Rumus TPT 10 2 0.

4 8
Pasir Beton 0.52 4.16 180000 748,800
Batu Belah 1.1 8.8 125000 1,100,000
Semen 136 2.72 21.76 75000 1,632,000
Hok 151 1208 1,208,000 350
4,688,800 300
Jalan Gang 450 0.9 0.05 20.25
Pasir Beton 0.52 10.53 235000 2,474,550 Pasir Beton
Batu Pecah 0.87 17.6175 225000 3,963,938 Batu Pecah
Semen 218 4.36 88.29 70000 6,180,300 semen
Hok 133,950 2712487.5 2,893,320 Hok
15,512,108

Rabat Beton 35 2 0.1 7


Pasir Beton 0.52 3.64 235000 855,400
Batu Pecah 0.87 6.09 225000 1,370,250
Hok 133,950 937650 937,650
semen 330 6.6 46.2 70000 3,234,000 tpt jl. Wargiluyu
6,397,300
260 3

pasir Beton
300 2.5 0.1 75 Batu Belah
Semen
Pasir Beton 39 180,000 7,020,000 hok
Batu Pecah 65.25 208,000 13,572,000
Semen 495 75,000 37,125,000
Hok 10,046,250 10,046,250 Jln. Wrg-Lbk
67,763,250 300 2.5

Pasir Beton
Batu Pecah
Semen
4 2.5 0.1 1 Hok

0.52 0.52 180000 93,600


0.54 0.54 208000 112,320
218 81.75 75000 6,131,250
133950 133,950
6,471,120
2.5 0.12 105
2.5 0.12 90

47 8,225,000 55 9,625,000
79 16,432,000 92 19,136,000
648 42,120,000 756 49,140,000
12,055,500 14,064,750
100,000,000
78,832,500 91,965,750
21,167,500

jl. Wargiluyu

0.6 468

243.36 180,000 43,804,800


514.8 125,000 64,350,000
18.36 75,000 1,377,000
70,668 14,466,600
123,998,400

0.12 90

46.8 235,000 10,998,000


78.3 225,000 17,617,500
594 75,000 44,550,000
12,055,500 12,055,500
85,221,000