Académique Documents
Professionnel Documents
Culture Documents
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
PCC Cement/Steel/
Earth/Sand/ Rubble/Size
Slabs/Shabad RCC poles/A.C
Gravel/ Stone/ Cut
Bricks per 1000 Slabs/CC & & G.I Sheets
Murrum Stone/ Coarse
Sl.No
Accordingly the Detailed estimate is prepared to the extent of amount sanctioned vide Procgs.Rc.No.L1/1773/2017
Dated 25.01.2021 of the Commissioner of Tribal Welfare TS, Hyderabad
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all
1 operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering
etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken
2 Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming
Filling
concretewith usefulinavailable
in layers positionexcavated earth15cm,
not exceeding (excluding rock)top
finishing in surface,
trenches,curing
sides concrete,
of foundations
etc., and basement
complete with
for finished
3 initial
item oflead in (APSS
work layers not
No.exceeding 15 cm thick,
402) for Levelling consolidating
Course and Flooringeach deposited layer by watering and ramming including
Bed
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. APSS No.309 & 310
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick,
4 consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded
5 machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges,
sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
Providing High Yield
laying concrete, curingStrength Deformed
etc.,complete (HYSD) steel
but excluding cost bars (Feand
of steel 500its
grade as per IS
fabrication 1786-1979)
charges of different
for finished diameters
item of work
6 for RCCNo.
(APSS works,
402) including
including labour charges
centering, for straightening,
shuttering, cutting,vibrating,
laying concrete, bending curing
to required
etc sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel
Brick Masonry all
bars, including in superstructure
wastages such with CM (1:8)
as overlaps, prop: using
couplings, second
chairs, class
spacer bricks
bars from approved
including source having
cost and conveyance of minimum
binding
7 crushing
wire, cover strength
blocksofand
40 all
Kg/Sqcm. including
incidental, cost and
operational, conveyance
laour charges suchof all
as materials like cement,
cutting, bending placingsand, bricks, water
in position, tyingetc.,
to site, including
including sales andseigniorage
other taxescharges, sales & other
on all materials taxes on all
etc., complete formaterials, all operational,
finished item of work in incidental and labour
all floors. (APSS charges
No.126) of
such
TATA, as mixing cement
SAIL, VSP, mortar,&constructing
JINDAL SHYAM STEEL masonry, scaffolding charges, lift charges, curing, etc., complete for
Ceiling
finishedPlastering with(APSS
item of work. CM(1:4) No.Prop:
501 & 12mm
504).thick in single
for panel coat
walls spongstructure
in super finish including cost and conveyance of all
8 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all
9 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick in single coat including cost and conveyance of
10 all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
The total estimated cost is Worked out to Rs 16.00 lakhs with current SOR 2020-21
An early sanction of estimate is solicited.
2 Electrification 3965.00
1371969.00
Total : 1600000.00
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Earth work excavation for foundations and depositing on bank
for all lifts and with an initial lead of 10m including all
operational, incidental, seigniorage charges, labour charges
such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS
308). for Building Foundation
EW Qty 26.24
Deduct PCC (1:5:10) -3.28
Footings -5.18
Pedestals -2.59
Columns -0.12
15.07 34.15 1 Cum 515.00
Page 43 of 144
4 Filling with Gravel in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15cm thick,
consolidating each deposited layer by watering and ramming
including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310
A FOOTINGS
1 X 12 1.20 1.20 0.30 5.18
5.18 10517.05 1 Cum 54478.00
B PEDESTALS
1 X 12 0.60 0.60 0.60 2.59
2.59 11141.90 1 Cum 28858.00
C COLUMNS
Upto GL 1 X 12 0.30 0.23 0.15 0.12
Above Plinth beam 1 X 12 0.30 0.23 3.35 2.77
2.89 12896.10 1 Cum 37270.00
D PLINTH BEAM
Long walls 1 X 3 12.80 0.23 0.30 2.65
Cross walls 1 X 4 7.77 0.23 0.30 2.14
Toilet 1 X 2 2.13 0.23 0.30 0.29
Deduct Columns 1 X 12 0.30 0.23 -0.30 -0.25
4.83 13155.20 1 Cum 63540.00
E LINTELS
Main Door 1 X 1 1.20 0.23 0.15 0.04
Inside Doors 1 X 5 1.05 0.23 0.15 0.18
Toilet Doors 1 X 2 0.75 0.23 0.15 0.05
Windows W1 1 X 4 1.20 0.23 0.15 0.17
W2 1 X 4 0.90 0.23 0.15 0.12
0.56 12427.60 1 Cum 6959.00
F SUNSHADES
Main Door 1 X 1 1.50 0.60 0.90
Back Door 1 X 1 1.20 0.60 0.72
Windows W1 1 X 4 1.50 0.60 3.60
Page 44 of 144
W2 1 X 4 1.20 0.60 2.88
8.10 950.10 1 Sqm 7696.00
G ROOF BEAMS
Long walls 1 X 3 12.80 0.23 0.30 2.65
Cross walls 1 X 4 7.77 0.23 0.30 2.14
4.79 11575.35 1 Cum 55446.00
H ROOF SLAB 115MM
1 X 1 13.40 8.37 112.16
112.16 1324.25 1 Sqm 148528.00
6 Providing High Yield Strength Deformed (HYSD) steel bars
(Fe 500 grade as per IS 1786-1979) of different diameters for
RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and
tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges
such as cutting, bending placing in position, tying including
sales and other taxes on all materials etc., complete for
finished item of work in all floors. (APSS No.126) of TATA,
SAIL, VSP, JINDAL & SHYAM STEEL
Page 45 of 144
38.88
45.76 7059.50 1 Cum 323043.00
8 Ceiling Plastering with CM(1:4) Prop: 12mm thick in single
coat spong finish including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Nurse Room
Long walls 1 X 2 3.05 3.00 18.30
Cross walls 1 X 2 4.65 3.00 27.90
Hall
Long walls 1 X 2 5.18 3.00 31.08
Cross walls 1 X 2 4.65 3.00 27.90
Passage
Long walls 1 X 1 1.85 3.00 5.55
Cross walls 1 X 2 2.36 3.00 14.16
Store
Long walls 1 X 1 3.66 3.00 10.98
Cross walls 1 X 2 2.29 3.00 13.74
Ward
Long walls 1 X 1 3.66 3.00 10.98
Cross walls 1 X 2 4.80 3.00 28.80
Lab
Long walls 1 X 1 3.10 3.00 9.30
Cross walls 1 X 2 2.44 3.00 14.64
Toilet 1
Long walls 1 X 1 1.45 3.00 4.35
Cross walls 1 X 2 2.44 3.00 14.64
Toilet 2
Page 46 of 144
Long walls 1 X 1 1.37 3.00 4.11
Cross walls 1 X 2 2.13 3.00 12.78
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Inside Doors 2 X 4 1.05 -2.10 -17.64
Back Door 1 X 1 1.05 -2.10 -2.21
Toilet Doors 2 X 2 0.75 -2.10 -6.30
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
207.40 1789.65 10 Sqm 37117.00
10 Plastering to even surfaces of wall with CM (1:5) Prop: 16mm
thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as
mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Page 47 of 144
12 Providing Skirting to internal walls and Risers of Steps to 15
cm height with Polished shabad / Tandur stone minimum 15
to 18 mm thick of size (0.254M x0.254M) length equal to
flooring stones, set over base coat of CM (1:3) 12 mm thick
with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointed with white cement paste
mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc., complete for
finished item of work
Page 48 of 144
15 Painting to New External Walls with two coats of Plastic
Emulsion paint of Asian / Berger / Nerolac / Saicoat /
Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of
cement primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly brushing
the surface to remove all loose powdered materials, including
cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site,
etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external
Walls.(APSS No. 911)
Nurse Room
Long walls 1 X 2 3.66 3.00 21.96
Cross walls 1 X 2 4.80 3.00 28.80
Hall
Long walls 1 X 2 3.10 3.00 18.60
Cross walls 1 X 2 2.44 3.00 14.64
Passage
Long walls 1 X 1 1.45 3.00 4.35
Cross walls 1 X 2 2.44 3.00 14.64
Store
Long walls 1 X 1 1.37 3.00 4.11
Cross walls 1 X 2 2.13 3.00 12.78
Ward
Long walls 1 X 1 1.50 3.00 4.50
Cross walls 1 X 2 0.60 3.00 3.60
Lab
Long walls 1 X 1 1.20 3.00 3.60
Cross walls 1 X 2 0.60 3.00 3.60
Page 49 of 144
Toilet 1
Long walls 1 X 1 1.50 3.00 4.50
Cross walls 1 X 2 0.60 3.00 3.60
Toilet 2
Long walls 1 X 1 1.20 3.00 3.60
Cross walls 1 X 2 0.60 3.00 3.60
Deduct Main Door 1 X 1 1.20 -2.10 -2.52
Inside Doors 2 X 4 1.05 -2.10 -17.64
Back Door 1 X 1 1.05 -2.10 -2.21
Toilet Doors 2 X 2 0.75 -2.10 -6.30
Windows W1 1 X 4 1.20 -1.35 -6.48
W2 1 X 4 0.90 -1.35 -4.86
Ventilators 1 X 10 0.60 -0.30 -1.80
Toilet 1 1 X 2 0.750 -1.50 -2.25
Toilet 2 1 X 2 1.200 -1.50 -3.60
102.82 1238.15 10 Sqm 12731.00
17 Supplying & fixing of 1.22x 2.13 Mts. (Double Leaf) Door
frame made of roll formed section of 1.25 mm thick CRCA
section, size should be 50 x 75 mm with 32 mm rebate. The
corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure
polyester paint. The frame should be provided with approved
quality M.S.Powder coated butt hinges IS 205 125mm long of
6 Nos. along with Double flush door shutters solid bond wood
block board type with commercial ply on both faces of 30mm
thick including fixtures such as Mild Steel "Z" type Hold Fasts
6 Nos., M.S.Powder coated tower bolts I.S. 204, 300 mm long
and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681
300mm long 1No., M.S.Powder coated Door Stoper 2No.,
sales and other taxes cost and conveyance of all materials to
site, all labour cahrges such as making of door frame, fixing
in position,fixing of shutters, & hard ware fixtures,
etc.,complete for finished item of work. The frame should be
embedded to a depth of 40mm in the flooring.
Page 50 of 144
18 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door
frame made of roll formed section of 1.25 mm thick CRCA
section, size should be 50 x 75 mm with 32 mm rebate. The
corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure
polyester paint. The frame should be provided with approved
quality M.S.Powder coated butt hinges IS 205 125mm long of
6 Nos. along with Double flush door shutters solid bond wood
block board type with commercial ply on both faces of 30mm
thick including fixtures such as Mild Steel "Z" type Hold Fasts
6 Nos., M.S.Powder coated tower bolts I.S. 204, 300 mm long
and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681
300mm long 1No., M.S.Powder coated Door Stoper 2No.,
sales and other taxes cost and conveyance of all materials to
site, all labour cahrges such as making of door frame, fixing
in position,fixing of shutters, & hard ware fixtures,
etc.,complete for finished item of work. The frame should be
embedded to a depth of 40mm in the flooring.
Page 51 of 144
20 Supplying and fixing of Unplasticised Poly Vinyl Chloride
(UPVC) 3 track sliding windows with mesh shutter provision –
(only 2-glass shutters) duly manufactured using UPVC
reinforced profiles (Composition of profile shall consists a
minimum of 5.5 PHR of TiO2 and not more than 12 PHR of
CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)
/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38
mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames
capable of mounting single glazing system, structurally
reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0 / 1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5
mm thick clear float glass of reputed make duly fixed with
Grey colour TPV Gasket for sash & Glazing bead shall be co-
extruded with Grey colour soft PVC. System shall have single
point locking with Touch Lock and the system is to be
installed at the site using anchor fasteners, silicon rubber
sealant, easy glazing / deglazing at site etc., including cost
and conveyance of all materials, accessories, labour charges
for transportation, erection at site complete for finished item of
work.
Page 52 of 144
21 Supply and fixing of M.S.Grill of size with outer angular frame
of rolled steel equal angle of ISA 2525 of size 25mm x 25mm
x 4mm welded with safety bars of 10mm square rods at
150mm centre to centre horizontally and verticlally including
red oxide primer of grade-I quality, sales and other taxes, cost
and conveyance of all materials to site, all labour charges
and fixing in position etc., complete for finished item of work.
Page 53 of 144
GOVERNMENT OF TELANGANA
TRIBAL WELFARE ENGINEERING DEPARTMENT
The work Construction of Sub Centre Building at Gummadivalli (V) of Aswaraopeta (M) in Bhadradri
Kothagudem Dist. was administratively sanctioned vide Proc.No.L1/1773/2017, Dt:25-01-2021 of Commissioner,
Tribal Welfare, Hyderabad for Rs:16.00 Lakhs under NHM Grant and technically sanctioned by the Superintending
Engineer, Tribal welfare, Warangal vide TS.No. 12 / 2020-21 of SE.TW.Wgl, Dt.03-04-2021 for Rs:16.00 Lakhs
The work was entrusted to Sri. Kalakoti Venkateswara Rao, Contractor, H.No.7-72/9 B, R/o, Aswaraopeta
(V) & (M) Bhadradri Kothagudem Dist. Agreement No & Date : 57 /2021-22, Dt.08-07-2021 Tender % : 17.90%
Less and the work was completed within stipulated period of 6 months.
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all
1 operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering
etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken
2 Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges,
sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming
Filling
concretewith usefulinavailable
in layers positionexcavated earth15cm,
not exceeding (excluding rock)top
finishing in surface,
trenches,curing
sides concrete,
of foundations
etc., and basement
complete with
for finished
3 initial
item oflead in (APSS
work layers not
No.exceeding 15 cm thick,
402) for Levelling consolidating
Course and Flooringeach deposited layer by watering and ramming including
Bed
cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. APSS No.309 & 310
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick,
4 consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges,
seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded
5 machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges,
sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
Providing High Yield
laying concrete, curingStrength Deformed
etc.,complete (HYSD) steel
but excluding cost bars (Feand
of steel 500itsgrade as per IS
fabrication 1786-1979)
charges of different
for finished diameters
item of work
6 for RCCNo.
(APSS works,
402) including
including labour charges
centering, for straightening,
shuttering, cutting,vibrating,
laying concrete, bending curing
to required
etc sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel
Brick Masonry all
bars, including in superstructure
wastages such with CM (1:8)
as overlaps, prop: using
couplings, second
chairs, class
spacer bricks
bars from approved
including source having
cost and conveyance of minimum
binding
7 crushing
wire, coverstrength
blocksofand40 all
Kg/Sqcm. including
incidental, cost and
operational, conveyance
laour charges suchof all
as materials like cement,
cutting, bending placingsand, bricks, water
in position, tyingetc.,
to site, including
including sales andseigniorage
other taxescharges, sales & other
on all materials taxes on all
etc., complete formaterials, all operational,
finished item of work in incidental and labour
all floors. (APSS charges
No.126) of
such
TATA, as mixing cement
SAIL, VSP, mortar,&constructing
JINDAL SHYAM STEEL masonry, scaffolding charges, lift charges, curing, etc., complete for
Plastering
finished itemto even surfaces
of work. (APSS of wall with&CM(1:5)
No. 501 504). forProp:
panel12mm
walls thick in single
in super coat including cost and conveyance of all
structure
8 materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Plastering to even surfaces of wall with CM (1:5) Prop: 16mm thick in single coat including cost and conveyance of
9 all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm
10 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and
designs of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm
thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @
3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
including
The Workdonecost ofestimate
all materials like cement,
is Worked sand
out to Rs water and tiles etc., complete, including seigniorage charges, etc.,
1600901.00
complete for finished item of work.
An early sanction of workdone estimate cum completion report is solicited.
