PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG


BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN 1.2 2.2
Pile Dim. : Ø 30 cm 2.4 3.4

Depth N L/P N >15sand g sat g ' po N Corr 2N N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S
1 8.00 L 8.000 1.701 0.701 0.701 24.992 16 16.00 16.50 46.65 8.00 3.77 3.77 50.42
1.5 9.75 L 9.750 1.701 0.701 1.0515 27.453 19.5 19.50 16.50 46.65 9.75 4.59 8.36 55.02
2.0 7.00 L 7 1.701 0.701 1.402 17.940 14 14.00 15.75 44.53 7.00 3.30 11.66 56.20
2.5 6.75 L 6.75 1.701 0.701 1.7525 15.873 13.5 13.50 15.40 43.54 6.75 3.18 14.84 58.39
3.0 7.00 L 7 1.701 0.701 2.103 15.207 14 14.00 14.90 42.13 7.00 3.30 18.14 60.27
3.5 6.75 L 6.75 1.701 0.701 2.4535 13.627 13.5 13.50 13.26 37.50 6.75 3.18 21.32 58.82
4.0 6.00 L 6 1.701 0.701 2.804 11.312 12 11.31 12.94 36.58 5.66 2.67 23.99 60.57
4.5 7.00 L 7 1.701 0.701 3.1545 12.380 14 12.38 12.57 35.54 6.19 2.92 26.91 62.45
5.0 7.00 L 7 1.701 0.701 3.505 11.657 14 11.66 12.29 34.74 5.83 2.75 29.65 64.39
5.5 8.00 L 8 1.701 0.701 3.8555 12.588 16 12.59 12.57 35.54 6.29 2.97 32.62 68.16
6.0 10.00 L 10 1.701 0.701 4.206 14.912 20 14.91 13.42 37.96 7.46 3.51 36.13 74.09
6.5 11.00 L 11 1.701 0.701 4.5565 15.588 22 15.59 14.19 40.12 7.79 3.67 39.80 79.92
7.0 12.00 L 12 1.701 0.701 4.907 16.201 24 16.20 15.21 43.00 8.10 3.82 43.62 86.63
7.5 13.00 L 13 1.701 0.701 5.2575 16.758 26 16.76 16.15 45.65 8.38 3.95 47.57 93.22
8.0 14.00 L 14 1.701 0.701 5.608 17.267 28 17.27 16.59 46.91 8.63 4.07 51.64 98.55
8.5 14.50 L 14.5 1.701 0.701 5.9585 17.143 29 17.14 16.88 47.72 8.57 4.04 55.68 103.40
9.0 15.00 L 15 1.701 0.701 6.309 17.028 30 17.03 17.02 48.13 8.51 4.01 59.69 107.82
9.5 15.50 L 15.5 1.701 0.701 6.6595 16.922 31 16.92 17.04 48.17 8.46 3.99 63.68 111.85
10.0 16.00 L 16 1.701 0.701 7.01 16.824 32 16.82 16.93 47.87 8.41 3.96 67.64 115.51
10.5 16.50 L 16.5 1.701 0.701 7.3605 16.733 33 16.73 16.88 47.74 8.37 3.94 71.58 119.32
11.0 17.00 L 17 1.701 0.701 7.711 16.911 34 16.91 16.93 47.87 8.46 3.98 75.57 123.44
11.5 17.50 L 17.5 1.701 0.701 8.0615 17.258 35 17.26 17.07 48.25 8.63 4.07 79.64 127.89
12.0 18.00 L 18 1.701 0.701 8.412 17.599 36 17.60 17.29 48.88 8.80 4.15 83.78 132.66
12.5 18.50 L 18.5 1.701 0.701 8.7625 17.934 37 17.93 17.40 49.20 8.97 4.23 88.01 137.21
13.0 18.00 L 18 1.701 0.701 9.113 17.302 36 17.30 17.55 49.61 8.65 4.08 92.08 141.69
13.5 18.50 L 18.5 1.701 0.701 9.4635 17.634 37 17.63 17.88 50.54 8.82 4.16 96.24 146.78
14.0 20.00 L 20 1.701 0.701 9.814 18.906 40 18.91 18.15 51.32 9.45 4.45 100.69 152.02
14.5 20.25 L 20.25 1.701 0.701 10.165 18.985 40.5 18.99 18.47 52.23 9.49 4.47 105.17 157.39
15.0 21.00 L 21 1.701 0.701 10.515 19.528 42 19.53 18.93 53.53 9.76 4.60 109.77 163.29
15.5 21.25 L 21.25 1.701 0.701 10.866 19.601 42.5 19.60 19.25 54.42 9.80 4.62 114.39 168.81
16.0 21.00 L 21 1.701 0.701 11.216 19.215 42 19.21 19.23 54.38 9.61 4.53 118.91 173.29
16.5 20.75 L 20.75 1.701 0.701 11.567 18.835 41.5 18.84 19.22 54.34 9.42 4.44 123.35 177.69
17.0 21.00 L 21 1.701 0.701 11.917 18.912 42 18.91 19.02 53.78 9.46 4.46 127.81 181.59
17.5 20.75 L 20.75 1.701 0.701 12.268 18.540 41.5 18.54 17.23 48.71 9.27 4.37 132.18 180.89
18.0 20.00 P 12 1.701 0.701 12.618 10.639 24 10.64 15.39 43.52 2.13 1.00 133.18 176.70
18.5 19.00 P 11.4 1.701 0.701 12.969 10.029 22.8 10.03 13.30 37.61 2.01 0.95 134.12 171.73
19.0 16.00 P 9.6 1.701 0.701 13.319 8.381 19.2 8.38 12.12 34.26 1.68 0.79 134.91 169.17
19.5 15.00 P 15 1.701 0.701 13.67 12.996 30 13.00 10.06 28.44 2.60 1.22 136.14 164.58
20.0 16.00 P 9.6 1.701 0.701 14.02 8.255 19.2 8.25 9.91 28.03 1.65 0.78 136.92 164.95

530792970.xls
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN 1.2 2.2
Pile Dim. : Ø 30 cm 2.4 3.4

Depth N L/P N >15sand gsat g ' po N Corr 2N N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S

530792970.xls
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN 1.2 2.2
Pile Dim. : Ø 30 cm 2.4 3.4

Depth N L/P N >15sand gsat g ' po N Corr 2N N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)

1 8.00 L 8.000 1.701 0.701 0.701 24.992 16 16.00 16.50 46.65 8.00 3.77 3.77 50.42 16.81
1.5 9.75 L 9.750 1.701 0.701 1.0515 27.453 19.5 19.50 16.50 46.65 9.75 4.59 8.36 55.02 18.34
2.0 7.00 L 7 1.701 0.701 1.402 17.940 14 14.00 15.75 44.53 7.00 3.30 11.66 56.20 18.73
2.5 6.75 L 6.75 1.701 0.701 1.7525 15.873 13.5 13.50 15.40 43.54 6.75 3.18 14.84 58.39 19.46
3.0 7.00 L 7 1.701 0.701 2.103 15.207 14 14.00 14.90 42.13 7.00 3.30 18.14 60.27 20.09
3.5 6.75 L 6.75 1.701 0.701 2.4535 13.627 13.5 13.50 13.26 37.50 6.75 3.18 21.32 58.82 19.61
4.0 6.00 L 6 1.701 0.701 2.804 11.312 12 11.31 12.94 36.58 5.66 2.67 23.99 60.57 20.19
4.5 7.00 L 7 1.701 0.701 3.1545 12.380 14 12.38 12.57 35.54 6.19 2.92 26.91 62.45 20.82
5.0 7.00 L 7 1.701 0.701 3.505 11.657 14 11.66 12.29 34.74 5.83 2.75 29.65 64.39 21.46
5.5 8.00 L 8 1.701 0.701 3.8555 12.588 16 12.59 12.57 35.54 6.29 2.97 32.62 68.16 22.72
6.0 10.00 L 10 1.701 0.701 4.206 14.912 20 14.91 13.42 37.96 7.46 3.51 36.13 74.09 24.70
6.5 11.00 L 11 1.701 0.701 4.5565 15.588 22 15.59 14.19 40.12 7.79 3.67 39.80 79.92 26.64
7.0 12.00 L 12 1.701 0.701 4.907 16.201 24 16.20 15.21 43.00 8.10 3.82 43.62 86.63 28.88
7.5 13.00 L 13 1.701 0.701 5.2575 16.758 26 16.76 16.15 45.65 8.38 3.95 47.57 93.22 31.07
8.0 14.00 L 14 1.701 0.701 5.608 17.267 28 17.27 16.59 46.91 8.63 4.07 51.64 98.55 32.85
8.5 14.50 L 14.5 1.701 0.701 5.9585 17.143 29 17.14 16.88 47.72 8.57 4.04 55.68 103.40 34.47
9.0 15.00 L 15 1.701 0.701 6.309 17.028 30 17.03 17.02 48.13 8.51 4.01 59.69 107.82 35.94
9.5 15.50 L 15.5 1.701 0.701 6.6595 16.922 31 16.92 17.04 48.17 8.46 3.99 63.68 111.85 37.28
10.0 16.00 L 16 1.701 0.701 7.01 16.824 32 16.82 16.93 47.87 8.41 3.96 67.64 115.51 38.50
10.5 16.50 L 16.5 1.701 0.701 7.3605 16.733 33 16.73 16.88 47.74 8.37 3.94 71.58 119.32 39.77
11.0 17.00 L 17 1.701 0.701 7.711 16.911 34 16.91 16.93 47.87 8.46 3.98 75.57 123.44 41.15
11.5 17.50 L 17.5 1.701 0.701 8.0615 17.258 35 17.26 17.07 48.25 8.63 4.07 79.64 127.89 42.63
12.0 18.00 L 18 1.701 0.701 8.412 17.599 36 17.60 17.29 48.88 8.80 4.15 83.78 132.66 44.22
12.5 18.50 L 18.5 1.701 0.701 8.7625 17.934 37 17.93 17.40 49.20 8.97 4.23 88.01 137.21 45.74
13.0 18.00 L 18 1.701 0.701 9.113 17.302 36 17.30 17.55 49.61 8.65 4.08 92.08 141.69 47.23
13.5 18.50 L 18.5 1.701 0.701 9.4635 17.634 37 17.63 17.88 50.54 8.82 4.16 96.24 146.78 48.93
14.0 20.00 L 20 1.701 0.701 9.814 18.906 40 18.91 18.15 51.32 9.45 4.45 100.69 152.02 50.67
14.5 20.25 L 20.25 1.701 0.701 10.165 18.985 40.5 18.99 18.47 52.23 9.49 4.47 105.17 157.39 52.46
15.0 21.00 L 21 1.701 0.701 10.515 19.528 42 19.53 18.93 53.53 9.76 4.60 109.77 163.29 54.43
15.5 21.25 L 21.25 1.701 0.701 10.866 19.601 42.5 19.60 19.25 54.42 9.80 4.62 114.39 168.81 56.27
16.0 21.00 L 21 1.701 0.701 11.216 19.215 42 19.21 19.23 54.38 9.61 4.53 118.91 173.29 57.76
16.5 20.75 L 20.75 1.701 0.701 11.567 18.835 41.5 18.84 19.22 54.34 9.42 4.44 123.35 177.69 59.23
17.0 21.00 L 21 1.701 0.701 11.917 18.912 42 18.91 19.02 53.78 9.46 4.46 127.81 181.59 60.53
17.5 20.75 L 20.75 1.701 0.701 12.268 18.540 41.5 18.54 17.23 48.71 9.27 4.37 132.18 180.89 60.30
18.0 20.00 P 12 1.701 0.701 12.618 10.639 24 10.64 15.39 43.52 2.13 1.00 133.18 176.70 58.90
18.5 19.00 P 11.4 1.701 0.701 12.969 10.029 22.8 10.03 13.30 37.61 2.01 0.95 134.12 171.73 57.24
19.0 16.00 P 9.6 1.701 0.701 13.319 8.381 19.2 8.38 12.12 34.26 1.68 0.79 134.91 169.17 56.39
19.5 15.00 P 15 1.701 0.701 13.67 12.996 30 13.00 10.06 28.44 2.60 1.22 136.14 164.58 54.86
20.0 16.00 P 9.6 1.701 0.701 14.02 8.255 19.2 8.25 9.91 28.03 1.65 0.78 136.92 164.95 54.98

