CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


### 1 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00
2 2 12.43 2 11.92 2 19.85 2 17.52 2 7.45
3 3 26.93 3 26.93 3 43.01 3 41.49 3 17.64
4 4 39.36 4 39.36 4 62.86 4 59.77 4 25.41
5 5 51.79 5 51.79 5 82.72 5 78.05 5 33.18
6 6 64.22 6 64.22 6 102.58 6 96.33 6 40.95
7 7 76.65 7 76.65 7 122.44 7 114.61 7 48.72
8 8 89.08 8 89.08 8 142.30 8 132.89 8 56.49
9 9 101.51 9 101.51 9 162.16 9 151.17 9 64.26
10 10 113.94 10 113.94 10 182.02 10 169.45 10 72.03
11 11 126.37 11 126.37 11 201.88 11 187.73 11 79.80
12 12 138.80 12 138.80 12 221.74 12 206.01 12 87.57
13 13 151.23 13 151.23 13 241.60 13 224.29 13 95.34
14 14 163.66 14 163.66 14 261.46 14 242.57 14 103.11
15 15 176.09 15 176.09 15 281.32 15 260.85 15 110.88
16 16 188.52 16 188.52 16 301.18 16 279.13 16 118.65
17 17 200.95 17 200.95 17 321.04 17 297.41 17 126.42
18 18 213.38 18 213.38 18 340.90 18 315.69 18 134.19
19 19 225.81 19 225.81 19 360.76 19 333.97 19 141.96
20 20 238.24 20 238.24 20 380.62 20 352.25 20 149.73
21 21 250.67 21 250.67 21 400.48 21 370.53 21 157.50
22 22 263.10 22 263.10 22 420.34 22 388.81 22 165.27
23 23 275.53 23 275.53 23 440.20 23 407.09 23 173.04
24 24 287.96 24 287.96 24 460.06 24 425.37 24 180.81
25 25 300.39 25 300.39 25 479.92 25 443.65 25 188.58
26 26 312.82 26 312.82 26 499.78 26 461.93 26 196.35
27 27 325.25 27 325.25 27 519.64 27 480.21 27 204.12
28 28 337.68 28 337.68 28 539.50 28 498.49 28 211.89
29 29 350.11 29 350.11 29 559.36 29 516.77 29 219.66
30 30 362.54 30 362.54 30 579.22 30 535.05 30 227.43
31 31 372.90 31 372.90 31 595.77 31 550.28 31 233.90
32 32 383.26 32 383.26 32 612.32 32 565.51 32 240.37
33 33 393.62 33 393.62 33 628.87 33 580.74 33 246.84
34 34 403.98 34 403.98 34 645.42 34 595.97 34 253.31
35 35 414.34 35 414.34 35 661.97 35 611.20 35 259.78
36 36 424.70 36 424.70 36 678.52 36 626.43 36 266.25
37 37 435.06 37 435.06 37 695.07 37 641.66 37 272.72
38 38 445.42 38 445.42 38 711.62 38 656.89 38 279.19
39 39 455.78 39 455.78 39 728.17 39 672.12 39 285.66

662593135.xlsx CONVEYANCE 1 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


40 40 466.14 40 466.14 40 744.72 40 687.35 40 292.13
41 41 476.50 41 476.50 41 761.27 41 702.58 41 298.60
42 42 486.86 42 486.86 42 777.82 42 717.81 42 305.07
43 43 497.22 43 497.22 43 794.37 43 733.04 43 311.54
44 44 507.58 44 507.58 44 810.92 44 748.27 44 318.01
45 45 517.94 45 517.94 45 827.47 45 763.50 45 324.48
46 46 528.30 46 528.30 46 844.02 46 778.73 46 330.95
47 47 538.66 47 538.66 47 860.57 47 793.96 47 337.42
48 48 549.02 48 549.02 48 877.12 48 809.19 48 343.89
49 49 559.38 49 559.38 49 893.67 49 824.42 49 350.36
50 50 569.74 50 569.74 50 910.22 50 839.65 50 356.83
51 51 580.10 51 580.10 51 926.77 51 854.88 51 363.30
52 52 590.46 52 590.46 52 943.32 52 870.11 52 369.77
53 53 600.82 53 600.82 53 959.87 53 885.34 53 376.24
54 54 611.18 54 611.18 54 976.42 54 900.57 54 382.71
55 55 621.54 55 621.54 55 992.97 55 915.80 55 389.18
56 56 631.90 56 631.90 56 1009.52 56 931.03 56 395.65
57 57 642.26 57 642.26 57 1026.07 57 946.26 57 402.12
58 58 652.62 58 652.62 58 1042.62 58 961.49 58 408.59
59 59 662.98 59 662.98 59 1059.17 59 976.72 59 415.06
60 60 673.34 60 673.34 60 1075.72 60 991.95 60 421.53
61 61 683.70 61 683.70 61 1092.27 61 1007.18 61 428.00
62 62 694.06 62 694.06 62 1108.82 62 1022.41 62 434.47
63 63 704.42 63 704.42 63 1125.37 63 1037.64 63 440.94
64 64 714.78 64 714.78 64 1141.92 64 1052.87 64 447.41
65 65 725.14 65 725.14 65 1158.47 65 1068.10 65 453.88
66 66 735.50 66 735.50 66 1175.02 66 1083.33 66 460.35
67 67 745.86 67 745.86 67 1191.57 67 1098.56 67 466.82
68 68 756.22 68 756.22 68 1208.12 68 1113.79 68 473.29
69 69 766.58 69 766.58 69 1224.67 69 1129.02 69 479.76
70 70 776.94 70 776.94 70 1241.22 70 1144.25 70 486.23
71 71 787.30 71 787.30 71 1257.77 71 1159.48 71 492.70
72 72 797.66 72 797.66 72 1274.32 72 1174.71 72 499.17
73 73 808.02 73 808.02 73 1290.87 73 1189.94 73 505.64
74 74 818.38 74 818.38 74 1307.42 74 1205.17 74 512.11
75 75 828.74 75 828.74 75 1323.97 75 1220.40 75 518.58
76 76 839.10 76 839.10 76 1340.52 76 1235.63 76 525.05
77 77 849.46 77 849.46 77 1357.07 77 1250.86 77 531.52
78 78 859.82 78 859.82 78 1373.62 78 1266.09 78 537.99

662593135.xlsx CONVEYANCE 2 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


79 79 870.18 79 870.18 79 1390.17 79 1281.32 79 544.46
80 80 880.54 80 880.54 80 1406.72 80 1296.55 80 550.93
81 81 890.90 81 890.90 81 1423.27 81 1311.78 81 557.40
82 82 901.26 82 901.26 82 1439.82 82 1327.01 82 563.87
83 83 911.62 83 911.62 83 1456.37 83 1342.24 83 570.34
84 84 921.98 84 921.98 84 1472.92 84 1357.47 84 576.81
85 85 932.34 85 932.34 85 1489.47 85 1372.70 85 583.28
86 86 942.70 86 942.70 86 1506.02 86 1387.93 86 589.75
87 87 953.06 87 953.06 87 1522.57 87 1403.16 87 596.22
88 88 963.42 88 963.42 88 1539.12 88 1418.39 88 602.69
89 89 973.78 89 973.78 89 1555.67 89 1433.62 89 609.16
90 90 984.14 90 984.14 90 1572.22 90 1448.85 90 615.63
91 91 994.50 91 994.50 91 1588.77 91 1464.08 91 622.10
92 92 1004.86 92 1004.86 92 1605.32 92 1479.31 92 628.57
93 93 1015.22 93 1015.22 93 1621.87 93 1494.54 93 635.04
94 94 1025.58 94 1025.58 94 1638.42 94 1509.77 94 641.51
95 95 1035.94 95 1035.94 95 1654.97 95 1525.00 95 647.98
96 96 1046.30 96 1046.30 96 1671.52 96 1540.23 96 654.45
97 97 1056.66 97 1056.66 97 1688.07 97 1555.46 97 660.92
98 98 1067.02 98 1067.02 98 1704.62 98 1570.69 98 667.39
99 99 1077.38 99 1077.38 99 1721.17 99 1585.92 99 673.86
100 100 1087.74 100 1087.74 100 1737.72 100 1601.15 100 680.33
101 101 1098.10 101 1098.10 101 1754.27 101 1616.38 101 686.80
102 102 1108.46 102 1108.46 102 1770.82 102 1631.61 102 693.27
103 103 1118.82 103 1118.82 103 1787.37 103 1646.84 103 699.74
104 104 1129.18 104 1129.18 104 1803.92 104 1662.07 104 706.21
105 105 1139.54 105 1139.54 105 1820.47 105 1677.30 105 712.68
106 106 1149.90 106 1149.90 106 1837.02 106 1692.53 106 719.15
107 107 1160.26 107 1160.26 107 1853.57 107 1707.76 107 725.62
108 108 1170.62 108 1170.62 108 1870.12 108 1722.99 108 732.09
109 109 1180.98 109 1180.98 109 1886.67 109 1738.22 109 738.56
110 110 1191.34 110 1191.34 110 1903.22 110 1753.45 110 745.03
111 111 1201.70 111 1201.70 111 1919.77 111 1768.68 111 751.50
112 112 1212.06 112 1212.06 112 1936.32 112 1783.91 112 757.97
113 113 1222.42 113 1222.42 113 1952.87 113 1799.14 113 764.44
114 114 1232.78 114 1232.78 114 1969.42 114 1814.37 114 770.91
115 115 1243.14 115 1243.14 115 1985.97 115 1829.60 115 777.38
116 116 1253.50 116 1253.50 116 2002.52 116 1844.83 116 783.85
117 117 1263.86 117 1263.86 117 2019.07 117 1860.06 117 790.32

662593135.xlsx CONVEYANCE 3 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


118 118 1274.22 118 1274.22 118 2035.62 118 1875.29 118 796.79
119 119 1284.58 119 1284.58 119 2052.17 119 1890.52 119 803.26
120 120 1294.94 120 1294.94 120 2068.72 120 1905.75 120 809.73
121 121 1305.30 121 1305.30 121 2085.27 121 1920.98 121 816.20
122 122 1315.66 122 1315.66 122 2101.82 122 1936.21 122 822.67
123 123 1326.02 123 1326.02 123 2118.37 123 1951.44 123 829.14
124 124 1336.38 124 1336.38 124 2134.92 124 1966.67 124 835.61
125 125 1346.74 125 1346.74 125 2151.47 125 1981.90 125 842.08
126 126 1357.10 126 1357.10 126 2168.02 126 1997.13 126 848.55
127 127 1367.46 127 1367.46 127 2184.57 127 2012.36 127 855.02
128 128 1377.82 128 1377.82 128 2201.12 128 2027.59 128 861.49
129 129 1388.18 129 1388.18 129 2217.67 129 2042.82 129 867.96
130 130 1398.54 130 1398.54 130 2234.22 130 2058.05 130 874.43
131 131 1408.90 131 1408.90 131 2250.77 131 2073.28 131 880.90
132 132 1419.26 132 1419.26 132 2267.32 132 2088.51 132 887.37
133 133 1429.62 133 1429.62 133 2283.87 133 2103.74 133 893.84
134 134 1439.98 134 1439.98 134 2300.42 134 2118.97 134 900.31
135 135 1450.34 135 1450.34 135 2316.97 135 2134.20 135 906.78
136 136 1460.70 136 1460.70 136 2333.52 136 2149.43 136 913.25
137 137 1471.06 137 1471.06 137 2350.07 137 2164.66 137 919.72
138 138 1481.42 138 1481.42 138 2366.62 138 2179.89 138 926.19
139 139 1491.78 139 1491.78 139 2383.17 139 2195.12 139 932.66
140 140 1502.14 140 1502.14 140 2399.72 140 2210.35 140 939.13
141 141 1512.50 141 1512.50 141 2416.27 141 2225.58 141 945.60
142 142 1522.86 142 1522.86 142 2432.82 142 2240.81 142 952.07
143 143 1533.22 143 1533.22 143 2449.37 143 2256.04 143 958.54
144 144 1543.58 144 1543.58 144 2465.92 144 2271.27 144 965.01
145 145 1553.94 145 1553.94 145 2482.47 145 2286.50 145 971.48
146 146 1564.30 146 1564.30 146 2499.02 146 2301.73 146 977.95
147 147 1574.66 147 1574.66 147 2515.57 147 2316.96 147 984.42
148 148 1585.02 148 1585.02 148 2532.12 148 2332.19 148 990.89
149 149 1595.38 149 1595.38 149 2548.67 149 2347.42 149 997.36
150 150 1605.74 150 1605.74 150 2565.22 150 2362.65 150 1003.83
151 151 1616.10 151 1616.10 151 2581.77 151 2377.88 151 1010.30
152 152 1626.46 152 1626.46 152 2598.32 152 2393.11 152 1016.77
153 153 1636.82 153 1636.82 153 2614.87 153 2408.34 153 1023.24
154 154 1647.18 154 1647.18 154 2631.42 154 2423.57 154 1029.71
155 155 1657.54 155 1657.54 155 2647.97 155 2438.80 155 1036.18
156 156 1667.90 156 1667.90 156 2664.52 156 2454.03 156 1042.65

662593135.xlsx CONVEYANCE 4 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


157 157 1678.26 157 1678.26 157 2681.07 157 2469.26 157 1049.12
158 158 1688.62 158 1688.62 158 2697.62 158 2484.49 158 1055.59
159 159 1698.98 159 1698.98 159 2714.17 159 2499.72 159 1062.06
160 160 1709.34 160 1709.34 160 2730.72 160 2514.95 160 1068.53
161 161 1719.70 161 1719.70 161 2747.27 161 2530.18 161 1075.00
162 162 1730.06 162 1730.06 162 2763.82 162 2545.41 162 1081.47
163 163 1740.42 163 1740.42 163 2780.37 163 2560.64 163 1087.94
164 164 1750.78 164 1750.78 164 2796.92 164 2575.87 164 1094.41
165 165 1761.14 165 1761.14 165 2813.47 165 2591.10 165 1100.88
166 166 1771.50 166 1771.50 166 2830.02 166 2606.33 166 1107.35
167 167 1781.86 167 1781.86 167 2846.57 167 2621.56 167 1113.82
168 168 1792.22 168 1792.22 168 2863.12 168 2636.79 168 1120.29
169 169 1802.58 169 1802.58 169 2879.67 169 2652.02 169 1126.76
170 170 1812.94 170 1812.94 170 2896.22 170 2667.25 170 1133.23
171 171 1823.30 171 1823.30 171 2912.77 171 2682.48 171 1139.70
172 172 1833.66 172 1833.66 172 2929.32 172 2697.71 172 1146.17
173 173 1844.02 173 1844.02 173 2945.87 173 2712.94 173 1152.64
174 174 1854.38 174 1854.38 174 2962.42 174 2728.17 174 1159.11
175 175 1864.74 175 1864.74 175 2978.97 175 2743.40 175 1165.58
176 176 1875.10 176 1875.10 176 2995.52 176 2758.63 176 1172.05
177 177 1885.46 177 1885.46 177 3012.07 177 2773.86 177 1178.52
178 178 1895.82 178 1895.82 178 3028.62 178 2789.09 178 1184.99
179 179 1906.18 179 1906.18 179 3045.17 179 2804.32 179 1191.46
180 180 1916.54 180 1916.54 180 3061.72 180 2819.55 180 1197.93
181 181 1926.90 181 1926.90 181 3078.27 181 2834.78 181 1204.40
182 182 1937.26 182 1937.26 182 3094.82 182 2850.01 182 1210.87
183 183 1947.62 183 1947.62 183 3111.37 183 2865.24 183 1217.34
184 184 1957.98 184 1957.98 184 3127.92 184 2880.47 184 1223.81
185 185 1968.34 185 1968.34 185 3144.47 185 2895.70 185 1230.28
186 186 1978.70 186 1978.70 186 3161.02 186 2910.93 186 1236.75
187 187 1989.06 187 1989.06 187 3177.57 187 2926.16 187 1243.22
188 188 1999.42 188 1999.42 188 3194.12 188 2941.39 188 1249.69
189 189 2009.78 189 2009.78 189 3210.67 189 2956.62 189 1256.16
190 190 2020.14 190 2020.14 190 3227.22 190 2971.85 190 1262.63
191 191 2030.50 191 2030.50 191 3243.77 191 2987.08 191 1269.10
192 192 2040.86 192 2040.86 192 3260.32 192 3002.31 192 1275.57
193 193 2051.22 193 2051.22 193 3276.87 193 3017.54 193 1282.04
194 194 2061.58 194 2061.58 194 3293.42 194 3032.77 194 1288.51
195 195 2071.94 195 2071.94 195 3309.97 195 3048.00 195 1294.98

662593135.xlsx CONVEYANCE 5 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


196 196 2082.30 196 2082.30 196 3326.52 196 3063.23 196 1301.45
197 197 2092.66 197 2092.66 197 3343.07 197 3078.46 197 1307.92
198 198 2103.02 198 2103.02 198 3359.62 198 3093.69 198 1314.39
199 199 2113.38 199 2113.38 199 3376.17 199 3108.92 199 1320.86
200 200 2123.74 200 2123.74 200 3392.72 200 3124.15 200 1327.33
201 201 2134.10 201 2134.10 201 3409.27 201 3139.38 201 1333.80
202 202 2144.46 202 2144.46 202 3425.82 202 3154.61 202 1340.27
203 203 2154.82 203 2154.82 203 3442.37 203 3169.84 203 1346.74
204 204 2165.18 204 2165.18 204 3458.92 204 3185.07 204 1353.21
205 205 2175.54 205 2175.54 205 3475.47 205 3200.30 205 1359.68
206 206 2185.90 206 2185.90 206 3492.02 206 3215.53 206 1366.15
207 207 2196.26 207 2196.26 207 3508.57 207 3230.76 207 1372.62
208 208 2206.62 208 2206.62 208 3525.12 208 3245.99 208 1379.09
209 209 2216.98 209 2216.98 209 3541.67 209 3261.22 209 1385.56
210 210 2227.34 210 2227.34 210 3558.22 210 3276.45 210 1392.03
211 211 2237.70 211 2237.70 211 3574.77 211 3291.68 211 1398.50
212 212 2248.06 212 2248.06 212 3591.32 212 3306.91 212 1404.97
213 213 2258.42 213 2258.42 213 3607.87 213 3322.14 213 1411.44
214 214 2268.78 214 2268.78 214 3624.42 214 3337.37 214 1417.91
215 215 2279.14 215 2279.14 215 3640.97 215 3352.60 215 1424.38
216 216 2289.50 216 2289.50 216 3657.52 216 3367.83 216 1430.85
217 217 2299.86 217 2299.86 217 3674.07 217 3383.06 217 1437.32
218 218 2310.22 218 2310.22 218 3690.62 218 3398.29 218 1443.79
219 219 2320.58 219 2320.58 219 3707.17 219 3413.52 219 1450.26
220 220 2330.94 220 2330.94 220 3723.72 220 3428.75 220 1456.73
221 221 2341.30 221 2341.30 221 3740.27 221 3443.98 221 1463.20
222 222 2351.66 222 2351.66 222 3756.82 222 3459.21 222 1469.67
223 223 2362.02 223 2362.02 223 3773.37 223 3474.44 223 1476.14
224 224 2372.38 224 2372.38 224 3789.92 224 3489.67 224 1482.61
225 225 2382.74 225 2382.74 225 3806.47 225 3504.90 225 1489.08
226 226 2393.10 226 2393.10 226 3823.02 226 3520.13 226 1495.55
227 227 2403.46 227 2403.46 227 3839.57 227 3535.36 227 1502.02
228 228 2413.82 228 2413.82 228 3856.12 228 3550.59 228 1508.49
229 229 2424.18 229 2424.18 229 3872.67 229 3565.82 229 1514.96
230 230 2434.54 230 2434.54 230 3889.22 230 3581.05 230 1521.43
231 231 2444.90 231 2444.90 231 3905.77 231 3596.28 231 1527.90
232 232 2455.26 232 2455.26 232 3922.32 232 3611.51 232 1534.37
233 233 2465.62 233 2465.62 233 3938.87 233 3626.74 233 1540.84
234 234 2475.98 234 2475.98 234 3955.42 234 3641.97 234 1547.31

662593135.xlsx CONVEYANCE 6 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


235 235 2486.34 235 2486.34 235 3971.97 235 3657.20 235 1553.78
236 236 2496.70 236 2496.70 236 3988.52 236 3672.43 236 1560.25
237 237 2507.06 237 2507.06 237 4005.07 237 3687.66 237 1566.72
238 238 2517.42 238 2517.42 238 4021.62 238 3702.89 238 1573.19
239 239 2527.78 239 2527.78 239 4038.17 239 3718.12 239 1579.66
240 240 2538.14 240 2538.14 240 4054.72 240 3733.35 240 1586.13
241 241 2548.50 241 2548.50 241 4071.27 241 3748.58 241 1592.60
242 242 2558.86 242 2558.86 242 4087.82 242 3763.81 242 1599.07
243 243 2569.22 243 2569.22 243 4104.37 243 3779.04 243 1605.54
244 244 2579.58 244 2579.58 244 4120.92 244 3794.27 244 1612.01
245 245 2589.94 245 2589.94 245 4137.47 245 3809.50 245 1618.48
246 246 2600.30 246 2600.30 246 4154.02 246 3824.73 246 1624.95
247 247 2610.66 247 2610.66 247 4170.57 247 3839.96 247 1631.42
248 248 2621.02 248 2621.02 248 4187.12 248 3855.19 248 1637.89
249 249 2631.38 249 2631.38 249 4203.67 249 3870.42 249 1644.36
250 250 2641.74 250 2641.74 250 4220.22 250 3885.65 250 1650.83
251 251 2652.10 251 2652.10 251 4236.77 251 3900.88 251 1657.30
252 252 2662.46 252 2662.46 252 4253.32 252 3916.11 252 1663.77
253 253 2672.82 253 2672.82 253 4269.87 253 3931.34 253 1670.24
254 254 2683.18 254 2683.18 254 4286.42 254 3946.57 254 1676.71
255 255 2693.54 255 2693.54 255 4302.97 255 3961.80 255 1683.18
256 256 2703.90 256 2703.90 256 4319.52 256 3977.03 256 1689.65
257 257 2714.26 257 2714.26 257 4336.07 257 3992.26 257 1696.12
258 258 2724.62 258 2724.62 258 4352.62 258 4007.49 258 1702.59
259 259 2734.98 259 2734.98 259 4369.17 259 4022.72 259 1709.06
260 260 2745.34 260 2745.34 260 4385.72 260 4037.95 260 1715.53
261 261 2755.70 261 2755.70 261 4402.27 261 4053.18 261 1722.00
262 262 2766.06 262 2766.06 262 4418.82 262 4068.41 262 1728.47
263 263 2776.42 263 2776.42 263 4435.37 263 4083.64 263 1734.94
264 264 2786.78 264 2786.78 264 4451.92 264 4098.87 264 1741.41
265 265 2797.14 265 2797.14 265 4468.47 265 4114.10 265 1747.88
266 266 2807.50 266 2807.50 266 4485.02 266 4129.33 266 1754.35
267 267 2817.86 267 2817.86 267 4501.57 267 4144.56 267 1760.82
268 268 2828.22 268 2828.22 268 4518.12 268 4159.79 268 1767.29
269 269 2838.58 269 2838.58 269 4534.67 269 4175.02 269 1773.76
270 270 2848.94 270 2848.94 270 4551.22 270 4190.25 270 1780.23
271 271 2859.30 271 2859.30 271 4567.77 271 4205.48 271 1786.70
272 272 2869.66 272 2869.66 272 4584.32 272 4220.71 272 1793.17
273 273 2880.02 273 2880.02 273 4600.87 273 4235.94 273 1799.64

662593135.xlsx CONVEYANCE 7 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


274 274 2890.38 274 2890.38 274 4617.42 274 4251.17 274 1806.11
275 275 2900.74 275 2900.74 275 4633.97 275 4266.40 275 1812.58
276 276 2911.10 276 2911.10 276 4650.52 276 4281.63 276 1819.05
277 277 2921.46 277 2921.46 277 4667.07 277 4296.86 277 1825.52
278 278 2931.82 278 2931.82 278 4683.62 278 4312.09 278 1831.99
279 279 2942.18 279 2942.18 279 4700.17 279 4327.32 279 1838.46
280 280 2952.54 280 2952.54 280 4716.72 280 4342.55 280 1844.93
281 281 2962.90 281 2962.90 281 4733.27 281 4357.78 281 1851.40
282 282 2973.26 282 2973.26 282 4749.82 282 4373.01 282 1857.87
283 283 2983.62 283 2983.62 283 4766.37 283 4388.24 283 1864.34
284 284 2993.98 284 2993.98 284 4782.92 284 4403.47 284 1870.81
285 285 3004.34 285 3004.34 285 4799.47 285 4418.70 285 1877.28
286 286 3014.70 286 3014.70 286 4816.02 286 4433.93 286 1883.75
287 287 3025.06 287 3025.06 287 4832.57 287 4449.16 287 1890.22
288 288 3035.42 288 3035.42 288 4849.12 288 4464.39 288 1896.69
289 289 3045.78 289 3045.78 289 4865.67 289 4479.62 289 1903.16
290 290 3056.14 290 3056.14 290 4882.22 290 4494.85 290 1909.63
291 291 3066.50 291 3066.50 291 4898.77 291 4510.08 291 1916.10
292 292 3076.86 292 3076.86 292 4915.32 292 4525.31 292 1922.57
293 293 3087.22 293 3087.22 293 4931.87 293 4540.54 293 1929.04
294 294 3097.58 294 3097.58 294 4948.42 294 4555.77 294 1935.51
295 295 3107.94 295 3107.94 295 4964.97 295 4571.00 295 1941.98
296 296 3118.30 296 3118.30 296 4981.52 296 4586.23 296 1948.45
297 297 3128.66 297 3128.66 297 4998.07 297 4601.46 297 1954.92
298 298 3139.02 298 3139.02 298 5014.62 298 4616.69 298 1961.39
299 299 3149.38 299 3149.38 299 5031.17 299 4631.92 299 1967.86
300 300 3159.74 300 3159.74 300 5047.72 300 4647.15 300 1974.33
301 301 3170.10 301 3170.10 301 5064.27 301 4662.38 301 1980.80
302 302 3180.46 302 3180.46 302 5080.82 302 4677.61 302 1987.27
303 303 3190.82 303 3190.82 303 5097.37 303 4692.84 303 1993.74
304 304 3201.18 304 3201.18 304 5113.92 304 4708.07 304 2000.21
305 305 3211.54 305 3211.54 305 5130.47 305 4723.30 305 2006.68
306 306 3221.90 306 3221.90 306 5147.02 306 4738.53 306 2013.15
307 307 3232.26 307 3232.26 307 5163.57 307 4753.76 307 2019.62
308 308 3242.62 308 3242.62 308 5180.12 308 4768.99 308 2026.09
309 309 3252.98 309 3252.98 309 5196.67 309 4784.22 309 2032.56
310 310 3263.34 310 3263.34 310 5213.22 310 4799.45 310 2039.03
311 311 3273.70 311 3273.70 311 5229.77 311 4814.68 311 2045.50
312 312 3284.06 312 3284.06 312 5246.32 312 4829.91 312 2051.97

662593135.xlsx CONVEYANCE 8 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


313 313 3294.42 313 3294.42 313 5262.87 313 4845.14 313 2058.44
314 314 3304.78 314 3304.78 314 5279.42 314 4860.37 314 2064.91
315 315 3315.14 315 3315.14 315 5295.97 315 4875.60 315 2071.38
316 316 3325.50 316 3325.50 316 5312.52 316 4890.83 316 2077.85
317 317 3335.86 317 3335.86 317 5329.07 317 4906.06 317 2084.32
318 318 3346.22 318 3346.22 318 5345.62 318 4921.29 318 2090.79
319 319 3356.58 319 3356.58 319 5362.17 319 4936.52 319 2097.26
320 320 3366.94 320 3366.94 320 5378.72 320 4951.75 320 2103.73
321 321 3377.30 321 3377.30 321 5395.27 321 4966.98 321 2110.20
322 322 3387.66 322 3387.66 322 5411.82 322 4982.21 322 2116.67
323 323 3398.02 323 3398.02 323 5428.37 323 4997.44 323 2123.14
324 324 3408.38 324 3408.38 324 5444.92 324 5012.67 324 2129.61
325 325 3418.74 325 3418.74 325 5461.47 325 5027.90 325 2136.08
326 326 3429.10 326 3429.10 326 5478.02 326 5043.13 326 2142.55
327 327 3439.46 327 3439.46 327 5494.57 327 5058.36 327 2149.02
328 328 3449.82 328 3449.82 328 5511.12 328 5073.59 328 2155.49
329 329 3460.18 329 3460.18 329 5527.67 329 5088.82 329 2161.96
330 330 3470.54 330 3470.54 330 5544.22 330 5104.05 330 2168.43
331 331 3480.90 331 3480.90 331 5560.77 331 5119.28 331 2174.90
332 332 3491.26 332 3491.26 332 5577.32 332 5134.51 332 2181.37
333 333 3501.62 333 3501.62 333 5593.87 333 5149.74 333 2187.84
334 334 3511.98 334 3511.98 334 5610.42 334 5164.97 334 2194.31
335 335 3522.34 335 3522.34 335 5626.97 335 5180.20 335 2200.78
336 336 3532.70 336 3532.70 336 5643.52 336 5195.43 336 2207.25
337 337 3543.06 337 3543.06 337 5660.07 337 5210.66 337 2213.72
338 338 3553.42 338 3553.42 338 5676.62 338 5225.89 338 2220.19
339 339 3563.78 339 3563.78 339 5693.17 339 5241.12 339 2226.66
340 340 3574.14 340 3574.14 340 5709.72 340 5256.35 340 2233.13
341 341 3584.50 341 3584.50 341 5726.27 341 5271.58 341 2239.60
342 342 3594.86 342 3594.86 342 5742.82 342 5286.81 342 2246.07
343 343 3605.22 343 3605.22 343 5759.37 343 5302.04 343 2252.54
344 344 3615.58 344 3615.58 344 5775.92 344 5317.27 344 2259.01
345 345 3625.94 345 3625.94 345 5792.47 345 5332.50 345 2265.48
346 346 3636.30 346 3636.30 346 5809.02 346 5347.73 346 2271.95
347 347 3646.66 347 3646.66 347 5825.57 347 5362.96 347 2278.42
348 348 3657.02 348 3657.02 348 5842.12 348 5378.19 348 2284.89
349 349 3667.38 349 3667.38 349 5858.67 349 5393.42 349 2291.36
350 350 3677.74 350 3677.74 350 5875.22 350 5408.65 350 2297.83
351 351 3688.10 351 3688.10 351 5891.77 351 5423.88 351 2304.30

662593135.xlsx CONVEYANCE 9 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


352 352 3698.46 352 3698.46 352 5908.32 352 5439.11 352 2310.77
353 353 3708.82 353 3708.82 353 5924.87 353 5454.34 353 2317.24
354 354 3719.18 354 3719.18 354 5941.42 354 5469.57 354 2323.71
355 355 3729.54 355 3729.54 355 5957.97 355 5484.80 355 2330.18
356 356 3739.90 356 3739.90 356 5974.52 356 5500.03 356 2336.65
357 357 3750.26 357 3750.26 357 5991.07 357 5515.26 357 2343.12
358 358 3760.62 358 3760.62 358 6007.62 358 5530.49 358 2349.59
359 359 3770.98 359 3770.98 359 6024.17 359 5545.72 359 2356.06
360 360 3781.34 360 3781.34 360 6040.72 360 5560.95 360 2362.53
361 361 3791.70 361 3791.70 361 6057.27 361 5576.18 361 2369.00
362 362 3802.06 362 3802.06 362 6073.82 362 5591.41 362 2375.47
363 363 3812.42 363 3812.42 363 6090.37 363 5606.64 363 2381.94
364 364 3822.78 364 3822.78 364 6106.92 364 5621.87 364 2388.41
365 365 3833.14 365 3833.14 365 6123.47 365 5637.10 365 2394.88
366 366 3843.50 366 3843.50 366 6140.02 366 5652.33 366 2401.35
367 367 3853.86 367 3853.86 367 6156.57 367 5667.56 367 2407.82
368 368 3864.22 368 3864.22 368 6173.12 368 5682.79 368 2414.29
369 369 3874.58 369 3874.58 369 6189.67 369 5698.02 369 2420.76
370 370 3884.94 370 3884.94 370 6206.22 370 5713.25 370 2427.23
371 371 3895.30 371 3895.30 371 6222.77 371 5728.48 371 2433.70
372 372 3905.66 372 3905.66 372 6239.32 372 5743.71 372 2440.17
373 373 3916.02 373 3916.02 373 6255.87 373 5758.94 373 2446.64
374 374 3926.38 374 3926.38 374 6272.42 374 5774.17 374 2453.11
375 375 3936.74 375 3936.74 375 6288.97 375 5789.40 375 2459.58
376 376 3947.10 376 3947.10 376 6305.52 376 5804.63 376 2466.05
377 377 3957.46 377 3957.46 377 6322.07 377 5819.86 377 2472.52
378 378 3967.82 378 3967.82 378 6338.62 378 5835.09 378 2478.99
379 379 3978.18 379 3978.18 379 6355.17 379 5850.32 379 2485.46
380 380 3988.54 380 3988.54 380 6371.72 380 5865.55 380 2491.93
381 381 3998.90 381 3998.90 381 6388.27 381 5880.78 381 2498.40
382 382 4009.26 382 4009.26 382 6404.82 382 5896.01 382 2504.87
383 383 4019.62 383 4019.62 383 6421.37 383 5911.24 383 2511.34
384 384 4029.98 384 4029.98 384 6437.92 384 5926.47 384 2517.81
385 385 4040.34 385 4040.34 385 6454.47 385 5941.70 385 2524.28
386 386 4050.70 386 4050.70 386 6471.02 386 5956.93 386 2530.75
387 387 4061.06 387 4061.06 387 6487.57 387 5972.16 387 2537.22
388 388 4071.42 388 4071.42 388 6504.12 388 5987.39 388 2543.69
389 389 4081.78 389 4081.78 389 6520.67 389 6002.62 389 2550.16
390 390 4092.14 390 4092.14 390 6537.22 390 6017.85 390 2556.63

662593135.xlsx CONVEYANCE 10 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


391 391 4102.50 391 4102.50 391 6553.77 391 6033.08 391 2563.10
392 392 4112.86 392 4112.86 392 6570.32 392 6048.31 392 2569.57
393 393 4123.22 393 4123.22 393 6586.87 393 6063.54 393 2576.04
394 394 4133.58 394 4133.58 394 6603.42 394 6078.77 394 2582.51
395 395 4143.94 395 4143.94 395 6619.97 395 6094.00 395 2588.98
396 396 4154.30 396 4154.30 396 6636.52 396 6109.23 396 2595.45
397 397 4164.66 397 4164.66 397 6653.07 397 6124.46 397 2601.92
398 398 4175.02 398 4175.02 398 6669.62 398 6139.69 398 2608.39
399 399 4185.38 399 4185.38 399 6686.17 399 6154.92 399 2614.86
400 400 4195.74 400 4195.74 400 6702.72 400 6170.15 400 2621.33
401 401 4206.10 401 4206.10 401 6719.27 401 6185.38 401 2627.80
402 402 4216.46 402 4216.46 402 6735.82 402 6200.61 402 2634.27
403 403 4226.82 403 4226.82 403 6752.37 403 6215.84 403 2640.74
404 404 4237.18 404 4237.18 404 6768.92 404 6231.07 404 2647.21
405 405 4247.54 405 4247.54 405 6785.47 405 6246.30 405 2653.68
406 406 4257.90 406 4257.90 406 6802.02 406 6261.53 406 2660.15
407 407 4268.26 407 4268.26 407 6818.57 407 6276.76 407 2666.62
408 408 4278.62 408 4278.62 408 6835.12 408 6291.99 408 2673.09
409 409 4288.98 409 4288.98 409 6851.67 409 6307.22 409 2679.56
410 410 4299.34 410 4299.34 410 6868.22 410 6322.45 410 2686.03
411 411 4309.70 411 4309.70 411 6884.77 411 6337.68 411 2692.50
412 412 4320.06 412 4320.06 412 6901.32 412 6352.91 412 2698.97
413 413 4330.42 413 4330.42 413 6917.87 413 6368.14 413 2705.44
414 414 4340.78 414 4340.78 414 6934.42 414 6383.37 414 2711.91
415 415 4351.14 415 4351.14 415 6950.97 415 6398.60 415 2718.38
416 416 4361.50 416 4361.50 416 6967.52 416 6413.83 416 2724.85
417 417 4371.86 417 4371.86 417 6984.07 417 6429.06 417 2731.32
418 418 4382.22 418 4382.22 418 7000.62 418 6444.29 418 2737.79
419 419 4392.58 419 4392.58 419 7017.17 419 6459.52 419 2744.26
420 420 4402.94 420 4402.94 420 7033.72 420 6474.75 420 2750.73
421 421 4413.30 421 4413.30 421 7050.27 421 6489.98 421 2757.20
422 422 4423.66 422 4423.66 422 7066.82 422 6505.21 422 2763.67
423 423 4434.02 423 4434.02 423 7083.37 423 6520.44 423 2770.14
424 424 4444.38 424 4444.38 424 7099.92 424 6535.67 424 2776.61
425 425 4454.74 425 4454.74 425 7116.47 425 6550.90 425 2783.08
426 426 4465.10 426 4465.10 426 7133.02 426 6566.13 426 2789.55
427 427 4475.46 427 4475.46 427 7149.57 427 6581.36 427 2796.02
428 428 4485.82 428 4485.82 428 7166.12 428 6596.59 428 2802.49
429 429 4496.18 429 4496.18 429 7182.67 429 6611.82 429 2808.96

662593135.xlsx CONVEYANCE 11 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


430 430 4506.54 430 4506.54 430 7199.22 430 6627.05 430 2815.43
431 431 4516.90 431 4516.90 431 7215.77 431 6642.28 431 2821.90
432 432 4527.26 432 4527.26 432 7232.32 432 6657.51 432 2828.37
433 433 4537.62 433 4537.62 433 7248.87 433 6672.74 433 2834.84
434 434 4547.98 434 4547.98 434 7265.42 434 6687.97 434 2841.31
435 435 4558.34 435 4558.34 435 7281.97 435 6703.20 435 2847.78
436 436 4568.70 436 4568.70 436 7298.52 436 6718.43 436 2854.25
437 437 4579.06 437 4579.06 437 7315.07 437 6733.66 437 2860.72
438 438 4589.42 438 4589.42 438 7331.62 438 6748.89 438 2867.19
439 439 4599.78 439 4599.78 439 7348.17 439 6764.12 439 2873.66
440 440 4610.14 440 4610.14 440 7364.72 440 6779.35 440 2880.13
441 441 4620.50 441 4620.50 441 7381.27 441 6794.58 441 2886.60
442 442 4630.86 442 4630.86 442 7397.82 442 6809.81 442 2893.07
443 443 4641.22 443 4641.22 443 7414.37 443 6825.04 443 2899.54
444 444 4651.58 444 4651.58 444 7430.92 444 6840.27 444 2906.01
445 445 4661.94 445 4661.94 445 7447.47 445 6855.50 445 2912.48
446 446 4672.30 446 4672.30 446 7464.02 446 6870.73 446 2918.95
447 447 4682.66 447 4682.66 447 7480.57 447 6885.96 447 2925.42
448 448 4693.02 448 4693.02 448 7497.12 448 6901.19 448 2931.89
449 449 4703.38 449 4703.38 449 7513.67 449 6916.42 449 2938.36
450 450 4713.74 450 4713.74 450 7530.22 450 6931.65 450 2944.83
451 451 4724.10 451 4724.10 451 7546.77 451 6946.88 451 2951.30
452 452 4734.46 452 4734.46 452 7563.32 452 6962.11 452 2957.77
453 453 4744.82 453 4744.82 453 7579.87 453 6977.34 453 2964.24
454 454 4755.18 454 4755.18 454 7596.42 454 6992.57 454 2970.71
455 455 4765.54 455 4765.54 455 7612.97 455 7007.80 455 2977.18
456 456 4775.90 456 4775.90 456 7629.52 456 7023.03 456 2983.65
457 457 4786.26 457 4786.26 457 7646.07 457 7038.26 457 2990.12
458 458 4796.62 458 4796.62 458 7662.62 458 7053.49 458 2996.59
459 459 4806.98 459 4806.98 459 7679.17 459 7068.72 459 3003.06
460 460 4817.34 460 4817.34 460 7695.72 460 7083.95 460 3009.53
461 461 4827.70 461 4827.70 461 7712.27 461 7099.18 461 3016.00
462 462 4838.06 462 4838.06 462 7728.82 462 7114.41 462 3022.47
463 463 4848.42 463 4848.42 463 7745.37 463 7129.64 463 3028.94
464 464 4858.78 464 4858.78 464 7761.92 464 7144.87 464 3035.41
465 465 4869.14 465 4869.14 465 7778.47 465 7160.10 465 3041.88
466 466 4879.50 466 4879.50 466 7795.02 466 7175.33 466 3048.35
467 467 4889.86 467 4889.86 467 7811.57 467 7190.56 467 3054.82
468 468 4900.22 468 4900.22 468 7828.12 468 7205.79 468 3061.29

662593135.xlsx CONVEYANCE 12 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


469 469 4910.58 469 4910.58 469 7844.67 469 7221.02 469 3067.76
470 470 4920.94 470 4920.94 470 7861.22 470 7236.25 470 3074.23
471 471 4931.30 471 4931.30 471 7877.77 471 7251.48 471 3080.70
472 472 4941.66 472 4941.66 472 7894.32 472 7266.71 472 3087.17
473 473 4952.02 473 4952.02 473 7910.87 473 7281.94 473 3093.64
474 474 4962.38 474 4962.38 474 7927.42 474 7297.17 474 3100.11
475 475 4972.74 475 4972.74 475 7943.97 475 7312.40 475 3106.58
476 476 4983.10 476 4983.10 476 7960.52 476 7327.63 476 3113.05
477 477 4993.46 477 4993.46 477 7977.07 477 7342.86 477 3119.52
478 478 5003.82 478 5003.82 478 7993.62 478 7358.09 478 3125.99
479 479 5014.18 479 5014.18 479 8010.17 479 7373.32 479 3132.46
480 480 5024.54 480 5024.54 480 8026.72 480 7388.55 480 3138.93
481 481 5034.90 481 5034.90 481 8043.27 481 7403.78 481 3145.40
482 482 5045.26 482 5045.26 482 8059.82 482 7419.01 482 3151.87
483 483 5055.62 483 5055.62 483 8076.37 483 7434.24 483 3158.34
484 484 5065.98 484 5065.98 484 8092.92 484 7449.47 484 3164.81
485 485 5076.34 485 5076.34 485 8109.47 485 7464.70 485 3171.28
486 486 5086.70 486 5086.70 486 8126.02 486 7479.93 486 3177.75
487 487 5097.06 487 5097.06 487 8142.57 487 7495.16 487 3184.22
488 488 5107.42 488 5107.42 488 8159.12 488 7510.39 488 3190.69
489 489 5117.78 489 5117.78 489 8175.67 489 7525.62 489 3197.16
490 490 5128.14 490 5128.14 490 8192.22 490 7540.85 490 3203.63
491 491 5138.50 491 5138.50 491 8208.77 491 7556.08 491 3210.10
492 492 5148.86 492 5148.86 492 8225.32 492 7571.31 492 3216.57
493 493 5159.22 493 5159.22 493 8241.87 493 7586.54 493 3223.04
494 494 5169.58 494 5169.58 494 8258.42 494 7601.77 494 3229.51
495 495 5179.94 495 5179.94 495 8274.97 495 7617.00 495 3235.98
496 496 5190.30 496 5190.30 496 8291.52 496 7632.23 496 3242.45
497 497 5200.66 497 5200.66 497 8308.07 497 7647.46 497 3248.92
498 498 5211.02 498 5211.02 498 8324.62 498 7662.69 498 3255.39
499 499 5221.38 499 5221.38 499 8341.17 499 7677.92 499 3261.86
500 500 5231.74 500 5231.74 500 8357.72 500 7693.15 500 3268.33
501 501 5242.10 501 5242.10 501 8374.27 501 7708.38 501 3274.80
502 502 5252.46 502 5252.46 502 8390.82 502 7723.61 502 3281.27
503 503 5262.82 503 5262.82 503 8407.37 503 7738.84 503 3287.74
504 504 5273.18 504 5273.18 504 8423.92 504 7754.07 504 3294.21
505 505 5283.54 505 5283.54 505 8440.47 505 7769.30 505 3300.68
506 506 5293.90 506 5293.90 506 8457.02 506 7784.53 506 3307.15
507 507 5304.26 507 5304.26 507 8473.57 507 7799.76 507 3313.62