Asst. Engineer Dy Executive. Engineer Executive Engineer
TWS: Dammapeta TWSD-Aswaraopeta TWED: Bhadrachalam
GENERAL ABSTRACT
2 Electrification 64738.00
1699702.00
1395455.00
Total : 1600901.00
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Earth work excavation for foundations and depositing on bank for
all lifts and with an initial lead of 10m including all operational,
incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building
Foundation
Page 60 of 144
2 Plain Cement Concrete (1:5:10) proportion (cement: fine
aggregate: Coarse aggregate) using 40mm size Hard Broken
Granite (IS383, 1970) machine crushed metal from approved
quarry including cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, mixing concrete in
concrete mixer including seigniorage charges, sales & other taxes
on all materials, all operational, incidental, and labour charges
such as laying and ramming concrete in layers in position not
exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work (APSS No. 402) for Levelling
Course and Flooring Bed
Page 61 of 144
Deduct PCC 1:5:10 -3.93
Footings -6.31
Columns -0.89
31-Jul-21 33.35
33.35 34.15 1 Cum 1139.00
4 Filling with Gravel in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15cm thick, consolidating
each deposited layer by watering and ramming including all
operational, incidental, labour charges, seignorage charges, hire
charges of T & P etc., complete for finished item of work. APSS
No.309 & 310
A FOOTINGS
Qty Vide Page No.5 of MB No.209/B/TW/19-20
F1 1 X 4 1.350 1.500 0.300 2.43
F2 1 X 4 1.200 1.350 0.300 1.94
F3 1 X 4 1.350 1.200 0.300 1.94
24-Jul-21 6.31
6.31 10517.05 1 Cum 66363.00
C COLUMNS
Qty Vide Page No.5 to 6 of MB No.209/B/TW/19-20
C1 & C2 1 X 2 0.230 0.300 1.100 0.15
C3 & C4 1 X 2 0.230 0.300 1.000 0.14
C5 & C6 1 X 2 0.230 0.300 1.100 0.15
C7 & C8 1 X 2 0.230 0.300 1.000 0.14
C9 & C10 1 X 2 0.230 0.300 1.150 0.16
C11 & C12 1 X 2 0.230 0.300 1.100 0.15
24-Jul-21 0.89
Qty Vide Page No.15 of MB No.209/B/TW/19-20
1 X 4 0.230 0.300 3.470 0.96
1 X 4 0.230 0.300 3.500 0.97
1 X 4 0.230 0.300 3.550 0.98
8-Aug-21 2.91
3.80 12896.10 1 Cum 49005.00
D PLINTH BEAM
Page 62 of 144
Qty Vide Page No.14 of MB No.209/B/TW/19-20
1 X 2 12.810 0.230 0.300 1.77
1 X 1 12.810 0.230 0.300 0.88
1 X 4 4.650 0.230 0.300 1.28
1 X 1 3.650 0.230 0.300 0.25
1 X 6 2.260 0.230 0.300 0.94
8-Aug-21 5.12
5.12 13155.20 1 Cum 67355.00
Page 63 of 144
E LINTELS
Qty Vide Page No.32 of MB No.209/B/TW/19-20
1 X 1 2.700 0.200 0.230 0.12
1 X 1 1.800 0.200 0.150 0.05
1 X 4 1.600 0.150 0.150 0.14
1 X 2 1.300 0.150 0.150 0.06
1 X 1 1.500 0.150 0.150 0.03
1 X 6 1.800 0.200 0.150 0.32
14-Sep-21 0.72
0.72 12427.60 1 Cum 8948.00
F SUNSHADES
Qty Vide Page No.33 of MB No.209/B/TW/19-20
1 X 1 2.400 0.600 1.44
1 X 6 1.200 0.600 4.32
14-Sep-21 5.76
5.76 950.10 1 Sqm 5473.00
G ROOF BEAMS
Qty Vide Page No.27 of MB No.209/B/TW/19-20
1 X 3 12.810 0.230 0.300 2.65
1 X 5 5.460 0.230 0.300 1.88
1 X 4 2.400 0.230 0.300 0.66
1-Sep-21 5.19
5.19 11575.35 1 Cum 60076.00
H ROOF SLAB 115MM
3126.05 Kg
3.126 MT
Page 64 of 144
3.126 81489.60 1 MT 254736.00
7 Ceiling Plastering with CM(1:4) Prop: 12mm thick in single coat
spong finish including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges,
sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing,
curing, etc., complete for finished item of work. (APSS 901,906)
Page 65 of 144
22-Oct-21 273.26
Qty Vide Page No.56 to 57 of MB No.209/B/TW/19-20
1 X 2 1.050 0.950 2.00
1 X 3 1.100 0.950 3.14
1 X 2 1.050 0.950 2.00
1 X 3 1.100 0.950 3.14
1 X 1 2.600 0.300 0.78
1 X 2 0.450 0.300 0.27
1 X 1 2.400 0.600 1.44
1 X 6 1.200 0.600 4.32
1 X 1 6.600 0.800 5.28
1 X 1 6.210 0.450 2.79
1 X 1 1.950 0.800 1.56
1 X 4 6.600 0.300 7.92
1 X 4 6.600 0.150 3.96
1 X 2 1.200 0.150 0.36
1 X 2 0.900 0.150 0.27
1 X 2 0.600 0.150 0.18
1 X 2 0.300 0.150 0.09
16-Nov-21 39.50
312.76 1789.65 10 Sqm 55973.00
9 Plastering to even surfaces of wall with CM (1:5) Prop: 16mm
thick in single coat including cost and conveyance of all materials
like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of work. (APSS
901,906)
Page 66 of 144
11 Dadooing to walls with glazed red or white full body ceramic wall
tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6
mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs, any
brand as approved by Engineer - in - charge and set over a base
coat of CM (1:5), 12mm thick and neat cement paste at the rate of
3.3 Kg/Sqmt. and jointed with white cement paste mixed with
pigment of matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, seigniorage
charges, sales and other taxes on all materials, and all opertional,
incidental and all labour charges such as mixing of cement
mortar, laying in position, curing, lift charges etc., complete for
finished item of work in all floors
Page 67 of 144
13 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior
Grade-I of approved brand, makind three (3) coats in all to give an
even shade after thourughly brushing the surface to remove all
dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete for finished item of work
in all floors for internal walls (SS 911)
Page 68 of 144
14 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the
frame should be welded. The frame should be painted with one
coat of primer and finished painted with pure polyester paint. The
frame should be provided with approved quality M.S.Powder
coated butt hinges IS 205 125mm long of 6 Nos. along with
Double flush door shutters solid bond wood block board type with
commercial ply on both faces of 30mm thick including fixtures
such as Mild Steel "Z" type Hold Fasts 6 Nos., M.S.Powder
coated tower bolts I.S. 204, 300 mm long and 10mm BOLT dia
2Nos, M.S.Powder coated handles IS 208 125mm long 4No,
M.S.Powder coated Aldrop IS 2681 300mm long 1No.,
M.S.Powder coated Door Stoper 2No., sales and other taxes cost
and conveyance of all materials to site, all labour cahrges such
as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.
Page 69 of 144
16 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC)
3 track sliding windows with mesh shutter provision – (only 2-
glass shutters) duly manufactured using UPVC reinforced profiles
(Composition of profile shall consists a minimum of 5.5 PHR of
TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of
PVC resin) of (80 mm x 52 mm) / (94 mm x 45 mm) x 2.20 mm for
outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for
sliding shutter frames capable of mounting single glazing system,
structurally reinforced with hot dip galvanized up to 50 microns of
minimum thickness of 1.0 / 1.2 mm prefabricated & welded
through fusion welding. The window sash shall be fitted with 5 mm
thick clear float glass of reputed make duly fixed with Grey colour
TPV Gasket for sash & Glazing bead shall be co-extruded with
Grey colour soft PVC. System shall have single point locking with
Touch Lock and the system is to be installed at the site using
anchor fasteners, silicon rubber sealant, easy glazing / deglazing
at site etc., including cost and conveyance of all materials,
accessories, labour charges for transportation, erection at site
complete for finished item of work.
Page 70 of 144
1 X 2 2.300 0.200 0.500 0.46
1 X 2 2.500 0.200 0.500 0.50
1 X 2 4.600 0.200 0.500 0.92
1 X 2 4.600 0.200 0.500 0.92
12-Aug-21 6.83
Qty Vide Page No.28 to 29 of MB No.209/B/TW/19-20
1 X 1 4.770 0.200 2.150 2.05
1 X 1 3.450 0.200 2.150 1.48
1 X 1 3.660 0.200 2.150 1.57
1 X 1 3.050 0.200 2.150 1.31
1 X 1 5.180 0.200 2.150 2.23
1 X 1 3.660 0.200 2.150 1.57
1 X 2 4.600 0.200 2.150 3.96
1 X 2 2.300 0.200 2.150 1.98
1 X 1 4.770 0.150 2.150 1.54
1 X 1 3.450 0.150 2.150 1.11
1 X 1 3.660 0.150 2.150 1.18
1 X 2 4.600 0.150 2.150 2.97
1 X 2 2.400 0.150 2.150 1.55
1 X 2 2.500 0.150 2.150 1.61
1 X 1 1.800 0.200 -2.130 -0.77
1 X 4 1.000 0.150 -2.130 -1.28
1 X 2 0.750 0.150 -2.100 -0.47
1 X 1 0.900 0.150 -2.130 -0.29
1 X 6 1.200 0.200 -1.200 -1.73
4 X 4 0.300 0.150 -0.150 -0.11
1 X 4 0.300 0.200 -0.150 -0.04
4-Sep-21 21.42
Qty Vide Page No.34 to 35 of MB No.209/B/TW/19-20
1 X 1 4.770 0.200 0.820 0.78
1 X 1 3.450 0.200 0.820 0.57
1 X 1 3.660 0.200 0.820 0.60
1 X 1 3.050 0.200 0.900 0.55
1 X 1 5.180 0.200 0.900 0.93
1 X 1 3.660 0.200 0.900 0.66
1 X 2 4.600 0.200 0.840 1.55
1 X 2 2.300 0.200 0.840 0.77
1 X 1 4.770 0.150 0.860 0.62
1 X 1 3.450 0.150 0.860 0.45
1 X 1 3.660 0.150 0.880 0.48
1 X 2 4.600 0.150 0.860 1.19
1 X 2 2.400 0.150 0.840 0.60
1 X 2 2.500 0.150 0.840 0.63
1 X 8 0.600 0.200 -0.300 -0.29
Deduct Lintel Qty -0.72
14-Sep-21 9.37
Qty Vide Page No.42 of MB No.209/B/TW/19-20
1 X 1 12.810 0.200 0.300 0.77
1 X 2 1.950 0.200 0.300 0.23
22-Oct-21 1.00
Qty Vide Page No.43 of MB No.209/B/TW/19-20
1 X 1 6.600 0.200 0.800 1.06
1 X 1 6.210 0.200 0.450 0.56
1 X 1 6.600 1.200 0.150 1.19
1 X 1 6.600 0.900 0.150 0.89
1 X 1 6.600 0.600 0.150 0.59
Page 71 of 144
1 X 1 6.600 0.300 0.150 0.30
1 X 1 2.600 0.150 0.450 0.18
1 X 2 0.300 0.150 0.450 0.04
22-Oct-21 4.81
Page 72 of 144
Qty Vide Page No.49 of MB No.209/B/TW/19-20
1 X 2 0.450 0.150 0.950 0.13
1 X 3 0.450 0.200 0.950 0.26
1 X 2 0.450 0.150 0.950 0.13
1 X 3 0.450 0.200 0.950 0.26
1 X 1 4.600 0.200 0.400 0.37
6-Nov-21 1.15
44.58 6996.10 1 Cum 311886.00
2 Supply and fixing of M.S.Grill Door of size 1.80 X 2.13 M with
outer angular frame of rolled steel equal angle of ISA 4040 of size
40mm x 40mm x 6mm and shutter ISA 2525 of size 25mm x
25mm x 4mm welded with safety bars of 10mm square rods at
horizontal 14 no.s and verticlal 9 no.s including red oxide primer
of grade-I quality, sales and other taxes, cost and conveyance of
all materials to site, all labour charges and fixing in position etc.,
complete for finished item of work.
Page 73 of 144
6 Flooring with soluble salt porcelain vitrified tiles screen printed
and polished of size 600 x 600 mm and thickness between 8-10
mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
1 to 15) of any colour and finish in all shades and designs of make
Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat
of cement mortar (1:8), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles
etc., complete, including seigniorage charges, etc., complete for
finished item of work, .
Page 74 of 144
26-Nov-21 7.58
7.58 10179.80 10 Sqm 7716.00
8 Reinforced Cement Concrete M20 Grade Nominal Mix
corresponding to IS 456 using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) including centering, shuttering, laying
concrete, curing etc. complete for Shelves of 50mm thick
Page 75 of 144
TOTAL Rs. 1553449.00
Page 76 of 144
SUB ESTIMATE ELECTRICAL ITEMS
Construction of Sub Centre Building at Gummadivalli (V) of Aswaraopeta (M) in Bhadradri
Kothagudem Dist.
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
1 Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit
pipe Sudhakar / Macoplast / Modimake concealed in roof slab
with all required acessories including No.14 SWG GI wire for
earth continuity including chiseling the wall wherever necessary ,
including necessary masonery work for light/fan pointand
seperate plug point with teak wood deep box including cost and
conveyance of all materials to site and labour charges, sales tax
etc., complete for finished item of work.
Page 77 of 144
Qty Vide Page No.65 to 66 of MB No.209/B/TW/19-20
1 X 3 3.00
1 X 6 6.00
1 X 2 2.00
1 X 6 6.00
1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
1 X 3 3.00
26-Nov-21 24.00
24.00 546.30 1 No.s 13111.00
4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch
control of Anchor / Gold medal olive / Million zoom make with ISI
mark on a common switch board with earth continuity including
wire leads, earth connections including cost and conveyance of
all materials to site, labour charges and sales tax etc. complete for
finished item of work
Page 78 of 144
1 X 2 2.00
1 X 2 2.00
1 X 1 1.00
1 X 1 1.00
26-Nov-21 7.00
7.00 1033.80 1 No.s 7237.00
Page 79 of 144
7 Supply and fixing of Stepped type Electronic Regulator. including
cost and conveyance of all material and labour charges etc.,
complete
Qty Vide Page No.70 of MB No.209/B/TW/19-20
1 X 1 1.00
1 X 2 2.00
1 X 2 2.00
1 X 1 1.00
26-Nov-21 6.00
6.00 226.54 1 No.s 1359.00
8 Supply and fixing 4 way SPN Distribution board with IP-20
protection of make Standard / Havells / HPL/Toyoma/ C &S
suitable for single phase 40A Double pole Isolator as incomer and
10KA-6-32A range single pole miniature circuit breakers four
numbers (4Nos) as out going with internal connections including
cost and conveyance of all materials to site, labour charges for
surface / flush mounting etc., sales tax complete for finished item
of work.
Page 80 of 144
1 X 2 2.00
1 X 2 2.00
1 X 1 1.00
26-Nov-21 6.00
6.00 3445.72 1 Each 20674.00
11 Supply and Run of 2 of 6 Sq.mm (7/18) WPSC ISI Aluminium wire
of makes Finolex / Polycab/ Gold Medal /million /Payal/ Power
Flex along with No.10 SWG G.I bearer wire through PVC cleats
with all accessories including cost and conveyance of all materials
to site, labour charges and sales tax etc., complete for finished
item of work.