530792970.xls
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN 1.2 2.2
Pile Dim. : Ø 30 cm 2.4 3.4

Depth N L/P N >15sand gsat g ' po N Corr 2N N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)

530792970.xls
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 20 x 20 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
1 8 L 8 1.701 0.701 0.3505 16.00 17.75 28.40 8.00 3.20 3.20 31.60
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 16.50 26.40 9.75 3.90 7.10 33.50
2 7 L 7 1.701 0.701 1.0515 14.00 15.75 25.20 7.00 2.80 9.90 35.10 11.70
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.40 24.64 6.75 2.70 12.60 37.24 12.41
3 7 L 7 1.701 0.701 1.7525 14.00 14.90 23.84 7.00 2.80 15.40 39.24 13.08
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 13.40 21.44 6.75 2.70 18.10 39.54 13.18
4 6 L 6 1.701 0.701 2.4535 12.00 13.24 21.18 6.00 2.40 20.50 41.68 13.89
4.5 7 L 7 1.701 0.701 2.804 13.20 13.02 20.82 6.60 2.64 23.14 43.96 14.65
5 7 L 7 1.701 0.701 3.1545 12.38 12.88 20.61 6.19 2.48 25.62 46.22 15.41
5.5 8 L 8 1.701 0.701 3.505 13.32 13.33 21.32 6.66 2.66 28.28 49.60 16.53
6 10 L 10 1.701 0.701 3.8555 15.73 14.21 22.73 7.87 3.15 31.43 54.16 18.05
6.5 11 L 11 1.701 0.701 4.206 16.40 14.97 23.95 8.20 3.28 34.71 58.66 19.55
7 12 L 12 1.701 0.701 4.5565 17.01 16.00 25.61 8.50 3.40 38.11 63.71 21.24
7.5 13 L 13 1.701 0.701 4.907 17.55 16.95 27.12 8.78 3.51 41.62 68.74 22.91
8 14 L 14 1.701 0.701 5.2575 18.05 17.38 27.80 9.02 3.61 45.23 73.03 24.34
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.64 28.23 8.94 3.58 48.80 77.04 25.68
9 15 L 15 1.701 0.701 5.9585 17.73 17.76 28.42 8.87 3.55 52.35 80.77 26.92
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.75 28.39 8.80 3.52 55.87 84.26 28.09
10 16 L 16 1.701 0.701 6.6595 17.47 17.61 28.17 8.73 3.49 59.36 87.53 29.18
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.48 27.96 8.68 3.47 62.83 90.80 30.27
11 17 L 17 1.701 0.701 7.3605 17.24 17.41 27.86 8.62 3.45 66.28 94.14 31.38
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.44 27.91 8.70 3.48 69.76 97.67 32.56
12 18 L 18 1.701 0.701 8.0615 17.75 17.57 28.11 8.88 3.55 73.31 101.42 33.81
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.59 28.14 9.04 3.62 76.93 105.07 35.02
13 18 L 18 1.701 0.701 8.7625 17.45 17.70 28.31 8.72 3.49 80.42 108.73 36.24
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.03 28.84 8.89 3.56 83.98 112.82 37.61
14 20 L 20 1.701 0.701 9.4635 19.06 18.31 29.29 9.53 3.81 87.79 117.08 39.03
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.63 29.80 9.57 3.83 91.62 121.42 40.47
15 21 L 21 1.701 0.701 10.165 19.69 19.09 30.54 9.84 3.94 95.56 126.10 42.03
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.41 31.05 9.88 3.95 99.51 130.56 43.52
16 21 L 21 1.701 0.701 10.866 19.37 19.39 31.02 9.69 3.87 103.38 134.41 44.80
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.37 31.00 9.49 3.80 107.18 138.18 46.06
17 21 L 21 1.701 0.701 11.567 19.06 19.17 30.68 9.53 3.81 110.99 141.67 47.22
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 17.37 27.78 9.34 3.74 114.73 142.52 47.51
18 20 P 12 1.701 0.701 12.268 10.72 15.51 24.82 2.14 0.86 115.59 140.41 46.80
18.5 19 P 11.4 1.701 0.701 12.618 10.11 13.40 21.45 2.02 0.81 116.40 137.84 45.95
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 20 x 20 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
19 16 P 9.6 1.701 0.701 12.969 8.45 12.21 19.54 1.69 0.68 117.07 136.61 45.54
19.5 15 P 15 1.701 0.701 13.319 13.10 10.14 16.22 2.62 1.05 118.12 134.34 44.78
20 16 P 9.6 1.701 0.701 13.67 8.32 9.99 15.99 1.66 0.67 118.79 134.77 44.92
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 25 x 25 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
1 8 L 8 1.701 0.701 0.3505 16.00 16.50 41.25 8.00 4.00 4.00 45.25
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 39.38 9.75 4.88 8.88 48.25
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 38.50 7.00 3.50 12.38 50.88 16.96
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 37.71 6.75 3.38 15.75 53.46 17.82
3 7 L 7 1.701 0.701 1.7525 14.00 14.64 36.61 7.00 3.50 19.25 55.86 18.62
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.24 35.61 6.75 3.38 22.63 58.23 19.41
4 6 L 6 1.701 0.701 2.4535 12.00 13.23 33.06 6.00 3.00 25.63 58.69 19.56
4.5 7 L 7 1.701 0.701 2.804 13.20 13.13 32.82 6.60 3.30 28.92 61.75 20.58
5 7 L 7 1.701 0.701 3.1545 12.38 13.45 33.62 6.19 3.09 32.02 65.64 21.88
5.5 8 L 8 1.701 0.701 3.505 13.32 13.79 34.48 6.66 3.33 35.35 69.83 23.28
6 10 L 10 1.701 0.701 3.8555 15.73 14.29 35.73 7.87 3.93 39.28 75.01 25.00
6.5 11 L 11 1.701 0.701 4.206 16.40 15.08 37.71 8.20 4.10 43.38 81.10 27.03
7 12 L 12 1.701 0.701 4.5565 17.01 15.78 39.44 8.50 4.25 47.64 87.08 29.03
7.5 13 L 13 1.701 0.701 4.907 17.55 16.56 41.41 8.78 4.39 52.02 93.43 31.14
8 14 L 14 1.701 0.701 5.2575 18.05 17.19 42.99 9.02 4.51 56.54 99.52 33.17
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.46 43.65 8.94 4.47 61.01 104.66 34.89
9 15 L 15 1.701 0.701 5.9585 17.73 17.61 44.03 8.87 4.43 65.44 109.47 36.49
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.66 44.15 8.80 4.40 69.84 113.99 38.00
10 16 L 16 1.701 0.701 6.6595 17.47 17.62 44.04 8.73 4.37 74.21 118.25 39.42
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.53 43.81 8.68 4.34 78.54 122.36 40.79
11 17 L 17 1.701 0.701 7.3605 17.24 17.51 43.77 8.62 4.31 82.85 126.62 42.21
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 43.89 8.70 4.35 87.21 131.10 43.70
12 18 L 18 1.701 0.701 8.0615 17.75 17.54 43.84 8.88 4.44 91.64 135.48 45.16
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.58 43.95 9.04 4.52 96.16 140.12 46.71
13 18 L 18 1.701 0.701 8.7625 17.45 17.83 44.57 8.72 4.36 100.53 145.09 48.36
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.10 45.24 8.89 4.45 104.97 150.22 50.07
14 20 L 20 1.701 0.701 9.4635 19.06 18.42 46.06 9.53 4.77 109.74 155.80 51.93
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.71 46.78 9.57 4.79 114.52 161.30 53.77
15 21 L 21 1.701 0.701 10.165 19.69 18.89 47.24 9.84 4.92 119.45 166.68 55.56
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.11 47.78 9.88 4.94 124.39 172.17 57.39
16 21 L 21 1.701 0.701 10.866 19.37 19.30 48.24 9.69 4.84 129.23 177.47 59.16
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.24 48.11 9.49 4.75 133.98 182.08 60.69
17 21 L 21 1.701 0.701 11.567 19.06 18.04 45.10 9.53 4.77 138.74 183.84 61.28
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.67 41.68 9.34 4.67 143.41 185.09 61.70
18 20 P 12 1.701 0.701 12.268 10.72 15.05 37.64 2.14 1.07 144.49 182.12 60.71
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.16 35.39 2.02 1.01 145.50 180.89 60.30
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 25 x 25 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
19 16 P 9.6 1.701 0.701 12.969 8.45 12.63 31.58 1.69 0.84 146.34 177.92 59.31
19.5 15 P 15 1.701 0.701 13.319 13.10 11.56 28.91 2.62 1.31 147.65 176.56 58.85
20 16 P 9.6 1.701 0.701 13.67 8.32 10.14 25.34 1.66 0.83 148.48 173.82 57.94
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 30 x 30 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
1 8 L 8 1.701 0.701 0.3505 16.00 15.75 56.70 8.00 4.80 4.80 61.50
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.40 55.44 9.75 5.85 10.65 66.09
2 7 L 7 1.701 0.701 1.0515 14.00 15.08 54.30 7.00 4.20 14.85 69.15 23.05
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 14.64 52.71 6.75 4.05 18.90 71.61 23.87
3 7 L 7 1.701 0.701 1.7525 14.00 14.46 52.06 7.00 4.20 23.10 75.16 25.05
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.23 51.23 6.75 4.05 27.15 78.38 26.13
4 6 L 6 1.701 0.701 2.4535 12.00 13.93 50.16 6.00 3.60 30.75 80.91 26.97
4.5 7 L 7 1.701 0.701 2.804 13.20 13.51 48.65 6.60 3.96 34.71 83.36 27.79
5 7 L 7 1.701 0.701 3.1545 12.38 13.78 49.61 6.19 3.71 38.42 88.04 29.35
5.5 8 L 8 1.701 0.701 3.505 13.32 14.17 51.02 6.66 4.00 42.42 93.44 31.15
6 10 L 10 1.701 0.701 3.8555 15.73 14.57 52.44 7.87 4.72 47.14 99.58 33.19
6.5 11 L 11 1.701 0.701 4.206 16.40 15.07 54.26 8.20 4.92 52.06 106.32 35.44
7 12 L 12 1.701 0.701 4.5565 17.01 15.72 56.61 8.50 5.10 57.16 113.77 37.92
7.5 13 L 13 1.701 0.701 4.907 17.55 16.23 58.42 8.78 5.27 62.43 120.85 40.28
8 14 L 14 1.701 0.701 5.2575 18.05 16.81 60.51 9.02 5.41 67.84 128.35 42.78
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.27 62.17 8.94 5.37 73.21 135.38 45.13
9 15 L 15 1.701 0.701 5.9585 17.73 17.45 62.82 8.87 5.32 78.53 141.34 47.11
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.54 63.15 8.80 5.28 83.81 146.96 48.99
10 16 L 16 1.701 0.701 6.6595 17.47 17.59 63.31 8.73 5.24 89.05 152.36 50.79
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.61 63.39 8.68 5.21 94.25 157.64 52.55
11 17 L 17 1.701 0.701 7.3605 17.24 17.61 63.41 8.62 5.17 99.42 162.83 54.28
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 63.23 8.70 5.22 104.65 167.88 55.96
12 18 L 18 1.701 0.701 8.0615 17.75 17.57 63.25 8.88 5.33 109.97 173.22 57.74
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.73 63.84 9.04 5.43 115.40 179.24 59.75
13 18 L 18 1.701 0.701 8.7625 17.45 17.92 64.51 8.72 5.23 120.63 185.14 61.71
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.18 65.45 8.89 5.33 125.97 191.41 63.80
14 20 L 20 1.701 0.701 9.4635 19.06 18.46 66.45 9.53 5.72 131.69 198.14 66.05
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.68 67.24 9.57 5.74 137.43 204.67 68.22
15 21 L 21 1.701 0.701 10.165 19.69 18.81 67.73 9.84 5.91 143.34 211.07 70.36
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 18.92 68.12 9.88 5.93 149.26 217.39 72.46
16 21 L 21 1.701 0.701 10.866 19.37 19.06 68.62 9.69 5.81 155.08 223.69 74.56
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 18.28 65.79 9.49 5.70 160.77 226.56 75.52
17 21 L 21 1.701 0.701 11.567 19.06 17.28 62.21 9.53 5.72 166.49 228.70 76.23
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.09 57.93 9.34 5.61 172.10 230.03 76.68
18 20 P 12 1.701 0.701 12.268 10.72 15.36 55.29 2.14 1.29 173.38 228.68 76.23
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.09 50.72 2.02 1.21 174.60 225.31 75.10
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 30 x 30 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3; (ton)
19 16 P 9.6 1.701 0.701 12.969 8.45 13.43 48.34 1.69 1.01 175.61 223.95 74.65
19.5 15 P 15 1.701 0.701 13.319 13.10 12.63 45.48 2.62 1.57 177.18 222.66 74.22
20 16 P 9.6 1.701 0.701 13.67 8.32 11.56 41.62 1.66 1.00 178.18 219.80 73.27
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 40 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)

