Durada

Act Prec Dur a Dur m Dur b Te Nudos ENudos L Early Last H Dur n Cost n
REAL
A --- 2 6 10 5 5 1 4 0 5 0 6 30
B --- 1 3 11 4 4 1 2 0 4 0 4 23
C --- 4 5 6 4 4 1 3 0 4 0 5 15
D B,C 1 3 5 1 1 3 4 4 5 0 3 39
E A,D 2 3 4 3 3 4 5 5 8 0 3 13
F A,D 3 3 9 4 3 4 6 5 9 1 4 7
G E 3 4 5 2 2 5 7 8 10 0 4 18
H F 1 1 7 1 1 6 7 9 10 0 2 25

BC 5 DC 5 GC 6
BD 6 DD 3 GG 4
Nud+A10:AN16os
Early Last BG 7 DG 7
1 0 0
2 4 4
3 4 4 ABC 8 GBC 9
4 5 5 ADD 6 GDD 7 X
5 8 8 AGG 7 GGG 4 ⴗ
6 9 9 ₂‫ס‬
7 10 10 CCAB 8 FABC 9 ‫ס‬
Z
Dur AccCost Acc Ra Ruta1 Ruta 2 Ruta 3 ruta 4 costes Dur Re A B C D E F G

4 36 3 X 170 15 6 4 5 3 3 4 4
3 26 3 X 172 14 6 4 4 3 3 4 4
4 17 2 X X 175 13 6 4 4 2 3 4 4
1 45 3 X X X 179 12 6 4 4 2 3 4 3
3 13 ### X X X 186 11 6 4 4 2 3 4 2
3 8 1 X 193 10 5 4 4 1 3 3 2
2 26 4 X X X
1 28 3 X

C D E G
16
15
0.778 0.111 0.4 0.111 0.111
0.882
1.134

el 86 % de probabilitat de acabar en 16 setmanes


H 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

2
2
2
2
1
1

A 5

D
1 B 4 2
0 0 4 4
3
C 4 4 4
4 E 3 5 G 2 7
5 5 8 8 10 10

F 4 H 1
1 6
9 9