Académique Documents
Professionnel Documents
Culture Documents
0 130 100 30
2 100 100 0
4 200 100 100
6 250 100 150
8 300 100 200
10 200 100 100
12 180 100 80
14 160 100 60
16 140 100 40
18 120 100 20
20 100 100 0
22 100 100 0
Total
780
2 Horas
Intervalo
7200 segundos
1080 Km2
Area
1080000000 m2
Ve 5616000 m3
0.0052 m
Hp
5.2 mm
t [h] Q obs [m3/s] Q base [m3/s] Q directo [m3/s] H.U de 2 h [m3/s/mm]
0 130 100 30 5.76923
2 100 100 0 0.00000
4 200 100 100 19.23077
6 250 100 150 28.84615
8 300 100 200 38.46154
10 200 100 100 19.23077
12 180 100 80 15.38462
14 160 100 60 11.53846
16 140 100 40 7.69231
18 120 100 20 3.84615
20 100 100 0 0.00000
22 100 100 0 0.00000
Hidrograma
Q obs Q base H.U Q directo
290
240
Q [m3/s]
190
140
90
40
-10 0 5 10 15 20
T [h]
Q directo
15 20 25
EVENTO A
ϕ 6
T [h] P [mm] Pe [mm] Pe de 2 h [mm]
1 4 0
2
2 8 2
3 14 8
8
4 2 0
Caudales - EVENTO A
Q total H. 1er de 2h H. 2do de 2h
400
350
300
250
Q [m3/s]
200
150
100
50
0
0 2 4 6 8 10 12 14 16 18 20 22 24
t [h]
EVENTO B
ϕ
T [h] P [mm] Pe [mm]
1 1.5 0
2 3 1
3 5 3
4 4 2
5 3 1
6 1 0
7 1.5 0
8 3 1
9 3 1
Caudales - EVENTO B
Q total H. 1er de 2h H. 2do de 2h H. 3er d
300
250
200
20 22 24
Q [m3/s]
150
100
50
0
0 2 4 6 8 10 12 14
t [h]
EVENTO B
2
Pe de 2 h [mm]
Caudales - EVENTO B
1er de 2h H. 2do de 2h H. 3er de 2h H. 4to de 2h
8 10 12 14 16 18 20 22 24
t [h]
Area 160 km2
Tc 4.2 h
Hpe (supuesto) 30 mm
de 4.09878031 h
Tp 4.56939015 h
Tb 12.2002717 h
Qp 218.497429 m3/s
Q [m3/s] t [h]
0 0
218.49742887518 4.56939015
0 12.2002717
200
150
Q [m3/s]
100
50
0 0
0
0 2 4 6 8 10 12 14
t [h]
14
Area 215 km2
Hpe 7 mm
Longitud 20.92 km
Pendiente 0.006
Tc 4.93886052932372 h
de 4.4447094525171 h
Tp 5.18567104385278 h
Tb 13.8457416870869 h
Qp 60.3663435942558 m3/s
Q [m3/s] t [h]
0 0
60.3663435942558 5.18567104385278
0 13.8457416870869
Hidrograma H.U
t/tp Q/Qp t (hr)
adimensional SCS
0 0 0.00000 0.000
0.1 0.015 0.51857 0.905
0.2 0.075 1.03713 4.527
0.3 0.16 1.55570 9.659
0.4 0.28 2.07427 16.903
0.5 0.43 2.59284 25.958
0.6 0.6 3.11140 36.220
0.7 0.77 3.62997 46.482
0.8 0.89 4.14854 53.726
0.9 0.97 4.66710 58.555
1 1 5.18567 60.366
1.1 0.98 5.70424 59.159
1.2 0.92 6.22281 55.537
1.3 0.84 6.74137 50.708
1.4 0.75 7.25994 45.275
1.5 0.65 7.77851 39.238
1.6 0.57 8.29707 34.409
1.8 0.43 9.33421 25.958
2 0.32 10.37134 19.317
2.2 0.24 11.40848 14.488
2.4 0.18 12.44561 10.866
2.6 0.13 13.48274 7.848
2.8 0.098 14.51988 5.916
3 0.075 15.55701 4.527
3.5 0.036 18.14985 2.173
4 0.018 20.74268 1.087
4.5 0.009 23.33552 0.543
5 0.004 25.92836 0.241
HIDROGRAMA
H.U triangular H.U SCS
70
60
50
40
Q [m3/s]
30
20
10
0
0 5 10 15 20 25
t [h]
H.U SCS
20 25 30
2 hr
Tc
120 min
Tr 10 años
Area total 4.6 km2
60% (bosque) 2.76 km2 0.18
