Vous êtes sur la page 1sur 9

Long.

Total Fe E500
Élément Pos. Diam. No.
(cm) (cm) (kg)
P1=P6 1 HA12 5 116 580 5.1
2 HA12 5 116 580 5.1
Fondation 3 HA12 4 112 448 4.0
Plan de ferraillage fondation Récapitulatif Acier Long. total Poids+10% 4 HA6 3 106 318 0.7

Béton: C25/30 Fondation (m) (kg) Total Total+10%: 16.4


(x2): 32.8
Échelle: 1:100 Plan de ferraillage fondation
HA6: 1.6
Fe E500 HA6 HA12: 31.2
85.3 21 Total: 32.8
HA10 75.8 51
HA12 744.7 727 799
95 x 130 x 30

P31 P32
(20x30) (30x20)
150 x 100 x 40
TABLE DES ÉLÉMENTS DE FONDATION
Références Dimensions (cm) Épaisseur (cm) Armature inf. X Armature inf. Y
P1, P4, P5, P6, P7 et P28 100x100 40 5HA12e=20 5HA12e=20
P2, P3, P10, P18, P23,
P29 P30 P24 et P30
150x120 40 6HA12e=20 7HA12e=20
(20x30) (20x30)
150 x 120 x 40

150 x 220 x 45

140 x 200 x 40

100 x 100 x 40
95 x 130 x 30 150 x 120 x 40 P8 et P9 160x210 40 13HA12e=15 10HA12e=15
P11 et P19 200x130 40 6HA12e=20 10HA12e=20
P16 200x210 40 10HA12e=20 13HA12e=15
P23 P24 P25 P27 P28
(30x30) (30x30) (30x40) (30x30) (30x30) P17, P20 et P27 140x200 40 13HA12e=15 9HA12e=15
150 x 120 x 40
P21 210x150 40 9HA12e=15 13HA12e=15
P22 150x130 40 6HA12e=20 7HA12e=20
P25 150x220 45 16HA10e=13 11HA10e=13

210 x 150 x 40
P29 et P31 95x130 30 5HA12e=28 3HA12e=28
P32 150x100 40 5HA12e=20 7HA12e=20

P19 P20 P21 P22


(30x30) (30x30) (30x40) (30x30)
200 x 130 x 40 150 x 130 x 40
140 x 200 x 40
P1 et P6
P1 et P6 P1 et P6

50 50 50 50

P16 P17 P18 P1 et P6


(30x40) (30x30) (30x30)
150 x 120 x 40
200 x 210 x 40 140 x 200 x 40

4X1P3HA12 L=112
P11
(30x30) 30
200 x 130 x 40

40
160 x 210 x 40

23

30

23

6
15

15
P8 P9 P10 5P1HA12e=20 L=116 5P2HA12e=20 L=116 30 3P4HA6
(30x40) (40x30) (30x30) L=106
150 x 120 x 40
160 x 210 x 40

P7
(30x30)
100 x 100 x 40

100
150 x 120 x 40

P1 P2 P3 P4 P5 P6
(30x30)
100 x 100 x 40 (30x30) (30x30) (20x30)
100 x 100 x 40 (20x30)
100 (30x30)
x 100 x 40100 x 100 x 40 100
150 x 120 x 40
Long. Total Fe E500
P2 Élément Pos. Diam. No.
(cm) (cm) (kg)
P2 1 HA12 6 166 996 8.8
P2 P2 2 HA12 7 136 952 8.5
3 HA12 4 112 448 4.0
4 HA6 3 106 318 0.7
P4 et P5
75 75 60 60 Total+10%: 24.2
P3 5 HA12 6 166 996 8.8
P4 et P5 P4 et P5
P2 6
7
HA12
HA12
7
4
136
112
952
448
8.5
4.0
8 HA6 3 106 318 0.7
50 50 50 50
Total+10%: 24.2

