Vous êtes sur la page 1sur 145

1 2

Raw Data Minescape Wk-3 2023 0.52


Catchment
Volume Date Area Sump
Elevasi Volume (m³) Accumulated [Ha]
(m³)

-27.4 264.32 4,406.62 -27.4 30-Jun-23 52.00


-27.3 282.259 4,688.88 -27.3 1-Jul-23 52.00
-27.2 302.136 4,991.01 -27.2 2-Jul-23 52.00
-27.1 352.59 5,343.60 -27.1 3-Jul-23 52.00
-27 403.286 5,746.89 -27.0 4-Jul-23 52.00
-26.9 444.881 6,191.77 -26.9 5-Jul-23 52.00
-26.8 484.975 6,676.74 -26.8 6-Jul-23 52.00
-26.7 525.081 7,201.83 -26.7 7-Jul-23 52.00
-26.6 567.566 7,769.39 -26.6 8-Jul-23 52.00
-26.5 611.408 8,380.80 -26.5 9-Jul-23 52.00
-26.4 652.948 9,033.75 -26.4 10-Jul-23 52.00
-26.3 691.125 9,724.87 -26.3 11-Jul-23 52.00
-26.2 716.706 10,441.58 -26.2 12-Jul-23 52.00
-26.1 742.049 11,183.63 -26.1 13-Jul-23 52.00
-26 771.09 11,954.72 -26.0 14-Jul-23 52.00
-25.9 803.342 12,758.06 -25.9 15-Jul-23 52.00
-25.8 836.387 13,594.45 -25.8 16-Jul-23 52.00
-25.7 890.94 14,485.39 -25.7 17-Jul-23 52.00
-25.6 989.739 15,475.13 -25.6 18-Jul-23 52.00
-25.5 1050.678 16,525.80 -25.5 19-Jul-23 52.00
-25.4 1085.946 17,611.75 -25.4 20-Jul-23 52.00
-25.3 1125.95 18,737.70 -25.3 21-Jul-23 52.00
-25.2 1162.263 19,899.96 -25.2 22-Jul-23 52.00
-25.1 1192.375 21,092.34 -25.1 23-Jul-23 52.00
-25 1220.608 22,312.95 -25.0 24-Jul-23 52.00
-24.9 1247.97 23,560.92 -24.9 25-Jul-23 52.00
-24.8 1284.275 24,845.19 -24.8 26-Jul-23 52.00
-24.7 1389.152 26,234.34 -24.7 27-Jul-23 52.00
0 -24.6 1462.869 27,697.21 -24.6 28-Jul-23 52.00
-24.5 1507.572 29,204.78 -24.5 29-Jul-23 52.00
-24.4 1537.769 30,742.55 -24.4 30-Jul-23 52.00
-24.3 1564.487 32,307.04 -24.3 31-Jul-23 52.00
-24.2 1591.788 33,898.83 -24.2 1-Aug-23 52.00
-24.1 1692.363 35,591.19 -24.1 2-Aug-23 52.00
-24 1744.861 37,336.05 -24.0 3-Aug-23 52.00
-23.9 1782.428 39,118.48 -23.9 4-Aug-23 52.00
-23.8 1829.768 40,948.25 -23.8 5-Aug-23 52.00
-23.7 1874.121 42,822.37 -23.7 6-Aug-23 52.00
-23.6 1911.345 44,733.71 -23.6 7-Aug-23 52.00
-23.5 1945.127 46,678.84 -23.5 8-Aug-23 52.00
-23.4 1975.745 48,654.59 -23.4 9-Aug-23 52.00
-23.3 2000.494 50,655.08 -23.3 10-Aug-23 52.00
-23.2 2039.264 52,694.34 -23.2 11-Aug-23
-23.1 2093.467 54,787.81 -23.1
-23 2113.849 56,901.66 -23.0
-22.9 2132.772 59,034.43 -22.9
-22.8 2151.283 61,185.71 -22.8
-22.7 2169.21 63,354.92 -22.7
-22.6 2186.364 65,541.29 -22.6
-22.5 2203.212 67,744.50 -22.5
-22.4 2220.747 69,965.25 -22.4
-22.3 2239.547 72,204.79 -22.3
-22.2 2258.912 74,463.71 -22.2
-22.1 2280.141 76,743.85 -22.1
-22 2302.316 79,046.16 -22.0
-21.9 2322.554 81,368.72 -21.9
-21.8 2341.507 83,710.22 -21.8
-21.7 2359.173 86,069.40 -21.7
-21.6 2377.018 88,446.42 -21.6
-21.5 2399.443 90,845.86 -21.5
-21.4 2422.375 93,268.23 -21.4
-21.3 2442.123 95,710.36 -21.3
-21.2 2459.194 98,169.55 -21.2
-21.1 2474.933 100,644.48 -21.1
-21 2490.485 103,134.97 -21.0
-20.9 2505.48 105,640.45 -20.9
-20.8 2520.793 108,161.24 -20.8
-20.7 2534.952 110,696.19 -20.7
-20.6 2548.741 113,244.93 -20.6
-20.5 2561.866 115,806.80 -20.5
-20.4 2574.799 118,381.60 -20.4
-20.3 2587.578 120,969.18 -20.3
-20.2 2600.154 123,569.33 -20.2
-20.1 2612.554 126,181.89 -20.1
-20 2624.926 128,806.81 -20.0
-19.9 2637.583 131,444.39 -19.9
-19.8 2650.363 134,094.76 -19.8
-19.7 2663.075 136,757.83 -19.7
-19.6 2675.657 139,433.49 -19.6
-19.5 2688.198 142,121.69 -19.5
-19.4 2700.726 144,822.41 -19.4
-19.3 2713.254 147,535.67 -19.3
-19.2 2725.87 150,261.54 -19.2
-19.1 2738.584 153,000.12 -19.1
-19 2755.128 155,755.25 -19.0
-18.9 2778.346 158,533.60 -18.9
-18.8 2844.559 161,378.15 -18.8
-18.7 2912.401 164,290.56 -18.7
-18.6 2948.124 167,238.68 -18.6
-18.5 2977.529 170,216.21 -18.5
-18.4 3006.553 173,222.76 -18.4
-18.3 3035.108 176,257.87 -18.3
-18.2 3063.386 179,321.26 -18.2
-18.1 3091.537 182,412.79 -18.1
3 4 5 6

Curah Hujan
Elevasi [mm]
Elevasi Estimasi Durasi
Lowest Volume Air
Sump Elev. Mud Hujan
Point [m³]
[mdpl] [mdpl] [Jam] Actual Plan
[mdpl]

-25.00 -18.0 -19.0 13,733.07 4.2 14.0 8.5


(25.00) -20.1 -20.0 0.4 1.5 8.5
(25.00) -20.1 -20.1 - - 8.5
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) -20.8 -20.1 2.0 23.0 8.5
(25.00) -17.7 -20.1 11.3 159.3 8.5
(25.00) -17.7 -20.1 - - 8.5
(25.00) -17.9 -20.1 - - 8.5
(25.00) -18.0 -20.1 1.7 1.0 8.5
(25.00) -17.5 -20.1 6.8 54.0 8.5
(25.00) -17.3 -20.6 1.0 0..5 8.5
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(27.00) -18.9 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
(27.00) 0.0 -19.0 69,167.86 - - -
-

300 23 6900
700 23 16100 -30.0

400 23 9200
32200
13824
46024
-35.0

-40.0

-45.0

Elv. Mud -51

Elv. Mud -50


-50.0
Elv. Mud -50
-50.0

-55.0

9,000

9,000

9,000
4,500
13,733
-60.0

4,140
15-Oct-22 16-Oct-22

-
Lowest Point Section 2
Total Inflow Total Outflow Total Pompa
Working Hours (Hours)
[m³/day] [m³/day] Act

Actual Plan
Upper
Actual Plan Outflow Outflow Actual Plan Actual
Limit WH
[m³/day] [m³/day]

