 5
B4 0.14625 351 25.57 1.759875 2 456.3 5
B5A 0.423 1015.2 25.57 1.759875 2 1319.76 5
BALOK
II B5B 0.423 1015.2 25.57 1.759875 2 1319.76 5
B5C 0.423 1015.2 25.57 1.759875 2 1319.76 5
B5D 0.423 1015.2 25.57 1.759875 2 1319.76 5
B6 0.478125 1147.5 25.57 1.759875 2 1491.75 10
B7 0.47925 1150.2 25.57 1.759875 2 1495.26 5
B8 0.3105 745.2 25.57 1.759875 2 968.76 20
B8A 0.3105 745.2 25.57 1.759875 2 968.76 10
B9A 0.423 1015.2 25.57 1.759875 2 1319.76 10
B9B 0.423 1015.2 25.57 1.759875 2 1319.76 10
B10A 0.423 1015.2 25.57 1.759875 2 1319.76 15
B10B 0.423 1015.2 25.57 1.759875 2 1319.76 15
B11A 0.3105 745.2 25.57 1.759875 2 968.76 5
B11B 0.3105 745.2 25.57 1.759875 2 968.76 5
CG 0.165375 396.9 25.57 1.759875 2 515.97 80
TOTAL (jam)

Total hari yang dibutuhkan untuk install balok dengan 8 jam kerja
Durasi (jam)

92.30769231 24 18.46154
15.38461538 4 3.076923
7.692307692 2 1.538462
3.846153846 1 0.769231
3.846153846 1 0.769231
92.30769231 24 18.46154
38.46153846 10 7.692308
38.46153846 10 7.692308
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
3.846153846 1 0.769231
7.692307692 2 1.538462
3.846153846 1 0.769231
15.38461538 4 3.076923
7.692307692 2 1.538462
7.692307692 2 1.538462
7.692307692 2 1.538462
11.53846154 3 2.307692
11.53846154 3 2.307692
3.846153846 1 0.769231
3.846153846 1 0.769231
61.53846154 16 12.30769
469.2307692 93.84615
67.03296703 11.73077
VOLUME waktu
NO TYPE VOLUME siklus Siklus @ siklus produksi JML. TIAP
(m3) (Kg) jam @jam /jam GEDUNG
(menit)

S1 0.8534 2048.1120 18.87356 2.384288 2 2662.546 240


S2 0.8534 2048.1120 18.87356 2.384288 2 2662.546 120
S3A 0.8948 2147.4144 18.87356 2.384288 2 2791.639 20
S3B 0.8948 2147.4144 18.87356 2.384288 2 2791.639 20
S3C 0.8948 2147.4144 18.87356 2.384288 2 2791.639 20
S3D 0.8948 2147.4144 18.87356 2.384288 2 2791.639 20
S3E 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
S3F 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
S3G 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
S3H 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
PELAT S4A 0.5834 1400.0544 18.87356 2.384288 2 1820.071 20
I
S4B 0.8093 1942.2720 18.87356 2.384288 2 2524.954 20
S5A 0.1035 248.2920 18.87356 2.384288 2 322.7796 60
S5B 0.1035 248.2920 18.87356 2.384288 2 322.7796 60
S6A 0.6240 1497.6000 18.87356 2.384288 2 1946.88 5
S6B 0.6240 1497.6000 18.87356 2.384288 2 1946.88 5
S7A 1.2465 2991.4848 18.87356 2.384288 2 3888.93 5
S7B 1.2465 2991.4848 18.87356 2.384288 2 3888.93 5
S8A 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
S8B 0.8948 2147.4144 18.87356 2.384288 2 2791.639 5
S9 1.2465 2991.4848 18.87356 2.384288 2 3888.93 10
TOTAL (jam)
Total hari yang dibutuhkan untuk install pelat dengan 8 jam kerja
Durasi
(jam)

