PIPING DAILY PROGRSS REPORT
Area: P, P1, M, J1, J2, F, G, H, K, K3, T, L, C, Y, V1, V2, N3, N2, W, 3220, 3310, 3640, 3670, 3210, 39EJ & 39WL Date: 11-02-2022
Pipe Size Spool Erection
SL. No Activity Line No Joint No. Spool No. Support-ID Material Support REMARKS
Installation (Kg)
Inch LM IM
28 Fit Up 50-3810-CSS-AQ08-81152-ET-1-CT 2 20 SS
34 Fit Up 25-3650-WHO-AA06-65231-PP 1 10 CS
35 Fit Up 25-3650-WHO-AA06-65231-PP 1 15 CS
36 Fit Up 25-3650-WHO-AA06-65231-PP 1 9 CS
37 Fit Up 80-3750-PWC-AA05-75064-NI 3 3 CS
38 Fit Up 25-39WQ-WSI-AA02-99217-NI 1 4 CS
39 Fit Up 80-3640-PSA-AA02-64135-NI 3 29 CS
40 Fit Up 80-3650-WHO-BA06-65141-HC 1 18 CS
46 Fit Up 25-3600-IAS-AQ08-60066-NI 1 13 SS
47 Fit Up 25-3600-IAS-AQ08-60066-NI 1 15 SS
48 Fit Up 25-3600-IAS-AQ08-60066-NI 1 26 SS
Todays Progress
Total Spool Erection (LM): 124.71
Total Fit Up: 27" Welding(ID): 0" Total Support Installation (Kg): 243.62 Total Bolt Torqueing (ID):