662593135.xlsx CONVEYANCE 13 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


508 508 5314.62 508 5314.62 508 8490.12 508 7814.99 508 3320.09
509 509 5324.98 509 5324.98 509 8506.67 509 7830.22 509 3326.56
510 510 5335.34 510 5335.34 510 8523.22 510 7845.45 510 3333.03
511 511 5345.70 511 5345.70 511 8539.77 511 7860.68 511 3339.50
512 512 5356.06 512 5356.06 512 8556.32 512 7875.91 512 3345.97
513 513 5366.42 513 5366.42 513 8572.87 513 7891.14 513 3352.44
514 514 5376.78 514 5376.78 514 8589.42 514 7906.37 514 3358.91
515 515 5387.14 515 5387.14 515 8605.97 515 7921.60 515 3365.38
516 516 5397.50 516 5397.50 516 8622.52 516 7936.83 516 3371.85
517 517 5407.86 517 5407.86 517 8639.07 517 7952.06 517 3378.32
518 518 5418.22 518 5418.22 518 8655.62 518 7967.29 518 3384.79
519 519 5428.58 519 5428.58 519 8672.17 519 7982.52 519 3391.26
520 520 5438.94 520 5438.94 520 8688.72 520 7997.75 520 3397.73
521 521 5449.30 521 5449.30 521 8705.27 521 8012.98 521 3404.20
522 522 5459.66 522 5459.66 522 8721.82 522 8028.21 522 3410.67
523 523 5470.02 523 5470.02 523 8738.37 523 8043.44 523 3417.14
524 524 5480.38 524 5480.38 524 8754.92 524 8058.67 524 3423.61
525 525 5490.74 525 5490.74 525 8771.47 525 8073.90 525 3430.08
526 526 5501.10 526 5501.10 526 8788.02 526 8089.13 526 3436.55
527 527 5511.46 527 5511.46 527 8804.57 527 8104.36 527 3443.02
528 528 5521.82 528 5521.82 528 8821.12 528 8119.59 528 3449.49
529 529 5532.18 529 5532.18 529 8837.67 529 8134.82 529 3455.96
530 530 5542.54 530 5542.54 530 8854.22 530 8150.05 530 3462.43
531 531 5552.90 531 5552.90 531 8870.77 531 8165.28 531 3468.90
532 532 5563.26 532 5563.26 532 8887.32 532 8180.51 532 3475.37
533 533 5573.62 533 5573.62 533 8903.87 533 8195.74 533 3481.84
534 534 5583.98 534 5583.98 534 8920.42 534 8210.97 534 3488.31
535 535 5594.34 535 5594.34 535 8936.97 535 8226.20 535 3494.78
536 536 5604.70 536 5604.70 536 8953.52 536 8241.43 536 3501.25
537 537 5615.06 537 5615.06 537 8970.07 537 8256.66 537 3507.72
538 538 5625.42 538 5625.42 538 8986.62 538 8271.89 538 3514.19
539 539 5635.78 539 5635.78 539 9003.17 539 8287.12 539 3520.66
540 540 5646.14 540 5646.14 540 9019.72 540 8302.35 540 3527.13
541 541 5656.50 541 5656.50 541 9036.27 541 8317.58 541 3533.60
542 542 5666.86 542 5666.86 542 9052.82 542 8332.81 542 3540.07
543 543 5677.22 543 5677.22 543 9069.37 543 8348.04 543 3546.54
544 544 5687.58 544 5687.58 544 9085.92 544 8363.27 544 3553.01
545 545 5697.94 545 5697.94 545 9102.47 545 8378.50 545 3559.48
546 546 5708.30 546 5708.30 546 9119.02 546 8393.73 546 3565.95

662593135.xlsx CONVEYANCE 14 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


547 547 5718.66 547 5718.66 547 9135.57 547 8408.96 547 3572.42
548 548 5729.02 548 5729.02 548 9152.12 548 8424.19 548 3578.89
549 549 5739.38 549 5739.38 549 9168.67 549 8439.42 549 3585.36
550 550 5749.74 550 5749.74 550 9185.22 550 8454.65 550 3591.83
551 551 5760.10 551 5760.10 551 9201.77 551 8469.88 551 3598.30
552 552 5770.46 552 5770.46 552 9218.32 552 8485.11 552 3604.77
553 553 5780.82 553 5780.82 553 9234.87 553 8500.34 553 3611.24
554 554 5791.18 554 5791.18 554 9251.42 554 8515.57 554 3617.71
555 555 5801.54 555 5801.54 555 9267.97 555 8530.80 555 3624.18
556 556 5811.90 556 5811.90 556 9284.52 556 8546.03 556 3630.65
557 557 5822.26 557 5822.26 557 9301.07 557 8561.26 557 3637.12
558 558 5832.62 558 5832.62 558 9317.62 558 8576.49 558 3643.59
559 559 5842.98 559 5842.98 559 9334.17 559 8591.72 559 3650.06
560 560 5853.34 560 5853.34 560 9350.72 560 8606.95 560 3656.53
561 561 5863.70 561 5863.70 561 9367.27 561 8622.18 561 3663.00
562 562 5874.06 562 5874.06 562 9383.82 562 8637.41 562 3669.47
563 563 5884.42 563 5884.42 563 9400.37 563 8652.64 563 3675.94
564 564 5894.78 564 5894.78 564 9416.92 564 8667.87 564 3682.41
565 565 5905.14 565 5905.14 565 9433.47 565 8683.10 565 3688.88
566 566 5915.50 566 5915.50 566 9450.02 566 8698.33 566 3695.35
567 567 5925.86 567 5925.86 567 9466.57 567 8713.56 567 3701.82
568 568 5936.22 568 5936.22 568 9483.12 568 8728.79 568 3708.29
569 569 5946.58 569 5946.58 569 9499.67 569 8744.02 569 3714.76
570 570 5956.94 570 5956.94 570 9516.22 570 8759.25 570 3721.23
571 571 5967.30 571 5967.30 571 9532.77 571 8774.48 571 3727.70
572 572 5977.66 572 5977.66 572 9549.32 572 8789.71 572 3734.17
573 573 5988.02 573 5988.02 573 9565.87 573 8804.94 573 3740.64
574 574 5998.38 574 5998.38 574 9582.42 574 8820.17 574 3747.11
575 575 6008.74 575 6008.74 575 9598.97 575 8835.40 575 3753.58
576 576 6019.10 576 6019.10 576 9615.52 576 8850.63 576 3760.05
577 577 6029.46 577 6029.46 577 9632.07 577 8865.86 577 3766.52
578 578 6039.82 578 6039.82 578 9648.62 578 8881.09 578 3772.99
579 579 6050.18 579 6050.18 579 9665.17 579 8896.32 579 3779.46
580 580 6060.54 580 6060.54 580 9681.72 580 8911.55 580 3785.93
581 581 6070.90 581 6070.90 581 9698.27 581 8926.78 581 3792.40
582 582 6081.26 582 6081.26 582 9714.82 582 8942.01 582 3798.87
583 583 6091.62 583 6091.62 583 9731.37 583 8957.24 583 3805.34
584 584 6101.98 584 6101.98 584 9747.92 584 8972.47 584 3811.81
585 585 6112.34 585 6112.34 585 9764.47 585 8987.70 585 3818.28

662593135.xlsx CONVEYANCE 15 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


586 586 6122.70 586 6122.70 586 9781.02 586 9002.93 586 3824.75
587 587 6133.06 587 6133.06 587 9797.57 587 9018.16 587 3831.22
588 588 6143.42 588 6143.42 588 9814.12 588 9033.39 588 3837.69
589 589 6153.78 589 6153.78 589 9830.67 589 9048.62 589 3844.16
590 590 6164.14 590 6164.14 590 9847.22 590 9063.85 590 3850.63
591 591 6174.50 591 6174.50 591 9863.77 591 9079.08 591 3857.10
592 592 6184.86 592 6184.86 592 9880.32 592 9094.31 592 3863.57
593 593 6195.22 593 6195.22 593 9896.87 593 9109.54 593 3870.04
594 594 6205.58 594 6205.58 594 9913.42 594 9124.77 594 3876.51
595 595 6215.94 595 6215.94 595 9929.97 595 9140.00 595 3882.98
596 596 6226.30 596 6226.30 596 9946.52 596 9155.23 596 3889.45
597 597 6236.66 597 6236.66 597 9963.07 597 9170.46 597 3895.92
598 598 6247.02 598 6247.02 598 9979.62 598 9185.69 598 3902.39
599 599 6257.38 599 6257.38 599 9996.17 599 9200.92 599 3908.86
600 600 6267.74 600 6267.74 600 10012.72 600 9216.15 600 3915.33
601 601 6278.10 601 6278.10 601 10029.27 601 9231.38 601 3921.80
602 602 6288.46 602 6288.46 602 10045.82 602 9246.61 602 3928.27
603 603 6298.82 603 6298.82 603 10062.37 603 9261.84 603 3934.74
604 604 6309.18 604 6309.18 604 10078.92 604 9277.07 604 3941.21
605 605 6319.54 605 6319.54 605 10095.47 605 9292.30 605 3947.68
606 606 6329.90 606 6329.90 606 10112.02 606 9307.53 606 3954.15
607 607 6340.26 607 6340.26 607 10128.57 607 9322.76 607 3960.62
608 608 6350.62 608 6350.62 608 10145.12 608 9337.99 608 3967.09
609 609 6360.98 609 6360.98 609 10161.67 609 9353.22 609 3973.56
610 610 6371.34 610 6371.34 610 10178.22 610 9368.45 610 3980.03
611 611 6381.70 611 6381.70 611 10194.77 611 9383.68 611 3986.50
612 612 6392.06 612 6392.06 612 10211.32 612 9398.91 612 3992.97
613 613 6402.42 613 6402.42 613 10227.87 613 9414.14 613 3999.44
614 614 6412.78 614 6412.78 614 10244.42 614 9429.37 614 4005.91
615 615 6423.14 615 6423.14 615 10260.97 615 9444.60 615 4012.38
616 616 6433.50 616 6433.50 616 10277.52 616 9459.83 616 4018.85
617 617 6443.86 617 6443.86 617 10294.07 617 9475.06 617 4025.32
618 618 6454.22 618 6454.22 618 10310.62 618 9490.29 618 4031.79
619 619 6464.58 619 6464.58 619 10327.17 619 9505.52 619 4038.26
620 620 6474.94 620 6474.94 620 10343.72 620 9520.75 620 4044.73
621 621 6485.30 621 6485.30 621 10360.27 621 9535.98 621 4051.20
622 622 6495.66 622 6495.66 622 10376.82 622 9551.21 622 4057.67
623 623 6506.02 623 6506.02 623 10393.37 623 9566.44 623 4064.14
624 624 6516.38 624 6516.38 624 10409.92 624 9581.67 624 4070.61

662593135.xlsx CONVEYANCE 16 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


625 625 6526.74 625 6526.74 625 10426.47 625 9596.90 625 4077.08
626 626 6537.10 626 6537.10 626 10443.02 626 9612.13 626 4083.55
627 627 6547.46 627 6547.46 627 10459.57 627 9627.36 627 4090.02
628 628 6557.82 628 6557.82 628 10476.12 628 9642.59 628 4096.49
629 629 6568.18 629 6568.18 629 10492.67 629 9657.82 629 4102.96
630 630 6578.54 630 6578.54 630 10509.22 630 9673.05 630 4109.43
631 631 6588.90 631 6588.90 631 10525.77 631 9688.28 631 4115.90
632 632 6599.26 632 6599.26 632 10542.32 632 9703.51 632 4122.37
633 633 6609.62 633 6609.62 633 10558.87 633 9718.74 633 4128.84
634 634 6619.98 634 6619.98 634 10575.42 634 9733.97 634 4135.31
635 635 6630.34 635 6630.34 635 10591.97 635 9749.20 635 4141.78
636 636 6640.70 636 6640.70 636 10608.52 636 9764.43 636 4148.25
637 637 6651.06 637 6651.06 637 10625.07 637 9779.66 637 4154.72
638 638 6661.42 638 6661.42 638 10641.62 638 9794.89 638 4161.19
639 639 6671.78 639 6671.78 639 10658.17 639 9810.12 639 4167.66
640 640 6682.14 640 6682.14 640 10674.72 640 9825.35 640 4174.13
641 641 6692.50 641 6692.50 641 10691.27 641 9840.58 641 4180.60
642 642 6702.86 642 6702.86 642 10707.82 642 9855.81 642 4187.07
643 643 6713.22 643 6713.22 643 10724.37 643 9871.04 643 4193.54
644 644 6723.58 644 6723.58 644 10740.92 644 9886.27 644 4200.01
645 645 6733.94 645 6733.94 645 10757.47 645 9901.50 645 4206.48
646 646 6744.30 646 6744.30 646 10774.02 646 9916.73 646 4212.95
647 647 6754.66 647 6754.66 647 10790.57 647 9931.96 647 4219.42
648 648 6765.02 648 6765.02 648 10807.12 648 9947.19 648 4225.89
649 649 6775.38 649 6775.38 649 10823.67 649 9962.42 649 4232.36
650 650 6785.74 650 6785.74 650 10840.22 650 9977.65 650 4238.83
651 651 6796.10 651 6796.10 651 10856.77 651 9992.88 651 4245.30
652 652 6806.46 652 6806.46 652 10873.32 652 10008.11 652 4251.77
653 653 6816.82 653 6816.82 653 10889.87 653 10023.34 653 4258.24
654 654 6827.18 654 6827.18 654 10906.42 654 10038.57 654 4264.71
655 655 6837.54 655 6837.54 655 10922.97 655 10053.80 655 4271.18
656 656 6847.90 656 6847.90 656 10939.52 656 10069.03 656 4277.65
657 657 6858.26 657 6858.26 657 10956.07 657 10084.26 657 4284.12
658 658 6868.62 658 6868.62 658 10972.62 658 10099.49 658 4290.59
659 659 6878.98 659 6878.98 659 10989.17 659 10114.72 659 4297.06
660 660 6889.34 660 6889.34 660 11005.72 660 10129.95 660 4303.53
661 661 6899.70 661 6899.70 661 11022.27 661 10145.18 661 4310.00
662 662 6910.06 662 6910.06 662 11038.82 662 10160.41 662 4316.47
663 663 6920.42 663 6920.42 663 11055.37 663 10175.64 663 4322.94

662593135.xlsx CONVEYANCE 17 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


664 664 6930.78 664 6930.78 664 11071.92 664 10190.87 664 4329.41
665 665 6941.14 665 6941.14 665 11088.47 665 10206.10 665 4335.88
666 666 6951.50 666 6951.50 666 11105.02 666 10221.33 666 4342.35
667 667 6961.86 667 6961.86 667 11121.57 667 10236.56 667 4348.82
668 668 6972.22 668 6972.22 668 11138.12 668 10251.79 668 4355.29
669 669 6982.58 669 6982.58 669 11154.67 669 10267.02 669 4361.76
670 670 6992.94 670 6992.94 670 11171.22 670 10282.25 670 4368.23
671 671 7003.30 671 7003.30 671 11187.77 671 10297.48 671 4374.70
672 672 7013.66 672 7013.66 672 11204.32 672 10312.71 672 4381.17
673 673 7024.02 673 7024.02 673 11220.87 673 10327.94 673 4387.64
674 674 7034.38 674 7034.38 674 11237.42 674 10343.17 674 4394.11
675 675 7044.74 675 7044.74 675 11253.97 675 10358.40 675 4400.58
676 676 7055.10 676 7055.10 676 11270.52 676 10373.63 676 4407.05
677 677 7065.46 677 7065.46 677 11287.07 677 10388.86 677 4413.52
678 678 7075.82 678 7075.82 678 11303.62 678 10404.09 678 4419.99
679 679 7086.18 679 7086.18 679 11320.17 679 10419.32 679 4426.46
680 680 7096.54 680 7096.54 680 11336.72 680 10434.55 680 4432.93
681 681 7106.90 681 7106.90 681 11353.27 681 10449.78 681 4439.40
682 682 7117.26 682 7117.26 682 11369.82 682 10465.01 682 4445.87
683 683 7127.62 683 7127.62 683 11386.37 683 10480.24 683 4452.34
684 684 7137.98 684 7137.98 684 11402.92 684 10495.47 684 4458.81
685 685 7148.34 685 7148.34 685 11419.47 685 10510.70 685 4465.28
686 686 7158.70 686 7158.70 686 11436.02 686 10525.93 686 4471.75
687 687 7169.06 687 7169.06 687 11452.57 687 10541.16 687 4478.22
688 688 7179.42 688 7179.42 688 11469.12 688 10556.39 688 4484.69
689 689 7189.78 689 7189.78 689 11485.67 689 10571.62 689 4491.16
690 690 7200.14 690 7200.14 690 11502.22 690 10586.85 690 4497.63
691 691 7210.50 691 7210.50 691 11518.77 691 10602.08 691 4504.10
692 692 7220.86 692 7220.86 692 11535.32 692 10617.31 692 4510.57
693 693 7231.22 693 7231.22 693 11551.87 693 10632.54 693 4517.04
694 694 7241.58 694 7241.58 694 11568.42 694 10647.77 694 4523.51
695 695 7251.94 695 7251.94 695 11584.97 695 10663.00 695 4529.98
696 696 7262.30 696 7262.30 696 11601.52 696 10678.23 696 4536.45
697 697 7272.66 697 7272.66 697 11618.07 697 10693.46 697 4542.92
698 698 7283.02 698 7283.02 698 11634.62 698 10708.69 698 4549.39
699 699 7293.38 699 7293.38 699 11651.17 699 10723.92 699 4555.86
700 700 7303.74 700 7303.74 700 11667.72 700 10739.15 700 4562.33
701 701 7314.10 701 7314.10 701 11684.27 701 10754.38 701 4568.80
702 702 7324.46 702 7324.46 702 11700.82 702 10769.61 702 4575.27

662593135.xlsx CONVEYANCE 18 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


703 703 7334.82 703 7334.82 703 11717.37 703 10784.84 703 4581.74
704 704 7345.18 704 7345.18 704 11733.92 704 10800.07 704 4588.21
705 705 7355.54 705 7355.54 705 11750.47 705 10815.30 705 4594.68
706 706 7365.90 706 7365.90 706 11767.02 706 10830.53 706 4601.15
707 707 7376.26 707 7376.26 707 11783.57 707 10845.76 707 4607.62
708 708 7386.62 708 7386.62 708 11800.12 708 10860.99 708 4614.09
709 709 7396.98 709 7396.98 709 11816.67 709 10876.22 709 4620.56
710 710 7407.34 710 7407.34 710 11833.22 710 10891.45 710 4627.03
711 711 7417.70 711 7417.70 711 11849.77 711 10906.68 711 4633.50
712 712 7428.06 712 7428.06 712 11866.32 712 10921.91 712 4639.97
713 713 7438.42 713 7438.42 713 11882.87 713 10937.14 713 4646.44
714 714 7448.78 714 7448.78 714 11899.42 714 10952.37 714 4652.91
715 715 7459.14 715 7459.14 715 11915.97 715 10967.60 715 4659.38
716 716 7469.50 716 7469.50 716 11932.52 716 10982.83 716 4665.85
717 717 7479.86 717 7479.86 717 11949.07 717 10998.06 717 4672.32
718 718 7490.22 718 7490.22 718 11965.62 718 11013.29 718 4678.79
719 719 7500.58 719 7500.58 719 11982.17 719 11028.52 719 4685.26
720 720 7510.94 720 7510.94 720 11998.72 720 11043.75 720 4691.73
721 721 7521.30 721 7521.30 721 12015.27 721 11058.98 721 4698.20
722 722 7531.66 722 7531.66 722 12031.82 722 11074.21 722 4704.67
723 723 7542.02 723 7542.02 723 12048.37 723 11089.44 723 4711.14
724 724 7552.38 724 7552.38 724 12064.92 724 11104.67 724 4717.61
725 725 7562.74 725 7562.74 725 12081.47 725 11119.90 725 4724.08
726 726 7573.10 726 7573.10 726 12098.02 726 11135.13 726 4730.55
727 727 7583.46 727 7583.46 727 12114.57 727 11150.36 727 4737.02
728 728 7593.82 728 7593.82 728 12131.12 728 11165.59 728 4743.49
729 729 7604.18 729 7604.18 729 12147.67 729 11180.82 729 4749.96
730 730 7614.54 730 7614.54 730 12164.22 730 11196.05 730 4756.43
731 731 7624.90 731 7624.90 731 12180.77 731 11211.28 731 4762.90
732 732 7635.26 732 7635.26 732 12197.32 732 11226.51 732 4769.37
733 733 7645.62 733 7645.62 733 12213.87 733 11241.74 733 4775.84
734 734 7655.98 734 7655.98 734 12230.42 734 11256.97 734 4782.31
735 735 7666.34 735 7666.34 735 12246.97 735 11272.20 735 4788.78
736 736 7676.70 736 7676.70 736 12263.52 736 11287.43 736 4795.25
737 737 7687.06 737 7687.06 737 12280.07 737 11302.66 737 4801.72
738 738 7697.42 738 7697.42 738 12296.62 738 11317.89 738 4808.19
739 739 7707.78 739 7707.78 739 12313.17 739 11333.12 739 4814.66
740 740 7718.14 740 7718.14 740 12329.72 740 11348.35 740 4821.13
741 741 7728.50 741 7728.50 741 12346.27 741 11363.58 741 4827.60

662593135.xlsx CONVEYANCE 19 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


742 742 7738.86 742 7738.86 742 12362.82 742 11378.81 742 4834.07
743 743 7749.22 743 7749.22 743 12379.37 743 11394.04 743 4840.54
744 744 7759.58 744 7759.58 744 12395.92 744 11409.27 744 4847.01
745 745 7769.94 745 7769.94 745 12412.47 745 11424.50 745 4853.48
746 746 7780.30 746 7780.30 746 12429.02 746 11439.73 746 4859.95
747 747 7790.66 747 7790.66 747 12445.57 747 11454.96 747 4866.42
748 748 7801.02 748 7801.02 748 12462.12 748 11470.19 748 4872.89
749 749 7811.38 749 7811.38 749 12478.67 749 11485.42 749 4879.36
750 750 7821.74 750 7821.74 750 12495.22 750 11500.65 750 4885.83
751 751 7832.10 751 7832.10 751 12511.77 751 11515.88 751 4892.30
752 752 7842.46 752 7842.46 752 12528.32 752 11531.11 752 4898.77
753 753 7852.82 753 7852.82 753 12544.87 753 11546.34 753 4905.24
754 754 7863.18 754 7863.18 754 12561.42 754 11561.57 754 4911.71
755 755 7873.54 755 7873.54 755 12577.97 755 11576.80 755 4918.18
756 756 7883.90 756 7883.90 756 12594.52 756 11592.03 756 4924.65
757 757 7894.26 757 7894.26 757 12611.07 757 11607.26 757 4931.12
758 758 7904.62 758 7904.62 758 12627.62 758 11622.49 758 4937.59
759 759 7914.98 759 7914.98 759 12644.17 759 11637.72 759 4944.06
760 760 7925.34 760 7925.34 760 12660.72 760 11652.95 760 4950.53
761 761 7935.70 761 7935.70 761 12677.27 761 11668.18 761 4957.00
762 762 7946.06 762 7946.06 762 12693.82 762 11683.41 762 4963.47
763 763 7956.42 763 7956.42 763 12710.37 763 11698.64 763 4969.94
764 764 7966.78 764 7966.78 764 12726.92 764 11713.87 764 4976.41
765 765 7977.14 765 7977.14 765 12743.47 765 11729.10 765 4982.88
766 766 7987.50 766 7987.50 766 12760.02 766 11744.33 766 4989.35
767 767 7997.86 767 7997.86 767 12776.57 767 11759.56 767 4995.82
768 768 8008.22 768 8008.22 768 12793.12 768 11774.79 768 5002.29
769 769 8018.58 769 8018.58 769 12809.67 769 11790.02 769 5008.76
770 770 8028.94 770 8028.94 770 12826.22 770 11805.25 770 5015.23
771 771 8039.30 771 8039.30 771 12842.77 771 11820.48 771 5021.70
772 772 8049.66 772 8049.66 772 12859.32 772 11835.71 772 5028.17
773 773 8060.02 773 8060.02 773 12875.87 773 11850.94 773 5034.64
774 774 8070.38 774 8070.38 774 12892.42 774 11866.17 774 5041.11
775 775 8080.74 775 8080.74 775 12908.97 775 11881.40 775 5047.58
776 776 8091.10 776 8091.10 776 12925.52 776 11896.63 776 5054.05
777 777 8101.46 777 8101.46 777 12942.07 777 11911.86 777 5060.52
778 778 8111.82 778 8111.82 778 12958.62 778 11927.09 778 5066.99
779 779 8122.18 779 8122.18 779 12975.17 779 11942.32 779 5073.46
780 780 8132.54 780 8132.54 780 12991.72 780 11957.55 780 5079.93

662593135.xlsx CONVEYANCE 20 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


781 781 8142.90 781 8142.90 781 13008.27 781 11972.78 781 5086.40
782 782 8153.26 782 8153.26 782 13024.82 782 11988.01 782 5092.87
783 783 8163.62 783 8163.62 783 13041.37 783 12003.24 783 5099.34
784 784 8173.98 784 8173.98 784 13057.92 784 12018.47 784 5105.81
785 785 8184.34 785 8184.34 785 13074.47 785 12033.70 785 5112.28
786 786 8194.70 786 8194.70 786 13091.02 786 12048.93 786 5118.75
787 787 8205.06 787 8205.06 787 13107.57 787 12064.16 787 5125.22
788 788 8215.42 788 8215.42 788 13124.12 788 12079.39 788 5131.69
789 789 8225.78 789 8225.78 789 13140.67 789 12094.62 789 5138.16
790 790 8236.14 790 8236.14 790 13157.22 790 12109.85 790 5144.63
791 791 8246.50 791 8246.50 791 13173.77 791 12125.08 791 5151.10
792 792 8256.86 792 8256.86 792 13190.32 792 12140.31 792 5157.57
793 793 8267.22 793 8267.22 793 13206.87 793 12155.54 793 5164.04
794 794 8277.58 794 8277.58 794 13223.42 794 12170.77 794 5170.51
795 795 8287.94 795 8287.94 795 13239.97 795 12186.00 795 5176.98
796 796 8298.30 796 8298.30 796 13256.52 796 12201.23 796 5183.45
797 797 8308.66 797 8308.66 797 13273.07 797 12216.46 797 5189.92
798 798 8319.02 798 8319.02 798 13289.62 798 12231.69 798 5196.39
799 799 8329.38 799 8329.38 799 13306.17 799 12246.92 799 5202.86
800 800 8339.74 800 8339.74 800 13322.72 800 12262.15 800 5209.33
801 801 8350.10 801 8350.10 801 13339.27 801 12277.38 801 5215.80
802 802 8360.46 802 8360.46 802 13355.82 802 12292.61 802 5222.27
803 803 8370.82 803 8370.82 803 13372.37 803 12307.84 803 5228.74
804 804 8381.18 804 8381.18 804 13388.92 804 12323.07 804 5235.21
805 805 8391.54 805 8391.54 805 13405.47 805 12338.30 805 5241.68
806 806 8401.90 806 8401.90 806 13422.02 806 12353.53 806 5248.15
807 807 8412.26 807 8412.26 807 13438.57 807 12368.76 807 5254.62
808 808 8422.62 808 8422.62 808 13455.12 808 12383.99 808 5261.09
809 809 8432.98 809 8432.98 809 13471.67 809 12399.22 809 5267.56
810 810 8443.34 810 8443.34 810 13488.22 810 12414.45 810 5274.03
811 811 8453.70 811 8453.70 811 13504.77 811 12429.68 811 5280.50
812 812 8464.06 812 8464.06 812 13521.32 812 12444.91 812 5286.97
813 813 8474.42 813 8474.42 813 13537.87 813 12460.14 813 5293.44
814 814 8484.78 814 8484.78 814 13554.42 814 12475.37 814 5299.91
815 815 8495.14 815 8495.14 815 13570.97 815 12490.60 815 5306.38
816 816 8505.50 816 8505.50 816 13587.52 816 12505.83 816 5312.85
817 817 8515.86 817 8515.86 817 13604.07 817 12521.06 817 5319.32
818 818 8526.22 818 8526.22 818 13620.62 818 12536.29 818 5325.79
819 819 8536.58 819 8536.58 819 13637.17 819 12551.52 819 5332.26

662593135.xlsx CONVEYANCE 21 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


820 820 8546.94 820 8546.94 820 13653.72 820 12566.75 820 5338.73
821 821 8557.30 821 8557.30 821 13670.27 821 12581.98 821 5345.20
822 822 8567.66 822 8567.66 822 13686.82 822 12597.21 822 5351.67
823 823 8578.02 823 8578.02 823 13703.37 823 12612.44 823 5358.14
824 824 8588.38 824 8588.38 824 13719.92 824 12627.67 824 5364.61
825 825 8598.74 825 8598.74 825 13736.47 825 12642.90 825 5371.08
826 826 8609.10 826 8609.10 826 13753.02 826 12658.13 826 5377.55
827 827 8619.46 827 8619.46 827 13769.57 827 12673.36 827 5384.02
828 828 8629.82 828 8629.82 828 13786.12 828 12688.59 828 5390.49
829 829 8640.18 829 8640.18 829 13802.67 829 12703.82 829 5396.96
830 830 8650.54 830 8650.54 830 13819.22 830 12719.05 830 5403.43
831 831 8660.90 831 8660.90 831 13835.77 831 12734.28 831 5409.90
832 832 8671.26 832 8671.26 832 13852.32 832 12749.51 832 5416.37
833 833 8681.62 833 8681.62 833 13868.87 833 12764.74 833 5422.84
834 834 8691.98 834 8691.98 834 13885.42 834 12779.97 834 5429.31
835 835 8702.34 835 8702.34 835 13901.97 835 12795.20 835 5435.78
836 836 8712.70 836 8712.70 836 13918.52 836 12810.43 836 5442.25
837 837 8723.06 837 8723.06 837 13935.07 837 12825.66 837 5448.72
838 838 8733.42 838 8733.42 838 13951.62 838 12840.89 838 5455.19
839 839 8743.78 839 8743.78 839 13968.17 839 12856.12 839 5461.66
840 840 8754.14 840 8754.14 840 13984.72 840 12871.35 840 5468.13
841 841 8764.50 841 8764.50 841 14001.27 841 12886.58 841 5474.60
842 842 8774.86 842 8774.86 842 14017.82 842 12901.81 842 5481.07
843 843 8785.22 843 8785.22 843 14034.37 843 12917.04 843 5487.54
844 844 8795.58 844 8795.58 844 14050.92 844 12932.27 844 5494.01
845 845 8805.94 845 8805.94 845 14067.47 845 12947.50 845 5500.48
846 846 8816.30 846 8816.30 846 14084.02 846 12962.73 846 5506.95
847 847 8826.66 847 8826.66 847 14100.57 847 12977.96 847 5513.42
848 848 8837.02 848 8837.02 848 14117.12 848 12993.19 848 5519.89
849 849 8847.38 849 8847.38 849 14133.67 849 13008.42 849 5526.36
850 850 8857.74 850 8857.74 850 14150.22 850 13023.65 850 5532.83
851 851 8868.10 851 8868.10 851 14166.77 851 13038.88 851 5539.30
852 852 8878.46 852 8878.46 852 14183.32 852 13054.11 852 5545.77
853 853 8888.82 853 8888.82 853 14199.87 853 13069.34 853 5552.24
854 854 8899.18 854 8899.18 854 14216.42 854 13084.57 854 5558.71
855 855 8909.54 855 8909.54 855 14232.97 855 13099.80 855 5565.18
856 856 8919.90 856 8919.90 856 14249.52 856 13115.03 856 5571.65
857 857 8930.26 857 8930.26 857 14266.07 857 13130.26 857 5578.12
858 858 8940.62 858 8940.62 858 14282.62 858 13145.49 858 5584.59

662593135.xlsx CONVEYANCE 22 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


859 859 8950.98 859 8950.98 859 14299.17 859 13160.72 859 5591.06
860 860 8961.34 860 8961.34 860 14315.72 860 13175.95 860 5597.53
861 861 8971.70 861 8971.70 861 14332.27 861 13191.18 861 5604.00
862 862 8982.06 862 8982.06 862 14348.82 862 13206.41 862 5610.47
863 863 8992.42 863 8992.42 863 14365.37 863 13221.64 863 5616.94
864 864 9002.78 864 9002.78 864 14381.92 864 13236.87 864 5623.41
865 865 9013.14 865 9013.14 865 14398.47 865 13252.10 865 5629.88
866 866 9023.50 866 9023.50 866 14415.02 866 13267.33 866 5636.35
867 867 9033.86 867 9033.86 867 14431.57 867 13282.56 867 5642.82
868 868 9044.22 868 9044.22 868 14448.12 868 13297.79 868 5649.29
869 869 9054.58 869 9054.58 869 14464.67 869 13313.02 869 5655.76
870 870 9064.94 870 9064.94 870 14481.22 870 13328.25 870 5662.23
871 871 9075.30 871 9075.30 871 14497.77 871 13343.48 871 5668.70
872 872 9085.66 872 9085.66 872 14514.32 872 13358.71 872 5675.17
873 873 9096.02 873 9096.02 873 14530.87 873 13373.94 873 5681.64
874 874 9106.38 874 9106.38 874 14547.42 874 13389.17 874 5688.11
875 875 9116.74 875 9116.74 875 14563.97 875 13404.40 875 5694.58
876 876 9127.10 876 9127.10 876 14580.52 876 13419.63 876 5701.05
877 877 9137.46 877 9137.46 877 14597.07 877 13434.86 877 5707.52
878 878 9147.82 878 9147.82 878 14613.62 878 13450.09 878 5713.99
879 879 9158.18 879 9158.18 879 14630.17 879 13465.32 879 5720.46
880 880 9168.54 880 9168.54 880 14646.72 880 13480.55 880 5726.93
881 881 9178.90 881 9178.90 881 14663.27 881 13495.78 881 5733.40
882 882 9189.26 882 9189.26 882 14679.82 882 13511.01 882 5739.87
883 883 9199.62 883 9199.62 883 14696.37 883 13526.24 883 5746.34
884 884 9209.98 884 9209.98 884 14712.92 884 13541.47 884 5752.81
885 885 9220.34 885 9220.34 885 14729.47 885 13556.70 885 5759.28
886 886 9230.70 886 9230.70 886 14746.02 886 13571.93 886 5765.75
887 887 9241.06 887 9241.06 887 14762.57 887 13587.16 887 5772.22
888 888 9251.42 888 9251.42 888 14779.12 888 13602.39 888 5778.69
889 889 9261.78 889 9261.78 889 14795.67 889 13617.62 889 5785.16
890 890 9272.14 890 9272.14 890 14812.22 890 13632.85 890 5791.63
891 891 9282.50 891 9282.50 891 14828.77 891 13648.08 891 5798.10
892 892 9292.86 892 9292.86 892 14845.32 892 13663.31 892 5804.57
893 893 9303.22 893 9303.22 893 14861.87 893 13678.54 893 5811.04
894 894 9313.58 894 9313.58 894 14878.42 894 13693.77 894 5817.51
895 895 9323.94 895 9323.94 895 14894.97 895 13709.00 895 5823.98
896 896 9334.30 896 9334.30 896 14911.52 896 13724.23 896 5830.45
897 897 9344.66 897 9344.66 897 14928.07 897 13739.46 897 5836.92

662593135.xlsx CONVEYANCE 23 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


898 898 9355.02 898 9355.02 898 14944.62 898 13754.69 898 5843.39
899 899 9365.38 899 9365.38 899 14961.17 899 13769.92 899 5849.86
900 900 9375.74 900 9375.74 900 14977.72 900 13785.15 900 5856.33
901 901 9386.10 901 9386.10 901 14994.27 901 13800.38 901 5862.80
902 902 9396.46 902 9396.46 902 15010.82 902 13815.61 902 5869.27
903 903 9406.82 903 9406.82 903 15027.37 903 13830.84 903 5875.74
904 904 9417.18 904 9417.18 904 15043.92 904 13846.07 904 5882.21
905 905 9427.54 905 9427.54 905 15060.47 905 13861.30 905 5888.68
906 906 9437.90 906 9437.90 906 15077.02 906 13876.53 906 5895.15
907 907 9448.26 907 9448.26 907 15093.57 907 13891.76 907 5901.62
908 908 9458.62 908 9458.62 908 15110.12 908 13906.99 908 5908.09
909 909 9468.98 909 9468.98 909 15126.67 909 13922.22 909 5914.56
910 910 9479.34 910 9479.34 910 15143.22 910 13937.45 910 5921.03
911 911 9489.70 911 9489.70 911 15159.77 911 13952.68 911 5927.50
912 912 9500.06 912 9500.06 912 15176.32 912 13967.91 912 5933.97
913 913 9510.42 913 9510.42 913 15192.87 913 13983.14 913 5940.44
914 914 9520.78 914 9520.78 914 15209.42 914 13998.37 914 5946.91
915 915 9531.14 915 9531.14 915 15225.97 915 14013.60 915 5953.38
916 916 9541.50 916 9541.50 916 15242.52 916 14028.83 916 5959.85
917 917 9551.86 917 9551.86 917 15259.07 917 14044.06 917 5966.32
918 918 9562.22 918 9562.22 918 15275.62 918 14059.29 918 5972.79
919 919 9572.58 919 9572.58 919 15292.17 919 14074.52 919 5979.26
920 920 9582.94 920 9582.94 920 15308.72 920 14089.75 920 5985.73
921 921 9593.30 921 9593.30 921 15325.27 921 14104.98 921 5992.20
922 922 9603.66 922 9603.66 922 15341.82 922 14120.21 922 5998.67
923 923 9614.02 923 9614.02 923 15358.37 923 14135.44 923 6005.14
924 924 9624.38 924 9624.38 924 15374.92 924 14150.67 924 6011.61
925 925 9634.74 925 9634.74 925 15391.47 925 14165.90 925 6018.08
926 926 9645.10 926 9645.10 926 15408.02 926 14181.13 926 6024.55
927 927 9655.46 927 9655.46 927 15424.57 927 14196.36 927 6031.02
928 928 9665.82 928 9665.82 928 15441.12 928 14211.59 928 6037.49
929 929 9676.18 929 9676.18 929 15457.67 929 14226.82 929 6043.96
930 930 9686.54 930 9686.54 930 15474.22 930 14242.05 930 6050.43
931 931 9696.90 931 9696.90 931 15490.77 931 14257.28 931 6056.90
932 932 9707.26 932 9707.26 932 15507.32 932 14272.51 932 6063.37
933 933 9717.62 933 9717.62 933 15523.87 933 14287.74 933 6069.84
934 934 9727.98 934 9727.98 934 15540.42 934 14302.97 934 6076.31
935 935 9738.34 935 9738.34 935 15556.97 935 14318.20 935 6082.78
936 936 9748.70 936 9748.70 936 15573.52 936 14333.43 936 6089.25

662593135.xlsx CONVEYANCE 24 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


937 937 9759.06 937 9759.06 937 15590.07 937 14348.66 937 6095.72
938 938 9769.42 938 9769.42 938 15606.62 938 14363.89 938 6102.19
939 939 9779.78 939 9779.78 939 15623.17 939 14379.12 939 6108.66
940 940 9790.14 940 9790.14 940 15639.72 940 14394.35 940 6115.13
941 941 9800.50 941 9800.50 941 15656.27 941 14409.58 941 6121.60
942 942 9810.86 942 9810.86 942 15672.82 942 14424.81 942 6128.07
943 943 9821.22 943 9821.22 943 15689.37 943 14440.04 943 6134.54
944 944 9831.58 944 9831.58 944 15705.92 944 14455.27 944 6141.01
945 945 9841.94 945 9841.94 945 15722.47 945 14470.50 945 6147.48
946 946 9852.30 946 9852.30 946 15739.02 946 14485.73 946 6153.95
947 947 9862.66 947 9862.66 947 15755.57 947 14500.96 947 6160.42
948 948 9873.02 948 9873.02 948 15772.12 948 14516.19 948 6166.89
949 949 9883.38 949 9883.38 949 15788.67 949 14531.42 949 6173.36
950 950 9893.74 950 9893.74 950 15805.22 950 14546.65 950 6179.83
951 951 9904.10 951 9904.10 951 15821.77 951 14561.88 951 6186.30
952 952 9914.46 952 9914.46 952 15838.32 952 14577.11 952 6192.77
953 953 9924.82 953 9924.82 953 15854.87 953 14592.34 953 6199.24
954 954 9935.18 954 9935.18 954 15871.42 954 14607.57 954 6205.71
955 955 9945.54 955 9945.54 955 15887.97 955 14622.80 955 6212.18
956 956 9955.90 956 9955.90 956 15904.52 956 14638.03 956 6218.65
957 957 9966.26 957 9966.26 957 15921.07 957 14653.26 957 6225.12
958 958 9976.62 958 9976.62 958 15937.62 958 14668.49 958 6231.59
959 959 9986.98 959 9986.98 959 15954.17 959 14683.72 959 6238.06
960 960 9997.34 960 9997.34 960 15970.72 960 14698.95 960 6244.53
961 961 10007.70 961 10007.70 961 15987.27 961 14714.18 961 6251.00
962 962 10018.06 962 10018.06 962 16003.82 962 14729.41 962 6257.47
963 963 10028.42 963 10028.42 963 16020.37 963 14744.64 963 6263.94
964 964 10038.78 964 10038.78 964 16036.92 964 14759.87 964 6270.41
965 965 10049.14 965 10049.14 965 16053.47 965 14775.10 965 6276.88
966 966 10059.50 966 10059.50 966 16070.02 966 14790.33 966 6283.35
967 967 10069.86 967 10069.86 967 16086.57 967 14805.56 967 6289.82
968 968 10080.22 968 10080.22 968 16103.12 968 14820.79 968 6296.29
969 969 10090.58 969 10090.58 969 16119.67 969 14836.02 969 6302.76
970 970 10100.94 970 10100.94 970 16136.22 970 14851.25 970 6309.23
971 971 10111.30 971 10111.30 971 16152.77 971 14866.48 971 6315.70
972 972 10121.66 972 10121.66 972 16169.32 972 14881.71 972 6322.17
973 973 10132.02 973 10132.02 973 16185.87 973 14896.94 973 6328.64
974 974 10142.38 974 10142.38 974 16202.42 974 14912.17 974 6335.11
975 975 10152.74 975 10152.74 975 16218.97 975 14927.40 975 6341.58