7,280.0 4,420 4,140 4,500 2.0 1.0 18.0 18.0


780.0 4,420 - 9,000 2.0 2.0 - 18.0
- 4,420 - 9,000 2.0 2.0 - 18.0
- - - 9,000 2.0 2.0 - 18.0
- - - 9,000 2.0 2.0 - 18.0
- - - - 2.0 - - 20.0
- - - - 2.0 - - 20.0
11,960.0 4,420 2,727 - 1.0 - 15.0 20.0
82,836.0 4,420 3,636 - 2.0 - 10.0 20.0
- 4,420 3,454 - 2.0 - 9.5 20.0
- 4,420 3,636 - 2.0 - 10.0 20.0
520.0 4,420 3,454 - 3.0 - 9.5 20.0
28,080.0 4,420 3,636 - 3.0 - 10.0 20.0
- 4,420 3,272 - 3.0 - 9.0 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 4.0 - - 20.0
9,000

9,000

9,000

0
3,636

3,636

3,636
3,454

3,454
2,727
16-Oct-22 17-Oct-22 18-Oct-22 19-Oct-22 20-Oct-22 21-Oct-22
-

Actual Outflow [m³/day] Plan Outflow [m³/d


g Hours (Hours) Flowrate (m3/Hours)
Estimated
Upper Lower Remarks
Lower Pumping [day]
Actual Limit Limit
Limit WH
Flowrate Flowrate

9.0 230 250 210 Flooded 6


9.0 91 250 210 Mineable -
9.0 - 250 210 Mineable -
9.0 - 250 210 Mineable -
9.0 - 250 210 Mineable -
10.0 - 250 210 Mineable -
10.0 - 250 210 Mineable -
10.0 182 250 210 Mineable 5
10.0 91 250 210 Mineable 23
10.0 91 250 210 Mineable -
10.0 91 250 210 Mineable -
10.0 91 250 210 Mineable 1
10.0 91 250 210 Mineable 8
10.0 91 250 210 Mineable -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168
0

0
3,636
3,454

3,272

2 21-Oct-22 22-Oct-22 23-Oct-22 24-Oct-22 25-Oct-22 26-


-

-
n Outflow [m³/day] Volume Air [m³] Elevasi Su
23 24 25 26 27 28 29

Jenis pompa 1 Plan Pompa Jenis pompa 2

Flowrate Total
UA PM Flowrate
Act PM 10 Outflow RPM Status UA PM
10 PM 6
(m³/hours PM 10 PM 10 Pompa 6
(hours) (m³/hours)
) (m³/day)
- - - - 18.0 230.0
- - - - - 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 15.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 18.0 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,1
0

0
25-Oct-22 26-Oct-22 27-Oct-22 28-Oct-22 29-Oct-22 30-Oct-22
-

-
Elevasi Sump [mdpl] Estimasi Elev. Mud [mdpl]
30 31 32 33 34 35 36
PUMP PERFORMANCE

Plan Pompa Jenis pompa 3 Plan Pompa

Total UA Flowrat Total


Outflow Status 420- e Act. Outflow RPM 420-
RPM PM 6
PM 6 Pompa 24(hou 420 24 420-24 24
(m³/day) rs) (m³/ho (m³/day)
urs)
4,140.0 1,400.0 Running - -
- 1,650.0 - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,727.0 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,651.0 Running - -
3,272.4 1,652.0 Running - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - - -
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,
0

0
Oct-22 30-Oct-22 31-Oct-22 1-Nov-22 2-Nov-22 3-Nov-22
-

-
. Mud [mdpl]
37 38 39 40 41 42

Jenis pompa 4 Plan Pompa

UA Flowrat
Total
420- e Act.
Status Pompa Outflow 420- RPM 420-75 Status Pompa
75(hou 420 75
75 (m³/day)
rs) (m³/ho
urs)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - Running
- - - - Running
- - - - Running
- - - - Running
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

600,000

550,000

500,000

450,000

400,000

350,000

300,000

250,000

200,000
250,000

200,000

150,000

100,000

9,168 69,168 69,168 69,168 69,168

50,000
0

-
3-Nov-22 4-Nov-22
-
43 44 45 46 47

Jenis pompa 5 Plan Pompa


TDH Actual
UA Flowrat MF420 - 24
Total
420- e Act. (m)
Outflow 420- RPM 420-76 Status Pompa
76(hou 420 76
76 (m³/day)
rs) (m³/ho
urs)
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - Start Running 197.68
- - - - 197.68
- - - - 197.68
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,500.0 Pump P
2,000.0

1,500.0

1,000.0

500.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct

Pump P

25,000.0

20,000.0

15,000.0

10,000.0

5,000.0
5,000.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oc

Total Outflow PM 10 (m³/day) Total Outflow PM 6 (m³/day) Total Outflow 420-


UA PM 6 UA 420-75(hours)
Pump Performance

Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct 24/Oct 25/Oct 26/Oct 27/Oct 28/Oct 29/Oct 3

Pump Performance TBR Utara (Lowest)


8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct

) Total Outflow 420-75 (m³/day) RPM PM 10 RPM PM 6 RPM 420-75 Upper Limit WH Lower Limit WH
25.0
20.0
15.0
10.0
5.0
-
(5.0)
(10.0)
(15.0)
(20.0)
(25.0)
ct 27/Oct 28/Oct 29/Oct 30/Oct

25.0

20.0

15.0

10.0

5.0

(5.0)

(10.0)

(15.0)
(10.0)

(15.0)

(20.0)

(25.0)
21/Oct 22/Oct 23/Oct 24/Oct 25/Oct

WH Lower Limit WH UA PM 10 (hours)


1 2

Raw Data Minescape Wk-3 2023 0.52


Catchment
Volume Date Area Sump
Elevasi Volume (m³) Accumulated [Ha]
(m³)