Page 81 of 144
Sub Estimate - Water Supply and Sanitary
Page 82 of 144
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
6 Supply and Fixing European Water Closet of 1st quality
conforming to IS:2556-part-2-2004 of Hindustan / Neycer or
Parryware make white glazed with 'S' trap including cost of
plastic sheet and lid for European Water Closet with rubber or
plastic buffers as per IS:2548-1996 and PVC low level single flush
10 litere capacity system with internal components and short bend
of make Parryware slim line including cost and conveyance of all
materials to site, labour charges for fixing etc., complete for
finished item of work. for all floors
Page 83 of 144
S. Measurements
Description of Item No.s Qty. Rate Per Amount
No. L B D
Page 84 of 144
Sub Estimate - Fixing of Submersible Motor
3 Supply and Delivery of 1HP motor panel board including cost and
conveyance of material etc., complete
Page 85 of 144
Seigniorage Charges
Quantity
S No Description of Work (Finished Unit Metal Sand Earth/Gravel Brick
item )
1 2 3 4 5 6 7 8
1 EARTH WORK 50.95 Cum 50.95
2 PCC (1:5:10) 15.36 Cum 13.82 6.91
3 GRAVEL FILLING 34.34 Cum 34.34
4 FOOTINGS 6.31 Cum 5.68 2.84
5 PEDESTALS 0.00 Cum 0.00 0.00
6 COLUMNS 3.80 Cum 3.42 1.71
7 PLINTH BEAM 5.12 Cum 4.61 2.30
8 LINTELS 0.72 Cum 0.65 0.32
9 SUNSHADES 0.22 Cum 0.20 0.10
10 ROOF BEAM 5.19 Cum 4.67 2.34
11 ROOF SLAB 115MM 13.33 Cum 12.00 6.00
12 2ND CLASS BRICK (1:8) 0.00 Cum 0.00 0.00
CEILING PLASTERING
13 107.83 Sqm 1.62
12MM 1 COAT
PLASTERING 12MM 2
14 312.76 Sqm 4.69
COAT
PLASTERING 20MM 2
15 140.17 Sqm 3.08
COAT
16 FLOORING TANDUR 0.00 Sqm 0.00
17 SKIRTING TANDUR 0.00 Sqm 0.00
FLOORING NON SKID
18 7.01 Sqm 0.08
CERAMIC TILES
DADOOING CERAMIC
19 21.21 Sqm 0.25
TILES
FLY ASH BRICK
20 44.58 Cum 4.90
MASONRY (1:6)
FLOORING VITRIFIED
21 78.33 Sqm 0.94
TILES
SKIRTING VITRIFIED
22 7.58 Sqm 0.09
TILES
23 M20 50MM SHELVES 0.82 Cum 0.73 0.37
24 M15 6.89 Cum 5.51 3.31
TOTAL 8079.45
SAY 8079.00
Assistant Engineer Dy. Executive Engineer Executive Engineer
TWS:Dammapeta TWSD:Aswaraopeta TWED:Bhadrachalam
Construction of Sub Centre Building at Gummadivalli (V) of Aswaraopeta (M) in Bhadradri Kothagudem Dist.
PRICE ADJUSTMENT
1 STEEL 0.00
2 CEMENT 33.00
GROUND FLOOR
1 209/B/TW/19-20 4 55.00 17-Jul-21 57.00 3.64 0.00 Rejected 0.00 STEEL 640.95
2 209/B/TW/19-20 13 55.00 3-Aug-21 57.00 3.64 0.00 Rejected 0.00 STEEL 662.00
3 209/B/TW/19-20 25 55.00 28-Aug-21 56.00 1.82 0.00 Rejected 0.00 STEEL 1673.66
4 209/B/TW/19-20 31 55.00 4-Sep-21 56.00 1.82 0.00 Rejected 0.00 STEEL 149.44
0.00
SAY : 0.00
Construction of Sub Centre Building at Gummadivalli (V) of Aswaraopeta (M) in Bhadradri Kothagudem Dist.
GROUND FLOOR
1 209/B/TW/19-20 2 5500.00 17-Jul-21 5600.00 1.82 0.00 Rejected 0.00 0.00 PCC (1:5:10) 3.93
2 209/B/TW/19-20 10 to 11 5500.00 3-Aug-21 5600.00 1.82 0.00 Rejected 0.00 0.00 PCC (1:5:10) 1.72
3 209/B/TW/19-20 19 5500.00 24-Aug-21 5600.00 1.82 0.00 Rejected 0.00 0.00 PCC (1:5:10) 6.12
4 209/B/TW/19-20 38 5500.00 30-Sep-21 5600.00 1.82 0.00 Rejected 0.00 0.00 PCC (1:5:10) 1.59
5 209/B/TW/19-20 52 5500.00 6-Nov-21 5600.00 1.82 0.00 Rejected 0.00 0.00 PCC (1:5:10) 2.00
31-Jul-21
M20
6 209/B/TW/19-20 7 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 33.35
FOOTINGS
24-Jul-21
M20
7 209/B/TW/19-20 5 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 6.31
FOOTINGS
24-Jul-21
M20
8 209/B/TW/19-20 5 to 6 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 0.89
COLUMNS
8-Aug-21
M20
9 209/B/TW/19-20 15 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 2.91
COLUMNS
8-Aug-21
M20 PLINTH
10 209/B/TW/19-20 14 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 5.12
BEAM
14-Sep-21
11 209/B/TW/19-20 32 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 M20 LINTELS 0.72
14-Sep-21
M20
12 209/B/TW/19-20 33 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 5.76
SUNSHADES
1-Sep-21
M20 ROOF
13 209/B/TW/19-20 27 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 5.19
BEAM
1-Sep-21
M20 ROOF
14 209/B/TW/19-20 27 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 115.94
SLAB 115MM
22-Oct-21
CEILING
15 209/B/TW/19-20 44 to 45 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 PLASTERING 107.83
12MM 1 COAT
22-Oct-21
PLASTERING
16 209/B/TW/19-20 45 to 47 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 273.26
12MM 1 COAT
16-Nov-21
PLASTERING
17 209/B/TW/19-20 56 to 57 5500.00 5800.00 5.45 0.45 Accepted 0.20 5.04 39.50 5.10
12MM 1 COAT
22-Oct-21
PLASTERING
18 209/B/TW/19-20 47 to 48 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 140.17
16MM 1 COAT
26-Nov-21
FLOORING
19 209/B/TW/19-20 64 5500.00 5800.00 5.45 0.45 Accepted 0.06 1.59 NON SKID 7.01 9.06
TILES
26-Nov-21
DADOOING
20 209/B/TW/19-20 64 to 65 5500.00 5800.00 5.45 0.45 Accepted 0.19 4.80 CERAMIC 21.21 9.06
TILES
12-Aug-21 FLY ASH
BRICK
21 209/B/TW/19-20 16 to 17 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 6.83
MASONRY
(1:6)
4-Sep-21 FLY ASH
BRICK
22 209/B/TW/19-20 28 to 29 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 21.42
MASONRY
(1:6)
14-Sep-21 FLY ASH
BRICK
23 209/B/TW/19-20 34 to 35 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 9.37
MASONRY
(1:6)
22-Oct-21 FLY ASH
BRICK
24 209/B/TW/19-20 42 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 1.00
MASONRY
(1:6)
22-Oct-21 FLY ASH
BRICK
25 209/B/TW/19-20 43 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 4.81
MASONRY
(1:6)
6-Nov-21 FLY ASH
BRICK
26 209/B/TW/19-20 49 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 1.15
MASONRY
(1:6)
20-Sep-21
MS DOOR
27 209/B/TW/19-20 36 5500.00 5600.00 1.82 0.00 Rejected 0.00 0.00 1.00
1.80X2.13M
16-Nov-21
DRIP MOULD
28 209/B/TW/19-20 57 5500.00 5800.00 5.45 0.45 Accepted 0.02 0.56 44.50 0.50
25X12MM
16-Nov-21
ELEVATION
29 209/B/TW/19-20 58 5500.00 5800.00 5.45 0.45 Accepted 0.05 1.18 PATTY 94.00 0.50
100X20MM
26-Nov-21
FLOORING
30 209/B/TW/19-20 60 to 61 5500.00 5800.00 5.45 0.45 Accepted 0.71 17.74 VITRIFIED 78.33 9.06
TILES
26-Nov-21 SKIRTING
31 209/B/TW/19-20 62 to 63 5500.00 5800.00 5.45 0.45 Accepted 0.07 1.72 VITRIFIED 7.58 9.06
TILES
TOTAL : 32.63
SAY : 33.00
COMPLETION REPORT
Construction of Sub Centre Building at Gummadivalli (V) of Aswaraopeta (M) in Bhadradri Kothagudem Dist.
Sl. As Per Sanction Estimate As Per Workdone Estimate Difference
Description of item Remarks
No. Qty. Rate Amount Qty. Rate Amount Excess Less
1 2 3 4 5 6 7 8 9 10 11
Civil Work
1 Earth work excavation for foundations and depositing on bank for all
lifts and with an initial lead of 10m including all operational,
incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for 26.24 384.65 1 Cum 10093.00 50.95 384.65 1 Cum 19598.00 9505.00 0.00
finished item of work as per SS - 20 B (APSS 308). for Building
Foundation
B PEDESTALS
2.59 11141.90 1 Cum 28858.00 0.00 11141.90 1 Cum 0.00 0.00 28858.00
C COLUMNS
2.89 12896.10 1 Cum 37270.00 3.80 12896.10 1 Cum 49005.00 11735.00 0.00
D PLINTH BEAM
4.83 13155.20 1 Cum 63540.00 5.12 13155.20 1 Cum 67355.00 3815.00 0.00
E LINTELS
0.56 12427.60 1 Cum 6959.00 0.72 12427.60 1 Cum 8948.00 1989.00 0.00
F SUNSHADES
8.10 950.10 1 Sqm 7696.00 5.76 950.10 1 Sqm 5473.00 0.00 2223.00
G ROOF BEAMS
4.79 11575.35 1 Cum 55446.00 5.19 11575.35 1 Cum 60076.00 4630.00 0.00
6 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
grade as per IS 1786-1979) of different diameters for RCC works,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire, 2.60 81489.60 1 MT 211873.00 3.13 81489.60 1 MT 254736.00 42863.00 0.00
cover blocks and all incidental, operational, laour charges such as
cutting, bending placing in position, tying including sales and other
taxes on all materials etc., complete for finished item of work in all
floors. (APSS No.126) of TATA, SAIL, VSP, JINDAL & SHYAM
STEEL
14 Dadooing to walls with glazed red or white full body ceramic wall tiles
of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs, any brand as
approved by Engineer - in - charge and set over a base coat of CM
(1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt.
and jointed with white cement paste mixed with pigment of matching
shade including cost and conveyance of all materials like cement, 22.17 5664.40 10 Sqm 12558.00 21.21 5664.40 10 Sqm 12014.00 0.00 544.00
sand, water, tiles, etc. to site, seigniorage charges, sales and other
taxes on all materials, and all opertional, incidental and all labour
charges such as mixing of cement mortar, laying in position, curing,
lift charges etc., complete for finished item of work in all floors
16 Painting to new internal walls with two (2) coats of ready mixed oil
bound washable distemper acrylic base of approved brand and
shade over a base coat of cement primer water base interior Grade-
I of approved brand, makind three (3) coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and
remains of loose powdered materials, including cost and conveyance 102.82 1238.15 10 Sqm 12731.00 309.87 1238.15 10 Sqm 38367.00 25636.00 0.00
of all materials to work site and all operational, incidental, labour
charges etc., complete for finished item of work in all floors for
internal walls (SS 911)
17 Supplying & fixing of 1.22x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of
primer and finished painted with pure polyester paint. The frame
should be provided with approved quality M.S.Powder coated butt
hinges IS 205 125mm long of 6 Nos. along with Double flush door
shutters solid bond wood block board type with commercial ply on
both faces of 30mm thick including fixtures such as Mild Steel "Z"
type Hold Fasts 6 Nos., M.S.Powder coated tower bolts I.S. 204, 300
mm long and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS 1.00 7565.00 1 Each 7565.00 0.00 7565.00 1 Each 0.00 0.00 7565.00
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681 300mm
long 1No., M.S.Powder coated Door Stoper 2No., sales and other
taxes cost and conveyance of all materials to site, all labour cahrges
such as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.
18 Supplying & fixing of 1.05x 2.13 Mts. (Double Leaf) Door frame
made of roll formed section of 1.25 mm thick CRCA section, size
should be 50 x 75 mm with 32 mm rebate. The corner of the frame
should be welded. The frame should be painted with one coat of
primer and finished painted with pure polyester paint. The frame
should be provided with approved quality M.S.Powder coated butt
hinges IS 205 125mm long of 6 Nos. along with Double flush door
shutters solid bond wood block board type with commercial ply on
both faces of 30mm thick including fixtures such as Mild Steel "Z"
type Hold Fasts 6 Nos., M.S.Powder coated tower bolts I.S. 204, 300
mm long and 10mm BOLT dia 2Nos, M.S.Powder coated handles IS 5.00 6880.00 1 Each 34400.00 4.00 6880.00 1 Each 27520.00 0.00 6880.00
208 125mm long 4No, M.S.Powder coated Aldrop IS 2681 300mm
long 1No., M.S.Powder coated Door Stoper 2No., sales and other
taxes cost and conveyance of all materials to site, all labour cahrges
such as making of door frame, fixing in position,fixing of shutters, &
hard ware fixtures, etc.,complete for finished item of work. The
frame should be embedded to a depth of 40mm in the flooring.
19 Providing and fixing 30mm thick Solid panel PVC door shutter
consisting of frame made out of M.S. tubes of 19 gauge thickness
and size of 19mm x 19mm for stiles, & 15mm x 15mm for top &
bottom rails. M.S. frame shall have a coat of steel primers of
approved make and manufacture. M.S. frame shall be covered with
5mm thick heat molded PVC ‘C’ channel of size 30 x 50mm forming
stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide
cross PVC sheet as gap insert for top rail & bottom rail. Paneling of
5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed 3.15 2480.00 1 Sqm 7812.00 3.07 2480.00 1 Sqm 7614.00 0.00 198.00
to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading
on either side, and joined together with solvent cement adhesive etc.
An additional 5mm thick PVC strip of 20mm width is to be stuck on
the interior side of the ‘C’ Channel using PVC solvent adhesive.
Complete as per direction of Engineer-in-charge, manufacturer’s
specification & drawing for finished item of work
SUPPLEMENTARY ITEMS
1 Brick Masonry in superstructure with CM (1:6) prop with Flyash
Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing
of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs.
Gypsum of 5 kgs. and stone dust with a compresive strength not
44.58 6996.10 1 Cum 311886.00 311886.00 0.00
lessthan 50 kg/sqm including cost and conveyance of all materials,
labour charges, seiniorage charges, scaffolding and curing etc., for
Superstructure Walls.
2 Supply and fixing of M.S.Grill Door of size 1.80 X 2.13 M with outer
angular frame of rolled steel equal angle of ISA 4040 of size 40mm x
40mm x 6mm and shutter ISA 2525 of size 25mm x 25mm x 4mm
welded with safety bars of 10mm square rods at horizontal 14 no.s
and verticlal 9 no.s including red oxide primer of grade-I quality, 1.00 7343.00 1 Each 7343.00 7343.00 0.00
sales and other taxes, cost and conveyance of all materials to site,
all labour charges and fixing in position etc., complete for finished
item of work.
10 Painting to New wood work with two coats of ready mixed Synthetic
Enamel paints in all shades Grade - I having VOC (Volatile Organic
Compound) content less than 50 grams/ liter first quality all shades
to give an even shade over base coatof wood Primer finishing with
putty for wood work after thouroughly brushing the surface to
remove all remains including cost and conveyance of all materials to 17.04 1999.10 10 Sqm 3406.00 3406.00 0.00
site, sales & other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3 coats) (APSS No.
1201 & 1212).in All Floors
1368004.00 1553449.00
Electrification
1 Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit
pipe Sudhakar / Macoplast / Modimake concealed in roof slab with
all required acessories including No.14 SWG GI wire for earth
continuity including chiseling the wall wherever necessary , including
necessary masonery work for light/fan pointand seperate plug point 18.00 86.40 1 Rmt 1555.00 26.70 86.40 1 Rmt 2307.00 752.00 0.00
with teak wood deep box including cost and conveyance of all
materials to site and labour charges, sales tax etc., complete for
finished item of work.
2 Supply and fixing of ISI mark 25mm dia 1.8mm thick PVC conduit
pipe Sudhakar / Macoplast / Modi make concealed in wall with all
required acessories including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary , including
necessary masonery work for light/fan pointand seperate plug point 25.00 96.40 1 Rmt 2410.00 50.10 96.40 1 Rmt 4830.00 2420.00 0.00
with teak wood deep box including cost and conveyance of all
materials to site and labour charges, sales tax etc., complete for
finished item of work.