662593135.xlsx CONVEYANCE 25 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


976 976 10163.10 976 10163.10 976 16235.52 976 14942.63 976 6348.05
977 977 10173.46 977 10173.46 977 16252.07 977 14957.86 977 6354.52
978 978 10183.82 978 10183.82 978 16268.62 978 14973.09 978 6360.99
979 979 10194.18 979 10194.18 979 16285.17 979 14988.32 979 6367.46
980 980 10204.54 980 10204.54 980 16301.72 980 15003.55 980 6373.93
981 981 10214.90 981 10214.90 981 16318.27 981 15018.78 981 6380.40
982 982 10225.26 982 10225.26 982 16334.82 982 15034.01 982 6386.87
983 983 10235.62 983 10235.62 983 16351.37 983 15049.24 983 6393.34
984 984 10245.98 984 10245.98 984 16367.92 984 15064.47 984 6399.81
985 985 10256.34 985 10256.34 985 16384.47 985 15079.70 985 6406.28
986 986 10266.70 986 10266.70 986 16401.02 986 15094.93 986 6412.75
987 987 10277.06 987 10277.06 987 16417.57 987 15110.16 987 6419.22
988 988 10287.42 988 10287.42 988 16434.12 988 15125.39 988 6425.69
989 989 10297.78 989 10297.78 989 16450.67 989 15140.62 989 6432.16
990 990 10308.14 990 10308.14 990 16467.22 990 15155.85 990 6438.63
991 991 10318.50 991 10318.50 991 16483.77 991 15171.08 991 6445.10
992 992 10328.86 992 10328.86 992 16500.32 992 15186.31 992 6451.57
993 993 10339.22 993 10339.22 993 16516.87 993 15201.54 993 6458.04
994 994 10349.58 994 10349.58 994 16533.42 994 15216.77 994 6464.51
995 995 10359.94 995 10359.94 995 16549.97 995 15232.00 995 6470.98
996 996 10370.30 996 10370.30 996 16566.52 996 15247.23 996 6477.45
997 997 10380.66 997 10380.66 997 16583.07 997 15262.46 997 6483.92
998 998 10391.02 998 10391.02 998 16599.62 998 15277.69 998 6490.39
999 999 10401.38 999 10401.38 999 16616.17 999 15292.92 999 6496.86
1000 1000 10411.74 1000 10411.74 1000 16632.72 1000 15308.15 1000 6503.33
1001 1001 10422.10 1001 10422.10 1001 16649.27 1001 15323.38 1001 6509.80
1002 1002 10432.46 1002 10432.46 1002 16665.82 1002 15338.61 1002 6516.27
1003 1003 10442.82 1003 10442.82 1003 16682.37 1003 15353.84 1003 6522.74
1004 1004 10453.18 1004 10453.18 1004 16698.92 1004 15369.07 1004 6529.21
1005 1005 10463.54 1005 10463.54 1005 16715.47 1005 15384.30 1005 6535.68
1006 1006 10473.90 1006 10473.90 1006 16732.02 1006 15399.53 1006 6542.15
1007 1007 10484.26 1007 10484.26 1007 16748.57 1007 15414.76 1007 6548.62
1008 1008 10494.62 1008 10494.62 1008 16765.12 1008 15429.99 1008 6555.09
1009 1009 10504.98 1009 10504.98 1009 16781.67 1009 15445.22 1009 6561.56
1010 1010 10515.34 1010 10515.34 1010 16798.22 1010 15460.45 1010 6568.03
1011 1011 10525.70 1011 10525.70 1011 16814.77 1011 15475.68 1011 6574.50
1012 1012 10536.06 1012 10536.06 1012 16831.32 1012 15490.91 1012 6580.97
1013 1013 10546.42 1013 10546.42 1013 16847.87 1013 15506.14 1013 6587.44
1014 1014 10556.78 1014 10556.78 1014 16864.42 1014 15521.37 1014 6593.91

662593135.xlsx CONVEYANCE 26 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1015 1015 10567.14 1015 10567.14 1015 16880.97 1015 15536.60 1015 6600.38
1016 1016 10577.50 1016 10577.50 1016 16897.52 1016 15551.83 1016 6606.85
1017 1017 10587.86 1017 10587.86 1017 16914.07 1017 15567.06 1017 6613.32
1018 1018 10598.22 1018 10598.22 1018 16930.62 1018 15582.29 1018 6619.79
1019 1019 10608.58 1019 10608.58 1019 16947.17 1019 15597.52 1019 6626.26
1020 1020 10618.94 1020 10618.94 1020 16963.72 1020 15612.75 1020 6632.73
1021 1021 10629.30 1021 10629.30 1021 16980.27 1021 15627.98 1021 6639.20
1022 1022 10639.66 1022 10639.66 1022 16996.82 1022 15643.21 1022 6645.67
1023 1023 10650.02 1023 10650.02 1023 17013.37 1023 15658.44 1023 6652.14
1024 1024 10660.38 1024 10660.38 1024 17029.92 1024 15673.67 1024 6658.61
1025 1025 10670.74 1025 10670.74 1025 17046.47 1025 15688.90 1025 6665.08
1026 1026 10681.10 1026 10681.10 1026 17063.02 1026 15704.13 1026 6671.55
1027 1027 10691.46 1027 10691.46 1027 17079.57 1027 15719.36 1027 6678.02
1028 1028 10701.82 1028 10701.82 1028 17096.12 1028 15734.59 1028 6684.49
1029 1029 10712.18 1029 10712.18 1029 17112.67 1029 15749.82 1029 6690.96
1030 1030 10722.54 1030 10722.54 1030 17129.22 1030 15765.05 1030 6697.43
1031 1031 10732.90 1031 10732.90 1031 17145.77 1031 15780.28 1031 6703.90
1032 1032 10743.26 1032 10743.26 1032 17162.32 1032 15795.51 1032 6710.37
1033 1033 10753.62 1033 10753.62 1033 17178.87 1033 15810.74 1033 6716.84
1034 1034 10763.98 1034 10763.98 1034 17195.42 1034 15825.97 1034 6723.31
1035 1035 10774.34 1035 10774.34 1035 17211.97 1035 15841.20 1035 6729.78
1036 1036 10784.70 1036 10784.70 1036 17228.52 1036 15856.43 1036 6736.25
1037 1037 10795.06 1037 10795.06 1037 17245.07 1037 15871.66 1037 6742.72
1038 1038 10805.42 1038 10805.42 1038 17261.62 1038 15886.89 1038 6749.19
1039 1039 10815.78 1039 10815.78 1039 17278.17 1039 15902.12 1039 6755.66
1040 1040 10826.14 1040 10826.14 1040 17294.72 1040 15917.35 1040 6762.13
1041 1041 10836.50 1041 10836.50 1041 17311.27 1041 15932.58 1041 6768.60
1042 1042 10846.86 1042 10846.86 1042 17327.82 1042 15947.81 1042 6775.07
1043 1043 10857.22 1043 10857.22 1043 17344.37 1043 15963.04 1043 6781.54
1044 1044 10867.58 1044 10867.58 1044 17360.92 1044 15978.27 1044 6788.01
1045 1045 10877.94 1045 10877.94 1045 17377.47 1045 15993.50 1045 6794.48
1046 1046 10888.30 1046 10888.30 1046 17394.02 1046 16008.73 1046 6800.95
1047 1047 10898.66 1047 10898.66 1047 17410.57 1047 16023.96 1047 6807.42
1048 1048 10909.02 1048 10909.02 1048 17427.12 1048 16039.19 1048 6813.89
1049 1049 10919.38 1049 10919.38 1049 17443.67 1049 16054.42 1049 6820.36
1050 1050 10929.74 1050 10929.74 1050 17460.22 1050 16069.65 1050 6826.83
1051 1051 10940.10 1051 10940.10 1051 17476.77 1051 16084.88 1051 6833.30
1052 1052 10950.46 1052 10950.46 1052 17493.32 1052 16100.11 1052 6839.77
1053 1053 10960.82 1053 10960.82 1053 17509.87 1053 16115.34 1053 6846.24

662593135.xlsx CONVEYANCE 27 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1054 1054 10971.18 1054 10971.18 1054 17526.42 1054 16130.57 1054 6852.71
1055 1055 10981.54 1055 10981.54 1055 17542.97 1055 16145.80 1055 6859.18
1056 1056 10991.90 1056 10991.90 1056 17559.52 1056 16161.03 1056 6865.65
1057 1057 11002.26 1057 11002.26 1057 17576.07 1057 16176.26 1057 6872.12
1058 1058 11012.62 1058 11012.62 1058 17592.62 1058 16191.49 1058 6878.59
1059 1059 11022.98 1059 11022.98 1059 17609.17 1059 16206.72 1059 6885.06
1060 1060 11033.34 1060 11033.34 1060 17625.72 1060 16221.95 1060 6891.53
1061 1061 11043.70 1061 11043.70 1061 17642.27 1061 16237.18 1061 6898.00
1062 1062 11054.06 1062 11054.06 1062 17658.82 1062 16252.41 1062 6904.47
1063 1063 11064.42 1063 11064.42 1063 17675.37 1063 16267.64 1063 6910.94
1064 1064 11074.78 1064 11074.78 1064 17691.92 1064 16282.87 1064 6917.41
1065 1065 11085.14 1065 11085.14 1065 17708.47 1065 16298.10 1065 6923.88
1066 1066 11095.50 1066 11095.50 1066 17725.02 1066 16313.33 1066 6930.35
1067 1067 11105.86 1067 11105.86 1067 17741.57 1067 16328.56 1067 6936.82
1068 1068 11116.22 1068 11116.22 1068 17758.12 1068 16343.79 1068 6943.29
1069 1069 11126.58 1069 11126.58 1069 17774.67 1069 16359.02 1069 6949.76
1070 1070 11136.94 1070 11136.94 1070 17791.22 1070 16374.25 1070 6956.23
1071 1071 11147.30 1071 11147.30 1071 17807.77 1071 16389.48 1071 6962.70
1072 1072 11157.66 1072 11157.66 1072 17824.32 1072 16404.71 1072 6969.17
1073 1073 11168.02 1073 11168.02 1073 17840.87 1073 16419.94 1073 6975.64
1074 1074 11178.38 1074 11178.38 1074 17857.42 1074 16435.17 1074 6982.11
1075 1075 11188.74 1075 11188.74 1075 17873.97 1075 16450.40 1075 6988.58
1076 1076 11199.10 1076 11199.10 1076 17890.52 1076 16465.63 1076 6995.05
1077 1077 11209.46 1077 11209.46 1077 17907.07 1077 16480.86 1077 7001.52
1078 1078 11219.82 1078 11219.82 1078 17923.62 1078 16496.09 1078 7007.99
1079 1079 11230.18 1079 11230.18 1079 17940.17 1079 16511.32 1079 7014.46
1080 1080 11240.54 1080 11240.54 1080 17956.72 1080 16526.55 1080 7020.93
1081 1081 11250.90 1081 11250.90 1081 17973.27 1081 16541.78 1081 7027.40
1082 1082 11261.26 1082 11261.26 1082 17989.82 1082 16557.01 1082 7033.87
1083 1083 11271.62 1083 11271.62 1083 18006.37 1083 16572.24 1083 7040.34
1084 1084 11281.98 1084 11281.98 1084 18022.92 1084 16587.47 1084 7046.81
1085 1085 11292.34 1085 11292.34 1085 18039.47 1085 16602.70 1085 7053.28
1086 1086 11302.70 1086 11302.70 1086 18056.02 1086 16617.93 1086 7059.75
1087 1087 11313.06 1087 11313.06 1087 18072.57 1087 16633.16 1087 7066.22
1088 1088 11323.42 1088 11323.42 1088 18089.12 1088 16648.39 1088 7072.69
1089 1089 11333.78 1089 11333.78 1089 18105.67 1089 16663.62 1089 7079.16
1090 1090 11344.14 1090 11344.14 1090 18122.22 1090 16678.85 1090 7085.63
1091 1091 11354.50 1091 11354.50 1091 18138.77 1091 16694.08 1091 7092.10
1092 1092 11364.86 1092 11364.86 1092 18155.32 1092 16709.31 1092 7098.57

662593135.xlsx CONVEYANCE 28 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1093 1093 11375.22 1093 11375.22 1093 18171.87 1093 16724.54 1093 7105.04
1094 1094 11385.58 1094 11385.58 1094 18188.42 1094 16739.77 1094 7111.51
1095 1095 11395.94 1095 11395.94 1095 18204.97 1095 16755.00 1095 7117.98
1096 1096 11406.30 1096 11406.30 1096 18221.52 1096 16770.23 1096 7124.45
1097 1097 11416.66 1097 11416.66 1097 18238.07 1097 16785.46 1097 7130.92
1098 1098 11427.02 1098 11427.02 1098 18254.62 1098 16800.69 1098 7137.39
1099 1099 11437.38 1099 11437.38 1099 18271.17 1099 16815.92 1099 7143.86
1100 1100 11447.74 1100 11447.74 1100 18287.72 1100 16831.15 1100 7150.33
1101 1101 11458.10 1101 11458.10 1101 18304.27 1101 16846.38 1101 7156.80
1102 1102 11468.46 1102 11468.46 1102 18320.82 1102 16861.61 1102 7163.27
1103 1103 11478.82 1103 11478.82 1103 18337.37 1103 16876.84 1103 7169.74
1104 1104 11489.18 1104 11489.18 1104 18353.92 1104 16892.07 1104 7176.21
1105 1105 11499.54 1105 11499.54 1105 18370.47 1105 16907.30 1105 7182.68
1106 1106 11509.90 1106 11509.90 1106 18387.02 1106 16922.53 1106 7189.15
1107 1107 11520.26 1107 11520.26 1107 18403.57 1107 16937.76 1107 7195.62
1108 1108 11530.62 1108 11530.62 1108 18420.12 1108 16952.99 1108 7202.09
1109 1109 11540.98 1109 11540.98 1109 18436.67 1109 16968.22 1109 7208.56
1110 1110 11551.34 1110 11551.34 1110 18453.22 1110 16983.45 1110 7215.03
1111 1111 11561.70 1111 11561.70 1111 18469.77 1111 16998.68 1111 7221.50
1112 1112 11572.06 1112 11572.06 1112 18486.32 1112 17013.91 1112 7227.97
1113 1113 11582.42 1113 11582.42 1113 18502.87 1113 17029.14 1113 7234.44
1114 1114 11592.78 1114 11592.78 1114 18519.42 1114 17044.37 1114 7240.91
1115 1115 11603.14 1115 11603.14 1115 18535.97 1115 17059.60 1115 7247.38
1116 1116 11613.50 1116 11613.50 1116 18552.52 1116 17074.83 1116 7253.85
1117 1117 11623.86 1117 11623.86 1117 18569.07 1117 17090.06 1117 7260.32
1118 1118 11634.22 1118 11634.22 1118 18585.62 1118 17105.29 1118 7266.79
1119 1119 11644.58 1119 11644.58 1119 18602.17 1119 17120.52 1119 7273.26
1120 1120 11654.94 1120 11654.94 1120 18618.72 1120 17135.75 1120 7279.73
1121 1121 11665.30 1121 11665.30 1121 18635.27 1121 17150.98 1121 7286.20
1122 1122 11675.66 1122 11675.66 1122 18651.82 1122 17166.21 1122 7292.67
1123 1123 11686.02 1123 11686.02 1123 18668.37 1123 17181.44 1123 7299.14
1124 1124 11696.38 1124 11696.38 1124 18684.92 1124 17196.67 1124 7305.61
1125 1125 11706.74 1125 11706.74 1125 18701.47 1125 17211.90 1125 7312.08
1126 1126 11717.10 1126 11717.10 1126 18718.02 1126 17227.13 1126 7318.55
1127 1127 11727.46 1127 11727.46 1127 18734.57 1127 17242.36 1127 7325.02
1128 1128 11737.82 1128 11737.82 1128 18751.12 1128 17257.59 1128 7331.49
1129 1129 11748.18 1129 11748.18 1129 18767.67 1129 17272.82 1129 7337.96
1130 1130 11758.54 1130 11758.54 1130 18784.22 1130 17288.05 1130 7344.43
1131 1131 11768.90 1131 11768.90 1131 18800.77 1131 17303.28 1131 7350.90

662593135.xlsx CONVEYANCE 29 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1132 1132 11779.26 1132 11779.26 1132 18817.32 1132 17318.51 1132 7357.37
1133 1133 11789.62 1133 11789.62 1133 18833.87 1133 17333.74 1133 7363.84
1134 1134 11799.98 1134 11799.98 1134 18850.42 1134 17348.97 1134 7370.31
1135 1135 11810.34 1135 11810.34 1135 18866.97 1135 17364.20 1135 7376.78
1136 1136 11820.70 1136 11820.70 1136 18883.52 1136 17379.43 1136 7383.25
1137 1137 11831.06 1137 11831.06 1137 18900.07 1137 17394.66 1137 7389.72
1138 1138 11841.42 1138 11841.42 1138 18916.62 1138 17409.89 1138 7396.19
1139 1139 11851.78 1139 11851.78 1139 18933.17 1139 17425.12 1139 7402.66
1140 1140 11862.14 1140 11862.14 1140 18949.72 1140 17440.35 1140 7409.13
1141 1141 11872.50 1141 11872.50 1141 18966.27 1141 17455.58 1141 7415.60
1142 1142 11882.86 1142 11882.86 1142 18982.82 1142 17470.81 1142 7422.07
1143 1143 11893.22 1143 11893.22 1143 18999.37 1143 17486.04 1143 7428.54
1144 1144 11903.58 1144 11903.58 1144 19015.92 1144 17501.27 1144 7435.01
1145 1145 11913.94 1145 11913.94 1145 19032.47 1145 17516.50 1145 7441.48
1146 1146 11924.30 1146 11924.30 1146 19049.02 1146 17531.73 1146 7447.95
1147 1147 11934.66 1147 11934.66 1147 19065.57 1147 17546.96 1147 7454.42
1148 1148 11945.02 1148 11945.02 1148 19082.12 1148 17562.19 1148 7460.89
1149 1149 11955.38 1149 11955.38 1149 19098.67 1149 17577.42 1149 7467.36
1150 1150 11965.74 1150 11965.74 1150 19115.22 1150 17592.65 1150 7473.83
1151 1151 11976.10 1151 11976.10 1151 19131.77 1151 17607.88 1151 7480.30
1152 1152 11986.46 1152 11986.46 1152 19148.32 1152 17623.11 1152 7486.77
1153 1153 11996.82 1153 11996.82 1153 19164.87 1153 17638.34 1153 7493.24
1154 1154 12007.18 1154 12007.18 1154 19181.42 1154 17653.57 1154 7499.71
1155 1155 12017.54 1155 12017.54 1155 19197.97 1155 17668.80 1155 7506.18
1156 1156 12027.90 1156 12027.90 1156 19214.52 1156 17684.03 1156 7512.65
1157 1157 12038.26 1157 12038.26 1157 19231.07 1157 17699.26 1157 7519.12
1158 1158 12048.62 1158 12048.62 1158 19247.62 1158 17714.49 1158 7525.59
1159 1159 12058.98 1159 12058.98 1159 19264.17 1159 17729.72 1159 7532.06
1160 1160 12069.34 1160 12069.34 1160 19280.72 1160 17744.95 1160 7538.53
1161 1161 12079.70 1161 12079.70 1161 19297.27 1161 17760.18 1161 7545.00
1162 1162 12090.06 1162 12090.06 1162 19313.82 1162 17775.41 1162 7551.47
1163 1163 12100.42 1163 12100.42 1163 19330.37 1163 17790.64 1163 7557.94
1164 1164 12110.78 1164 12110.78 1164 19346.92 1164 17805.87 1164 7564.41
1165 1165 12121.14 1165 12121.14 1165 19363.47 1165 17821.10 1165 7570.88
1166 1166 12131.50 1166 12131.50 1166 19380.02 1166 17836.33 1166 7577.35
1167 1167 12141.86 1167 12141.86 1167 19396.57 1167 17851.56 1167 7583.82
1168 1168 12152.22 1168 12152.22 1168 19413.12 1168 17866.79 1168 7590.29
1169 1169 12162.58 1169 12162.58 1169 19429.67 1169 17882.02 1169 7596.76
1170 1170 12172.94 1170 12172.94 1170 19446.22 1170 17897.25 1170 7603.23

662593135.xlsx CONVEYANCE 30 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1171 1171 12183.30 1171 12183.30 1171 19462.77 1171 17912.48 1171 7609.70
1172 1172 12193.66 1172 12193.66 1172 19479.32 1172 17927.71 1172 7616.17
1173 1173 12204.02 1173 12204.02 1173 19495.87 1173 17942.94 1173 7622.64
1174 1174 12214.38 1174 12214.38 1174 19512.42 1174 17958.17 1174 7629.11
1175 1175 12224.74 1175 12224.74 1175 19528.97 1175 17973.40 1175 7635.58
1176 1176 12235.10 1176 12235.10 1176 19545.52 1176 17988.63 1176 7642.05
1177 1177 12245.46 1177 12245.46 1177 19562.07 1177 18003.86 1177 7648.52
1178 1178 12255.82 1178 12255.82 1178 19578.62 1178 18019.09 1178 7654.99
1179 1179 12266.18 1179 12266.18 1179 19595.17 1179 18034.32 1179 7661.46
1180 1180 12276.54 1180 12276.54 1180 19611.72 1180 18049.55 1180 7667.93
1181 1181 12286.90 1181 12286.90 1181 19628.27 1181 18064.78 1181 7674.40
1182 1182 12297.26 1182 12297.26 1182 19644.82 1182 18080.01 1182 7680.87
1183 1183 12307.62 1183 12307.62 1183 19661.37 1183 18095.24 1183 7687.34
1184 1184 12317.98 1184 12317.98 1184 19677.92 1184 18110.47 1184 7693.81
1185 1185 12328.34 1185 12328.34 1185 19694.47 1185 18125.70 1185 7700.28
1186 1186 12338.70 1186 12338.70 1186 19711.02 1186 18140.93 1186 7706.75
1187 1187 12349.06 1187 12349.06 1187 19727.57 1187 18156.16 1187 7713.22
1188 1188 12359.42 1188 12359.42 1188 19744.12 1188 18171.39 1188 7719.69
1189 1189 12369.78 1189 12369.78 1189 19760.67 1189 18186.62 1189 7726.16
1190 1190 12380.14 1190 12380.14 1190 19777.22 1190 18201.85 1190 7732.63
1191 1191 12390.50 1191 12390.50 1191 19793.77 1191 18217.08 1191 7739.10
1192 1192 12400.86 1192 12400.86 1192 19810.32 1192 18232.31 1192 7745.57
1193 1193 12411.22 1193 12411.22 1193 19826.87 1193 18247.54 1193 7752.04
1194 1194 12421.58 1194 12421.58 1194 19843.42 1194 18262.77 1194 7758.51
1195 1195 12431.94 1195 12431.94 1195 19859.97 1195 18278.00 1195 7764.98
1196 1196 12442.30 1196 12442.30 1196 19876.52 1196 18293.23 1196 7771.45
1197 1197 12452.66 1197 12452.66 1197 19893.07 1197 18308.46 1197 7777.92
1198 1198 12463.02 1198 12463.02 1198 19909.62 1198 18323.69 1198 7784.39
1199 1199 12473.38 1199 12473.38 1199 19926.17 1199 18338.92 1199 7790.86
1200 1200 12483.74 1200 12483.74 1200 19942.72 1200 18354.15 1200 7797.33
1201 1201 12494.10 1201 12494.10 1201 19959.27 1201 18369.38 1201 7803.80
1202 1202 12504.46 1202 12504.46 1202 19975.82 1202 18384.61 1202 7810.27
1203 1203 12514.82 1203 12514.82 1203 19992.37 1203 18399.84 1203 7816.74
1204 1204 12525.18 1204 12525.18 1204 20008.92 1204 18415.07 1204 7823.21
1205 1205 12535.54 1205 12535.54 1205 20025.47 1205 18430.30 1205 7829.68
1206 1206 12545.90 1206 12545.90 1206 20042.02 1206 18445.53 1206 7836.15
1207 1207 12556.26 1207 12556.26 1207 20058.57 1207 18460.76 1207 7842.62
1208 1208 12566.62 1208 12566.62 1208 20075.12 1208 18475.99 1208 7849.09
1209 1209 12576.98 1209 12576.98 1209 20091.67 1209 18491.22 1209 7855.56

662593135.xlsx CONVEYANCE 31 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1210 1210 12587.34 1210 12587.34 1210 20108.22 1210 18506.45 1210 7862.03
1211 1211 12597.70 1211 12597.70 1211 20124.77 1211 18521.68 1211 7868.50
1212 1212 12608.06 1212 12608.06 1212 20141.32 1212 18536.91 1212 7874.97
1213 1213 12618.42 1213 12618.42 1213 20157.87 1213 18552.14 1213 7881.44
1214 1214 12628.78 1214 12628.78 1214 20174.42 1214 18567.37 1214 7887.91
1215 1215 12639.14 1215 12639.14 1215 20190.97 1215 18582.60 1215 7894.38
1216 1216 12649.50 1216 12649.50 1216 20207.52 1216 18597.83 1216 7900.85
1217 1217 12659.86 1217 12659.86 1217 20224.07 1217 18613.06 1217 7907.32
1218 1218 12670.22 1218 12670.22 1218 20240.62 1218 18628.29 1218 7913.79
1219 1219 12680.58 1219 12680.58 1219 20257.17 1219 18643.52 1219 7920.26
1220 1220 12690.94 1220 12690.94 1220 20273.72 1220 18658.75 1220 7926.73
1221 1221 12701.30 1221 12701.30 1221 20290.27 1221 18673.98 1221 7933.20
1222 1222 12711.66 1222 12711.66 1222 20306.82 1222 18689.21 1222 7939.67
1223 1223 12722.02 1223 12722.02 1223 20323.37 1223 18704.44 1223 7946.14
1224 1224 12732.38 1224 12732.38 1224 20339.92 1224 18719.67 1224 7952.61
1225 1225 12742.74 1225 12742.74 1225 20356.47 1225 18734.90 1225 7959.08
1226 1226 12753.10 1226 12753.10 1226 20373.02 1226 18750.13 1226 7965.55
1227 1227 12763.46 1227 12763.46 1227 20389.57 1227 18765.36 1227 7972.02
1228 1228 12773.82 1228 12773.82 1228 20406.12 1228 18780.59 1228 7978.49
1229 1229 12784.18 1229 12784.18 1229 20422.67 1229 18795.82 1229 7984.96
1230 1230 12794.54 1230 12794.54 1230 20439.22 1230 18811.05 1230 7991.43
1231 1231 12804.90 1231 12804.90 1231 20455.77 1231 18826.28 1231 7997.90
1232 1232 12815.26 1232 12815.26 1232 20472.32 1232 18841.51 1232 8004.37
1233 1233 12825.62 1233 12825.62 1233 20488.87 1233 18856.74 1233 8010.84
1234 1234 12835.98 1234 12835.98 1234 20505.42 1234 18871.97 1234 8017.31
1235 1235 12846.34 1235 12846.34 1235 20521.97 1235 18887.20 1235 8023.78
1236 1236 12856.70 1236 12856.70 1236 20538.52 1236 18902.43 1236 8030.25
1237 1237 12867.06 1237 12867.06 1237 20555.07 1237 18917.66 1237 8036.72
1238 1238 12877.42 1238 12877.42 1238 20571.62 1238 18932.89 1238 8043.19
1239 1239 12887.78 1239 12887.78 1239 20588.17 1239 18948.12 1239 8049.66
1240 1240 12898.14 1240 12898.14 1240 20604.72 1240 18963.35 1240 8056.13
1241 1241 12908.50 1241 12908.50 1241 20621.27 1241 18978.58 1241 8062.60
1242 1242 12918.86 1242 12918.86 1242 20637.82 1242 18993.81 1242 8069.07
1243 1243 12929.22 1243 12929.22 1243 20654.37 1243 19009.04 1243 8075.54
1244 1244 12939.58 1244 12939.58 1244 20670.92 1244 19024.27 1244 8082.01
1245 1245 12949.94 1245 12949.94 1245 20687.47 1245 19039.50 1245 8088.48
1246 1246 12960.30 1246 12960.30 1246 20704.02 1246 19054.73 1246 8094.95
1247 1247 12970.66 1247 12970.66 1247 20720.57 1247 19069.96 1247 8101.42
1248 1248 12981.02 1248 12981.02 1248 20737.12 1248 19085.19 1248 8107.89

662593135.xlsx CONVEYANCE 32 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1249 1249 12991.38 1249 12991.38 1249 20753.67 1249 19100.42 1249 8114.36
1250 1250 13001.74 1250 13001.74 1250 20770.22 1250 19115.65 1250 8120.83
1251 1251 13012.10 1251 13012.10 1251 20786.77 1251 19130.88 1251 8127.30
1252 1252 13022.46 1252 13022.46 1252 20803.32 1252 19146.11 1252 8133.77
1253 1253 13032.82 1253 13032.82 1253 20819.87 1253 19161.34 1253 8140.24
1254 1254 13043.18 1254 13043.18 1254 20836.42 1254 19176.57 1254 8146.71
1255 1255 13053.54 1255 13053.54 1255 20852.97 1255 19191.80 1255 8153.18
1256 1256 13063.90 1256 13063.90 1256 20869.52 1256 19207.03 1256 8159.65
1257 1257 13074.26 1257 13074.26 1257 20886.07 1257 19222.26 1257 8166.12
1258 1258 13084.62 1258 13084.62 1258 20902.62 1258 19237.49 1258 8172.59
1259 1259 13094.98 1259 13094.98 1259 20919.17 1259 19252.72 1259 8179.06
1260 1260 13105.34 1260 13105.34 1260 20935.72 1260 19267.95 1260 8185.53
1261 1261 13115.70 1261 13115.70 1261 20952.27 1261 19283.18 1261 8192.00
1262 1262 13126.06 1262 13126.06 1262 20968.82 1262 19298.41 1262 8198.47
1263 1263 13136.42 1263 13136.42 1263 20985.37 1263 19313.64 1263 8204.94
1264 1264 13146.78 1264 13146.78 1264 21001.92 1264 19328.87 1264 8211.41
1265 1265 13157.14 1265 13157.14 1265 21018.47 1265 19344.10 1265 8217.88
1266 1266 13167.50 1266 13167.50 1266 21035.02 1266 19359.33 1266 8224.35
1267 1267 13177.86 1267 13177.86 1267 21051.57 1267 19374.56 1267 8230.82
1268 1268 13188.22 1268 13188.22 1268 21068.12 1268 19389.79 1268 8237.29
1269 1269 13198.58 1269 13198.58 1269 21084.67 1269 19405.02 1269 8243.76
1270 1270 13208.94 1270 13208.94 1270 21101.22 1270 19420.25 1270 8250.23
1271 1271 13219.30 1271 13219.30 1271 21117.77 1271 19435.48 1271 8256.70
1272 1272 13229.66 1272 13229.66 1272 21134.32 1272 19450.71 1272 8263.17
1273 1273 13240.02 1273 13240.02 1273 21150.87 1273 19465.94 1273 8269.64
1274 1274 13250.38 1274 13250.38 1274 21167.42 1274 19481.17 1274 8276.11
1275 1275 13260.74 1275 13260.74 1275 21183.97 1275 19496.40 1275 8282.58
1276 1276 13271.10 1276 13271.10 1276 21200.52 1276 19511.63 1276 8289.05
1277 1277 13281.46 1277 13281.46 1277 21217.07 1277 19526.86 1277 8295.52
1278 1278 13291.82 1278 13291.82 1278 21233.62 1278 19542.09 1278 8301.99
1279 1279 13302.18 1279 13302.18 1279 21250.17 1279 19557.32 1279 8308.46
1280 1280 13312.54 1280 13312.54 1280 21266.72 1280 19572.55 1280 8314.93
1281 1281 13322.90 1281 13322.90 1281 21283.27 1281 19587.78 1281 8321.40
1282 1282 13333.26 1282 13333.26 1282 21299.82 1282 19603.01 1282 8327.87
1283 1283 13343.62 1283 13343.62 1283 21316.37 1283 19618.24 1283 8334.34
1284 1284 13353.98 1284 13353.98 1284 21332.92 1284 19633.47 1284 8340.81
1285 1285 13364.34 1285 13364.34 1285 21349.47 1285 19648.70 1285 8347.28
1286 1286 13374.70 1286 13374.70 1286 21366.02 1286 19663.93 1286 8353.75
1287 1287 13385.06 1287 13385.06 1287 21382.57 1287 19679.16 1287 8360.22

662593135.xlsx CONVEYANCE 33 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1288 1288 13395.42 1288 13395.42 1288 21399.12 1288 19694.39 1288 8366.69
1289 1289 13405.78 1289 13405.78 1289 21415.67 1289 19709.62 1289 8373.16
1290 1290 13416.14 1290 13416.14 1290 21432.22 1290 19724.85 1290 8379.63
1291 1291 13426.50 1291 13426.50 1291 21448.77 1291 19740.08 1291 8386.10
1292 1292 13436.86 1292 13436.86 1292 21465.32 1292 19755.31 1292 8392.57
1293 1293 13447.22 1293 13447.22 1293 21481.87 1293 19770.54 1293 8399.04
1294 1294 13457.58 1294 13457.58 1294 21498.42 1294 19785.77 1294 8405.51
1295 1295 13467.94 1295 13467.94 1295 21514.97 1295 19801.00 1295 8411.98
1296 1296 13478.30 1296 13478.30 1296 21531.52 1296 19816.23 1296 8418.45
1297 1297 13488.66 1297 13488.66 1297 21548.07 1297 19831.46 1297 8424.92
1298 1298 13499.02 1298 13499.02 1298 21564.62 1298 19846.69 1298 8431.39
1299 1299 13509.38 1299 13509.38 1299 21581.17 1299 19861.92 1299 8437.86
1300 1300 13519.74 1300 13519.74 1300 21597.72 1300 19877.15 1300 8444.33
1301 1301 13530.10 1301 13530.10 1301 21614.27 1301 19892.38 1301 8450.80
1302 1302 13540.46 1302 13540.46 1302 21630.82 1302 19907.61 1302 8457.27
1303 1303 13550.82 1303 13550.82 1303 21647.37 1303 19922.84 1303 8463.74
1304 1304 13561.18 1304 13561.18 1304 21663.92 1304 19938.07 1304 8470.21
1305 1305 13571.54 1305 13571.54 1305 21680.47 1305 19953.30 1305 8476.68
1306 1306 13581.90 1306 13581.90 1306 21697.02 1306 19968.53 1306 8483.15
1307 1307 13592.26 1307 13592.26 1307 21713.57 1307 19983.76 1307 8489.62
1308 1308 13602.62 1308 13602.62 1308 21730.12 1308 19998.99 1308 8496.09
1309 1309 13612.98 1309 13612.98 1309 21746.67 1309 20014.22 1309 8502.56
1310 1310 13623.34 1310 13623.34 1310 21763.22 1310 20029.45 1310 8509.03
1311 1311 13633.70 1311 13633.70 1311 21779.77 1311 20044.68 1311 8515.50
1312 1312 13644.06 1312 13644.06 1312 21796.32 1312 20059.91 1312 8521.97
1313 1313 13654.42 1313 13654.42 1313 21812.87 1313 20075.14 1313 8528.44
1314 1314 13664.78 1314 13664.78 1314 21829.42 1314 20090.37 1314 8534.91
1315 1315 13675.14 1315 13675.14 1315 21845.97 1315 20105.60 1315 8541.38
1316 1316 13685.50 1316 13685.50 1316 21862.52 1316 20120.83 1316 8547.85
1317 1317 13695.86 1317 13695.86 1317 21879.07 1317 20136.06 1317 8554.32
1318 1318 13706.22 1318 13706.22 1318 21895.62 1318 20151.29 1318 8560.79
1319 1319 13716.58 1319 13716.58 1319 21912.17 1319 20166.52 1319 8567.26
1320 1320 13726.94 1320 13726.94 1320 21928.72 1320 20181.75 1320 8573.73
1321 1321 13737.30 1321 13737.30 1321 21945.27 1321 20196.98 1321 8580.20
1322 1322 13747.66 1322 13747.66 1322 21961.82 1322 20212.21 1322 8586.67
1323 1323 13758.02 1323 13758.02 1323 21978.37 1323 20227.44 1323 8593.14
1324 1324 13768.38 1324 13768.38 1324 21994.92 1324 20242.67 1324 8599.61
1325 1325 13778.74 1325 13778.74 1325 22011.47 1325 20257.90 1325 8606.08
1326 1326 13789.10 1326 13789.10 1326 22028.02 1326 20273.13 1326 8612.55

662593135.xlsx CONVEYANCE 34 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1327 1327 13799.46 1327 13799.46 1327 22044.57 1327 20288.36 1327 8619.02
1328 1328 13809.82 1328 13809.82 1328 22061.12 1328 20303.59 1328 8625.49
1329 1329 13820.18 1329 13820.18 1329 22077.67 1329 20318.82 1329 8631.96
1330 1330 13830.54 1330 13830.54 1330 22094.22 1330 20334.05 1330 8638.43
1331 1331 13840.90 1331 13840.90 1331 22110.77 1331 20349.28 1331 8644.90
1332 1332 13851.26 1332 13851.26 1332 22127.32 1332 20364.51 1332 8651.37
1333 1333 13861.62 1333 13861.62 1333 22143.87 1333 20379.74 1333 8657.84
1334 1334 13871.98 1334 13871.98 1334 22160.42 1334 20394.97 1334 8664.31
1335 1335 13882.34 1335 13882.34 1335 22176.97 1335 20410.20 1335 8670.78
1336 1336 13892.70 1336 13892.70 1336 22193.52 1336 20425.43 1336 8677.25
1337 1337 13903.06 1337 13903.06 1337 22210.07 1337 20440.66 1337 8683.72
1338 1338 13913.42 1338 13913.42 1338 22226.62 1338 20455.89 1338 8690.19
1339 1339 13923.78 1339 13923.78 1339 22243.17 1339 20471.12 1339 8696.66
1340 1340 13934.14 1340 13934.14 1340 22259.72 1340 20486.35 1340 8703.13
1341 1341 13944.50 1341 13944.50 1341 22276.27 1341 20501.58 1341 8709.60
1342 1342 13954.86 1342 13954.86 1342 22292.82 1342 20516.81 1342 8716.07
1343 1343 13965.22 1343 13965.22 1343 22309.37 1343 20532.04 1343 8722.54
1344 1344 13975.58 1344 13975.58 1344 22325.92 1344 20547.27 1344 8729.01
1345 1345 13985.94 1345 13985.94 1345 22342.47 1345 20562.50 1345 8735.48
1346 1346 13996.30 1346 13996.30 1346 22359.02 1346 20577.73 1346 8741.95
1347 1347 14006.66 1347 14006.66 1347 22375.57 1347 20592.96 1347 8748.42
1348 1348 14017.02 1348 14017.02 1348 22392.12 1348 20608.19 1348 8754.89
1349 1349 14027.38 1349 14027.38 1349 22408.67 1349 20623.42 1349 8761.36
1350 1350 14037.74 1350 14037.74 1350 22425.22 1350 20638.65 1350 8767.83
1351 1351 14048.10 1351 14048.10 1351 22441.77 1351 20653.88 1351 8774.30
1352 1352 14058.46 1352 14058.46 1352 22458.32 1352 20669.11 1352 8780.77
1353 1353 14068.82 1353 14068.82 1353 22474.87 1353 20684.34 1353 8787.24
1354 1354 14079.18 1354 14079.18 1354 22491.42 1354 20699.57 1354 8793.71
1355 1355 14089.54 1355 14089.54 1355 22507.97 1355 20714.80 1355 8800.18
1356 1356 14099.90 1356 14099.90 1356 22524.52 1356 20730.03 1356 8806.65
1357 1357 14110.26 1357 14110.26 1357 22541.07 1357 20745.26 1357 8813.12
1358 1358 14120.62 1358 14120.62 1358 22557.62 1358 20760.49 1358 8819.59
1359 1359 14130.98 1359 14130.98 1359 22574.17 1359 20775.72 1359 8826.06
1360 1360 14141.34 1360 14141.34 1360 22590.72 1360 20790.95 1360 8832.53
1361 1361 14151.70 1361 14151.70 1361 22607.27 1361 20806.18 1361 8839.00
1362 1362 14162.06 1362 14162.06 1362 22623.82 1362 20821.41 1362 8845.47
1363 1363 14172.42 1363 14172.42 1363 22640.37 1363 20836.64 1363 8851.94
1364 1364 14182.78 1364 14182.78 1364 22656.92 1364 20851.87 1364 8858.41
1365 1365 14193.14 1365 14193.14 1365 22673.47 1365 20867.10 1365 8864.88