-27.4 264.32 4,406.62 -27.4 30-Jun-23 52.00


-27.3 282.259 4,688.88 -27.3 1-Jul-23 52.00
-27.2 302.136 4,991.01 -27.2 2-Jul-23 52.00
-27.1 352.59 5,343.60 -27.1 3-Jul-23 52.00
-27 403.286 5,746.89 -27.0 4-Jul-23 52.00
-26.9 444.881 6,191.77 -26.9 5-Jul-23 52.00
-26.8 484.975 6,676.74 -26.8 6-Jul-23 52.00
-26.7 525.081 7,201.83 -26.7 7-Jul-23 52.00
-26.6 567.566 7,769.39 -26.6 8-Jul-23 52.00
-26.5 611.408 8,380.80 -26.5 9-Jul-23 52.00
-26.4 652.948 9,033.75 -26.4 10-Jul-23 52.00
-26.3 691.125 9,724.87 -26.3 11-Jul-23 52.00
-26.2 716.706 10,441.58 -26.2 12-Jul-23 52.00
-26.1 742.049 11,183.63 -26.1 13-Jul-23 52.00
-26 771.09 11,954.72 -26.0 14-Jul-23 52.00
-25.9 803.342 12,758.06 -25.9 15-Jul-23 52.00
-25.8 836.387 13,594.45 -25.8 16-Jul-23 52.00
-25.7 890.94 14,485.39 -25.7 17-Jul-23 52.00
-25.6 989.739 15,475.13 -25.6 18-Jul-23 52.00
-25.5 1050.678 16,525.80 -25.5 19-Jul-23 52.00
-25.4 1085.946 17,611.75 -25.4 20-Jul-23 52.00
-25.3 1125.95 18,737.70 -25.3 21-Jul-23 52.00
-25.2 1162.263 19,899.96 -25.2 22-Jul-23 52.00
-25.1 1192.375 21,092.34 -25.1 23-Jul-23 52.00
-25 1220.608 22,312.95 -25.0 24-Jul-23 52.00
-24.9 1247.97 23,560.92 -24.9 25-Jul-23 52.00
-24.8 1284.275 24,845.19 -24.8 26-Jul-23 52.00
-24.7 1389.152 26,234.34 -24.7 27-Jul-23 52.00
0 -24.6 1462.869 27,697.21 -24.6 28-Jul-23 52.00
-24.5 1507.572 29,204.78 -24.5 29-Jul-23 52.00
-24.4 1537.769 30,742.55 -24.4 30-Jul-23 52.00
-24.3 1564.487 32,307.04 -24.3 31-Jul-23 52.00
-24.2 1591.788 33,898.83 -24.2 1-Aug-23 52.00
-24.1 1692.363 35,591.19 -24.1 2-Aug-23 52.00
-24 1744.861 37,336.05 -24.0 3-Aug-23 52.00
-23.9 1782.428 39,118.48 -23.9 4-Aug-23 52.00
-23.8 1829.768 40,948.25 -23.8 5-Aug-23 52.00
-23.7 1874.121 42,822.37 -23.7 6-Aug-23 52.00
-23.6 1911.345 44,733.71 -23.6 7-Aug-23 52.00
-23.5 1945.127 46,678.84 -23.5 8-Aug-23 52.00
-23.4 1975.745 48,654.59 -23.4 9-Aug-23 52.00
-23.3 2000.494 50,655.08 -23.3 10-Aug-23 52.00
-23.2 2039.264 52,694.34 -23.2 11-Aug-23
-23.1 2093.467 54,787.81 -23.1
-23 2113.849 56,901.66 -23.0
-22.9 2132.772 59,034.43 -22.9
-22.8 2151.283 61,185.71 -22.8
-22.7 2169.21 63,354.92 -22.7
-22.6 2186.364 65,541.29 -22.6
-22.5 2203.212 67,744.50 -22.5
-22.4 2220.747 69,965.25 -22.4
-22.3 2239.547 72,204.79 -22.3
-22.2 2258.912 74,463.71 -22.2
-22.1 2280.141 76,743.85 -22.1
-22 2302.316 79,046.16 -22.0
-21.9 2322.554 81,368.72 -21.9
-21.8 2341.507 83,710.22 -21.8
-21.7 2359.173 86,069.40 -21.7
-21.6 2377.018 88,446.42 -21.6
-21.5 2399.443 90,845.86 -21.5
-21.4 2422.375 93,268.23 -21.4
-21.3 2442.123 95,710.36 -21.3
-21.2 2459.194 98,169.55 -21.2
-21.1 2474.933 100,644.48 -21.1
-21 2490.485 103,134.97 -21.0
-20.9 2505.48 105,640.45 -20.9
-20.8 2520.793 108,161.24 -20.8
-20.7 2534.952 110,696.19 -20.7
-20.6 2548.741 113,244.93 -20.6
-20.5 2561.866 115,806.80 -20.5
-20.4 2574.799 118,381.60 -20.4
-20.3 2587.578 120,969.18 -20.3
-20.2 2600.154 123,569.33 -20.2
-20.1 2612.554 126,181.89 -20.1
-20 2624.926 128,806.81 -20.0
-19.9 2637.583 131,444.39 -19.9
-19.8 2650.363 134,094.76 -19.8
-19.7 2663.075 136,757.83 -19.7
-19.6 2675.657 139,433.49 -19.6
-19.5 2688.198 142,121.69 -19.5
-19.4 2700.726 144,822.41 -19.4
-19.3 2713.254 147,535.67 -19.3
-19.2 2725.87 150,261.54 -19.2
-19.1 2738.584 153,000.12 -19.1
-19 2755.128 155,755.25 -19.0
-18.9 2778.346 158,533.60 -18.9
-18.8 2844.559 161,378.15 -18.8
-18.7 2912.401 164,290.56 -18.7
-18.6 2948.124 167,238.68 -18.6
-18.5 2977.529 170,216.21 -18.5
-18.4 3006.553 173,222.76 -18.4
-18.3 3035.108 176,257.87 -18.3
-18.2 3063.386 179,321.26 -18.2
-18.1 3091.537 182,412.79 -18.1
3 4 5 6

Curah Hujan
Elevasi [mm]
Elevasi Estimasi Durasi
Lowest Volume Air
Sump Elev. Mud Hujan
Point [m³]
[mdpl] [mdpl] [Jam] Actual Plan
[mdpl]

-25.00 -18.0 -19.0 13,733.07 4.2 14.0 8.5


(25.00) -20.1 -20.0 0.4 1.5 8.5
(25.00) -20.1 -20.1 - - 8.5
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) 0.0 -20.1 - - -
(25.00) -20.8 -20.1 2.0 23.0 8.5
(25.00) -17.7 -20.1 11.3 159.3 8.5
(25.00) -17.7 -20.1 - - 8.5
(25.00) -17.9 -20.1 - - 8.5
(25.00) -18.0 -20.1 1.7 1.0 8.5
(25.00) -17.5 -20.1 6.8 54.0 8.5
(25.00) -17.3 -20.6 1.0 0..5 8.5
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
(25.00) 0.0 -20.6 69,167.86 - - -
-

300 23 6900
700 23 16100 -30.0

400 23 9200
32200
13824
46024
-35.0

-40.0

-45.0

Elv. Mud -51

Elv. Mud -50


-50.0
Elv. Mud -50
-50.0

-55.0

9,000

9,000

9,000
4,500
13,733
-60.0

4,140
15-Oct-22 16-Oct-22

-
Lowest Point Section 2
Total Inflow Total Outflow Total Pompa
Working Hours (Hours)
[m³/day] [m³/day] Act

Actual Plan
Upper
Actual Plan Outflow Outflow Actual Plan Actual
Limit WH
[m³/day] [m³/day]

7,280.0 4,420 4,140 4,500 2.0 1.0 18.0 18.0


780.0 4,420 - 9,000 2.0 2.0 - 18.0
- 4,420 - 9,000 2.0 2.0 - 18.0
- - - 9,000 2.0 2.0 - 18.0
- - - 9,000 2.0 2.0 - 18.0
- - - - 2.0 - - 20.0
- - - - 2.0 - - 20.0
11,960.0 4,420 2,727 - 1.0 - 15.0 20.0
82,836.0 4,420 3,636 - 2.0 - 10.0 20.0
- 4,420 3,454 - 2.0 - 9.5 20.0
- 4,420 3,636 - 2.0 - 10.0 20.0
520.0 4,420 3,454 - 3.0 - 9.5 20.0
28,080.0 4,420 3,636 - 3.0 - 10.0 20.0
- 4,420 3,272 - 3.0 - 9.0 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 4.0 - - 20.0
9,000

9,000

9,000

0
3,636

3,636

3,636
3,454

3,454
2,727
16-Oct-22 17-Oct-22 18-Oct-22 19-Oct-22 20-Oct-22 21-Oct-22
-

Actual Outflow [m³/day] Plan Outflow [m³/d


g Hours (Hours) Flowrate (m3/Hours)
Estimated
Upper Lower Remarks
Lower Pumping [day]
Actual Limit Limit
Limit WH
Flowrate Flowrate

9.0 230 250 210 Flooded 6


9.0 91 250 210 Mineable -
9.0 - 250 210 Mineable -
9.0 - 250 210 Mineable -
9.0 - 250 210 Mineable -
10.0 - 250 210 Mineable -
10.0 - 250 210 Mineable -
10.0 182 250 210 Mineable 5
10.0 91 250 210 Mineable 23
10.0 91 250 210 Mineable -
10.0 91 250 210 Mineable -
10.0 91 250 210 Mineable 1
10.0 91 250 210 Mineable 8
10.0 91 250 210 Mineable -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -
10.0 - - 210 -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168
0

0
3,636
3,454

3,272

2 21-Oct-22 22-Oct-22 23-Oct-22 24-Oct-22 25-Oct-22 26-


-

-
n Outflow [m³/day] Volume Air [m³] Elevasi Su
23 24 25 26 27 28 29

Jenis pompa 1 Plan Pompa Jenis pompa 2

Flowrate Total
UA PM Flowrate
Act PM 10 Outflow RPM Status UA PM
10 PM 6
(m³/hours PM 10 PM 10 Pompa 6
(hours) (m³/hours)
) (m³/day)
- - - - 18.0 230.0
- - - - - 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 15.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 18.0 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,1
0

0
25-Oct-22 26-Oct-22 27-Oct-22 28-Oct-22 29-Oct-22 30-Oct-22
-

-
Elevasi Sump [mdpl] Estimasi Elev. Mud [mdpl]
30 31 32 33 34 35 36
PUMP PERFORMANCE

