Académique Documents
Professionnel Documents
Culture Documents
GENERALITES
DYE PENETRANT/ EXAMINATION
Generalities REPORT
CLIENT / Client SOCOMENIN
PCI-RP-14/01 Review date 20/03/2014 PT: 17781
CLIENT FINAL / Final client ARC
PROCEDURE N°/ Procedure No SOCOMENINI-NDT-PT-00 Date 26/01/2019
NORMES DE REFERENCE / Applicable
API 650 Last Edition
standards
N° DU PLAN / Drawing No -
N° PIECE / Piece No TK105 ROOF NOZZELES
MATIERE / Material A283GR.C
EPAISSEUR / Thickness -
LIEU DE CONTROLE / Examination place TK 105
ETENDUE DE CONTROLE / Extent of
100%
examination
STADE DE CONTROLE / Examination stage AFTER WELDING
Avant T. Thermique / Before PWHT Après T. Thermique / After PWHT Autre / Other
CONDITIONS D'EXAMEN / Examination conditions
ETAT DE SURFACE / Surface treatement BRUT / As weld MEULE / Grinded BROSSE / Brushed SABLE / Sandblasted
NETOYAGE PREALABLE / Previous OUI / Yes NON / No SOLVANT / Cleaner
TEMPS DE SECHAGE/ Drying Time
cleaning EAU/ Water
PRODUIT DE CONTROLE / Control
DP55 D100
PENETRANT/Penetrant REVELATEUR/ Developper SOLVENT/Cleaner eau
product
TYPE D’APPLICATION / Application type PINCEAU / Brush PULVERISATION / Pulverization AUTRES / Others
TYPE DU PENETRANT / penetrant type VISIBLE / Visible FLUORESCENT / Fluorescent
DUREE D’APPLICATION / Application time PENETRANT / Penetrant 15min REVELATEUR / Developper 10min
Without Defaults
de joint/Joint Identification
Date de contrôle / Control date Nom de l’opérateur / Operator name Interprété par / Interprated by Approbation client / Client approval
Observations/Observations
Sans Défauts/
Acceptable Defaults Défauts
Identification