1 8 L 8 1.701 0.701 0.3505 16.00 17.75 89.22 8.00 5.03 5.03 94.25
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 16.50 82.94 9.75 6.13 11.15 94.09
2 7 L 7 1.701 0.701 1.0515 14.00 15.75 79.17 7.00 4.40 15.55 94.72 31.57
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.40 77.41 6.75 4.24 19.79 97.20 32.40
3 7 L 7 1.701 0.701 1.7525 14.00 14.90 74.90 7.00 4.40 24.19 99.09 33.03
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 13.40 67.36 6.75 4.24 28.43 95.79 31.93
4 6 L 6 1.701 0.701 2.4535 12.00 13.24 66.55 6.00 3.77 32.20 98.75 32.92
4.5 7 L 7 1.701 0.701 2.804 13.20 13.02 65.42 6.60 4.15 36.35 101.77 33.92
5 7 L 7 1.701 0.701 3.1545 12.38 12.88 64.74 6.19 3.89 40.24 104.98 34.99
5.5 8 L 8 1.701 0.701 3.505 13.32 13.33 66.99 6.66 4.19 44.42 111.41 37.14
6 10 L 10 1.701 0.701 3.8555 15.73 14.21 71.41 7.87 4.94 49.37 120.78 40.26
6.5 11 L 11 1.701 0.701 4.206 16.40 14.97 75.24 8.20 5.15 54.52 129.76 43.25
7 12 L 12 1.701 0.701 4.5565 17.01 16.00 80.44 8.50 5.34 59.86 140.30 46.77
7.5 13 L 13 1.701 0.701 4.907 17.55 16.95 85.19 8.78 5.51 65.37 150.57 50.19
8 14 L 14 1.701 0.701 5.2575 18.05 17.38 87.35 9.02 5.67 71.04 158.40 52.80
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.64 88.69 8.94 5.62 76.66 165.35 55.12
9 15 L 15 1.701 0.701 5.9585 17.73 17.76 89.28 8.87 5.57 82.23 171.52 57.17
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.75 89.20 8.80 5.53 87.76 176.96 58.99
10 16 L 16 1.701 0.701 6.6595 17.47 17.61 88.50 8.73 5.49 93.25 181.75 60.58
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.48 87.85 8.68 5.45 98.70 186.55 62.18
11 17 L 17 1.701 0.701 7.3605 17.24 17.41 87.52 8.62 5.42 104.12 191.64 63.88
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.44 87.68 8.70 5.47 109.59 197.27 65.76
12 18 L 18 1.701 0.701 8.0615 17.75 17.57 88.30 8.88 5.58 115.16 203.47 67.82
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.59 88.40 9.04 5.68 120.84 209.25 69.75
13 18 L 18 1.701 0.701 8.7625 17.45 17.70 88.95 8.72 5.48 126.33 215.27 71.76
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.03 90.61 8.89 5.59 131.91 222.53 74.18
14 20 L 20 1.701 0.701 9.4635 19.06 18.31 92.01 9.53 5.99 137.90 229.91 76.64
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.63 93.62 9.57 6.01 143.92 237.54 79.18
15 21 L 21 1.701 0.701 10.165 19.69 19.09 95.95 9.84 6.19 150.10 246.05 82.02
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.41 97.54 9.88 6.21 156.31 253.85 84.62
16 21 L 21 1.701 0.701 10.866 19.37 19.39 97.46 9.69 6.09 162.39 259.86 86.62
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.37 97.38 9.49 5.96 168.36 265.74 88.58
17 21 L 21 1.701 0.701 11.567 19.06 19.17 96.37 9.53 5.99 174.35 270.72 90.24
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 17.37 87.29 9.34 5.87 180.22 267.51 89.17
18 20 P 12 1.701 0.701 12.268 10.72 15.51 77.98 2.14 1.35 181.57 259.54 86.51
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 40 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)
18.5 19 P 11.4 1.701 0.701 12.618 10.11 13.40 67.38 2.02 1.27 182.84 250.21 83.40
19 16 P 9.6 1.701 0.701 12.969 8.45 12.21 61.38 1.69 1.06 183.90 245.28 81.76
19.5 15 P 15 1.701 0.701 13.319 13.10 10.14 50.96 2.62 1.65 185.54 236.50 78.83
20 16 P 9.6 1.701 0.701 13.67 8.32 9.99 50.22 1.66 1.05 186.59 236.81 78.94
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 40 x 40 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)

1 8 L 8 1.701 0.701 0.3505 16.00 17.75 113.60 8.00 6.40 6.40 120.00
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 16.50 105.60 9.75 7.80 14.20 119.80
2 7 L 7.000 1.701 0.701 1.0515 14.00 15.75 100.80 7.00 5.60 19.80 120.60 40.20
2.5 6.75 L 6.75 1.521 0.521 1.312 13.50 15.40 98.56 6.75 5.40 25.20 123.76 41.25
3 7 L 7 1.521 0.521 1.5725 14.00 14.90 95.36 7.00 5.60 30.80 126.16 42.05
3.5 6.75 L 6.75 1.701 0.701 1.923 13.50 13.40 85.76 6.75 5.40 36.20 121.96 40.65
4 6 L 6 1.701 0.701 2.2735 12.00 13.33 85.33 6.00 4.80 41.00 126.33 42.11
4.5 7 L 7 1.701 0.701 2.624 13.66 13.19 84.41 6.83 5.46 46.46 130.88 43.63
5 7 L 7 1.701 0.701 2.9745 12.79 13.14 84.07 6.39 5.11 51.58 135.65 45.22
5.5 8 L 8 1.701 0.701 3.325 13.73 13.67 87.52 6.87 5.49 57.07 144.59 48.20
6 10 L 10 1.701 0.701 3.6755 16.19 14.65 93.73 8.10 6.48 63.55 157.28 52.43
6.5 11 L 11 1.701 0.701 4.026 16.86 15.40 98.59 8.43 6.74 70.29 168.88 56.29
7 12 L 12 1.701 0.701 4.3765 17.45 16.44 105.24 8.73 6.98 77.27 182.52 60.84
7.5 13 L 13 1.701 0.701 4.727 17.99 17.39 111.31 8.99 7.20 84.47 195.78 65.26
8 14 L 14 1.701 0.701 5.0775 18.48 17.81 114.00 9.24 7.39 91.86 205.85 68.62
8.5 14.5 L 14.5 1.701 0.701 5.428 18.29 18.06 115.61 9.14 7.32 99.17 214.79 71.60
9 15 L 15 1.701 0.701 5.7785 18.12 18.17 116.27 9.06 7.25 106.42 222.69 74.23
9.5 15.5 L 15.5 1.701 0.701 6.129 17.96 18.13 116.05 8.98 7.19 113.61 229.66 76.55
10 16 L 16 1.701 0.701 6.4795 17.82 17.97 115.04 8.91 7.13 120.73 235.77 78.59
10.5 16.5 L 16.5 1.701 0.701 6.83 17.68 17.83 114.11 8.84 7.07 127.81 241.92 80.64
11 17 L 17 1.701 0.701 7.1805 17.56 17.70 113.30 8.78 7.02 134.83 248.13 82.71
11.5 17.5 L 17.5 1.701 0.701 7.531 17.49 17.68 113.13 8.74 6.99 141.83 254.95 84.98
12 18 L 18 1.701 0.701 7.8815 17.83 17.75 113.57 8.91 7.13 148.96 262.53 87.51
12.5 18.5 L 18.5 1.701 0.701 8.232 18.17 17.71 113.37 9.08 7.27 156.23 269.60 89.87
13 18 L 18 1.701 0.701 8.5825 17.53 17.77 113.75 8.76 7.01 163.24 276.99 92.33
13.5 18.5 L 18.5 1.701 0.701 8.933 17.86 18.11 115.88 8.93 7.14 170.38 286.26 95.42
14 20 L 20 1.701 0.701 9.2835 19.15 18.38 117.66 9.57 7.66 178.04 295.70 98.57
14.5 20.25 L 20.25 1.701 0.701 9.634 19.22 18.71 119.72 9.61 7.69 185.73 305.44 101.81
15 21 L 21 1.701 0.701 9.9845 19.77 19.17 122.68 9.89 7.91 193.64 316.32 105.44
15.5 21.25 L 21.25 1.701 0.701 10.335 19.84 19.49 124.72 9.92 7.94 201.57 326.29 108.76
16 21 L 21 1.701 0.701 10.686 19.45 19.47 124.62 9.73 7.78 209.36 333.97 111.32
16.5 20.75 L 20.75 1.701 0.701 11.036 19.06 19.45 124.51 9.53 7.63 216.98 341.49 113.83
17 21 L 21 1.701 0.701 11.387 19.14 19.25 123.22 9.57 7.66 224.64 347.85 115.95
17.5 20.75 L 20.75 1.701 0.701 11.737 18.76 17.44 111.60 9.38 7.51 232.14 343.74 114.58
18 20 P 12 1.701 0.701 12.088 10.77 15.58 99.69 2.15 1.72 233.86 333.55 111.18
18.5 19 P 11.4 1.701 0.701 12.438 10.15 13.46 86.14 2.03 1.62 235.49 321.63 107.21
19 16 P 9.6 1.701 0.701 12.789 8.48 12.26 78.47 1.70 1.36 236.84 315.31 105.10
19.5 15 P 15 1.701 0.701 13.139 13.15 10.18 65.14 2.63 2.10 238.95 304.08 101.36
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : 40 x 40 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)
20 16 P 9.6 1.701 0.701 13.49 8.35 10.03 64.20 1.67 1.34 240.28 304.48 101.49
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 45 cm