Plan Pompa Jenis pompa 3 Plan Pompa

Total UA Flowrat Total


Outflow Status 420- e Act. Outflow RPM 420-
RPM PM 6
PM 6 Pompa 24(hou 420 24 420-24 24
(m³/day) rs) (m³/ho (m³/day)
urs)
4,140.0 1,400.0 Running - -
- 1,650.0 - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,727.0 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,651.0 Running - -
3,272.4 1,652.0 Running - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - - -
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,
0

0
Oct-22 30-Oct-22 31-Oct-22 1-Nov-22 2-Nov-22 3-Nov-22
-

-
. Mud [mdpl]
37 38 39 40 41 42

Jenis pompa 4 Plan Pompa

UA Flowrat
Total
420- e Act.
Status Pompa Outflow 420- RPM 420-75 Status Pompa
75(hou 420 75
75 (m³/day)
rs) (m³/ho
urs)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - Running
- - - - Running
- - - - Running
- - - - Running
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

600,000

550,000

500,000

450,000

400,000

350,000

300,000

250,000

200,000
250,000

200,000

150,000

100,000

9,168 69,168 69,168 69,168 69,168

50,000
0

-
3-Nov-22 4-Nov-22
-
43 44 45 46 47

Jenis pompa 5 Plan Pompa


TDH Actual
UA Flowrat MF420 - 24
Total
420- e Act. (m)
Outflow 420- RPM 420-76 Status Pompa
76(hou 420 76
76 (m³/day)
rs) (m³/ho
urs)
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - Start Running 197.68
- - - - 197.68
- - - - 197.68
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,500.0 Pump P
2,000.0

1,500.0

1,000.0

500.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct

Pump P

25,000.0

20,000.0

15,000.0

10,000.0

5,000.0
5,000.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oc

Total Outflow PM 10 (m³/day) Total Outflow PM 6 (m³/day) Total Outflow 420-


UA PM 6 UA 420-75(hours)
Pump Performance

Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct 24/Oct 25/Oct 26/Oct 27/Oct 28/Oct 29/Oct 3

Pump Performance TBR Utara (Lowest)


8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct

) Total Outflow 420-75 (m³/day) RPM PM 10 RPM PM 6 RPM 420-75 Upper Limit WH Lower Limit WH
25.0
20.0
15.0
10.0
5.0
-
(5.0)
(10.0)
(15.0)
(20.0)
(25.0)
ct 27/Oct 28/Oct 29/Oct 30/Oct

25.0

20.0

15.0

10.0

5.0

(5.0)

(10.0)

(15.0)
(10.0)

(15.0)

(20.0)

(25.0)
21/Oct 22/Oct 23/Oct 24/Oct 25/Oct

WH Lower Limit WH UA PM 10 (hours)


1 2

Raw Data Minescape Wk-3 2023 0.52


Catchment
Volume Date Area Sump
Elevasi Volume (m³) Accumulated [Ha]
(m³)

-27.4 264.32 4,406.62 -27.4 30-Jun-23 52.00


-27.3 282.259 4,688.88 -27.3 1-Jul-23 52.00
-27.2 302.136 4,991.01 -27.2 2-Jul-23 52.00
-27.1 352.59 5,343.60 -27.1 3-Jul-23 52.00
-27 403.286 5,746.89 -27.0 4-Jul-23 52.00
-26.9 444.881 6,191.77 -26.9 5-Jul-23 52.00
-26.8 484.975 6,676.74 -26.8 6-Jul-23 52.00
-26.7 525.081 7,201.83 -26.7 7-Jul-23 52.00
-26.6 567.566 7,769.39 -26.6 8-Jul-23 52.00
-26.5 611.408 8,380.80 -26.5 9-Jul-23 52.00
-26.4 652.948 9,033.75 -26.4 10-Jul-23 52.00
-26 771.09 11,954.72 -26.0 14-Jul-23 52.00
-25.9 803.342 12,758.06 -25.9 15-Jul-23 52.00
-25.8 836.387 13,594.45 -25.8 16-Jul-23 52.00
-25.7 890.94 14,485.39 -25.7 17-Jul-23 52.00
-25.6 989.739 15,475.13 -25.6 18-Jul-23 52.00
-25.5 1050.678 16,525.80 -25.5 19-Jul-23 52.00
-25.4 1085.946 17,611.75 -25.4 20-Jul-23 52.00
-25.3 1125.95 18,737.70 -25.3 21-Jul-23 52.00
-25.2 1162.263 19,899.96 -25.2 22-Jul-23 52.00
-25.1 1192.375 21,092.34 -25.1 23-Jul-23 52.00
-25 1220.608 22,312.95 -25.0 24-Jul-23 52.00
-24.9 1247.97 23,560.92 -24.9 25-Jul-23 52.00
-24.8 1284.275 24,845.19 -24.8 26-Jul-23 52.00
-24.7 1389.152 26,234.34 -24.7 27-Jul-23 52.00
0 -24.6 1462.869 27,697.21 -24.6 28-Jul-23 52.00
-24.5 1507.572 29,204.78 -24.5 29-Jul-23 52.00
-24.4 1537.769 30,742.55 -24.4 30-Jul-23 52.00
-24.3 1564.487 32,307.04 -24.3 31-Jul-23 52.00
-24.2 1591.788 33,898.83 -24.2 1-Aug-23 52.00
-24.1 1692.363 35,591.19 -24.1 2-Aug-23 52.00
-24 1744.861 37,336.05 -24.0 3-Aug-23 52.00
-23.9 1782.428 39,118.48 -23.9 4-Aug-23 52.00
-23.8 1829.768 40,948.25 -23.8 5-Aug-23 52.00
-23.7 1874.121 42,822.37 -23.7 6-Aug-23 52.00
-23.6 1911.345 44,733.71 -23.6 7-Aug-23 52.00
-23.5 1945.127 46,678.84 -23.5 8-Aug-23 52.00
-23.4 1975.745 48,654.59 -23.4 9-Aug-23 52.00
-23.3 2000.494 50,655.08 -23.3 10-Aug-23 52.00
-23.2 2039.264 52,694.34 -23.2 11-Aug-23
-23.1 2093.467 54,787.81 -23.1
-23 2113.849 56,901.66 -23.0
-22.9 2132.772 59,034.43 -22.9
-22.8 2151.283 61,185.71 -22.8
-22.7 2169.21 63,354.92 -22.7
-22.6 2186.364 65,541.29 -22.6
-22.5 2203.212 67,744.50 -22.5
-22.4 2220.747 69,965.25 -22.4
-22.3 2239.547 72,204.79 -22.3
-22.2 2258.912 74,463.71 -22.2
-22.1 2280.141 76,743.85 -22.1
-22 2302.316 79,046.16 -22.0
-21.9 2322.554 81,368.72 -21.9
-21.8 2341.507 83,710.22 -21.8
-21.7 2359.173 86,069.40 -21.7
-21.6 2377.018 88,446.42 -21.6
-21.5 2399.443 90,845.86 -21.5
-21.4 2422.375 93,268.23 -21.4
-21.3 2442.123 95,710.36 -21.3
-21.2 2459.194 98,169.55 -21.2
-21.1 2474.933 100,644.48 -21.1
-21 2490.485 103,134.97 -21.0
-20.9 2505.48 105,640.45 -20.9
-20.8 2520.793 108,161.24 -20.8
-20.7 2534.952 110,696.19 -20.7
-20.6 2548.741 113,244.93 -20.6
-20.5 2561.866 115,806.80 -20.5
-20.4 2574.799 118,381.60 -20.4
-20.3 2587.578 120,969.18 -20.3
-20.2 2600.154 123,569.33 -20.2
-20.1 2612.554 126,181.89 -20.1
-20 2624.926 128,806.81 -20.0
-19.9 2637.583 131,444.39 -19.9
-19.8 2650.363 134,094.76 -19.8
-19.7 2663.075 136,757.83 -19.7
-19.6 2675.657 139,433.49 -19.6
-19.5 2688.198 142,121.69 -19.5
-19.4 2700.726 144,822.41 -19.4
-19.3 2713.254 147,535.67 -19.3
-19.2 2725.87 150,261.54 -19.2
-19.1 2738.584 153,000.12 -19.1
-19 2755.128 155,755.25 -19.0
-18.9 2778.346 158,533.60 -18.9
-18.8 2844.559 161,378.15 -18.8
-18.7 2912.401 164,290.56 -18.7
-18.6 2948.124 167,238.68 -18.6
-18.5 2977.529 170,216.21 -18.5
-18.4 3006.553 173,222.76 -18.4
-18.3 3035.108 176,257.87 -18.3
-18.2 3063.386 179,321.26 -18.2
-18.1 3091.537 182,412.79 -18.1
3 4 5 6