4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch
control of Anchor / Gold medal olive / Million zoom make with ISI
mark on a common switch board with earth continuity including wire
leads, earth connections including cost and conveyance of all 0.00 141.39 1 No.s 0.00 7.00 141.39 1 No.s 990.00 990.00 0.00
materials to site, labour charges and sales tax etc. complete for
finished item of work
8 Supply and fixing 4 way SPN Distribution board with IP-20 protection
of make Standard / Havells / HPL/Toyoma/ C &S suitable for single
phase 40A Double pole Isolator as incomer and 10KA-6-32A range
single pole miniature circuit breakers four numbers (4Nos) as out
going with internal connections including cost and conveyance of all 0.00 4049.81 1 No.s 0.00 1.00 4049.81 1 No.s 4050.00 4050.00 0.00
materials to site, labour charges for surface / flush mounting etc.,
sales tax complete for finished item of work.
3965.00 64738.00
Water Supply and Sanitary Arrangements
1 Providing & Placing of RCC water storage tank on Roof slab alround
50mm thick and base 100mm thick with suitable locking
arrangement & making necessary holes for inlet & outlets and over 1360.00 8.00 1 Litre 10880.00 10880.00 0.00
flow pipes but without fittings
2 S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 27.80 223.82 1 Rmt 6222.00 6222.00 0.00
all floors.
3 S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 4.60 147.70 1 Rmt 679.00 679.00 0.00
all floors.
4 S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 10.20 181.41 1 Rmt 1850.00 1850.00 0.00
all floors.
5 S&F 63 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm
including cost and conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished item of work for 24.20 60.25 1 Rmt 1458.00 1458.00 0.00
all floors.
6 Supply and Fixing European Water Closet of 1st quality conforming
to IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make
white glazed with 'S' trap including cost of plastic sheet and lid for
European Water Closet with rubber or plastic buffers as per IS:2548-
1996 and PVC low level single flush 10 litere capacity system with
internal components and short bend of make Parryware slim line 2.00 4390.10 1 Rmt 8780.00 8780.00 0.00
including cost and conveyance of all materials to site, labour charges
for fixing etc., complete for finished item of work. for all floors
7 Supplying & Fixing of 15.00 mm brass body CP finish bib tap of not
less than 300 grams weight screw type (full turn) with internal /
external threaded connection conforming to IS 8931 including cost
and conveyance of all materials to site, all labour charges, sales and 4.00 257.95 1 Each 1032.00 1032.00 0.00
other taxes on all materials etc., complete for finished item of work
for All Floors.
8 Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash
Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32
mm nominal size C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore single Chromium
Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
Esso/Nice/Senior or equivalent complete with standard CI brackets 3.00 2114.40 1 Each 6343.00 6343.00 0.00
including wooden block, 12.7mm PVC connection with Brass union
nut CP coated, 12.7mm dia first qualifty NP angle stop cock,
38.1mm CP waste coupling , 31.75mm dia PVC flexible waste pipe
of 914.4mm length of first quality including cost and conveyance of
all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work. for All Floors.
9 Supply and Fixing of 1.20m dia RCC Readymade Rings 50mm thick
0.30m height including cost and conveyance of all materials and 12.00 682.00 1 Each 8184.00 8184.00 0.00
labour charges etc., complete
10 Supply and Fixing of 1.20m dia RCC Readymade Top Cover 50mm
thick including cost and conveyance of all materials and labour 2.00 682.00 1 Each 1364.00 1364.00 0.00
charges etc., complete
11 Supply and Fixing of 25mm PPR Ball Valve conforming to DIN
Standards 8077/8092 including cost and conveyance of all materials 2.00 254.00 1 Each 508.00 508.00 0.00
and labour charges etc., complete
0.00 47300.00
0.00 34182.00
Total: -
1371969.00 1699669.00 787381.00 459681.00
Price Adjustment
33.00 33.00 0.00
1699702.00
1395455.00
Seigniorage Charges
7504.00 8079.00 575.00 0.00
Total: -
1600000.00 1600901.00 813860.00 812959.00
-901.00 901.00
Shahabad/Tandur Rough
TBSC-B.I- 10Sqm
19 stone slabs minimum Tandur 439.00 2198.34 1230.00 43.65 21.82 16.37 3510.18
02 .
25mm to 40mm thick
Unloading
Ordinary Portland Cement
18 At Site 0.00 5500.00 0.00 72.69 18.17 5590.86 M.T Manual
43 Grade
means
Mild Steel Bars (Fe 250) for
19 At Site 0.00 52000.00 0.00 87.13 21.78 52108.91 M.T -do-
6mm
High Yield Strength
20 Deformed Bars (Fe 500) for At Site 0.00 55000.00 0.00 87.13 21.78 55108.91 M.T -do-
8mm to 40mm dia
High Yield Strength
20 Deformed Bars (Fe 415) for At Site 0.00 55000.00 0.00 87.13 21.78 55108.91 M.T -do-
8mm to 40mm dia
Mild Steel, Structural steel,
21 I,e, Angles, Channels & I- At Site 0.00 48000.00 0.00 87.13 21.78 48108.91 M.T -do-
Sections
22 M.S. Plates At Site 0.00 52000.00 0.00 87.13 21.78 M.T -do-
Note :- Rates of CEMENT and STEEL for the Month of February 2021 Dated 24.02.2021
CERTIFICATES:-
1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
3 Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
4 Certified that the work spot falls within the limits of Agency Area. Hence 25% on labour is proposed and the same may be allowed.
GRADED METAL OF 20mm for Concrete Work GRADED METAL for Granolithic Work
nm
Unit Qty Rate Per Amount
BLDCST A Cement Mortar(1:2)
N - 1-3
Page - 14
Unit : Cum
A. Materials
Cement Kg 720.00 5590.86 MT 4025.42
Sand (Including 5% Wastage) Cum 1.05 1579.57 Cum 1658.55
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 5800.22
BLDCST B Cement Mortar(1:3)
N - 1-4
Page - 14
Unit : Cum
A. Materials
Cement Kg 480.00 5590.86 MT 2683.61
Sand (Including 5% Wastage) Cum 1.05 1579.57 Cum 1658.55
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 4458.41
BLDCST C Cement Mortar(1:4)
N - 1-5
Page - 15
Unit : Cum
A. Materials
Cement Kg 360.00 5590.86 MT 2012.71
Sand (Including 5% Wastage) Cum 1.05 1579.57 Cum 1658.55
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 3787.51
BLDCST D Cement Mortar(1:5)
N - 1-6
Page - 15
Unit : Cum
A. Materials
Cement Kg 288.00 5590.86 MT 1610.17
Sand (Including 5% Wastage) Cum 1.05 1579.57 Cum 1658.55
B.Labour
Man mazdoor for mixing mortar Day 0.20 465.00 Day 93.00
Add Agency Allowance 25% 93.00 23.25
Grand Total 3384.97
BLDCST E Cement Mortar(1:6)
N - 1-7 Unit : Cum
Page - 15
A. Materials
Cement Kg 240.00 5590.86 MT 1341.81
Sand (Including 5% Wastage) Cum 1.05 1579.57 Cum 1658.55
B.Labour
Unit : 1 Cum
a.Material
Cement Kg 275.00 5590.86 MT 1537.49
40mm aggregate Cum 0.00 1783.34 Cum 0.00
20mm aggregate Cum 0.80 2239.59 Cum 1791.67
10mm aggregate Cum 0.00 2128.34 Cum 0.00
Fine aggregate (sand) Cum 0.48 1579.57 Cum 758.19
4087.35
b. Machinery
Concrete Mixer (0.2/0.8 cum hr 1.00 550.70 550.70
capacity) 600/400 (Diesel)
550.70
c. Labour
Mason 1st Class day 0.10 520.00 52.00
Mazdoor (Unskilled) day 1.39 465.00 646.35
Add Agency Allowance 25% 698.35 174.59
Add Agency Allowance on Crew 25% 271.70 67.93
charges of concrete mixer
940.87
Sub-Total :: 5578.92
d. Add 13.615% Overhead & 13.615% 5578.92 759.57
Contractors profit on sub - total
e. Seigniorage charges cum 0.90 75.00 Cum
(i) Aggregate
(ii) Sand cum 0.48 40.00 Cum
Rate per cum 6338.49
Say 6338.50
BLDCST 26 Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size
N - 3-13 graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
Page - 23 and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including
centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick
Unit = 1 cum
a.Material
Cement Kg 400.00 5590.86 MT 2236.34
20mm HBG graded metal Cum 0.90 2137.33 Cum 1923.60
147.04
Basic Rate per Cum 6663.86
Unit : Cum
a.Material
No of blocks required for one cum of Nos 110.00 25925.66 1000 2851.82
Masonry
CM (1:6) Cum 0.10 3116.610 Cum 311.66
3163.48
b.Labour
Mason 1st Class Day 0.420 520.00 Day 218.40
Mason 2nd Class Day 0.920 490.00 Day 450.80
Mazdoor (Unskilled) Day 2.800 465.00 Day 1302.00
Add Agency Allowance 25% 1971.20 492.80
2464.00
Rate per Cum 5627.48
Unit : 10Sqm
a.Materials
Vitrified tiles (TBSC-C.II-02) Sqm 10.50 421.00 Sqm 4420.50
cement for CM(1:8) Proportion Kg 21.60 5590.86 MT 120.76
Sand for CM(1:8) Proportion Cum 0.12 1579.57 Cum 189.55
Cement slurry Kg 33.00 5590.86 MT 184.50
White cement Kg 6.00 29.00 Kg 174.00
5089.31
b.Labour
Mason 1st Class Day 0.960 520.00 Day 499.20
Mason 2nd Class Day 2.240 490.00 Day 1097.60
Mazdoor Unskilled Day 3.300 465.00 Day 1534.50
Add Agency Allowance 25% 3131.30 782.83
3914.13
Rate per 10 Sqm 9003.44
Description of Item GF FF SF TF
c Basic rate per 10 Sqm 9003.44 9003.44 9003.44 9003.44
d Lift charges - Add 10% on labour for 0.00 313.13 626.26 939.39
A.F,20% for SF, 30% for T.F
Sub-Total :: 9003.44 9316.57 9629.70 9942.83
e Add 13.615% Overhead & 13.615% 1225.82 1268.45 1311.08 1353.72
Contractors profit on sub - total
f Seigniorage charge 0.00 0.00 0.00 0.00
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm 10229.26 10585.02 10940.78 11296.55
Say 10229.30 10585.05 10940.80 11296.55
Unit : 10Sqm
a.Materials
Vitrified tiles (TBSC-C.II-02) Sqm 10.50 421.00 10Sqm 4420.50
Cement for CM(1:5) Proportion Kg 34.56 5590.86 MT 193.22
Sand for CM(1:5) Proportion cum 0.12 1579.57 cum 189.55
Cement slurry Kg 33.00 5590.86 MT 184.50
White Cement for Jointing & pointing Kg 2.00 29.00 Kg 58.00
5045.77
b.Labour
Mason 1st Class Day 0.960 520.00 Day 499.20
Mason 2nd Class Day 2.240 490.00 Day 1097.60
Mazdoor (Unskilled) Day 3.300 465.00 Day 1534.50
Add Agency Allowance 25% 3131.30 782.83
3914.13
Rate per 10 Sqm 8959.90
Description of Item GF FF SF TF
c Basic rate per 10 Sqm 8959.90 8959.90 8959.90 8959.90
d Lift charges - Add 10% on labour for 0.00 313.13 626.26 939.39
F.F,20% for SF, 30% for T.F
Sub-Total :: 8959.90 9273.03 9586.16 9899.29
e Add 13.615% Overhead & 13.615% 1219.89 1262.52 1305.16 1347.79
Contractors profit on sub - total
f Seigniorage charge 0.00 0.00 0.00 0.00
(i) Sand - 0.12 x 40 = 4.80
Rate as per 10 Sqm 10179.79 10535.55 10891.32 11247.08
Say 10179.80 10535.55 10891.35 11247.10
BLDCST 54
N-12-12 Painting to New wood work with two coats of ready
(195) mixed Synthetic Enamel paints in all shades Grade - I
Page.86 having VOC (Volatile Organic Compound) content less
than 50 grams/ liter first quality all shades to give an
even shade over base coatof wood Primer finishing with
putty for wood work after thouroughly brushing the surface
to remove all remains including cost and conveyance of all
materials to site, sales & other taxes, all operational,
incidental and labour charges etc., complete for finished
item of work.(3 coats) (APSS No. 1201 & 1212).in All
Floors
Unit = 10 Sqm.
a.Materials
Wood primer (TBSC-G.I-07 ) Litre 0.70 144.00 Litre 100.80
Putty for wood work (TBSC-G.I-09) Kg 1.00 144.00 Kg 144.00
Synthetic enamel paint (TBSC-G.V-
Ltr 1.10 251.000 Ltr 276.10
01 )
b.Labour
For priming coat
Painter (1st class) day 0.21 595.00 day 124.95
Unit = 10 Sqm.
a.Materials
Synthetic enamel paint (TBSC-G.V- Ltr 1.10 251.000 Ltr 276.10
01 )
276.10
b.Labour
Painter (1st class) Day 0.33 595.00 Day 196.35
Painter (2nd class) Day 0.77 490.00 Day 377.30
Add Agency Allowance 25% 573.65 143.41
717.06
Sub-Total :: 993.16
Add 13.615% Overhead & 13.615% 135.22
Contractors profit on sub - total
Rate as per 10 Sqm 1128.38
Say 1128.40
Unit = 10 Sqm.
a. Materials :
TBSC-B.I-09 Sqm 1.00 287.00 1 Sqm 287.00
c) Add 13.615% Overhead & 13.615% 39.08
Contractors profit on sub - total
Rate per 1 Sqm 326.08
Say 326.10
Manufacturing, Supply, delivery and fixing of plain MS sheet door of size 1.80 x 2.13 with frame
made of L Angular section of 35 X 35 X 5mm and inner frame of double leave shutters with MS
2 "L"angle of 25 X 25 X 4mm welded with 2 nos of 25 X 25 X4 angle and 3 No.s of 30x4mm each
leaf and welded with powder coated fixtures including red oxide paint including cost and
conveyance of all materials and labour charges etc., complete for finished item of work.
Cost of Red oxide Grade-I quality 0.60 Ltr 136.00 1 Ltr 81.60
Cost of MS Angular frames of rolled steel equal angle 39.03 Kgs 55.11 1.00 Kg 2151.02
MS powder coated butt hinges 150mm long 3 Nos 42.00 1.00 Each 126.00
MS powder coated Tower bolts 150 mm long 1 Nos 37.00 1.00 Each 37.00
MS powder coated Handles 125 mm long 2 Nos 33.00 1.00 Each 66.00
MS powder coated Aldrops 300 mm long 1 Nos 173.00 1.00 Each 173.00
8613.23
Add 13.615% Overhead & Contractors profit 13.615% 0.00
or say 8614.00
1 Supply and fixing of Stainless steel fly proof wire mesh of not less than 20 gauge with wooden frame
Including Labour charges for making, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.
a Frame -
Horizontal 2 1.00 0.025 0.0125 0.001 cum
Vertical 4 1.00 0.025 0.0125 0.001 cum
0.0020 cum
Say 0.0020 Cum
b Door Shutter frame
Styles 4 #REF! 0.070 0.035
Rails 4 #REF! 0.070 0.035
c Door shutter
Horizontal x Vertical 2 #REF! ### 0.065
ABSTRACT
Sl.
Description Qty. Rate/Per Amount
No.
frame
1 TBSC-D.V-01 0.0020 cum 44785.00 Cum 89.57
(Sal wood )
2 Stainless steel fly proof wire mesh TBSC-E.III-02 1.000 Sqm 522.00 Cum 522.00
3 Labour charges for making frame TBSC-T.I-25 467.00
1078.57
Add 13.615% Overhead & Contractors
4 13.615% 146.85
profit
5 Rate per sqmt. 1225.50
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040 612.50 637.00
b) Machinery 0.00
Hydraulic Excavator 0.9 cum bucket capacity @
hour 1.670 3331.20 5563.10
60 cum per hour
Tipper 5.5 cum / 10 t capacity hour 4.500 1185.60 5335.20
Dozer D-50 for spreading @ 200 cum per hour hour 0.500 1758.00 879.00
Mortor grader for grading @ 200 cum per hour hour 0.500 3602.00 1801.00
Water tanker 6 kl capacity hour 2.000 699.00 1398.00
Vibratory Roller 80 - 100 kN @ 100 cum per hour hour 1.000 3292.40 3292.40
18905.70
c) Overheads & Contractors Profit on a+b 13.615% 18905.704 2574.01
Sub-Total :: 21479.72
Seigniorage charges 100.000 30.00 3000.00
24479.72
Rate per cum = (a+b+c+d)/100 244.80
Rate per cum Say 244.80
2007 - 2008 SSR March 2008 Rates 662593136.xlsx - GRILL DOOR 128
Water supply & Sanitary datas
SCHEDULE OF RATES FOR THE YEAR 2020 - 2021
Sl Amount Unit
Description of work
No. (Rs.)
