Bearing 100

FE 500
FC 20

PRESSUR
AREA LENGTH Width PRESSURE
GRID WIDTH m E (KN/M)
m2 m adopted m (KN/M2)
per m
Grid D
1 199.000 199.000
2 198.000 198.000 D 3.97 2.6 1.5 1.6 96.18 96.18
8.458 5.050 5.250
8 5.500
153.94995

Grid C
3 366.500 366.500
4 350.000 350.000 C 7.17 2.5 2.9 3.7 78.26 78.26
8.208 9.391 12.000
8 2.500
286.30904

Grid B
5 384.000 384.000
6 372.000 372.000 B 7.56 2.4 3.1 3.2 97.33 97.33
7.958 10.220 10.500
7 11.500
311.58283

Grid A
7 200.000 200.000
8 202.000 202.000 A 4.02 2.3 1.7 1.8 94.02 94.02
7.667 5.641 6.000
7 8.000
171.98609
300

MOMENT d required dadopt Ast reqd


PROJECTION c b a rebar
(kNm) (mm) (mm) mm2

1.301 122.025 214.182 300 280517.60 -300 0.025 1022.119 12


113.04

1.679 165.512 249.444 350 380487.01 -350 0.025 1187.899 14


153.86

1.451 153.610 240.309 300 353127.27 -300 0.025 1322.938 12


113.04

1.529 164.909 248.990 300 379101.31 -300 0.025 1435.359 12


113.04
spacing Ast adopted
spacing mm % adopted Vu (kN/m) τv τc
inch mm2

110.59 4 1130.40 0.45 144.36 0.481 0.52 SAFE

129.52 4 1538.60 0.51 156.04 0.446 0.46 SAFE


% of steel
0.15
0.25
0.50
0.75
1.00
85.45 4 1130.40 0.45 167.99 0.560 0.52 TRY AGAIN 1.25
1.50
1.75
2.00
2.25
2.50
2.75
78.75 4 1130.40 0.45 173.36 0.578 0.52 TRY AGAIN
M15 M20 M25
0.28 0.28 0.29
0.35 0.36 0.36
0.46 0.48 0.49 X Y
0.54 0.56 0.57 X1,Y1 0.5 0.36
0.60 0.62 0.64 X,Y 0.38 0.302
0.64 0.67 0.70 X2.Y2 0.75 0.48
0.68 0.72 0.74
0.75
0.79
0.81
0.82
0.82