Curah Hujan
Elevasi [mm]
Elevasi Estimasi Durasi
Lowest Volume Air
Sump Elev. Mud Hujan
Point [m³]
[mdpl] [mdpl] [Jam] Actual Plan
[mdpl]

-30.00 -16.0 -19.0 82,346.95 4.2 14.0 8.5


(30.00) -20.1 -20.0 0.4 1.5 8.5
(30.00) -20.1 -20.1 - - 8.5
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) -20.8 -20.1 2.0 23.0 8.5
(30.00) -17.7 -20.1 11.3 159.3 8.5
(30.00) -17.7 -20.1 - - 8.5
(30.00) -17.9 -20.1 76,982.74 27.1 50.0 8.5
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
-

300 23 6900
700 23 16100 -30.0

400 23 9200
32200
13824
46024
-35.0

-40.0

-45.0

Elv. Mud -51

Elv. Mud -50


-50.0

-55.0
-50.0

-55.0
82,347

23,400

23,400

23,400
11,700
-60.0

8,442
15-Oct-22 16-Oct-22

-
Lowest Point Section 2
Total Inflow Total Outflow Total Pompa
Working Hours (Hours)
[m³/day] [m³/day] Act

Actual Plan
Upper
Actual Plan Outflow Outflow Actual Plan Actual
Limit WH
[m³/day] [m³/day]

7,280.0 4,420 8,442 11,700 1.0 1.0 18.0 18.0


780.0 4,420 - 23,400 2.0 2.0 - 18.0
- 4,420 - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - - 2.0 - - 20.0
- - - - 2.0 - - 20.0
11,960.0 4,420 2,727 - 1.0 - 15.0 20.0
82,836.0 4,420 3,636 - 2.0 - 10.0 20.0
- 4,420 3,454 - 2.0 - 9.5 20.0
26,000.0 4,420 5,616 - 2.0 - 18.0 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 4.0 - - 20.0
76,983
23,400

23,400

23,400

0
5,616
3,636

3,454
2,727
16-Oct-22 17-Oct-22 18-Oct-22 19-Oct-22 20-Oct-22 21-Oct-22
-

-
Actual Outflow [m³/day] Plan Outflow [m³/d
g Hours (Hours) Flowrate (m3/Hours)
Estimated
Upper Lower Remarks
Lower Pumping [day]
Actual Limit Limit
Limit WH
Flowrate Flowrate

9.0 469 650 325 Flooded 11


9.0 91 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 182 650 325 Mineable 5
10.0 91 650 325 Mineable 23
10.0 91 650 325 Mineable -
10.0 312 650 325 Flooded 19
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168

0
2 21-Oct-22 22-Oct-22 23-Oct-22 24-Oct-22 25-Oct-22 26-
-

-
n Outflow [m³/day] Volume Air [m³] Elevasi Su
23 24 25 26 27 28 29

Jenis pompa 1 Plan Pompa Jenis pompa 2

Flowrate Total Flowrate


UA PM UA 385
Act PM 10 Outflow RPM Status Act. 385 -
10 - SIS
(m³/hours PM 10 PM 10 Pompa SIS
(hours) (hours)
) (m³/day) (m³/hours)
18.0 469.0 8,442.0 1,400.0 Running
- - - - - 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 15.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 18.0 312.0
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,1
0

0
25-Oct-22 26-Oct-22 27-Oct-22 28-Oct-22 29-Oct-22 30-Oct-22
-

-
Elevasi Sump [mdpl] Estimasi Elev. Mud [mdpl]
30 31 32 33 34 35 36
PUMP PERFORMANCE

Plan Pompa Jenis pompa 3 Plan Pompa

Total UA Flowrat Total


Outflow RPM 385- Status 420- e Act. Outflow RPM 420-
385-SIS SIS Pompa 24(hou 420 24 420-24 24
(m³/day) rs) (m³/ho (m³/day)
urs)
- -
- 1,650.0 - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,727.0 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
5,616.0 1,450.0 Running - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - - -
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,
0

0
Oct-22 30-Oct-22 31-Oct-22 1-Nov-22 2-Nov-22 3-Nov-22
-

-
. Mud [mdpl]
37 38 39 40 41 42

Jenis pompa 4 Plan Pompa

UA Flowrat
Total
420- e Act.
Status Pompa Outflow 420- RPM 420-75 Status Pompa
75(hou 420 75
75 (m³/day)
rs) (m³/ho
urs)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - Running
- - - - Running
- - - - Running
- - - - Running
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

600,000

550,000

500,000

450,000

400,000

350,000

300,000

250,000

200,000

150,000

100,000
200,000

150,000

100,000

9,168 69,168 69,168 69,168 69,168

50,000
0

0
-
3-Nov-22 4-Nov-22
-
43 44 45 46 47

Jenis pompa 5 Plan Pompa


TDH Actual
UA Flowrat MF420 - 24
Total
420- e Act. (m)
Outflow 420- RPM 420-76 Status Pompa
76(hou 420 76
76 (m³/day)
rs) (m³/ho
urs)
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - Start Running 197.68
- - - - 197.68
- - - - 197.68
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,500.0 Pump P
2,000.0

1,500.0

1,000.0

500.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct

Pump P

25,000.0

20,000.0

15,000.0

10,000.0

5,000.0
5,000.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oc

Total Outflow PM 10 (m³/day) Total Outflow 385-SIS (m³/day) Total Outflow 420
UA 385 - SIS (hours) UA 420-75(hours)
Pump Performance

Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct 24/Oct 25/Oct 26/Oct 27/Oct 28/Oct 29/Oct 3

Pump Performance TBR Utara (Lowest)


8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct

y) Total Outflow 420-75 (m³/day) RPM PM 10 RPM 385-SIS RPM 420-75 Upper Limit WH Lower Limit WH
25.0
20.0
15.0
10.0
5.0
-
(5.0)
(10.0)
(15.0)
(20.0)
(25.0)
ct 27/Oct 28/Oct 29/Oct 30/Oct

25.0

20.0

15.0

10.0

5.0

(5.0)

(10.0)

(15.0)

(20.0)
(15.0)

(20.0)

(25.0)
21/Oct 22/Oct 23/Oct 24/Oct 25/Oct

t WH Lower Limit WH UA PM 10 (hours)


1 2

Raw Data Minescape Wk-3 2023 0.52


Catchment
Volume Date Area Sump
Elevasi Volume (m³) Accumulated [Ha]
(m³)