2 Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste
fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread
conforming to IS:2963-1979 and fitted with 15 mm nominal bore single Chromium
Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso/Nice/Senior or
equivalent complete with standard CI brackets including wooden block, 12.7mm PVC
connection with Brass union nut CP coated, 12.7mm dia first qualifty NP angle stop
cock, 38.1mm CP waste coupling , 31.75mm dia PVC flexible waste pipe of 914.4mm
length of first quality including cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc., complete for finished item of work.
for All Floors.
10
S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 including cost and
conveyance of all materials and labour charges , Overheads & Contractors profit
complete for finished item of work for all floors.
TBSP-J.III-03 197.00
Add Overheads and Contractor profits @ 13.615% 26.82
223.82 Rmt
5
S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including cost and
conveyance of all materials and labour charges , Overheads & Contractors profit
complete for finished item of work for all floors.
TBSP-H.I-03 159.67
Add Overheads and Contractor profits @ 13.615% 21.74
181.41 Rmt
12 Supply and Fixing of 63mm dia PVC pipe - 4 Kg/sq.cm including cost and conveyance
of all materials and labour charges , Overheads & Contractors profit complete for
finished item of work
Rate as per SSR Page No. 505 PH Item 53.00
Add Overheads and Contractor profits @ 13.615% 7.22
60.25 Rmt
13 Supply and Fixing of 1.20m dia RCC Readymade Rings 50mm thick 0.30m height
including cost and conveyance of all materials and labour charges etc., complete
Rate as per Market Rate 600.00
Add Overheads and Contractor profits @ 13.615% 81.69
682.00 Each
14 Supply and Fixing of 1.20m dia RCC Readymade Top Cover 50mm thick including cost
and conveyance of all materials and labour charges etc., complete
Rate as per Market Rate 600.00
Add Overheads and Contractor profits @ 13.615% 81.69
682.00 Each
14 Supply and Fixing of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092
including cost and conveyance of all materials and labour charges etc., complete
TBSP-J.III-185 223.00
Add Overheads and Contractor profits @ 13.615% 30.36
254.00 Each
MS Door Data
Manufacturing, Supply, delivery and fixing of plain G.I sheet door of size 1.20. x 2.10 with frame made of L
Angular section of 25 X 25 X 3mm and inner frame of single leave shutters with GI Sheet and welded with
1
powder coated fixtures including red oxide paint including cost and conveyance of all materials and labour
charges etc complete for finished item of work"
Calculation of 1.20 2.10 2.52 Sqm
Frame
Vertical 2 2.100 4.20
Horizontal 2 1.200 2.40
Shutter
Vertical 2 2.100 4.20
Horizontal 3 1.200 3.60
14.40 Rmt
1.10 15.84 Kg
Shutter
22.12 55.74 Kg
Data for Rec Oxide Primer
Cost of Red oxide Grade-I quality 0.60 Ltr 129.00 1 Ltr 77.40
Cost of MS Angular frames of rolled steel 15.84 Kgs 48.11 1.00 Kg 762.05
Data for Red oxide primer 2.52 Sqm 553.06 10.00 Sqm 139.37
MS powder coated butt hinges 100mm long 4 Nos 21.00 1.00 Each 84.00
8904.54
Add 13.615% Contractors profit & Over head
13.615% 1212.35
charges
or say 10117.00
662593136.xlsxGI 131
Standard Data - Electrical Items For Buildings 2020-2021
Sl.
SSR Item No. Description Unit Qty. Rate Rs. Amount Rs.
No.
P.V.C. Conduit (Concealed)
Copper Wiring
3 Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C.
insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion/ Vimal/ Suncab/ Paragaon/FortuneArt
make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type
switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box
including cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings
a) Material
ELEC-9.4.14 25 x 20 cms (10" x8") Hylam sheet 3mm each 1 80.00 80.00
thick.
Total 1340.00
b) Labour charges :
5 Skilled Electrician day 0.6 590.00 354.00
34 Semi skilled Electrician day 1.2 490.00 588.00
33 Helpers day 0.6 490.00 294.00
Total 1236.00
c) Agency allowance @ 25% 25% 1236.00 309.00
Total (a+b+c) 2885.00
d) Overheads & Contractors Profit on 13.615% 2885.00 392.79
(a+b+c)
e) Cost for 6 Points 3277.79
Rate per Point = e/6 546.30
Rate per Point 546.30
4 Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of
Anchor / Gold medal olive / Million zoom make with ISI mark on a common
switch board with earth continuity including wire leads, earth connections
including cost and conveyance of all materials to site, labour charges and
sales tax etc. complete for finished item of work
Page 1 of 144
Rate per each 141.39
6 Supply and fixing of batten holder / slanting holder Anchor / Gold medal
olive / Million zoom make with ISI mark in lieu of ceiling rose of light point
with 12.0W LED Lamp all connections including cost and conveyance of all
materials to site, labour charges and sales tax etc., complete for finished
item of work.
Taking Output = each
a) Material
PVC batten holder Anchor / Gold
medal olive / Million zoom make with each 1 26.00 26.00
ELEC-3.7.9 ISI mark
ELEC-3.10.1 f 12.0W LED Lamp each 1 225.00 225.00
Total 251.00
b) Labour charges :
5 Skilled Electrician day 0.05 590.00 29.50
33 Helpers day 0.05 490.00 24.50
Total 54.00
c) Agency allowance @ 25% 25% 54.00 13.50
Total (a+b+c) 318.50
d) Overheads & Contractors Profit
13.615% 318.50 43.36
on (a+b+c)
Rate per each 361.86
361.90
7 Supply and run of 2 of 36/0.3mm (2.5 sqmm) FRLS / HFFR PVC insulated
ISI Copper cable of makes Polycab / Havells / Gold medal /Fortune art
/L&T/ HPL in existing metallic / non-metallic conduit pipe for mains including
cost and conveyance of all materials to site, labour charges and sales tax
etc., complete for finished item of work.
Page 2 of 144
8 Supply and fixing 4 way SPN Distribution board with IP-20 protection of
make Standard / Havells / HPL/Toyoma/ C &S suitable for single phase 40A
Double pole Isolator as incomer and 10KA-6-32A range single pole
miniature circuit breakers four numbers (4Nos) as out going with internal
connections including cost and conveyance of all materials to site, labour
charges for surface / flush mounting etc., sales tax complete for finished
item of work.
a) Material
Page 3 of 144
Rate per each 4381.56
10 Supply and Run of 2 of 6 Sq.mm (7/18) WPSC ISI Aluminium wire of
makes Finolex / Polycab/ Gold Medal /million /Payal/ Power Flex along
with No.10 SWG G.I bearer wire through PVC cleats with all accessories
including cost and conveyance of all materials to site, labour charges and
sales tax etc., complete for finished item of work.
a) Material
Page 4 of 144
c) Agency allowance @ 25% 25% 147.50 36.88
Total (a+b+c) 3385.94
d) Overheads & Contractors Profit
13.615% 3385.94 461.00
on (a+b+c)
Rate per each 3846.93
11 Supply and transportation of 20W, 2000 lumens, T8,1200mm length LED
tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge protection:
2KV,THD<125%, with inbuilt driver and frosted cover CCT: 3000K - 5700K,
minimum CRI≥80,.etc., complete Manufacture has to submit LM79,LM80 &
Photobiological Safety Report. Luminaire Performance Complies to IS10322
(Part 5/Sec 3) & IEC 60598-1,IEC 60529 ISO certified company.
LUMINAIRE MAKE: Phillips / OSRAM / GE / Crompton / VIN / Bajaj /
Havells / Halonix / HPL. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/ OSRAM / SAMSUNG / LG LEDs
a) Material
20W, 2000 lumens, T8,1200mm length
1 730.00 730.00
ELEC-3.9.10 LED tube light
ELEC-1.5.4 23/0060 3 core Flat Copper Wire M 1.00 9.80 9.80
screws with rawal plugs each 2.00 1.00 2.00
ELEC-9.1.29 T.W round blocks each 2.00 8.00 16.00
Cement and sand etc., LS 17.10
Total 774.90
b) Labour charges
5 Skilled Electrician/carpenter day 0.10 590.00 59.00
33 Semi skilled Electrician / Helper day 0.10 490.00 49.00
Total 108.00
c) Agency allowance @ 25% 25% 108.00 27.00
Total (a+b+c) 909.90
d) Overheads & Contractors Profit
13.615% 909.90 123.88
on (a+b+c)
Rate per each 1033.78
1033.80
38 Supply and errecting of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28
W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of
insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope,
copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5,
Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than
10%. with remote or compatible to electronic step type regulator unit for speed control and all
remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree
C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase
AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg
(Efficio ) / Havells / Orient
a) Material
Supply of 48" (1200mm) Sweep
No 1 2825.00 2825.00
ELEC- 5.1.1 Ceiling Fan Havells / Orient
Transportation charges @ 1% 1% 2825.00 28.25
ELEC-1.5.4 23/0060 Twin Core wire M 1 9.80 9.80
Unforseen item works, such as
LS 1.00 1.00
painting to down rod, screws etc.,
Total 2864.05
b) Labour charges.
1349 Skilled Electrician day 0.125 590.00 73.75
1357 Helper day 0.125 490.00 61.25
Total 135.00
c) Agency allowance @ 25% 25% 135.00 33.75
Total (a+b+c) 3032.80
d) Overheads & Contractors Profit
13.615% 3032.80 412.92
on (a+b+c)
Page 5 of 144
Rate per each 3445.72
Page 6 of 144
Supply and fixing of Stepped type Electronic Regulator. including cost and
conveyance of all material and labour charges etc., complete
a) Material
ELEC-1.7.1 l Stepped type Electronic Regulator. Each 1.00 200.00 200.00
b) Labor charges:
Skilled Electrician day 0.02 590.00 11.80
Helpers day 0.015 490.00 7.35
Total 19.15
c) Agency allowance @ 25% 25% 19.15 4.79
Total (a+b+c) 223.94
Contractor Profit 13.615% 2.61
TOTAL cost per meter 226.54
Page 7 of 144
Quantity since
executed for Item of work, of supplies granted under "sub-head" and previous bill
Unit supplied upto Rate Upto date total for Remarks
date as per sub work of estimate each
measurement subhead
I
Earth work excavation for foundations and depositing on bank for all
Cum 50.950 lifts and with an initial lead of 10m including all operational, incidental, 384.65 19598
seigniorage charges, labour charges such as shoring ,sheeting, planking,
strutting, dewatering etc. complete for finished item of work as per SS -
Plain Cement
20 B (APSS Concrete
308). (1:5:10)
for Building proportion (cement: fine aggregate:
Foundation
Cum 15.360 Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) 5149.00 79089
machine crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
Filling withmixing
etc. to site, useful available
concrete in excavated
concreteearth
mixer(excluding
including rock) in
seigniorage
Cum 33.350 trenches, sides&ofother
charges, sales foundations
taxes onand basement all
all materials, with initial leadincidental,
operational, in layers 34.15 1139
not
and exceeding 15 cmsuch
labour charges thick,
as consolidating each deposited
laying and ramming concretelayer by in
in layers
watering
position notandexceeding
ramming 15cm,including cost and
finishing topconveyance of water
surface, curing to work
concrete, etc.,
Filling
site with
and allfor
complete Gravel in
operational, trenches,
finished item sides
incidental, of
of worklabour foundations
(APSScharges, and
No. 402)hire basement Twith
charges ofCourse
for Levelling &P
Cum 34.340 initial
etc., lead in
completeBed
and Flooring layers not exceeding 15cm thick, consolidating
for finished item of work. APSS No.309 & 310 each 292.05 10029
deposited layer by watering and ramming including all operational,
incidental, labour charges, seignorage charges, hire charges of T & P etc.,
Vibrated
completeReinforced
for finishedCement
item of Concrete
work. APSS M20 Grade&Nominal
No.309 310 Mix
corresponding to IS 456 using 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand)
Cum 6.310 FOOTINGS
coarse aggregate, water etc., to site and including Seigniorage charges, 10517.05 66363
sales
COLUMNS& other taxes on all materials including all operational, incidental
Cum 3.800 and labour charges such as machine mixing, laying concrete, curing 12896.10 49005
Cum 5.120 PLINTH BEAMbut excluding cost of steel and its fabrication charges for
etc.,complete 13155.20 67355
finished
LINTELSitem of work (APSS No. 402) including centering, shuttering,
Cum 0.720 laying concrete, vibrating, curing etc 12427.60 8948
Sqm 5.760 SUNSHADES 950.10 5473
Cum 5.190 ROOF BEAMS 11575.35 60076
Sqm 115.940 ROOF SLAB 115MM 1324.25 153534
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
MT 3.126 grade as per IS 1786-1979) of different diameters for RCC works, 81489.60 254736
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
Ceiling
materials Plastering
and sizewith CM(1:4)
and tying andProp: 12mmwith
lapsplicing thickbinding
in single wirecoatofspong
18
Sqm 107.830 finish
SWG, forming including costfor
grills and conveyance of
reinforcement all materials
work as per approved like cement, designs sand,and 1908.45 20579
water
drawings, etc.,including
to site, includingcost andseigniorage
conveyancecharges, of steel sales
bars, & other taxes
including all on
all materials,
wastages suchallasoperational,
overlaps, couplings,incidentalchairs, charges and labour
spacer chargescost
bars including such
Plastering
as
andmixing
conveyance to even
mortar, surfaces
offinishing,
binding wire, of wall
curing, with CM(1:5)
etc.,blocks
cover complete and Prop:
for 12mm thick
all finished
incidental, item of in
Sqm 312.760 single
work.
operational, coat including
(APSS 901,906)
laour cost and
charges suchconveyance
as cutting, bending of all materialsplacinglike cement,
in position, 1789.65 55973
sand, water etc.,sales
tying including to site,andincluding
other taxes seigniorage
on all materialscharges,etc., sales & otherfor
complete
taxes
finished on item
all materials,
of work in allall
operational,
floors. (APSS incidental
No.126)charges of TATA, and labour
SAIL, VSP,
Plastering
charges
JINDAL & such to even
SHYAM as mixing surfaces
STEEL mortar,of wall with CM
finishing, (1:5) etc.,
curing, Prop: 16mm thick
complete for in
Sqm 140.170 single coat including
finished item of work. (APSS 901,906) cost and conveyance of all materials like cement, 2578.75 36146
sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour
Flooring
charges such withas Non-skid red or white
mixing mortar, full body
finishing, curing, Ceramic floor tilesfor
etc., complete of size
Sqm 7.010 300
finished x 300 itemmmofand work. thickness between 7-8 mm 1st quality conforming to
(APSS 901,906) 8654.00 6066
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs of makes Jhonson & Jhonson, Kajaria, Nitco and
Dadooing
Marbonite,toset walls
overwith baseglazed
coat of red or white
cement mortarfull body
(1:8),ceramic
12 mm wall thicktilesoverof
Sqm 21.210 size
CC bed 200already
x 300 mm laid/or245 RCC mm roof x 325
slab,mm and thickness
including neat cement 6 mmslurry 1st quality
of 5664.40 12014
conforming
honey like consistency to IS:13711,spread IS:13712, IS:13630
@ 3.3.kgs per (Parts
sqm &1jointed to 15) neatlyof any withcolour
and
white finish
cement in allpaste
shades anddepth
to full designs, mixed anywithbrand as approved
pigment of matchingby Engineershade,
Painting
-including
in - charge tocost
New
andof External
set over aWalls
all materials base with
likecoat two
of
cement, CM coats
(1:5),
sand ofwater
Plastic
12mm and Emulsion
thick
tiles andetc., paint
neat
Sqm 160.100 of Asianpaste
cement
complete, / Berger at the
including / Nerolac
rate of 3.3
seigniorage / Saicoat
Kg/Sqmt.
