N° Site Nom de la tâche Durée Début Fin Prédécesseurs Noms ressources Tri 1, 2023

Déc Jan Fév


1 FABRICATION ET INSTALLATION DE 2 87 jrs Lun 26/12/22 Lun 24/04/23
CUVES DE 20000L
2 1. ETUDES ET CONCEPTION 17 jrs Lun 26/12/22 Mar 17/01/23
3 SURVEY SUR SITE-ANALYSE DES EXIG 17 jrs Lun 26/12/22 Mar 17/01/23 0%
4 2. APPROVISIONNEMENT 15 jrs Mer 18/01/23 Mar 07/02/23
5 APPROVISIONNEMENT EXTERIEUR 15 jrs Mer 18/01/23 Mar 07/02/23 0%
6 APPROVISIONNEMENT LOCAL 5 jrs Mer 18/01/23 Mar 24/01/23 0%
7 3. FABRICATION-CONTRÔLE CND ET TEXT 38 jrs Mar 24/01/23 Jeu 16/03/23
8 PREFABRICATION-ASSEMBLAGE 26 jrs Mar 24/01/23 Mar 28/02/23
9 CND ET EPREUVE HYDROLIQUE-MISE E 12 jrs Mar 28/02/23 Mer 15/03/23 6
10 4. INSTALLATION SUR SITE 11 jrs Ven 17/03/23 Jeu 30/03/23
11 PREPARATION DES TRAVAUX 3 jrs Ven 17/03/23 Lun 20/03/23 8
12 INSTALLATION ET RETOUCHE PIENTUR 7 jrs Sam 18/03/23 Lun 27/03/23 9
13 5. RECEPTION ET DEMOBILISATION 5 jrs Mar 28/03/23 Lun 03/04/23
14 RECEPTION 2 jrs Mar 28/03/23 Mer 29/03/23 11
15 DEMOBILISATION 3 jrs Jeu 30/03/23 Lun 03/04/23 12
16 6. DFA 15 jrs Mar 04/04/23 Lun 24/04/23 12;15

Critiques Jalon Durée uniquement


Fractionnement critique Récapitulation de l'avancement Report récapitulatif manuel
Avancement de la tâche critique Récapitulative Récapitulatif manuel
Tâche Récapitulatif du projet Début uniquement
Projet : MSProj11
Date : Mar 03/01/23 Fractionnement Tâches externes Fin uniquement
Avancement de la tâche Jalons externes Tâches externes
Planifié Jalon inactif Jalons externes
Fractionnement planifié Récapitulatif inactif Échéance
Jalon planifié Tâche manuelle