Depth N L/P N >15sand g sat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S
1 8 L 8 1.701 0.701 0.3505 16.00 16.50 104.97 8.00 5.65 5.65 110.62
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 100.20 9.75 6.89 12.55 112.74
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 97.97 7.00 4.95 17.49 115.47
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 95.96 6.75 4.77 22.27 118.22
3 7 L 7 1.701 0.701 1.7525 14.00 14.42 91.71 7.00 4.95 27.21 118.93
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 13.37 85.03 6.75 4.77 31.99 117.02
4 6 L 6 1.701 0.701 2.4535 12.00 13.10 83.31 6.00 4.24 36.23 119.54
4.5 7 L 7 1.701 0.701 2.804 13.20 13.07 83.13 6.60 4.66 40.89 124.02
5 7 L 7 1.701 0.701 3.1545 12.38 13.36 84.96 6.19 4.38 45.27 130.23
5.5 8 L 8 1.701 0.701 3.505 13.32 13.84 88.04 6.66 4.71 49.97 138.02
6 10 L 10 1.701 0.701 3.8555 15.73 14.67 93.35 7.87 5.56 55.54 148.89
6.5 11 L 11 1.701 0.701 4.206 16.40 15.40 97.97 8.20 5.80 61.33 159.30
7 12 L 12 1.701 0.701 4.5565 17.01 16.34 103.98 8.50 6.01 67.34 171.32
7.5 13 L 13 1.701 0.701 4.907 17.55 17.10 108.81 8.78 6.20 73.55 182.36
8 14 L 14 1.701 0.701 5.2575 18.05 17.44 110.93 9.02 6.38 79.92 190.86
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.64 112.20 8.94 6.32 86.25 198.44
9 15 L 15 1.701 0.701 5.9585 17.73 17.71 112.69 8.87 6.27 92.51 205.20
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.68 112.47 8.80 6.22 98.73 211.21
10 16 L 16 1.701 0.701 6.6595 17.47 17.55 111.62 8.73 6.17 104.91 216.52
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.47 111.11 8.68 6.13 111.04 222.15
11 17 L 17 1.701 0.701 7.3605 17.24 17.47 111.13 8.62 6.09 117.13 228.26
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.55 111.65 8.70 6.15 123.28 234.94
12 18 L 18 1.701 0.701 8.0615 17.75 17.55 111.63 8.88 6.27 129.56 241.19
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.62 112.09 9.04 6.39 135.95 248.04
13 18 L 18 1.701 0.701 8.7625 17.45 17.92 114.03 8.72 6.17 142.12 256.14
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.21 115.87 8.89 6.28 148.40 264.27
14 20 L 20 1.701 0.701 9.4635 19.06 18.54 117.92 9.53 6.74 155.14 273.06
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.81 119.69 9.57 6.77 161.91 281.60
15 21 L 21 1.701 0.701 10.165 19.69 19.13 121.73 9.84 6.96 168.86 290.59
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.34 123.01 9.88 6.98 175.85 298.85
16 21 L 21 1.701 0.701 10.866 19.37 19.34 123.00 9.69 6.85 182.69 305.70
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.26 122.52 9.49 6.71 189.40 311.92
17 21 L 21 1.701 0.701 11.567 19.06 17.76 113.01 9.53 6.74 196.14 309.15
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.16 102.78 9.34 6.60 202.75 305.52
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 45 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S
18 20 P 12 1.701 0.701 12.268 10.72 14.33 91.19 2.14 1.52 204.26 295.46
18.5 19 P 11.4 1.701 0.701 12.618 10.11 13.35 84.95 2.02 1.43 205.69 290.64
19 16 P 9.6 1.701 0.701 12.969 8.45 11.56 73.56 1.69 1.19 206.88 280.44
19.5 15 P 15 1.701 0.701 13.319 13.10 10.14 64.49 2.62 1.85 208.74 273.23
20 16 P 9.6 1.701 0.701 13.67 8.32 9.99 63.56 1.66 1.18 209.91 273.47

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
g sat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selimut
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih + 1-2 meter
PANCANG
RHOF DAN BAZARA

Qijin = Qult/SF
SF=3 ; (ton)

38.49
39.41
39.64
39.01
39.85
41.34
43.41
46.01
49.63
53.10
57.11
60.79
63.62
66.15
68.40
70.40
72.17
74.05
76.09
78.31
80.40
82.68
85.38
88.09
91.02
93.87
96.86
99.62
101.90
103.97
103.05
101.84
PANCANG
RHOF DAN BAZARA

Qijin = Qult/SF
SF=3 ; (ton)
98.49
96.88
93.48
91.08
91.16

meter panjang selimut

ya selisih + 1-2 meter


TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BA
DIAMETER
Bor No. : BH-1 Depth. Increment : 0.5
45 Project : PEMBANGUNAN PABRIK GULA
360 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
180 Pile Dim. : 45 x 45 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi

(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton)

1 8 L 8 1.701 0.701 0.3505 16.00 16.50 133.65 8.00 7.20 7.20


1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 127.58 9.75 8.78 15.98
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 124.74 7.00 6.30 22.28
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 122.18 6.75 6.08 28.35
3 7 L 7 1.701 0.701 1.7525 14.00 14.42 116.78 7.00 6.30 34.65
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 13.37 108.27 6.75 6.08 40.73
4 6 L 6 1.701 0.701 2.4535 12.00 13.10 106.08 6.00 5.40 46.13
4.5 7 L 7 1.701 0.701 2.804 13.20 13.07 105.84 6.60 5.94 52.06
5 7 L 7 1.701 0.701 3.1545 12.38 13.36 108.18 6.19 5.57 57.63
5.5 8 L 8 1.701 0.701 3.505 13.32 13.84 112.10 6.66 6.00 63.63
6 10 L 10 1.701 0.701 3.8555 15.73 14.67 118.86 7.87 7.08 70.71
6.5 11 L 11 1.701 0.701 4.206 16.40 15.40 124.73 8.20 7.38 78.09
7 12 L 12 1.701 0.701 4.5565 17.01 16.34 132.39 8.50 7.65 85.74
7.5 13 L 13 1.701 0.701 4.907 17.55 17.10 138.54 8.78 7.90 93.64
8 14 L 14 1.701 0.701 5.2575 18.05 17.44 141.24 9.02 8.12 101.76
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.64 142.85 8.94 8.05 109.81
9 15 L 15 1.701 0.701 5.9585 17.73 17.71 143.48 8.87 7.98 117.79
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.68 143.21 8.80 7.92 125.71
10 16 L 16 1.701 0.701 6.6595 17.47 17.55 142.12 8.73 7.86 133.57
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.47 141.48 8.68 7.81 141.38
11 17 L 17 1.701 0.701 7.3605 17.24 17.47 141.50 8.62 7.76 149.14
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.55 142.16 8.70 7.83 156.97
12 18 L 18 1.701 0.701 8.0615 17.75 17.55 142.14 8.88 7.99 164.96
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.62 142.72 9.04 8.14 173.10
13 18 L 18 1.701 0.701 8.7625 17.45 17.92 145.18 8.72 7.85 180.95
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.21 147.52 8.89 8.00 188.95
14 20 L 20 1.701 0.701 9.4635 19.06 18.54 150.14 9.53 8.58 197.53
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.81 152.40 9.57 8.61 206.14
15 21 L 21 1.701 0.701 10.165 19.69 19.13 154.99 9.84 8.86 215.00
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.34 156.62 9.88 8.89 223.90
16 21 L 21 1.701 0.701 10.866 19.37 19.34 156.61 9.69 8.72 232.61
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.26 156.00 9.49 8.54 241.16
17 21 L 21 1.701 0.701 11.567 19.06 17.76 143.89 9.53 8.58 249.73
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.16 130.86 9.34 8.41 258.14
18 20 P 12 1.701 0.701 12.268 10.72 14.33 116.11 2.14 1.93 260.07
18.5 19 P 11.4 1.701 0.701 12.618 10.11 13.35 108.16 2.02 1.82 261.89
19 16 P 9.6 1.701 0.701 12.969 8.45 11.56 93.65 1.69 1.52 263.41
19.5 15 P 15 1.701 0.701 13.319 13.10 10.14 82.11 2.62 2.36 265.77
20 16 P 9.6 1.701 0.701 13.67 8.32 9.99 80.93 1.66 1.50 267.27

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
gsat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selim
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
AN) TIANG PANCANG
LA MAYEERHOF DAN BAZARA

Qult = Qujung + Qijin = Qult/SF


S SF=3 ; (ton)

140.85
143.55
147.02 49.01
150.53 50.18
151.43 50.48
148.99 49.66
152.20 50.73
157.90 52.63
165.82 55.27
175.73 58.58
189.57 63.19
202.83 67.61
218.13 72.71
232.19 77.40
243.01 81.00
252.66 84.22
261.27 87.09
268.91 89.64
275.69 91.90
282.85 94.28
290.63 96.88
299.13 99.71
307.09 102.36
315.82 105.27
326.13 108.71
336.48 112.16
347.67 115.89
358.54 119.51
370.00 123.33
380.51 126.84
389.23 129.74
397.15 132.38
393.63 131.21
389.00 129.67
376.19 125.40
370.05 123.35
357.07 119.02
347.88 115.96
348.19 116.06

corr rata-rata ujung tiang


aya dukung tiang
aya lekatan per-satuan luas
aya lekatan per-meter panjang selimut