4X1P3HA12 L=112
P4 et P5 P4=P5 9 HA12 5 116 580 5.1
10 HA12 5 116 580 5.1
11 HA10 4 124 496 3.1
30

4X1P11HA10 L=124
12 HA6 3 86 258 0.6

40
23 Total+10%: 15.3

30
(x2): 30.6

23

6
20 P7=P28 13 HA12 5 116 580 5.1
15

15
14 HA12 5 116 580 5.1
3P4HA6

40
6P1HA12e=20 L=166 7P2HA12e=20 L=136 30 13 15 HA12 4 112 448 4.0
L=106 16 HA6 3 106 318 0.7

30

23

6
Total+10%: 16.4

15

15
(x2): 32.8
5P9HA12e=20 L=116 5P10HA12e=20 L=116 30 3P12HA6 HA6: 4.6
L=86 HA10: 6.8
HA12: 100.4
Total: 111.8
120

100
150

Récapitulatif Acier Long. total Poids+10%


100
Fondation (m) (kg) Total
Plan de ferraillage fondation
Fe E500 HA6 85.3 21
HA10 75.8 51
HA12 744.7 727 799 P7 et P28

P3 P7 et P28 P7 et P28

P3 P3 50 50 50 50

P7 et P28
75 75 60 60

4X1P15HA12 L=112
P3

30
4X1P7HA12 L=112

40
23

30

23

6
30

15

15
40

23 30 3P16HA6
5P13HA12e=20 L=116 5P14HA12e=20 L=116
30

L=106
23

6
15

15

6P5HA12e=20 L=166 7P6HA12e=20 L=136 30 3P8HA6


L=106
100
120

100

150
Long. Total Fe E500
Élément Pos. Diam. No.
(cm) (cm) (kg)
P8 P8 1 HA12 13 184 2392 21.2
2 HA12 10 234 2340 20.8
3 HA10 2 124 248 1.5
P8 P8 4 HA12 4 112 448 4.0
5 HA6 3 126 378 0.8
Total+10%: 53.1
80 80 105 105
P11=P19 6 HA12 6 216 1296 11.5
7 HA12 10 146 1460 13.0
P8 8 HA12 4 112 448 4.0
9 HA6 3 106 318 0.7
Total+10%: 32.1
2X1P3HA10 30

2X1P3HA10 L=124
(x2): 64.2

4X1P4HA12 L=112
HA6: 2.2
HA10: 1.7
HA12: 113.4

40
23 Total: 117.3

40

33

6
19 10P2HA12e=15 L=234

19
13P1HA12e=15 L=184 30 30 3P5HA6
4X1P4HA12 L=126
210

160

P11 et P19
P11 et P19 P11 et P19

100 100 65 65

P11 et P19

4X1P8HA12 L=112
Récapitulatif Acier Long. total Poids+10% 30

40
Fondation (m) (kg) Total 23

30
Plan de ferraillage fondation

23

6
6P6HA12e=20 L=216

15
15

Fe E500 HA6 85.3 21


10P7HA12e=20 L=146 30 3P9HA6
HA10 75.8 51 L=106
HA12 744.7 727 799
130

200
Long. Total Fe E500
Élément Pos. Diam. No.
(cm) (cm) (kg)
P9 P9 1 HA12 13 184 2392 21.2
2 HA12 10 234 2340 20.8
3 HA10 2 124 248 1.5
P9 P9 4 HA12 4 112 448 4.0
5 HA6 3 126 378 0.8
Total+10%: 53.1
80 80 105 105 P10=P24 6 HA12 6 166 996 8.8
7 HA12 7 136 952 8.5
P9 8 HA12 4 112 448 4.0
9 HA6 3 106 318 0.7
Total+10%: 24.2

2X1P3HA10 L=124
(x2): 48.4

4X1P4HA12 L=112
P18 10 HA12 6 166 996 8.8
11 HA12 7 136 952 8.5
40 12 HA12 4 136 544 4.8
13 HA6 3 106 318 0.7

40
33 Total+10%: 25.1

30

23
HA6: 3.2

6
10P2HA12e=15 L=234
19

19
HA10: 1.7
30 30 3P5HA6 HA12: 121.7
13P1HA12e=15 L=184 4X1P4HA12 2X1P3HA10 L=126 Total: 126.6
210

P18
P18 P18

75 75 60 60
160 P18

4X1P12HA12 L=136
P10 et P24
P10 et P24 P10 et P24 30

40
23

30
75 75 60 60

23

6
15

15
P10 et P24 30 3P13HA6
6P10HA12e=20 L=166 7P11HA12e=20 L=136
L=106

4X1P8HA12 L=112
Récapitulatif Acier Long. total Poids+10%
30
Fondation (m) (kg) Total
40
23
Plan de ferraillage fondation

