VOLUME CALCULATION REPORT OF CONTOUR SURVEY OF 33 KV Line,Kurmitar LOC-2

AVERAGE R.L.
AREA OF THE
SL. IN BLOCK OF REQUIRE DIFFERENCE VOLUME OF VOLUME OF
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 BLOCK IN SQ. REMARKS
NO. (2X2) SQ. MTR. D R.L. R.L. (3-2) FILLING (+) CUTTING (-)
MTR.
(1+2+3+4)/4
1 97.810 97.128 96.911 96.937 97.197 99.200 2.004 4.00 8.014 A
2 96.911 96.937 97.070 96.721 96.910 99.200 2.290 4.00 9.161
3 97.070 96.721 97.129 97.012 96.983 99.200 2.217 4.00 8.868
4 97.129 97.012 96.057 96.947 96.786 99.200 2.414 4.00 9.655
5 96.057 96.947 96.490 96.637 96.533 99.200 2.667 4.00 10.669
6 96.490 96.637 96.618 96.871 96.654 99.200 2.546 4.00 10.184
7 96.618 96.871 97.051 97.127 96.917 99.200 2.283 4.00 9.133
8 97.051 97.127 97.356 97.227 97.190 99.200 2.010 4.00 8.039
9 97.356 97.227 97.411 97.147 97.285 99.200 1.915 4.00 7.659
10 97.411 97.147 97.312 97.257 97.282 99.200 1.918 4.00 7.673
11 97.312 97.257 97.201 97.337 97.277 99.200 1.923 4.00 7.693
12 97.201 97.337 97.519 97.457 97.379 99.200 1.822 4.00 7.286
TOTAL 89.055 0.000

1 97.128 97.790 96.937 97.636 97.373 99.200 1.827 4.00 7.309 B


2 96.937 97.636 96.721 97.774 97.267 99.200 1.933 4.00 7.732
3 96.721 97.774 97.012 98.262 97.442 99.200 1.758 4.00 7.031
4 97.012 98.262 96.947 98.105 97.582 99.200 1.619 4.00 6.474
5 96.947 98.105 96.637 97.929 97.405 99.200 1.795 4.00 7.182
6 96.637 97.929 96.871 98.016 97.363 99.200 1.837 4.00 7.347
7 96.871 98.016 97.127 98.097 97.528 99.200 1.672 4.00 6.689
8 97.127 98.097 97.227 97.761 97.553 99.200 1.647 4.00 6.588
9 97.227 97.761 97.147 98.174 97.577 99.200 1.623 4.00 6.491
10 97.147 98.174 97.257 98.106 97.671 99.200 1.529 4.00 6.116
11 97.257 98.106 97.337 98.008 97.677 99.200 1.523 4.00 6.092
12 97.337 98.008 97.457 98.126 97.732 99.200 1.468 4.00 5.872
TOTAL 80.923 0.000

1 97.790 97.965 97.636 97.822 97.803 99.200 1.397 4.00 5.587 C


2 97.636 97.822 97.774 97.906 97.785 99.200 1.416 4.00 5.662
3 97.774 97.906 98.262 98.053 97.999 99.200 1.201 4.00 4.805
4 98.262 98.053 98.105 98.111 98.133 99.200 1.067 4.00 4.269
5 98.105 98.111 97.929 98.272 98.104 99.200 1.096 4.00 4.383
6 97.929 98.272 98.016 98.366 98.146 99.200 1.054 4.00 4.217
VOLUME CALCULATION REPORT OF CONTOUR SURVEY OF 33 KV Line,Kurmitar LOC-2
AVERAGE R.L.
AREA OF THE
SL. IN BLOCK OF REQUIRE DIFFERENCE VOLUME OF VOLUME OF
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 BLOCK IN SQ. REMARKS
NO. (2X2) SQ. MTR. D R.L. R.L. (3-2) FILLING (+) CUTTING (-)
MTR.
(1+2+3+4)/4
7 98.016 98.366 98.097 98.347 98.207 99.200 0.994 4.00 3.974
8 98.097 98.347 97.761 98.345 98.138 99.200 1.063 4.00 4.250
9 97.761 98.345 98.174 98.307 98.147 99.200 1.053 4.00 4.213
10 98.174 98.307 98.106 98.178 98.191 99.200 1.009 4.00 4.035
11 98.106 98.178 98.008 98.278 98.143 99.200 1.058 4.00 4.230
12 98.008 98.278 98.126 98.369 98.195 99.200 1.005 4.00 4.019
TOTAL 53.644 0.000