662593135.xlsx CONVEYANCE 35 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1366 1366 14203.50 1366 14203.50 1366 22690.02 1366 20882.33 1366 8871.35
1367 1367 14213.86 1367 14213.86 1367 22706.57 1367 20897.56 1367 8877.82
1368 1368 14224.22 1368 14224.22 1368 22723.12 1368 20912.79 1368 8884.29
1369 1369 14234.58 1369 14234.58 1369 22739.67 1369 20928.02 1369 8890.76
1370 1370 14244.94 1370 14244.94 1370 22756.22 1370 20943.25 1370 8897.23
1371 1371 14255.30 1371 14255.30 1371 22772.77 1371 20958.48 1371 8903.70
1372 1372 14265.66 1372 14265.66 1372 22789.32 1372 20973.71 1372 8910.17
1373 1373 14276.02 1373 14276.02 1373 22805.87 1373 20988.94 1373 8916.64
1374 1374 14286.38 1374 14286.38 1374 22822.42 1374 21004.17 1374 8923.11
1375 1375 14296.74 1375 14296.74 1375 22838.97 1375 21019.40 1375 8929.58
1376 1376 14307.10 1376 14307.10 1376 22855.52 1376 21034.63 1376 8936.05
1377 1377 14317.46 1377 14317.46 1377 22872.07 1377 21049.86 1377 8942.52
1378 1378 14327.82 1378 14327.82 1378 22888.62 1378 21065.09 1378 8948.99
1379 1379 14338.18 1379 14338.18 1379 22905.17 1379 21080.32 1379 8955.46
1380 1380 14348.54 1380 14348.54 1380 22921.72 1380 21095.55 1380 8961.93
1381 1381 14358.90 1381 14358.90 1381 22938.27 1381 21110.78 1381 8968.40
1382 1382 14369.26 1382 14369.26 1382 22954.82 1382 21126.01 1382 8974.87
1383 1383 14379.62 1383 14379.62 1383 22971.37 1383 21141.24 1383 8981.34
1384 1384 14389.98 1384 14389.98 1384 22987.92 1384 21156.47 1384 8987.81
1385 1385 14400.34 1385 14400.34 1385 23004.47 1385 21171.70 1385 8994.28
1386 1386 14410.70 1386 14410.70 1386 23021.02 1386 21186.93 1386 9000.75
1387 1387 14421.06 1387 14421.06 1387 23037.57 1387 21202.16 1387 9007.22
1388 1388 14431.42 1388 14431.42 1388 23054.12 1388 21217.39 1388 9013.69
1389 1389 14441.78 1389 14441.78 1389 23070.67 1389 21232.62 1389 9020.16
1390 1390 14452.14 1390 14452.14 1390 23087.22 1390 21247.85 1390 9026.63
1391 1391 14462.50 1391 14462.50 1391 23103.77 1391 21263.08 1391 9033.10
1392 1392 14472.86 1392 14472.86 1392 23120.32 1392 21278.31 1392 9039.57
1393 1393 14483.22 1393 14483.22 1393 23136.87 1393 21293.54 1393 9046.04
1394 1394 14493.58 1394 14493.58 1394 23153.42 1394 21308.77 1394 9052.51
1395 1395 14503.94 1395 14503.94 1395 23169.97 1395 21324.00 1395 9058.98
1396 1396 14514.30 1396 14514.30 1396 23186.52 1396 21339.23 1396 9065.45
1397 1397 14524.66 1397 14524.66 1397 23203.07 1397 21354.46 1397 9071.92
1398 1398 14535.02 1398 14535.02 1398 23219.62 1398 21369.69 1398 9078.39
1399 1399 14545.38 1399 14545.38 1399 23236.17 1399 21384.92 1399 9084.86
1400 1400 14555.74 1400 14555.74 1400 23252.72 1400 21400.15 1400 9091.33
1401 1401 14566.10 1401 14566.10 1401 23269.27 1401 21415.38 1401 9097.80
1402 1402 14576.46 1402 14576.46 1402 23285.82 1402 21430.61 1402 9104.27
1403 1403 14586.82 1403 14586.82 1403 23302.37 1403 21445.84 1403 9110.74
1404 1404 14597.18 1404 14597.18 1404 23318.92 1404 21461.07 1404 9117.21

662593135.xlsx CONVEYANCE 36 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1405 1405 14607.54 1405 14607.54 1405 23335.47 1405 21476.30 1405 9123.68
1406 1406 14617.90 1406 14617.90 1406 23352.02 1406 21491.53 1406 9130.15
1407 1407 14628.26 1407 14628.26 1407 23368.57 1407 21506.76 1407 9136.62
1408 1408 14638.62 1408 14638.62 1408 23385.12 1408 21521.99 1408 9143.09
1409 1409 14648.98 1409 14648.98 1409 23401.67 1409 21537.22 1409 9149.56
1410 1410 14659.34 1410 14659.34 1410 23418.22 1410 21552.45 1410 9156.03
1411 1411 14669.70 1411 14669.70 1411 23434.77 1411 21567.68 1411 9162.50
1412 1412 14680.06 1412 14680.06 1412 23451.32 1412 21582.91 1412 9168.97
1413 1413 14690.42 1413 14690.42 1413 23467.87 1413 21598.14 1413 9175.44
1414 1414 14700.78 1414 14700.78 1414 23484.42 1414 21613.37 1414 9181.91
1415 1415 14711.14 1415 14711.14 1415 23500.97 1415 21628.60 1415 9188.38
1416 1416 14721.50 1416 14721.50 1416 23517.52 1416 21643.83 1416 9194.85
1417 1417 14731.86 1417 14731.86 1417 23534.07 1417 21659.06 1417 9201.32
1418 1418 14742.22 1418 14742.22 1418 23550.62 1418 21674.29 1418 9207.79
1419 1419 14752.58 1419 14752.58 1419 23567.17 1419 21689.52 1419 9214.26
1420 1420 14762.94 1420 14762.94 1420 23583.72 1420 21704.75 1420 9220.73
1421 1421 14773.30 1421 14773.30 1421 23600.27 1421 21719.98 1421 9227.20
1422 1422 14783.66 1422 14783.66 1422 23616.82 1422 21735.21 1422 9233.67
1423 1423 14794.02 1423 14794.02 1423 23633.37 1423 21750.44 1423 9240.14
1424 1424 14804.38 1424 14804.38 1424 23649.92 1424 21765.67 1424 9246.61
1425 1425 14814.74 1425 14814.74 1425 23666.47 1425 21780.90 1425 9253.08
1426 1426 14825.10 1426 14825.10 1426 23683.02 1426 21796.13 1426 9259.55
1427 1427 14835.46 1427 14835.46 1427 23699.57 1427 21811.36 1427 9266.02
1428 1428 14845.82 1428 14845.82 1428 23716.12 1428 21826.59 1428 9272.49
1429 1429 14856.18 1429 14856.18 1429 23732.67 1429 21841.82 1429 9278.96
1430 1430 14866.54 1430 14866.54 1430 23749.22 1430 21857.05 1430 9285.43
1431 1431 14876.90 1431 14876.90 1431 23765.77 1431 21872.28 1431 9291.90
1432 1432 14887.26 1432 14887.26 1432 23782.32 1432 21887.51 1432 9298.37
1433 1433 14897.62 1433 14897.62 1433 23798.87 1433 21902.74 1433 9304.84
1434 1434 14907.98 1434 14907.98 1434 23815.42 1434 21917.97 1434 9311.31
1435 1435 14918.34 1435 14918.34 1435 23831.97 1435 21933.20 1435 9317.78
1436 1436 14928.70 1436 14928.70 1436 23848.52 1436 21948.43 1436 9324.25
1437 1437 14939.06 1437 14939.06 1437 23865.07 1437 21963.66 1437 9330.72
1438 1438 14949.42 1438 14949.42 1438 23881.62 1438 21978.89 1438 9337.19
1439 1439 14959.78 1439 14959.78 1439 23898.17 1439 21994.12 1439 9343.66
1440 1440 14970.14 1440 14970.14 1440 23914.72 1440 22009.35 1440 9350.13
1441 1441 14980.50 1441 14980.50 1441 23931.27 1441 22024.58 1441 9356.60
1442 1442 14990.86 1442 14990.86 1442 23947.82 1442 22039.81 1442 9363.07
1443 1443 15001.22 1443 15001.22 1443 23964.37 1443 22055.04 1443 9369.54

662593135.xlsx CONVEYANCE 37 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1444 1444 15011.58 1444 15011.58 1444 23980.92 1444 22070.27 1444 9376.01
1445 1445 15021.94 1445 15021.94 1445 23997.47 1445 22085.50 1445 9382.48
1446 1446 15032.30 1446 15032.30 1446 24014.02 1446 22100.73 1446 9388.95
1447 1447 15042.66 1447 15042.66 1447 24030.57 1447 22115.96 1447 9395.42
1448 1448 15053.02 1448 15053.02 1448 24047.12 1448 22131.19 1448 9401.89
1449 1449 15063.38 1449 15063.38 1449 24063.67 1449 22146.42 1449 9408.36
1450 1450 15073.74 1450 15073.74 1450 24080.22 1450 22161.65 1450 9414.83
1451 1451 15084.10 1451 15084.10 1451 24096.77 1451 22176.88 1451 9421.30
1452 1452 15094.46 1452 15094.46 1452 24113.32 1452 22192.11 1452 9427.77
1453 1453 15104.82 1453 15104.82 1453 24129.87 1453 22207.34 1453 9434.24
1454 1454 15115.18 1454 15115.18 1454 24146.42 1454 22222.57 1454 9440.71
1455 1455 15125.54 1455 15125.54 1455 24162.97 1455 22237.80 1455 9447.18
1456 1456 15135.90 1456 15135.90 1456 24179.52 1456 22253.03 1456 9453.65
1457 1457 15146.26 1457 15146.26 1457 24196.07 1457 22268.26 1457 9460.12
1458 1458 15156.62 1458 15156.62 1458 24212.62 1458 22283.49 1458 9466.59
1459 1459 15166.98 1459 15166.98 1459 24229.17 1459 22298.72 1459 9473.06
1460 1460 15177.34 1460 15177.34 1460 24245.72 1460 22313.95 1460 9479.53
1461 1461 15187.70 1461 15187.70 1461 24262.27 1461 22329.18 1461 9486.00
1462 1462 15198.06 1462 15198.06 1462 24278.82 1462 22344.41 1462 9492.47
1463 1463 15208.42 1463 15208.42 1463 24295.37 1463 22359.64 1463 9498.94
1464 1464 15218.78 1464 15218.78 1464 24311.92 1464 22374.87 1464 9505.41
1465 1465 15229.14 1465 15229.14 1465 24328.47 1465 22390.10 1465 9511.88
1466 1466 15239.50 1466 15239.50 1466 24345.02 1466 22405.33 1466 9518.35
1467 1467 15249.86 1467 15249.86 1467 24361.57 1467 22420.56 1467 9524.82
1468 1468 15260.22 1468 15260.22 1468 24378.12 1468 22435.79 1468 9531.29
1469 1469 15270.58 1469 15270.58 1469 24394.67 1469 22451.02 1469 9537.76
1470 1470 15280.94 1470 15280.94 1470 24411.22 1470 22466.25 1470 9544.23
1471 1471 15291.30 1471 15291.30 1471 24427.77 1471 22481.48 1471 9550.70
1472 1472 15301.66 1472 15301.66 1472 24444.32 1472 22496.71 1472 9557.17
1473 1473 15312.02 1473 15312.02 1473 24460.87 1473 22511.94 1473 9563.64
1474 1474 15322.38 1474 15322.38 1474 24477.42 1474 22527.17 1474 9570.11
1475 1475 15332.74 1475 15332.74 1475 24493.97 1475 22542.40 1475 9576.58
1476 1476 15343.10 1476 15343.10 1476 24510.52 1476 22557.63 1476 9583.05
1477 1477 15353.46 1477 15353.46 1477 24527.07 1477 22572.86 1477 9589.52
1478 1478 15363.82 1478 15363.82 1478 24543.62 1478 22588.09 1478 9595.99
1479 1479 15374.18 1479 15374.18 1479 24560.17 1479 22603.32 1479 9602.46
1480 1480 15384.54 1480 15384.54 1480 24576.72 1480 22618.55 1480 9608.93
1481 1481 15394.90 1481 15394.90 1481 24593.27 1481 22633.78 1481 9615.40
1482 1482 15405.26 1482 15405.26 1482 24609.82 1482 22649.01 1482 9621.87

662593135.xlsx CONVEYANCE 38 of 130


CONVEYANCE CHARGES AS PER COMMON SSR:2020-21

PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No

Nos. Laterite /Packed


/Lime/Surki per aggregates per
Blocks/Wood materials per
Cum cum
per cum MT

Km Charges Km Charges Km Charges Km Charges Km Charges


1483 1483 15415.62 1483 15415.62 1483 24626.37 1483 22664.24 1483 9628.34
1484 1484 15425.98 1484 15425.98 1484 24642.92 1484 22679.47 1484 9634.81
1485 1485 15436.34 1485 15436.34 1485 24659.47 1485 22694.70 1485 9641.28
1486 1486 15446.70 1486 15446.70 1486 24676.02 1486 22709.93 1486 9647.75
1487 1487 15457.06 1487 15457.06 1487 24692.57 1487 22725.16 1487 9654.22
1488 1488 15467.42 1488 15467.42 1488 24709.12 1488 22740.39 1488 9660.69
1489 1489 15477.78 1489 15477.78 1489 24725.67 1489 22755.62 1489 9667.16
1490 1490 15488.14 1490 15488.14 1490 24742.22 1490 22770.85 1490 9673.63
1491 1491 15498.50 1491 15498.50 1491 24758.77 1491 22786.08 1491 9680.10
1492 1492 15508.86 1492 15508.86 1492 24775.32 1492 22801.31 1492 9686.57
1493 1493 15519.22 1493 15519.22 1493 24791.87 1493 22816.54 1493 9693.04
1494 1494 15529.58 1494 15529.58 1494 24808.42 1494 22831.77 1494 9699.51
1495 1495 15539.94 1495 15539.94 1495 24824.97 1495 22847.00 1495 9705.98
1496 1496 15550.30 1496 15550.30 1496 24841.52 1496 22862.23 1496 9712.45
1497 1497 15560.66 1497 15560.66 1497 24858.07 1497 22877.46 1497 9718.92
1498 1498 15571.02 1498 15571.02 1498 24874.62 1498 22892.69 1498 9725.39
1499 1499 15581.38 1499 15581.38 1499 24891.17 1499 22907.92 1499 9731.86
1500 1500 15591.74 1500 15591.74 1500 24907.72 1500 22923.15 1500 9738.33

662593135.xlsx CONVEYANCE 39 of 130


GOVERNMENT OF TELANGANA
TRIBAL WELFARE ENGINEERING DEPARTMENT

DETAILED ABSTRACT ESTIMATE


Name of the Work

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta


(M) in Bhadradri Kothagudem Dist.

Name of the District : Bhadradri Kothagudem

Name of the Division : Bhadrachalam

Name of the Sub Division : Aswaraopeta

Name of the Mandal : Dammapeta

Estimate Cost : 16.00 Lakhs

Grant : CDP 2018-19


SPECIFICATION REPORT
Specification report accompanying for the work Construction of Sub Centre Building at Dammapeta-II
(EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

Estimate cost:- Rs. 16.00 Lakhs

Accordingly the Detailed estimate is prepared to the extent of amount sanctioned vide Procgs.Rc.No.L1/1773/2017
Dated 25.01.2021 of the Commissioner of Tribal Welfare TS, Hyderabad

Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all
1 operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering
etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken
2 Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming
Filling
concretewith usefulinavailable
in layers positionexcavated earth15cm,
not exceeding (excluding rock)top
finishing in surface,
trenches,curing
sides concrete,
of foundations
etc., and basement
complete with
for finished
3 initial
item oflead in (APSS
work layers not
No.exceeding 15 cm thick,
402) for Levelling consolidating
Course and Flooringeach deposited layer by watering and ramming including
Bed
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. APSS No.309 & 310
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick,
4 consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded
5 machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges,
sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
Providing High Yield
laying concrete, curingStrength Deformed
etc.,complete (HYSD) steel
but excluding cost bars (Feand
of steel 500its
grade as per IS
fabrication 1786-1979)
charges of different
for finished diameters
item of work
6 for RCCNo.
(APSS works,
402) including
including labour charges
centering, for straightening,
shuttering, cutting,vibrating,
laying concrete, bending curing
to required
etc sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel
Brick Masonry all
bars, including in superstructure
wastages such with CM (1:8)
as overlaps, prop: using
couplings, second
chairs, class
spacer bricks
bars from approved
including source having
cost and conveyance of minimum
binding
7 crushing
wire, cover strength
blocksofand
40 all
Kg/Sqcm. including
incidental, cost and
operational, conveyance
laour charges suchof all
as materials like cement,
cutting, bending placingsand, bricks, water
in position, tyingetc.,
to site, including
including sales andseigniorage
other taxescharges, sales & other
on all materials taxes on all
etc., complete formaterials, all operational,
finished item of work in incidental and labour
all floors. (APSS charges
No.126) of
such
TATA, as mixing cement
SAIL, VSP, mortar,&constructing
JINDAL SHYAM STEEL masonry, scaffolding charges, lift charges, curing, etc., complete for
Ceiling
finishedPlastering with(APSS
item of work. CM(1:3) No.Prop:
501 & 12mm
504).thick in single
for panel coat
walls spongstructure
in super finish including cost and conveyance of all
8 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all
9 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick in single coat including cost and conveyance of
10 all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

The total estimated cost is Worked out to Rs 16.00 lakhs with current SOR 2020-21
An early sanction of estimate is solicited.

Asst. Engineer Dy Executive. Engineer Executive Engineer


TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam
GENERAL ABSTRACT

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in


Bhadradri Kothagudem Dist.

Sl. No. Description of item Amount

1 Civil Work 1349152.00

2 Electrification 5411.00

1354563.00

3 Add GST @ 12.00% 162548.00

4 Add QC @ 0.50% 6773.00

5 Provision for Bore Well 25000.00

6 Seigniorage Charges 7504.00

7 LS Amount for Unfore seen Items 43612.00

Total : 1600000.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
DETAILED ABSTRACT ESTIMATE
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.

S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all
operational, incidental, seigniorage charges, labour charges
such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS
308). for Building Foundation

Columns 1 X 12 1.35 1.35 1.20 26.24


26.24 384.65 1 Cum 10093.00
2 Plain Cement Concrete (1:5:10) proportion (cement: fine
aggregate: Coarse aggregate) using 40mm size Hard Broken
Granite (IS383, 1970) machine crushed metal from approved
quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing
concrete in concrete mixer including seigniorage charges,
sales & other taxes on all materials, all operational, incidental,
and labour charges such as laying and ramming concrete in
layers in position not exceeding 15cm, finishing top surface,
curing concrete, etc., complete for finished item of work
(APSS No. 402) for Levelling Course and Flooring Bed

Columns 1 X 12 1.35 1.35 0.15 3.28


Under Flooring
Nurse Room 1 X 1 3.05 4.65 0.075 1.06
Hall 1 X 1 5.18 4.65 0.075 1.81
Passage 1 X 1 1.850 2.36 0.075 0.33
Store 1 X 1 3.660 2.29 0.075 0.63
Ward 1 X 1 3.660 4.80 0.075 1.32
Lab 1 X 1 3.100 2.44 0.075 0.57
Toilet 1 1 X 1 1.450 2.44 0.075 0.27
Toilet 2 1 X 1 1.370 2.13 0.075 0.22
9.49 4900.05 1 Cum 46501.00
3 Filling with useful available excavated earth (excluding rock)
in trenches, sides of foundations and basement with initial
lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational,
incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. APSS No.309 & 310

EW Qty 26.24
Deduct PCC (1:5:10) -3.28
Footings -5.18
Pedestals -2.59
Columns -0.12
15.07 34.15 1 Cum 515.00

Page 43 of 130
4 Filling with Gravel in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15cm thick,
consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310

Nurse Room 1 X 1 3.05 4.65 0.35 4.96


Hall 1 X 1 5.18 4.65 0.35 8.43
Passage 1 X 1 1.850 2.36 0.35 1.53
Store 1 X 1 3.660 2.29 0.35 2.93
Ward 1 X 1 3.660 4.80 0.35 6.15
Lab 1 X 1 3.100 2.44 0.35 2.65
Toilet 1 1 X 1 1.450 2.44 0.35 1.24
Toilet 2 1 X 1 1.370 2.13 0.35 1.02
28.91 292.05 1 Cum 8443.00
5 Vibrated Reinforced Cement Concrete M20 Grade Nominal
Mix corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but excluding
cost of steel and its fabrication charges for finished item of
work (APSS No. 402) including centering, shuttering, laying
concrete, vibrating, curing etc

A FOOTINGS
1 X 12 1.20 1.20 0.30 5.18
5.18 10268.10 1 Cum 53189.00

B PEDESTALS
1 X 12 0.60 0.60 0.60 2.59
2.59 10893.00 1 Cum 28213.00
C COLUMNS
Upto GL 1 X 12 0.30 0.23 0.15 0.12
Above Plinth beam 1 X 12 0.30 0.23 3.35 2.77
2.89 12647.20 1 Cum 36550.00
D PLINTH BEAM
Long walls 1 X 3 12.80 0.23 0.30 2.65
Cross walls 1 X 4 7.77 0.23 0.30 2.14
Toilet 1 X 2 2.13 0.23 0.30 0.29
Deduct Columns 1 X 12 0.30 0.23 -0.30 -0.25
4.83 12906.25 1 Cum 62337.00
E LINTELS
Main Door 1 X 1 1.20 0.23 0.15 0.04
Inside Doors 1 X 5 1.05 0.23 0.15 0.18
Toilet Doors 1 X 2 0.75 0.23 0.15 0.05
Windows W1 1 X 4 1.20 0.23 0.15 0.17
W2 1 X 4 0.90 0.23 0.15 0.12
0.56 12178.70 1 Cum 6820.00
F SUNSHADES
Main Door 1 X 1 1.50 0.60 0.90
Back Door 1 X 1 1.20 0.60 0.72
Windows W1 1 X 4 1.50 0.60 3.60

Page 44 of 130
W2 1 X 4 1.20 0.60 2.88
8.10 934.55 1 Sqm 7570.00
G ROOF BEAMS
Long walls 1 X 3 12.80 0.23 0.30 2.65
Cross walls 1 X 4 7.77 0.23 0.30 2.14
4.79 11326.40 1 Cum 54253.00
H ROOF SLAB 115MM
1 X 1 13.40 8.37 112.16
112.16 1295.60 1 Sqm 145314.00
6 Providing High Yield Strength Deformed (HYSD) steel bars
(Fe 500 grade as per IS 1786-1979) of different diameters for
RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges
such as cutting, bending placing in position, tying including
sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126) of TATA,
SAIL, VSP, JINDAL & SHYAM STEEL

2.60 81489.60 1 MT 211873.00


7 Brick Masonry in superstructure with CM (1:8) prop: using
second class bricks from approved source having minimum
crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks, water
etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. (APSS No. 501 & 504). for
panel walls in super structure

Upto Basement Level

Long walls 1 X 2 12.80 0.23 0.35 2.06


Long walls 1 X 1 10.95 0.23 0.35 0.88
Cross walls 1 X 4 7.77 0.23 0.35 2.50
Toilet 1 X 2 2.13 0.23 0.35 0.34
Deduct Columns 1 X 12 0.30 0.23 -0.35 -0.29
5.49
Upto Roof Level
Long walls 1 X 2 12.80 0.23 3.00 17.66
Long walls 1 X 1 10.95 0.23 3.00 7.56
Cross walls 1 X 4 7.77 0.23 3.00 21.45
Toilet 1 X 2 2.13 0.23 3.00 2.94
Deduct Columns 1 X 12 0.30 0.23 -3.00 -2.48
Main Door 1 X 1 1.20 0.23 -2.10 -0.58
Inside Doors 1 X 5 1.05 0.23 -2.10 -2.54
Toilet Doors 1 X 2 0.75 0.23 -2.10 -0.72
Windows W1 1 X 4 1.20 0.23 -1.35 -1.49
W2 1 X 4 0.90 0.23 -1.35 -1.12
Ventilators 1 X 10 0.60 0.23 -0.30 -0.41

Page 45 of 130
40.27
45.76 6888.55 1 Cum 315220.00
8 Ceiling Plastering with CM(1:3) Prop: 12mm thick in single
coat spong finish including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

Nurse Room 1 X 1 3.05 4.65 14.18


Hall 1 X 1 5.18 4.65 24.09
Passage 1 X 1 1.850 2.36 4.37
Store 1 X 1 3.660 2.29 8.38
Ward 1 X 1 3.660 4.80 17.57
Lab 1 X 1 3.100 2.44 7.56
Toilet 1 1 X 1 1.450 2.44 3.54
Toilet 2 1 X 1 1.370 2.13 2.92
Sunshade Bottom Main 1 X 1 1.50 0.60 0.90
Door
Back Door 1 X 1 1.20 0.60 0.72
Windows W1 1 X 4 1.50 0.60 3.60
W2 1 X 4 1.20 0.60 2.88
Slab Projection F/S & 1 X 2 13.40 0.30 8.04
B/S
Slab Projection R/S & 1 X 2 7.77 0.30 4.66
L/S
103.41 2000.30 10 Sqm 20685.00
9 Plastering to even surfaces of wall with CM(1:4) Prop: 12mm
thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

Nurse Room
Long walls 1 X 2 3.05 3.00 18.30
Cross walls 1 X 2 4.65 3.00 27.90
Hall
Long walls 1 X 2 5.18 3.00 31.08
Cross walls 1 X 2 4.65 3.00 27.90
Passage
Long walls 1 X 1 1.85 3.00 5.55
Cross walls 1 X 2 2.36 3.00 14.16
Store
Long walls 1 X 1 3.66 3.00 10.98
Cross walls 1 X 2 2.29 3.00 13.74
Ward
Long walls 1 X 1 3.66 3.00 10.98
Cross walls 1 X 2 4.80 3.00 28.80
Lab
Long walls 1 X 1 3.10 3.00 9.30
Cross walls 1 X 2 2.44 3.00 14.64
Toilet 1
Long walls 1 X 1 1.45 3.00 4.35
Cross walls 1 X 2 2.44 3.00 14.64
Toilet 2

Page 46 of 130
Long walls 1 X 1 1.37 3.00 4.11
Cross walls 1 X 2 2.13 3.00 12.78
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Inside Doors 2 X 4 1.05 -2.10 -17.64
Back Door 1 X 1 1.05 -2.10 -2.21
Toilet Doors 2 X 2 0.75 -2.10 -6.30
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
207.40 1791.50 10 Sqm 37156.00
10 Plastering to even surfaces of wall with CM (1:5) Prop: 16mm
thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

Long Walls 1 X 2 12.80 3.35 85.76


Cross Walls 1 X 2 7.77 3.35 52.06
Sunshade Top Main 1 X 1 1.50 0.60 0.90
Door
Back Door 1 X 1 1.20 0.60 0.72
Windows W1 1 X 4 1.50 0.60 3.60
W2 1 X 5 1.20 0.60 3.60
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Back Door 1 X 1 1.05 -2.10 -2.21
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
128.77 2581.00 10 Sqm 33236.00
11 Flooring and Treads with Polished shabad / Tandur stone
minimum 15 to 18 mm thick of size (0.254M x0.254M) set
over base coat of CM (1:8) over already laid CC bed / RCC
Roof Slab, including neat cement slurry of honey like
consistency spread @ 3.3 kgs per sqm. & Jointed with neat
cement to full depth including cost of all materials like cement,
sand, and water and flooring stones etc., complete, including
seigniorage charges, labour charges for dressing of flooring
stones etc., complete for finished item of work, .

Nurse Room 1 X 1 3.05 4.65 14.18


Hall 1 X 1 5.18 4.65 24.09
Passage 1 X 1 1.850 2.36 4.37
Store 1 X 1 3.660 2.29 8.38
Ward 1 X 1 3.660 4.80 17.57
Lab 1 X 1 3.100 2.44 7.56
76.15 7681.05 10 Sqm 58491.00

Page 47 of 130
12 Providing Skirting to internal walls and Risers of Steps to 15
cm height with Polished shabad / Tandur stone minimum 15
to 18 mm thick of size (0.254M x0.254M) length equal to
flooring stones, set over base coat of CM (1:3) 12 mm thick
with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointed with white cement paste
mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for
finished item of work

Nurse Room 1 X 2 7.70 0.15 2.31


Hall 1 X 2 9.83 0.15 2.95
Passage 1 X 2 4.21 0.15 1.26
Store 1 X 2 5.95 0.15 1.79
Ward 1 X 2 8.46 0.15 2.54
Lab 1 X 2 5.54 0.15 1.66
12.51 8474.85 10 Sqm 10602.00
13 Flooring with Non-skid red or white full body Ceramic floor
tiles of size 300 x 300 mm and thickness between 7-8 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs of
makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set
over base coat of cement mortar (1:8), 12 mm thick over CC
bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like
cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work.

Toilet 1 1 X 1 1.450 2.44 3.54


Toilet 2 1 X 1 1.370 2.13 2.92
6.46 8655.40 10 Sqm 5591.00
14 Dadooing to walls with glazed red or white full body ceramic
wall tiles of size 200 x 300 mm / 245 mm x 325 mm and
thickness 6 mm 1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all shades
and designs, any brand as approved by Engineer - in - charge
and set over a base coat of CM (1:5), 12mm thick and neat
cement paste at the rate of 3.3 Kg/Sqmt. and jointed with
white cement paste mixed with pigment of matching shade
including cost and conveyance of all materials like cement,
sand, water, tiles, etc. to site, seigniorage charges, sales and
other taxes on all materials, and all opertional, incidental and
all labour charges such as mixing of cement mortar, laying in
position, curing, lift charges etc., complete for finished item of
work in all floors

Toilet 1 1 X 2 3.890 1.50 11.67


Toilet 2 1 X 2 3.500 1.50 10.50
22.17 5665.80 10 Sqm 12561.00

Page 48 of 130
15 Painting to New External Walls with two coats of Plastic
Emulsion paint of Asian / Berger / Nerolac / Saicoat /
Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of
cement primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly brushing
the surface to remove all loose powdered materials, including
cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external
Walls.(APSS No. 911)

Long Walls 1 X 2 12.80 3.35 85.76


Cross Walls 1 X 2 7.77 3.35 52.06
Sunshade Top Main 1 X 1 1.50 0.60 0.90
Door
Back Door 1 X 1 1.20 0.60 0.72
Windows W1 1 X 4 1.50 0.60 3.60
W2 1 X 5 1.20 0.60 3.60
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Back Door 1 X 1 1.05 -2.10 -2.21
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
128.77 1908.20 10 Sqm 24572.00
16 Painting to new internal walls with two (2) coats of ready
mixed oil bound washable distemper acrylic base of approved
brand and shade over a base coat of cement primer water
base interior Grade-I of approved brand, makind three (3)
coats in all to give an even shade after thourughly brushing
the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to
work site and all operational, incidental, labour charges etc.,
complete for finished item of work in all floors for internal
walls (SS 911)

Nurse Room
Long walls 1 X 2 3.66 3.00 21.96
Cross walls 1 X 2 4.80 3.00 28.80
Hall
Long walls 1 X 2 3.10 3.00 18.60
Cross walls 1 X 2 2.44 3.00 14.64
Passage
Long walls 1 X 1 1.45 3.00 4.35
Cross walls 1 X 2 2.44 3.00 14.64
Store
Long walls 1 X 1 1.37 3.00 4.11
Cross walls 1 X 2 2.13 3.00 12.78
Ward
Long walls 1 X 1 1.50 3.00 4.50
Cross walls 1 X 2 0.60 3.00 3.60
Lab
Long walls 1 X 1 1.20 3.00 3.60
Cross walls 1 X 2 0.60 3.00 3.60

Page 49 of 130
Toilet 1
Long walls 1 X 1 1.50 3.00 4.50
Cross walls 1 X 2 0.60 3.00 3.60
Toilet 2
Long walls 1 X 1 1.20 3.00 3.60
Cross walls 1 X 2 0.60 3.00 3.60
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Inside Doors 2 X 4 1.05 -2.10 -17.64
Back Door 1 X 1 1.05 -2.10 -2.21
Toilet Doors 2 X 2 0.75 -2.10 -6.30
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
Toilet 1 1 X 2 0.750 -1.50 -2.25
Toilet 2 1 X 2 1.200 -1.50 -3.60
102.82 1238.15 10 Sqm 12731.00
17 Supplying & fixing of 1.22x 2.13 Mts. (Double Leaf) Door
frame made of roll formed section of 1.25 mm thick CRCA
section, size should be 50 x 75 mm with 32 mm rebate. The
corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure
polyester paint. The frame should be provided with approved
quality M.S.Powder coated butt hinges IS 205 125mm long of
6 Nos. along with Double flush door shutters solid bond wood
block board type with commercial ply on both faces of 30mm
thick including fixtures such as Mild Steel "Z" type Hold Fasts
6 Nos., M.S.Powder coated tower bolts I.S. 204, 300 mm long
and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681
300mm long 1No., M.S.Powder coated Door Stoper 2No.,
sales and other taxes cost and conveyance of all materials to
site, all labour cahrges such as making of door frame, fixing
in position,fixing of shutters, & hard ware fixtures,
etc.,complete for finished item of work. The frame should be
embedded to a depth of 40mm in the flooring.

1.20 X 2.10 Mts 1 X 1 1.00 7560.00 1 Each 7560.00

Page 50 of 130
18 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door
frame made of roll formed section of 1.25 mm thick CRCA
section, size should be 50 x 75 mm with 32 mm rebate. The
corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure
polyester paint. The frame should be provided with approved
quality M.S.Powder coated butt hinges IS 205 125mm long of
6 Nos. along with Double flush door shutters solid bond wood
block board type with commercial ply on both faces of 30mm
thick including fixtures such as Mild Steel "Z" type Hold Fasts
6 Nos., M.S.Powder coated tower bolts I.S. 204, 300 mm long
and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681
300mm long 1No., M.S.Powder coated Door Stoper 2No.,
sales and other taxes cost and conveyance of all materials to
site, all labour cahrges such as making of door frame, fixing
in position,fixing of shutters, & hard ware fixtures,
etc.,complete for finished item of work. The frame should be
embedded to a depth of 40mm in the flooring.

1.05 X 2.10 Mts 1 X 5 5.00 6875.00 1 Each 34375.00


19 Providing and fixing 30mm thick Solid panel PVC door shutter
consisting of frame made out of M.S. tubes of 19 gauge
thickness and size of 19mm x 19mm for stiles, & 15mm x
15mm for top & bottom rails. M.S. frame shall have a coat of
steel primers of approved make and manufacture. M.S. frame
shall be covered with 5mm thick heat molded PVC ‘C’
channel of size 30 x 50mm forming stiles, and 5mm thick,
75mm wide PVC sheets for top rail, lock rail & bottom rail on
either side, and 10mm (5mm x 2) thick, 20mm wide cross
PVC sheet as gap insert for top rail & bottom rail. Paneling of
5mm thick PVC sheet to be fitted in the M.S. frame welded /
sealed to the stiles & rails with 30mm wide x 5mm thick PVC
sheet beading on either side, and joined together with solvent
cement adhesive etc. An additional 5mm thick PVC strip of
20mm width is to be stuck on the interior side of the ‘C’
Channel using PVC solvent adhesive. Complete as per
direction of Engineer-in-charge, manufacturer’s specification
& drawing for finished item of work

1 X 2 0.75 2.10 3.15 2480.00 1 Sqm 7812.00

Page 51 of 130
20 Supplying and fixing of Unplasticised Poly Vinyl Chloride
(UPVC) 3 track sliding windows with mesh shutter provision –
(only 2-glass shutters) duly manufactured using UPVC
reinforced profiles (Composition of profile shall consists a
minimum of 5.5 PHR of TiO2 and not more than 12 PHR of
CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)
/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38
mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames
capable of mounting single glazing system, structurally
reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0 / 1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5
mm thick clear float glass of reputed make duly fixed with
Grey colour TPV Gasket for sash & Glazing bead shall be co-
extruded with Grey colour soft PVC. System shall have single
point locking with Touch Lock and the system is to be
installed at the site using anchor fasteners, silicon rubber
sealant, easy glazing / deglazing at site etc., including cost
and conveyance of all materials, accessories, labour charges
for transportation, erection at site complete for finished item of
work.

Windows W1 1 X 4 1.20 1.35 6.48


W2 1 X 4 0.90 1.35 4.86
11.34 6921.00 1 Sqm 78484.00

Page 52 of 130
21 Supply and fixing of M.S.Grill of size with outer angular frame
of rolled steel equal angle of ISA 2525 of size 25mm x 25mm
x 4mm welded with safety bars of 10mm square rods at
150mm centre to centre horizontally and verticlally including
red oxide primer of grade-I quality, sales and other taxes, cost
and conveyance of all materials to site, all labour charges
and fixing in position etc., complete for finished item of work.

Window Safety Grills 1 X 4 1.20 1.35 6.48


1 X 4 0.90 1.35 4.86
11.34 1623.00 1 Sqm 18405.00

TOTAL Rs. 1349152.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

Page 53 of 130
GOVERNMENT OF TELANGANA
TRIBAL WELFARE ENGINEERING DEPARTMENT

WORKDONE ESTIMATE cum COMPLETION REPORT


Name of the Work

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta


(M) in Bhadradri Kothagudem Dist.

Name of the District : Bhadradri Kothagudem

Name of the Division : Bhadrachalam

Name of the Sub Division : Aswaraopeta

Name of the Mandal : Dammapeta

Estimate Cost : 16.00 Lakhs

Grant : CDP 2018-19


SPECIFICATION REPORT
Specification report accompanying for the work Construction of Sub Centre Building at Dammapeta-II
(EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

Estimate cost:- Rs. 16.00 Lakhs

The work Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in
Bhadradri Kothagudem Dist. was administratively sanctioned vide Proc.No.L1/1773/2017, Dt:25-01-2021 of
Commissioner, Tribal Welfare, Hyderabad for Rs:16.00 Lakhs under NHM Grant and technically sanctioned by the
Superintending Engineer, Tribal welfare, Warangal vide TS.No. 12 / 2020-21 of SE.TW.Wgl, Dt.03-04-2021 for
Rs:16.00 Lakhs

The work was entrusted to Sri. K. Venkateswara Rao, Contractor, H.No.7-72/9B, Aswaraopeta (V&M)
Bhadradri Kothagudem Dist. Agreement No & Date : 61 /2021-22, Dt.05-07-2021 Tender % : 17.09% Less and the
work was completed within stipulated period of 6 months.

The Workdone estimate is prepared with the following items

Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all
1 operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering
etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken
2 Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming
Filling
concretewith usefulinavailable
in layers positionexcavated earth15cm,
not exceeding (excluding rock)top
finishing in surface,
trenches,curing
sides concrete,
of foundations
etc., and basement
complete with
for finished
3 initial
item oflead in (APSS
work layers not
No.exceeding 15 cm thick,
402) for Levelling consolidating
Course and Flooringeach deposited layer by watering and ramming including
Bed
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. APSS No.309 & 310
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick,
4 consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded
5 machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges,
sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
Providing High Yield
laying concrete, curingStrength Deformed
etc.,complete (HYSD) steel
but excluding cost bars (Feand
of steel 500its
grade as per IS
fabrication 1786-1979)
charges of different
for finished diameters
item of work
6 for RCCNo.
(APSS works,
402) including
including labour charges
centering, for straightening,
shuttering, cutting,vibrating,
laying concrete, bending curing
to required
etc sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel
Ceiling Plastering
bars, including with CM(1:3)
all wastages such Prop: 12mm couplings,
as overlaps, thick in single coatspacer
chairs, spongbars
finish including
including costcost
andand conveyance
conveyance of all
of binding
7 materials
wire, coverlike cement,
blocks andsand, water etc.,
all incidental, to site, including
operational, seigniorage
laour charges such charges, sales
as cutting, & other
bending taxesin
placing onposition,
all materials,
tying all
operational,
including salesincidental charges
and other taxes and labour
on all charges
materials etc.,such as mixing
complete mortar, item
for finished finishing, curing,
of work in alletc., complete
floors. (APSSfor finished
No.126) of
item
TATA,of work.
SAIL,(APSS 901,906)& SHYAM STEEL
VSP, JINDAL
Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all
8 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick in single coat including cost and conveyance of
9 all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick in single coat including cost and conveyance of
10 all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

The Workdone estimate is Worked out to Rs 1575468.00


An early sanction of workdone estimate cum completion report is solicited.
Asst. Engineer Dy Executive. Engineer Executive Engineer
TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam
GENERAL ABSTRACT

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in


Bhadradri Kothagudem Dist.

Sl. No. Description of item Amount

1 Civil Work 1552178.00

2 Electrification 65122.00

3 Water Supply and Sanitary 56898.00

4 Price Adjustment 0.00

1674198.00

5 Deduct Tender Premium @ 17.09% -286120.00

1388078.00

6 Add GST @ 12.00% 166569.00

7 Add QC @ 0.50% 6940.00

8 Seigniorage Charges 10516.00

9 Add DMF & SMET 32% on Seigniorage charges 3365.00

10 Add tender saving amount

11 LS Amount for Unfore seen Items 0.00

Total : 1575468.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
ABSTRACT COMPLETION REPORT
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

Estimate amount: 20.00 Lakhs


As per Sanctioned As per Workdone
S.No. Description Excess Less Remarks
Estimate. Estimate

1 Civil Work 1349152.00 1552178.00 203026.00 -

2 Electrification 5411.00 65122.00 59711.00 -

3 Water Supply and Sanitary 56898.00 56898.00 -

4 Price Adjustment 0.00 - -

Sub Total >>> 1354563.00 1674198.00

5 Deduct Tender Premium @ 17.09% -286120.00 - 286120.00

Sub Total >>> 1354563.00 1388078.00

6 Add GST @ 12.00% 162548.00 166569.00 4021.00 -

7 Add QC @ 0.50% 6773.00 6940.00 167.00 -

8 Provision for Bore Well 25000.00 - 25000.00

9 Seigniorage Charges 7504.00 10516.00 3012.00 -

10 Add DMF & SMET 32% on Seigniorage charges 3365.00 3365.00 -

11 Add tender saving amount 0.00 - -

12 LS Amount for Unfore seen Items 43612.00 0.00 - 43612.00

13 Total 1,600,000.00 1,575,468.00 330200.00 354732.00

As per Sanctioned Estimate. 1600000.00 Excess 330200.00

As per Workdone Estimate 1575468.00 Less 354732.00


24532.00 -24532.00
Assistant Engineer Dy. Executive Engineer Executive Engineer
TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
DETAILED ABSTRACT ESTIMATE
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.