30

120
23

6
Fe E500 HA6 85.3 21
15

15

6P6HA12e=20 L=166 7P7HA12e=20 L=136 30 3P9HA6


HA10 75.8 51 L=106
HA12 744.7 727 799

150
120

150
Long. Total Fe E500
Élément Pos. Diam. No.
P16 (cm) (cm) (kg)
P16 1 HA12 10 224 2240 19.9
P16 P16 2 HA12 13 234 3042 27.0
3 HA12 6 136 816 7.2
4 HA6 3 126 378 0.8
100 100 105 105 Total+10%: 60.4

P16 P17 5
6
HA12
HA12
13
9
150
210
1950
1890
17.3
16.8
7 HA10 2 124 248 1.5
8 HA12 4 136 544 4.8

6X1P3HA12 L=136
9 HA6 3 106 318 0.7
Total+10%: 45.2
HA6: 1.7
30 HA10: 1.6

40
HA12: 102.3
23
Total: 105.6

40

33

6
10P1HA12e=20 L=224 13P2HA12e=15 L=234

19

19
30 3P4HA6
210 L=126

200

P17
P17 P17

70 70 100 100
P17

4X1P8HA12 L=136
2X1P7HA10 L=124
2X1P7HA10 30

40
23

30
Récapitulatif Acier Long. total Poids+10%

23

6
Fondation (m) (kg) Total 9P6HA12e=15 L=210
12

12
Plan de ferraillage fondation 13P5HA12e=15 L=150 30 30 3P9HA6
4X1P8HA12 L=106
Fe E500 HA6 85.3 21
HA10 75.8 51
HA12 744.7 727 799
200

140
Long. Total Fe E500
Élément Pos. Diam. No.
(cm) (cm) (kg)
P20 P20 1 HA12 13 150 1950 17.3
2 HA12 9 210 1890 16.8
3 HA12 4 136 544 4.8
P20 P20 4 HA6 3 106 318 0.7
Total+10%: 43.6
70 70 100 100 P21 5 HA12 9 234 2106 18.7
P20 6
7
HA12
HA10
13
2
174
124
2262
248
20.1
1.5
8 HA12 4 112 448 4.0
9 HA6 3 126 378 0.8

4X1P3HA12 L=136
Total+10%: 49.6
HA6: 1.7
HA10: 1.6
HA12: 89.9
30 Total: 93.2

40
23

30

23

6
9P2HA12e=15 L=210

12

12
13P1HA12e=15 L=150 30 3P4HA6
L=106
200

140

P21
P21 P21

105 105 75 75

P21

2X1P7HA10 30

2X1P7HA10 L=124

4X1P8HA12 L=112
Récapitulatif Acier Long. total Poids+10%

40
23
Fondation (m) (kg) Total

40
Plan de ferraillage fondation 6

33
9P5HA12e=15 L=234
19

19
Fe E500 HA6 85.3 21 3P9HA6
13P6HA12e=15 L=174 30 30
HA10 4X1P8HA12 L=126
75.8 51
HA12 744.7 727 799
150

210
Long. Total Fe E500
P22 Élément Pos. Diam. No.
(cm) (cm) (kg)
P22 1 HA12 6 166 996 8.8
P22 P22 2 HA12 7 146 1022 9.1
3 HA12 4 136 544 4.8
4 HA6 3 106 318 0.7
75 75 65 65 Total+10%: 25.7
P22 P23 5 HA12 6 166 996 8.8
6 HA12 7 136 952 8.5
7 HA12 4 112 448 4.0
8 HA6 3 106 318 0.7

4X1P3HA12 L=136
Total+10%: 24.2
P25 9 HA10 16 160 2560 15.8
10 HA10 11 230 2530 15.6
30 11 HA10 2 130 260 1.6