1 97.965 98.171 97.822 98.034 97.998 99.200 1.202 4.00 4.808 D


2 97.822 98.034 97.906 98.273 98.009 99.200 1.191 4.00 4.765
3 97.906 98.273 98.053 98.580 98.203 99.200 0.997 4.00 3.988
4 98.053 98.580 98.111 98.670 98.354 99.200 0.847 4.00 3.386
5 98.111 98.670 98.272 98.754 98.452 99.200 0.748 4.00 2.993
6 98.272 98.754 98.366 98.948 98.585 99.200 0.615 4.00 2.460
7 98.366 98.948 98.347 99.076 98.684 99.200 0.516 4.00 2.063
8 98.347 99.076 98.345 99.070 98.710 99.200 0.490 4.00 1.962
9 98.345 99.070 98.307 98.588 98.578 99.200 0.623 4.00 2.490
10 98.307 98.588 98.178 98.581 98.414 99.200 0.787 4.00 3.146
11 98.178 98.581 98.278 98.681 98.430 99.200 0.770 4.00 3.082
12 98.278 98.681 98.369 98.786 98.529 99.200 0.672 4.00 2.686
TOTAL 37.829 0.000

1 98.171 98.912 98.034 98.801 98.480 99.200 0.721 4.00 2.882 E


2 98.034 98.801 98.273 98.975 98.521 99.200 0.679 4.00 2.717
3 98.273 98.975 98.580 99.176 98.751 99.200 0.449 4.00 1.796
4 98.580 99.176 98.670 99.520 98.987 99.200 0.214 4.00 0.854
5 98.670 99.520 98.754 99.502 99.112 99.200 0.088 4.00 0.354
6 98.754 99.502 98.948 99.609 99.203 99.200 -0.003 4.00 0.013
7 98.948 99.609 99.076 99.582 99.304 99.200 -0.104 4.00 0.415
8 99.076 99.582 99.070 99.478 99.302 99.200 -0.101 4.00 0.406
9 99.070 99.478 98.588 99.250 99.097 99.200 0.104 4.00 0.414
10 98.588 99.250 98.581 99.321 98.935 99.200 0.265 4.00 1.060
11 98.581 99.321 98.681 99.459 99.011 99.200 0.190 4.00 0.758
12 98.681 99.459 98.786 99.741 99.167 99.200 0.033 4.00 0.133
TOTAL 10.968 0.834
VOLUME CALCULATION REPORT OF CONTOUR SURVEY OF 33 KV Line,Kurmitar LOC-2
AVERAGE R.L.
AREA OF THE
SL. IN BLOCK OF REQUIRE DIFFERENCE VOLUME OF VOLUME OF
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 BLOCK IN SQ. REMARKS
NO. (2X2) SQ. MTR. D R.L. R.L. (3-2) FILLING (+) CUTTING (-)
MTR.
(1+2+3+4)/4
1 98.912 98.512 98.801 98.110 98.584 99.200 0.616 4.00 2.465 F
2 98.801 98.110 98.975 98.315 98.550 99.200 0.650 4.00 2.599
3 98.975 98.315 99.176 98.539 98.751 99.200 0.449 4.00 1.795
4 99.176 98.539 99.520 98.715 98.988 99.200 0.212 4.00 0.850
5 99.520 98.715 99.502 98.890 99.157 99.200 0.043 4.00 0.173
6 99.502 98.890 99.609 99.200 99.300 99.200 -0.100 4.00 0.401
7 99.609 99.200 99.582 99.610 99.500 99.200 -0.300 4.00 1.201
8 99.582 99.610 99.478 99.712 99.596 99.200 -0.395 4.00 1.582
9 99.478 99.712 99.250 99.884 99.581 99.200 -0.381 4.00 1.524
10 99.250 99.884 99.321 99.764 99.555 99.200 -0.355 4.00 1.419
11 99.321 99.764 99.459 99.686 99.558 99.200 -0.358 4.00 1.430
12 99.459 99.686 99.741 99.993 99.720 99.200 -0.520 4.00 2.079
TOTAL 7.882 9.636