10% (tierra) 0.46 km2 0.62
c
5% (calles) 0.23 km2 0.9
25% (campos) 1.15 km2 0.1
C 0.24
i 40.8001327 mm/h
A 4.6 km2
Q 12.5220503 m3/s
Cálculo de X y K
t(h) Entrada (I) [m3/s] Salida (O) [m3/s] (Ii-1 + Ii)/2
0 20 20 10
4 106 30 63
8 75 43 90.5
12 60 56 67.5
16 55 58 57.5
20 45 58 50
24 30 54 37.5
28 20 47 25
32 20 37 20
36 20 31 20
40 20 27 20
44 20 24 20
X=0.1
500
450
f(x) = 12.0721882682607 x − 263.187885255615
400 R² = 0.965831631674108
350
300
250
Si
200
150
100
50
0
15 20 25 30 35 40 45 50 55 60
X*I+(1-X)*O
X=0.3
500
450
400
350
300
250
Si
200
400
350
300
250
Si
200
150
100
50
0
15 20 25 30 35 40 45 50
X*I+(1-X)*O
Δt 4
X*I+(1-X)*O
X = 0,1 X=0,12 X = 0,2 X = 0,3 X = 0,4
(Oi-1 + Oi)/2 Si 0.1 0.12 0.2 0.3 0.4
10 0 20 20 20 20 20
25 152 37.6 39.12 45.2 52.8 60.4
36.5 368 46.2 46.84 49.4 52.6 55.8
49.5 440 56.4 56.48 56.8 57.2 57.6
57 442 57.7 57.64 57.4 57.1 56.8
58 410 56.7 56.44 55.4 54.1 52.8
56 336 51.6 51.12 49.2 46.8 44.4
50.5 234 44.3 43.76 41.6 38.9 36.2
42 146 35.3 34.96 33.6 31.9 30.2
34 90 29.9 29.68 28.8 27.7 26.6
29 54 26.3 26.16 25.6 24.9 24.2
25.5 32 23.6 23.52 23.2 22.8 22.4
X=0.12
500 500
450 450
f(x) = 12.0942259424226 x − 264.200618729458 f(x) = 11.7
400 R² = 0.966587220312207 400
R² = 0.936
350 350
300 300
250 250
Si
Si
200 200
150 150
100 100
50 50
0 0
55 60 15 20 25 30 35 40 45 50 55 60 15 20 25
X*I+(1-X)*O
X=0.3 X=0.4
500
450
400
350
300
250
Si
200
400
350
300
250
Si
200
150
100
50
0
30 35 40 45 50 55 60 15 20 25 30 35 40 45 50 55 60
X*I+(1-X)*O X*I+(1-X)*O
Se escoge la grafica de X=0,12 ya que el R^2 qu
e
Se escoge la grafica de X=0,12 ya que el R^2 qu
e
X 0.12
Pendiente K 12.094
X=0.2
500
450
200 20
24
150
28
100 32
36
50
40
0 44
15 20 25 30 35 40 45 50 55 60
X*I+(1-X)*O
140
120
100
80
Q [m3/s]
60
40
100
80
Q [m3/s]
60
40
20
0
0.0000 0.2000 0.400
0 45 50 55 60 65
)*O
de X=0,12 ya que el R^2 que presenta es el que mas se aproxima al valor de 1. La pendiente K se saca de la
ecuación qu presenta dicha grafica
de X=0,12 ya que el R^2 que presenta es el que mas se aproxima al valor de 1. La pendiente K se saca de la
ecuación qu presenta dicha grafica
Co 0.0434
C1 0.2730
C2 0.6836
Suma 1.0000 cumple
HIDROGRAMA
Q entrada Q salida
140
Si el caudal máximo que pued
120 m3/s; y si el caudal maximo qu
historicos es de 70,59 m3/s ento
100 el poblado s
80
Q [m3/s]
60
40
100
80
Q [m3/s]
60
40
20
0
0.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000 1.4000 1.6000 1.8000 2.0000
t [días]
Si el caudal máximo que puede abarcar en el poblado (B) es de 65
m3/s; y si el caudal maximo que puede llegar a ser según los datos
historicos es de 70,59 m3/s entonces significa que en algun momento
el poblado se puede inundar