40
12 HA12 4 117 468 4.2
23 13 HA6 3 126 378 0.8

30

23
Total+10%: 41.8

6
15

15
HA6: 2.4
6P1HA12e=20 L=166 7P2HA12e=20 L=146 30 3P4HA6 HA10: 36.3
L=106 HA12: 53.0
Total: 91.7
130

P25
150 P25 P25

Récapitulatif Acier Long. total Poids+10% 75 75 110 110


Fondation (m) (kg) Total
Plan de ferraillage fondation P25
Fe E500 HA6 85.3 21

2X1P11HA10 L=130

4X1P12HA12 L=117
HA10 75.8 51 2X1P11HA10 30

HA12 744.7 727 799

45
23
P23

40
6

33
12
11P10HA10e=13 L=230

12
P23 P23
16P9HA10e=13 L=160 30 30 3P13HA6
4X1P12HA12 L=126
75 75 60 60

P23
4X1P7HA12 L=112

30
40

23
220
30

23

6
15

15

6P5HA12e=20 L=166 7P6HA12e=20 L=136 30 3P8HA6


L=106

150
120

150
Long. Total Fe E500
Élément Pos. Diam. No.
(cm) (cm) (kg)
P27 1 HA12 13 150 1950 17.3
2 HA12 9 210 1890 16.8
3 HA12 4 112 448 4.0
4 HA6 3 106 318 0.7
Total+10%: 42.7
P29 5 HA12 5 111 555 4.9
6 HA12 3 146 438 3.9
7 HA12 4 102 408 3.6
8 HA6 3 86 258 0.6
P27 Total+10%: 14.3
HA6: 1.5
P27 P27 HA12: 55.5
Total: 57.0

70 70 100 100

P27

4X1P3HA12 L=112
30

40
23

30

23

6
9P2HA12e=15 L=210
12

12
13P1HA12e=15 L=150 30 3P4HA6
L=106

P29
P29 P29

43 52 58 72
P29
200

4X1P7HA12 L=102
20

30
13

30

23

6
15

15
140 5P5HA12e=28 L=111 3P6HA12e=28 L=146 30 3P8HA6
L=86

130
Récapitulatif Acier Long. total Poids+10%
Fondation (m) (kg) Total
Plan de ferraillage fondation 95
Fe E500 HA6 85.3 21
HA10 75.8 51
HA12 744.7 727 799
Long. Total Fe E500
Élément Pos. Diam. No.
P30 (cm) (cm) (kg)
P30 1 HA12 6 166 996 8.8
P30 P30 2 HA12 7 136 952 8.5
3 HA10 2 124 248 1.5
4 HA12 4 136 544 4.8
75 75 60 60 5 HA6 3 86 258 0.6

P30 Total+10%: 26.6


P31 6 HA12 5 111 555 4.9
7 HA12 3 146 438 3.9
8 HA12 4 126 504 4.5

4X1P4HA12 L=136
20

2X1P3HA10 L=124
9 HA6 3 86 258 0.6
2X1P3HA10 Total+10%: 15.3
P32 10 HA12 5 166 830 7.4
11 HA12 7 116 812 7.2

40
12 HA12 4 112 448 4.0
13 13 HA6 3 86 258 0.6

30
Total+10%: 21.1

23

6
15

15
HA6: 1.9
6P1HA12e=20 L=166 7P2HA12e=20 L=136 30 30 3P5HA6 HA10: 1.7
4X1P4HA12 L=86 HA12: 59.4
Total: 63.0
120

150

Récapitulatif Acier Long. total Poids+10%


Fondation (m) (kg) Total
Plan de ferraillage fondation
Fe E500 HA6 85.3 21
HA10 75.8 51 P32
HA12 744.7 727 799 P32 P32

P31 75 75 50 50
P31 P31 P32

4X1P12HA12 L=112
48 48 65 65
P31

30
4X1P8HA12 L=126

40
23

20

6
13
20

15

15
30 3P13HA6
30

13 5P10HA12e=20 L=166 7P11HA12e=20 L=116 L=86


30

23

6
15

15

5P6HA12e=28 L=111 3P7HA12e=28 L=146 30 3P9HA6


L=86
100
130

150

95

Vous aimerez peut-être aussi