DESIGNATION U QUANTITE DEB,UNIT

DESIGNATION U QUANTITE DEB,UNIT

MATERIAUX

CIMENT T 0.40 1050

SABLE M3 0.44 105

GRAVIER M3 0.73 95

L'EAU M3 0.21 4

M.O de béton H 0.5 25

SD partiels

SD total

DESIGNATION U QUANTITE DEB,UNIT


MATERIAUX

ACIER kg 67.73 9.20

BETON M3 2.08 551.60

M.O yc coffrage H 2.2 100

SD partiels

SD total

DESIGNATION U QUANTITE COEFFIVIENT K

B.A POUR SEMELLE M3 1 1.33

B.A POUR POTEAU M3 1 2.33

B.A POUR POUTRE M3 1 3.33

MONTANT TOTAL HT

TVA 20%

MONTANT TOTAL TTC


DEB,UNIT

DESIGNATION U QUANTITE

MATERIAUX

9.20

ACIER kg 215.53

551.60

BETON M3 2.08

100

M.O yc coffrage H 2.2 SD partiels

SD total
DEBOURSE SEC

M.O MATERIAUX AUTRES

DEBOURSE SEC
M.O MATERIAUX AUTRES

422.62

46.50

69.14

0.83

12.5

12.5 539.10

551.60

DEBOURSE SEC
M.O MATERIAUX AUTRES
623.07

1146.78

220

220 1769.85

1989.85

DEBOURSE SEC MONTANT TOTAL

1989.85 2646.50

3349.68 7804.75

2719.18 9054.87

19506.12

3901.22

23407.35
DEBOURSE SEC

M.O MATERIAUX AUTRES

1982.91

1146.78

220

220 3129.68

3349.68

Vous aimerez peut-être aussi