S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Earth work excavation for foundations and depositing on bank for
all lifts and with an initial lead of 10m including all operational,
incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building
Foundation

Qty Vide Page No.1 to 2 of MB No.210/B/TW/19-20


C6 1 X 1 1.500 1.650 1.500 3.71
C7 1 X 1 1.500 1.650 1.400 3.47
C10 1 X 1 1.500 1.650 1.300 3.22
C11 1 X 1 1.500 1.650 1.350 3.34
C5 1 X 1 1.350 1.500 1.500 3.04
C8 1 X 1 1.350 1.500 1.650 3.34
C9 1 X 1 1.350 1.500 1.550 3.14
C12 1 X 1 1.350 1.500 1.600 3.24
C1 & C2 1 X 2 1.500 1.350 1.600 6.48
C3 1 X 1 1.500 1.350 1.500 3.04
C4 1 X 1 1.500 1.350 1.400 2.84
7-Jul-21 38.86
Qty Vide Page No.9 to 10 of MB No.210/B/TW/19-20
1 X 1 3.500 0.300 0.100 0.11
1 X 1 2.185 0.300 0.100 0.07
1 X 1 2.390 0.300 0.100 0.07
1 X 1 3.570 0.300 0.100 0.11
1 X 1 2.185 0.300 0.100 0.07
1 X 1 2.465 0.300 0.100 0.07
1 X 1 1.905 0.300 0.100 0.06
1 X 1 3.910 0.300 0.100 0.12
1 X 1 2.510 0.300 0.100 0.08
1 X 1 1.240 0.300 0.100 0.04
1 X 1 3.380 0.300 0.100 0.10
1 X 1 1.220 0.300 0.100 0.04
1 X 1 3.830 0.300 0.100 0.11
1 X 1 1.220 0.300 0.100 0.04
1 X 1 3.230 0.300 0.100 0.10
1 X 1 1.290 0.300 0.100 0.04
1 X 1 3.380 0.300 0.100 0.10
23-Jul-21 1.33
Qty Vide Page No.45 of MB No.210/B/TW/19-20
Front Ramp L/W 1 X 1 12.880 0.300 0.600 2.32
C/W 1 X 2 1.200 0.300 0.600 0.43
Steps 1 X 1 2.150 0.900 0.100 0.19
Soak pit 2 X 0.7857 1.000 1.000 1.200 1.89
17-Oct-21 4.83
Qty Vide Page No.78 of MB No.210/B/TW/19-20
1 X 1 15.000 0.450 0.600 4.05
1 X 1 11.700 0.450 0.600 3.16
1 X 1 12.600 0.450 0.600 3.40
Soak pit 1 X 0.7857 1.000 1.000 1.500 1.18

Page 60 of 130
1-Dec-21 11.79
56.81 384.65 1 Cum 21852.00
2 Plain Cement Concrete (1:5:10) proportion (cement: fine
aggregate: Coarse aggregate) using 40mm size Hard Broken
Granite (IS383, 1970) machine crushed metal from approved
quarry including cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, mixing concrete in
concrete mixer including seigniorage charges, sales & other taxes
on all materials, all operational, incidental, and labour charges
such as laying and ramming concrete in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work (APSS No. 402) for Levelling
Course and Flooring Bed

Qty Vide Page No.3 of MB No.210/B/TW/19-20


F1 1 X 4 1.500 1.650 0.150 1.49
F2 1 X 4 1.350 1.500 0.150 1.22
F3 1 X 4 1.500 1.350 0.150 1.22
12-Jul-21 3.93
Qty Vide Page No.11 to 12 of MB No.210/B/TW/19-20
1 X 2 4.770 0.300 0.080 0.23
1 X 2 3.465 0.300 0.080 0.17
1 X 2 3.660 0.300 0.080 0.18
1 X 2 3.660 0.300 0.080 0.18
1 X 1 3.050 0.300 0.080 0.07
1 X 1 5.180 0.300 0.080 0.12
1 X 6 2.260 0.300 0.080 0.33
1 X 2 4.580 0.300 0.080 0.22
1 X 2 4.580 0.300 0.080 0.22
26-Jul-21 1.72
Qty Vide Page No.20 of MB No.210/B/TW/19-20
1 X 1 3.050 4.700 0.080 1.15
1 X 1 5.160 4.670 0.080 1.93
1 X 1 3.660 2.300 0.080 0.67
1 X 1 3.660 4.800 0.080 1.41
1 X 1 3.100 2.400 0.080 0.60
1 X 1 1.850 2.400 0.080 0.36
13-Aug-21 6.12
Qty Vide Page No.46 of MB No.210/B/TW/19-20
Front Ramp L/W 1 X 1 12.880 0.300 0.080 0.31
C/W 1 X 2 1.200 0.300 0.080 0.06
Steps 1 X 1 2.150 0.900 0.080 0.15
Toilets 1 X 2 1.450 2.500 0.080 0.58
24-Oct-21 1.10
Qty Vide Page No.55 of MB No.210/B/TW/19-20
1 X 1 2.300 0.300 0.080 0.06
1 X 1 12.480 1.200 0.080 1.20
10-Nov-21 1.26
14.13 4900.05 1 Cum 69238.00
3 Filling with useful available excavated earth (excluding rock) in
trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited
layer by watering and ramming including cost and conveyance of
water to work site and all operational, incidental, labour charges,
hire charges of T & P etc., complete for finished item of work.
APSS No.309 & 310

Page 61 of 130
Qty Vide Page No.8 of MB No.210/B/TW/19-20
Earth Work Qty 38.86
Deduct PCC 1:5:10 -3.93
Footings -6.31
Columns -0.75
23-Jul-21 27.87
27.87 34.15 1 Cum 952.00
4 Filling with Gravel in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire
charges of T & P etc., complete for finished item of work. APSS
No.309 & 310

Qty Vide Page No.19 of MB No.210/B/TW/19-20


1 X 1 3.050 4.700 0.500 7.17
1 X 1 5.160 4.670 0.500 12.05
1 X 1 3.660 2.300 0.500 4.21
1 X 1 3.660 4.800 0.500 8.78
1 X 1 3.100 2.400 0.500 3.72
1 X 1 1.850 2.400 0.500 2.22
9-Aug-21 38.15
Qty Vide Page No.51 of MB No.210/B/TW/19-20
1 X 1 12.480 1.300 0.200 3.24
4-Nov-21 3.24
Qty Vide Page No.81 of MB No.210/B/TW/19-20
1 X 1 60.000 5.000 0.300 90.00
90.00
131.39 292.05 1 Cum 38372.00
5 Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix
corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) including centering, shuttering, laying
concrete, vibrating, curing etc

A FOOTINGS
Qty Vide Page No.6 of MB No.210/B/TW/19-20
F1 1 X 4 1.350 1.500 0.300 2.43
F2 1 X 4 1.200 1.350 0.300 1.94
F3 1 X 4 1.350 1.200 0.300 1.94
16-Jul-21 6.31
6.31 10268.10 1 Cum 64792.00
C COLUMNS
Qty Vide Page No.6 to 7 of MB No.210/B/TW/19-20
C1 & C2 1 X 2 0.230 0.300 1.000 0.14
C3 & C4 1 X 2 0.230 0.300 0.900 0.12
C5 & C6 1 X 2 0.230 0.300 0.900 0.12
C7 1 X 1 0.230 0.300 1.000 0.07
C8 1 X 1 0.230 0.300 0.850 0.06
C9 1 X 1 0.230 0.300 0.900 0.06

Page 62 of 130
C10 1 X 1 0.230 0.300 0.850 0.06
C11 & C12 1 X 2 0.230 0.300 0.900 0.12
16-Jul-21 0.75
Qty Vide Page No.16 of MB No.210/B/TW/19-20
1 X 4 0.230 0.300 3.570 0.99
1 X 4 0.230 0.300 3.520 0.97
1 X 4 0.230 0.300 3.470 0.96
31-Jul-21 2.92
3.67 12647.20 1 Cum 46415.00

Page 63 of 130
D PLINTH BEAM
Qty Vide Page No.15 of MB No.210/B/TW/19-20
1 X 3 12.810 0.230 0.300 2.65
1 X 4 4.650 0.230 0.300 1.28
1 X 1 3.650 0.230 0.300 0.25
1 X 6 2.260 0.230 0.300 0.94
31-Jul-21 5.12
5.12 12906.25 1 Cum 66080.00
E LINTELS
Qty Vide Page No.34 of MB No.210/B/TW/19-20
1 X 1 2.700 0.200 0.150 0.08
1 X 4 1.600 0.150 0.150 0.14
1 X 2 1.300 0.150 0.150 0.06
1 X 1 1.450 0.150 0.150 0.03
1 X 6 1.800 0.200 0.150 0.32
19-Sep-21 0.63
0.63 12178.70 1 Cum 7673.00
F SUNSHADES
Qty Vide Page No.34 of MB No.210/B/TW/19-20
1 X 1 2.700 0.600 1.62
1 X 6 1.500 0.600 5.40
19-Sep-21 7.02
7.02 934.55 1 Sqm 6561.00
G ROOF BEAMS
Qty Vide Page No.28 of MB No.210/B/TW/19-20
1 X 3 12.810 0.230 0.300 2.65
1 X 5 5.460 0.230 0.300 1.88
1 X 4 2.400 0.230 0.300 0.66
19-Aug-21 5.19
5.19 11326.40 1 Cum 58784.00
H ROOF SLAB 115MM

Qty Vide Page No.29 of MB No.210/B/TW/19-20


1 X 1 13.500 8.750 118.13
19-Aug-21 118.13
118.13 1295.60 1 Sqm 153049.00
6 Providing High Yield Strength Deformed (HYSD) steel bars (Fe
500 grade as per IS 1786-1979) of different diameters for RCC
works, including labour charges for straightening, cutting, bending
to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lapsplicing with
binding wire of 18 SWG, forming grills for reinforcement work as
per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in
position, tying including sales and other taxes on all materials etc.,
complete for finished item of work in all floors. (APSS No.126) of
TATA, SAIL, VSP, JINDAL & SHYAM STEEL

Qty Vide Page No.5 of MB No.210/B/TW/19-20


12-Jul-21 640.95
Qty Vide Page No.14 of MB No.210/B/TW/19-20
26-Jul-21 663.53
Qty Vide Page No.26 of MB No.210/B/TW/19-20
17-Aug-21 1605.45

Page 64 of 130
Qty Vide Page No.33 of MB No.210/B/TW/19-20
15-Sep-21 144.04
3053.97 Kg
3.054 MT
3.054 81489.60 1 MT 248869.00
7 Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat
spong finish including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)

Qty Vide Page No.40 to 41 of MB No.210/B/TW/19-20


1 X 1 3.050 4.700 14.34
1 X 1 5.160 4.700 24.25
1 X 1 3.660 2.200 8.05
1 X 1 3.660 5.000 18.30
1 X 1 3.100 2.500 7.75
1 X 1 1.450 2.500 3.63
1 X 1 1.450 2.500 3.63
1 X 1 1.850 2.500 4.63
1 X 1 13.500 0.300 4.05
1 X 1 13.500 0.600 8.10
1 X 2 7.850 0.300 4.71
1 X 1 2.700 0.600 1.62
1 X 6 1.500 0.600 5.40
13-Oct-21 108.46
108.46 2000.30 10 Sqm 21695.00
8 Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick
in single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)

Qty Vide Page No.41 to 43 of MB No.210/B/TW/19-20


1 X 1 3.050 3.150 9.61
1 X 1 3.050 3.110 9.49
1 X 2 4.700 3.130 29.42
1 X 1 5.160 3.150 16.25
1 X 1 5.160 3.110 16.05
1 X 2 4.700 3.130 29.42
1 X 2 3.660 3.100 22.69
1 X 2 2.200 3.100 13.64
1 X 1 3.660 3.110 11.38
1 X 1 3.660 3.070 11.24
1 X 2 5.000 3.090 30.90
1 X 1 3.100 3.110 9.64
1 X 1 3.100 3.070 9.52
1 X 2 2.500 3.090 15.45
1 X 2 1.450 1.610 4.67
1 X 2 2.500 1.570 7.85
1 X 2 1.450 1.610 4.67
1 X 2 2.500 1.570 7.85
1 X 2 1.850 1.610 5.96
1 X 2 2.500 1.570 7.85

Page 65 of 130
1 X 1 1.800 -2.130 -3.83
1 X 4 1.050 -2.130 -8.95
1 X 2 0.750 -2.100 -3.15
1 X 1 0.900 -2.100 -1.89
1 X 10 0.600 -0.300 -1.80
13-Oct-21 253.93
Qty Vide Page No.51 of MB No.210/B/TW/19-20
1 X 1 3.500 0.500 1.75
1 X 3 1.000 0.900 2.70
1 X 3 1.000 0.950 2.85
1 X 2 0.550 0.950 1.05
1 X 1 2.700 0.600 1.62
1 X 6 1.500 0.600 5.40
4-Nov-21 15.37
269.30 1791.50 10 Sqm 48245.00
9 Plastering to even surfaces of wall with CM (1:5) Prop: 16mm
thick in single coat including cost and conveyance of all materials
like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS
901,906)

Qty Vide Page No.44 of MB No.210/B/TW/19-20


1 X 1 12.880 3.550 45.72
1 X 1 12.880 3.470 44.69
1 X 2 7.800 3.510 54.76
1 X 6 1.200 -1.200 -8.64
13-Oct-21 136.53
136.53 2581.00 10 Sqm 35238.00
10 Flooring with Non-skid red or white full body Ceramic floor tiles of
size 300 x 300 mm and thickness between 7-8 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs of makes Jhonson &
Jhonson, Kajaria, Nitco and Marbonite, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles
etc., complete, including seigniorage charges, etc., complete for
finished item of work.

Qty Vide Page No.64 of MB No.210/B/TW/19-20


1 X 2 1.450 2.500 7.25
10-Nov-21 7.25
7.25 8655.40 10 Sqm 6275.00

Page 66 of 130
11 Dadooing to walls with glazed red or white full body ceramic wall
tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6
mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs, any
brand as approved by Engineer - in - charge and set over a base
coat of CM (1:5), 12mm thick and neat cement paste at the rate of
3.3 Kg/Sqmt. and jointed with white cement paste mixed with
pigment of matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, seigniorage
charges, sales and other taxes on all materials, and all opertional,
incidental and all labour charges such as mixing of cement
mortar, laying in position, curing, lift charges etc., complete for
finished item of work in all floors

Qty Vide Page No.64 of MB No.210/B/TW/19-20


2 X 2 1.450 1.450 8.41
2 X 2 2.500 1.450 14.50
1 X 2 0.750 -1.450 -2.18
10-Nov-21 20.73
20.73 5665.80 10 Sqm 11745.00
12 Painting to New External Walls with two coats of Plastic Emulsion
paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent
quality of approved brand and shade as approved by the Engineer
- in - Charge over base coat of cement primer water base grade -
II exterior making three coats in all to give an even shade after
thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes,
water to site, etc., sales & other taxes, all operational, incidental
and labour charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all floors for
external Walls.(APSS No. 911)

Qty Vide Page No.70 to 71 of MB No.210/B/TW/19-20


1 X 1 12.880 3.470 44.69
1 X 1 12.880 3.050 39.28
1 X 1 5.550 0.500 2.78
1 X 2 7.800 3.510 54.76
1 X 1 4.900 0.550 2.70
1 X 1 13.500 0.300 4.05
1 X 1 13.500 0.600 8.10
1 X 2 7.850 0.300 4.71
1 X 1 2.700 0.600 1.62
1 X 6 1.500 0.600 5.40
1 X 1 1.800 -2.130 -3.83
1 X 6 1.200 -1.200 -8.64
22-Nov-21 155.62
155.62 1908.20 10 Sqm 29695.00

Page 67 of 130
13 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior
Grade-I of approved brand, makind three (3) coats in all to give an
even shade after thourughly brushing the surface to remove all
dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete for finished item of work
in all floors for internal walls (SS 911)

Qty Vide Page No.67 to 69 of MB No.210/B/TW/19-20


1 X 1 3.050 4.700 14.34
1 X 1 5.160 4.700 24.25
1 X 1 3.660 2.200 8.05
1 X 1 3.660 5.000 18.30
1 X 1 3.100 2.500 7.75
1 X 2 1.450 2.500 7.25
1 X 1 1.850 2.500 4.63
1 X 1 3.050 3.050 9.30
1 X 1 3.050 3.010 9.18
1 X 2 4.700 3.030 28.48
1 X 1 5.160 3.050 15.74
1 X 1 5.160 3.010 15.53
1 X 2 4.700 3.030 28.48
1 X 1 3.660 3.010 11.02
1 X 1 3.660 3.070 11.24
1 X 2 5.000 3.040 30.40
1 X 1 2.100 3.010 6.32
1 X 1 3.100 2.970 9.21
1 X 2 2.500 2.990 14.95
2 X 2 1.450 1.610 9.34
2 X 2 2.500 1.570 15.70
1 X 2 1.850 3.000 11.10
1 X 2 2.500 3.000 15.00
1 X 4 1.030 -2.130 -8.78
1 X 2 0.750 -2.100 -3.15
1 X 1 0.900 -2.100 -1.89
22-Nov-21 311.74
311.74 1238.15 10 Sqm 38598.00

Page 68 of 130
14 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one
coat of primer and finished painted with pure polyester paint. The
frame should be provided with approved quality M.S.Powder
coated butt hinges IS 205 125mm long of 6 Nos. along with
Double flush door shutters solid bond wood block board type with
commercial ply on both faces of 30mm thick including fixtures
such as Mild Steel "Z" type Hold Fasts 6 Nos., M.S.Powder
coated tower bolts I.S. 204, 300 mm long and 10mm BOLT dia
2Nos, M.S.Powder coated handles IS 208 125mm long 4No,
M.S.Powder coated Aldrop IS 2681 300mm long 1No.,
M.S.Powder coated Door Stoper 2No., sales and other taxes cost
and conveyance of all materials to site, all labour cahrges such
as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.

Qty Vide Page No.54 of MB No.210/B/TW/19-20


1 X 4 4.00
4-Nov-21 4.00
4.00 6875.00 1 Each 27500.00
15 Providing and fixing 30mm thick Solid panel PVC door shutter
consisting of frame made out of M.S. tubes of 19 gauge thickness
and size of 19mm x 19mm for stiles, & 15mm x 15mm for top &
bottom rails. M.S. frame shall have a coat of steel primers of
approved make and manufacture. M.S. frame shall be covered
with 5mm thick heat molded PVC ‘C’ channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail,
lock rail & bottom rail on either side, and 10mm (5mm x 2) thick,
20mm wide cross PVC sheet as gap insert for top rail & bottom
rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S.
frame welded / sealed to the stiles & rails with 30mm wide x 5mm
thick PVC sheet beading on either side, and joined together with
solvent cement adhesive etc. An additional 5mm thick PVC strip
of 20mm width is to be stuck on the interior side of the ‘C’
Channel using PVC solvent adhesive. Complete as per direction
of Engineer-in-charge, manufacturer’s specification & drawing for
finished item of work

Qty Vide Page No.72 of MB No.210/B/TW/19-20


1 X 2 0.750 1.800 2.70
1-Dec-21 2.70
2.70 2480.00 1 Sqm 6696.00

Page 69 of 130
16 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC)
3 track sliding windows with mesh shutter provision – (only 2-
glass shutters) duly manufactured using UPVC reinforced profiles
(Composition of profile shall consists a minimum of 5.5 PHR of
TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of
PVC resin) of (80 mm x 52 mm) / (94 mm x 45 mm) x 2.20 mm for
outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for
sliding shutter frames capable of mounting single glazing system,
structurally reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0 / 1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5 mm
thick clear float glass of reputed make duly fixed with Grey colour
TPV Gasket for sash & Glazing bead shall be co-extruded with
Grey colour soft PVC. System shall have single point locking with
Touch Lock and the system is to be installed at the site using
anchor fasteners, silicon rubber sealant, easy glazing / deglazing
at site etc., including cost and conveyance of all materials,
accessories, labour charges for transportation, erection at site
complete for finished item of work.

Qty Vide Page No.53 of MB No.210/B/TW/19-20


1 X 6 1.200 1.200 8.64
4-Nov-21 8.64
8.64 6921.00 1 Sqm 59797.00
17 Supply and fixing of M.S.Grill of size with outer angular frame of
rolled steel equal angle of ISA 2525 of size 25mm x 25mm x 4mm
welded with safety bars of 10mm square rods at 150mm centre to
centre horizontally and verticlally including red oxide primer of
grade-I quality, sales and other taxes, cost and conveyance of all
materials to site, all labour charges and fixing in position etc.,
complete for finished item of work.

Qty Vide Page No.39 of MB No.210/B/TW/19-20


Windows 1 X 6 1.200 1.200 8.64
24-Sep-21 8.64
Qty Vide Page No.39 of MB No.210/B/TW/19-20
Ventilators 1 X 10 0.600 0.300 1.80
24-Sep-21 1.80
10.44 1623.00 1 Sqm 16944.00
SUPPLEMENTARY ITEMS
1 Brick Masonry in superstructure with CM (1:6) prop with Flyash
Cement solid blocks of size 290 x 225 x 140 mm, for
manufacturing of flyash solid blocks using flyash of 80 kgs,
cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a
compresive strength not lessthan 50 kg/sqm including cost and
conveyance of all materials, labour charges, seiniorage charges,
scaffolding and curing etc., for Superstructure Walls.

Qty Vide Page No.17 to 18 of MB No.210/B/TW/19-20


1 X 2 4.770 0.200 0.500 0.95
1 X 2 3.450 0.200 0.500 0.69
1 X 2 3.660 0.200 0.500 0.73
1 X 1 3.050 0.200 0.500 0.31
1 X 1 5.180 0.200 0.500 0.52
1 X 1 3.660 0.200 0.500 0.37
1 X 2 2.300 0.200 0.500 0.46

Page 70 of 130
1 X 2 2.300 0.200 0.500 0.46
1 X 2 2.500 0.200 0.500 0.50
1 X 2 4.600 0.200 0.500 0.92
1 X 2 4.600 0.200 0.500 0.92
4-Aug-21 6.83
Qty Vide Page No.30 to 31 of MB No.210/B/TW/19-20
1 X 1 4.770 0.200 2.150 2.05
1 X 1 3.450 0.200 2.150 1.48
1 X 1 3.660 0.200 2.150 1.57
1 X 1 3.050 0.200 2.150 1.31
1 X 1 5.180 0.200 2.150 2.23
1 X 1 3.660 0.200 2.150 1.57
1 X 2 4.600 0.200 2.150 3.96
1 X 2 2.300 0.200 2.150 1.98
1 X 1 4.780 0.150 2.150 1.54
1 X 1 3.450 0.150 2.150 1.11
1 X 1 3.660 0.150 2.150 1.18
1 X 2 4.600 0.150 2.150 2.97
1 X 2 2.400 0.150 2.150 1.55
1 X 2 2.260 0.150 2.150 1.46
1 X 1 1.800 0.200 -2.130 -0.77
1 X 4 1.050 0.150 -2.130 -1.34
1 X 2 0.750 0.150 -2.100 -0.47
1 X 1 0.900 0.150 -2.130 -0.29
1 X 6 1.200 0.200 -1.200 -1.73
1 X 6 0.300 0.200 -0.150 -0.05
1 4 6 0.300 0.150 -0.150 -0.16
15-Sep-21 21.15
Qty Vide Page No.35 to 36 of MB No.210/B/TW/19-20
1 X 1 4.770 0.200 0.820 0.78
1 X 1 3.450 0.200 0.820 0.57
1 X 1 3.660 0.200 0.820 0.60
1 X 1 3.050 0.200 0.900 0.55
1 X 1 5.180 0.200 0.900 0.93
1 X 1 3.600 0.200 0.900 0.65
1 X 2 2.300 0.200 0.840 0.77
1 X 2 4.600 0.200 0.880 1.62
1 X 1 4.780 0.150 0.860 0.62
1 X 1 3.450 0.150 0.860 0.45
1 X 2 4.600 0.150 0.860 1.19
1 X 2 2.400 0.150 0.840 0.60
1 X 2 2.260 0.150 0.840 0.57
1 X 1 3.660 0.150 0.880 0.48
1 X 10 0.600 0.200 -0.300 -0.36
Deduct Lintel Qty -0.63
22-Sep-21 9.39
Qty Vide Page No.48 to 49 of MB No.210/B/TW/19-20
1 X 1 12.880 0.200 0.450 1.16
1 X 2 1.300 0.200 0.450 0.23
1 X 1 2.150 0.900 0.150 0.29
1 X 1 2.150 0.600 0.150 0.19
1 X 1 2.150 0.300 0.150 0.10
1 X 1 2.600 0.150 0.500 0.20
1 X 3 0.450 0.100 0.900 0.12
1 X 5 0.450 0.100 0.950 0.21
1 X 1 4.900 0.150 0.450 0.33

Page 71 of 130
1 X 1 1.500 0.150 0.450 0.10
1 X 2 0.300 0.150 0.500 0.05
29-Oct-21 2.98
Qty Vide Page No.50 of MB No.210/B/TW/19-20
1 X 1 7.300 0.200 0.500 0.73
1 X 1 5.550 0.200 0.250 0.28
1 X 1 1.300 0.200 0.500 0.13
4-Nov-21 1.14
41.49 6882.05 1 Cum 285536.00
2 Manufacturing, Supply, delivery and fixing of plain MS sheet door
of size 1.80 x 2.13 with frame made of L Angular section of 35 X
35 X 5mm and inner frame of double leave shutters with MS
"L"angle of 25 X 25 X 4mm welded with 2 nos of 25 X 25 X4
angle and 3 No.s of 30x4mm each leaf and welded with powder
coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for
finished item of work.

Qty Vide Page No.38 of MB No.210/B/TW/19-20


1 X 1 1.00
24-Sep-21 1.00
1.00 8614.00 1 Each 8614.00
3 Providing Drip mould of size 25x12mm with CM(1:3) prop.
Including cost and conveyance of all materials and labour charges
etc., to complete.

Qty Vide Page No.44 of MB No.210/B/TW/19-20


1 X 6 2.700 16.20
1 X 1 3.900 3.90
13-Oct-21 20.10
20.10 68.48 1 Rmt 1376.00
4 Reinforced Cement Concrete M20 Grade Nominal Mix
corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) including centering, shuttering, laying
concrete, curing etc. complete for Shelves of 50mm thick

Qty Vide Page No.49 of MB No.210/B/TW/19-20


1 X 2 2.130 0.450 1.92
1 X 2 1.780 0.450 1.60
1 X 2 3.700 0.450 3.33
29-Oct-21 6.85
6.85 843.05 1 Sqm 5775.00
5 Providing Drip mould of size 25x12mm with CM(1:3) prop.
Including cost and conveyance of all materials and labour charges
etc., to complete.

Qty Vide Page No.54 of MB No.210/B/TW/19-20


1 X 17 4.100 69.70
1 X 4 4.900 19.60
1 X 7 -1.200 -8.40
4-Nov-21 80.90

Page 72 of 130
80.90 138.75 1 Rmt 11225.00
6 Flooring with soluble salt porcelain vitrified tiles screen printed
and polished of size 600 x 600 mm and thickness between 8-10
mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs of make
Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat
of cement mortar (1:8), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles
etc., complete, including seigniorage charges, etc., complete for
finished item of work, .

Qty Vide Page No.60 to 61 of MB No.210/B/TW/19-20


1 X 1 3.050 4.700 14.34
1 X 1 5.160 4.700 24.25
1 X 1 3.660 2.200 8.05
1 X 1 3.660 5.000 18.30
1 X 1 3.100 2.500 7.75
1 X 1 1.850 2.500 4.63
1 X 4 0.930 0.150 0.56
10-Nov-21 77.88
77.88 10230.70 10 Sqm 79677.00
7 Providing Skirting to internal walls to 15 cm height and risers of
steps with soluble salt porcelain vitrified tiles screen printed and
polished of size 600 x 600 mm and thickness between 8-10 mm
1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish of make Jhonson & Jhonson, Kajaria,
Nitco, Marbonite, set over base coat of CM (1:5) 12 mm thick with
cement slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointed with white cement paste mixed with
pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., complete
including seigniorage charges, etc., complete for finished item of
work,

Qty Vide Page No.62 to 63 of MB No.210/B/TW/19-20


1 X 2 3.050 0.100 0.61
1 X 2 4.700 0.100 0.94
1 X 2 5.160 0.100 1.03
1 X 2 4.700 0.100 0.94
1 X 1 3.660 0.100 0.37
1 X 2 1.750 0.100 0.35
1 X 5 0.100 0.100 0.05
1 X 2 3.660 0.100 0.73
1 X 2 5.000 0.100 1.00
1 X 1 3.100 0.100 0.31
1 X 1 2.500 0.100 0.25
1 X 3 0.100 0.100 0.03
1 X 2 1.850 0.100 0.37
1 X 2 2.500 0.100 0.50
1 X 4 1.030 -0.100 -0.41
1 X 2 0.750 -0.100 -0.15
1 X 2 0.450 0.100 0.09
10-Nov-21 7.01
7.01 10181.20 10 Sqm 7137.00

Page 73 of 130
8 Plain Cement Concrete M15 grade nominal mix (1:2.5:5)
proportion (cement: fine aggregate: Coarse aggregate) using
40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970)
Machine Crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental and labour
charges such as mixing concrete in Concrete Mixer, laying, curing
concrete, etc., complete for finished item of work (APSS No. 402)

Qty Vide Page No.67 of MB No.210/B/TW/19-20


1 X 1 12.880 1.500 0.050 0.97
22-Nov-21 0.97
0.97 6118.20 1 Cum 5935.00
9 Providing impervious coat to exposed RCC roof slab surface with
CM(1:3), 20mm thick with 1kg of water proof compound per bag
of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of
materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work

Qty Vide Page No.80 of MB No.210/B/TW/19-20


1 X 1 13.500 8.750 118.13
118.13
118.13 5234.75 10 Sqm 61838.00

TOTAL Rs. 1552178.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

Page 74 of 130
SUB ESTIMATE ELECTRICAL ITEMS
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.

S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit
pipe Sudhakar / Macoplast / Modimake concealed in roof slab
with all required acessories including No.14 SWG GI wire for
earth continuity including chiseling the wall wherever necessary ,
including necessary masonery work for light/fan pointand
seperate plug point with teak wood deep box including cost and
conveyance of all materials to site and labour charges, sales tax
etc., complete for finished item of work.

Qty Vide Page No.26 to 27 of MB No.210/B/TW/19-20


1 X 1 10.30 10.30
1 X 2 1.80 3.60
1 X 3 1.85 5.55
1 X 2 1.90 3.80
1 X 1 1.60 1.60
17-Aug-21 24.85
24.85 86.40 1 Rmt 2147.00
2 Supply and fixing of ISI mark 25mm dia 1.8mm thick PVC conduit
pipe Sudhakar / Macoplast / Modi make concealed in wall with all
required acessories including No.14 SWG GI wire for earth
continuity including chiseling the wall wherever necessary ,
including necessary masonery work for light/fan pointand
seperate plug point with teak wood deep box including cost and
conveyance of all materials to site and labour charges, sales tax
etc., complete for finished item of work.

Qty Vide Page No.37 to 38 of MB No.210/B/TW/19-20


1 X 2 0.90 1.80
1 X 1 19.60 19.60
1 X 1 0.90 0.90
1 X 1 3.30 3.30
1 X 2 0.90 1.80
1 X 2 1.50 3.00
1 X 1 0.90 0.90
1 X 1 2.60 2.60
1 X 2 0.90 1.80
1 X 1 8.50 8.50
24-Sep-21 44.20
44.20 96.40 1 Rmt 4261.00
3 Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm)
FRLS / HFFR P.V.C. insulated ISI Copper Cable
GM/L&T/RPG/Havells/V-Guard/Power Flex/Polycab/Gold Medal/
Standard /Milion/ Vimal/ Suncab/ Paragaon/FortuneArt make in
the existing metallic / non-metallic conduct pipe with 6A 1 Way
flush type switch, Ceiling rose and 3mm thick hylam sheet
covering to switch control box including cost and conveyance of
all materials to site, labour charges and sales tax etc. complete for
finished item of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings

Qty Vide Page No.56 to 57 of MB No.210/B/TW/19-20


1 X 2 2.00
1 X 2 2.00
1 X 2 2.00
1 X 1 1.00

Page 75 of 130
1 X 1 1.00
1 X 1 1.00
1 X 1 1.00
1 X 1 1.00
1 X 1 1.00
1 X 2 2.00
1 X 1 1.00
1 X 2 2.00
1 X 2 2.00
1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
1 X 1 1.00
10-Nov-21 24.00
24.00 546.30 1 No.s 13111.00
4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch
control of Anchor / Gold medal olive / Million zoom make with ISI
mark on a common switch board with earth continuity including
wire leads, earth connections including cost and conveyance of
all materials to site, labour charges and sales tax etc. complete for
finished item of work

Qty Vide Page No.57 to 58 of MB No.210/B/TW/19-20


1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
1 X 2 2.00
1 X 1 1.00
10-Nov-21 7.00
7.00 141.39 1 No.s 990.00
5 Supply and fixing of batten holder / slanting holder Anchor / Gold
medal olive / Million zoom make with ISI mark in lieu of ceiling
rose of light point with 40W bulb all connections including cost
and conveyance of all materials to site, labour charges and sales
tax etc., complete for finished item of work.

Qty Vide Page No.58 to 59 of MB No.210/B/TW/19-20


1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
1 X 2 2.00
1 X 1 1.00
1 X 2 2.00
1 X 1 1.00
10-Nov-21 10.00
10.00 118.80 1 No.s 1188.00
6 Supply and transportation of 20W, 2000 lumens, T8,1200mm
length LED tube light, input voltage AC 220 - 260Volts with
PF≥0.9, Surge protection: 2KV,THD<125%, with inbuilt driver and
frosted cover CCT: 3000K - 5700K, minimum CRI≥80,.etc.,
complete Manufacture has to submit LM79,LM80 &
Photobiological Safety Report. Luminaire Performance Complies
to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 ISO certified
company. LUMINAIRE MAKE: Phillips / OSRAM / GE /
Crompton / VIN / Bajaj / Havells / Halonix / HPL. LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG /
LG LEDs

Qty Vide Page No.59 of MB No.210/B/TW/19-20


1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
1 X 2 2.00

Page 76 of 130
1 X 1 1.00
10-Nov-21 7.00
7.00 1033.80 1 No.s 7237.00
7 Providing independent earthing for main switches integrated
circuit cutouts and moters with 40mm dia Medium grade GI Pipe
of TATA/Zenith/GST make of 2.5 m length duly providing 12mm
dia 16 Nos. holes and rewired bolts, nuts and washers,
checknuts, Humepipe ring 18 inches dia, 2 inch thick etc., as per
IS specifications with necessary double GI earth wire NO. 8 SWG
inclkuding filling with equal preparation of salt and charcoal in
layers including cost and conveyance of all materials to site,
labour charges and sales tax etc., complete for finished item of
work.

Qty Vide Page No.73 of MB No.210/B/TW/19-20


1 X 1 1.00
1-Dec-21 1.00
1.00 4381.56 1 No.s 4382.00
8 Supply and fixing 4 way SPN Distribution board with IP-20
protection of make Standard / Havells / HPL/Toyoma/ C &S
suitable for single phase 40A Double pole Isolator as incomer and
10KA-6-32A range single pole miniature circuit breakers four
numbers (4Nos) as out going with internal connections including
cost and conveyance of all materials to site, labour charges for
surface / flush mounting etc., sales tax complete for finished item
of work.

Qty Vide Page No.74 of MB No.210/B/TW/19-20


1 X 1 1.00
1-Dec-21 1.00
1.00 4049.81 1 No.s 4050.00
9 Supply and run of 2 of 36/0.3mm (2.5 sqmm) FRLS / HFFR PVC
insulated ISI Copper cable of makes Polycab / Havells / Gold
medal /Fortune art /L&T/ HPL in existing metallic / non-metallic
conduit pipe for mains including cost and conveyance of all
materials to site, labour charges and sales tax etc., complete for
finished item of work.

Qty Vide Page No.66 of MB No.210/B/TW/19-20


1 X 1 8.20 8.20
1 X 1 5.50 5.50
1 X 1 7.60 7.60
1 X 1 4.30 4.30
1 X 1 7.60 7.60
1 X 1 6.30 6.30
10-Nov-21 39.50
39.50 81.89 1 Rmt 3235.00
10 Supply and errecting of energy efficient fan, 1200 mm sweep,
aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan
with Brush Less Direct Current(BLDC)motor, class of insulation:
B, 3 no's blades, 30 cm long down rod, 2 no's canopies,
shackle'kit, safety rope, copper winding, Power Factor greater
than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery
minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019),
THD less than 10%. with remote or compatible to electronic step
type regulator unit for speed control and all remaining accessories
including safety pin, nut bolts, washers, temperature rise=75
degree C(max), insulation resistance more than 2 mega ohm,
suitable for 230V, 50 HZ, single phase AC supply, earthing etc.,
including all standard accessories etc., complete. Makes :
Atomberg (Efficio ) / Havells / Orient

Qty Vide Page No.73 to 74 of MB No.210/B/TW/19-20


1 X 2 2.00

Page 77 of 130
1 X 1 1.00
1 X 2 2.00
1 X 1 1.00
1-Dec-21 6.00
6.00 3445.72 1 Each 20674.00
11 Supply and transportation of 30W. LED Street light Body made of
high grade pressure die – cast Aluminium alloy with corrosion
resistant powder coat, having protective toughened glass cover,
Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, wide operating voltage range,
P.F > 0.90, System having efficacy >100 lumens/watt, with
Ingress protection IP66, Potted driver, Driver surge protection
>10KV, THD<15%, CCT: 3000- 6500K as desired by the
department and as per IS, CRI>70, Inbuilt Electrical protections
like Over voltage, short circuit, Over load, Open Circuit, Miswiring,
etc complete with BIS certification with 5 years warranty. The
contractor must furnish the manufacturer warranty letter, LM 79
and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM /
GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready /
Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA /
Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM /
Goldmedal

Qty Vide Page No.75 of MB No.210/B/TW/19-20


1 X 1 1.00
1-Dec-21 1.00
1.00 3846.93 1 Each 3847.00

SUB TOTAL :: 65122.00

Assistant Engineer, Dy. Executive Engineer, Executive Engineer,


TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam.

Page 78 of 130
Sub Estimate - Water Supply and Sanitary

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Providing & Placing of RCC water storage tank on Roof slab
alround 50mm thick and base 100mm thick with suitable locking
arrangement & making necessary holes for inlet & outlets and
over flow pipes but without fittings

Qty Vide Page No.45 of MB No.210/B/TW/19-20


1 X 0.7857 1.20 1.200 1.200 1.36 Cum
1000 Litre per Cum 1360.00
17-Oct-21 1360.00
1360.00 8.00 1 Litre 10880.00
2 S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR
13.5 including cost and conveyance of all materials and labour
charges , Overheads & Contractors profit complete for finished
item of work for all floors.

Qty Vide Page No.46 to 47 of MB No.210/B/TW/19-20


1 X 1 3.50 3.50
1 X 1 2.20 2.20
24-Oct-21 5.70
5.70 147.70 1 Rmt 842.00
3 S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm
including cost and conveyance of all materials and labour charges
, Overheads & Contractors profit complete for finished item of
work for all floors.

Qty Vide Page No.47 of MB No.210/B/TW/19-20


1 X 1 1.20 1.20
1 X 1 1.10 1.10
24-Oct-21 2.30
2.30 181.41 1 Rmt 417.00
4 Supply and Fixing European Water Closet of 1st quality
conforming to IS:2556-part-2-2004 of Hindustan / Neycer or
Parryware make white glazed with 'S' trap including cost of
plastic sheet and lid for European Water Closet with rubber or
plastic buffers as per IS:2548-1996 and PVC low level single flush
10 litere capacity system with internal components and short bend
of make Parryware slim line including cost and conveyance of all
materials to site, labour charges for fixing etc., complete for
finished item of work. for all floors

Qty Vide Page No.65 of MB No.210/B/TW/19-20


1 X 2 2.00
10-Nov-21 2.00
2.00 4390.10 1 Rmt 8780.00
5 Supplying & Fixing of 12.70 mm brass body CP finish bib tap of
not less than 300 grams weight screw type (full turn) with internal /
external threaded connection conforming to IS 8931 including cost
and conveyance of all materials to site, all labour charges, sales
and other taxes on all materials etc., complete for finished item of
Qty
workVide Page
for All No.75 of MB No.210/B/TW/19-20
Floors.
1 X 2 2.00
1 X 2 2.00
1-Dec-21 4.00
4.00 257.95 1 Each 1032.00
6 S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR
13.5 including cost and conveyance of all materials and labour
charges , Overheads & Contractors profit complete for finished
item of work for all floors.

Qty Vide Page No.75 of MB No.210/B/TW/19-20


1 X 2 6.50 13.00
1-Dec-21 13.00
Qty Vide Page No.79 of MB No.210/B/TW/19-20

Page 79 of 130
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 X 1 3.90 3.90
1 X 1 2.80 2.80
1 X 1 3.40 3.40
1 X 1 4.70 4.70
1 X 1 15.00 15.00
1 X 1 11.70 11.70
1 X 1 12.60 12.60
1-Dec-21 54.10
67.10 223.82 1 Rmt 15018.00
7 Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash
Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32
mm nominal size C.P. Fitting with parallel pipe thread conforming
to IS:2963-1979 and fitted with 15 mm nominal bore single
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams
Seiko/ Esso/Nice/Senior or equivalent complete with standard CI
brackets including wooden block, 12.7mm PVC connection with
Brass union nut CP coated, 12.7mm dia first qualifty NP angle
stop cock, 38.1mm CP waste coupling , 31.75mm dia PVC flexible
waste pipe of 914.4mm length of first quality including cost and
conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of
work. for All Floors.

Qty Vide Page No.76 of MB No.210/B/TW/19-20


1 X 2 2.00
1-Dec-21 2.00
2.00 2114.40 1 Each 4229.00
8 Supply and Fixing of 3'-0" dia RCC Readymade Rings 50mm thick
0.30m height including cost and conveyance of all materials and
labour charges etc., complete
Qty Vide Page No.76 of MB No.210/B/TW/19-20
2 X 6 12.00
1-Dec-21 12.00
Qty Vide Page No.80 of MB No.210/B/TW/19-20
1 X 7 7.00
1-Dec-21 7.00
19.00 700.00 1 Each 13300.00
9 Supply and Fixing of 3'-0" dia RCC Readymade Top Cover 50mm
thick including cost and conveyance of all materials and labour
charges etc., complete
Qty Vide Page No.77 of MB No.210/B/TW/19-20
2 X 1 2.00
1-Dec-21 2.00
Qty Vide Page No.80 of MB No.210/B/TW/19-20
1 X 1 1.00
1-Dec-21 1.00
3.00 800.00 1 Each 2400.00

TOTAL Rs. 56898.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

Page 80 of 130
Seigniorage Charges

Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in


Bhadradri Kothagudem Dist.

Quantity
S No Description of Work (Finished Unit Metal Sand Earth/Gravel Brick
item )

1 2 3 4 5 6 7 8
1 EARTH WORK 56.81 Cum 56.81
2 PCC (1:5:10) 14.13 Cum 12.72 6.36
3 GRAVEL FILLING 131.39 Cum 131.39
4 FOOTINGS 6.31 Cum 5.68 2.84
5 PEDESTALS 0.00 Cum 0.00 0.00
6 COLUMNS 3.67 Cum 3.30 1.65
7 PLINTH BEAM 5.12 Cum 4.61 2.30
8 LINTELS 0.63 Cum 0.57 0.28
9 SUNSHADES 0.26 Cum 0.23 0.12
10 ROOF BEAM 5.19 Cum 4.67 2.34
11 ROOF SLAB 115MM 13.58 Cum 12.22 6.11
12 2ND CLASS BRICK (1:8) 0.00 Cum 0.00 0.00
CEILING PLASTERING
13 108.46 Sqm 1.63
12MM 1 COAT
PLASTERING 12MM 2
14 269.30 Sqm 4.04
COAT
PLASTERING 20MM 2
15 136.53 Sqm 3.00
COAT
16 FLOORING TANDUR 0.00 Sqm 0.00
17 SKIRTING TANDUR 0.00 Sqm 0.00
FLOORING NON SKID
18 7.25 Sqm 0.09
CERAMIC TILES
DADOOING CERAMIC
19 20.73 Sqm 0.25
TILES
FLY ASH BRICK
20 41.49 Cum 4.56
MASONRY (1:6)
FLOORING VITRIFIED
21 77.88 Sqm 0.93
TILES
SKIRTING VITRIFIED
22 7.01 Sqm 0.08
TILES
23 M20 50MM SHELVES 0.34 Cum 0.31 0.15
24 M15 0.97 Cum 0.78 0.47

TOTAL QUANTITY 45.09 37.20 188.20 0.00


SEIGNIORAGE CHARGES
PER CUM
75.00 40.00 30.00 30.72

AMOUNT 3381.75 1488.00 5646.00 0.00

TOTAL 10515.75

SAY 10516.00
Assistant Engineer Dy. Executive Engineer Executive Engineer
TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

PRICE ADJUSTMENT

Sl. No. Name of Component Amount in Rs.

