PENYELIDIKAN TANAH
JEMBATAN KALIGAWE A
SONDIR TITIK 2
DATA SONDIR / DPCT (Dynamic Cone Penestration Test)
SNI 2827.2008
Titik : S-3
Diameter (cm) 30 40 50 60 80
Luas Penampang (cm2) 706.858 1256.637 1963.495 2827.433 5026.548
Keliling (cm) 94.248 125.664 157.08 188.496 251.327
Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.0 0 0 0 0 0 0 0
0.2 4 4 1.02 1.78 2.74 3.92 6.90
0.4 6 10 1.60 2.76 4.24 6.03 10.56
0.6 5 16 1.48 2.50 3.78 5.32 9.18
0.8 3 20 1.08 1.76 2.59 3.58 6.03
1.0 4 26 1.43 2.33 3.43 4.75 8.01
1.2 9 30 2.69 4.52 6.83 9.61 16.59
1.4 9 38 2.84 4.72 7.08 9.91 16.99
1.6 10 46 3.22 5.34 7.99 11.16 19.07
1.8 10 54 3.37 5.55 8.24 11.46 19.47
2.0 9 62 3.29 5.33 7.84 10.82 18.20
2.2 8 68 3.17 5.06 7.37 10.10 16.82
2.4 11 76 4.02 6.52 9.59 13.23 22.25
2.6 10 84 3.94 6.30 9.18 12.59 20.98
2.8 13 90 4.76 7.71 11.34 15.65 26.31
3.0 16 98 5.62 9.17 13.55 18.77 31.73
3.2 21 102 6.87 11.36 16.95 23.64 40.31
3.4 26 114 8.27 13.76 20.60 28.80 49.29
3.6 25 126 8.27 13.64 20.32 28.31 48.22
3.8 19 138 7.08 11.43 16.77 23.11 38.77
4.0 16 150 6.60 10.47 15.18 20.73 34.35
4.2 13 162 6.12 9.52 13.60 18.36 29.92
4.4 10 172 5.60 8.51 11.95 15.91 25.40
4.6 8 180 5.28 7.87 10.89 14.33 22.45
4.8 9 188 5.66 8.49 11.80 15.57 24.53
5.0 8 194 5.54 8.23 11.33 14.85 23.16
5.2 12 202 6.64 10.10 14.20 18.92 30.26
5.4 18 210 8.20 12.82 18.38 24.88 40.72
5.6 21 214 8.98 14.17 20.47 27.86 45.94
5.8 30 226 11.33 18.25 26.73 36.79 61.63
6.0 45 246 15.24 25.03 37.18 51.69 87.76
6.2 60 266 19.15 31.82 47.63 66.58 113.90
6.4 50 286 17.17 28.13 41.71 57.91 98.15
6.6 30 306 12.84 20.26 29.25 39.81 65.65
6.8 27 322 12.43 19.40 27.79 37.59 61.42
7.0 28 332 12.86 20.07 28.76 38.91 63.60
7.2 25 346 12.41 19.17 27.23 36.61 59.28
7.4 26 364 12.99 20.04 28.45 38.23 61.86
7.6 23 380 12.58 19.18 26.99 36.00 57.64
7.8 21 398 12.45 18.80 26.25 34.80 55.19
8.0 21 414 12.75 19.20 26.75 35.40 56.00
8.2 18 436 12.46 18.50 25.48 33.40 52.08
8.4 18 442 12.57 18.65 25.67 33.63 52.38
8.6 14 450 11.78 17.17 23.30 30.16 46.08
8.8 10 458 10.99 15.70 20.93 26.69 39.78
9.0 6 466 10.20 14.23 18.57 23.22 33.48
9.2 6 472 10.31 14.38 18.76 23.45 33.78
9.4 5 478 10.19 14.11 18.29 22.73 32.40
9.6 7 486 10.81 15.15 19.85 24.92 36.16
9.8 5 492 10.45 14.46 18.73 23.26 33.11
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVE/BORED PILE)
Titik : S-3
Diameter (cm) 30 40 50 60 80
Luas Penampang (cm2) 706.858 1256.637 1963.495 2827.433 5026.548
Keliling (cm) 94.248 125.664 157.08 188.496 251.327
Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.0
10.0 7 498 11.04 15.45 20.23 25.37 36.76