charges,/ Endocem
and
etc.,jointed or equalent
complete with forwhite quality
finished cement of
item 1908.20 30550
approved
paste
of work. mixed brandwithand shadeof
pigment asmatching
approvedshade by theincluding
Engineercost - inand- Charge
over
conveyancebase coat of cement
of all materials primer water base
like cement, sand,grade water, -IItiles,
exterioretc. making
to site,
Painting
three
seignioragecoats to new
in allinternal
charges, to give sales walls
an even
and withshade
other two (2)on
after
taxes coats of ready
thoroughly
all materials, mixed
and alloil
brushing the
Sqm 309.870 bound
surface
opertional, washable
to remove
incidentaldistemper
all loose
and all acrylic
powdered base
labour charges of approved
materials, suchincluding brand
as mixingcost and shade
and
of cement 1238.15 38367
over
conveyancea base coat
of all of cement
materials, primer
including watercost
mortar, laying in position, curing, lift charges etc., complete for finished base
and interior
conveyance Grade-I of of
all
approved
materials,
item of work brand,
cost inof allmakind
floors three
brushes, water (3)tocoats in allsales
site, etc., to give an even
& other taxes,shade all after
Supplying
thourughly
operational, &brushing
fixing of the
incidental 1.05x
and 2.13
surface
labour Mts. (Double
tocharges
remove allLeaf)
such dirt Door
and framecharges,
remains
as scaffolding made
of loose of
Each 4.000 roll formedmaterials,
powdered
lift charges, section
curing etc., ofincluding
1.25 mm cost
complete thick
forandCRCA section,
conveyance
finished item of size
of should
all
work in allbe
materials 50tox
floors 6880.00 27520
75
for mm
work with
site
external and 32allmm rebate.
operational,
Walls.(APSS No.The corner oflabour
incidental,
911) the frame charges should etc.,be welded.
complete
The frame should
for finished item ofbework painted in allwithfloorsonefor coat of primer
internal walls and (SSfinished
911)
Providing
painted with andpurefixing 30mm thick
polyester paint.SolidThe panel
framePVC should door beshutter
provided consisting
with
Sqm 3.070 of frame made
approved quality outM.S.Powder
of M.S. tubes of 19 butt
coated gauge thickness
hinges IS 205 and size oflong
125mm 19mm of 6 2480.00 7614
xNos.
19mm along forwithstiles, & 15mm
Double flush x 15mm for top &
door shutters bottom
solid bondrails. wood M.S.
blockframe board
shall
type withhavecommercial
a coat of steel plyprimers
on bothoffaces approved
of 30mm make thickandincluding
manufacture.
Supplying
M.S.
fixturesframe suchand asfixing
shall Mild of
be covered Unplasticised
Steel with
"Z" type 5mm HoldPoly
thick Vinyl
Fasts heat Chloride
molded
6 Nos., (UPVC)
PVC
M.S.Powder 3coated
track
‘C’ channel
Sqm 8.640 sliding
of
tower windows
size bolts
30 x 50mm with
I.S. 204,forming mesh
300 mm shutter
stiles,
longand provision
and5mm 10mm –
thick,
BOLT(only
75mm 2-glass
dia 2Nos,wideshutters)
PVC 6921.00 59797
duly
sheets manufactured
M.S.Powder for top rail, lock
coated using rail
handles UPVC
&ISbottomreinforced
208 125mmrail onprofiles
either
long 4No, (Composition
side, and 10mm
M.S.Powder ofcoated
profile
Aldropxshall
(5mm IS2)2681 consists
thick, 20mm
300mm a minimum
wide1No.,
long cross ofM.S.Powder
5.5 PHR
PVC sheet ofas TiO2
gapand
coated insert
Doornotfor moretop than
Stoper rail
2No., &
Supply
12 PHR
bottom
sales and and
of
rail. fixing
CaCo3
Paneling
other of
for
taxesof M.S.Grill
every5mm
cost 100 of
andthick size
parts with
of PVC
PVC sheet
conveyance outerresin)
of all angular
to be of (80 frame
mm
fitted intothe
materials xof52rolled
M.S.
site, mm) /
all
Sqm 10.440 steel
(94
frame mm equal x
welded 45 angle
mm)
/ ofx
sealed ISA
2.20 2525
to mm
the of
for size
stiles outer
& 25mmframes,
rails
labour cahrges such as making of door frame, fixing in position,fixing of x
with 25mm
(54
30mm mmx 4mmx
wide 38 welded
xmm)/(39
5mm with
thick 1623.00 16944
safety
mm
PVC
shutters, bars
xsheet
58 mm) of 10mm
&beading
hardx 2.20wareonsquare
mmeitherforrods
fixtures, sliding
side, at
and150mm
shutter centre
joinedframes
etc.,complete together to centre
capable
for finished withitem ofhorizontally
mounting
solventof work.
and
The verticlally
single
cement glazing
frame adhesive
shouldincluding
system,etc. An
be embedded red oxide
structurally
additional primer
to reinforced
a5mm
depth of
ofgrade-I
thick with
PVChot
40mm quality,
strip
in dip
the sales and
ofgalvanized
20mm
flooring. width up
Brick
other
to 50be
is to Masonry
taxes,
stuckcost
microns onofinthesuperstructure
and
minimum conveyance
interior side with
thickness of allofCM
of the 1.0(1:6)
‘C’ / 1.2prop
materials
Channel to using
mm with
site, all Flyash
labour
prefabricated
PVC Cement
solvent &
Cum 44.580 solid
charges
welded
adhesive.blocksand
through of
Completesize
fixing fusion290
in x 225
asposition
welding.
per xetc.,
direction140
The mm,
complete
window
of for manufacturing
for
sashfinished
Engineer-in-charge, shall be item of of
fitted flyash
work.
with 5 6996.10 311886
solid
mm blocks
thick
manufacturer’s clearusingfloat flyash
glassofof80
specification &kgs,
reputed cement
drawing make forofduly 15 fixed
finished kgs.itemGypsum
withofGrey of colour
work 5 kgs.
and
TPV stone
Gasketdust for with
sash a&compresive
Glazing beadstrength shall benot lessthan 50
co-extruded withkg/sqm
Grey
Supply
including
colour soft and fixing
cost
PVC. and ofconveyance
System M.S.Grill
shall Doorhaveof allofmaterials,
sizepoint
single 1.80 Xlocking
2.13 M
labour withTouch
charges,
with outer Lock
Each 1.000 angular
seiniorage
and the systemframe of
charges, rolled steel
is toscaffolding
be installedandequal angle
curing
at the of
siteetc.,ISA
usingfor4040 of size
Superstructure
anchor 40mm
fasteners, Walls. x 7343.00 7343
40mm
silicon xrubber6mm and sealant, shuttereasyISA 2525/ofdeglazing
glazing size 25mm x 25mm
at site x 4mm cost
etc., including
welded
and conveyancewith safety of allbars of 10mmaccessories,
materials, square rodslabour at horizontal
charges14 forno.s and
Providing
verticlal
transportation,9 Drip mould
no.s including
erection of at
size
red 25x12mm
oxide
site primer
complete with CM(1:3)quality,
offinished
for grade-I prop.ofIncluding
item sales and
work.
Rmt 44.500 cost
otherand taxes,conveyance of all materials
cost and conveyance of alland labour charges
materials to site, all etc., to
labour 68.46 3046
complete.
charges and fixing in position etc., complete for finished item of work.
Painting to New Iron work with two coats of ready mixed Synthetic
Sqm 16.310 Enamel paints in all shades Grade - I having VOC (Volatile Organic 1128.40 1840
Compound) content less than 50 grams/ liter first quality all shades over
red oxide primer Grade-I making three (3) coats in all to given and even
Providing
shade afterElevation
thourughly Patty of size the
brushing 50x12mm
surfacewith CM(1:3)
to remove allprop.
dirt and Including
Rmt 94.000 cost
remainsand ofconveyance
loose powered of all materials,
materials and labourcost
including charges etc., to
and conveyance of 138.69 13037
complete.
all materials to site, sales & other taxes, incidental, operational and all
labour charges etc., complete for finished item of work. (APSS No. 1201,
Flooring with soluble
1207 & 1212).in salt porcelain vitrified tiles screen printed and
All Floors
Sqm 78.330 polished of size 600 x 600 mm and thickness between 8-10 mm 1st 10229.30 80126
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs of make Jhonson &
Providing SkirtingNitco,
Jhonson, Kajaria, to internal
Marbonite,walls setto 15overcmbaseheight coat and of risers
cement ofmortar
steps
Sqm 7.580 with
(1:8),soluble
12 mmsalt thick porcelain
over CC vitrified
bed already tileslaid
screenor RCCprintedroof and slab,polished
including of 10179.80 7716
size
neat600cementx 600 mm and
slurry thickness
of honey between 8-10
like consistency mm 1st
spread qualityper sqm
@ 3.3.kgs
conforming
& jointed neatly to IS:13711,
with white IS:13712,
cementIS:13630
paste to (Parts
full depth 1 tomixed15) ofwithany colour
Reinforced
and Cement
finishofofmatching
pigment make JhonsonConcrete M20
shade,&including Grade
Jhonson, Nominal
Kajaria,
cost of allNitco, MixMarbonite,
materials corresponding
like cement,set to
Sqm 6.890 IS
over456 using
base coat 20mmof CM size graded
(1:5) 12 mm machine
thick crushed
with
sand water and tiles etc., complete, including seigniorage charges, cement hard granite
slurry of metal
honey like
etc., 855.50 5894
(coarse
consistency
complete aggregate)
forspread
finished from theapproved
at item rate of 3.30
of work, quarry
. kgs per including
sqm and cost and conveyance
jointed with
of all materials
white cement paste like cement,
mixed with finepigment
aggregate of(sand)
matching coarseshade aggregate,
to full depth,
Painting
water
including tocost
etc., New
to site wood
of alland work with
including
materials two
tiles,coats
Seigniorage
like cement,of ready
charges,
sand sales mixed
and water&Synthetic
other taxes
etc.,
Sqm 17.040 Enamel
on
complete paints
all materials
including inincluding
allseigniorage
shades allGrade - I having
operational,
charges, etc.,VOC
incidental (Volatile
complete andfor Organic
labour
finished charges
item 1999.10 3406
Compound)
such as machine
of work, content less laying
mixing, than 50 grams/ liter
concrete, curing first quality all shades
etc.,complete but to
give an even
excluding cost shade
of steelover andbaseits coatof woodcharges
fabrication Primer for finishing
finished with
item putty
of
Supply
for
work wood and
(APSS work fixing
No.after of Foundation
402) thouroughly /brushing
including centering,Inauguaration stonelaying
the surface
shuttering, including
to remove cost
all
concrete,
No.s 1.000 and
curingconveyance
remains etc.including
complete of all
cost material
for and
Shelves and
conveyance labour
of 50mm charges
ofthick
all materials etc., complete
to site, sales & 20000.00 20000
other taxes, all operational, incidental and labour charges etc., complete
for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Forming embankment with approved material obtained from
Cum 50.000 borrowpits with a lead upto 1000 meters useful from outside road 244.80 12240
boundary by mechanical means upto SDR with all leads and lifts,
including pre-watering of soil at borrow area, removal of top soil,
Electrification
excavation and conveyance of soils and depositing the soil on the
embankment,
Supply and fixing spreading,
of ISI mark breaking
25mmclods, sectioning,
dia 2.2mm thickgrading
PVC conduit and pipe
consilodation
Sudhakar / Macoplast with vibratory / Modimake roller at OMC to meet
concealed in roof the slabrequirement
with all of
Rmt 26.700 table 300-2 of MoRT&H and table 300.1 86.40 2307
required acessories including No.14 SWGand 300.2,for
GI wire ofearth
MORD including
continuity
all hire and
including operational
chiseling the wallcharges of T&Pnecessary
wherever and seigniorage, including charges,
necessaryas per
MoRT&H
Supply
masonery and specification
fixingfor
work ISI305
oflight/fan
mark (4th
25mm revision)
pointand 301.5thick
diaseperate
1.8mm of MORD
plug complete
PVC conduit
point with teak for
pipe
finished
Sudhakar
wood deep item
/ box of including
work. (Payment
Macoplast / Modi
cost make
and will be made based
concealed
conveyance in
of wall onwithlevel
all materials allfortofinished
required
site and
Rmt 50.100 item ofcharges,
work). 96.40 4830
acessories
labour including salesNo.14
tax etc., SWG GI wirefor
complete forfinished
earth continuity
item of work. including
chiseling the wall wherever necessary , including necessary masonery
Supplying and wiring with 2 runs of 14/0.3m
work for light/fan pointand seperate plug point with teak wood deep (1.00 Sq.mm) FRLS /
No.s 24.000 HFFR P.V.C. insulated
box including cost andISI Copper Cable
conveyance of allGM/L&T/RPG/Havells/V-
materials to site and labour 546.30 13111
Guard/Power
charges, sales tax Flex/Polycab/Gold
etc., complete for Medal/
finished Standard
item of /Milion/
work. Vimal/
Suncab/ Paragaon/FortuneArt make in the existing metallic / non-
Supply
metallicand conductfixing pipeof 6Awith3/2 6A pin1flush
Waytype flushsocket with 6ACeiling
type switch, switchrose control
and
No.s 7.000 of
3mm Anchor
thick/hylamGold medal sheet olive
covering / Million
to switchzoomcontrol
make with ISI mark on
box including costa 141.39 990
common switch board
and conveyance with earth
of all materials tocontinuity
site, labourincluding
charges wire and salesleads,tax earth
etc.
connections
complete for includingfinished item costof andworkconveyance of allfan
for light, bell, materials
and exhaust to site,fan
Supply
labour
points in and
charges fixing and
Non-Residential ofsales
batten tax holder / slanting
etc. complete
Buildings forholder
finished Anchor
item /ofGold workmedal
No.s 11.000 olive / Million zoom make with ISI mark in lieu of ceiling rose of light 361.90 3981
point with 12.0W LED Lamp all connections including cost and
conveyance of all materials to site, labour charges and sales tax etc.,
Supply
complete and fortransportation
finished item of work. 20W, 2000 lumens, T8,1200mm length
No.s 7.000 LED tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge 1033.80 7237
protection: 2KV,THD<125%, with inbuilt driver and frosted cover CCT:
3000K - 5700K, minimum CRI≥80,.etc., complete Manufacture has to
Providing
submit LM79,LM80independent earthing for main
& Photobiological switches
Safety Report. integrated
Luminaire circuit
No.s 6.000 cutouts
Performanceand moters Complies withto40mm IS10322 dia(Part
Medium 5/Sec grade
3) &GI IECPipe of
60598-1,IEC 226.54 1359
TATA/Zenith/GST
60529 ISO certifiedmake company. of 2.5LUMINAIRE
m length duly providing
MAKE: Phillips 12mm/ OSRAM dia 16/ GE
Nos. holes and
/ Crompton / VINrewired
/ Bajaj bolts, nuts and
/ Havells washers,
/ Halonix checknuts,
/ HPL. LED MAKE Humepipe
: PHILIPS
Supply
ring 18 and
LUMILEDS inches /fixing
dia,42/way
CREE inch
NICHIASPN
thick/Distribution
etc., as per
OSRAM board with
IS specifications
/ SAMSUNG / LG IP-20LEDs protection of
with
No.s 1.000 make
necessaryStandard
double / Havells
GI earth/ wire HPL/Toyoma/
NO. 8 SWGCinclkuding
&S suitable for single
filling phase
with equal 4049.81 4050
40A Double pole
preparation of salt Isolator as incomer
and charcoal and 10KA-6-32A
in layers including cost rangeand single
conveyancepole
miniature
of all materialscircuit tobreakers
site, labour four numbers
charges and(4Nos)
sales tax as outetc.,going
complete withfor
Supply
finishedand
internal run
connections
item of of 2 ofincluding
work. 36/0.3mm cost(2.5
andsqmm)
conveyanceFRLS /ofHFFR PVC to
all materials
Rmt 38.700 insulated
site, labour ISIcharges
Copperfor cable
surfaceof makes
/ flushPolycab
mounting / Havells
etc., sales / Goldtax medal
complete 81.89 3169
/Fortune
for finished artitem/L&T/ HPL in existing metallic / non-metallic conduit pipe
of work.
for mains including cost and conveyance of all materials to site, labour
Supply
chargesand anderrecting
sales tax of energy
etc., completeefficient fan, 1200
for finished itemmmofsweep, work. aluminium
Each 6.000 body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less 3445.72 20674
Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm
long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding,
Supply and Run
Power Factor of 2 ofthan
greater 6 Sq.mm0.90, (7/18)
ServiceWPSC Value ISI Aluminium
(CMMAV) greaterwirethanof
Rmt 47.000 makes Finolex minimum
8.5, Air delivery / Polycab/235 Gold Medal
CMM, 350/million /Payal/ Power
RPM( tolerance as perFlex IS:374- 64.46 3030
along
2019),withTHDNo.10 less than SWG10%. G.I bearer wire through
with remote PVC cleats
or compatible with all step
to electronic
accessories
type regulator including
unit forcost speed andcontrol
conveyance and allofremaining
all materials to site, labour
accessories
Water Supply
charges
including andsafety and
sales tax
pin, Sanitary
nutetc.,bolts, Arrangements
complete
washers, for finished
temperature item of work. degree
rise=75
C(max),
Providing insulation
& Placingresistance
of RCC water more than 2tank
storage megaonohm, Roofsuitable
slab alroundfor 230V,
50
50mm HZ, single
thick and phase base AC100mm
supply,thick earthing
withetc., including
suitable locking all arrangement
standard &
Litre 1360.000 accessories etc., complete. 8.00 10880
making necessary holes forMakes inlet &: Atomberg
outlets and(Efficioover flow ) / Havells
pipes but / Orient
without fittings
S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5
Rmt 27.800 including cost and conveyance of all materials and labour charges , 223.82 6222
Overheads & Contractors profit complete for finished item of work for
all floors.
