RECAPITULATIF DE DEBOURSSE SEC

N Description U Quantité Prix unitaire Prix Total


GROS ŒUVRE
CIMENT tonne 19.00 120,000 2,280,000

SABLE voyage 15.00 25,000 375,000


GRAVIER voyage 9.00 25,000 225,000
CHEVRONS 6/4 U 45.00 1,700 76,500
CHEVRONS 6/8 u 20.00 2,500 50,000
6/11 90.00 3,000 270,000
FOND 30 U 60.00 3,500 210,000
FOND 20 u 20.00 3,500 70,000
FOND 15 POUR LINTEAU u 14.00 3,000 42,000
FER A BETON botte 14.00 60,000 840,000
AGGLO 15 PLEINS u 1,100.00 275 302,500
AGGLO 15 CREUX u 3,450.00 250 862,500
AGGLO 12 CREUX u 450.00 200 90,000
CLAUSTRAS u 558.00 300 167,400
POINTE kg 70.00 1,200 84,000
FILM POLYANE m² 243.00 500 121,500
FIL DE FER RECUIT u 11.00 2,300 25,300
FEUILLE DE TOLE ALU ZINC 6m u 32.00 15,000 480,000

TOTAL MATERIAUX 6,571,700


MAIN D'ŒUVRE 1,800,000
TOTAL GENERAL 8,371,700