10.2 8 504 11.39 16.02 21.07 26.54 38.74
10.4 6 510 11.03 15.33 19.95 24.88 35.69
10.6 3 516 10.43 14.23 18.17 22.28 30.96
10.8 4 520 10.74 14.74 18.95 23.37 32.84
11.0 4 526 10.86 14.90 19.14 23.60 33.14
11.2 8 528 11.84 16.62 21.82 27.44 39.94
11.4 6 538 11.55 16.03 20.83 25.94 37.10
11.6 8 542 12.10 16.97 22.26 27.97 40.65
11.8 7 554 12.09 16.86 21.99 27.48 39.58
12.0 9 564 12.75 17.94 23.61 29.74 43.43
12.2 10 566 13.03 18.41 24.33 30.76 45.21
12.4 9 574 12.94 18.20 23.92 30.12 43.93
12.6 10 578 13.25 18.72 24.70 31.21 45.81
12.8 9 580 13.05 18.35 24.11 30.35 44.23
13.0 7 588 12.73 17.71 23.05 28.76 41.28
13.2 8 590 13.01 18.18 23.77 29.78 43.06
13.4 7 597 12.82 17.80 23.13 28.81 41.21
13.6 8 605 13.28 18.55 24.23 30.33 43.79
13.8 6 613 12.96 17.91 23.17 28.75 40.85
14.0 7 619 13.31 18.48 24.02 29.92 42.82
14.2 13 627 14.87 21.19 28.19 35.87 53.28
14.4 18 639 16.28 23.59 31.84 41.04 62.26
14.6 21 657 17.32 25.30 34.37 44.55 68.19
14.8 20 675 17.43 25.33 34.28 44.28 67.42
15.0 21 693 18.00 26.20 35.50 45.90 70.00
15.2 19 711 17.87 25.82 34.76 44.70 67.55
15.4 21 731 18.72 27.16 36.70 47.34 71.91
15.6 22 749 19.29 28.03 37.92 48.96 74.49
15.8 23 773 19.98 29.05 39.33 50.80 77.37
16.0 24 789 20.52 29.87 40.48 52.35 79.85
16.2 25 807 21.09 30.74 41.70 53.97 82.43
16.4 27 825 21.91 32.03 43.58 56.53 86.69
16.6 30 845 22.99 33.79 46.17 60.12 92.72
16.8 30 877 23.59 34.60 47.17 61.32 94.33
17.0 28 911 23.76 34.61 46.93 60.72 92.69
17.2 30 937 24.72 36.11 49.06 63.58 97.34
17.4 30 969 25.33 36.91 50.06 64.79 98.95
17.6 30 1,009 26.08 37.92 51.32 66.30 100.96
17.8 19 1,027 23.83 33.76 44.69 56.61 83.44
18.0 21 1,047 24.68 35.10 46.62 59.25 87.79
18.2 22 1,065 25.25 35.97 47.84 60.87 90.37
18.4 23 1,089 25.94 36.99 49.25 62.72 93.26
18.6 24 1,105 26.48 37.81 50.41 64.26 95.74
18.8 25 1,123 27.05 38.69 51.63 65.88 98.32
19.0 27 1,141 27.86 39.98 53.50 68.45 102.57
19.2 30 1,161 28.95 41.74 56.10 72.03 108.60
19.4 30 1,193 29.55 42.54 57.10 73.23 110.21
19.6 28 1,227 29.72 42.56 56.86 72.63 108.57
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVE/BORED PILE)
Titik : S-3
Diameter (cm) 30 40 50 60 80
Luas Penampang (cm2) 706.858 1256.637 1963.495 2827.433 5026.548
Keliling (cm) 94.248 125.664 157.08 188.496 251.327
Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.0
19.8 30 1,253 30.68 44.05 58.99 75.50 113.23
20.0 30 1,285 31.28 44.85 59.99 76.70 114.84
20.2 30 1,325 32.04 45.86 61.25 78.21 116.85
20.4 35 1,355 33.78 48.71 65.46 84.05 126.73
20.6 35 1,395 34.53 49.71 66.72 85.56 128.74