S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5
Rmt 4.600 including cost and conveyance of all materials and labour charges , 147.70 679
Overheads & Contractors profit complete for finished item of work for
all floors.
S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including
Rmt 10.200 cost and conveyance of all materials and labour charges , Overheads & 181.41 1850
Contractors profit complete for finished item of work for all floors.
S&F 63 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including
Rmt 24.200 cost and conveyance of all materials and labour charges , Overheads & 60.25 1458
Contractors profit complete for finished item of work for all floors.
Supply and Fixing European Water Closet of 1st quality conforming to
Rmt 2.000 IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make white 4390.10 8780
glazed with 'S' trap including cost of plastic sheet and lid for European
Water Closet with rubber or plastic buffers as per IS:2548-1996 and PVC
low level single flush 10 litere capacity system with internal components
and short bend of make Parryware slim line including cost and
conveyance of all materials to site, labour charges for fixing etc.,
Supplying & Fixing of 15.00 mm brass body CP finish bib tap of not less
Each 4.000 than 300 grams weight screw type (full turn) with internal / external 257.95 1032
threaded connection conforming to IS 8931 including cost and
conveyance of all materials to site, all labour charges, sales and other
Supplying
taxes on all&materials
Fixing 550 x 400
etc., mm Indian
complete make Flat
for finished itemBack Wash
of work forHand
All
Each 3.000 Basin
Floors.(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556- 2114.40 6343
Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979
Supply andwith
and fitted Fixing of 1.20m
15 mm dia RCC
nominal boreReadymade Rings 50mm
single Chromium thick Tap
Plated Pillar
Each 12.000 0.30m height Indian
of 1st quality including
makecost400
andgrams
conveyance
Seiko/ of all materials andorlabour
Esso/Nice/Senior 682.00 8184
charges etc.,complete
equivalent completewith standard CI brackets including wooden block,
12.7mm PVC connection with Brass union nut CP coated, 12.7mm dia
Supply and Fixing
first qualifty of 1.20m
NP angle dia RCC
stop cock, Readymade
38.1mm Topcoupling
CP waste Cover 50mm thick
, 31.75mm
Each 2.000 including cost and
dia PVC flexible conveyance
waste of all materials
pipe of 914.4mm lengthand labour
of first charges
quality etc.,
including 682.00 1364
complete
cost and conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of work. for
Supply and Fixing of 25mm PPR Ball Valve conforming to DIN Standards
All Floors.
Each 2.000 8077/8092 including cost and conveyance of all materials and labour 254.00 508
charges etc., complete
Fixing of Submersible Motor
Supply and Delivery of 1HP Submersible motor pump set including cost
Each 1.000 and conveyance of material etc., complete 20000.00 20000
Supplying & fixing of 32mm dia HPDE 10.00kg sqm pipe including cost
Rmt 36.000 and convenyance of all material etc., complete 75.00 2700
Supply and Delivery of 1HP motor panel board including cost and
Each 1.000 conveyance of material etc., complete 6800.00 6800
Supplying & fixing of 1.50 sqmm pvc flat copper cable wire including
Rmt 40.000 cost and convenyance of all material etc., complete 95.00 3800
Supplying & fixing of M.S Clamp set including cost and convenyance of
Each 2.000 all material etc., complete 441.00 882
1699669
Quantity since
executed for Item of work, of supplies granted under "sub-head" and previous bill
Unit supplied upto Rate Upto date total for Remarks
date as per sub work of estimate each
measurement subhead
I
Earth work excavation for foundations and depositing on bank for all
Cum 50.950 lifts and with an initial lead of 10m including all operational, incidental, 384.65 19598
seigniorage charges, labour charges such as shoring ,sheeting, planking,
strutting, dewatering etc. complete for finished item of work as per SS -
Plain Cement
20 B (APSS Concrete
308). (1:5:10)
for Building proportion (cement: fine aggregate:
Foundation
Cum 15.360 Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) 5149.00 79089
machine crushed metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water
Filling withmixing
etc. to site, useful available
concrete in excavated
concreteearth
mixer(excluding
including rock) in
seigniorage
Cum 33.350 trenches, sides&ofother
charges, sales foundations
taxes onand basement all
all materials, with initial leadincidental,
operational, in layers 34.15 1139
not
and exceeding 15 cmsuch
labour charges thick,
as consolidating each deposited
laying and ramming concretelayer by in
in layers
watering
position notandexceeding
ramming 15cm,including cost and
finishing topconveyance of water
surface, curing to work
concrete, etc.,
Filling
site with
and allfor
complete Gravel in
operational, trenches,
finished item sides
incidental, of
of worklabour foundations
(APSScharges, and
No. 402)hire basement Twith
charges ofCourse
for Levelling &P
Cum 34.340 initial
etc., lead in
completeBed
and Flooring layers not exceeding 15cm thick, consolidating
for finished item of work. APSS No.309 & 310 each 292.05 10029
deposited layer by watering and ramming including all operational,
incidental, labour charges, seignorage charges, hire charges of T & P etc.,
Vibrated
completeReinforced
for finishedCement
item of Concrete
work. APSS M20 Grade&Nominal
No.309 310 Mix
corresponding to IS 456 using 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand)
Cum 6.310 FOOTINGS
coarse aggregate, water etc., to site and including Seigniorage charges, 10517.05 66363
sales
COLUMNS& other taxes on all materials including all operational, incidental
Cum 3.800 and labour charges such as machine mixing, laying concrete, curing 12896.10 49005
Cum 5.120 PLINTH BEAMbut excluding cost of steel and its fabrication charges for
etc.,complete 13155.20 67355
finished
LINTELSitem of work (APSS No. 402) including centering, shuttering,
Cum 0.720 laying concrete, vibrating, curing etc 12427.60 8948
Sqm 5.760 SUNSHADES 950.10 5473
Cum 5.190 ROOF BEAMS 11575.35 60076
Sqm 115.940 ROOF SLAB 115MM 1324.25 153534
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500
MT 3.126 grade as per IS 1786-1979) of different diameters for RCC works, 81489.60 254736
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
Ceiling
materials Plastering
and sizewith CM(1:4)
and tying andProp: 12mmwith
lapsplicing thickbinding
in single wirecoatofspong
18
Sqm 107.830 finish
SWG, forming including costfor
grills and conveyance of
reinforcement all materials
work as per approved like cement, designs sand,and 1908.45 20579
water
drawings, etc.,including
to site, includingcost andseigniorage
conveyancecharges, of steel sales
bars, & other taxes
including all on
all materials,
wastages suchallasoperational,
overlaps, couplings,incidentalchairs, charges and labour
spacer chargescost
bars including such
Plastering
as
andmixing
conveyance to even
mortar, surfaces
offinishing,
binding wire, of wall
curing, with CM(1:5)
etc.,blocks
cover complete and Prop:
for 12mm thick
all finished
incidental, item of in
Sqm 312.760 single
work.
operational, coat including
(APSS 901,906)
laour cost and
charges suchconveyance
as cutting, bending of all materialsplacinglike cement,
in position, 1789.65 55973
sand, water etc.,sales
tying including to site,andincluding
other taxes seigniorage
on all materialscharges,etc., sales & otherfor
complete
taxes
finished on item
all materials,
of work in allall
operational,
floors. (APSS incidental
No.126)charges of TATA, and labour
SAIL, VSP,
Plastering
charges
JINDAL & such to even
SHYAM as mixing surfaces
STEEL mortar,of wall with CM
finishing, (1:5) etc.,
curing, Prop: 16mm thick
complete for in
Sqm 140.170 single coat including
finished item of work. (APSS 901,906) cost and conveyance of all materials like cement, 2578.75 36146
sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, all operational, incidental charges and labour
Flooring
charges such withas Non-skid red or white
mixing mortar, full body
finishing, curing, Ceramic floor tilesfor
etc., complete of size
Sqm 7.010 300
finished x 300 itemmmofand work. thickness between 7-8 mm 1st quality conforming to
(APSS 901,906) 8654.00 6066
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs of makes Jhonson & Jhonson, Kajaria, Nitco and
Dadooing
Marbonite,toset walls
overwith baseglazed
coat of red or white
cement mortarfull body
(1:8),ceramic
12 mm wall thicktilesoverof
Sqm 21.210 size
CC bed 200already
x 300 mm laid/or245 RCC mm roof x 325
slab,mm and thickness
including neat cement 6 mmslurry 1st quality
of 5664.40 12014
conforming
honey like consistency to IS:13711,spread IS:13712, IS:13630
@ 3.3.kgs per (Parts
sqm &1jointed to 15) neatlyof any withcolour
and
white finish
cement in allpaste
shades anddepth
to full designs, mixed anywithbrand as approved
pigment of matchingby Engineershade,
Painting
-including
in - charge tocost
New
andof External
set over aWalls
all materials base with
likecoat two
of
cement, CM coats
(1:5),
sand ofwater
Plastic
12mm and Emulsion
thick
tiles andetc., paint
neat
Sqm 160.100 of Asianpaste
cement
complete, / Berger at the
including / Nerolac
rate of 3.3
seigniorage / Saicoat
Kg/Sqmt.
charges,/ Endocem
and
etc.,jointed or equalent
complete with forwhite quality
finished cement of
item 1908.20 30550
approved
paste
of work. mixed brandwithand shadeof
pigment asmatching
approvedshade by theincluding
Engineercost - inand- Charge
over
conveyancebase coat of cement
of all materials primer water base
like cement, sand,grade water, -IItiles,
exterioretc. making
to site,
Painting
three
seignioragecoats to new
in allinternal
charges, to give sales walls
an even
and withshade
other two (2)on
after
taxes coats of ready
thoroughly
all materials, mixed
and alloil
brushing the
Sqm 309.870 bound
surface
opertional, washable
to remove
incidentaldistemper
all loose
and all acrylic
powdered base
labour charges of approved
materials, suchincluding brand
as mixingcost and shade
and
of cement 1238.15 38367
over
conveyancea base coat
of all of cement
materials, primer
including watercost
mortar, laying in position, curing, lift charges etc., complete for finished base
and interior
conveyance Grade-I of of
all
approved
materials,
item of work brand,
cost inof allmakind
floors three
brushes, water (3)tocoats in allsales
site, etc., to give an even
& other taxes,shade all after
Supplying
thourughly
operational, &brushing
fixing of the
incidental 1.05x
and 2.13
surface
labour Mts. (Double
tocharges
remove allLeaf)
such dirt Door
and framecharges,
remains
as scaffolding made
of loose of
Each 4.000 roll formedmaterials,
powdered
lift charges, section
curing etc., ofincluding
1.25 mm cost
complete thick
forandCRCA section,
conveyance
finished item of size
of should
all
work in allbe
materials 50tox
floors 6880.00 27520
75
for mm
work with
site
external and 32allmm rebate.
operational,
Walls.(APSS No.The corner oflabour
incidental,
911) the frame charges should etc.,be welded.
complete
The frame should
for finished item ofbework painted in allwithfloorsonefor coat of primer
internal walls and (SSfinished
911)
Providing
painted with andpurefixing 30mm thick
polyester paint.SolidThe panel
framePVC should door beshutter
provided consisting
with
Sqm 3.070 of frame made
approved quality outM.S.Powder
of M.S. tubes of 19 butt
coated gauge thickness
hinges IS 205 and size oflong
125mm 19mm of 6 2480.00 7614
xNos.
19mm along forwithstiles, & 15mm
Double flush x 15mm for top &
door shutters bottom
solid bondrails. wood M.S.
blockframe board
shall
type withhavecommercial
a coat of steel plyprimers
on bothoffaces approved
of 30mm make thickandincluding
manufacture.
Supplying
M.S.
fixturesframe suchand asfixing
shall Mild of
be covered Unplasticised
Steel with
"Z" type 5mm HoldPoly
thick Vinyl
Fasts heat Chloride
molded
6 Nos., (UPVC)
PVC
M.S.Powder 3coated
track
‘C’ channel
Sqm 8.640 sliding
of
tower windows
size bolts
30 x 50mm with
I.S. 204,forming mesh
300 mm shutter
stiles,
longand provision
and5mm 10mm –
thick,
BOLT(only
75mm 2-glass
dia 2Nos,wideshutters)
PVC 6921.00 59797
duly
sheets manufactured
M.S.Powder for top rail, lock
coated using rail
handles UPVC
&ISbottomreinforced
208 125mmrail onprofiles
either
long 4No, (Composition
side, and 10mm
M.S.Powder ofcoated
profile
Aldropxshall
(5mm IS2)2681 consists
thick, 20mm
300mm a minimum
wide1No.,
long cross ofM.S.Powder
5.5 PHR
PVC sheet ofas TiO2
gapand
coated insert
Doornotfor moretop than
Stoper rail
2No., &
Supply
12 PHR
bottom
sales and and
of
rail. fixing
CaCo3
Paneling
other of
for
taxesof M.S.Grill
every5mm
cost 100 of
andthick size
parts with
of PVC
PVC sheet
conveyance outerresin)
of all angular
to be of (80 frame
mm
fitted intothe
materials xof52rolled
M.S.
site, mm) /
all
Sqm 10.440 steel
(94
frame mm equal x
welded 45 angle
mm)
/ ofx
sealed ISA
2.20 2525
to mm
the of
for size
stiles outer
& 25mmframes,
rails
labour cahrges such as making of door frame, fixing in position,fixing of x
with 25mm
(54
30mm mmx 4mmx
wide 38 welded
xmm)/(39
5mm with
thick 1623.00 16944
safety
mm
PVC
shutters, bars
xsheet
58 mm) of 10mm
&beading
hardx 2.20wareonsquare
mmeitherforrods
fixtures, sliding
side, at
and150mm
shutter centre
joinedframes
etc.,complete together to centre
capable
for finished withitem ofhorizontally
mounting
solventof work.
and
The verticlally
single
cement glazing
frame adhesive
shouldincluding
system,etc. An
be embedded red oxide
structurally
additional primer
to reinforced
a5mm
depth of
ofgrade-I
thick with
PVChot
40mm quality,
strip
in dip
the sales and
ofgalvanized
20mm
flooring. width up
Brick
other
to 50be
is to Masonry
taxes,
stuckcost
microns onofinthesuperstructure
and
minimum conveyance
interior side with
thickness of allofCM
of the 1.0(1:6)
‘C’ / 1.2prop
materials
Channel to using
mm with
site, all Flyash
labour
prefabricated
PVC Cement
solvent &
Cum 44.580 solid
charges
welded
adhesive.blocksand
through of
Completesize
fixing fusion290
in x 225
asposition
welding.
per xetc.,
direction140
The mm,
complete
window
of for manufacturing
for
sashfinished
Engineer-in-charge, shall be item of of
fitted flyash
work.
with 5 6996.10 311886
solid
mm blocks
thick
manufacturer’s clearusingfloat flyash
glassofof80
specification &kgs,
reputed cement
drawing make forofduly 15 fixed
finished kgs.itemGypsum
withofGrey of colour
work 5 kgs.
and
TPV stone
Gasketdust for with
sash a&compresive
Glazing beadstrength shall benot lessthan 50
co-extruded withkg/sqm
Grey
Supply
including
colour soft and fixing
cost
PVC. and ofconveyance
System M.S.Grill
shall Doorhaveof allofmaterials,
sizepoint
single 1.80 Xlocking
2.13 M
labour withTouch
charges,
with outer Lock
Each 1.000 angular
seiniorage
and the systemframe of
charges, rolled steel
is toscaffolding
be installedandequal angle
curing
at the of
siteetc.,ISA
usingfor4040 of size
Superstructure
anchor 40mm
fasteners, Walls. x 7343.00 7343
40mm
silicon xrubber6mm and sealant, shuttereasyISA 2525/ofdeglazing
glazing size 25mm x 25mm
at site x 4mm cost
etc., including
welded
and conveyancewith safety of allbars of 10mmaccessories,
materials, square rodslabour at horizontal
charges14 forno.s and
Providing
verticlal
transportation,9 Drip mould
no.s including
erection of at
size
red 25x12mm
oxide
site primer
complete with CM(1:3)quality,
offinished
for grade-I prop.ofIncluding
item sales and
work.
