Vous êtes sur la page 1sur 5

Perhitungan gorong-gorong

Saluran Q (m3/dt) b (m) r (m) M A (m^2) g (m/dt^2) z (m)


T1-K1 0.037 0.3 0.15 0.9 0.071 10 0.076
K1-K2 0.02 0.3 0.15 0.9 0.071 10 0.022
A4 0.015 0.3 0.15 0.9 0.071 10 0.012
T2-K4 0.026 0.3 0.15 0.9 0.071 10 0.037
T3-K7 0.015 0.3 0.15 0.9 0.071 10 0.012
Tabel Hujan Harian Maksimum

NO Tahun RB RC RD
1 1999 112 99 90
2 2000 124 78 90
3 2001 100 110 112
4 2002 130 112 124
5 2003 112 124 90
6 2004 90 100 90
7 2005 90 130 112
8 2006 112 112 145
9 2007 124 90 134
10 2008 90 90 146
11 2009 90 112 90
12 2010 112 145 90
13 2011 145 134 90
14 2012 134 146 112
15 2013 146 95 124
16 2014 90 98 90
17 2015 99 100 90
18 2016 78 110 112
19 2017 110 90 112
20 2018 100 110 146
AB/ATOT x RB AC/ATOT x RC AD/ATOT x RD R Total (R-Ŕ) (R-Ŕ)”
35.81 38.26 26.45 100.51 -8.85 78.24
39.64 30.14 26.45 96.23 -13.12 172.24
31.97 42.51 32.91 107.39 -1.97 3.87
41.56 43.28 36.44 121.28 11.92 142.18
35.81 47.92 26.45 110.17 0.82 0.67
28.77 38.65 26.45 93.86 -15.49 240.01
28.77 50.24 32.91 111.92 2.57 6.58
35.81 43.28 42.61 121.70 12.34 152.27
39.64 34.78 39.37 113.80 4.44 19.73
28.77 34.78 42.90 106.45 -2.90 8.42
28.77 43.28 26.45 98.50 -10.85 117.82
35.81 56.04 26.45 118.29 8.93 79.78
46.36 51.79 26.45 124.59 15.23 231.99
42.84 56.42 32.91 132.17 22.82 520.59
46.68 36.71 36.44 119.83 10.47 109.61
28.77 37.87 26.45 93.09 -16.27 264.55
31.65 38.65 26.45 96.74 -12.61 159.13
24.94 42.51 32.91 100.36 -9.00 80.99
35.17 34.78 32.91 102.86 -6.50 42.23
31.97 42.51 42.90 117.38 8.02 64.39
2187.13 2495.30
Ŕ 109.36
Perencanaan Bendung

Beff 50 m Q 34.39
Cd 1.2 Kontrol Q 34.03
Q 50th 34.39 m^3/dt I 0.75
P 0.72 m n 0.035
R 1m yu 0.116
H1 0.48 m b 55.5
Kontrol Q 34.35 I 0.014
H1/R 0.480 Kontrol Q 34.36
Co 1.05 h2 0.363
P/H1 1.5
C1 0.99
C2 0.993
Cd 1.03 1.2

Bangunan Bagi
No Saluran Tersier Saluran I
Sadap
1 Sumber Sumber
SII Sumber 0.00049
2 Bandungan Bandungan
SI Bandungan 0.00071
3 Tukul Tukul
SI Tukul 0.00047
4 Mahoni Mahoni
SI Mahoni 0.00041
5 Ampel Gading Ampel Gading
SI Ampel Gading 0.00054
6 Kandil Kandil
SI Kandil 0.00046
7 Pinus Pinus
SI Pinus 0.00043
8 Plapah Plapah
SI Plapah 0.00038
9 Gemito Gemito
SI Gemito 0.00043
EL. Muka Air EL. Muka Air
L Elevasi Upstream Elevasi Muka Air
Downstream Upstream
823 823 823.1
186.33 740.1 740.19
875 875 875.1
234.88 823.1 823.27
900 900 900.1
205.97 875.1 875.20
925 925 925.1
146.96 900.1 900.16
980 980 980.1
205.32 925.1 925.21
1050 1050 1050.1
191.85 980.1 980.19
1100 1100 1100.1
158.5 1050.1 1050.17
1100 1100 1100.1
173.34 1100.1 1100.17
1150 1150 1150,1
307.6 1100.1 1100.23

Vous aimerez peut-être aussi