1 98.512 99.318 98.110 99.466 98.852 99.200 0.349 4.00 1.394 G


2 98.110 99.466 98.315 99.719 98.903 99.200 0.298 4.00 1.190
3 98.315 99.719 98.539 100.203 99.194 99.200 0.006 4.00 0.024
4 98.539 100.203 98.715 100.430 99.472 99.200 -0.272 4.00 1.087
5 98.715 100.430 98.890 100.478 99.628 99.200 -0.428 4.00 1.713
6 98.890 100.478 99.200 100.366 99.734 99.200 -0.533 4.00 2.134
7 99.200 100.366 99.610 100.260 99.859 99.200 -0.659 4.00 2.636
8 99.610 100.260 99.712 100.092 99.919 99.200 -0.718 4.00 2.874
9 99.712 100.092 99.884 100.130 99.955 99.200 -0.754 4.00 3.018
10 99.884 100.130 99.764 100.211 99.997 99.200 -0.797 4.00 3.189
11 99.764 100.211 99.686 100.323 99.996 99.200 -0.796 4.00 3.184
12 99.686 100.323 99.993 100.473 100.119 99.200 -0.919 4.00 3.675
TOTAL 2.608 23.510

1 99.318 99.723 99.466 99.898 99.601 99.200 -0.401 4.00 1.605 H


2 99.466 99.898 99.719 99.714 99.699 99.200 -0.499 4.00 1.997
3 99.719 99.714 100.203 100.383 100.005 99.200 -0.805 4.00 3.219
4 100.203 100.383 100.430 101.003 100.505 99.200 -1.305 4.00 5.219
5 100.430 101.003 100.478 100.952 100.716 99.200 -1.516 4.00 6.063
6 100.478 100.952 100.366 100.348 100.536 99.200 -1.336 4.00 5.344
7 100.366 100.348 100.260 100.987 100.490 99.200 -1.290 4.00 5.161
8 100.260 100.987 100.092 100.531 100.468 99.200 -1.268 4.00 5.070
VOLUME CALCULATION REPORT OF CONTOUR SURVEY OF 33 KV Line,Kurmitar LOC-2
AVERAGE R.L.
AREA OF THE
SL. IN BLOCK OF REQUIRE DIFFERENCE VOLUME OF VOLUME OF
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 BLOCK IN SQ. REMARKS
NO. (2X2) SQ. MTR. D R.L. R.L. (3-2) FILLING (+) CUTTING (-)
MTR.
(1+2+3+4)/4
9 100.092 100.531 100.130 100.508 100.315 99.200 -1.115 4.00 4.461
10 100.130 100.508 100.211 100.470 100.330 99.200 -1.130 4.00 4.519
11 100.211 100.470 100.323 100.325 100.332 99.200 -1.132 4.00 4.529
12 100.323 100.325 100.473 100.512 100.408 99.200 -1.208 4.00 4.833
TOTAL 0.000 52.020

1 99.723 100.814 99.898 100.706 100.285 99.200 -1.085 4.00 4.341 I


2 99.898 100.706 99.714 100.746 100.266 99.200 -1.066 4.00 4.264
3 99.714 100.746 100.383 100.459 100.326 99.200 -1.125 4.00 4.502
4 100.383 100.459 101.003 100.998 100.711 99.200 -1.511 4.00 6.043
5 101.003 100.998 100.952 100.247 100.800 99.200 -1.600 4.00 6.400
6 100.952 100.247 100.348 101.363 100.728 99.200 -1.528 4.00 6.110
7 100.348 101.363 100.987 101.306 101.001 99.200 -1.801 4.00 7.204
8 100.987 101.306 100.531 101.148 100.993 99.200 -1.793 4.00 7.172
9 100.531 101.148 100.508 100.844 100.758 99.200 -1.558 4.00 6.231
10 100.508 100.844 100.470 100.745 100.642 99.200 -1.442 4.00 5.767
11 100.470 100.745 100.325 100.631 100.543 99.200 -1.343 4.00 5.371
12 100.325 100.631 100.512 100.820 100.572 99.200 -1.372 4.00 5.488
TOTAL 0.000 68.893