20.8 30 1,435 34.11 48.62 64.70 82.36 122.38
21.0 35 1,475 36.04 51.72 69.23 88.58 132.76
21.2 40 1,505 37.79 54.57 73.45 94.42 142.65
21.4 40 1,545 38.54 55.58 74.71 95.93 144.66
21.6 45 1,575 40.28 58.42 78.92 101.77 154.55
21.8 40 1,625 40.05 57.59 77.22 98.95 148.68
22.0 45 1,655 41.79 60.43 81.43 104.79 158.57
22.2 40 1,705 41.56 59.60 79.73 101.96 152.70
22.4 45 1,745 43.49 62.70 84.26 108.18 163.09
22.6 45 1,795 44.43 63.95 85.83 110.07 165.60
22.8 50 1,835 46.36 67.05 90.36 116.29 175.99
23.0 45 1,875 45.94 65.96 88.34 113.08 169.63
23.2 50 1,915 47.87 69.06 92.87 119.30 180.01
23.4 50 1,975 49.00 70.57 94.76 121.56 183.03
23.6 35 2,015 46.22 65.29 86.20 108.94 159.91
23.8 40 2,065 48.34 68.64 91.04 115.53 170.80
24.0 45 2,085 49.90 71.24 94.94 121.00 180.18
24.2 16 2,097 43.29 59.40 76.34 94.12 132.19
24.4 25 2,109 45.64 63.47 82.61 103.05 147.88
24.6 25 2,121 45.86 63.77 82.98 103.51 148.48
24.8 19 2,133 44.68 61.56 79.43 98.30 139.03
25.0 40 2,183 50.57 71.61 94.75 119.98 176.73
25.2 35 2,223 50.14 70.52 92.73 116.78 170.36
25.4 40 2,273 52.26 73.87 97.58 123.37 181.25
25.6 45 2,293 53.82 76.47 101.48 128.84 190.64
25.8 25 2,305 49.33 68.39 88.76 110.44 157.73
26.0 19 2,317 48.14 66.18 85.21 105.24 148.28
26.2 45 2,337 54.65 77.57 102.86 130.50 192.85
26.4 45 2,357 55.02 78.08 103.49 131.25 193.85
26.6 45 2,407 55.97 79.33 105.06 133.14 196.37
26.8 45 2,457 56.91 80.59 106.63 135.02 198.88
27.0 25 2,469 52.42 72.51 93.92 116.63 165.97
27.2 19 2,481 51.24 70.30 90.37 111.42 156.52
27.4 35 2,521 55.76 78.01 102.09 128.01 185.34
27.6 25 2,533 53.63 74.12 95.93 119.04 169.19
27.8 55 2,573 61.45 87.69 116.82 148.82 221.47
28.0 60 2,613 63.38 90.79 121.35 155.04 231.85
28.2 65 2,653 65.32 93.89 125.88 161.26 242.24
28.4 70 2,693 67.25 96.99 130.41 167.48 252.63
28.6 75 2,733 69.18 100.09 134.93 173.70 263.02
28.8 80 2,773 71.11 103.19 139.46 179.92 273.41
29.0 75 2,813 70.69 102.10 137.45 176.72 267.04
29.2 80 2,863 72.81 105.46 142.29 183.32 277.93
29.4 85 2,913 74.93 108.81 147.13 189.91 288.82
29.6 90 2,963 77.05 112.16 151.98 196.51 299.71
29.8 85 2,985 76.29 110.62 149.40 192.63 292.44
30.0 80 3,021 75.79 109.43 147.26 189.27 285.87
GRAFIK SONDIR / DCPT
Titik : S-3 Koordinat GPS (UTM) X = 438408
Lokasi : Semarang Y = 9230677
Proyek : Jembatan Kali Gawe Tanggal Survey : 03 September 2017
Elevasi : ± 0.00 m muka tanah setempat Master Sondir : Waluyo
:
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
KEDALAMAN (m)
15
15
16
16
17
17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
0 500 1000 1500 2000 2500 3000 3500 4000