-27.4 264.32 4,406.62 -27.4 30-Jun-23 52.00


-27.3 282.259 4,688.88 -27.3 1-Jul-23 52.00
-27.2 302.136 4,991.01 -27.2 2-Jul-23 52.00
-27.1 352.59 5,343.60 -27.1 3-Jul-23 52.00
-27 403.286 5,746.89 -27.0 4-Jul-23 52.00
-26.9 444.881 6,191.77 -26.9 5-Jul-23 52.00
-26.8 484.975 6,676.74 -26.8 6-Jul-23 52.00
-26.7 525.081 7,201.83 -26.7 7-Jul-23 52.00
-26.6 567.566 7,769.39 -26.6 8-Jul-23 52.00
-26.5 611.408 8,380.80 -26.5 9-Jul-23 52.00
-26.4 652.948 9,033.75 -26.4 10-Jul-23 52.00
-26 771.09 11,954.72 -26.0 14-Jul-23 52.00
-25.9 803.342 12,758.06 -25.9 15-Jul-23 52.00
-25.8 836.387 13,594.45 -25.8 16-Jul-23 52.00
-25.7 890.94 14,485.39 -25.7 17-Jul-23 52.00
-25.6 989.739 15,475.13 -25.6 18-Jul-23 52.00
-25.5 1050.678 16,525.80 -25.5 19-Jul-23 52.00
-25.4 1085.946 17,611.75 -25.4 20-Jul-23 52.00
-25.3 1125.95 18,737.70 -25.3 21-Jul-23 52.00
-25.2 1162.263 19,899.96 -25.2 22-Jul-23 52.00
-25.1 1192.375 21,092.34 -25.1 23-Jul-23 52.00
-25 1220.608 22,312.95 -25.0 24-Jul-23 52.00
-24.9 1247.97 23,560.92 -24.9 25-Jul-23 52.00
-24.8 1284.275 24,845.19 -24.8 26-Jul-23 52.00
-24.7 1389.152 26,234.34 -24.7 27-Jul-23 52.00
0 -24.6 1462.869 27,697.21 -24.6 28-Jul-23 52.00
-24.5 1507.572 29,204.78 -24.5 29-Jul-23 52.00
-24.4 1537.769 30,742.55 -24.4 30-Jul-23 52.00
-24.3 1564.487 32,307.04 -24.3 31-Jul-23 52.00
-24.2 1591.788 33,898.83 -24.2 1-Aug-23 52.00
-24.1 1692.363 35,591.19 -24.1 2-Aug-23 52.00
-24 1744.861 37,336.05 -24.0 3-Aug-23 52.00
-23.9 1782.428 39,118.48 -23.9 4-Aug-23 52.00
-23.8 1829.768 40,948.25 -23.8 5-Aug-23 52.00
-23.7 1874.121 42,822.37 -23.7 6-Aug-23 52.00
-23.6 1911.345 44,733.71 -23.6 7-Aug-23 52.00
-23.5 1945.127 46,678.84 -23.5 8-Aug-23 52.00
-23.4 1975.745 48,654.59 -23.4 9-Aug-23 52.00
-23.3 2000.494 50,655.08 -23.3 10-Aug-23 52.00
-23.2 2039.264 52,694.34 -23.2 11-Aug-23
-23.1 2093.467 54,787.81 -23.1
-23 2113.849 56,901.66 -23.0
-22.9 2132.772 59,034.43 -22.9
-22.8 2151.283 61,185.71 -22.8
-22.7 2169.21 63,354.92 -22.7
-22.6 2186.364 65,541.29 -22.6
-22.5 2203.212 67,744.50 -22.5
-22.4 2220.747 69,965.25 -22.4
-22.3 2239.547 72,204.79 -22.3
-22.2 2258.912 74,463.71 -22.2
-22.1 2280.141 76,743.85 -22.1
-22 2302.316 79,046.16 -22.0
-21.9 2322.554 81,368.72 -21.9
-21.8 2341.507 83,710.22 -21.8
-21.7 2359.173 86,069.40 -21.7
-21.6 2377.018 88,446.42 -21.6
-21.5 2399.443 90,845.86 -21.5
-21.4 2422.375 93,268.23 -21.4
-21.3 2442.123 95,710.36 -21.3
-21.2 2459.194 98,169.55 -21.2
-21.1 2474.933 100,644.48 -21.1
-21 2490.485 103,134.97 -21.0
-20.9 2505.48 105,640.45 -20.9
-20.8 2520.793 108,161.24 -20.8
-20.7 2534.952 110,696.19 -20.7
-20.6 2548.741 113,244.93 -20.6
-20.5 2561.866 115,806.80 -20.5
-20.4 2574.799 118,381.60 -20.4
-20.3 2587.578 120,969.18 -20.3
-20.2 2600.154 123,569.33 -20.2
-20.1 2612.554 126,181.89 -20.1
-20 2624.926 128,806.81 -20.0
-19.9 2637.583 131,444.39 -19.9
-19.8 2650.363 134,094.76 -19.8
-19.7 2663.075 136,757.83 -19.7
-19.6 2675.657 139,433.49 -19.6
-19.5 2688.198 142,121.69 -19.5
-19.4 2700.726 144,822.41 -19.4
-19.3 2713.254 147,535.67 -19.3
-19.2 2725.87 150,261.54 -19.2
-19.1 2738.584 153,000.12 -19.1
-19 2755.128 155,755.25 -19.0
-18.9 2778.346 158,533.60 -18.9
-18.8 2844.559 161,378.15 -18.8
-18.7 2912.401 164,290.56 -18.7
-18.6 2948.124 167,238.68 -18.6
-18.5 2977.529 170,216.21 -18.5
-18.4 3006.553 173,222.76 -18.4
-18.3 3035.108 176,257.87 -18.3
-18.2 3063.386 179,321.26 -18.2
-18.1 3091.537 182,412.79 -18.1
3 4 5 6

Curah Hujan
Elevasi [mm]
Elevasi Estimasi Durasi
Lowest Volume Air
Sump Elev. Mud Hujan
Point [m³]
[mdpl] [mdpl] [Jam] Actual Plan
[mdpl]

-30.00 -16.0 -19.0 82,346.95 4.2 14.0 8.5


(30.00) -20.1 -20.0 0.4 1.5 8.5
(30.00) -20.1 -20.1 - - 8.5
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) -20.8 -20.1 2.0 23.0 8.5
(30.00) -17.7 -20.1 11.3 159.3 8.5
(30.00) -17.7 -20.1 - - 8.5
(30.00) -17.9 -20.1 - - 8.5
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
-

300 23 6900
700 23 16100 -30.0

400 23 9200
32200
13824
46024
-35.0

-40.0

-45.0

Elv. Mud -51

Elv. Mud -50


-50.0

-55.0
-50.0

-55.0
82,347

23,400

23,400

23,400

23,400
14,742
-60.0
15-Oct-22 16-Oct-22

-
Lowest Point Section 2
Total Inflow Total Outflow Total Pompa
Working Hours (Hours)
[m³/day] [m³/day] Act

Actual Plan
Upper
Actual Plan Outflow Outflow Actual Plan Actual
Limit WH
[m³/day] [m³/day]

7,280.0 4,420 14,742 23,400 2.0 2.0 18.0 18.0


780.0 4,420 - 23,400 2.0 2.0 - 18.0
- 4,420 - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - - 2.0 - - 20.0
- - - - 2.0 - - 20.0
11,960.0 4,420 2,727 - 1.0 - 15.0 20.0
82,836.0 4,420 3,636 - 2.0 - 10.0 20.0
- 4,420 3,454 - 2.0 - 9.5 20.0
- 4,420 3,636 - 2.0 - 10.0 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 4.0 - - 20.0
23,400

23,400

23,400

0
3,636

3,636
3,454
2,727
16-Oct-22 17-Oct-22 18-Oct-22 19-Oct-22 20-Oct-22 21-Oct-22
-

-
Actual Outflow [m³/day] Plan Outflow [m³/d
g Hours (Hours) Flowrate (m3/Hours)
Estimated
Upper Lower Remarks
Lower Pumping [day]
Actual Limit Limit
Limit WH
Flowrate Flowrate

9.0 410 650 325 Flooded 7


9.0 91 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 182 650 325 Mineable 5
10.0 91 650 325 Mineable 23
10.0 91 650 325 Mineable -
10.0 91 650 325 Mineable -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168

0
2 21-Oct-22 22-Oct-22 23-Oct-22 24-Oct-22 25-Oct-22 26-
-

-
n Outflow [m³/day] Volume Air [m³] Elevasi Su
23 24 25 26 27 28 29

Jenis pompa 1 Plan Pompa Jenis pompa 2

Flowrate Total Flowrate


UA PM UA 385
Act PM 10 Outflow RPM Status Act. 385 -
10 - SIS
(m³/hours PM 10 PM 10 Pompa SIS
(hours) (hours)
) (m³/day) (m³/hours)
18.0 469.0 8,442.0 1,400.0 Running 18.0 350.0
- - - - - 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 15.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,1
0

0
25-Oct-22 26-Oct-22 27-Oct-22 28-Oct-22 29-Oct-22 30-Oct-22
-

-
Elevasi Sump [mdpl] Estimasi Elev. Mud [mdpl]
30 31 32 33 34 35 36
PUMP PERFORMANCE

Plan Pompa Jenis pompa 3 Plan Pompa

Total UA Flowrat Total


Outflow RPM 385- Status 420- e Act. Outflow RPM 420-
385-SIS SIS Pompa 24(hou 420 24 420-24 24
(m³/day) rs) (m³/ho (m³/day)
urs)
6,300.0 1,500.0 Running - -
- 1,650.0 - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,727.0 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,650.0 Running - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - - -
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,
0