1 STEEL 0.00

2 CEMENT 1.00

Grand Total 1.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

PRICE ADJUSTMENT FOR STEEL


Average whole
sale price of Percentage of Percentage of
Date of Steel on the 28 increase or increase or Cost of work
Sl. Accept > 5 % Item Qty in
MB No. Page No. Estt rate measurement of days prior to decrese in cost decrese in cost done Item Name Remarks
No. Reject < 5 % Kgs
the Bill last date of of Steel (Si- of Steel (Si- Increse/decreased
measurement So/So)100 So/So)100 -5%
(Si)

GROUND FLOOR
1 210/B/TW/19-20 5 55.00 12-Jul-21 57.00 3.64 0.00 Rejected 0.00 STEEL 640.95

2 210/B/TW/19-20 14 55.00 26-Jul-21 57.00 3.64 0.00 Rejected 0.00 STEEL 663.53

3 210/B/TW/19-20 26 55.00 17-Aug-21 57.00 3.64 0.00 Rejected 0.00 STEEL 1605.45

4 210/B/TW/19-20 33 55.00 15-Sep-21 56.00 1.82 0.00 Rejected 0.00 STEEL 144.04

0.00

SAY : 0.00
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.

PRICE ADJUSTMENT FOR CEMENT


Percentage of
Average whole Percentage of
increase or
sale price of increase or Cement qty in
Date of decrese in cost Cost of work Cement
Sl. cement on the decrese in cost Accept > 5 % MT's = Qty of Item Qty in
MB No. Page No. Estt rate measurement of of cement (Ci- done Item Name Content per Remarks
No. date of of cement (Ci- Reject < 5 % item*cement Cum/Sqm
the Bill Co )/Co*100 Increse/decreased Cum/Sqm
measurement Co )/Co*100 ( qty per cum
( Rate Base) -
(Ci) Rate Base)
5%

GROUND FLOOR
1 210/B/TW/19-20 3 5500.00 12-Jul-21 5600.00 1.82 0.00 Rejected 0.64 0.00 PCC (1:5:10) 3.93 162.00
26-Jul-21
2 210/B/TW/19-20 11 to 12 5500.00 5600.00 1.82 0.00 Rejected 0.28 0.00 PCC (1:5:10) 1.72 162.00
13-Aug-21
3 210/B/TW/19-20 20 5500.00 5600.00 1.82 0.00 Rejected 2.45 0.00 PCC (1:5:10) 6.12 400.00

4 210/B/TW/19-20 46 5500.00 24-Oct-21 5600.00 1.82 0.00 Rejected 0.44 0.00 PCC (1:5:10) 1.10 400.00

5 210/B/TW/19-20 55 5500.00 10-Nov-21 5600.00 1.82 0.00 Rejected 0.50 0.00 PCC (1:5:10) 1.26 400.00
23-Jul-21
M20
6 210/B/TW/19-20 8 5500.00 5600.00 1.82 0.00 Rejected 11.15 0.00 27.87 400.00
FOOTINGS
16-Jul-21
M20
7 210/B/TW/19-20 6 5500.00 5600.00 1.82 0.00 Rejected 2.52 0.00 6.31 400.00
FOOTINGS
16-Jul-21
M20
8 210/B/TW/19-20 6 to 7 5500.00 5600.00 1.82 0.00 Rejected 0.30 0.00 0.75 400.00
COLUMNS
31-Jul-21
M20
9 210/B/TW/19-20 16 5500.00 5600.00 1.82 0.00 Rejected 1.17 0.00 2.92 400.00
COLUMNS
31-Jul-21
M20 PLINTH
10 210/B/TW/19-20 15 5500.00 5600.00 1.82 0.00 Rejected 2.05 0.00 5.12 400.00
BEAM
19-Sep-21
11 210/B/TW/19-20 34 5500.00 5600.00 1.82 0.00 Rejected 0.03 0.00 M20 LINTELS 0.63 46.00

19-Sep-21
M20
12 210/B/TW/19-20 34 5500.00 5600.00 1.82 0.00 Rejected 0.42 0.00 7.02 60.00
SUNSHADES
19-Aug-21
M20 ROOF
13 210/B/TW/19-20 28 5500.00 5600.00 1.82 0.00 Rejected 0.31 0.00 5.19 60.00
BEAM
19-Aug-21
M20 ROOF
14 210/B/TW/19-20 29 5500.00 5600.00 1.82 0.00 Rejected 47.25 0.00 118.13 400.00
SLAB 115MM

13-Oct-21
CEILING
15 210/B/TW/19-20 40 to 41 5500.00 5600.00 1.82 0.00 Rejected 0.55 0.00 PLASTERING 108.46 5.10
12MM 1 COAT

13-Oct-21
PLASTERING
16 210/B/TW/19-20 41 to 43 5500.00 5600.00 1.82 0.00 Rejected 1.30 0.00 253.93 5.10
12MM 1 COAT
4-Nov-21
PLASTERING
17 210/B/TW/19-20 51 5500.00 5600.00 1.82 0.00 Rejected 0.09 0.00 15.37 5.75
12MM 1 COAT

13-Oct-21
PLASTERING
18 210/B/TW/19-20 44 5500.00 5600.00 1.82 0.00 Rejected 17.69 0.00 136.53 129.60
16MM 1 COAT

10-Nov-21
FLOORING
19 210/B/TW/19-20 64 5500.00 5600.00 1.82 0.00 Rejected 0.94 0.00 NON SKID 7.25 129.60
TILES
10-Nov-21
DADOOING
20 210/B/TW/19-20 64 5500.00 5600.00 1.82 0.00 Rejected 0.54 0.00 CERAMIC 20.73 26.00
TILES
4-Aug-21 FLY ASH
BRICK
21 210/B/TW/19-20 17 to 18 5500.00 5600.00 1.82 0.00 Rejected 0.18 0.00 6.83 26.00
MASONRY
(1:6)
15-Sep-21 FLY ASH
BRICK
22 210/B/TW/19-20 30 to 31 5500.00 5600.00 1.82 0.00 Rejected 0.55 0.00 21.15 26.00
MASONRY
(1:6)
22-Sep-21 FLY ASH
BRICK
23 210/B/TW/19-20 35 to 36 5500.00 5600.00 1.82 0.00 Rejected 0.24 0.00 9.39 26.00
MASONRY
(1:6)
29-Oct-21 FLY ASH
BRICK
24 210/B/TW/19-20 48 to 49 5500.00 5600.00 1.82 0.00 Rejected 0.08 0.00 2.98 26.00
MASONRY
(1:6)
4-Nov-21 FLY ASH
BRICK
25 210/B/TW/19-20 50 5500.00 5600.00 1.82 0.00 Rejected 0.03 0.00 1.14 26.00
MASONRY
(1:6)
13-Oct-21
DRIP MOULD
26 210/B/TW/19-20 44 5500.00 5600.00 1.82 0.00 Rejected 0.52 0.00 20.10 26.00
25X12MM

29-Oct-21 SHELVES
27 210/B/TW/19-20 49 5500.00 5600.00 1.82 0.00 Rejected 0.18 0.00 6.85 26.00
50MM
4-Nov-21
ELEVATION
28 210/B/TW/19-20 54 5500.00 5600.00 1.82 0.00 Rejected 2.10 0.00 PATTY 80.90 26.00
150X12MM

10-Nov-21
FLOORING
29 210/B/TW/19-20 60 to 61 5500.00 5600.00 1.82 0.00 Rejected 2.02 0.00 VITRIFIED 77.88 26.00
TILES
10-Nov-21
SKIRTING
30 210/B/TW/19-20 62 to 63 5500.00 5600.00 1.82 0.00 Rejected 0.18 0.00 VITRIFIED 7.01 26.00
TILES
31 210/B/TW/19-20 67 5500.00 22-Nov-21 5800.00 5.45 0.45 Accepted 0.03 0.63 M 15 0.97 26.00

TOTAL : 0.63

SAY : 1.00
LEAD CHART
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.
AS PER SCHEDULE OF RATES FOR BUILDINGS / IRRIGATION FOR THE YEAR 2020-21

nm Overhead & Contractors profit 13.615% 25% Allowance


Allowance on
Initial Cost Loading Unloading
Loading &
Sl. Index Lead in Conveyance excluding Charges Charges Unit
Description Source of Material Unloading Total Remarks
No. code Km Charges Seigionarage (Manual (Mechanical per
manual
Charges means) means)
means
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Coarse Sand for Mortar 27 Bhadrachalam 92.00 1004.86 570.00 15.07 0.00 1589.93 Cum.
2 Coarse Sand for filling 27 Local 10.00 113.94 570.00 15.07 0.00 699.01 Cum.
3 Fine sand (screened) 28 Bhadrachalam 92.00 1004.86 760.00 15.07 0.00 1779.93 Cum.
Intial rate
including
4 Gravel M-008 Local 10.00 113.94 98.00 15.07 0.00 227.01 Cum.
loading
charges
R.R. Stone(Granite,
5 12.g Thoggudem 74.00 818.38 309.00 15.07 0.00 1142.45 Cum.
Dolamite &Trap variety)
CR Stone (30cm x 30cm x
6 13 Thoggudem 74.00 818.38 662.59 15.07 0.00 1496.04 Cum.
45 cm)
Bond stone 76
7 Thoggudem 74.00 818.38 1208.33 15.07 0.00 2041.78 Cum.
(600x200x200mm)
6mm M/c HBG Metal
8 33.a Thoggudem 74.00 818.38 701.25 15.07 0.00 1534.70 Cum.
Nominal size
10mm M/c HBG Metal
9 33.b Thoggudem 74.00 818.38 891.25 15.07 0.00 1724.70 Cum.
Nominal size
13.2/12.5mm M/c HBG
10 33.c Thoggudem 74.00 818.38 1046.25 15.07 0.00 1879.70 Cum.
Metal Nominal size
20mm M/c HBG Metal
11 33.d Thoggudem 74.00 818.38 1157.50 15.07 0.00 1990.95 Cum.
Nominal size
40mm M/c HBG Metal
12 33.f Thoggudem 74.00 818.38 701.25 15.07 0.00 1534.70 Cum.
Nominal size
Loading &
2nd Class Bricks of size TBSC-A.I- 1000 Unloading
13 Dammapeta 3.00 43.01 6500.00 60.58 60.58 30.29 6694.46
23x11x7cm 01 Nos Manual
means
Loading &
Fly Ash bricks of 290 x 140 TBSC- 1000 Unloading
14 Dammapeta 3.00 221.93 24000.00 312.59 312.59 156.30 25003.42
x 225 mm of 50Kg/SqCmt A.II-08 Nos Manual
means
Loading &
Fly Ash bricks of 290 x
TBSC- 1000 Unloading
15 110/112 x 140 mm of Dammapeta 3.00 104.51 11000.00 147.21 147.21 73.60 11472.53
A.II-11 Nos Manual
50Kg/SqCmt
means
Loading &
Polished Bethamcherla
TBSC-B.I- 10 Unloading
16 coloured stone minimum 22 Bethamcherla 575.00 2076.32 2730.00 31.56 15.78 11.84 4865.50
09 Sqm. Manual
- 25 mm thick
means
High Polished Granite
TBSC- 10
17 Slabs 16 to 18mm thick Khammam 80.00 23030.00 22.83 11.42 8.56 23072.81
B.III-03 Sqm.
upto 8'-0" (2.43 Mts)
Polished Shahabad Loading &
(Tandur Blue) stones of 15 TBSC-B.I- 10Sqm Unloading
18 Tandur 398.00 1013.05 1640.00 22.16 11.08 8.31 2694.60
to 18mm thick (0.254M 03 . Manual
x0.254M) means

Shahabad/Tandur Rough
TBSC-B.I- 10Sqm
19 stone slabs minimum Tandur 398.00 1995.40 1230.00 43.65 21.82 16.37 3307.24
02 .
25mm to 40mm thick

Polished Kadapa Slab of TBSC-B.I- 10Sqm


20 398.00 1013.05 22.16 11.08 8.31 1054.60
15 - 18 mm thick 06 .

Unloading
Ordinary Portland Cement
18 At Site 0.00 5500.00 0.00 72.69 18.17 5590.86 M.T Manual
43 Grade
means
Mild Steel Bars (Fe 250) for
19 At Site 0.00 52000.00 0.00 87.13 21.78 52108.91 M.T -do-
6mm
High Yield Strength
20 Deformed Bars (Fe 500) for At Site 0.00 55000.00 0.00 87.13 21.78 55108.91 M.T -do-
8mm to 40mm dia
High Yield Strength
20 Deformed Bars (Fe 415) for At Site 0.00 55000.00 0.00 87.13 21.78 55108.91 M.T -do-
8mm to 40mm dia
Mild Steel, Structural steel,
21 I,e, Angles, Channels & I- At Site 0.00 48000.00 0.00 87.13 21.78 48108.91 M.T -do-
Sections
22 M.S. Plates At Site 0.00 52000.00 0.00 87.13 21.78 M.T -do-
Note :- Rates of CEMENT and STEEL for the Month of February 2021 Dated 24.02.2021
CERTIFICATES:-
1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
3 Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
4 Certified that the work spot falls within the limits of Agency Area. Hence 25% on labour is proposed and the same may be allowed.
GRADED METAL OF 20mm for Concrete Work GRADED METAL for Granolithic Work

6mm 10% 1534.70 153.47 6mm 20% 1534.70 306.94


10mm 15% 1724.70 258.71 10mm 20% 1724.70 344.94
12mm 15% 1879.70 281.96 12mm 60% 1879.70 1127.82
20mm 60% 1990.95 1194.57 1779.7
1888.71

Mason 1st Class 520.00 520.00


Mason 2nd Class 490.00 490.00
Man Mazdoor 465.00 465.00
Woman Mazdoor 465.00 465.00
Painter Class - 1 595.00 595.00
Painter Class - 2 490.00 490.00

Asst. Engineer Dy Executive. Engineer Executive Engineer


TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem
Dist.

DATAS AS PER A.P.REVISED STANDARD DATA FOR BUILDINGS - PART-III


VIDE G.O.MS.NO.49, I&CAD (PW: Reforms) Department dt.02-03-2009
WITH SCHEDULE OF RATES FOR BUILDING / IRRIGATION WORKS FOR THE YEAR 2020-21

nm
Unit Qty Rate Per Amount
BLDCST A Cement Mortar(1:2)
N - 1-3
Page - 14

Unit : Cum
A. Materials
Cement Kg 720.00 5590.86 MT 4025.42
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 5811.10
BLDCST B Cement Mortar(1:3)
N - 1-4
Page - 14

Unit : Cum
A. Materials
Cement Kg 480.00 5590.86 MT 2683.61
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 4469.29
BLDCST C Cement Mortar(1:4)
N - 1-5
Page - 15

Unit : Cum
A. Materials
Cement Kg 360.00 5590.86 MT 2012.71
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 3798.39
BLDCST D Cement Mortar(1:5)
N - 1-6
Page - 15

Unit : Cum
A. Materials
Cement Kg 288.00 5590.86 MT 1610.17
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 3395.85
BLDCST E Cement Mortar(1:6)
N - 1-7 Unit : Cum
Page - 15
A. Materials
Cement Kg 240.00 5590.86 MT 1341.81
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour

Page 91 of 130
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 3127.49
BLDCST F Cement Mortar(1:8)
N - 1-8
Page - 15
Unit : Cum
A. Materials
Cement Kg 180.00 5590.86 MT 1006.35
Sand (Including 5% Wastage) Cum 1.05 1589.93 Cum 1669.43
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 2792.03
BLDCST 8 Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse
N - 3-12 aggregate) using 40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970) Machine Crushed
Page - 22 metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing concrete in Concrete Mixer, laying, curing
concrete, etc., complete for finished item of work (APSS No. 402)

Unit : 1 Cum
a.Material
Cement Kg 275.00 5590.86 MT 1537.49
40mm aggregate Cum 0.00 1534.70 Cum 0.00
20mm aggregate Cum 0.80 1990.95 Cum 1592.76
10mm aggregate Cum 0.00 1879.70 Cum 0.00
Fine aggregate (sand) Cum 0.48 1589.93 Cum 763.17
3893.42
b. Machinery
Concrete Mixer (0.2/0.8 cum hr 1.00 550.70 550.70
capacity) 600/400 (Diesel)
550.70
c. Labour
Mason 1st Class day 0.10 520.00 52.00
Mazdoor (Unskilled) day 1.39 465.00 646.35
Add Agency Allowance 25% 698.35 174.59
Add Agency Allowance on Crew 25% 271.70 67.93
charges of concrete mixer
940.87
Sub-Total :: 5384.99
d. Add 13.615% Overhead & 13.615% 5384.99 733.17
Contractors profit on sub - total
e. Seigniorage charges cum 0.90 75.00 Cum
(i) Aggregate
(ii) Sand cum 0.48 40.00 Cum
Rate per cum 6118.16
Say 6118.20

BLDCST 26 Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size
N - 3-13 graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
Page - 23 and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including
centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick

Unit = 1 cum
a.Material
Cement Kg 400.00 5590.86 MT 2236.34
20mm HBG graded metal Cum 0.90 1888.71 Cum 1699.84

Page 92 of 130
Fine aggregate (Sand) Cum 0.45 1589.93 Cum 715.47
4651.65
b.Labour
Mason 1st Class Day 0.067 520.00 Day 34.84
Mason 2nd Class Day 0.133 490.00 Day 65.17
Mazdoor (Unskilled) Day 2.500 465.00 Day 1162.50
Add Agency Allowance 25% 1262.51 315.63
Add Agency Allowance on Crew 25% 67.93
271.70
charges of Concrete Mixer
1646.07
c. Hire Charges of Machinery + Fuel charges + crew charges of Machinery
Concrete Mixer (0.2/0.8 cum Hr 0.267 550.70 Hr 147.04
capacity) 600/400 (Diesel)

147.04
Basic Rate per Cum 6444.76

M RCC M-20 FOR SHELVES 50mm thick

Basic Rate of RCC M25 0.05 Cum 6444.76 Cum 322.24


322.24
Description of Item GF FF SF TF
a Basic rate per Sqm 322.24 322.24 322.24 322.24
b Hire charges for centering and 156.00 156.00 156.00 156.00
scaffolding material
c Labour charges for centering and 211.00 232.00 254.00 275.00
scaffolding material
d Allowance on labour charges for 25% 52.75 58.00 63.50 68.75
centering and scaffolding material
e Lift charges of Labour - Add 10% 0.00 23.36 46.73 70.09
labour charges on G.F Rate, 20% on
GF Rate, 30% on GF Rate only
Sub-Total :: 741.99 791.60 842.47 892.08
f Add 13.615% Overhead & 13.615% 101.02 107.78 114.70 121.46
Contractors profit on sub - total
g Seigniorage charges (i) Aggregate 0.00 0.00 0.00 0.00
0.90 x 75 = 67.5
h (ii) Sand 0.45 x 40 = 18.00 0.00 0.00 0.00 0.00
Rate per Sqm. 843.01 899.38 957.17 1013.54
Say 843.05 899.40 957.20 1013.55

BLDCST 33 Brick Masonry in superstructure with CM (1:6) prop


N-5-17 with Flyash Cement solid blocks of size 290 x 225 x
Page.35 140 mm, for manufacturing of flyash solid blocks using
flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and
stone dust with a compresive strength not lessthan 50
kg/sqm including cost and conveyance of all materials,
labour charges, seiniorage charges, scaffolding and curing
etc., for Superstructure Walls.

Unit : Cum
a.Material
No of blocks required for one cum of Nos 110.00 25003.42 1000 2750.38
Masonry
CM (1:6) Cum 0.10 3127.490 Cum 312.75
3063.13
b.Labour
Mason 1st Class Day 0.420 520.00 Day 218.40
Mason 2nd Class Day 0.920 490.00 Day 450.80
Mazdoor (Unskilled) Day 2.800 465.00 Day 1302.00
Add Agency Allowance 25% 1971.20 492.80
2464.00
Rate per Cum 5527.13

Page 93 of 130
Rate for other floors GF FF SF TF
a Basic rate per Cum. 5527.13 5527.13 5527.13 5527.13
b Hire charges of Access Scaffolding 45.87 45.87 45.87 45.87
@ 9.93/Sqm /0.225
c Labour charges for Access 387.47 554.89 722.18 889.56
Scaffolding material (Labour charge /
0.225)
d Allowance on labour charges for 25% 96.87 138.72 180.54 222.39
Asscess Scaffolding
e Lift charges of Labour - Add 10% 0.00 235.87 471.73 707.60
labour charges on G.F Rate, 20% on
GF, 30% on GF Rate only
Sub-Total :: 6057.33 6502.48 6947.44 7392.54
f Add 13.615% Overhead & 13.615% 824.71 885.31 945.89 1006.49
Contractors profit on sub - total
g Seigniorage charge 0.00 0.00 0.00 0.00
(i) Sand - 0.11 x 40 = 4.4
Rate per Cum 6882.04 7387.79 7893.33 8399.03
Say 6882.05 7387.80 7893.35 8399.05

BLDCST 43 Flooring with soluble salt porcelain vitrified tiles


N-9-6 screen printed and polished of size 600 x 600 mm and
Page.51& thickness between 8-10 mm 1st quality conforming to
52 IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs of make
Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over
base coat of cement mortar (1:8), 12 mm thick over CC
bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm
& jointed neatly with white cement paste to full depth mixed
with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc., complete,
including seigniorage charges, etc., complete for finished
item of work, .

Unit : 10Sqm
a.Materials
Vitrified tiles (TBSC-C.II-02) Sqm 10.50 421.00 Sqm 4420.50
cement for CM(1:8) Proportion Kg 21.60 5590.86 MT 120.76
Sand for CM(1:8) Proportion Cum 0.12 1589.93 Cum 190.79
Cement slurry Kg 33.00 5590.86 MT 184.50
White cement Kg 6.00 29.00 Kg 174.00
5090.55
b.Labour
Mason 1st Class Day 0.960 520.00 Day 499.20
Mason 2nd Class Day 2.240 490.00 Day 1097.60
Mazdoor Unskilled Day 3.300 465.00 Day 1534.50
Add Agency Allowance 25% 3131.30 782.83
3914.13
Rate per 10 Sqm 9004.68

Description of Item GF FF SF TF
c Basic rate per 10 Sqm 9004.68 9004.68 9004.68 9004.68
d Lift charges - Add 10% on labour for 0.00 313.13 626.26 939.39
A.F,20% for SF, 30% for T.F
Sub-Total :: 9004.68 9317.81 9630.94 9944.07
e Add 13.615% Overhead & 13.615% 1225.99 1268.62 1311.25 1353.89
Contractors profit on sub - total
f Seigniorage charge 0.00 0.00 0.00 0.00
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm 10230.67 10586.43 10942.19 11297.96
Say 10230.70 10586.45 10942.20 11298.00

Page 94 of 130
BLDCST 44 Providing Skirting to internal walls to 15 cm height and
N-9-20 risers of steps with soluble salt porcelain vitrified tiles
Page.60 screen printed and polished of size 600 x 600 mm and
thickness between 8-10 mm 1st quality conforming to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish of make Jhonson & Jhonson, Kajaria,
Nitco, Marbonite, set over base coat of CM (1:5) 12 mm
thick with cement slurry of honey like consistency spread at
the rate of 3.30 kgs per sqm and jointed with white cement
paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc.,
complete for finished item of work,

Unit : 10Sqm
a.Materials
Vitrified tiles (TBSC-C.II-02) Sqm 10.50 421.00 10Sqm 4420.50
Cement for CM(1:5) Proportion Kg 34.56 5590.86 MT 193.22
Sand for CM(1:5) Proportion cum 0.12 1589.93 cum 190.79
Cement slurry Kg 33.00 5590.86 MT 184.50
White Cement for Jointing & pointing Kg 2.00 29.00 Kg 58.00
5047.01
b.Labour
Mason 1st Class Day 0.960 520.00 Day 499.20
Mason 2nd Class Day 2.240 490.00 Day 1097.60
Mazdoor (Unskilled) Day 3.300 465.00 Day 1534.50
Add Agency Allowance 25% 3131.30 782.83
3914.13
Rate per 10 Sqm 8961.14

Description of Item GF FF SF TF
c Basic rate per 10 Sqm 8961.14 8961.14 8961.14 8961.14
d Lift charges - Add 10% on labour for 0.00 313.13 626.26 939.39
F.F,20% for SF, 30% for T.F
Sub-Total :: 8961.14 9274.27 9587.40 9900.53
e Add 13.615% Overhead & 13.615% 1220.06 1262.69 1305.32 1347.96
Contractors profit on sub - total
f Seigniorage charge 0.00 0.00 0.00 0.00
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm 10181.20 10536.96 10892.72 11248.49
Say 10181.20 10537.00 10892.75 11248.50

28 Providing impervious coat to exposed RCC roof slab


surface with CM(1:3), 20mm thick with 1kg of water proof
compound per bag of cement laid over roof when it is
green including cost of all materials, seigniorage charges,
excluding conveyance charges of materials and including
all operational, incidental and labour charges for mixing
mortar, laying, rendering smooth and thread lining, curing,
rounding off junctions of wall and slab etc,, complete for
finished item of work

Unit : 10Sqm
a.Materials
CM (1:3) Cum 0.21 4469.290 Cum 938.55
Water proof compound (TBSC-Q.II-05 Kg 2.00 73.00 Kg 146.00
1084.55
b.Labour
Mason 1st Class Day 0.66 520.00 Day 343.20
Mason 2nd Class Day 1.54 490.00 Day 754.60
Mazdoor (Unskilled) Day 3.70 465.00 Day 1720.50
Add Agency Allowance 25% 2818.30 704.58
3522.88
Rate per 10 Sqm 4607.43

Page 95 of 130
Description of Item GF FF SF TF FOURTH
Basic rate per 10 Sqm 4607.43 4607.43 4607.43 4607.43 4607.43
Lift charges - Add 10% on labour for 0.00 281.83 563.66 845.49 1127.32
F.F,20% for SF, 30% for T.F
Sub-Total :: 4607.43 4889.26 5171.09 5452.92 5734.75
Add 13.615% Overhead & 13.615% 627.30 665.67 704.04 742.42 780.79
Contractors profit on sub - total
Seigniorage charge 0.00 0.00 0.00 0.00 0.00
(i) Sand - 0.21 x 40 = 8.40
Rate per 10 Sqm 5234.73 5554.93 5875.13 6195.34 6515.54
Say 5234.75 5554.95 5875.15 6195.35 6515.55

Providing Drip mould of size 25x12mm with CM(1:3) prop.


Including cost and conveyance of all materials and labour
charges etc., to complete.
Unit : 1 Rmt
a.Materials
Cement Mortor (1:3) Cum 0.015 4469.29 Cum 67.04
b.Labour
Mason 1st Class Day 0.00 520.00 Day 0.00
Mason IInd Class Day 0.30 490.00 Day 147.00
Mazdoor (Unskilled) Day 0.40 465.00 Day 186.00
Add Agency Allowance 25.00% 333.00 83.25
Rate per 1 Rmt 483.29
Description of Item GF FF SF TF FF
a Basic rate per 10 Sqm 483.29 483.29 483.29 483.29 483.29
b Hire charges for access scaffolding 10.30 10.30 10.30 10.30 10.30
c Labour charges for access 87.30 124.90 162.40 200.10 237.70
scaffolding
d Allowance on labour charges for 25% 21.83 31.23 40.60 50.03 59.43
centring material
e Lift charges - Add 10% labour 0.00 42.03 84.06 126.09 168.12
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total :: 602.72 691.75 780.65 869.81 958.84
g Add 13.615% Overhead & 13.615% 82.06 94.18 106.29 118.42 130.55
Contractors profit on sub - total
h Seigniorage charge 0.00 0.00 0.00 0.00 0.00
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm Total 684.78 785.93 886.94 988.23 1089.39
Rate as per 1 Rmt 68.48 78.59 88.69 98.82 108.94

Providing Elevation Patty of size 150x12mm with CM(1:3)


prop. Including cost and conveyance of all materials and
labour charges etc., to complete.
Unit : 1 Rmt
a.Materials
Cement Mortor (1:3) Cum 0.050 4469.29 Cum 223.46
b.Labour
Mason 1st Class Day 0.20 520.00 Day 104.00
Mason IInd Class Day 0.60 490.00 Day 294.00
Mazdoor (Unskilled) Day 0.70 465.00 Day 325.50
Add Agency Allowance 25.00% 619.50 154.88
Rate per 1 Rmt 1101.84
Description of Item GF FF SF TF FF
a Basic rate per 10 Sqm 1101.84 1101.84 1101.84 1101.84 1101.84
b Hire charges for access scaffolding 10.30 10.30 10.30 10.30 10.30
c Labour charges for access 87.30 124.90 162.40 200.10 237.70
scaffolding
d Allowance on labour charges for 25% 21.83 31.23 40.60 50.03 59.43
centring material

Page 96 of 130
e Lift charges - Add 10% labour 0.00 70.68 141.36 212.04 282.72
charges on G.F Rate, 20% on GF,
30% on GF Rate only
Sub-Total :: 1221.27 1338.95 1456.50 1574.31 1691.99
g Add 13.615% Overhead & 13.615% 166.28 182.30 198.30 214.34 230.36
Contractors profit on sub - total
h Seigniorage charge 0.00 0.00 0.00 0.00 0.00
(i) Sand - 0.15 x 40 = 6.00
Rate per 10 Sqm Total 1387.55 1521.25 1654.80 1788.65 1922.35
Rate as per 1 Rmt 138.75 152.12 165.48 178.86 192.23

Asst. Engineer Dy Executive. Engineer Executive Engineer


TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam

Page 97 of 130
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.

MS Doors & Windows Data

Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.80 x 2.13 with frame
made of L Angular section of 35 X 35 X 5mm and inner frame of double leave shutters with MS
2 "L"angle of 25 X 25 X 4mm welded with 2 nos of 25 X 25 X4 angle and 3 No.s of 30x4mm each
leaf and welded with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished item of work.

Calculation of Weight /Rmt


Frame 2 x (1.80+2.13) = 7.86 2.60 20.436
Shutter 2 x (0.895+2.125) = 6.04 1.60 9.664
Flat 6 0.350 2.100 1.600 3.36
Angle 6 0.350 2.100 1.60 3.36
Hold fasts 6 0.230 1.380 1.60 2.208
39.03
/Kgs
Data for Rec Oxide Primer

Cost of Red oxide Grade-I quality 0.60 Ltr 136.00 1 Ltr 81.60

1st Class Painter 0.21 Nos. 625.00 1 Each 131.25

2nd Class Painter 0.49 Nos. 515.00 1 Each 252.35


Add M/A @ 25% on Labour
116.30
Charges
Rater per 10 Sqmt. Total 581.50

Abstract Quty Rate Amount

Cost of MS Angular frames of rolled steel equal angle 39.03 Kgs 55.11 1.00 Kg 2151.02

Cost of MS sheet 2 x 0.895 x 2.125 = 3.80 x 9.80 =


37.24 Kgs 55.11 1.00 Kg 2052.47
37.24 Kgs
MS hold fasts 6 Nos 35.00 1.00 Nos 210.00
Data for Red oxide primer 3.01 Sqm 581.50 10.00 Sqm 175.01
Fixtures

MS powder coated butt hinges 150mm long 3 Nos 42.00 1.00 Each 126.00

MS powder coated Tower bolts 150 mm long 1 Nos 37.00 1.00 Each 37.00

MS powder coated Handles 125 mm long 2 Nos 33.00 1.00 Each 66.00

MS powder coated Aldrops 300 mm long 1 Nos 173.00 1.00 Each 173.00

Fabrication charges for making of door frame, hard


76.27 Kgs 33.00 Kg Each 2516.84
ware fixtures, transportation etc., complete
Fabrication charges for making of door frame, hard
76.27 Kgs 5.00 Kg Each 381.34
ware fixtures, transportation etc., complete

Add A/A @ 25% on Labour charges 724.55

8613.23
Add 13.615% Overhead & Contractors profit 13.615% 0.00
or say 8614.00

662593135.xlsxMS Doors 98
Assistant Engineer Dy. Executive Engineer Executive Engineer
TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

662593135.xlsxMS Doors 99
1 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh
shutter provision – (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition
of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100
parts of PVC resin) of (80 mm x 52 mm) / (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38
mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system,
structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0 / 1.2 mm
prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float
glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-
extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the
system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing / deglazing
at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation,
erection at site complete for finished item of work.

Basic rate as per item code TBSC-M.II-10 6,091.00 1 SQM 6091


Add 13.615% Overhead & Contractors
13.615% 829.29
profit
Rate per sqmt. 6921.00

1 Supply and fixing of Stainless steel fly proof wire mesh of not less than 20 gauge with wooden frame
Including Labour charges for making, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.

Window Size : 1.00 X 1.00 1.00 Sqm.

a Frame -
Horizontal 2 1.00 0.025 0.0125 0.001 cum
Vertical 4 1.00 0.025 0.0125 0.001 cum
0.0020 cum
Say 0.0020 Cum
b Door Shutter frame
Styles 4 #REF! 0.070 0.035
Rails 4 #REF! 0.070 0.035

c Door shutter
Horizontal x Vertical 2 #REF! ### 0.065
ABSTRACT
Sl.
Description Qty. Rate/Per Amount
No.
frame
1 TBSC-D.V-01 0.0020 cum 44785.00 Cum 89.57
(Sal wood )
2 Stainless steel fly proof wire mesh TBSC-E.III-02 1.000 Sqm 522.00 Cum 522.00
3 Labour charges for making frame TBSC-T.I-25 467.00
1078.57
Add 13.615% Overhead & Contractors
4 13.615% 146.85
profit
5 Rate per sqmt. 1225.50

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
5 Supply and fixing of M.S.Grill of size with outer angular frame of rolled steel equal angle
of ISA 2525 of size 25mm x 25mm x 4mm welded with safety bars of 10mm square rods at
150mm centre to centre horizontally and verticlally including red oxide primer of grade-I
quality, sales and other taxes, cost and conveyance of all materials to site, all labour
charges and fixing in position etc., complete for finished item of work.

MS GRILL SIZE 1.00 X 1.00


AREA OF GRILL 1.00 Sqmts.
THEORITICAL REQUIREMENT
1 OUTER ANGULAR FRAME OF ROLLED STEEL EQUAL ANGLE ISA 2525 - 25mm x
25mm x4mm
Verticals(L -Angle) 2 1.00 2.00
Horizontals(L-Angle) 2 1.00 2.00
Hold Fasts 2 0.23 0.46
4.46 RM
Equivalent Weight 1.40 Kgs/RM
Total Weight 4.46 1.40 6.24 Kgs.
2 10mm square rods safety bars
Horizontals 7 1.00 6.67 RM
Vertical 7 1.00 6.67 RM
13.34 RM
Equivalent Weight 0.78 Kgs/RM
Total Weight 13.34 0.78 10.41 Kgs.
3 DATA for Red Oxide Primer
Cost of Red Oxide GRADE-I Quality 0.6 129.00 77.40
Painter 1st class 0.21 595.00 124.95
Painter 2nd class 0.49 490.00 240.10
TOTAL Rs. 442.45 /10 Sqm.
ABSTRACT QUANTITY RATE Unit AMOUNT
1 OUTER ANGULAR FRAME OF ROLLED STEEL 6.24 Kgs
EQUAL ANGLE ISA 2525 - 25mm x 25mm x4mm

2 10mm square rods safety bars 10.41 Kgs


TOTAL 16.65 Kgs 48.11 /Kg 801.03
3 Red Oxide Primer 1.00 Sqmts. 442.45 /10 Sqmts. 44.25
4 Fabrication of Ventilator 16.65 Kgs 31.00 /Kg 516.15
5 Labour Charges for Fixing of Ventilator 16.65 Kgs 4.00 /Kg 66.60
Add 13.615% Overhead & Contractors profit on sub -
total 194.43
1623.00
Or Say 1623.00 /Sqmt

2007 - 2008 SSR March 2008 Rates 662593135.xlsx - V 102


Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre -
painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish
painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with
handle made of high grade aluminium powder coated and nylon receiver, corner brackets
made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed
to the concrete /masonry wall by means of self expanding screws including 10 mm square
guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers
2'-0 x 2'-0 (609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm and (ii)
Ventilators: Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame
section size of 33 x 56 mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed
louvers 4'-0 x 3'-0 (1219.2 x 914.4 mm) (Box section) outer frame section size of 33 x 56
mm Mullion section size of 33 x 56 mm

Basic rate as per item code TBSC-M.III-02 4,749.00 1 Sqmt 4749.00


Add 13.615% overheads 13.615% 646.58
Rate per sqmt. 5396.00 /Sqmt

2007 - 2008 SSR March 2008 Rates 662593135.xlsx - V 103


Water supply & Sanitary datas
SCHEDULE OF RATES FOR THE YEAR 2020 - 2021
Sl Amount Unit
Description of work
No. (Rs.)
1 Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste
fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread
conforming to IS:2963-1979 and fitted with 15 mm nominal bore single Chromium
Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso/Nice/Senior or
equivalent complete with standard CI brackets including wooden block, 12.7mm PVC
connection with Brass union nut CP coated, 12.7mm dia first qualifty NP angle stop
cock, 38.1mm CP waste coupling , 31.75mm dia PVC flexible waste pipe of 914.4mm
length of first quality including cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc., complete for finished item of work.
for All Floors.

Flat Back Wash Hand Basin - Item code No TBSP-E.VI-04 1496.00


15 mm Nomina size PVC connection with Brass union nut CP coated (TBSP-J.I-32 )
103.00
32 mm CP waste coupling (TBSP-F.VII-07 ) 236.00
30 mm dia PVC flexible waste pipe of 914.4mm length of first quality (flexible waste
pipe ) (TBSP-H.II-04 ) 26.00

Sub-Total :: 1861.00
Add Overheads and Contractor profits @ 13.615% 253.38
2114.38
Say 2114.40 /Each
2 Supplying & Fixing of 12.70 mm brass body CP finish bib tap of not less than 300
grams weight screw type (full turn) with internal / external threaded connection
conforming to IS 8931 including cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc., complete for finished item of work
for All Floors.
Initial cost (TBSP-F.I-01 ) 227.00
Add Overheads and Contractor profits @ 13.615% 30.91
257.91
Say 257.95
3 Providing & Placing on Terrace ( at all floor levels) polyethylene water storage
tank with Double layer approved brand & manufacture with cover and suitable locking
arrangement & making necessary holes for inlet & outlets and over flow pipes but
without fittings & base support for tanks
Providing & Placing of RCC water storage tank on Roof slab alround 50mm thick
and base 100mm thick with suitable locking arrangement & making necessary holes for
inlet & outlets and over flow pipes but without fittings
Initial cost (TBSP-H.II-01) 7.00
Add Overheads and Contractor profits @ 13.615% 0.95
7.95
Say 8.00 Litre
4 Supply and Fixing European Water Closet of 1st quality conforming to IS:2556-part-2-
2004 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including cost
of plastic sheet and lid for European Water Closet with rubber or plastic buffers as per
IS:2548-1996 and PVC low level single flush 10 litere capacity system with internal
components and short bend of make Parryware slim line including cost and
conveyance of all materials to site, labour charges for fixing etc., complete for finished
item of work. for all floors

a European Water Closet with "S" trap (TBSP-E.II-02) 1649.00


b Plastic seat & for E.W.C (TBSP-E.V-01 ) 749.00
c PVC low level system parry wax slim line with internal components and short bend 10
1466.00
liter capacity short bend (TBSP-H.II-07 )
3864.00
Add Overheads and Contractor profits @ 13.615% 526.08
4390.08
Say 4390.10 Each

W&S.Data 662593135.xlsx 104OF130


5
S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 including cost and
conveyance of all materials and labour charges , Overheads & Contractors profit
complete for finished item of work for all floors.
TBSP-J.III-01 130.00
Add Overheads and Contractor profits @ 13.615% 17.70
147.70 Rmt

6
S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 including cost and
conveyance of all materials and labour charges , Overheads & Contractors profit
complete for finished item of work for all floors.
TBSP-J.III-03 197.00
Add Overheads and Contractor profits @ 13.615% 26.82
223.82 Rmt

7
S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including cost and
conveyance of all materials and labour charges , Overheads & Contractors profit
complete for finished item of work for all floors.
TBSP-H.I-03 159.67
Add Overheads and Contractor profits @ 13.615% 21.74
181.41 Rmt
8 Supply and Fixing of 3'-0" dia RCC Readymade Rings 50mm thick 0.30m height
including cost and conveyance of all materials and labour charges etc., complete
Rate as per Market Rate 700.00
Add Overheads and Contractor profits @ 13.615% 0.00
700.00 Each

9 Supply and Fixing of 3'-0" dia RCC Readymade Top Cover 50mm thick including cost
and conveyance of all materials and labour charges etc., complete
Rate as per Market Rate 800.00
Add Overheads and Contractor profits @ 13.615% 0.00
800.00 Each

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

W&S.Data 662593135.xlsx 105OF130


Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri
Kothagudem Dist.

MS Door Data
Manufacturing, Supply, delivery and fixing of plain G.I sheet door of size 1.20. x 2.10 with frame made of L
Angular section of 25 X 25 X 3mm and inner frame of single leave shutters with GI Sheet and welded with
1
powder coated fixtures including red oxide paint including cost and conveyance of all materials and labour
charges etc complete for finished item of work"
Calculation of 1.20 2.10 2.52 Sqm
Frame
Vertical 2 2.100 4.20
Horizontal 2 1.200 2.40
Shutter
Vertical 2 2.100 4.20
Horizontal 3 1.200 3.60
14.40 Rmt
1.10 15.84 Kg
Shutter

G.I Sheet 12 guage


1.20 2.10 2.52 Sqm
2.75mm thick

22.12 55.74 Kg
Data for Rec Oxide Primer

Cost of Red oxide Grade-I quality 0.60 Ltr 129.00 1 Ltr 77.40

1st Class Painter 0.21 Nos. 595.00 1 Each 124.95

2nd Class Painter 0.49 Nos. 490.00 1 Each 240.10

Add M/A @ 25% on Labour Charges 110.61

Rater per 10 Sqmt. Total 553.06

Abstract Quty Rate Amount

Cost of MS Angular frames of rolled steel 15.84 Kgs 48.11 1.00 Kg 762.05

Cost of G.I Sheet 55.74 Kgs 80.00 1.00 Sqm 4459.39

MS hold fasts 4 Nos 32.00 1.00 Nos

Data for Red oxide primer 2.52 Sqm 553.06 10.00 Sqm 139.37

MS powder coated butt hinges 100mm long 4 Nos 21.00 1.00 Each 84.00

MS powder coated Aldrops 300 2 Nos 164.00 1.00 Each 328.00


Fabrication charges for making of door frame, hard
71.58 Kgs 31.00 Kg Each 2219.05
ware fixtures, transportation etc., complete
Fabrication charges for making of door frame, hard
71.58 Kgs 4.00 Kg Each 286.33
ware fixtures, transportation etc., complete
add 25% extra on Labour 626.35

8904.54
Add 13.615% Contractors profit & Over head
13.615% 1212.35
charges
or say 10117.00

Asst. Engineer Dy Executive. Engineer Executive Engineer


TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam

662593135.xlsxGI 106
Standard Data - Electrical Items For Buildings 2020-2021
Sl.
SSR Item No. Description Unit Qty. Rate Rs. Amount Rs.
No.
P.V.C. Conduit (Concealed)
Copper Wiring
3 Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C.
insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion/ Vimal/ Suncab/ Paragaon/FortuneArt
make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type
switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box
including cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings

Taking Output = 6 Points

a) Material

ELEC-9.2.8 14/0.3mm (1.0 sqmm) FRLS flexible 100 M 1 1050.00 1050.00


copper wire1100voltsgrade as
peris694/1990 specification
finolex/RRCABLES/HAVELLS
ELEC-1.7.1 a 6A 1 Way flush type Switch of makes each 6 16.00 96.00
Anchor penta cherry/ Gold Medal Olive /
great white omega/Million Zoom.
ELEC-1.7.1 m 3 Plate Jumbo Ceiling Rose of makes each 6 19.00 114.00
Anchor/ Gold Medal Olive / Million Zoom.

