BERITA ACARA HASIL EVALUASI

PEKERJAAN PEMANCANGAN TIANG PANCANG BETON PRATEKAN PRACETAK


PT. JAYA SENTRIKON INDONESIA

Pile Depth Pressure 2 Cylinder


No. Date
Number PCA Ø500 ( m ) PCA Ø500 ( m ) PCA Ø500 ( m ) PCB Ø500 ( m ) Dolly ( m ) ( Mpa ) Ton Meter's
1 7/10/2017 P1.G1 10 10 10 10 0.8 12 93.06 40.8
2 7/11/2017 P1.G2 10 10 10 10 0.7 11 85.31 40.7
3 7/12/2017 P1.G3 10 10 10 10 0.6 12 93.06 40.6
4 7/13/2017 P1.G4 10 10 10 10 0.6 12 93.06 40.6
5 7/14/2017 P1.G5 10 10 10 10 0.5 12 93.06 40.5
6 8/10/2017 P1.H4 10 10 10 10 0.8 13 100.82 40.8
7 8/11/2017 P1.H3 10 10 10 10 0.8 11 85.31 40.8
8 8/12/2017 P1.H2 10 10 10 10 1 12 93.06 41
9 8/13/2017 P1.H1 10 10 10 10 1 14 108.57 41
10 8/14/2017 P1.I1 10 10 10 10 1.1 13 100.82 41.1
11 8/15/2017 P1.I2 10 10 10 10 1.1 14 108.57 41.1
12 8/16/2017 P1.I3 10 10 10 10 1 13 100.82 41
13 8/17/2017 P1.I4 10 10 10 10 1 13 100.82 41
14 8/18/2017 P1.I5 10 10 10 10 1 13 100.82 41
15 8/19/2017 P1.H5 10 10 10 10 1 12 93.06 41
16 9/10/2017 P2.5 10 10 10 10 1 12 93.06 41
17 9/11/2017 P2.4 10 10 10 10 1 12 93.06 41
18 9/12/2017 P2.3 10 10 10 10 1.1 12 93.06 41.1
19 9/13/2017 P2.2 10 10 10 10 1.1 12 93.06 41.1
20 9/14/2017 P2.1 10 10 10 10 1 12 93.06 41
21 10/10/2017 P2.A1 10 10 10 10 1.25 13 100.82 41.25
22 10/11/2017 P2.A2 10 10 10 10 1.2 13 100.82 41.2
23 10/12/2017 P2.A3 10 10 10 10 1.2 12 93.06 41.2
24 10/13/2017 P2.A4 10 10 10 10 1.1 12 93.06 41.1
25 10/14/2017 P2.A5 10 10 10 10 1.1 13 100.82 41.1
26 10/15/2017 P2.B5 10 10 10 10 1 13 100.82 41
27 10/16/2017 P2.B4 10 10 10 10 1.1 13 100.82 41.1
28 10/17/2017 P2.B3 10 10 10 10 1.1 13 100.82 41.1
29 10/18/2017 P2.B2 10 10 10 10 1.2 13 100.82 41.2
30 10/19/2017 P2.B1 10 10 10 10 1.3 13 100.82 41.3

Diketahui, Dibuat oleh,

Anwar, BE Angga Purnama Candra


BERITA ACARA HASIL EVALUASI
PEKERJAAN PEMANCANGAN TIANG PANCANG BETON PRATEKAN PRACETAK
PT. JAYA SENTRIKON INDONESIA

Pile Depth Pressure 2 Cylinder


No. Date
Number PCA Ø500 ( m ) PCA Ø500 ( m ) PCA Ø500 ( m ) PCB Ø500 ( m ) Dolly ( m ) ( Mpa ) Ton Meter's
31 10/20/2017 P2.C1 10 10 10 10 1.2 13 100.82 41.2
32 10/21/2017 P2.C2 10 10 10 10 1.2 13 100.82 41.2
33 11/10/2017 P2.C3 10 10 10 10 1.2 13 100.82 41.2
34 11/11/2017 P2.C4 10 10 10 10 1 12 93.06 41
35 11/12/2017 P2.C5 10 10 10 10 1 12 93.06 41
36 11/13/2017 P1.F1 10 10 10 10 0.7 12 93.06 40.7
37 11/14/2017 P1.F2 10 10 10 10 0.7 12 93.06 40.7
38 11/15/2017 P1.F3 10 10 10 10 0.7 12 93.06 40.7
39 11/16/2017 P1.F4 10 10 10 10 0.6 12 93.06 40.6
40 11/17/2017 P1.F5 10 10 10 10 0.6 12 93.06 40.6
41 11/18/2017 P1.E5 10 10 10 10 0.6 12 93.06 40.6
42 11/19/2017 P1.E4 10 10 10 10 0.7 12 93.06 40.7
43 11/20/2017 P1.E3 10 10 10 10 0.7 12 93.06 40.7
44 12/10/2017 P1.E2 10 10 10 10 0.7 12 93.06 40.7
45 12/11/2017 P1.E1 10 10 10 10 0.7 12 93.06 40.7
46 12/12/2017 P1.D1 10 10 10 10 1 12 93.06 41
47 12/13/2017 P1.D2 10 10 10 10 1 13 100.82 41
48 12/14/2017 P1.D3 10 10 10 10 0.8 12 93.06 40.8
49 12/15/2017 P1.D4 10 10 10 10 0.6 12 93.06 40.6
50 12/16/2017 P1.D5 10 10 10 10 0.55 11 85.31 40.55
51 12/17/2017 P1.C5 10 10 10 10 0.55 12 93.06 40.55
52 12/18/2017 P1.C4 10 10 10 10 0.6 12 93.06 40.6
53 12/19/2017 P1.C3 10 10 10 10 0.65 11 85.31 40.65
54 12/20/2017 P1.C2 10 10 10 10 0.65 12 93.06 40.65
55 13/10/2017 P1.C1 10 10 10 10 0.7 12 93.06 40.7
56 13/10/2018 P1.B1 10 10 10 10 0.45 12 93.06 40.45
57 13/10/2019 P1.B2 10 10 10 10 0.45 12 93.06 40.45
58 13/10/2020 P1.B3 10 10 10 10 0.45 12 93.06 40.45
59 13/10/2021 P1.B4 10 10 10 10 0.4 11 85.31 40.4
60 13/10/2022 P1.B5 10 10 10 10 0.5 12 93.06 40.5

Diketahui, Dibuat oleh,

Anwar, BE Angga Purnama Candra