0
Oct-22 30-Oct-22 31-Oct-22 1-Nov-22 2-Nov-22 3-Nov-22
-

-
. Mud [mdpl]
37 38 39 40 41 42

Jenis pompa 4 Plan Pompa

UA Flowrat
Total
420- e Act.
Status Pompa Outflow 420- RPM 420-75 Status Pompa
75(hou 420 75
75 (m³/day)
rs) (m³/ho
urs)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - Running
- - - - Running
- - - - Running
- - - - Running
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

600,000

550,000

500,000

450,000

400,000

350,000

300,000

250,000

200,000

150,000

100,000
200,000

150,000

100,000

9,168 69,168 69,168 69,168 69,168

50,000
0

0
-
3-Nov-22 4-Nov-22
-
43 44 45 46 47

Jenis pompa 5 Plan Pompa


TDH Actual
UA Flowrat MF420 - 24
Total
420- e Act. (m)
Outflow 420- RPM 420-76 Status Pompa
76(hou 420 76
76 (m³/day)
rs) (m³/ho
urs)
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - Start Running 197.68
- - - - 197.68
- - - - 197.68
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,500.0 Pump P
2,000.0

1,500.0

1,000.0

500.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct

Pump P

25,000.0

20,000.0

15,000.0

10,000.0

5,000.0
5,000.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oc

Total Outflow PM 10 (m³/day) Total Outflow 385-SIS (m³/day) Total Outflow 420
UA 385 - SIS (hours) UA 420-75(hours)
Pump Performance

Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct 24/Oct 25/Oct 26/Oct 27/Oct 28/Oct 29/Oct 3

Pump Performance TBR Utara (Lowest)


8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct

y) Total Outflow 420-75 (m³/day) RPM PM 10 RPM 385-SIS RPM 420-75 Upper Limit WH Lower Limit WH
25.0
20.0
15.0
10.0
5.0
-
(5.0)
(10.0)
(15.0)
(20.0)
(25.0)
ct 27/Oct 28/Oct 29/Oct 30/Oct

25.0

20.0

15.0

10.0

5.0

(5.0)

(10.0)

(15.0)

(20.0)
(15.0)

(20.0)

(25.0)
21/Oct 22/Oct 23/Oct 24/Oct 25/Oct

t WH Lower Limit WH UA PM 10 (hours)


1 2

Raw Data Minescape Wk-3 2023 0.52


Catchment
Volume Date Area Sump
Elevasi Volume (m³) Accumulated [Ha]
(m³)

-27.4 264.32 4,406.62 -27.4 30-Jun-23 52.00


-27.3 282.259 4,688.88 -27.3 1-Jul-23 52.00
-27.2 302.136 4,991.01 -27.2 2-Jul-23 52.00
-27.1 352.59 5,343.60 -27.1 3-Jul-23 52.00
-27 403.286 5,746.89 -27.0 4-Jul-23 52.00
-26.9 444.881 6,191.77 -26.9 5-Jul-23 52.00
-26.8 484.975 6,676.74 -26.8 6-Jul-23 52.00
-26.7 525.081 7,201.83 -26.7 7-Jul-23 52.00
-26.6 567.566 7,769.39 -26.6 8-Jul-23 52.00
-26.5 611.408 8,380.80 -26.5 9-Jul-23 52.00
-26.4 652.948 9,033.75 -26.4 10-Jul-23 52.00
-26.3 691.125 9,724.87 -26.3 11-Jul-23 52.00
-26.2 716.706 10,441.58 -26.2 12-Jul-23 52.00
-26.1 742.049 11,183.63 -26.1 13-Jul-23 52.00
-26 771.09 11,954.72 -26.0 14-Jul-23 52.00
-25.9 803.342 12,758.06 -25.9 15-Jul-23 52.00
-25.8 836.387 13,594.45 -25.8 16-Jul-23 52.00
-25.7 890.94 14,485.39 -25.7 17-Jul-23 52.00
-25.6 989.739 15,475.13 -25.6 18-Jul-23 52.00
-25.5 1050.678 16,525.80 -25.5 19-Jul-23 52.00
-25.4 1085.946 17,611.75 -25.4 20-Jul-23 52.00
-25.3 1125.95 18,737.70 -25.3 21-Jul-23 52.00
-25.2 1162.263 19,899.96 -25.2 22-Jul-23 52.00
-25.1 1192.375 21,092.34 -25.1 23-Jul-23 52.00
-25 1220.608 22,312.95 -25.0 24-Jul-23 52.00
-24.9 1247.97 23,560.92 -24.9 25-Jul-23 52.00
-24.8 1284.275 24,845.19 -24.8 26-Jul-23 52.00
-24.7 1389.152 26,234.34 -24.7 27-Jul-23 52.00
0 -24.6 1462.869 27,697.21 -24.6 28-Jul-23 52.00
-24.5 1507.572 29,204.78 -24.5 29-Jul-23 52.00
-24.4 1537.769 30,742.55 -24.4 30-Jul-23 52.00
-24.3 1564.487 32,307.04 -24.3 31-Jul-23 52.00
-24.2 1591.788 33,898.83 -24.2 1-Aug-23 52.00
-24.1 1692.363 35,591.19 -24.1 2-Aug-23 52.00
-24 1744.861 37,336.05 -24.0 3-Aug-23 52.00
-23.9 1782.428 39,118.48 -23.9 4-Aug-23 52.00
-23.8 1829.768 40,948.25 -23.8 5-Aug-23 52.00
-23.7 1874.121 42,822.37 -23.7 6-Aug-23 52.00
-23.6 1911.345 44,733.71 -23.6 7-Aug-23 52.00
-23.5 1945.127 46,678.84 -23.5 8-Aug-23 52.00
-23.4 1975.745 48,654.59 -23.4 9-Aug-23 52.00
-23.3 2000.494 50,655.08 -23.3 10-Aug-23 52.00
-23.2 2039.264 52,694.34 -23.2 11-Aug-23
-23.1 2093.467 54,787.81 -23.1
-23 2113.849 56,901.66 -23.0
-22.9 2132.772 59,034.43 -22.9
-22.8 2151.283 61,185.71 -22.8
-22.7 2169.21 63,354.92 -22.7
-22.6 2186.364 65,541.29 -22.6
-22.5 2203.212 67,744.50 -22.5
-22.4 2220.747 69,965.25 -22.4
-22.3 2239.547 72,204.79 -22.3
-22.2 2258.912 74,463.71 -22.2
-22.1 2280.141 76,743.85 -22.1
-22 2302.316 79,046.16 -22.0
-21.9 2322.554 81,368.72 -21.9
-21.8 2341.507 83,710.22 -21.8
-21.7 2359.173 86,069.40 -21.7
-21.6 2377.018 88,446.42 -21.6
-21.5 2399.443 90,845.86 -21.5
-21.4 2422.375 93,268.23 -21.4
-21.3 2442.123 95,710.36 -21.3
-21.2 2459.194 98,169.55 -21.2
-21.1 2474.933 100,644.48 -21.1
-21 2490.485 103,134.97 -21.0
-20.9 2505.48 105,640.45 -20.9
-20.8 2520.793 108,161.24 -20.8
-20.7 2534.952 110,696.19 -20.7
-20.6 2548.741 113,244.93 -20.6
-20.5 2561.866 115,806.80 -20.5
-20.4 2574.799 118,381.60 -20.4
-20.3 2587.578 120,969.18 -20.3
-20.2 2600.154 123,569.33 -20.2
-20.1 2612.554 126,181.89 -20.1
-20 2624.926 128,806.81 -20.0
-19.9 2637.583 131,444.39 -19.9
-19.8 2650.363 134,094.76 -19.8
-19.7 2663.075 136,757.83 -19.7
-19.6 2675.657 139,433.49 -19.6
-19.5 2688.198 142,121.69 -19.5
-19.4 2700.726 144,822.41 -19.4
-19.3 2713.254 147,535.67 -19.3
-19.2 2725.87 150,261.54 -19.2
-19.1 2738.584 153,000.12 -19.1
-19 2755.128 155,755.25 -19.0
-18.9 2778.346 158,533.60 -18.9
-18.8 2844.559 161,378.15 -18.8
-18.7 2912.401 164,290.56 -18.7
-18.6 2948.124 167,238.68 -18.6
-18.5 2977.529 170,216.21 -18.5
-18.4 3006.553 173,222.76 -18.4
-18.3 3035.108 176,257.87 -18.3
-18.2 3063.386 179,321.26 -18.2
-18.1 3091.537 182,412.79 -18.1
3 4 5 6