ELEC-9.4.14 25 x 20 cms (10" x8") Hylam sheet 3mm each 1 80.00 80.00
thick.
Total 1340.00
b) Labour charges :
5 Skilled Electrician day 0.6 590.00 354.00
34 Semi skilled Electrician day 1.2 490.00 588.00
33 Helpers day 0.6 490.00 294.00
Total 1236.00
c) Agency allowance @ 25% 25% 1236.00 309.00
Total (a+b+c) 2885.00
d) Overheads & Contractors Profit on 13.615% 2885.00 392.79
(a+b+c)
e) Cost for 6 Points 3277.79
Rate per Point = e/6 546.30
Rate per Point 546.30
4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of
Anchor / Gold medal olive / Million zoom make with ISI mark on a common
switch board with earth continuity including wire leads, earth connections
including cost and conveyance of all materials to site, labour charges and
sales tax etc. complete for finished item of work

Taking Output = each


a) Material
6A 3/2 pin flush type Socket of makes
Anchor/ Gold Medal Olive / Million each 1 18.00 18.00
ELEC-1.7.1 c Zoom.

6A 1 way flush type Switch of makes


Anchor/ Gold Medal Olive / Million each 1 16.00 16.00
Zoom./GREAT WHITE OMEGA
ELEC-1.7.1 a
Total 34.00
b) Labour charges :
5 Skilled Electrician day 0.067 590.00 39.53
33 Helpers day 0.067 490.00 32.83
Total 72.36
c) Agency allowance @ 25% 25% 72.36 18.09
Total (a+b+c) 124.45
d) Overheads & Contractors Profit
13.615% 124.45 16.94
on (a+b+c)

Page 1 of 130
Rate per each 141.39

6 Supply and fixing of batten holder / slanting holder Anchor / Gold medal
olive / Million zoom make with ISI mark in lieu of ceiling rose of light point
with 40W bulb all connections including cost and conveyance of all
materials to site, labour charges and sales tax etc., complete for finished
item of work.
Taking Output = each
a) Material
PVC batten holder Anchor / Gold
medal olive / Million zoom make with each 1 26.00 26.00
ELEC-3.7.9 ISI mark
40W-60W Lamp of make Crompton
each 1 11.00 11.00
ELEC-3.8.1 /Bajaj / Surya / HPL/ Havells.
Total 37.00
b) Labour charges :
5 Skilled Electrician day 0.05 590.00 29.50
33 Helpers day 0.05 490.00 24.50
Total 54.00
c) Agency allowance @ 25% 25% 54.00 13.50
Total (a+b+c) 104.50
d) Overheads & Contractors Profit
13.615% 104.50 14.23
on (a+b+c)
Rate per each 118.73
118.80
7 Supply and run of 2 of 36/0.3mm (2.5 sqmm) FRLS / HFFR PVC insulated
ISI Copper cable of makes Polycab / Havells / Gold medal /Fortune art
/L&T/ HPL in existing metallic / non-metallic conduit pipe for mains including
cost and conveyance of all materials to site, labour charges and sales tax
etc., complete for finished item of work.

Taking Output = 100 M


a) Material
2 of 36/0.3mm (2.5 sqmm)
FRLS/HFFR PVC insulated ISI
Copper cable of makes Polycab / 100 M 2.00 2539.00 5078.00
Havells / Gold medal/Fortune art /L&T/
ELEC-1.5.1 b HPL
b) Labour charges :
5 Skilled Electrician day 0.67 590.00 395.30
34 Semi Skilled Electrician day 2.00 490.00 980.00
33 Helpers day 0.67 490.00 328.30
Sundries
Total 1703.60
c) Agency allowance @ 25% 25% 1703.60 425.90
Total (a+b+c) 7207.50
d) Overheads & Contractors Profit
13.615% 7207.50 981.30
on (a+b+c)
e) Cost for 100 RM 8188.80
Rate per Metre = e/100 81.89
DISTRIBUTION BOARDS
8 Supply and fixing 4 way SPN Distribution board with IP-20 protection of
make Standard / Havells / HPL/Toyoma/ C &S suitable for single phase 40A
Double pole Isolator as incomer and 10KA-6-32A range single pole
miniature circuit breakers four numbers (4Nos) as out going with internal
connections including cost and conveyance of all materials to site, labour
charges for surface / flush mounting etc., sales tax complete for finished
item of work.

Page 2 of 130
40A DP Isolator / RCCB / ELCB - 1
No for incomer, 6-32A SP MCBs -
4Nos for outgoing.
Taking Output = each
a) Material

4 way SPN D.B with IP-20 Protection


each 1.00 921.00 921.00
of make LEGRAND/SCHNEIDER
ELEC-2.16.1 a
40 A DP Isolater of make
each 1.00 424.00 424.00
ELEC-2.15.1 b LEGRANDDX3/SCHNEIDER-ACTI9
10 kA - 6-32A range SP MCB ISI Mark
of make LEGRANDDX3/SCHNEIDER- each 4.00 233.00 932.00
ELEC-2.14.1 a ACTI9
Total 2277.00
b) Labour charges :
5 Skilled Electrician day 0.5 590.00 295.00
34 Semi Skilled Electrician day 0.5 490.00 245.00
33 Helpers day 1 490.00 490.00
Sundries such as hardware, cement
LS
etc,
Total 1030.00
c) Agency allowance @ 25% 25% 1030.00 257.50
Total (a+b+c) 3564.50
d) Overheads & Contractors Profit
13.615% 3564.50 485.31
on (a+b+c)
Rate per each 4049.81
EARTHING
9 Providing independent earthing for main switches integrated circuit cutouts
and moters with 40mm dia Medium grade GI Pipe of TATA/Zenith/GST
make of 2.5 m length duly providing 12mm dia 16 Nos. holes and rewired
bolts, nuts and washers, checknuts, Humepipe ring 18 inches dia, 2 inch
thick etc., as per IS specifications with necessary double GI earth wire NO.
8 SWG inclkuding filling with equal preparation of salt and charcoal in layers
including cost and conveyance of all materials to site, labour charges and
sales tax etc., complete for finished item of work.

a) Material

Earth Work Excavation including all


cum 1.75 250.00 437.50
soils for trench, pole pit and Earth pit.
ELEC-9.4.17
TBSP-G.I-11 40mm dia Medium Grade G.I pipe Mtr 2.50 429.00 1072.50
25 x 6 mm (1"X 1/4") G.I Flat duly
drilled 12mm holes (4 Nos) of 200 mm Each 1.00 60.00 60.00
(8") length
Drilling of 16 Nos through holes of
Each 16.00 6.00 96.00
ELEC-9.4.20 12mm dia to G.I pipe
ELEC-9.4.21 G.I Nuts, Bolts an Washers Set 4.00 12.00 48.00
ELEC-9.4.22 18" dia 2" thick hume pipe ring Each 1.00 250.00 250.00
ELEC-9.1.10 Hard Coke Kg 40.00 23.00 920.00
ELEC-9.1.11 Salt Kg 20.00 18.00 360.00
Total 3244.00
b) labour charges for fixing pipe
ring and connections
5 Semi skilled Electrician Nos 0.50 490.00 245.00
33 Helpers Nos 0.50 490.00 245.00
Sundries
Total 490.00
c) Agency allowance @ 25% 25% 490.00 122.50
Total (a+b+c) 3856.50

Page 3 of 130
d) Overheads & Contractors Profit
13.615% 3856.50 525.06
on (a+b+c)
Rate per each 4381.56
35 Supply and transportation of 30W. LED Street light Body made of high
grade pressure die – cast Aluminium alloy with corrosion resistant powder
coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon
gasket ensures Optical & Electrical compartments are IP 66) protected,
wide operating voltage range, P.F > 0.90, System having efficacy >100
lumens/watt, with Ingress protection IP66, Potted driver, Driver surge
protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the
department and as per IS, CRI>70, Inbuilt Electrical protections like Over
voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with
BIS certification with 5 years warranty. The contractor must furnish the
manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE
MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro /
a) Material
Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA /
SYSKA
30WATT/ . Capart / Fortune
LED Street Arrt / FIEM each
light Luminaire / Panasonic1.00
/ Arraystorm / GM /
2651.00 2651.00
ELEC-3.11.1 b Goldmedal

40mm G.I pipe Medium Grade with


M 1.00 429.00 429.00
TBSP-G.I-11 Bracket.
2.5 Sq.mm FRLS / HFFR PVC
insulated ISI Copper cable of makes
GM / L&T/RPG/ Havels / V-Guard /
M 4.00 25.39 101.56
Power Flex/ Polycab/Gold Medal
/Standard /Million/ Vimal/ Suncab
ELEC-1.5.1 b
/Paragan/ Fortune Art
Pipe bending charges LS 1.00 20.00 20.00
Total 3201.56

b) Labour charges for Antitiling MS


flat / welding charges & fixing

5 Skilled Electrician day 0.25 590.00 147.50


ii(4) Carpenter day 0 615.00 0.00
33 Helper day 0 490.00 0.00
41 Welder day 0 555.00 0.00
Total 147.50
c) Agency allowance @ 25% 25% 147.50 36.88
Total (a+b+c) 3385.94
d) Overheads & Contractors Profit
13.615% 3385.94 461.00
on (a+b+c)
Rate per each 3846.93
11 Supply and transportation of 20W, 2000 lumens, T8,1200mm length LED
tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge protection:
2KV,THD<125%, with inbuilt driver and frosted cover CCT: 3000K - 5700K,
minimum CRI≥80,.etc., complete Manufacture has to submit LM79,LM80 &
Photobiological Safety Report. Luminaire Performance Complies to IS10322
(Part 5/Sec 3) & IEC 60598-1,IEC 60529 ISO certified company.
LUMINAIRE MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj /
Havells / Halonix / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/ OSRAM / SAMSUNG / LG LEDs

a) Material
20W, 2000 lumens, T8,1200mm length
1 730.00 730.00
ELEC-3.9.10 LED tube light
ELEC-1.5.4 23/0060 3 core Flat Copper Wire M 1.00 9.80 9.80
screws with rawal plugs each 2.00 1.00 2.00
ELEC-9.1.29 T.W round blocks each 2.00 8.00 16.00
Cement and sand etc., LS 17.10
Total 774.90
b) Labour charges
5 Skilled Electrician/carpenter day 0.10 590.00 59.00
33 Semi skilled Electrician / Helper day 0.10 490.00 49.00

Page 4 of 130
Total 108.00
c) Agency allowance @ 25% 25% 108.00 27.00
Total (a+b+c) 909.90
d) Overheads & Contractors Profit
13.615% 909.90 123.88
on (a+b+c)
Rate per each 1033.78
1033.80
38 Supply and errecting of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28
W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of
insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope,
copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5,
Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than
10%. with remote or compatible to electronic step type regulator unit for speed control and all
remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree
C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase
AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg
(Efficio ) / Havells / Orient

a) Material
Supply of 48" (1200mm) Sweep
No 1 2825.00 2825.00
ELEC- 5.1.1 Ceiling Fan Havells / Orient
Transportation charges @ 1% 1% 2825.00 28.25
ELEC-1.5.4 23/0060 Twin Core wire M 1 9.80 9.80
Unforseen item works, such as
LS 1.00 1.00
painting to down rod, screws etc.,
Total 2864.05
b) Labour charges.
1349 Skilled Electrician day 0.125 590.00 73.75
1357 Helper day 0.125 490.00 61.25
Total 135.00
c) Agency allowance @ 25% 25% 135.00 33.75
Total (a+b+c) 3032.80
d) Overheads & Contractors Profit
13.615% 3032.80 412.92
on (a+b+c)
Rate per each 3445.72

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam

Page 5 of 130
COMPLETION REPORT
Construction of Sub Centre Building at Dammapeta-II (EC) (V) of Dammapeta (M) in Bhadradri Kothagudem Dist.
Sl. As Per Sanction Estimate As Per Workdone Estimate Difference
Description of item Remarks
No. Qty. Rate Amount Qty. Rate Amount Excess Less
1 2 3 4 5 6 7 8 9 10 11
Civil Work
1 Earth work excavation for foundations and depositing on bank for all
lifts and with an initial lead of 10m including all operational,
incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for 26.24 384.65 1 Cum 10093.00 56.81 384.65 1 Cum 21852.00 11759.00 0.00
finished item of work as per SS - 20 B (APSS 308). for Building
Foundation

2 Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate:


Coarse aggregate) using 40mm size Hard Broken Granite (IS383,
1970) machine crushed metal from approved quarry including cost
and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, mixing concrete in concrete mixer
including seigniorage charges, sales & other taxes on all materials,
all operational, incidental, and labour charges such as laying and 9.49 4900.05 1 Cum 46501.00 14.13 4900.05 1 Cum 69238.00 22737.00 0.00
ramming concrete in layers in position not exceeding 15cm, finishing
top surface, curing concrete, etc., complete for finished item of
work (APSS No. 402) for Levelling Course and Flooring Bed

3 Filling with useful available excavated earth (excluding rock) in


trenches, sides of foundations and basement with initial lead in
layers not exceeding 15 cm thick, consolidating each deposited layer
by watering and ramming including cost and conveyance of water to
15.07 34.15 1 Cum 515.00 27.87 34.15 1 Cum 952.00 437.00 0.00
work site and all operational, incidental, labour charges, hire charges
of T & P etc., complete for finished item of work. APSS No.309 &
310

4 Filling with Gravel in trenches, sides of foundations and basement


with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire 28.91 292.05 1 Cum 8443.00 131.39 292.05 1 Cum 38372.00 29929.00 0.00
charges of T & P etc., complete for finished item of work. APSS
No.309 & 310

5 Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix


corresponding to IS 456 using 20mm size graded machine crushed
hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as machine 0.00 0.00
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) including centering, shuttering, laying concrete, vibrating,
curing etc
A FOOTINGS
5.18 10268.10 1 Cum 53189.00 6.31 10268.10 1 Cum 64792.00 11603.00 0.00

B PEDESTALS
2.59 10893.00 1 Cum 28213.00 0.00 10893.00 1 Cum 0.00 0.00 28213.00

C COLUMNS
2.89 12647.20 1 Cum 36550.00 3.67 12647.20 1 Cum 46415.00 9865.00 0.00

D PLINTH BEAM
4.83 12906.25 1 Cum 62337.00 5.12 12906.25 1 Cum 66080.00 3743.00 0.00

E LINTELS
0.56 12178.70 1 Cum 6820.00 0.63 12178.70 1 Cum 7673.00 853.00 0.00

F SUNSHADES
8.10 934.55 1 Sqm 7570.00 7.02 934.55 1 Sqm 6561.00 0.00 1009.00

G ROOF BEAMS
4.79 11326.40 1 Cum 54253.00 5.19 11326.40 1 Cum 58784.00 4531.00 0.00

H ROOF SLAB 115MM


112.16 1295.60 1 Sqm 145314.00 118.13 1295.60 1 Sqm 153049.00 7735.00 0.00

6 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire, 2.60 81489.60 1 MT 211873.00 3.05 81489.60 1 MT 248869.00 36996.00 0.00
cover blocks and all incidental, operational, laour charges such as
cutting, bending placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all
floors. (APSS No.126) of TATA, SAIL, VSP, JINDAL & SHYAM
STEEL

7 Brick Masonry in superstructure with CM (1:8) prop: using second


class bricks from approved source having minimum crushing
strength of 40 Kg/Sqcm. including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement 45.76 6888.55 1 Cum 315220.00 0.00 6888.55 1 Cum 0.00 0.00 315220.00
mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work. (APSS No. 501 &
504). for panel walls in super structure
8 Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat
spong finish including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
103.41 2000.30 10 Sqm 20685.00 108.46 2000.30 10 Sqm 21695.00 1010.00 0.00
charges and labour charges such as mixing mortar, finishing, curing,
etc., complete for finished item of work. (APSS 901,906)

9 Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in


single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
207.40 1791.50 10 Sqm 37156.00 269.30 1791.50 10 Sqm 48245.00 11089.00 0.00
charges and labour charges such as mixing mortar, finishing, curing,
etc., complete for finished item of work. (APSS 901,906)

10 Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick


in single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
128.77 2581.00 10 Sqm 33236.00 136.53 2581.00 10 Sqm 35238.00 2002.00 0.00
charges and labour charges such as mixing mortar, finishing, curing,
etc., complete for finished item of work. (APSS 901,906)

11 Flooring and Treads with Polished shabad / Tandur stone minimum


15 to 18 mm thick of size (0.254M x0.254M) set over base coat of
CM (1:8) over already laid CC bed / RCC Roof Slab, including neat
cement slurry of honey like consistency spread @ 3.3 kgs per sqm.
& Jointed with neat cement to full depth including cost of all materials
like cement, sand, and water and flooring stones etc., complete, 76.15 7681.05 10 Sqm 58491.00 0.00 7681.05 10 Sqm 0.00 0.00 58491.00
including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, .

12 Providing Skirting to internal walls and Risers of Steps to 15 cm


height with Polished shabad / Tandur stone minimum 15 to 18 mm
thick of size (0.254M x0.254M) length equal to flooring stones, set
over base coat of CM (1:3) 12 mm thick with cement slurry of honey
like consistency spread at the rate of 3.30 kgs per sqm and jointed
with white cement paste mixed with pigment of matching shade to 12.51 8474.85 10 Sqm 10602.00 0.00 8474.85 10 Sqm 0.00 0.00 10602.00
full depth, including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc., complete
for finished item of work
13 Flooring with Non-skid red or white full body Ceramic floor tiles of
size 300 x 300 mm and thickness between 7-8 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs of makes Jhonson &
Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 6.46 8655.40 10 Sqm 5591.00 7.25 8655.40 10 Sqm 6275.00 684.00 0.00
3.3.kgs per sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work.

14 Dadooing to walls with glazed red or white full body ceramic wall tiles
of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs, any brand as
approved by Engineer - in - charge and set over a base coat of CM
(1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt.
and jointed with white cement paste mixed with pigment of matching
shade including cost and conveyance of all materials like cement, 22.17 5665.80 10 Sqm 12561.00 20.73 5665.80 10 Sqm 11745.00 0.00 816.00
sand, water, tiles, etc. to site, seigniorage charges, sales and other
taxes on all materials, and all opertional, incidental and all labour
charges such as mixing of cement mortar, laying in position, curing,
lift charges etc., complete for finished item of work in all floors

15 Painting to New External Walls with two coats of Plastic Emulsion


paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent
quality of approved brand and shade as approved by the Engineer -
in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after
thoroughly brushing the surface to remove all loose powdered
materials, including cost and conveyance of all materials, including 128.77 1908.20 10 Sqm 24572.00 155.62 1908.20 10 Sqm 29695.00 5123.00 0.00
cost and conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.
(APSS No. 911)

16 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior Grade-
I of approved brand, makind three (3) coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and
remains of loose powdered materials, including cost and conveyance 102.82 1238.15 10 Sqm 12731.00 311.74 1238.15 10 Sqm 38598.00 25867.00 0.00
of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for
internal walls (SS 911)
17 Supplying & fixing of 1.22x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of
primer and finished painted with pure polyester paint. The frame
should be provided with approved quality M.S.Powder coated butt
hinges IS 205 125mm long of 6 Nos. along with Double flush door
shutters solid bond wood block board type with commercial ply on
both faces of 30mm thick including fixtures such as Mild Steel "Z"
type Hold Fasts 6 Nos., M.S.Powder coated tower bolts I.S. 204, 300
mm long and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS 1.00 7560.00 1 Each 7560.00 0.00 7560.00 1 Each 0.00 0.00 7560.00
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681 300mm
long 1No., M.S.Powder coated Door Stoper 2No., sales and other
taxes cost and conveyance of all materials to site, all labour cahrges
such as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.

18 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of
primer and finished painted with pure polyester paint. The frame
should be provided with approved quality M.S.Powder coated butt
hinges IS 205 125mm long of 6 Nos. along with Double flush door
shutters solid bond wood block board type with commercial ply on
both faces of 30mm thick including fixtures such as Mild Steel "Z"
type Hold Fasts 6 Nos., M.S.Powder coated tower bolts I.S. 204, 300
mm long and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS 5.00 6875.00 1 Each 34375.00 4.00 6875.00 1 Each 27500.00 0.00 6875.00
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681 300mm
long 1No., M.S.Powder coated Door Stoper 2No., sales and other
taxes cost and conveyance of all materials to site, all labour cahrges
such as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.
19 Providing and fixing 30mm thick Solid panel PVC door shutter
consisting of frame made out of M.S. tubes of 19 gauge thickness
and size of 19mm x 19mm for stiles, & 15mm x 15mm for top &
bottom rails. M.S. frame shall have a coat of steel primers of
approved make and manufacture. M.S. frame shall be covered with
5mm thick heat molded PVC ‘C’ channel of size 30 x 50mm forming
stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide
cross PVC sheet as gap insert for top rail & bottom rail. Paneling of
5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed 3.15 2480.00 1 Sqm 7812.00 2.70 2480.00 1 Sqm 6696.00 0.00 1116.00
to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading
on either side, and joined together with solvent cement adhesive etc.
An additional 5mm thick PVC strip of 20mm width is to be stuck on
the interior side of the ‘C’ Channel using PVC solvent adhesive.
Complete as per direction of Engineer-in-charge, manufacturer’s
specification & drawing for finished item of work

20 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3


track sliding windows with mesh shutter provision – (only 2-glass
shutters) duly manufactured using UPVC reinforced profiles
(Composition of profile shall consists a minimum of 5.5 PHR of TiO2
and not more than 12 PHR of CaCo3 for every 100 parts of PVC
resin) of (80 mm x 52 mm) / (94 mm x 45 mm) x 2.20 mm for outer
frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding
shutter frames capable of mounting single glazing system,
structurally reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0 / 1.2 mm prefabricated & welded through
fusion welding. The window sash shall be fitted with 5 mm thick clear
float glass of reputed make duly fixed with Grey colour TPV Gasket 11.34 6921.00 1 Sqm 78484.00 8.64 6921.00 1 Sqm 59797.00 0.00 18687.00
for sash & Glazing bead shall be co-extruded with Grey colour soft
PVC. System shall have single point locking with Touch Lock and
the system is to be installed at the site using anchor fasteners,
silicon rubber sealant, easy glazing / deglazing at site etc., including
cost and conveyance of all materials, accessories, labour charges
for transportation, erection at site complete for finished item of work.

21 Supply and fixing of M.S.Grill of size with outer angular frame of


rolled steel equal angle of ISA 2525 of size 25mm x 25mm x 4mm
welded with safety bars of 10mm square rods at 150mm centre to
centre horizontally and verticlally including red oxide primer of grade-
11.34 1623.00 1 Sqm 18405.00 10.44 1623.00 1 Sqm 16944.00 0.00 1461.00
I quality, sales and other taxes, cost and conveyance of all materials
to site, all labour charges and fixing in position etc., complete for
finished item of work.

SUPPLEMENTARY ITEMS
1 Brick Masonry in superstructure with CM (1:6) prop with Flyash
Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing
of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs.
Gypsum of 5 kgs. and stone dust with a compresive strength not
41.49 6882.05 1 Cum 285536.00 285536.00 0.00
lessthan 50 kg/sqm including cost and conveyance of all materials,
labour charges, seiniorage charges, scaffolding and curing etc., for
Superstructure Walls.

2 Manufacturing, Supply, delivery and fixing of plain MS sheet door of


size 1.80 x 2.13 with frame made of L Angular section of 35 X 35 X
5mm and inner frame of double leave shutters with MS "L"angle of
25 X 25 X 4mm welded with 2 nos of 25 X 25 X4 angle and 3 No.s
of 30x4mm each leaf and welded with powder coated fixtures 1.00 8614.00 1 Each 8614.00 8614.00 0.00
including red oxide paint including cost and conveyance of all
materials and labour charges etc., complete for finished item of
work.

3 Providing Drip mould of size 25x12mm with CM(1:3) prop. Including


cost and conveyance of all materials and labour charges etc., to 20.10 68.48 1 Rmt 1376.00 1376.00 0.00
complete.
4 Reinforced Cement Concrete M20 Grade Nominal Mix
corresponding to IS 456 using 20mm size graded machine crushed
hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as machine 6.85 843.05 1 Sqm 5775.00 5775.00 0.00
mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No.
402) including centering, shuttering, laying concrete, curing etc.
complete for Shelves of 50mm thick

5 Providing Drip mould of size 25x12mm with CM(1:3) prop. Including


cost and conveyance of all materials and labour charges etc., to 80.90 138.75 1 Rmt 11225.00 11225.00 0.00
complete.
6 Flooring with soluble salt porcelain vitrified tiles screen printed and
polished of size 600 x 600 mm and thickness between 8-10 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs of make Jhonson &
Jhonson, Kajaria, Nitco, Marbonite, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 77.88 10230.70 10 Sqm 79677.00 79677.00 0.00
3.3.kgs per sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work, .
7 Providing Skirting to internal walls to 15 cm height and risers of steps
with soluble salt porcelain vitrified tiles screen printed and polished
of size 600 x 600 mm and thickness between 8-10 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish of make Jhonson & Jhonson, Kajaria, Nitco,
Marbonite, set over base coat of CM (1:5) 12 mm thick with cement
slurry of honey like consistency spread at the rate of 3.30 kgs per 7.01 10181.20 10 Sqm 7137.00 7137.00 0.00
sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage
charges, etc., complete for finished item of work,

8 Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion


(cement: fine aggregate: Coarse aggregate) using 40mm, 20mm,
10mm size Hard Broken Granite (IS383, 1970) Machine Crushed
metal from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials, 0.97 6118.20 1 Cum 5935.00 5935.00 0.00
all operational, incidental and labour charges such as mixing
concrete in Concrete Mixer, laying, curing concrete, etc., complete
for finished item of work (APSS No. 402)

9 Providing impervious coat to exposed RCC roof slab surface with


CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials
and including all operational, incidental and labour charges for 118.13 5234.75 10 Sqm 61838.00 61838.00 0.00
mixing mortar, laying, rendering smooth and thread lining, curing,
rounding off junctions of wall and slab etc,, complete for finished
item of work

1349152.00 1552178.00
Electrification
1 Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit
pipe Sudhakar / Macoplast / Modimake concealed in roof slab with
all required acessories including No.14 SWG GI wire for earth
continuity including chiseling the wall wherever necessary , including
necessary masonery work for light/fan pointand seperate plug point 18.00 86.40 1 Rmt 1555.00 24.85 86.40 1 Rmt 2147.00 592.00 0.00
with teak wood deep box including cost and conveyance of all
materials to site and labour charges, sales tax etc., complete for
finished item of work.
2 Supply and fixing of ISI mark 25mm dia 1.8mm thick PVC conduit
pipe Sudhakar / Macoplast / Modi make concealed in wall with all
required acessories including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary , including
necessary masonery work for light/fan pointand seperate plug point 40.00 96.40 1 Rmt 3856.00 44.20 96.40 1 Rmt 4261.00 405.00 0.00
with teak wood deep box including cost and conveyance of all
materials to site and labour charges, sales tax etc., complete for
finished item of work.

3 Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS /


HFFR P.V.C. insulated ISI Copper Cable GM/L&T/RPG/Havells/V-
Guard/Power Flex/Polycab/Gold Medal/ Standard /Milion/ Vimal/
Suncab/ Paragaon/FortuneArt make in the existing metallic / non-
metallic conduct pipe with 6A 1 Way flush type switch, Ceiling rose
and 3mm thick hylam sheet covering to switch control box including 0.00 546.30 1 No.s 0.00 24.00 546.30 1 No.s 13111.00 13111.00 0.00
cost and conveyance of all materials to site, labour charges and
sales tax etc. complete for finished item of work for light, bell, fan
and exhaust fan points in Non-Residential Buildings

4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch
control of Anchor / Gold medal olive / Million zoom make with ISI
mark on a common switch board with earth continuity including wire
leads, earth connections including cost and conveyance of all 0.00 141.39 1 No.s 0.00 7.00 141.39 1 No.s 990.00 990.00 0.00
materials to site, labour charges and sales tax etc. complete for
finished item of work

5 Supply and fixing of batten holder / slanting holder Anchor / Gold


medal olive / Million zoom make with ISI mark in lieu of ceiling rose
of light point with 40W bulb all connections including cost and 0.00 118.80 1 No.s 0.00 10.00 118.80 1 No.s 1188.00 1188.00 0.00
conveyance of all materials to site, labour charges and sales tax
etc., complete for finished item of work.

6 Supply and transportation of 20W, 2000 lumens, T8,1200mm length


LED tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge
protection: 2KV,THD<125%, with inbuilt driver and frosted cover
CCT: 3000K - 5700K, minimum CRI≥80,.etc., complete Manufacture
has to submit LM79,LM80 & Photobiological Safety Report.
Luminaire Performance Complies to IS10322 (Part 5/Sec 3) & IEC
60598-1,IEC 60529 ISO certified company. LUMINAIRE MAKE: 0.00 1033.80 1 No.s 0.00 7.00 1033.80 1 No.s 7237.00 7237.00 0.00
Phillips / OSRAM / GE / Crompton / VIN / Bajaj / Havells / Halonix /
HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG / LG LEDs
7 Providing independent earthing for main switches integrated circuit
cutouts and moters with 40mm dia Medium grade GI Pipe of
TATA/Zenith/GST make of 2.5 m length duly providing 12mm dia 16
Nos. holes and rewired bolts, nuts and washers, checknuts,
Humepipe ring 18 inches dia, 2 inch thick etc., as per IS
specifications with necessary double GI earth wire NO. 8 SWG 0.00 4381.56 1 No.s 0.00 1.00 4381.56 1 No.s 4382.00 4382.00 0.00
inclkuding filling with equal preparation of salt and charcoal in layers
including cost and conveyance of all materials to site, labour charges
and sales tax etc., complete for finished item of work.

8 Supply and fixing 4 way SPN Distribution board with IP-20 protection
of make Standard / Havells / HPL/Toyoma/ C &S suitable for single
phase 40A Double pole Isolator as incomer and 10KA-6-32A range
single pole miniature circuit breakers four numbers (4Nos) as out
going with internal connections including cost and conveyance of all 0.00 4049.81 1 No.s 0.00 1.00 4049.81 1 No.s 4050.00 4050.00 0.00
materials to site, labour charges for surface / flush mounting etc.,
sales tax complete for finished item of work.

9 Supply and run of 2 of 36/0.3mm (2.5 sqmm) FRLS / HFFR PVC


insulated ISI Copper cable of makes Polycab / Havells / Gold medal
/Fortune art /L&T/ HPL in existing metallic / non-metallic conduit pipe
for mains including cost and conveyance of all materials to site, 0.00 81.89 1 Rmt 0.00 39.50 81.89 1 Rmt 3235.00 3235.00 0.00
labour charges and sales tax etc., complete for finished item of work.

10 Supply and errecting of energy efficient fan, 1200 mm sweep,


aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with
Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's
blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety
rope, copper winding, Power Factor greater than 0.90, Service Value
(CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350
RPM( tolerance as per IS:374-2019), THD less than 10%. with
remote or compatible to electronic step type regulator unit for speed
6.00 3445.72 1 Each 20674.00 20674.00 0.00
control and all remaining accessories including safety pin, nut bolts,
washers, temperature rise=75 degree C(max), insulation resistance
more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC
supply, earthing etc., including all standard accessories etc.,
complete. Makes : Atomberg (Efficio ) / Havells / Orient
11 Supply and transportation of 30W. LED Street light Body made of
high grade pressure die – cast Aluminium alloy with corrosion
resistant powder coat, having protective toughened glass cover,
Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical
compartments are IP 66) protected, wide operating voltage range,
P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress
protection IP66, Potted driver, Driver surge protection >10KV,
THD<15%, CCT: 3000- 6500K as desired by the department and as
per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short
circuit, Over load, Open Circuit, Miswiring, etc complete with BIS 1.00 3846.93 1 Each 3847.00 3847.00 0.00
certification with 5 years warranty. The contractor must furnish the
manufacturer warranty letter, LM 79 and LM 80 certificates.
LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON
/ BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS /
POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM /
Panasonic / Arraystorm / GM / Goldmedal

5411.00 65122.00
Water Supply and Sanitary Arrangements
1 Providing & Placing of RCC water storage tank on Roof slab alround
50mm thick and base 100mm thick with suitable locking
arrangement & making necessary holes for inlet & outlets and over 1360.00 8.00 1 Litre 10880.00 10880.00 0.00
flow pipes but without fittings
2 S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 5.70 147.70 1 Rmt 842.00 842.00 0.00
all floors.
3 S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 2.30 181.41 1 Rmt 417.00 417.00 0.00
all floors.
4 Supply and Fixing European Water Closet of 1st quality conforming
to IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make
white glazed with 'S' trap including cost of plastic sheet and lid for
European Water Closet with rubber or plastic buffers as per IS:2548-
1996 and PVC low level single flush 10 litere capacity system with
internal components and short bend of make Parryware slim line 2.00 4390.10 1 Rmt 8780.00 8780.00 0.00
including cost and conveyance of all materials to site, labour charges
for fixing etc., complete for finished item of work. for all floors

5 Supplying & Fixing of 12.70 mm brass body CP finish bib tap of not
less than 300 grams weight screw type (full turn) with internal /
external threaded connection conforming to IS 8931 including cost
and conveyance of all materials to site, all labour charges, sales and 4.00 257.95 1 Each 1032.00 1032.00 0.00
other taxes on all materials etc., complete for finished item of work
for All Floors.
6 S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 67.10 223.82 1 Rmt 15018.00 15018.00 0.00
all floors.
7 Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash
Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32
mm nominal size C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore single Chromium
Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
Esso/Nice/Senior or equivalent complete with standard CI brackets
including wooden block, 12.7mm PVC connection with Brass union
nut CP coated, 12.7mm dia first qualifty NP angle stop cock, 2.00 2114.40 1 Each 4229.00 4229.00 0.00
38.1mm CP waste coupling , 31.75mm dia PVC flexible waste pipe
of 914.4mm length of first quality including cost and conveyance of
all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work. for All Floors.

8 Supply and Fixing of 3'-0" dia RCC Readymade Rings 50mm thick
0.30m height including cost and conveyance of all materials and 19.00 700.00 1 Each 13300.00 13300.00 0.00
labour charges etc., complete
9 Supply and Fixing of 3'-0" dia RCC Readymade Top Cover 50mm
thick including cost and conveyance of all materials and labour 3.00 800.00 1 Each 2400.00 2400.00 0.00
charges etc., complete

0.00 56898.00

Total: -
1354563.00 1674198.00 769685.00 450050.00

Price Adjustment
0.00 0.00

1674198.00

Deduct Tender Premium @ 17.09%


-286120.00 0.00 286120.00

1388078.00

Provision for GST @ 12.00%


162548.00 166569.00 4021.00 0.00

Provision for Q.C charges @ 0. 5%


6773.00 6940.00 167.00 0.00

Add Tender Premium


0.00 0.00 0.00

Provision for Bore Well


25000.00 0.00 25000.00
Seigniorage Charges
7504.00 10516.00 3012.00 0.00

Add DMF & SMET 32% on Seigniorage charges


3365.00 3365.00 0.00

Provision for unforeseen items L.S.


43612.00 0.00 43612.00

Total: -
1600000.00 1575468.00 780250.00 804782.00

As Per Sanction Estimate 1600000.00 Excess 780250.00

As Per Work DoneEstimate 1575468.00 Less 804782.00

24532.00 -24532.00

Assistant Engineer Dy. Executive Engineer Executive Engineer


TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
Quantity since
executed for Item of work, of supplies granted under "sub-head" and previous bill
Unit supplied upto Rate Upto date total for Remarks
date as per sub work of estimate each
measurement subhead