ujung + S Rsi
aya dukung ijin

lapangan biasanya selisih + 1-2 meter


TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 50 cm

Depth N L/P N >15sand g sat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)
1 8 L 8 1.701 0.701 0.3505 16.00 16.50 129.59 8.00 6.28 6.28 135.87
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 123.70 9.75 7.66 13.94 137.64
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 120.95 7.00 5.50 19.44 140.39 46.80
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 118.46 6.75 5.30 24.74 143.20 47.73
3 7 L 7 1.701 0.701 1.7525 14.00 14.64 115.00 7.00 5.50 30.24 145.24 48.41
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.24 111.86 6.75 5.30 35.54 147.40 49.13
4 6 L 6 1.701 0.701 2.4535 12.00 13.23 103.87 6.00 4.71 40.25 144.12 48.04
4.5 7 L 7 1.701 0.701 2.804 13.20 13.13 103.11 6.60 5.18 45.43 148.55 49.52
5 7 L 7 1.701 0.701 3.1545 12.38 13.45 105.62 6.19 4.86 50.30 155.91 51.97
5.5 8 L 8 1.701 0.701 3.505 13.32 13.79 108.31 6.66 5.23 55.53 163.84 54.61
6 10 L 10 1.701 0.701 3.8555 15.73 14.29 112.25 7.87 6.18 61.71 173.95 57.98
6.5 11 L 11 1.701 0.701 4.206 16.40 15.08 118.48 8.20 6.44 68.15 186.62 62.21
7 12 L 12 1.701 0.701 4.5565 17.01 15.78 123.92 8.50 6.68 74.83 198.74 66.25
7.5 13 L 13 1.701 0.701 4.907 17.55 16.56 130.09 8.78 6.89 81.72 211.81 70.60
8 14 L 14 1.701 0.701 5.2575 18.05 17.19 135.04 9.02 7.09 88.81 223.85 74.62
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.46 137.13 8.94 7.02 95.83 232.96 77.65
9 15 L 15 1.701 0.701 5.9585 17.73 17.61 138.33 8.87 6.96 102.79 241.12 80.37
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.66 138.71 8.80 6.91 109.70 248.41 82.80
10 16 L 16 1.701 0.701 6.6595 17.47 17.62 138.36 8.73 6.86 116.56 254.92 84.97
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.53 137.65 8.68 6.81 123.37 261.02 87.01
11 17 L 17 1.701 0.701 7.3605 17.24 17.51 137.50 8.62 6.77 130.15 267.64 89.21
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 137.89 8.70 6.84 136.98 274.88 91.63
12 18 L 18 1.701 0.701 8.0615 17.75 17.54 137.73 8.88 6.97 143.95 281.68 93.89
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.58 138.08 9.04 7.10 151.06 289.14 96.38
13 18 L 18 1.701 0.701 8.7625 17.45 17.83 140.01 8.72 6.85 157.91 297.91 99.30
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.10 142.14 8.89 6.98 164.89 307.03 102.34
14 20 L 20 1.701 0.701 9.4635 19.06 18.42 144.70 9.53 7.49 172.38 317.08 105.69
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.71 146.95 9.57 7.52 179.89 326.85 108.95
15 21 L 21 1.701 0.701 10.165 19.69 18.89 148.39 9.84 7.73 187.63 336.02 112.01
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.11 150.12 9.88 7.76 195.39 345.50 115.17
16 21 L 21 1.701 0.701 10.866 19.37 19.30 151.55 9.69 7.61 202.99 354.55 118.18
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.24 151.13 9.49 7.46 210.45 361.58 120.53
17 21 L 21 1.701 0.701 11.567 19.06 18.04 141.68 9.53 7.49 217.93 359.62 119.87
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.67 130.93 9.34 7.34 225.27 356.20 118.73
18 20 P 12 1.701 0.701 12.268 10.72 15.05 118.24 2.14 1.68 226.96 345.19 115.06
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.16 111.19 2.02 1.59 228.54 339.74 113.25
19 16 P 9.6 1.701 0.701 12.969 8.45 12.63 99.22 1.69 1.33 229.87 329.09 109.70
19.5 15 P 15 1.701 0.701 13.319 13.10 11.56 90.81 2.62 2.06 231.93 322.74 107.58
20 16 P 9.6 1.701 0.701 13.67 8.32 10.14 79.62 1.66 1.31 233.23 312.85 104.28
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 50 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)
Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
g sat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selimut
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih + 1-2 meter
TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BA
DIAMETER
Bor No. : BH-1 Depth. Increment : 0.5
50 Project : PEMBANGUNAN PABRIK GULA
400 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
200 Pile Dim. : 50 x 50 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi

(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton)

1 8 L 8 1.701 0.701 0.3505 16.00 16.50 165.00 8.00 8.00 8.00


1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 157.50 9.75 9.75 17.75
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 154.00 7.00 7.00 24.75
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 150.83 6.75 6.75 31.50
3 7 L 7 1.701 0.701 1.7525 14.00 14.64 146.43 7.00 7.00 38.50
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.24 142.43 6.75 6.75 45.25
4 6 L 6 1.701 0.701 2.4535 12.00 13.23 132.25 6.00 6.00 51.25
4.5 7 L 7 1.701 0.701 2.804 13.20 13.13 131.28 6.60 6.60 57.85
5 7 L 7 1.701 0.701 3.1545 12.38 13.45 134.48 6.19 6.19 64.04
5.5 8 L 8 1.701 0.701 3.505 13.32 13.79 137.91 6.66 6.66 70.70
6 10 L 10 1.701 0.701 3.8555 15.73 14.29 142.92 7.87 7.87 78.57
6.5 11 L 11 1.701 0.701 4.206 16.40 15.08 150.85 8.20 8.20 86.77
7 12 L 12 1.701 0.701 4.5565 17.01 15.78 157.78 8.50 8.50 95.27
7.5 13 L 13 1.701 0.701 4.907 17.55 16.56 165.64 8.78 8.78 104.05
8 14 L 14 1.701 0.701 5.2575 18.05 17.19 171.94 9.02 9.02 113.07
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.46 174.60 8.94 8.94 122.01
9 15 L 15 1.701 0.701 5.9585 17.73 17.61 176.12 8.87 8.87 130.88
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.66 176.61 8.80 8.80 139.68
10 16 L 16 1.701 0.701 6.6595 17.47 17.62 176.17 8.73 8.73 148.41
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.53 175.26 8.68 8.68 157.09
11 17 L 17 1.701 0.701 7.3605 17.24 17.51 175.07 8.62 8.62 165.71
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 175.57 8.70 8.70 174.41
12 18 L 18 1.701 0.701 8.0615 17.75 17.54 175.36 8.88 8.88 183.29
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.58 175.81 9.04 9.04 192.33
13 18 L 18 1.701 0.701 8.7625 17.45 17.83 178.26 8.72 8.72 201.05
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.10 180.98 8.89 8.89 209.95
14 20 L 20 1.701 0.701 9.4635 19.06 18.42 184.24 9.53 9.53 219.48
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.71 187.11 9.57 9.57 229.05
15 21 L 21 1.701 0.701 10.165 19.69 18.89 188.94 9.84 9.84 238.89
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.11 191.14 9.88 9.88 248.77
16 21 L 21 1.701 0.701 10.866 19.37 19.30 192.96 9.69 9.69 258.46
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.24 192.42 9.49 9.49 267.95
17 21 L 21 1.701 0.701 11.567 19.06 18.04 180.39 9.53 9.53 277.48
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.67 166.71 9.34 9.34 286.83
18 20 P 12 1.701 0.701 12.268 10.72 15.05 150.54 2.14 2.14 288.97
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.16 141.58 2.02 2.02 290.99
19 16 P 9.6 1.701 0.701 12.969 8.45 12.63 126.34 1.69 1.69 292.68
19.5 15 P 15 1.701 0.701 13.319 13.10 11.56 115.62 2.62 2.62 295.30
20 16 P 9.6 1.701 0.701 13.67 8.32 10.14 101.37 1.66 1.66 296.96

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
gsat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selim
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
AN) TIANG PANCANG
LA MAYEERHOF DAN BAZARA

Qult = Qujung + Qijin = Qult/SF


S SF=3 ; (ton)

173.00
175.25
178.75 59.58
182.33 60.78
184.93 61.64
187.68 62.56
183.50 61.17
189.13 63.04
198.52 66.17
208.61 69.54
221.48 73.83
237.62 79.21
253.05 84.35
269.69 89.90
285.01 95.00
296.61 98.87
307.00 102.33
316.29 105.43
324.58 108.19
332.34 110.78
340.77 113.59
349.98 116.66
358.65 119.55
368.14 122.71
379.32 126.44
390.92 130.31
403.71 134.57
416.16 138.72
427.83 142.61
439.91 146.64
451.42 150.47
460.38 153.46
457.88 152.63
453.53 151.18
439.51 146.50
432.57 144.19
419.02 139.67
410.92 136.97
398.34 132.78

corr rata-rata ujung tiang


aya dukung tiang
aya lekatan per-satuan luas
aya lekatan per-meter panjang selimut

ujung + S Rsi
aya dukung ijin

lapangan biasanya selisih + 1-2 meter


TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 60 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S
1 8 L 8 1.701 0.701 0.3505 16.00 16.50 186.61 8.00 7.54 7.54 194.15
1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 178.13 9.75 9.19 16.73 194.86
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 174.17 7.00 6.60 23.33 197.50
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 170.59 6.75 6.36 29.69 200.28
3 7 L 7 1.701 0.701 1.7525 14.00 14.64 165.61 7.00 6.60 36.29 201.89
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.24 161.08 6.75 6.36 42.65 203.73
4 6 L 6 1.701 0.701 2.4535 12.00 13.23 149.57 6.00 5.65 48.30 197.88
4.5 7 L 7 1.701 0.701 2.804 13.20 13.13 148.48 6.60 6.22 54.52 203.00
5 7 L 7 1.701 0.701 3.1545 12.38 13.45 152.09 6.19 5.83 60.35 212.44
5.5 8 L 8 1.701 0.701 3.505 13.32 13.79 155.97 6.66 6.28 66.63 222.61
6 10 L 10 1.701 0.701 3.8555 15.73 14.29 161.64 7.87 7.41 74.05 235.68
6.5 11 L 11 1.701 0.701 4.206 16.40 15.08 170.60 8.20 7.73 81.78 252.38
7 12 L 12 1.701 0.701 4.5565 17.01 15.78 178.44 8.50 8.01 89.79 268.23
7.5 13 L 13 1.701 0.701 4.907 17.55 16.56 187.33 8.78 8.27 98.06 285.39
8 14 L 14 1.701 0.701 5.2575 18.05 17.19 194.46 9.02 8.50 106.57 301.03
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.46 197.47 8.94 8.43 114.99 312.46
9 15 L 15 1.701 0.701 5.9585 17.73 17.61 199.19 8.87 8.36 123.35 322.54
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.66 199.74 8.80 8.29 131.64 331.39
10 16 L 16 1.701 0.701 6.6595 17.47 17.62 199.24 8.73 8.23 139.87 339.12
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.53 198.21 8.68 8.18 148.05 346.26
11 17 L 17 1.701 0.701 7.3605 17.24 17.51 198.00 8.62 8.12 156.17 354.17
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 198.57 8.70 8.20 164.38 362.95
12 18 L 18 1.701 0.701 8.0615 17.75 17.54 198.33 8.88 8.36 172.74 371.07
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.58 198.84 9.04 8.52 181.27 380.11
13 18 L 18 1.701 0.701 8.7625 17.45 17.83 201.61 8.72 8.22 189.49 391.10
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.10 204.68 8.89 8.38 197.87 402.55
14 20 L 20 1.701 0.701 9.4635 19.06 18.42 208.37 9.53 8.98 206.85 415.22
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.71 211.61 9.57 9.02 215.87 427.49
15 21 L 21 1.701 0.701 10.165 19.69 18.89 213.69 9.84 9.28 225.15 438.84
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.11 216.17 9.88 9.31 234.46 450.63
16 21 L 21 1.701 0.701 10.866 19.37 19.30 218.24 9.69 9.13 243.59 461.83
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.24 217.63 9.49 8.95 252.54 470.16
17 21 L 21 1.701 0.701 11.567 19.06 18.04 204.02 9.53 8.98 261.52 465.54
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.67 188.54 9.34 8.81 270.33 458.87
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-1 Depth. Increment : 0.5 m


