DISEÑO

DIST PZ A PZ PENDIENTE DIST CHK CLAVE LOMO LOMO + 0.05


PZ55 0.000 58.030 58.057 58.107
K0+732 0.500 58.032 58.059 58.109
3.550 58.042 58.069 58.119
6.600 58.051 58.078 58.128
9.600 58.061 58.088 58.138
12.600 58.071 58.098 58.148
15.800 58.081 58.108 58.158
33.868 0.325%
19.000 58.092 58.119 58.169
22.085 58.102 58.129 58.179
25.170 58.112 58.139 58.189
28.115 58.121 58.148 58.198
31.060 58.131 58.158 58.208
K0+698 33.368 58.138 58.165 58.215
PZ53 33.868 58.140 58.167 58.217
REAL DIFERENCIA EXC DISEÑO REAL DIFERENCIA FECHA
57.357
58.104 -0.005 57.359 57.300 0.159 1-Feb-19
58.114 -0.005 57.369 57.360 0.109 1-Feb-19
58.123 -0.005 57.378 57.330 0.148 1-Feb-19
58.132 -0.006 57.388 57.289 0.199 5-Feb-19
58.152 0.004 57.398 57.259 0.239 5-Feb-19
58.159 0.001 57.408 57.405 0.103 6-Feb-19
58.173 0.004 57.419 57.415 0.104 6-Feb-19
58.185 0.006 57.429 57.429 0.100 7-Feb-19
58.191 0.002 57.439 57.435 0.104 7-Feb-19
58.199 0.001 57.448 57.440 0.108 8-Feb-19
58.211 0.003 57.458 57.400 0.158 8-Feb-19
58.220 0.005 57.465 57.455 0.110 8-Feb-19
57.467
DISEÑO
DIST PZ A PZ PENDIENTE DIST CHK CLAVE LOMO LOMO + 0.05
PZ79 0 57.480 57.507 57.557
K0+861 0.6 57.482 57.509 57.559
6.7 0.299% 3.6 57.491 57.518 57.568
6.6 57.500 57.527 57.577
PZ59 6.7 57.500 57.527 57.577
K0+855
DISEÑO
DIST PZ A PZ PENDIENTE DIST CHK CLAVE DISEÑO LOMO DISEÑO LOMO + 0.05
PZ59 0 57.520 57.547 57.597
K0+855 0.5 57.522 57.549 57.599
3.52 57.531 57.558 57.608
6.54 57.540 57.567 57.617
9.59 57.549 57.576 57.626
12.64 57.558 57.585 57.635
15.78 57.568 57.595 57.645
18.92 57.577 57.604 57.654
22.015 57.586 57.613 57.663
25.11 57.596 57.623 57.673
28.205 57.605 57.632 57.682
59.716 0.301%
31.3 57.614 57.641 57.691
34.395 57.624 57.651 57.701
37.49 57.633 57.660 57.710
40.59 57.642 57.669 57.719
43.69 57.652 57.679 57.729
46.745 57.661 57.688 57.738
49.8 57.670 57.697 57.747
52.9 57.679 57.706 57.756
56 57.689 57.716 57.766
K0+795 59.216 57.698 57.725 57.775
PZ57 59.716 57.700 57.727 57.777
REAL DIFERENCIA EXC DISEÑO REAL DIFERENCIA
56.807
57.564 0.005 56.809 56.810 0.099
57.570 0.002 56.818 56.800 0.118
57.580 0.003 56.827 56.806 0.121
56.827

LOMO + 0.07 REAL DIFERENCIA EXC DISEÑO REAL ESPESOR


56.847
57.596 -0.003 56.849 56.798 0.151
57.603 -0.005 56.858 56.868 0.090
57.611 -0.006 56.867 56.866 0.101
57.622 -0.004 56.876
57.632 -0.003 56.885
57.639 -0.006 56.895
57.656 0.002 56.904
57.668 0.005 56.913
57.672 -0.001 56.923
57.677 -0.005 56.932
57.691 0.000 56.941
57.701 0.000 56.951
57.710 0.000 56.960
57.719 0.000 56.969
57.749 57.754 0.005 56.979 56.97 0.109
57.758 57.760 0.002 56.988 56.98 0.108
57.767 57.766 -0.001 56.997 56.944 0.153
57.776 57.770 -0.006 57.006
57.786 57.786 0.000 57.016
57.795 57.798 0.003 57.025
57.797 57.027
FECHA

4-Feb-19
4-Feb-19
4-Feb-19

FECHA

4-Feb-19
4-Feb-19
4-Feb-19
5-Feb-19
5-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
6-Feb-19
7-Feb-19
7-Feb-19
7-Feb-19
7-Feb-19
8-Feb-19
8-Feb-19
8-Feb-19
8-Feb-19
12-Feb-19
12-Feb-19
12-Feb-19
JM TOPOGRAFOS E INGENIEROS CIVILES CONSTRUCTORA BOLIVAR S.A.
INSTALACION DE REDES DE ALCANTARILLADO
CALLE 152B