1 100.814 101.120 100.706 100.914 100.889 99.200 -1.688 4.00 6.754 J


2 100.706 100.914 100.746 101.201 100.892 99.200 -1.692 4.00 6.767
3 100.746 101.201 100.459 101.514 100.980 99.200 -1.780 4.00 7.120
4 100.459 101.514 100.998 101.714 101.171 99.200 -1.971 4.00 7.885
5 100.998 101.714 100.247 101.517 101.119 99.200 -1.919 4.00 7.676
6 100.247 101.517 101.363 101.613 101.185 99.200 -1.985 4.00 7.940
7 101.363 101.613 101.306 101.382 101.416 99.200 -2.216 4.00 8.864
8 101.306 101.382 101.148 101.431 101.317 99.200 -2.117 4.00 8.467
9 101.148 101.431 100.844 101.541 101.241 99.200 -2.041 4.00 8.164
10 100.844 101.541 100.745 101.097 101.057 99.200 -1.857 4.00 7.427
11 100.745 101.097 100.631 101.197 100.918 99.200 -1.717 4.00 6.870
12 100.631 101.197 100.820 101.452 101.025 99.200 -1.825 4.00 7.300
TOTAL 0.000 91.234

1 101.120 101.214 100.914 101.302 101.138 99.200 -1.938 4.00 7.750 K


2 100.914 101.302 101.201 101.508 101.231 99.200 -2.031 4.00 8.125
VOLUME CALCULATION REPORT OF CONTOUR SURVEY OF 33 KV Line,Kurmitar LOC-2
AVERAGE R.L.
AREA OF THE
SL. IN BLOCK OF REQUIRE DIFFERENCE VOLUME OF VOLUME OF
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 BLOCK IN SQ. REMARKS
NO. (2X2) SQ. MTR. D R.L. R.L. (3-2) FILLING (+) CUTTING (-)
MTR.
(1+2+3+4)/4
3 101.201 101.508 101.514 101.599 101.456 99.200 -2.256 4.00 9.022
4 101.120 101.599 101.714 101.789 101.556 99.200 -2.355 4.00 9.422
5 100.914 101.789 101.517 101.958 101.545 99.200 -2.345 4.00 9.378
6 101.201 101.958 101.613 101.987 101.690 99.200 -2.490 4.00 9.959
7 101.514 101.987 101.382 101.938 101.705 99.200 -2.505 4.00 10.021
8 101.714 101.938 101.431 101.593 101.669 99.200 -2.469 4.00 9.876
9 101.517 101.593 101.541 101.708 101.590 99.200 -2.390 4.00 9.559
10 101.613 101.708 101.097 101.628 101.512 99.200 -2.312 4.00 9.246
11 101.382 101.628 101.197 101.802 101.502 99.200 -2.302 4.00 9.209
12 101.431 101.802 101.452 101.998 101.671 99.200 -2.471 4.00 9.883
TOTAL 0.000 111.450

1 101.214 101.318 101.302 101.519 101.338 99.200 -2.138 4.00 8.553 L


2 101.302 101.739 101.508 101.739 101.572 99.200 -2.372 4.00 9.488
3 101.508 101.791 101.599 101.791 101.672 99.200 -2.472 4.00 9.889
4 101.214 101.921 101.789 101.921 101.711 99.200 -2.511 4.00 10.045
5 101.302 101.996 101.958 101.996 101.813 99.200 -2.613 4.00 10.452
6 101.508 101.912 101.987 101.912 101.830 99.200 -2.630 4.00 10.519
7 101.599 101.958 101.938 101.958 101.863 99.200 -2.663 4.00 10.653
8 101.789 101.725 101.593 101.725 101.708 99.200 -2.508 4.00 10.032
9 101.958 101.891 101.708 101.891 101.862 99.200 -2.662 4.00 10.648
10 101.987 101.792 101.628 101.792 101.800 99.200 -2.600 4.00 10.399
11 101.938 101.823 101.802 101.823 101.847 99.200 -2.646 4.00 10.586
12 101.593 101.912 101.998 101.912 101.854 99.200 -2.654 4.00 10.615
TOTAL 0.000 121.879
TOTAL QTY IN
282.909 479.456
CUM