Rmt 44.500 cost
otherand taxes,conveyance of all materials
cost and conveyance of alland labour charges
materials to site, all etc., to
labour 68.46 3046
complete.
charges and fixing in position etc., complete for finished item of work.
Painting to New Iron work with two coats of ready mixed Synthetic
Sqm 16.310 Enamel paints in all shades Grade - I having VOC (Volatile Organic 1128.40 1840
Compound) content less than 50 grams/ liter first quality all shades over
red oxide primer Grade-I making three (3) coats in all to given and even
Providing
shade afterElevation
thourughly Patty of size the
brushing 50x12mm
surfacewith CM(1:3)
to remove allprop.
dirt and Including
Rmt 94.000 cost
remainsand ofconveyance
loose powered of all materials,
materials and labourcost
including charges etc., to
and conveyance of 138.69 13037
complete.
all materials to site, sales & other taxes, incidental, operational and all
labour charges etc., complete for finished item of work. (APSS No. 1201,
Flooring with soluble
1207 & 1212).in salt porcelain vitrified tiles screen printed and
All Floors
Sqm 78.330 polished of size 600 x 600 mm and thickness between 8-10 mm 1st 10229.30 80126
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of
any colour and finish in all shades and designs of make Jhonson &
Providing SkirtingNitco,
Jhonson, Kajaria, to internal
Marbonite,walls setto 15overcmbaseheight coat and of risers
cement ofmortar
steps
Sqm 7.580 with
(1:8),soluble
12 mmsalt thick porcelain
over CC vitrified
bed already tileslaid
screenor RCCprintedroof and slab,polished
including of 10179.80 7716
size
neat600cementx 600 mm and
slurry thickness
of honey between 8-10
like consistency mm 1st
spread qualityper sqm
@ 3.3.kgs
conforming
& jointed neatly to IS:13711,
with white IS:13712,
cementIS:13630
paste to (Parts
full depth 1 tomixed15) ofwithany colour
Reinforced
and Cement
finishofofmatching
pigment make JhonsonConcrete M20
shade,&including Grade
Jhonson, Nominal
Kajaria,
cost of allNitco, MixMarbonite,
materials corresponding
like cement,set to
Sqm 6.890 IS
over456 using
base coat 20mmof CM size graded
(1:5) 12 mm machine
thick crushed
with
sand water and tiles etc., complete, including seigniorage charges, cement hard granite
slurry of metal
honey like
etc., 855.50 5894
(coarse
consistency
complete aggregate)
forspread
finished from theapproved
at item rate of 3.30
of work, quarry
. kgs per including
sqm and cost and conveyance
jointed with
of all materials
white cement paste like cement,
mixed with finepigment
aggregate of(sand)
matching coarseshade aggregate,
to full depth,
Painting
water
including tocost
etc., New
to site wood
of alland work with
including
materials two
tiles,coats
Seigniorage
like cement,of ready
charges,
sand sales mixed
and water&Synthetic
other taxes
etc.,
Sqm 17.040 Enamel
on
complete paints
all materials
including inincluding
allseigniorage
shades allGrade - I having
operational,
charges, etc.,VOC
incidental (Volatile
complete andfor Organic
labour
finished charges
item 1999.10 3406
Compound)
such as machine
of work, content less laying
mixing, than 50 grams/ liter
concrete, curing first quality all shades
etc.,complete but to
give an even
excluding cost shade
of steelover andbaseits coatof woodcharges
fabrication Primer for finishing
finished with
item putty
of
Supply
for
work wood and
(APSS work fixing
No.after of Foundation
402) thouroughly /brushing
including centering,Inauguaration stonelaying
the surface
shuttering, including
to remove cost
all
concrete,
No.s 1.000 and
curingconveyance
remains etc.including
complete of all
cost material
for and
Shelves and
conveyance labour
of 50mm charges
ofthick
all materials etc., complete
to site, sales & 20000.00 20000
other taxes, all operational, incidental and labour charges etc., complete
for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Forming embankment with approved material obtained from
Cum 50.000 borrowpits with a lead upto 1000 meters useful from outside road 244.80 12240
boundary by mechanical means upto SDR with all leads and lifts,
including pre-watering of soil at borrow area, removal of top soil,
Electrification
excavation and conveyance of soils and depositing the soil on the
embankment,
Supply and fixing spreading,
of ISI mark breaking
25mmclods, sectioning,
dia 2.2mm thickgrading
PVC conduit and pipe
consilodation
Sudhakar / Macoplast with vibratory / Modimake roller at OMC to meet
concealed in roof the slabrequirement
with all of
Rmt 26.700 table 300-2 of MoRT&H and table 300.1 86.40 2307
required acessories including No.14 SWGand 300.2,for
GI wire ofearth
MORD including
continuity
all hire and
including operational
chiseling the wallcharges of T&Pnecessary
wherever and seigniorage, including charges,
necessaryas per
MoRT&H
Supply
masonery and specification
fixingfor
work ISI305
oflight/fan
mark (4th
25mm revision)
pointand 301.5thick
diaseperate
1.8mm of MORD
plug complete
PVC conduit
point with teak for
pipe
finished
Sudhakar
wood deep item
/ box of including
work. (Payment
Macoplast / Modi
cost make
and will be made based
concealed
conveyance in
of wall onwithlevel
all materials allfortofinished
required
site and
Rmt 50.100 item ofcharges,
work). 96.40 4830
acessories
labour including salesNo.14
tax etc., SWG GI wirefor
complete forfinished
earth continuity
item of work. including
chiseling the wall wherever necessary , including necessary masonery
Supplying and wiring with 2 runs of 14/0.3m
work for light/fan pointand seperate plug point with teak wood deep (1.00 Sq.mm) FRLS /
No.s 24.000 HFFR P.V.C. insulated
box including cost andISI Copper Cable
conveyance of allGM/L&T/RPG/Havells/V-
materials to site and labour 546.30 13111
Guard/Power
charges, sales tax Flex/Polycab/Gold
etc., complete for Medal/
finished Standard
item of /Milion/
work. Vimal/
Suncab/ Paragaon/FortuneArt make in the existing metallic / non-
Supply
metallicand conductfixing pipeof 6Awith3/2 6A pin1flush
Waytype flushsocket with 6ACeiling
type switch, switchrose control
and
No.s 7.000 of
3mm Anchor
thick/hylamGold medal sheet olive
covering / Million
to switchzoomcontrol
make with ISI mark on
box including costa 141.39 990
common switch board
and conveyance with earth
of all materials tocontinuity
site, labourincluding
charges wire and salesleads,tax earth
etc.
connections
complete for includingfinished item costof andworkconveyance of allfan
for light, bell, materials
and exhaust to site,fan
Supply
labour
points in and
charges fixing and
Non-Residential ofsales
batten tax holder / slanting
etc. complete
Buildings forholder
finished Anchor
item /ofGold workmedal
No.s 11.000 olive / Million zoom make with ISI mark in lieu of ceiling rose of light 361.90 3981
point with 12.0W LED Lamp all connections including cost and
conveyance of all materials to site, labour charges and sales tax etc.,
Supply
complete and fortransportation
finished item of work. 20W, 2000 lumens, T8,1200mm length
No.s 7.000 LED tube light, input voltage AC 220 - 260Volts with PF≥0.9, Surge 1033.80 7237
protection: 2KV,THD<125%, with inbuilt driver and frosted cover CCT:
3000K - 5700K, minimum CRI≥80,.etc., complete Manufacture has to
Providing
submit LM79,LM80independent earthing for main
& Photobiological switches
Safety Report. integrated
Luminaire circuit
No.s 6.000 cutouts
Performanceand moters Complies withto40mm IS10322 dia(Part
Medium 5/Sec grade
3) &GI IECPipe of
60598-1,IEC 226.54 1359
TATA/Zenith/GST
60529 ISO certifiedmake company. of 2.5LUMINAIRE
m length duly providing
MAKE: Phillips 12mm/ OSRAM dia 16/ GE
Nos. holes and
/ Crompton / VINrewired
/ Bajaj bolts, nuts and
/ Havells washers,
/ Halonix checknuts,
/ HPL. LED MAKE Humepipe
: PHILIPS
Supply
ring 18 and
LUMILEDS inches /fixing
dia,42/way
CREE inch
NICHIASPN
thick/Distribution
etc., as per
OSRAM board with
IS specifications
/ SAMSUNG / LG IP-20LEDs protection of
with
No.s 1.000 make
necessaryStandard
double / Havells
GI earth/ wire HPL/Toyoma/
NO. 8 SWGCinclkuding
&S suitable for single
filling phase
with equal 4049.81 4050
40A Double pole
preparation of salt Isolator as incomer
and charcoal and 10KA-6-32A
in layers including cost rangeand single
conveyancepole
miniature
of all materialscircuit tobreakers
site, labour four numbers
charges and(4Nos)
sales tax as outetc.,going
complete withfor
Supply
finishedand
internal run
connections
item of of 2 ofincluding
work. 36/0.3mm cost(2.5
andsqmm)
conveyanceFRLS /ofHFFR PVC to
all materials
Rmt 38.700 insulated
site, labour ISIcharges
Copperfor cable
surfaceof makes
/ flushPolycab
mounting / Havells
etc., sales / Goldtax medal
complete 81.89 3169
/Fortune
for finished artitem/L&T/ HPL in existing metallic / non-metallic conduit pipe
of work.
for mains including cost and conveyance of all materials to site, labour
Supply
chargesand anderrecting
sales tax of energy
etc., completeefficient fan, 1200
for finished itemmmofsweep, work. aluminium
Each 6.000 body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less 3445.72 20674
Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm
long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding,
Supply and Run
Power Factor of 2 ofthan
greater 6 Sq.mm0.90, (7/18)
ServiceWPSC Value ISI Aluminium
(CMMAV) greaterwirethanof
Rmt 47.000 makes Finolex minimum
8.5, Air delivery / Polycab/235 Gold Medal
CMM, 350/million /Payal/ Power
RPM( tolerance as perFlex IS:374- 64.46 3030
along
2019),withTHDNo.10 less than SWG10%. G.I bearer wire through
with remote PVC cleats
or compatible with all step
to electronic
accessories
type regulator including
unit forcost speed andcontrol
conveyance and allofremaining
all materials to site, labour
accessories
Water Supply
charges
including andsafety and
sales tax
pin, Sanitary
nutetc.,bolts, Arrangements
complete
washers, for finished
temperature item of work. degree
rise=75
C(max),
Providing insulation
& Placingresistance
of RCC water more than 2tank
storage megaonohm, Roofsuitable
slab alroundfor 230V,
50
50mm HZ, single
thick and phase base AC100mm
supply,thick earthing
withetc., including
suitable locking all arrangement
standard &
Litre 1360.000 accessories etc., complete. 8.00 10880
making necessary holes forMakes inlet &: Atomberg
outlets and(Efficioover flow ) / Havells
pipes but / Orient
without fittings
S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5
Rmt 27.800 including cost and conveyance of all materials and labour charges , 223.82 6222
Overheads & Contractors profit complete for finished item of work for
all floors.
S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5
Rmt 4.600 including cost and conveyance of all materials and labour charges , 147.70 679
Overheads & Contractors profit complete for finished item of work for
all floors.
S&F 110 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including
Rmt 10.200 cost and conveyance of all materials and labour charges , Overheads & 181.41 1850
Contractors profit complete for finished item of work for all floors.
S&F 63 mm dia 3 M Single Socket PVC/SWR pipe- 4 Kg/sq.cm including
Rmt 24.200 cost and conveyance of all materials and labour charges , Overheads & 60.25 1458
Contractors profit complete for finished item of work for all floors.
Supply and Fixing European Water Closet of 1st quality conforming to
Rmt 2.000 IS:2556-part-2-2004 of Hindustan / Neycer or Parryware make white 4390.10 8780
glazed with 'S' trap including cost of plastic sheet and lid for European
Water Closet with rubber or plastic buffers as per IS:2548-1996 and PVC
low level single flush 10 litere capacity system with internal components
and short bend of make Parryware slim line including cost and
conveyance of all materials to site, labour charges for fixing etc.,
Supplying & Fixing of 15.00 mm brass body CP finish bib tap of not less
Each 4.000 than 300 grams weight screw type (full turn) with internal / external 257.95 1032
threaded connection conforming to IS 8931 including cost and
conveyance of all materials to site, all labour charges, sales and other
Supplying
taxes on all&materials
Fixing 550 x 400
etc., mm Indian
complete make Flat
for finished itemBack Wash
of work forHand
All
Each 3.000 Basin
Floors.(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556- 2114.40 6343
Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979
Supply andwith
and fitted Fixing of 1.20m
15 mm dia RCC
nominal boreReadymade Rings 50mm
single Chromium thick Tap
Plated Pillar
Each 12.000 0.30m height Indian
of 1st quality including
makecost400
andgrams
conveyance
Seiko/ of all materials andorlabour
Esso/Nice/Senior 682.00 8184
charges etc.,complete
equivalent completewith standard CI brackets including wooden block,
12.7mm PVC connection with Brass union nut CP coated, 12.7mm dia
Supply and Fixing
first qualifty of 1.20m
NP angle dia RCC
stop cock, Readymade
38.1mm Topcoupling
CP waste Cover 50mm thick
, 31.75mm
Each 2.000 including cost and
dia PVC flexible conveyance
waste of all materials
pipe of 914.4mm lengthand labour
of first charges
quality etc.,
including 682.00 1364
complete
cost and conveyance of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished item of work. for
Supply and Fixing of 25mm PPR Ball Valve conforming to DIN Standards
All Floors.
Each 2.000 8077/8092 including cost and conveyance of all materials and labour 254.00 508
charges etc., complete
Fixing of Submersible Motor
Supply and Delivery of 1HP Submersible motor pump set including cost
Each 1.000 and conveyance of material etc., complete 20000.00 20000
Supplying & fixing of 32mm dia HPDE 10.00kg sqm pipe including cost
Rmt 36.000 and convenyance of all material etc., complete 75.00 2700
Supply and Delivery of 1HP motor panel board including cost and
Each 1.000 conveyance of material etc., complete 6800.00 6800
Supplying & fixing of 1.50 sqmm pvc flat copper cable wire including
Rmt 40.000 cost and convenyance of all material etc., complete 95.00 3800
Supplying & fixing of M.S Clamp set including cost and convenyance of
Each 2.000 all material etc., complete 441.00 882
1699669