DISEÑO
PZ DIST PZ A PZ PENDIENTE DIST CHK CLAVE LOMO LOMO + 0.05 REAL DIF FECHA
PZ55 0.000 58.030 58.057 58.107 - - -
K0+732 0.500 58.032 58.059 58.109 58.104 -0.005 1-Feb-19
3.550 58.042 58.069 58.119 58.114 -0.005 1-Feb-19
6.600 58.051 58.078 58.128 58.123 -0.005 1-Feb-19
9.600 58.061 58.088 58.138 58.132 -0.006 5-Feb-19
12.600 58.071 58.098 58.148 58.152 0.004 5-Feb-19
15.800 58.081 58.108 58.158 58.159 0.001 6-Feb-19
33.868 0.325%
19.000 58.092 58.119 58.169 58.173 0.004 6-Feb-19
22.085 58.102 58.129 58.179 58.185 0.006 7-Feb-19
25.170 58.112 58.139 58.189 58.191 0.002 7-Feb-19
28.115 58.121 58.148 58.198 58.199 0.001 8-Feb-19
31.060 58.131 58.158 58.208 58.211 0.003 8-Feb-19
K0+698 33.368 58.138 58.165 58.215 58.220 0.005 8-Feb-19
PZ53 33.868 58.140 58.167 58.217 - - -

* Instalacion de Alcantarillado Residual de 24"

Top. Héctor Pachón Elkin Vargas Ing. Medardo Andrés Pérez


JM TOPOGRAFOS E INGENIEROS CIVILES CONSTRUCTORA BOLIVAR S.A.
INSTALACION DE REDES DE ALCANTARILLADO
CALLE 152B

Topografo Residente Residente de Obra


Constructora Bolívar S.A. Contesing Ltda. Constructora Bolívar S.A.

DISEÑO
PZ DIST PZ A PZ PENDIENTE DIST CHK CLAVE LOMO LOMO + 0.05 REAL DIF FECHA
PZ79 0.000 57.480 57.507 57.557 - - -
K0+861 0.600 57.482 57.509 57.559 57.564 0.005 4-Feb-19
6.700 0.299% 3.600 57.491 57.518 57.568 57.570 0.002 4-Feb-19
K0+855 6.600 57.500 57.527 57.577 57.580 0.003 4-Feb-19
PZ59 6.700 57.500 57.527 57.577 - - -

* Instalacion de Alcantarillado Residual de 24"

Top. Héctor Pachón Top. Amparo Rojas Ing. Medardo Andrés Pérez
Topografo Topografo Residente de Obra
Constructora Bolívar S.A. Shekinah Ltda. Constructora Bolívar S.A.
JM TOPOGRAFOS E INGENIEROS CIVILES CONSTRUCTORA BOLIVAR S.A.
INSTALACION DE REDES DE ALCANTARILLADO
CALLE 152B

DISEÑO
PZ DIST PZ A PZ PENDIENTE DIST CHK CLAVE LOMO LOMO + 0.05 LOMO + 0.07 REAL DIF FECHA
PZ59 0.000 57.520 57.547 57.597 - - - -
K0+855 0.500 57.522 57.549 57.599 - 57.596 -0.003 4-Feb-19
3.520 57.531 57.558 57.608 - 57.603 -0.005 4-Feb-19
6.540 57.540 57.567 57.617 - 57.611 -0.006 4-Feb-19
9.590 57.549 57.576 57.626 - 57.622 -0.004 5-Feb-19
12.640 57.558 57.585 57.635 - 57.632 -0.003 5-Feb-19
15.780 57.568 57.595 57.645 - 57.639 -0.006 6-Feb-19
18.920 57.577 57.604 57.654 - 57.656 0.002 6-Feb-19
22.015 57.586 57.613 57.663 - 57.668 0.005 6-Feb-19
25.110 57.596 57.623 57.673 - 57.672 -0.001 6-Feb-19
28.205 57.605 57.632 57.682 - 57.677 -0.005 7-Feb-19
59.716 0.301%
31.300 57.614 57.641 57.691 - 57.691 0.000 7-Feb-19
34.395 57.624 57.651 57.701 - 57.701 0.000 7-Feb-19
37.490 57.633 57.660 57.710 - 57.710 0.000 7-Feb-19
40.590 57.642 57.669 57.719 - 57.719 0.000 8-Feb-19
43.690 57.652 57.679 57.729 57.749 57.754 0.005 8-Feb-19
46.745 57.661 57.688 57.738 57.758 57.760 0.002 8-Feb-19
49.800 57.670 57.697 57.747 57.767 57.766 -0.001 8-Feb-19
52.900 57.679 57.706 57.756 57.776 57.770 -0.006 12-Feb-19
56.000 57.689 57.716 57.766 57.786 57.786 0.000 12-Feb-19
K0+795 59.216 57.698 57.725 57.775 57.795 57.798 0.003 12-Feb-19
PZ57 59.716 57.700 57.727 57.777 57.797 - - -

* Instalacion de Alcantarillado Residual de 24"

Top. Héctor Pachón Top. Amparo Rojas Ing. Medardo Andrés Pérez
Topografo Topografo Residente de Obra
Constructora Bolívar S.A. Shekinah Ltda. Constructora Bolívar S.A.