Project : PEMBANGUNAN PABRIK GULA
Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
Pile Dim. : Ø 60 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung +
(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S
18 20 P 12 1.701 0.701 12.268 10.72 15.05 170.26 2.14 2.02 272.35 442.61
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.16 160.12 2.02 1.91 274.25 434.37
19 16 P 9.6 1.701 0.701 12.969 8.45 12.63 142.88 1.69 1.59 275.85 418.73
19.5 15 P 15 1.701 0.701 13.319 13.10 11.56 130.77 2.62 2.47 278.31 409.08
20 16 P 9.6 1.701 0.701 13.67 8.32 10.14 114.65 1.66 1.57 279.88 394.53

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
gsat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selimut
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih + 1-2 meter
PANCANG
RHOF DAN BAZARA

Qijin = Qult/SF
SF=3 ; (ton)

65.83
66.76
67.30
67.91
65.96
67.67
70.81
74.20
78.56
84.13
89.41
95.13
100.34
104.15
107.51
110.46
113.04
115.42
118.06
120.98
123.69
126.70
130.37
134.18
138.41
142.50
146.28
150.21
153.94
156.72
155.18
152.96
PANCANG
RHOF DAN BAZARA

Qijin = Qult/SF
SF=3 ; (ton)
147.54
144.79
139.58
136.36
131.51

meter panjang selimut

ya selisih + 1-2 meter


TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BA
DIAMETER
Bor No. : BH-1 Depth. Increment : 0.5
60 Project : PEMBANGUNAN PABRIK GULA
480 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
240 Pile Dim. : 60 x 60 cm

Depth N L/P N >15sand gsat g ' po N Corr N rata2 ujung Qujung fsi Rsi S Rsi

(m) (blow/ft) (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton)

1 8 L 8 1.701 0.701 0.3505 16.00 16.50 237.60 8.00 9.60 9.60


1.5 9.75 L 9.75 1.701 0.701 0.701 19.50 15.75 226.80 9.75 11.70 21.30
2 7 L 7 1.701 0.701 1.0515 14.00 15.40 221.76 7.00 8.40 29.70
2.5 6.75 L 6.75 1.701 0.701 1.402 13.50 15.08 217.20 6.75 8.10 37.80
3 7 L 7 1.701 0.701 1.7525 14.00 14.64 210.86 7.00 8.40 46.20
3.5 6.75 L 6.75 1.701 0.701 2.103 13.50 14.24 205.09 6.75 8.10 54.30
4 6 L 6 1.701 0.701 2.4535 12.00 13.23 190.44 6.00 7.20 61.50
4.5 7 L 7 1.701 0.701 2.804 13.20 13.13 189.05 6.60 7.92 69.42
5 7 L 7 1.701 0.701 3.1545 12.38 13.45 193.65 6.19 7.43 76.85
5.5 8 L 8 1.701 0.701 3.505 13.32 13.79 198.59 6.66 7.99 84.84
6 10 L 10 1.701 0.701 3.8555 15.73 14.29 205.80 7.87 9.44 94.28
6.5 11 L 11 1.701 0.701 4.206 16.40 15.08 217.22 8.20 9.84 104.12
7 12 L 12 1.701 0.701 4.5565 17.01 15.78 227.20 8.50 10.20 114.33
7.5 13 L 13 1.701 0.701 4.907 17.55 16.56 238.52 8.78 10.53 124.86
8 14 L 14 1.701 0.701 5.2575 18.05 17.19 247.59 9.02 10.83 135.68
8.5 14.5 L 14.5 1.701 0.701 5.608 17.88 17.46 251.42 8.94 10.73 146.41
9 15 L 15 1.701 0.701 5.9585 17.73 17.61 253.61 8.87 10.64 157.05
9.5 15.5 L 15.5 1.701 0.701 6.309 17.60 17.66 254.32 8.80 10.56 167.61
10 16 L 16 1.701 0.701 6.6595 17.47 17.62 253.68 8.73 10.48 178.09
10.5 16.5 L 16.5 1.701 0.701 7.01 17.35 17.53 252.37 8.68 10.41 188.50
11 17 L 17 1.701 0.701 7.3605 17.24 17.51 252.10 8.62 10.34 198.85
11.5 17.5 L 17.5 1.701 0.701 7.711 17.41 17.56 252.83 8.70 10.44 209.29
12 18 L 18 1.701 0.701 8.0615 17.75 17.54 252.52 8.88 10.65 219.94
12.5 18.5 L 18.5 1.701 0.701 8.412 18.09 17.58 253.17 9.04 10.85 230.80
13 18 L 18 1.701 0.701 8.7625 17.45 17.83 256.70 8.72 10.47 241.26
13.5 18.5 L 18.5 1.701 0.701 9.113 17.78 18.10 260.61 8.89 10.67 251.93
14 20 L 20 1.701 0.701 9.4635 19.06 18.42 265.30 9.53 11.44 263.37
14.5 20.25 L 20.25 1.701 0.701 9.814 19.14 18.71 269.44 9.57 11.49 274.86
15 21 L 21 1.701 0.701 10.165 19.69 18.89 272.07 9.84 11.81 286.67
15.5 21.25 L 21.25 1.701 0.701 10.515 19.76 19.11 275.24 9.88 11.86 298.53
16 21 L 21 1.701 0.701 10.866 19.37 19.30 277.87 9.69 11.62 310.15
16.5 20.75 L 20.75 1.701 0.701 11.216 18.99 19.24 277.09 9.49 11.39 321.54
17 21 L 21 1.701 0.701 11.567 19.06 18.04 259.77 9.53 11.44 332.98
17.5 20.75 L 20.75 1.701 0.701 11.917 18.69 16.67 240.06 9.34 11.21 344.19
18 20 P 12 1.701 0.701 12.268 10.72 15.05 216.78 2.14 2.57 346.76
18.5 19 P 11.4 1.701 0.701 12.618 10.11 14.16 203.87 2.02 2.43 349.19
19 16 P 9.6 1.701 0.701 12.969 8.45 12.63 181.92 1.69 2.03 351.22
19.5 15 P 15 1.701 0.701 13.319 13.10 11.56 166.50 2.62 3.14 354.36
20 16 P 9.6 1.701 0.701 13.67 8.32 10.14 145.98 1.66 2.00 356.36

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung = N corr rata-rata ujung tiang
L/P = Lempung / Pasir P ujung = Daya dukung tiang
N >15sand = Koreksi N>15 untuk lapisan pasir fsi = Daya lekatan per-satuan luas
gsat = Berat volume tanah jenuh Rsi = Daya lekatan per-meter panjang selim
g ' = Berat volume tanah effektif S Rsi = Kumulatif Rsi
po = Overburden pressure Pult = P ujung + S Rsi
N Corr = N terkoreksi Pijin = Daya dukung ijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
AN) TIANG PANCANG
LA MAYEERHOF DAN BAZARA

Qult = Qujung + Qijin = Qult/SF


S SF=3 ; (ton)

247.20
248.10
251.46 83.82
255.00 85.00
257.06 85.69
259.39 86.46
251.94 83.98
258.47 86.16
270.49 90.16
283.43 94.48
300.08 100.03
321.34 107.11
341.52 113.84
363.38 121.13
383.28 127.76
397.84 132.61
410.67 136.89
421.94 140.65
431.78 143.93
440.87 146.96
450.94 150.31
462.12 154.04
472.47 157.49
483.97 161.32
497.96 165.99
512.54 170.85
528.67 176.22
544.29 181.43
558.75 186.25
573.76 191.25
588.02 196.01
598.63 199.54
592.75 197.58
584.25 194.75
563.54 187.85
553.06 184.35
533.14 177.71
520.86 173.62
502.33 167.44

corr rata-rata ujung tiang


aya dukung tiang
aya lekatan per-satuan luas
aya lekatan per-meter panjang selimut

ujung + S Rsi
aya dukung ijin

lapangan biasanya selisih + 1-2 meter


TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIA
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MA
DIAMETER
Bor No. : BH-1
80 Project : PEMBANGUNAN PABRIK GULA
640 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
320 Pile Dim. : Ø 80 cm

Depth N L/P N >15sand gsat g ' po N Corr N Corr


(m) (blow/ft) (t/m3) (t/m3) (ton/m2)

1 8 L 8 1.701 0.701 0.3505 28.065 16.00


1.5 9.75 L 9.75 1.701 0.701 0.701 30.459 19.50
2 7 L 7 1.701 0.701 1.0515 19.710 14.00
2.5 6.75 L 6.75 1.701 0.701 1.402 17.299 13.50
3 7 L 7 1.701 0.701 1.7525 16.461 14.00
3.5 6.75 L 6.75 1.701 0.701 2.103 14.664 13.50
4 6 L 6 1.701 0.701 2.4535 12.113 12.00
4.5 7 L 7 1.701 0.701 2.804 13.198 13.20
5 7 L 7 1.701 0.701 3.1545 12.380 12.38
5.5 8 L 8 1.701 0.701 3.505 13.322 13.32
6 10 L 10 1.701 0.701 3.8555 15.734 15.73
6.5 11 L 11 1.701 0.701 4.206 16.403 16.40
7 12 L 12 1.701 0.701 4.5565 17.006 17.01
7.5 13 L 13 1.701 0.701 4.907 17.551 17.55
8 14 L 14 1.701 0.701 5.2575 18.047 18.05
8.5 14.5 L 14.5 1.701 0.701 5.608 17.884 17.88
9 15 L 15 1.701 0.701 5.9585 17.734 17.73
9.5 15.5 L 15.5 1.701 0.701 6.309 17.596 17.60
10 16 L 16 1.701 0.701 6.6595 17.468 17.47
10.5 16.5 L 16.5 1.701 0.701 7.01 17.350 17.35
11 17 L 17 1.701 0.701 7.3605 17.241 17.24
11.5 17.5 L 17.5 1.701 0.701 7.711 17.408 17.41
12 18 L 18 1.701 0.701 8.0615 17.751 17.75
12.5 18.5 L 18.5 1.701 0.701 8.412 18.088 18.09
13 18 L 18 1.701 0.701 8.7625 17.449 17.45
13.5 18.5 L 18.5 1.701 0.701 9.113 17.783 17.78
14 20 L 20 1.701 0.701 9.4635 19.064 19.06
14.5 20.25 L 20.25 1.701 0.701 9.814 19.143 19.14
15 21 L 21 1.701 0.701 10.1645 19.688 19.69
15.5 21.25 L 21.25 1.701 0.701 10.515 19.761 19.76
16 21 L 21 1.701 0.701 10.8655 19.370 19.37
16.5 20.75 L 20.75 1.701 0.701 11.216 18.986 18.99
17 21 L 21 1.701 0.701 11.5665 19.062 19.06
17.5 20.75 L 20.75 1.701 0.701 11.917 18.687 18.69
18 20 P 12 1.701 0.701 12.2675 10.722 10.72
18.5 19 P 11.4 1.701 0.701 12.618 10.107 10.11
19 16 P 9.6 1.701 0.701 12.9685 8.445 8.45
19.5 15 P 15 1.701 0.701 13.319 13.095 13.10
20 16 P 9.6 1.701 0.701 13.6695 8.317 8.32

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan
L/P = Lempung / Pasir
N >15sand = Koreksi N>15 untuk lapisan pasir
gsat = Berat volume tanah jenuh
g ' = Berat volume tanah effektif
po = Overburden pressure
N Corr = N terkoreksi

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
ABEL
IN (AKSIAL-TEKAN) TIANG PANCANG
OR, DGN FORMULA MAYEERHOF DAN BAZARA

