Vous êtes sur la page 1sur 2

Hydrostatics report

Hydrostatics report.

Designer
Created by
Comment
Filename delf Anty 3.fbm
Design length 98.300 (m) Midship location 49.150 (m)
Length over all 101.33 (m) Relative water density 1.025
Design beam 18.800 (m) Mean shell thickness 0.0000 (m)
Maximum beam 18.800 (m) Appendage coefficient 1.0000
Design draught 6.320 (m)

Trim: 0.000
(m)
Draught Lwl Bwl Vol. mould Volume Displ. Displ. LCB
(m) (m) (m) (m^3) (m^3) (tonnes) (tonnes) (m)
0.000 93.385 14.094 0.00 0.00 0.00 0.00 0.000
0.100 97.142 14.511 21.74 21.74 22.29 22.29 50.073
0.200 97.996 14.929 79.04 79.04 81.01 81.01 50.182
0.300 98.507 15.337 161.14 161.14 165.17 165.17 50.392
0.400 98.898 15.730 251.44 251.44 257.73 257.73 50.487

0.500 99.224 16.122 345.06 345.06 353.68 353.68 50.524


0.600 99.494 16.478 441.89 441.89 452.94 452.94 50.538
0.700 99.721 16.822 541.72 541.72 555.26 555.26 50.541
0.800 99.942 17.156 644.53 644.53 660.64 660.64 50.539
0.900 100.107 17.425 750.03 750.03 768.78 768.78 50.532

1.000 100.272 17.694 858.04 858.04 879.49 879.49 50.522


1.100 100.417 17.918 968.46 968.46 992.67 992.67 50.510
1.200 100.539 18.097 1080.82 1080.82 1107.84 1107.84 50.494
1.300 100.662 18.275 1195.05 1195.05 1224.93 1224.93 50.476
1.400 100.756 18.388 1310.94 1310.94 1343.71 1343.71 50.456

1.500 100.845 18.491 1428.18 1428.18 1463.89 1463.89 50.433


1.600 100.928 18.580 1546.76 1546.76 1585.43 1585.43 50.409
1.700 100.991 18.631 1666.41 1666.41 1708.07 1708.07 50.383
1.800 101.054 18.681 1787.04 1787.04 1831.72 1831.72 50.355
1.900 101.105 18.712 1908.61 1908.61 1956.32 1956.32 50.326

2.000 101.149 18.733 2030.94 2030.94 2081.71 2081.71 50.297


2.100 101.193 18.753 2154.02 2154.02 2207.87 2207.87 50.266
2.200 101.223 18.764 2277.80 2277.80 2334.74 2334.74 50.234
2.300 101.253 18.774 2402.21 2402.21 2462.27 2462.27 50.202
2.400 101.278 18.782 2527.26 2527.26 2590.44 2590.44 50.169

2.500 101.295 18.788 2652.90 2652.90 2719.22 2719.22 50.136


2.600 101.313 18.793 2779.12 2779.12 2848.60 2848.60 50.102
2.700 101.321 18.796 2905.91 2905.91 2978.56 2978.56 50.068
2.800 101.326 18.798 3033.24 3033.24 3109.07 3109.07 50.033
2.900 101.330 18.799 3161.12 3161.12 3240.14 3240.14 49.997

3.000 101.323 18.800 3289.52 3289.52 3371.75 3371.75 49.961


3.100 101.316 18.800 3418.44 3418.44 3503.90 3503.90 49.925
3.200 101.304 18.800 3547.87 3547.87 3636.57 3636.57 49.888
3.300 101.283 18.800 3677.81 3677.81 3769.75 3769.75 49.849
3.400 101.262 18.800 3808.24 3808.24 3903.45 3903.45 49.810

3.500 101.229 18.800 3939.17 3939.17 4037.65 4037.65 49.771


3.600 101.190 18.800 4070.61 4070.61 4172.37 4172.37 49.730
3.700 101.149 18.800 4202.54 4202.54 4307.61 4307.61 49.688
3.800 101.087 18.800 4334.99 4334.99 4443.37 4443.37 49.645
3.900 101.025 18.800 4467.96 4467.96 4579.66 4579.66 49.600

4.000 100.950 18.800 4601.46 4601.46 4716.49 4716.49 49.555


4.100 100.859 18.800 4735.49 4735.49 4853.88 4853.88 49.508
4.200 100.768 18.800 4870.08 4870.08 4991.83 4991.83 49.460

11/23/2014 Page 1
Hydrostatics report

Trim: 0.000
(m)
Draught Lwl Bwl Vol. mould Volume Displ. Displ. LCB
(m) (m) (m) (m^3) (m^3) (tonnes) (tonnes) (m)
4.300 100.653 18.800 5005.22 5005.22 5130.35 5130.35 49.411
4.400 100.533 18.800 5140.93 5140.93 5269.46 5269.46 49.360

4.500 100.409 18.800 5277.23 5277.23 5409.16 5409.16 49.308


4.600 100.275 18.800 5414.12 5414.12 5549.47 5549.47 49.255
4.700 100.140 18.800 5551.61 5551.61 5690.40 5690.40 49.200
4.800 100.010 18.800 5689.71 5689.71 5831.95 5831.95 49.144
4.900 99.881 18.800 5828.42 5828.42 5974.13 5974.13 49.087

5.000 99.753 18.800 5967.75 5967.75 6116.95 6116.95 49.029


5.100 99.648 18.800 6107.70 6107.70 6260.40 6260.40 48.970
5.200 99.545 18.800 6248.28 6248.28 6404.49 6404.49 48.910
5.300 99.456 18.800 6389.48 6389.48 6549.22 6549.22 48.849
5.400 99.390 18.800 6531.30 6531.30 6694.58 6694.58 48.787

5.500 99.323 18.800 6673.73 6673.73 6840.58 6840.58 48.725


5.600 99.284 18.800 6816.74 6816.74 6987.16 6987.16 48.662
5.700 99.249 18.800 6960.33 6960.33 7134.33 7134.33 48.599
5.800 99.220 18.800 7104.49 7104.49 7282.10 7282.10 48.536
5.900 99.207 18.800 7249.17 7249.17 7430.40 7430.40 48.474

6.000 99.194 18.800 7394.36 7394.36 7579.22 7579.22 48.411


6.100 99.188 18.800 7540.06 7540.06 7728.56 7728.56 48.350
6.200 99.185 18.800 7686.26 7686.26 7878.41 7878.41 48.289
6.300 99.183 18.800 7832.90 7832.90 8028.72 8028.72 48.229

NOTE 1: Draught (and all other vertical heights) is measured above base Z=0.000

NOTE 2: All calculated coefficients based on project length, draught and beam.

Nomenclature
Draught Moulded draught, measured from baseline
Lwl Length on waterline
Bwl Beam on waterline
Vol. mould Moulded volume
Volume Total displaced volume
Displ. Displacement
Displ. Displacement
LCB Longitudinal center of buoyancy, measured from the aft perpendicular at X=0.0

11/23/2014 Page 2

Vous aimerez peut-être aussi