Vous êtes sur la page 1sur 1

UNIVERSITAS

54.00

2.50 4.00 6.50 9.00 9.00 2.00 8.00 2.00 7.00 4.00

UNIVERSITAS SYIAH KUALA


ACEH, INDONESIA

4.50
4.50

32
33

33

31
JURUSAN
9

ARSITEKTUR

4.00
DAN PERENCANAAN
6.50

34

FAKULTAS TEKNIK

2.00
33

MATA KULIAH :
8

TUGAS
36

AKHIR
6.50

9.00
30

31.00
28

29
39
OBJEK PERANCANGAN :
38
7

2.00
PUSAT PELATIHAN DAN PENGEMBANGAN
MUSIK TRADISIONAL ACEH
DI BANDA ACEH
8.50

35

4.00
TEMA PERANCANGAN :
6

ARSITEKTUR VERNAKULAR
33
34

27

7.00
5.00

DOSEN PEMBIMBING UTAMA


5

Ir. BUSTARI, M.T


NIP. 19670214 199203 1 002
3.50 1.50 2.00 5.50 6.00 6.00 6.00 1.00 3.00 11.00 2.00 6.00 2.00
DOSEN PEMBIMBING PENDAMPING

Ir. KHAIRUL HUDA, M. Eng

O
M
H

N
K
I

P
NIP. 19600507 198810 1 001

MAHASISWA

= INDOOR UNIT SISTEM AC SPLIT ASRI MULIA

RUANG PERALATAN

TRIBUN PENONTON
KETERANGAN

= OUTDOOR UNIT SISTEM AC SPLIT NIM. 1604104010018

RUANG KONTROL
RUANG TUNGGU
AREA PAMERAN
DENAH INSTALASI AC (AUDITORIUM)
DUCTING AC
JUDUL GAMBAR

RUANG GANTI
RESEPSIONIS

RUANG RIAS

PANGGUNG
= INDOOR UNIT SISTEM AC SENTRAL
MUSHALLA
SKALA 1 : 200 TERLAMPIR
TOILET
= SUPPLY AIR
HALL

OU 45 PK
SKALA HALAMAN
= OUTDOOR UNIT SISTEM AC SENTRAL
35
34
30

32
33
29
28

37
27

36

38
31

TERLAMPIR

Vous aimerez peut-être aussi