Curah Hujan
Elevasi [mm]
Elevasi Estimasi Durasi
Lowest Volume Air
Sump Elev. Mud Hujan
Point [m³]
[mdpl] [mdpl] [Jam] Actual Plan
[mdpl]

-30.00 -16.0 -19.0 82,346.95 4.2 14.0 8.5


(30.00) -20.1 -20.0 0.4 1.5 8.5
(30.00) -20.1 -20.1 - - 8.5
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) 0.0 -20.1 - - -
(30.00) -20.8 -20.1 2.0 23.0 8.5
(30.00) -17.7 -20.1 11.3 159.3 8.5
(30.00) -17.7 -20.1 - - 8.5
(30.00) -17.9 -20.1 - - 8.5
(30.00) -18.0 -20.1 1.7 1.0 8.5
(30.00) -17.5 -20.1 6.8 54.0 8.5
(30.00) -17.3 -20.6 1.0 0..5 8.5
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
(30.00) 0.0 -20.6 69,167.86 - - -
-

300 23 6900
700 23 16100 -30.0

400 23 9200
32200
13824
46024
-35.0

-40.0

-45.0

Elv. Mud -51

Elv. Mud -50


-50.0
Elv. Mud -50
-50.0

-55.0
82,347

23,400

23,400

23,400
11,700
-60.0

6,300
15-Oct-22 16-Oct-22

-
Lowest Point Section 2
Total Inflow Total Outflow Total Pompa
Working Hours (Hours)
[m³/day] [m³/day] Act

Actual Plan
Upper
Actual Plan Outflow Outflow Actual Plan Actual
Limit WH
[m³/day] [m³/day]

7,280.0 4,420 6,300 11,700 1.0 1.0 18.0 18.0


780.0 4,420 - 23,400 2.0 2.0 - 18.0
- 4,420 - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - 23,400 2.0 2.0 - 18.0
- - - - 2.0 - - 20.0
- - - - 2.0 - - 20.0
11,960.0 4,420 2,727 - 1.0 - 15.0 20.0
82,836.0 4,420 3,636 - 2.0 - 10.0 20.0
- 4,420 3,454 - 2.0 - 9.5 20.0
- 4,420 3,636 - 2.0 - 10.0 20.0
520.0 4,420 3,454 - 3.0 - 9.5 20.0
28,080.0 4,420 3,636 - 3.0 - 10.0 20.0
- 4,420 3,272 - 3.0 - 9.0 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 3.0 - - 20.0
- - - - 4.0 - - 20.0
23,400

23,400

23,400

0
3,636

3,636

3,636
3,454

3,454
2,727
16-Oct-22 17-Oct-22 18-Oct-22 19-Oct-22 20-Oct-22 21-Oct-22
-

Actual Outflow [m³/day] Plan Outflow [m³/d


g Hours (Hours) Flowrate (m3/Hours)
Estimated
Upper Lower Remarks
Lower Pumping [day]
Actual Limit Limit
Limit WH
Flowrate Flowrate

9.0 350 650 325 Flooded 15


9.0 91 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
9.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 - 650 325 Mineable -
10.0 182 650 325 Mineable 5
10.0 91 650 325 Mineable 23
10.0 91 650 325 Mineable -
10.0 91 650 325 Mineable -
10.0 91 650 325 Mineable 1
10.0 91 650 325 Mineable 8
10.0 91 650 325 Mineable -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -
10.0 - - 325 -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168
0

0
3,636
3,454

3,272

2 21-Oct-22 22-Oct-22 23-Oct-22 24-Oct-22 25-Oct-22 26-


-

-
n Outflow [m³/day] Volume Air [m³] Elevasi Su
23 24 25 26 27 28 29

Jenis pompa 1 Plan Pompa Jenis pompa 2

Flowrate Total Flowrate


UA PM UA 385
Act PM 10 Outflow RPM Status Act. 385 -
10 - SIS
(m³/hours PM 10 PM 10 Pompa SIS
(hours) (hours)
) (m³/day) (m³/hours)
- 18.0 350.0
- - - - - 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 15.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 19.0 181.8
- - - - 20.0 181.8
- - - - 18.0 181.8
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

sump
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,1
0

0
25-Oct-22 26-Oct-22 27-Oct-22 28-Oct-22 29-Oct-22 30-Oct-22
-

-
Elevasi Sump [mdpl] Estimasi Elev. Mud [mdpl]
30 31 32 33 34 35 36
PUMP PERFORMANCE

Plan Pompa Jenis pompa 3 Plan Pompa

Total UA Flowrat Total


Outflow RPM 385- Status 420- e Act. Outflow RPM 420-
385-SIS SIS Pompa 24(hou 420 24 420-24 24
(m³/day) rs) (m³/ho (m³/day)
urs)
6,300.0 1,500.0 Running - -
- 1,650.0 - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,727.0 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,650.0 Running - -
3,454.2 1,650.0 Running - -
3,636.0 1,651.0 Running - -
3,272.4 1,652.0 Running - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - - -
69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,168 69,
0

0
Oct-22 30-Oct-22 31-Oct-22 1-Nov-22 2-Nov-22 3-Nov-22
-

-
. Mud [mdpl]
37 38 39 40 41 42

Jenis pompa 4 Plan Pompa

UA Flowrat
Total
420- e Act.
Status Pompa Outflow 420- RPM 420-75 Status Pompa
75(hou 420 75
75 (m³/day)
rs) (m³/ho
urs)
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - - Running
- - - - Running
- - - - Running
- - - - Running
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

600,000

550,000

500,000

450,000

400,000

350,000

300,000

250,000

200,000
250,000

200,000

150,000

100,000

9,168 69,168 69,168 69,168 69,168

50,000
0

-
3-Nov-22 4-Nov-22
-
43 44 45 46 47

Jenis pompa 5 Plan Pompa


TDH Actual
UA Flowrat MF420 - 24
Total
420- e Act. (m)
Outflow 420- RPM 420-76 Status Pompa
76(hou 420 76
76 (m³/day)
rs) (m³/ho
urs)
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - 197.68
- - - - Start Running 197.68
- - - - 197.68
- - - - 197.68
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2,500.0 Pump P
2,000.0

1,500.0

1,000.0

500.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct

Pump P

25,000.0

20,000.0

15,000.0

10,000.0

5,000.0
5,000.0

-
1/Oct 2/Oct 3/Oct 4/Oct 5/Oct 6/Oct 7/Oct 8/Oct 9/Oct 10/Oc

Total Outflow PM 10 (m³/day) Total Outflow 385-SIS (m³/day) Total Outflow 420
UA 385 - SIS (hours) UA 420-75(hours)
Pump Performance

Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct 24/Oct 25/Oct 26/Oct 27/Oct 28/Oct 29/Oct 3

Pump Performance TBR Utara (Lowest)


8/Oct 9/Oct 10/Oct 11/Oct 12/Oct 13/Oct 14/Oct 15/Oct 16/Oct 17/Oct 18/Oct 19/Oct 20/Oct 21/Oct 22/Oct 23/Oct

y) Total Outflow 420-75 (m³/day) RPM PM 10 RPM 385-SIS RPM 420-75 Upper Limit WH Lower Limit WH
25.0
20.0
15.0
10.0
5.0
-
(5.0)
(10.0)
(15.0)
(20.0)
(25.0)
ct 27/Oct 28/Oct 29/Oct 30/Oct

25.0

20.0

15.0

10.0

5.0

(5.0)

(10.0)

(15.0)
(10.0)

(15.0)

(20.0)

(25.0)
21/Oct 22/Oct 23/Oct 24/Oct 25/Oct

t WH Lower Limit WH UA PM 10 (hours)

Vous aimerez peut-être aussi