Depth. Increment : 0.5 m

N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(ton) (ton/m2) (ton) (ton) S SF=3 ; (ton)

16.50 331.75 8.00 10.05 10.05 341.81


15.75 316.67 9.75 12.25 22.31 338.98
15.40 309.64 7.00 8.80 31.10 340.74 113.58
15.08 303.27 6.75 8.48 39.58 342.85 114.28
14.64 294.41 7.00 8.80 48.38 342.79 114.26
14.24 286.36 6.75 8.48 56.86 343.23 114.41
13.23 265.91 6.00 7.54 64.40 330.31 110.10
13.13 263.96 6.60 8.29 72.69 336.66 112.22
13.45 270.38 6.19 7.78 80.47 350.85 116.95
13.79 277.28 6.66 8.37 88.84 366.13 122.04
14.29 287.35 7.87 9.89 98.73 386.08 128.69
15.08 303.30 8.20 10.31 109.04 412.33 137.44
15.78 317.23 8.50 10.68 119.72 436.95 145.65
16.56 333.04 8.78 11.03 130.75 463.79 154.60
17.19 345.71 9.02 11.34 142.09 487.80 162.60
17.46 351.05 8.94 11.24 153.32 504.38 168.13
17.61 354.11 8.87 11.14 164.47 518.58 172.86
17.66 355.10 8.80 11.06 175.52 530.62 176.87
17.62 354.21 8.73 10.98 186.50 540.71 180.24
17.53 352.38 8.68 10.90 197.40 549.78 183.26
17.51 351.99 8.62 10.83 208.23 560.23 186.74
17.56 353.01 8.70 10.94 219.17 572.18 190.73
17.54 352.59 8.88 11.15 230.32 582.91 194.30
17.58 353.49 9.04 11.36 241.69 595.18 198.39
17.83 358.42 8.72 10.96 252.65 611.07 203.69
18.10 363.88 8.89 11.17 263.83 627.71 209.24
18.42 370.43 9.53 11.98 275.80 646.23 215.41
18.71 376.20 9.57 12.03 287.83 664.03 221.34
18.89 379.89 9.84 12.37 300.20 680.09 226.70
19.11 384.30 9.88 12.42 312.62 696.92 232.31
19.30 387.98 9.69 12.17 324.79 712.76 237.59
19.24 386.89 9.49 11.93 336.72 723.61 241.20
18.04 362.70 9.53 11.98 348.70 711.40 237.13
16.67 335.18 9.34 11.74 360.44 695.62 231.87
15.05 302.68 2.14 2.69 363.13 665.81 221.94
14.16 284.66 2.02 2.54 365.67 650.33 216.78
12.63 254.01 1.69 2.12 367.79 621.81 207.27
11.56 232.47 2.62 3.29 371.08 603.56 201.19
10.14 203.82 1.66 2.09 373.18 577.00 192.33

N rata2 ujung = N corr rata-rata ujung tiang


P ujung = Daya dukung tiang
fsi = Daya lekatan per-satuan luas
Rsi = Daya lekatan per-meter panjang selimut
S Rsi = Kumulatif Rsi
Pult = P ujung + S Rsi
Pijin = Daya dukung ijin

angan biasanya selisih + 1-2 meter


TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKA
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMUL
DIAMETER
Bor No. : BH-1
100 Project : PEMBANGUNAN PABRIK GULA
800 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
400 Pile Dim. : Ø 100 cm

Depth N L/P N >15sand gsat g ' po N Corr


(m) (blow/ft) (t/m3) (t/m3) (ton/m2)

1 8 L 8 1.701 0.701 0.3505 28.065


1.5 9.75 L 9.75 1.701 0.701 0.701 30.459
2 7 L 7 1.701 0.701 1.0515 19.710
2.5 6.75 L 6.75 1.701 0.701 1.402 17.299
3 7 L 7 1.701 0.701 1.7525 16.461
3.5 6.75 L 6.75 1.701 0.701 2.103 14.664
4 6 L 6 1.701 0.701 2.4535 12.113
4.5 7 L 7 1.701 0.701 2.804 13.198
5 7 L 7 1.701 0.701 3.1545 12.380
5.5 8 L 8 1.701 0.701 3.505 13.322
6 10 L 10 1.701 0.701 3.8555 15.734
6.5 11 L 11 1.701 0.701 4.206 16.403
7 12 L 12 1.701 0.701 4.5565 17.006
7.5 13 L 13 1.701 0.701 4.907 17.551
8 14 L 14 1.701 0.701 5.2575 18.047
8.5 14.5 L 14.5 1.701 0.701 5.608 17.884
9 15 L 15 1.701 0.701 5.9585 17.734
9.5 15.5 L 15.5 1.701 0.701 6.309 17.596
10 16 L 16 1.701 0.701 6.6595 17.468
10.5 16.5 L 16.5 1.701 0.701 7.01 17.350
11 17 L 17 1.701 0.701 7.3605 17.241
11.5 17.5 L 17.5 1.701 0.701 7.711 17.408
12 18 L 18 1.701 0.701 8.0615 17.751
12.5 18.5 L 18.5 1.701 0.701 8.412 18.088
13 18 L 18 1.701 0.701 8.7625 17.449
13.5 18.5 L 18.5 1.701 0.701 9.113 17.783
14 20 L 20 1.701 0.701 9.4635 19.064
14.5 20.25 L 20.25 1.701 0.701 9.814 19.143
15 21 L 21 1.701 0.701 10.1645 19.688
15.5 21.25 L 21.25 1.701 0.701 10.515 19.761
16 21 L 21 1.701 0.701 10.8655 19.370
16.5 20.75 L 20.75 1.701 0.701 11.216 18.986
17 21 L 21 1.701 0.701 11.5665 19.062
17.5 20.75 L 20.75 1.701 0.701 11.917 18.687
18 20 P 12 1.701 0.701 12.2675 10.722
18.5 19 P 11.4 1.701 0.701 12.618 10.107
19 16 P 9.6 1.701 0.701 12.9685 8.445
19.5 15 P 15 1.701 0.701 13.319 13.095
20 16 P 9.6 1.701 0.701 13.6695 8.317

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan
L/P = Lempung / Pasir
N >15sand = Koreksi N>15 untuk lapisan pasir
gsat = Berat volume tanah jenuh
g ' = Berat volume tanah effektif
po = Overburden pressure
N Corr = N terkoreksi

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
TABEL
UKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
N DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Depth. Increment : 0.5 m

N Corr N rata2 ujung Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF
(ton) (ton/m2) (ton) (ton) SF=3 ; (ton)

16.00 16.50 518.36 8.00 12.57 12.57 530.93


19.50 15.75 494.80 9.75 15.32 27.88 522.68
14.00 15.40 483.81 7.00 11.00 38.88 522.68 174.23
13.50 15.08 473.86 6.75 10.60 49.48 523.34 174.45
14.00 14.64 460.02 7.00 11.00 60.48 520.49 173.50
13.50 14.24 447.44 6.75 10.60 71.08 518.52 172.84
12.00 13.23 415.49 6.00 9.42 80.50 495.99 165.33
13.20 13.13 412.44 6.60 10.37 90.87 503.31 167.77
12.38 13.45 422.47 6.19 9.72 100.59 523.06 174.35
13.32 13.79 433.26 6.66 10.46 111.05 544.31 181.44
15.73 14.29 448.99 7.87 12.36 123.41 572.40 190.80
16.40 15.08 473.90 8.20 12.88 136.30 610.20 203.40
17.01 15.78 495.67 8.50 13.36 149.65 645.32 215.11
17.55 16.56 520.37 8.78 13.78 163.44 683.81 227.94
18.05 17.19 540.17 9.02 14.17 177.61 717.78 239.26
17.88 17.46 548.52 8.94 14.05 191.66 740.18 246.73
17.73 17.61 553.30 8.87 13.93 205.58 758.88 252.96
17.60 17.66 554.85 8.80 13.82 219.40 774.25 258.08
17.47 17.62 553.45 8.73 13.72 233.12 786.58 262.19
17.35 17.53 550.59 8.68 13.63 246.75 797.34 265.78
17.24 17.51 549.99 8.62 13.54 260.29 810.28 270.09
17.41 17.56 551.58 8.70 13.67 273.96 825.54 275.18
17.75 17.54 550.92 8.88 13.94 287.90 838.83 279.61
18.09 17.58 552.33 9.04 14.21 302.11 854.44 284.81
17.45 17.83 560.03 8.72 13.70 315.82 875.84 291.95
17.78 18.10 568.56 8.89 13.97 329.78 898.35 299.45
19.06 18.42 578.80 9.53 14.97 344.75 923.55 307.85
19.14 18.71 587.82 9.57 15.03 359.79 947.61 315.87
19.69 18.89 593.57 9.84 15.46 375.25 968.83 322.94
19.76 19.11 600.47 9.88 15.52 390.77 991.24 330.41
19.37 19.30 606.21 9.69 15.21 405.99 1012.20 337.40
18.99 19.24 604.52 9.49 14.91 420.90 1025.41 341.80
19.06 18.04 566.73 9.53 14.97 435.87 1002.59 334.20
18.69 16.67 523.72 9.34 14.68 450.55 974.27 324.76
10.72 15.05 472.94 2.14 3.37 453.91 926.86 308.95
10.11 14.16 444.78 2.02 3.18 457.09 901.87 300.62
8.45 12.63 396.90 1.69 2.65 459.74 856.64 285.55
13.10 11.56 363.24 2.62 4.11 463.86 827.09 275.70
8.32 10.14 318.47 1.66 2.61 466.47 784.94 261.65

N rata2 ujung = N corr rata-rata ujung tiang


P ujung = Daya dukung tiang
fsi = Daya lekatan per-satuan luas
Rsi = Daya lekatan per-meter panjang selimut
S Rsi = Kumulatif Rsi
Pult = P ujung + S Rsi
Pijin = Daya dukung ijin

di lapangan biasanya selisih + 1-2 meter


TABEL
DIISI PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIA
UTK GANTI BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAY
DIAMETER
Bor No. : BH-1 Depth. Increment
120 Project : PEMBANGUNAN PABRIK GULA
960 Location : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN
480 Pile Dim. : Ø 120 cm

Depth N L/P N >15sand gsat g ' po N Corr N Corr N rata2 ujung


(m) (blow/ft) (t/m3) (t/m3) (ton/m2)

