Vous êtes sur la page 1sur 1

CLIENT

PLAN CLÉ

SECTION 1

INGÉNIEUR
P2-1 P2-1.2 P2-1.3 1.5 P2-2 P2-3 P2-4 P2-5

ARCHITECTE
D-1

P2-H LESS CECD-24


CEFD-24

P.A. D-1

STRUCTURE
CA-1
E-1 20
L-1

10.10

10.02
L-1
CA-1 E-1
D-1

P.A. LESS
CECD-14
CEFD-14
P2-J
• L'ENTREPRENEUR DEVRA VÉRIFIER TOUTES LES DIMENSIONS ET
CONDITIONS EXISTANTES SUR LE CHANTIER AVANT LE DÉBUT DES
25 D-1 TRAVAUX.
D-1 CA-1
CA-1 L-1 • AUCUNE DIMENSION NE SERA PRISE SUR CE PLAN POUR FIN DE
L-1 RELEVÉ À MOINS QUE CE PLAN SOIT UN ORIGINAL.

NOTES
• TOUTES OMISSIONS OU ERREURS DÉCOUVERTES PAR
L'ENTREPRENEUR OU AUTRES DEVRONT ÊTRE TRANSMISES À
10.09 L'INGÉNIEUR AFIN D'APPORTER LES MODIFICATIONS REQUISES
10.03 AVANT LE DÉBUT DES TRAVAUX.
E-1 • TOUTE REPRODUCTION OU UTILISATION TOTALE OU PARTIELLE DE
E-1 25
LESS CE DOCUMENT EST STRICTEMENT INTERDITE À MOINS D'OBTENIR
P.A. CECD-15 L'APPROBATION DE LA FIRME DESJARDINS EXPERT CONSEIL.
CECD-23
P.A. CEFD-15
CEFD-23

CECD-22 CECR-02
P2-K
CEFD-22 CGZN-02
32 E-1

LESS L-1
P.A.
P.A. CA-1
E-1 CEFD-16 D-1
25 CECD-16
10.04
10.08

P2-L L-1

ÉMISSION
CA-1 20
D-1 ESC#3
1005

P.A.
1 2022-04-08 DIRECTIVE ME-04 C.P.
LESS 0 2022-01-21 CONSTRUCTION C.P.
CA-1 CEFD-18 B-1
L-1 P.A. CECD-18
2020-07-10 PERMIS J.D.
L-1
D-1 CA-1 No DATE ÉMIS POUR: PAR:
P.A.

P2-M
L-1
CA-1
D-1
LESS E-1
E-1

SCEAU
D-1
CA-1 DIMENSIONNEMENT DE LA
L-1
TUYAUTERIE D'ALIMENTATION
E-1 DIMENSION
NOMINALE (f.a.) FACTEUR
Ø TUYAU (po-mm) D'ALIMENTATION

APPAREILS EFD ECD EFD ECD TOTAL


10.07 10.05
CA-X ½Ø-15Ø - 3 - 3

L-X ½Ø-15Ø ½Ø-15Ø 0.75 0.75 1


10.06
B-X ½Ø-15Ø ½Ø-15Ø 1 1 1.4
P2-N

PROJET
D-X ½Ø-15Ø ½Ø-15Ø 1 1 1.4
E-X ½Ø-15Ø ½Ø-15Ø 1 1 1.4
LES ½Ø-15Ø ½Ø-15Ø 1.4 1.4
P2-N.4 LV - ½Ø-15Ø 1 1 1.4
NOTES:
1. LES DIMENSIONS DE LA TUYAUTERIE
3000 BLVD THIMENS,
D'ALIMENTATION D'EAU FROIDE ET D'EAU VILLE ST-LAURENT
CHAUDE DES APPAREILS SANITAIRES DOIT
ÊTRE CONFORME AU TABLEAU CI-DESSUS.
2. TOUS LES RACCORDEMENTS DES
APPAREILS DE PLOMBERIE SONT DE ½"∅-15
∅ POUR EFD ET ECD, SAUF INDICATION
CONTRAIRE. RACCORDER UN APPAREIL MÉCANIQUE

TITRE
SEULEMENT SUR LA TUYAUTERIE DE
1/2"Ø-15Ø
3. POUR LE DIMENSIONNEMENT DES TUYAUX
MAÎTRES, VOIR SCHÉMA AU PLAN M-501 & M-502 PLOMBERIE - DISTRIBUTION -
TOTAL
DIMENSION
ØTUYAU DE FAÇON GÉNÉRALE
10e ÉTAGE SECTION 2
(f.a.) (po-mm) (SAUF INDICATION
EFD & ECD CONTRAIRE), LE
DIAMÈTRE DE LA
0À2 ½Ø-15Ø TUYAUTERIE
3À7 ¾Ø-20Ø D'ALIMENTATION
SERA
8 À 19 1Ø-25Ø DÉTERMINÉ SELON LA ÉCHELLE: 1 : 100
DESSINÉ PAR: G.SCRAIRE
20 À 37 1¼Ø-32Ø SOMME DES

20055
FACTEURS
38 À 72 1½Ø-40Ø
D'ALIMENTATION S'Y
73 À 271 2Ø-50Ø RAPPORTANT, TEL PRÉPARÉ PAR: G.SCRAIRE
QUE
272 À 580 2½Ø-65Ø SPÉCIFIÉ CI-CONTRE:
581 À 1100 3Ø-80Ø SELON UNE PERTE DE
PRESSION DE:
5.0 psi / 100'-0"
VÉRIFIÉ PAR: C.PETRAS
M-319