184.6154 48 5 36.92308
92.30769 24 5 18.46154
15.38462 4 5 3.076923
15.38462 4 5 3.076923
15.38462 4 5 3.076923
15.38462 4 5 3.076923
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
15.38462 4 5 3.076923
15.38462 4 5 3.076923
46.15385 12 5 9.230769
46.15385 12 5 9.230769
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
3.846154 1 5 0.769231
7.692308 2 5 1.538462
507.6923 101.5385
72.52747 12.69231
No Pekerjaan Volume Satuan Harga Satuan Total
1 Bahan bakar 265.39 Jam Rp 150,005.40 Rp 39,809,933.11
2 Pelumas 265.39 Jam Rp 105,912.23 Rp 28,108,046.72
3 operator 265.39 Jam Rp 18,750.00 Rp 4,976,062.50
4 Minyak hidrolik 265.39 jam Rp 119,782.00 Rp 31,788,944.98
5 Sewa alat 265.39 Jam Rp 1,050,000.00 Rp 278,659,500.00
6 PPN 10 % 265.39 jam Rp 17,500.00 Rp 4,644,325.00
Total Rp 387,986,812.31

No Pekerjaan Volume Satuan Harga Satuan Total

1 Bahan bakar 469.23076923 Jam Rp 150,336.40 Rp 70,542,464.62

2 Pelumas 469.23076923 Jam Rp 105,877.29 Rp 49,680,882.23


3 operator 469.23076923 Jam Rp 18,750.00 Rp 8,798,076.92
4 Minyak hidrolik 469.23076923 jam Rp 119,782.00 Rp 56,205,400.00

5 Sewa alat 469.23076923 Jam Rp 1,050,000.00 Rp 492,692,307.69

6 PPN 10 % 469.23076923 jam Rp 17,500.00 Rp 8,211,538.46

Total Rp 686,130,669.92

No Pekerjaan Volume Satuan Harga Satuan Total

1 Bahan bakar 507.692 Jam Rp 152,899.60 Rp 77,625,903.72

2 Pelumas 507.692 Jam Rp 106,226.72 Rp 53,930,455.93


3 operator 507.692 Jam Rp 18,750.00 Rp 9,519,225.00
4 Minyak hidrolik 507.692 jam Rp 119,782.00 Rp 60,812,363.14

5 Sewa alat 507.692 Jam Rp 1,050,000.00 Rp 533,076,600.00

6 PPN 10 % 507.692 jam Rp 17,500.00 Rp 8,884,610.00

Total Rp 743,849,157.80
No Pekerjaa Volume Satuan Harga Satuan Total
1 n
Bahan 53.076923077 Jam Rp 150,005.40 Rp 7,961,825.08
bakar
2 Pelumas 53.076923077 Jam Rp 105,912.23 Rp 5,621,495.28
3 operator 53.076923077 Jam Rp 18,750.00 Rp 995,192.31
4 Minyak 53.076923077 jam Rp 119,782.00 Rp 6,357,660.00
hidrolik
5 Sewa 53.076923077 Jam Rp 350,000.00 Rp 18,576,923.08
alat
6 PPN 10 53.076923077 jam Rp 17,500.00 Rp 928,846.15
%
Total Rp 40,441,941.90

No Pekerjaa Volume Satuan Harga Satuan Total


n
1 Bahan 93.846153846 Jam Rp 150,336.40 Rp 14,108,492.92
bakar
2 Pelumas 93.846153846 Jam Rp 105,877.29 Rp 9,936,176.45
3 operator 93.846153846 Jam Rp 18,750.00 Rp 1,759,615.38
4 Minyak 93.846153846 jam Rp 119,782.00 Rp 11,241,080.00
hidrolik
5 Sewa 93.846153846 Jam Rp 350,000.00 Rp 32,846,153.85
alat
6 PPN 10 93.846153846 jam Rp 17,500.00 Rp 1,642,307.69
%
Total Rp 71,533,826.29

No Pekerjaa Volume Satuan Harga Satuan Total


n
1 Bahan 101.53846154 Jam Rp 152,899.60 Rp 15,525,190.15
bakar
2 Pelumas 101.53846154 Jam Rp 106,226.72 Rp 10,786,097.72
3 operator 101.53846154 Jam Rp 18,750.00 Rp 1,903,846.15
4 Minyak 101.53846154 jam Rp 119,782.00 Rp 12,162,480.00
hidrolik
5 Sewa 101.53846154 Jam Rp 350,000.00 Rp 35,538,461.54
alat
6 PPN 10 101.53846154 jam Rp 17,500.00 Rp 1,776,923.08
%
Total Rp 77,692,998.65