1 8 L 8 1.701 0.701 0.3505 28.065 16.00 16.50


1.5 9.75 L 9.75 1.701 0.701 0.701 30.459 19.50 15.75
2 7 L 7 1.701 0.701 1.0515 19.710 14.00 15.40
2.5 6.75 L 6.75 1.701 0.701 1.402 17.299 13.50 15.08
3 7 L 7 1.701 0.701 1.7525 16.461 14.00 14.64
3.5 6.75 L 6.75 1.701 0.701 2.103 14.664 13.50 14.24
4 6 L 6 1.701 0.701 2.4535 12.113 12.00 13.23
4.5 7 L 7 1.701 0.701 2.804 13.198 13.20 13.13
5 7 L 7 1.701 0.701 3.1545 12.380 12.38 13.45
5.5 8 L 8 1.701 0.701 3.505 13.322 13.32 13.79
6 10 L 10 1.701 0.701 3.8555 15.734 15.73 14.29
6.5 11 L 11 1.701 0.701 4.206 16.403 16.40 15.08
7 12 L 12 1.701 0.701 4.5565 17.006 17.01 15.78
7.5 13 L 13 1.701 0.701 4.907 17.551 17.55 16.56
8 14 L 14 1.701 0.701 5.2575 18.047 18.05 17.19
8.5 14.5 L 14.5 1.701 0.701 5.608 17.884 17.88 17.46
9 15 L 15 1.701 0.701 5.9585 17.734 17.73 17.61
9.5 15.5 L 15.5 1.701 0.701 6.309 17.596 17.60 17.66
10 16 L 16 1.701 0.701 6.6595 17.468 17.47 17.62
10.5 16.5 L 16.5 1.701 0.701 7.01 17.350 17.35 17.53
11 17 L 17 1.701 0.701 7.3605 17.241 17.24 17.51
11.5 17.5 L 17.5 1.701 0.701 7.711 17.408 17.41 17.56
12 18 L 18 1.701 0.701 8.0615 17.751 17.75 17.54
12.5 18.5 L 18.5 1.701 0.701 8.412 18.088 18.09 17.58
13 18 L 18 1.701 0.701 8.7625 17.449 17.45 17.83
13.5 18.5 L 18.5 1.701 0.701 9.113 17.783 17.78 18.10
14 20 L 20 1.701 0.701 9.4635 19.064 19.06 18.42
14.5 20.25 L 20.25 1.701 0.701 9.814 19.143 19.14 18.71
15 21 L 21 1.701 0.701 10.1645 19.688 19.69 18.89
15.5 21.25 L 21.25 1.701 0.701 10.515 19.761 19.76 19.11
16 21 L 21 1.701 0.701 10.8655 19.370 19.37 19.30
16.5 20.75 L 20.75 1.701 0.701 11.216 18.986 18.99 19.24
17 21 L 21 1.701 0.701 11.5665 19.062 19.06 18.04
17.5 20.75 L 20.75 1.701 0.701 11.917 18.687 18.69 16.67
18 20 P 12 1.701 0.701 12.2675 10.722 10.72 15.05
18.5 19 P 11.4 1.701 0.701 12.618 10.107 10.11 14.16
19 16 P 9.6 1.701 0.701 12.9685 8.445 8.45 12.63
19.5 15 P 15 1.701 0.701 13.319 13.095 13.10 11.56
20 16 P 9.6 1.701 0.701 13.6695 8.317 8.32 10.14

Keterangan :
*) Pijin = Pujung/3 + S Rsi/3
N = Harga SPT lapangan N rata2 ujung
L/P = Lempung / Pasir P ujung
N >15sand = Koreksi N>15 untuk lapisan pasir fsi
gsat = Berat volume tanah jenuh Rsi
g ' = Berat volume tanah effektif S Rsi
po = Overburden pressure Pult
N Corr = N terkoreksi Pijin

Catatan : Perkiraan daya dukung teoritis dengan kenyataan kedalaman tiang pancang di lapangan biasanya selisih
EL
AKSIAL-TEKAN) TIANG PANCANG
DGN FORMULA MAYEERHOF DAN BAZARA

Depth. Increment : 0.5 m

Qujung fsi Rsi S Rsi Qult = Qujung + Qijin = Qult/SF


(ton) (ton/m2) (ton) (ton) SF=3 ; (ton)

746.44 8.00 15.08 15.08 761.52


712.51 9.75 18.38 33.46 745.97
696.68 7.00 13.19 46.65 743.33 247.78
682.35 6.75 12.72 59.38 741.73 247.24
662.43 7.00 13.19 72.57 735.00 245.00
644.32 6.75 12.72 85.29 729.61 243.20
598.30 6.00 11.31 96.60 694.90 231.63
593.92 6.60 12.44 109.04 702.96 234.32
608.36 6.19 11.67 120.71 729.07 243.02
623.89 6.66 12.56 133.27 757.16 252.39
646.55 7.87 14.83 148.10 794.64 264.88
682.42 8.20 15.46 163.55 845.97 281.99
713.76 8.50 16.03 179.58 893.34 297.78
749.33 8.78 16.54 196.12 945.46 315.15
777.84 9.02 17.01 213.13 990.97 330.32
789.87 8.94 16.85 229.99 1019.86 339.95
796.75 8.87 16.71 246.70 1043.45 347.82
798.98 8.80 16.58 263.28 1062.26 354.09
796.97 8.73 16.46 279.75 1076.72 358.91
792.84 8.68 16.35 296.10 1088.94 362.98
791.99 8.62 16.25 312.35 1104.33 368.11
794.27 8.70 16.41 328.76 1123.03 374.34
793.33 8.88 16.73 345.49 1138.81 379.60
795.36 9.04 17.05 362.53 1157.89 385.96
806.44 8.72 16.45 378.98 1185.42 395.14
818.73 8.89 16.76 395.74 1214.47 404.82
833.47 9.53 17.97 413.71 1247.17 415.72
846.46 9.57 18.04 431.75 1278.20 426.07
854.75 9.84 18.56 450.30 1305.05 435.02
864.68 9.88 18.62 468.93 1333.61 444.54
872.95 9.69 18.26 487.18 1360.13 453.38
870.51 9.49 17.89 505.08 1375.58 458.53
816.09 9.53 17.97 523.04 1339.13 446.38
754.16 9.34 17.61 540.65 1294.82 431.61
681.04 2.14 4.04 544.70 1225.73 408.58
640.48 2.02 3.81 548.51 1188.99 396.33
571.53 1.69 3.18 551.69 1123.22 374.41
523.06 2.62 4.94 556.63 1079.69 359.90
458.60 1.66 3.14 559.76 1018.36 339.45

N rata2 ujung = N corr rata-rata ujung tiang


= Daya dukung tiang
= Daya lekatan per-satuan luas
= Daya lekatan per-meter panjang selimut
= Kumulatif Rsi
= P ujung + S Rsi
= Daya dukung ijin

n biasanya selisih + 1-2 meter


TABEL DAYA DUKUNG IJIN PONDASI TIANG PANCANG

Proyek : PEMBANGUNAN PABRIK GULA Titik bor BH-1


Lokasi : DESA LAMONGREJO, KEC NGIMBANG, LAMONGAN

Kedalaman Daya Dukung Q Ijin (ton) untuk SF=3


(m) 20x20 25x25 Ø 30 30x30 Ø 40 40x40 Ø 45 45x45 Ø 50 50x50 Ø 60 60x60 Ø 80 Ø 100
1.0 0.00 0.00 16.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.5 0.00 0.00 18.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.0 11.70 16.96 18.73 23.05 31.57 40.20 38.49 49.01 46.80 59.58 65.83 83.82 113.58 174.23
3.0 13.08 18.62 20.09 25.05 33.03 42.05 39.64 50.48 48.41 61.64 67.30 85.69 114.26 173.50
4.0 13.89 19.56 20.19 26.97 32.92 42.11 39.85 50.73 48.04 61.17 65.96 83.98 110.10 165.33
5.0 15.41 21.88 21.46 29.35 34.99 45.22 43.41 55.27 51.97 66.17 70.81 90.16 116.95 174.35
6.0 18.05 25.00 24.70 33.19 40.26 52.43 49.63 63.19 57.98 73.83 78.56 100.03 128.69 190.80
7.0 21.24 29.03 28.88 37.92 46.77 60.84 57.11 72.71 66.25 84.35 89.41 113.84 145.65 215.11
8.0 24.34 33.17 32.85 42.78 52.80 68.62 63.62 81.00 74.62 95.00 100.34 127.76 162.60 239.26
9.0 26.92 36.49 35.94 47.11 57.17 74.23 68.40 87.09 80.37 102.33 107.51 136.89 172.86 252.96
10.0 29.18 39.42 38.50 50.79 60.58 78.59 72.17 91.90 84.97 108.19 113.04 143.93 180.24 262.19
11.0 31.38 42.21 41.15 54.28 63.88 82.71 76.09 96.88 89.21 113.59 118.06 150.31 186.74 270.09
12.0 33.81 45.16 44.22 57.74 67.82 87.51 80.40 102.36 93.89 119.55 123.69 157.49 194.30 279.61
13.0 36.24 48.36 47.23 61.71 71.76 92.33 85.38 108.71 99.30 126.44 130.37 165.99 203.69 291.95
14.0 39.03 51.93 50.67 66.05 76.64 98.57 91.02 115.89 105.69 134.57 138.41 176.22 215.41 307.85
15.0 42.03 55.56 54.43 70.36 82.02 105.44 96.86 123.33 112.01 142.61 146.28 186.25 226.70 322.94
16.0 44.80 59.16 57.76 74.56 86.62 111.32 101.90 129.74 118.18 150.47 153.94 196.01 237.59 337.40
17.0 47.22 61.28 60.53 76.23 90.24 115.95 103.05 131.21 119.87 152.63 155.18 197.58 237.13 334.20
18.0 46.80 60.71 58.90 76.23 86.51 111.18 98.49 125.40 115.06 146.50 147.54 187.85 221.94 308.95
19.0 45.54 59.31 56.39 74.65 81.76 105.10 93.48 119.02 109.70 139.67 139.58 177.71 207.27 285.55
20.0 44.92 57.94 54.98 73.27 78.94 101.49 91.16 116.06 104.28 132.78 131.51 167.44 192.33 261.65

Keterangan :
Ø a cm = Diameter a cm
a x a cm2 = Ukuran tiang persegi a x a cm2
- Untuk ukuran bulat bisa dipakai tiang beton, bor pile, atau tiang baja.
- Untuk ukuran persegi hanya dipakai tiang beton.
-Sedangkan untuk kedalaman tiang pancang disesuaikan dengan beban yang ada.
Qijin = Daya dukung ijin untuk 1 tiang (single pile), dalam ton
SF = Safety factor, diambil 3
Ø 120
0.00
0.00
247.78
245.00
231.63
243.02
264.88
297.78
330.32
347.82
358.91
368.11
379.60
395.14
415.72
435.02
453.38
446.38
408.58
374.41
339.45
Grafik Daya Dukung Ijin Aksial Tekan Tiang Tunggal
Bor No : BH-1 BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Project : PEMBANGUNAN PABRIK GULA


SPT ( Blow/feet )
0 20 40 60 80 Qijin (ton) = Qult/3
0
0 50 100 150 200 250
1 0
2
3
4
5 Ø 30 cm
6
7
8 Ø 40 cm
5 9
10
11 5 Ø 45 cm
12
13
14 Ø 50 cm
15
16
17 Ø 60 cm
18
10 19
20 30x30 cm
21 10
22
23 40x40 cm
24
25
26 45x45 cm
27
28
15 29
30 50x50 cm
31 15
32
33 60x60 cm
34
35
36
37
38
20 39
20
Kedalaman (m)

Kedalaman (m)

25
25

30
30

35
35

40
40

45 45

50 50
50 50
2 0 1 0.5
4 10 2 1
6 11 3 1.5
8 7 4 2
10 8 5 5.5
12 9 6 9
14 11 7 5.5
16 13 8 2
18 15 9 1
20 17 10 0
22 18 11 0.5
24 20 12 1
26 35 13 2
28 50 14 3
30 50 15 4
32 50 16 5
18.26667 17 5.5
18 6
19 7
20 8
21 10
22 12
23 14.5
24 17
25 18
26 19 6.173077
27 21
28 23
29 25.5
30 28
31 28
32 28