I
Earth work excavation for foundations and depositing on bank for all
Cum 56.810 lifts and with an initial lead of 10m including all operational, incidental, 384.65 21852
seigniorage charges, labour charges such as shoring ,sheeting, planking,
strutting, dewatering etc. complete for finished item of work as per SS -
Plain Cement
20 B (APSS Concrete
308). (1:5:10)
for Building proportion (cement: fine aggregate:
Foundation
Cum 14.130 Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) 4900.05 69238
machine crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
Filling withmixing
etc. to site, useful available
concrete in excavated
concreteearth
mixer(excluding
including rock) in
seigniorage
Cum 27.870 trenches, sides&ofother
charges, sales foundations
taxes onand basement all
all materials, with initial leadincidental,
operational, in layers 34.15 952
not
and exceeding 15 cmsuch
labour charges thick,
as consolidating each deposited
laying and ramming concretelayer by in
in layers
watering
position notandexceeding
ramming 15cm,including cost and
finishing topconveyance of water
surface, curing to work
concrete, etc.,
Filling
site with
and allfor
complete Gravel in
operational, trenches,
finished item sides
incidental, of
of worklabour foundations
(APSScharges, and
No. 402)hire basement Twith
charges ofCourse
for Levelling &P
Cum 131.390 initial
etc., lead in
completeBed
and Flooring layers not exceeding 15cm thick, consolidating
for finished item of work. APSS No.309 & 310 each 292.05 38372
deposited layer by watering and ramming including all operational,
incidental, labour charges, seignorage charges, hire charges of T & P etc.,
Vibrated
completeReinforced
for finishedCement
item of Concrete
work. APSS M20 Grade&Nominal
No.309 310 Mix
corresponding to IS 456 using 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand)
Cum 6.310 FOOTINGS
coarse aggregate, water etc., to site and including Seigniorage charges, 10268.10 64792
sales
COLUMNS& other taxes on all materials including all operational, incidental
Cum 3.670 and labour charges such as machine mixing, laying concrete, curing 12647.20 46415
Cum 5.120 PLINTH BEAMbut excluding cost of steel and its fabrication charges for
etc.,complete 12906.25 66080
finished
LINTELSitem of work (APSS No. 402) including centering, shuttering,
Cum 0.630 laying concrete, vibrating, curing etc 12178.70 7673
Sqm 7.020 SUNSHADES 934.55 6561
Cum 5.190 ROOF BEAMS 11326.40 58784
Sqm 118.130 ROOF SLAB 115MM 1295.60 153049
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
MT 3.054 grade as per IS 1786-1979) of different diameters for RCC works, 81489.60 248869
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
Ceiling
materials Plastering
and sizewith CM(1:3)
and tying andProp: 12mmwith
lapsplicing thickbinding
in single wirecoatofspong
18
Sqm 108.460 finish
SWG, forming including costfor
grills and conveyance of
reinforcement all materials
work as per approved like cement, designs sand,and 2000.30 21695
water
drawings, etc.,including
to site, including
cost andseigniorage
conveyancecharges, of steel sales
bars, & other taxes
including all on
all materials,
wastages suchallasoperational,
overlaps, couplings,incidentalchairs, charges and labour
spacer chargescost
bars including such
Plastering
as
andmixing
conveyance to even
mortar, surfaces
offinishing,
binding wire, of wall
curing, with CM(1:4)
etc.,blocks
cover complete and Prop:
for 12mm thick
all finished
incidental, item of in
Sqm 269.300 single
work.
operational, coat including
(APSS 901,906)
laour cost and
charges suchconveyance
as cutting, bending of all materials
placinglike cement,
in position, 1791.50 48245
sand, water etc.,sales
tying including to site,
andincluding
other taxes seigniorage charges,etc.,
on all materials sales & otherfor
complete
taxes
finished on item
all materials,
of work in allall
operational,
floors. (APSS incidental
No.126)charges of TATA, and labour
SAIL, VSP,
Plastering
charges
JINDAL & such to even
SHYAM as mixing surfaces
STEEL mortar,of wall with CM
finishing, (1:5) etc.,
curing, Prop: 16mm thick
complete for in
Sqm 136.530 single coat including
finished item of work. (APSS 901,906) cost and conveyance of all materials like cement, 2581.00 35238
sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour
Flooring
charges such withas Non-skid red or white
mixing mortar, full body
finishing, curing,Ceramic floor tilesfor
etc., complete of size
Sqm 7.250 300
finished x 300 itemmmofand work.thickness between 7-8 mm 1st quality conforming to
(APSS 901,906) 8655.40 6275
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs of makes Jhonson & Jhonson, Kajaria, Nitco and
Dadooing
Marbonite,toset walls
overwith baseglazed
coat of red or white
cement mortarfull body
(1:8),ceramic
12 mm wall thicktilesoverof
Sqm 20.730 size
CC bed 200already
x 300 mm laid/or245 RCC mm roof x 325
slab,mm and thickness
including neat cement 6 mmslurry 1st quality
of 5665.80 11745
conforming
honey like consistency to IS:13711,spread IS:13712, IS:13630
@ 3.3.kgs per (Parts
sqm &1jointed to 15) neatly
of any withcolour
and
white finish
cement in allpaste
shades anddepth
to full designs, mixed anywithbrand as approved
pigment by Engineer
of matching shade,
Painting
-including
in - charge tocost
New
andof External
set over aWalls
all materials base with
likecoat two
of
cement, CM coats
(1:5),
sand ofwater
Plastic
12mm Emulsion
thick
and tilesandetc., paint
neat
Sqm 155.620 of Asianpaste
cement
complete, / Berger at the
including / Nerolac
rate of 3.3
seigniorage / Saicoat
Kg/Sqmt.
charges,/ Endocem
and
etc.,jointedor equalent
complete withforwhite quality
finished cement of
item 1908.20 29695
approved
paste
of work. mixed brandwithand shadeof
pigment asmatching
approvedshade by theincluding
Engineercost - inand- Charge
over
conveyancebase coat of cement
of all materials primer water base
like cement, sand,gradewater, -IItiles,
exterioretc. making
to site,
Painting
three
seignioragecoats to new
in allinternal
charges, to givesales walls
an even
and withshade
other two (2)on
after
taxes coats of ready
thoroughly
all materials, mixed
and alloil
brushing the
Sqm 311.740 bound
surface
opertional, washable
to remove
incidentaldistemper
all loose
and all acrylic
powdered base
labour charges of approved
materials, suchincluding brand
as mixingcost and shade
and
of cement 1238.15 38598
over
conveyancea base coat
of all of cement
materials, primer
including watercost
mortar, laying in position, curing, lift charges etc., complete for finished base
and interior
conveyance Grade-I of of
all
approved
materials,
item of work brand,
cost inof allmakind
floors three
brushes, water (3)tocoats in allsales
site, etc., to give an even
& other taxes,shade all after
Supplying
thourughly
operational, &brushing
fixing of the
incidental 1.05x
and 2.13
surface
labour Mts. (Double
tocharges
remove allLeaf)
such dirt Door
and framecharges,
remains
as scaffolding made
of loose of
Each 4.000 roll formedmaterials,
powdered
lift charges, section
curing etc., ofincluding
1.25 mm cost
complete thick
forandCRCA section,
conveyance
finished item of size
of should
all
work in allbe
materials 50tox
floors 6875.00 27500
75
for mm
work with
site
external and 32allmm rebate.
operational,
Walls.(APSS No.The corner oflabour
incidental,
911) the framecharges shouldetc.,be welded.
complete
The frame should
for finished item ofbework painted in allwithfloorsonefor coat of primer
internal walls and(SSfinished
911)
Providing
painted with andpurefixing 30mm thick
polyester paint.SolidThe panel
framePVC should door beshutter
provided consisting
with
Sqm 2.700 of frame made
approved quality outM.S.Powder
of M.S. tubes of 19 butt
coated gauge thickness
hinges IS 205 and size oflong
125mm 19mm of 6 2480.00 6696
xNos.
19mm along forwithstiles, & 15mm
Double flush x 15mm for top &
door shutters bottom
solid bondrails. wood M.S.
blockframe board
shall
type withhavecommercial
a coat of steel plyprimers
on bothoffaces approved
of 30mm make thickandincluding
manufacture.
Supplying
M.S.
fixturesframe suchand asfixing
shall Mild of
be covered Unplasticised
Steel with
"Z" type 5mm HoldPoly
thick Vinyl
Fasts heat Chloride
molded
6 Nos., (UPVC)
PVC
M.S.Powder 3coated
track
‘C’ channel
Sqm 8.640 sliding
of
tower windows
size bolts
30 x 50mm with
I.S. 204,forming mesh
300 mm shutter
stiles,
longand provision
and5mm 10mm –
thick,
BOLT(only
75mm 2-glass
wideshutters)
dia 2Nos, PVC 6921.00 59797
duly
sheets manufactured
M.S.Powder for top rail, lock
coated using rail
handles UPVC
&ISbottomreinforced
208 125mmrail onprofiles
either
long 4No, (Composition
side, and 10mm
M.S.Powder ofcoated
profile
Aldropxshall
(5mm IS2)2681 consists
thick, 20mm
300mm a minimum
wide1No.,
long cross ofM.S.Powder
5.5 PHR
PVC sheet ofasTiO2
gapand
coated insert
Doornotfor moretop than
Stoper rail
2No., &
Supply
12 PHR
bottom
sales and and
of
rail. fixing
CaCo3
Paneling
other of
for
taxesofM.S.Grill
every5mm
cost 100 of
andthick size
parts with
of PVC
PVC sheet
conveyance outer angular
resin)
to be
of all of (80frame
mm
fitted intothe
materials xof52rolled
M.S.
site, mm) /
all
Sqm 10.440 steel
(94
frame mm equal x
welded 45 angle
mm)
/ ofx
sealed ISA
2.20 2525
to mm
the of
for size
stiles outer
& 25mmframes,
rails
labour cahrges such as making of door frame, fixing in position,fixing of x
with25mm
(54
30mm mmx 4mm
x
wide38 welded
xmm)/(39
5mm with
thick 1623.00 16944
safety
mm
PVC
shutters, bars
xsheet
58 mm) of 10mm
&beading
hardx 2.20 onsquare
ware mmeitherforrods
fixtures, sliding
side, at
and150mm
shutter centre
joinedframes
etc.,complete together to centre
capable
for finished withitem ofhorizontally
mounting
solventof work.
and
The verticlally
single
cement glazing
frame adhesive
shouldincluding
system,etc. An
be embeddedred oxide
structurally
additional primer
to reinforced
a5mm
depth of
ofgrade-I
thick with
PVChot
40mm quality,
strip
in dip
the sales and
ofgalvanized
20mm
flooring. width up
Brick
other
to 50be
is to Masonry
taxes,
stuckcost
microns onofinthe
superstructure
and
minimumconveyance
interior side with
thickness of allofCM
of the 1.0(1:6)
‘C’ / 1.2prop
materials
Channel to using
mm with
site, all Flyash
labour
prefabricated
PVC Cement
solvent &
Cum 41.490 solid
charges
welded
adhesive.blocksand
through of
Completesize
fixing 290
in
fusion x 225
asposition
welding.
per xetc.,
direction140
The mm,
complete
window
of for manufacturing
for
sashfinished
Engineer-in-charge, shall be item of of
fittedflyash
work.
with 5 6882.05 285536
solid
mm blocks
thick
manufacturer’s clearusingfloatflyash
glassofof80
specification &kgs,
reputed cement
drawing make forofduly15 fixed
finishedkgs.itemGypsum
withofGrey of colour
work 5 kgs.
and
TPV stone
Gasketdust for with
sash a&compresive
Glazing beadstrength shall benot lessthan 50
co-extruded withkg/sqm
Grey
Manufacturing,
including
colour softcost PVC. andSupply, delivery
conveyance
System shall have ofand
all fixing
materials,
single of plain
point labour
lockingMScharges,
sheet
with Touch door ofLock size
Each 1.000 1.80 x
seiniorage 2.13
and the system with
charges, frame made
is toscaffolding
be installedandof L Angular
curing
at the section
siteetc.,
usingfor of 35 X 35
Superstructure
anchor X
fasteners, 5mmWalls. and 8614.00 8614
inner
siliconframerubber of sealant,
double leave shutters/ with
easy glazing deglazingMS "L"angle
at site etc.,of 25 X 25 X 4mm
including cost
welded
and conveyancewith 2 nos of ofall25 X 25 X4 accessories,
materials, angle and 3 labour No.s of charges
30x4mmfor each leaf
Providing
and welded Drip
with mouldpowder of size
coated25x12mm fixtures
transportation, erection at site complete for finished item of work. with CM(1:3)
including red prop.
oxide Including
paint
Rmt 20.100 cost and conveyance
including cost and conveyance of all materials and labourand
of all materials charges
labouretc., to etc.,
charges 68.48 1376
complete.
complete for finished item of work.
Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to
Sqm 6.850 IS 456 using 20mm size graded machine crushed hard granite metal 843.05 5775
(coarse aggregate) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate,
Providing
water etc.,Drip to site mould of size 25x12mm
and including Seigniorage withcharges,
CM(1:3)sales prop.&Including
other taxes
Rmt 80.900 cost
on alland conveyance
materials includingof allallmaterials
operational, and labour
incidental charges and etc.,
labour to charges 138.75 11225
complete.
such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of
Flooring
work (APSS with No.soluble salt porcelain
402) including vitrified
centering, tiles screen
shuttering, printed
laying and
concrete,
Sqm 77.880 polished
curing etc. ofcomplete
size 600 xfor 600 mm and
Shelves thickness
of 50mm thickbetween 8-10 mm 1st 10230.70 79677
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs of make Jhonson &
Providing SkirtingNitco,
Jhonson, Kajaria, to internal
Marbonite,walls set to 15overcmbaseheight coat and of risers
cement ofmortar
steps
Sqm 7.010 with
(1:8),soluble
12 mmsalt thick porcelain
over CC vitrified
bed already tileslaid
screenor RCCprinted
roof and slab,polished
including of 10181.20 7137
size
neat600
cement x 600 mm and
slurry thickness
of honey between 8-10
like consistency mm 1st
spread qualityper sqm
@ 3.3.kgs
conforming
& jointed neatly to IS:13711,
with white IS:13712,
cementIS:13630
paste to (Parts
full depth 1 tomixed
15) ofwith any colour
Plain
and
pigmentCement
finish Concrete
ofofmatching
make JhonsonM15&including
shade, grade
Jhonson, nominal ofmix
Kajaria,
cost (1:2.5:5)
allNitco,
materials proportion
Marbonite,
like cement,set
Cum 0.970 (cement:
over base fine
coat aggregate:
of CM (1:5)Coarse
12 mm aggregate)
thick with
sand water and tiles etc., complete, including seigniorage charges, using
cement 40mm, slurry 20mm,
of honey10mm like
etc., 6118.20 5935
size Hard for
consistency
complete Broken
spread Granite
finished the (IS383,
at item rate 1970)
of 3.30
of work, . kgsMachine
per sqmCrushedand jointed metal from
with
approved
white cement quarry pasteincluding
mixed with cost pigment
and conveyanceof matching of allshade
materials to fulllike
depth,
Providing
cement,
includingsand, impervious
cost coarse coat to exposed
aggregate,
of all materials like tiles,RCC
water etc. roof
to
cement, slab
site,
sand surface
including
and water withetc.,
seigniorage
Sqm 118.130 CM(1:3),
charges,
completesales 20mm
including& thick
other with
taxes1kg
seigniorage on ofall water proof
materials,
charges, compound
etc., all operational,
complete forper bag ofitem
incidental
finished 5234.75 61838
cement
and labour
of work, laidcharges
over roof suchwhen it is green
as mixing including
concrete cost of all
in Concrete materials,
Mixer, laying,
seigniorage
curing concrete, charges,etc.,excluding
complete conveyance
for finished chargesitem of work of materials
(APSS No. and402)
Electrification
including all operational, incidental and labour charges for mixing
mortar,
Supply and laying,fixingrendering
of ISI mark smooth25mm and thread
dia 2.2mm lining,
thickcuring,
PVC conduit rounding pipeoff
junctions
Sudhakar of wall and slab
/ Macoplast etc,, complete
/ Modimake for finished
concealed in roofitem slab of withwork all
Rmt 24.850 86.40 2147
required acessories including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary , including necessary
Supply
masonery andwork fixingfor oflight/fan
ISI mark pointand
25mm diaseperate 1.8mm thick PVC conduit
plug point with teak pipe
Rmt 44.200 Sudhakar
wood deep/ box Macoplast
including / Modi
cost make concealed in
and conveyance of wall with all required
all materials to site and 96.40 4261
acessories
labour charges, includingsalesNo.14
tax etc., SWG GI wirefor
complete forfinished
earth continuity
item of work. including
chiseling the wall wherever necessary , including necessary masonery
Supplying and wiring
work for light/fan with 2seperate
pointand runs of 14/0.3m
plug point (1.00
withSq.mm)teak wood FRLS /
deep
No.s 24.000 HFFR P.V.C. insulated
box including cost andISI Copper Cable
conveyance of allGM/L&T/RPG/Havells/V-
materials to site and labour 546.30 13111
Guard/Power
charges, sales tax Flex/Polycab/Gold
etc., complete for Medal/
finished Standard
item of /Milion/
work. Vimal/
Suncab/ Paragaon/FortuneArt make in the existing metallic / non-
Supply
metallicand fixing pipe
conduct of 6Awith3/2 6A pin1flush
Waytype flushsocket with 6ACeiling
type switch, switchrose control
and
No.s 7.000 of
3mmAnchor
thick/hylamGold medal sheet olive
covering / Million
to switchzoomcontrol
make with ISI mark on
box including costa 141.39 990
common
and conveyanceswitch board with earth
of all materials tocontinuity
site, labourincluding
charges wire and salesleads,tax earth
etc.
connections
complete for includingfinished item costof andwork conveyance of allfan
for light, bell, materials
and exhaust to site,fan
Supply
labour
points in and
charges fixing of batten
and sales tax
Non-Residential holder / slanting holder
etc. complete for finished item of work
Buildings Anchor / Gold medal
No.s 10.000 olive / Million zoom make with ISI mark in lieu of ceiling rose of light 118.80 1188
point with 40W bulb all connections including cost and conveyance of
all materials to site, labour charges and sales tax etc., complete for
Supply
finishedand item transportation
of work. of 20W, 2000 lumens, T8,1200mm length
No.s 7.000 LED tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge 1033.80 7237
protection: 2KV,THD<125%, with inbuilt driver and frosted cover CCT:
3000K - 5700K, minimum CRI≥80,.etc., complete Manufacture has to
Providing
submit LM79,LM80independent earthing for main
& Photobiological switches
Safety Report. integrated
Luminaire circuit
No.s 1.000 cutouts
Performanceand moters Complies withto40mmIS10322 dia(Part
Medium 5/Sec grade
3) &GI IECPipe of
60598-1,IEC 4381.56 4382
TATA/Zenith/GST
60529 ISO certifiedmake company.of 2.5LUMINAIRE
m length duly providing
MAKE: Phillips 12mm/ OSRAM dia 16/ GE
Nos. holes and
/ Crompton / VINrewired
/ Bajaj bolts, nuts and
/ Havells washers,
/ Halonix checknuts,
/ HPL. LED MAKE Humepipe
: PHILIPS
Supply
ring 18 and
LUMILEDS inches /fixing
dia,42/way
CREE inch
NICHIASPN
thick/Distribution
etc., as per
OSRAM board with
IS specifications
/ SAMSUNG / LG IP-20
LEDs protection of
with
No.s 1.000 make Standard
necessary double / Havells
GI earth/ wireHPL/Toyoma/
NO. 8 SWGCinclkuding&S suitable for single
filling phase
with equal 4049.81 4050
40A Double pole
preparation of saltIsolator as incomer
and charcoal and 10KA-6-32A
in layers including cost range
and single pole
conveyance
miniature circuit breakers four numbers (4Nos)
of all materials to site, labour charges and sales tax etc., complete for as out going with
Supply
finishedand
internal run of of
connections
item 2 ofincluding
work. 36/0.3mm cost(2.5andsqmm)
conveyanceFRLS /ofHFFR PVC to
all materials
Rmt 39.500 insulated
site, labour ISIcharges
Copperfor cable
surfaceof makes
/ flushPolycab
mounting / Havells
etc., sales / Goldtax medal
complete 81.89 3235
/Fortune
for finished artitem/L&T/ HPL in existing metallic / non-metallic conduit pipe
of work.
for mains including cost and conveyance of all materials to site, labour
Supply
chargesand anderrecting
sales tax of energy
etc., completeefficient fan, 1200
for finished mmofsweep,
item work. aluminium
Each 6.000 body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less 3445.72 20674
Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm
long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding,
Supply and transportation
Power Factor greater than 0.90, of 30W. LED Value
Service Street(CMMAV)
light Bodygreater made ofthan high
Each 1.000 grade
8.5, Airpressure
deliverydie – cast Aluminium
minimum 235 CMM, alloy 350 RPM(with corrosion
tolerance as resistant
per IS:374- 3846.93 3847
powder
2019), THD coat,less having
thanprotective
10%. withtoughened remote or glass compatiblecover, to Less Glare, IPstep
electronic 66
(Silicon gasket unit
type regulator ensures Optical
for speed & Electrical
control and allcompartments
remaining accessories are IP 66)
Water
protected,Supply wide and Sanitary
operating Arrangements
voltage range,
including safety pin, nut bolts, washers, temperature rise=75 degreeP.F > 0.90, System having
efficacy
C(max), >100
Providing insulation lumens/watt,
& Placing resistance
of RCC water with
more Ingress
than 2protection
storage megaonohm,
tank RoofIP66, Potted
suitable
slab fordriver,
alround 230V,
Driver
50mm surge
50 HZ, single
thick and protection
phase base AC100mm>10KV,thick
supply, THD<15%,
earthingwithetc., CCT: 3000-
including
suitable locking 6500K
all standardas desired
arrangement &
Litre 1360.000 by the department
accessories and
etc., complete. as per IS, CRI>70, Inbuilt Electrical protections 8.00 10880
making necessary holes forMakesinlet &: Atomberg
outlets and(Efficioover flow ) / Havells
pipes but / Orient
like Over voltage,
without fittings short circuit, Over load, Open Circuit, Miswiring, etc
complete
S&F premium withmake BIS certification
CPVC Pipeswith 5 years warranty.
of 15.90mm OD Pipe - The SDR contractor
13.5
must furnish
including costthe and manufacturer
conveyance of warranty letter,and
all materials LMlabour
79 andcharges LM 80 ,
Rmt 5.700 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / for 147.70 842
Overheads & Contractors profit complete for finished item of work
CROMPTON
all floors. / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec /
HAVELLS
S&F 110 mm / POLYCAB
dia 3 M Single/ SURYA / SYSKA
Socket PVC/SWR / Capart pipe- / Fortune
4 Kg/sq.cm Arrtincluding
/ FIEM /
Panasonic / Arraystorm
cost and conveyance / GM
of all / Goldmedal
materials and labour charges , Overheads &
Rmt 2.300 181.41 417
Contractors profit complete for finished item of work for all floors.
Supply and Fixing European Water Closet of 1st quality conforming to
Rmt 2.000 IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make white 4390.10 8780
glazed with 'S' trap including cost of plastic sheet and lid for European
Water Closet with rubber or plastic buffers as per IS:2548-1996 and PVC
Supplying & Fixing
low level single of10
flush 12.70 mm
litere brass body
capacity systemCP with
finishinternal
bib tap components
of not less
Each 4.000 than 300 grams
and short bend ofweight
makescrew type (full
Parryware slim turn) with internal
line including / external
cost and 257.95 1032
threaded
conveyance connection conforming
of all materials to site,tolabour
IS 8931 including
charges cost and
for fixing etc.,
conveyance
complete foroffinished
all materials
item oftowork.
site, all
forlabour charges, sales and other
all floors
S&F
taxespremium make CPVC
on all materials Pipes of 28.60mm
etc., complete for finishedOD item
Pipe of
- SDR
work13.5
for All
Rmt 67.100 including
Floors. cost and conveyance of all materials and labour charges , 223.82 15018
Overheads & Contractors profit complete for finished item of work for
all floors.
Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand
Each 2.000 Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556- 2114.40 4229
Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979
Supply
and fittedandwith
Fixing of 3'-0"
15 mm dia RCC
nominal boreReadymade Rings 50mm
single Chromium Platedthick 0.30m
Pillar Tap
Each 19.000 height including
of 1st quality costmake
Indian and conveyance of all materials
400 grams Seiko/ and labourorcharges 700.00
Esso/Nice/Senior 13300
etc., complete
equivalent complete with standard CI brackets including wooden block,
12.7mm PVC connection with Brass union nut CP coated, 12.7mm dia
first qualifty NP angle stop cock, 38.1mm CP waste coupling , 31.75mm
dia PVC flexible waste pipe of 914.4mm length of first quality including
cost and conveyance of all materials to site, all labour charges, sales and
Supply and Fixing of 3'-0" dia RCC Readymade Top Cover 50mm thick
Each 3.000 including cost and conveyance of all materials and labour charges etc., 800.00 2400
complete

1674198
Quantity since
executed for Item of work, of supplies granted under "sub-head" and previous bill
Unit supplied upto Rate Upto date total for Remarks
date as per sub work of estimate each
measurement subhead

I
Earth work excavation for foundations and depositing on bank for all
Cum 56.810 lifts and with an initial lead of 10m including all operational, incidental, 384.65 21852
seigniorage charges, labour charges such as shoring ,sheeting, planking,
strutting, dewatering etc. complete for finished item of work as per SS -
Plain Cement
20 B (APSS Concrete
308). (1:5:10)
for Building proportion (cement: fine aggregate:
Foundation
Cum 14.130 Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) 4900.05 69238
machine crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
Filling withmixing
etc. to site, useful available
concrete in excavated
concreteearth
mixer(excluding
including rock) in
seigniorage
Cum 27.870 trenches, sides&ofother
charges, sales foundations
taxes onand basement all
all materials, with initial leadincidental,
operational, in layers 34.15 952
not
and exceeding 15 cmsuch
labour charges thick,
as consolidating each deposited
laying and ramming concretelayer by in
in layers
watering
position notandexceeding
ramming 15cm,including cost and
finishing topconveyance of water
surface, curing to work
concrete, etc.,
Filling
site with
and allfor
complete Gravel in
operational, trenches,
finished item sides
incidental, of
of worklabour foundations
(APSScharges, and
No. 402)hire basement Twith
charges ofCourse
for Levelling &P
Cum 131.390 initial
etc., lead in
completeBed
and Flooring layers not exceeding 15cm thick, consolidating
for finished item of work. APSS No.309 & 310 each 292.05 38372
deposited layer by watering and ramming including all operational,
incidental, labour charges, seignorage charges, hire charges of T & P etc.,
Vibrated
completeReinforced
for finishedCement
item of Concrete
work. APSS M20 Grade&Nominal
No.309 310 Mix
corresponding to IS 456 using 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand)
Cum 6.310 FOOTINGS
coarse aggregate, water etc., to site and including Seigniorage charges, 10268.10 64792
sales
COLUMNS& other taxes on all materials including all operational, incidental
Cum 3.670 and labour charges such as machine mixing, laying concrete, curing 12647.20 46415
Cum 5.120 PLINTH BEAMbut excluding cost of steel and its fabrication charges for
etc.,complete 12906.25 66080
finished
LINTELSitem of work (APSS No. 402) including centering, shuttering,
Cum 0.630 laying concrete, vibrating, curing etc 12178.70 7673
Sqm 7.020 SUNSHADES 934.55 6561
Cum 5.190 ROOF BEAMS 11326.40 58784
Sqm 118.130 ROOF SLAB 115MM 1295.60 153049
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
MT 3.054 grade as per IS 1786-1979) of different diameters for RCC works, 81489.60 248869
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
Ceiling
materials Plastering
and sizewith CM(1:3)
and tying andProp: 12mmwith
lapsplicing thickbinding
in single wirecoatofspong
18
Sqm 108.460 finish
SWG, forming including costfor
grills and conveyance of
reinforcement all materials
work as per approved like cement, designs sand,and 2000.30 21695
water
drawings, etc.,including
to site, including
cost andseigniorage
conveyancecharges, of steel sales
bars, & other taxes
including all on
all materials,
wastages suchallasoperational,
overlaps, couplings,incidentalchairs, charges and labour
spacer chargescost
bars including such
Plastering
as
andmixing
conveyance to even
mortar, surfaces
offinishing,
binding wire, of wall
curing, with CM(1:4)
etc.,blocks
cover complete and Prop:
for 12mm thick
all finished
incidental, item of in
Sqm 269.300 single
work.
operational, coat including
(APSS 901,906)
laour cost and
charges suchconveyance
as cutting, bending of all materials
placinglike cement,
in position, 1791.50 48245
sand, water etc.,sales
tying including to site,
andincluding
other taxes seigniorage charges,etc.,
on all materials sales & otherfor
complete
taxes
finished on item
all materials,
of work in allall
operational,
floors. (APSS incidental
No.126)charges of TATA, and labour
SAIL, VSP,
Plastering
charges
JINDAL & such to even
SHYAM as mixing surfaces
STEEL mortar,of wall with CM
finishing, (1:5) etc.,
curing, Prop: 16mm thick
complete for in
Sqm 136.530 single coat including
finished item of work. (APSS 901,906) cost and conveyance of all materials like cement, 2581.00 35238
sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour
Flooring
charges such withas Non-skid red or white
mixing mortar, full body
finishing, curing,Ceramic floor tilesfor
etc., complete of size
Sqm 7.250 300
finished x 300 itemmmofand work.thickness between 7-8 mm 1st quality conforming to
(APSS 901,906) 8655.40 6275
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs of makes Jhonson & Jhonson, Kajaria, Nitco and
Dadooing
Marbonite,toset walls
overwith baseglazed
coat of red or white
cement mortarfull body
(1:8),ceramic
12 mm wall thicktilesoverof
Sqm 20.730 size
CC bed 200already
x 300 mm laid/or245 RCC mm roof x 325
slab,mm and thickness
including neat cement 6 mmslurry 1st quality
of 5665.80 11745
conforming
honey like consistency to IS:13711,spread IS:13712, IS:13630
@ 3.3.kgs per (Parts
sqm &1jointed to 15) neatly
of any withcolour
and
white finish
cement in allpaste
shades anddepth
to full designs, mixed anywithbrand as approved
pigment by Engineer
of matching shade,
Painting
-including
in - charge tocost
New
andof External
set over aWalls
all materials base with
likecoat two
of
cement, CM coats
(1:5),
sand ofwater
Plastic
12mm Emulsion
thick
and tilesandetc., paint
neat
Sqm 155.620 of Asianpaste
cement
complete, / Berger at the
including / Nerolac
rate of 3.3
seigniorage / Saicoat
Kg/Sqmt.
charges,/ Endocem
and
etc.,jointedor equalent
complete withforwhite quality
finished cement of
item 1908.20 29695
approved
paste
of work. mixed brandwithand shadeof
pigment asmatching
approvedshade by theincluding
Engineercost - inand- Charge
over
conveyancebase coat of cement
of all materials primer water base
like cement, sand,gradewater, -IItiles,
exterioretc. making
to site,
Painting
three
seignioragecoats to new
in allinternal
charges, to givesales walls
an even
and withshade
other two (2)on
after
taxes coats of ready
thoroughly
all materials, mixed
and alloil
brushing the
Sqm 311.740 bound
surface
opertional, washable
to remove
incidentaldistemper
all loose
and all acrylic
powdered base
labour charges of approved
materials, suchincluding brand
as mixingcost and shade
and
of cement 1238.15 38598
over
conveyancea base coat
of all of cement
materials, primer
including watercost
mortar, laying in position, curing, lift charges etc., complete for finished base
and interior
conveyance Grade-I of of
all
approved
materials,
item of work brand,
cost inof allmakind
floors three
brushes, water (3)tocoats in allsales
site, etc., to give an even
& other taxes,shade all after
Supplying
thourughly
operational, &brushing
fixing of the
incidental 1.05x
and 2.13
surface
labour Mts. (Double
tocharges
remove allLeaf)
such dirt Door
and framecharges,
remains
as scaffolding made
of loose of
Each 4.000 roll formedmaterials,
powdered
lift charges, section
curing etc., ofincluding
1.25 mm cost
complete thick
forandCRCA section,
conveyance
finished item of size
of should
all
work in allbe
materials 50tox
floors 6875.00 27500
75
for mm
work with
site
external and 32allmm rebate.
operational,
Walls.(APSS No.The corner oflabour
incidental,
911) the framecharges shouldetc.,be welded.
complete
The frame should
for finished item ofbework painted in allwithfloorsonefor coat of primer
internal walls and(SSfinished
911)
Providing
painted with andpurefixing 30mm thick
polyester paint.SolidThe panel
framePVC should door beshutter
provided consisting
with
Sqm 2.700 of frame made
approved quality outM.S.Powder
of M.S. tubes of 19 butt
coated gauge thickness
hinges IS 205 and size oflong
125mm 19mm of 6 2480.00 6696
xNos.
19mm along forwithstiles, & 15mm
Double flush x 15mm for top &
door shutters bottom
solid bondrails. wood M.S.
blockframe board
shall
type withhavecommercial
a coat of steel plyprimers
on bothoffaces approved
of 30mm make thickandincluding
manufacture.
Supplying
M.S.
fixturesframe suchand asfixing
shall Mild of
be covered Unplasticised
Steel with
"Z" type 5mm HoldPoly
thick Vinyl
Fasts heat Chloride
molded
6 Nos., (UPVC)
PVC
M.S.Powder 3coated
track
‘C’ channel
Sqm 8.640 sliding
of
tower windows
size bolts
30 x 50mm with
I.S. 204,forming mesh
300 mm shutter
stiles,
longand provision
and5mm 10mm –
thick,
BOLT(only
75mm 2-glass
wideshutters)
dia 2Nos, PVC 6921.00 59797
duly
sheets manufactured
M.S.Powder for top rail, lock
coated using rail
handles UPVC
&ISbottomreinforced
208 125mmrail onprofiles
either
long 4No, (Composition
side, and 10mm
M.S.Powder ofcoated
profile
Aldropxshall
(5mm IS2)2681 consists
thick, 20mm
300mm a minimum
wide1No.,
long cross ofM.S.Powder
5.5 PHR
PVC sheet ofasTiO2
gapand
coated insert
Doornotfor moretop than
Stoper rail
2No., &
Supply
12 PHR
bottom
sales and and
of
rail. fixing
CaCo3
Paneling
other of
for
taxesofM.S.Grill
every5mm
cost 100 of
andthick size
parts with
of PVC
PVC sheet
conveyance outer angular
resin)
to be
of all of (80frame
mm
fitted intothe
materials xof52rolled
M.S.
site, mm) /
all
Sqm 10.440 steel
(94
frame mm equal x
welded 45 angle
mm)
/ ofx
sealed ISA
2.20 2525
to mm
the of
for size
stiles outer
& 25mmframes,
rails
labour cahrges such as making of door frame, fixing in position,fixing of x
with25mm
(54
30mm mmx 4mm
x
wide38 welded
xmm)/(39
5mm with
thick 1623.00 16944
safety
mm
PVC
shutters, bars
xsheet
58 mm) of 10mm
&beading
hardx 2.20 onsquare
ware mmeitherforrods
fixtures, sliding
side, at
and150mm
shutter centre
joinedframes
etc.,complete together to centre
capable
for finished withitem ofhorizontally
mounting
solventof work.
and
The verticlally
single
cement glazing
frame adhesive
shouldincluding
system,etc. An
be embeddedred oxide
structurally
additional primer
to reinforced
a5mm
depth of
ofgrade-I
thick with
PVChot
40mm quality,
strip
in dip
the sales and
ofgalvanized
20mm
flooring. width up
Brick
other
to 50be
is to Masonry
taxes,
stuckcost
microns onofinthe
superstructure
and
minimumconveyance
interior side with
thickness of allofCM
of the 1.0(1:6)
‘C’ / 1.2prop
materials
Channel to using
mm with
site, all Flyash
labour
prefabricated
PVC Cement
solvent &
Cum 41.490 solid
charges
welded
adhesive.blocksand
through of
Completesize
fixing 290
in
fusion x 225
asposition
welding.
per xetc.,
direction140
The mm,
complete
window
of for manufacturing
for
sashfinished
Engineer-in-charge, shall be item of of
fittedflyash
work.
with 5 6882.05 285536
solid
mm blocks
thick
manufacturer’s clearusingfloatflyash
glassofof80
specification &kgs,
reputed cement
drawing make forofduly15 fixed
finishedkgs.itemGypsum
withofGrey of colour
work 5 kgs.
and
TPV stone
Gasketdust for with
sash a&compresive
Glazing beadstrength shall benot lessthan 50
co-extruded withkg/sqm
Grey
Manufacturing,
including
colour softcost PVC. andSupply, delivery
conveyance
System shall have ofand
all fixing
materials,
single of plain
point labour
lockingMScharges,
sheet
with Touch door ofLock size
Each 1.000 1.80 x
seiniorage 2.13
and the system with
charges, frame made
is toscaffolding
be installedandof L Angular
curing
at the section
siteetc.,
usingfor of 35 X 35
Superstructure
anchor X
fasteners, 5mmWalls. and 8614.00 8614
inner
siliconframerubber of sealant,
double leave shutters/ with
easy glazing deglazingMS "L"angle
at site etc.,of 25 X 25 X 4mm
including cost
welded
and conveyancewith 2 nos of ofall25 X 25 X4 accessories,
materials, angle and 3 labour No.s of charges
30x4mmfor each leaf
Providing
and welded Drip
with mouldpowder of size
coated25x12mm fixtures
transportation, erection at site complete for finished item of work. with CM(1:3)
including red prop.
oxide Including
paint
Rmt 20.100 cost and conveyance
including cost and conveyance of all materials and labourand
of all materials charges
labouretc., to etc.,
charges 68.48 1376
complete.
complete for finished item of work.
Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to
Sqm 6.850 IS 456 using 20mm size graded machine crushed hard granite metal 843.05 5775
(coarse aggregate) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate,
Providing
water etc.,Drip to site mould of size 25x12mm
and including Seigniorage withcharges,
CM(1:3)sales prop.&Including
other taxes
Rmt 80.900 cost
on alland conveyance
materials includingof allallmaterials
operational, and labour
incidental charges and etc.,
labour to charges 138.75 11225
complete.
such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of
Flooring
work (APSS with No.soluble salt porcelain
402) including vitrified
centering, tiles screen
shuttering, printed
laying and
concrete,
Sqm 77.880 polished
curing etc. ofcomplete
size 600 xfor 600 mm and
Shelves thickness
of 50mm thickbetween 8-10 mm 1st 10230.70 79677
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs of make Jhonson &
Providing SkirtingNitco,
Jhonson, Kajaria, to internal
Marbonite,walls set to 15overcmbaseheight coat and of risers
cement ofmortar
steps
Sqm 7.010 with
(1:8),soluble
12 mmsalt thick porcelain
over CC vitrified
bed already tileslaid
screenor RCCprinted
roof and slab,polished
including of 10181.20 7137
size
neat600
cement x 600 mm and
slurry thickness
of honey between 8-10
like consistency mm 1st
spread qualityper sqm
@ 3.3.kgs
conforming
& jointed neatly to IS:13711,
with white IS:13712,
cementIS:13630
paste to (Parts
full depth 1 tomixed
15) ofwith any colour
Plain
and
pigmentCement
finish Concrete
ofofmatching
make JhonsonM15&including
shade, grade
Jhonson, nominal ofmix
Kajaria,
cost (1:2.5:5)
allNitco,
materials proportion
Marbonite,
like cement,set
Cum 0.970 (cement:
over base fine
coat aggregate:
of CM (1:5)Coarse
12 mm aggregate)
thick with
sand water and tiles etc., complete, including seigniorage charges, using
cement 40mm, slurry 20mm,
of honey10mm like
etc., 6118.20 5935
size Hard for
consistency
complete Broken
spread Granite
finished the (IS383,
at item rate 1970)
of 3.30
of work, . kgsMachine
per sqmCrushedand jointed metal from
with
approved
white cement quarry pasteincluding
mixed with cost pigment
and conveyanceof matching of allshade
materials to fulllike
depth,
Providing
cement,
includingsand, impervious
cost coarse coat to exposed
aggregate,
of all materials like tiles,RCC
water etc. roof
to
cement, slab
site,
sand surface
including
and water withetc.,
seigniorage
Sqm 118.130 CM(1:3),
charges,
completesales 20mm
including& thick
other with
taxes1kg
seigniorage on ofall water proof
materials,
charges, compound
etc., all operational,
complete forper bag ofitem
incidental
finished 5234.75 61838
cement
and labour
of work, laidcharges
over roof suchwhen it is green
as mixing including
concrete cost of all
in Concrete materials,
Mixer, laying,
seigniorage
curing concrete, charges,etc.,excluding
complete conveyance
for finished chargesitem of work of materials
(APSS No. and402)
Electrification
including all operational, incidental and labour charges for mixing
mortar,
Supply and laying,fixingrendering
of ISI mark smooth25mm and thread
dia 2.2mm lining,
thickcuring,
PVC conduit rounding pipeoff
junctions
Sudhakar of wall and slab
/ Macoplast etc,, complete
/ Modimake for finished
concealed in roofitem slab of withwork all
Rmt 24.850 86.40 2147
required acessories including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary , including necessary
Supply
masonery andwork fixingfor oflight/fan
ISI mark pointand
25mm diaseperate 1.8mm thick PVC conduit
plug point with teak pipe
Rmt 44.200 Sudhakar
wood deep/ box Macoplast
including / Modi
cost make concealed in
and conveyance of wall with all required
all materials to site and 96.40 4261
acessories
labour charges, includingsalesNo.14
tax etc., SWG GI wirefor
complete forfinished
earth continuity
item of work. including
chiseling the wall wherever necessary , including necessary masonery
Supplying and wiring
work for light/fan with 2seperate
pointand runs of 14/0.3m
plug point (1.00
withSq.mm)teak wood FRLS /
deep
No.s 24.000 HFFR P.V.C. insulated
box including cost andISI Copper Cable
conveyance of allGM/L&T/RPG/Havells/V-
materials to site and labour 546.30 13111
Guard/Power
charges, sales tax Flex/Polycab/Gold
etc., complete for Medal/
finished Standard
item of /Milion/
work. Vimal/
Suncab/ Paragaon/FortuneArt make in the existing metallic / non-
Supply
metallicand fixing pipe
conduct of 6Awith3/2 6A pin1flush
Waytype flushsocket with 6ACeiling
type switch, switchrose control
and
No.s 7.000 of
3mmAnchor
thick/hylamGold medal sheet olive
covering / Million
to switchzoomcontrol
make with ISI mark on
box including costa 141.39 990
common
and conveyanceswitch board with earth
of all materials tocontinuity
site, labourincluding
charges wire and salesleads,tax earth
etc.
connections
complete for includingfinished item costof andwork conveyance of allfan
for light, bell, materials
and exhaust to site,fan
Supply
labour
points in and
charges fixing of batten
and sales tax
Non-Residential holder / slanting holder
etc. complete for finished item of work
Buildings Anchor / Gold medal
No.s 10.000 olive / Million zoom make with ISI mark in lieu of ceiling rose of light 118.80 1188
point with 40W bulb all connections including cost and conveyance of
all materials to site, labour charges and sales tax etc., complete for
Supply
finishedand item transportation
of work. of 20W, 2000 lumens, T8,1200mm length
No.s 7.000 LED tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge 1033.80 7237
protection: 2KV,THD<125%, with inbuilt driver and frosted cover CCT:
3000K - 5700K, minimum CRI≥80,.etc., complete Manufacture has to
Providing
submit LM79,LM80independent earthing for main
& Photobiological switches
Safety Report. integrated
Luminaire circuit
No.s 1.000 cutouts
Performanceand moters Complies withto40mmIS10322 dia(Part
Medium 5/Sec grade
3) &GI IECPipe of
60598-1,IEC 4381.56 4382
TATA/Zenith/GST
60529 ISO certifiedmake company.of 2.5LUMINAIRE
m length duly providing
MAKE: Phillips 12mm/ OSRAM dia 16/ GE
Nos. holes and
/ Crompton / VINrewired
/ Bajaj bolts, nuts and
/ Havells washers,
/ Halonix checknuts,
/ HPL. LED MAKE Humepipe
: PHILIPS
Supply
ring 18 and
LUMILEDS inches /fixing
dia,42/way
CREE inch
NICHIASPN
thick/Distribution
etc., as per
OSRAM board with
IS specifications
/ SAMSUNG / LG IP-20
LEDs protection of
with
No.s 1.000 make Standard
necessary double / Havells
GI earth/ wireHPL/Toyoma/
NO. 8 SWGCinclkuding&S suitable for single
filling phase
with equal 4049.81 4050
40A Double pole
preparation of saltIsolator as incomer
and charcoal and 10KA-6-32A
in layers including cost range
and single pole
conveyance
miniature circuit breakers four numbers (4Nos)
of all materials to site, labour charges and sales tax etc., complete for as out going with
Supply
finishedand
internal run of of
connections
item 2 ofincluding
work. 36/0.3mm cost(2.5andsqmm)
conveyanceFRLS /ofHFFR PVC to
all materials
Rmt 39.500 insulated
site, labour ISIcharges
Copperfor cable
surfaceof makes
/ flushPolycab
mounting / Havells
etc., sales / Goldtax medal
complete 81.89 3235
/Fortune
for finished artitem/L&T/ HPL in existing metallic / non-metallic conduit pipe
of work.
for mains including cost and conveyance of all materials to site, labour
Supply
chargesand anderrecting
sales tax of energy
etc., completeefficient fan, 1200
for finished mmofsweep,
item work. aluminium
Each 6.000 body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less 3445.72 20674
Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm
long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding,
Supply and transportation
Power Factor greater than 0.90, of 30W. LED Value
Service Street(CMMAV)
light Bodygreater made ofthan high
Each 1.000 grade
8.5, Airpressure
deliverydie – cast Aluminium
minimum 235 CMM, alloy 350 RPM(with corrosion
tolerance as resistant
per IS:374- 3846.93 3847
powder
2019), THD coat,less having
thanprotective
10%. withtoughened remote or glass compatiblecover, to Less Glare, IPstep
electronic 66
(Silicon gasket unit
type regulator ensures Optical
for speed & Electrical
control and allcompartments
remaining accessories are IP 66)
Water
protected,Supply wide and Sanitary
operating Arrangements
voltage range,
including safety pin, nut bolts, washers, temperature rise=75 degreeP.F > 0.90, System having
efficacy
C(max), >100
Providing insulation lumens/watt,
& Placing resistance
of RCC water with
more Ingress
than 2protection
storage megaonohm,
tank RoofIP66, Potted
suitable
slab fordriver,
alround 230V,
Driver
50mm surge
50 HZ, single
thick and protection
phase base AC100mm>10KV,thick
supply, THD<15%,
earthingwithetc., CCT: 3000-
including
suitable locking 6500K
all standardas desired
arrangement &
Litre 1360.000 by the department
accessories and
etc., complete. as per IS, CRI>70, Inbuilt Electrical protections 8.00 10880
making necessary holes forMakesinlet &: Atomberg
outlets and(Efficioover flow ) / Havells
pipes but / Orient
like Over voltage,
without fittings short circuit, Over load, Open Circuit, Miswiring, etc
complete
S&F premium withmake BIS certification
CPVC Pipeswith 5 years warranty.
of 15.90mm OD Pipe - The SDR contractor
13.5
must furnish
including costthe and manufacturer
conveyance of warranty letter,and
all materials LMlabour
79 andcharges LM 80 ,
Rmt 5.700 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / for 147.70 842
Overheads & Contractors profit complete for finished item of work
CROMPTON
all floors. / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec /
HAVELLS
S&F 110 mm / POLYCAB
dia 3 M Single/ SURYA / SYSKA
Socket PVC/SWR / Capart pipe- / Fortune
4 Kg/sq.cm Arrtincluding
/ FIEM /
Panasonic / Arraystorm
cost and conveyance / GM
of all / Goldmedal
materials and labour charges , Overheads &
Rmt 2.300 181.41 417
Contractors profit complete for finished item of work for all floors.
Supply and Fixing European Water Closet of 1st quality conforming to
Rmt 2.000 IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make white 4390.10 8780
glazed with 'S' trap including cost of plastic sheet and lid for European
Water Closet with rubber or plastic buffers as per IS:2548-1996 and PVC
Supplying & Fixing
low level single of10
flush 12.70 mm
litere brass body
capacity systemCP with
finishinternal
bib tap components
of not less
Each 4.000 than 300 grams
and short bend ofweight
makescrew type (full
Parryware slim turn) with internal
line including / external
cost and 257.95 1032
threaded
conveyance connection conforming
of all materials to site,tolabour
IS 8931 including
charges cost and
for fixing etc.,
conveyance
complete foroffinished
all materials
item oftowork.
site, all
forlabour charges, sales and other
all floors
S&F
taxespremium make CPVC
on all materials Pipes of 28.60mm
etc., complete for finishedOD item
Pipe of
- SDR
work13.5
for All
Rmt 67.100 including
Floors. cost and conveyance of all materials and labour charges , 223.82 15018
Overheads & Contractors profit complete for finished item of work for
all floors.
Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand
Each 2.000 Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556- 2114.40 4229
Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979
Supply
and fittedandwith
Fixing of 3'-0"
15 mm dia RCC
nominal boreReadymade Rings 50mm
single Chromium Platedthick 0.30m
Pillar Tap
Each 19.000 height including
of 1st quality costmake
Indian and conveyance of all materials
400 grams Seiko/ and labourorcharges 700.00
Esso/Nice/Senior 13300
etc., complete
equivalent complete with standard CI brackets including wooden block,
12.7mm PVC connection with Brass union nut CP coated, 12.7mm dia
first qualifty NP angle stop cock, 38.1mm CP waste coupling , 31.75mm
dia PVC flexible waste pipe of 914.4mm length of first quality including
cost and conveyance of all materials to site, all labour charges, sales and
Supply and Fixing of 3'-0" dia RCC Readymade Top Cover 50mm thick
Each 3.000 including cost and conveyance of all materials and labour charges etc., 800.00 2400
complete