Vous êtes sur la page 1sur 20

Ramol-Hathijan - Baleshwar Homes To Radhe Housing

TBM-1 100.000
TBM-2 100.520
TBM-3 100.340
TBM-4 100.452
TBM-5 100.602
Ramol-Hathijan - Baleshwar Homes To Radhe Housing
TBM-1 100.000 TBM-1 (RL=100)
BS 1.210
HI-1 101.210
LHS CENTER RHS
Chainage Remarks
FS RL2 FS RL1 FS RL FS RL1 FS RL2
0 1.470 99.740 1.47099.740 1.470 99.740 1.490 99.720 1.510 99.700
15 1.580 99.630 1.57099.640 1.570 99.640 1.510 99.700 1.540 99.670
30 1.540 99.670 1.51099.700 1.530 99.680 1.530 99.680 1.540 99.670
45 1.480 99.730 1.46099.750 1.450 99.760 1.470 99.740 1.470 99.740
60 1.430 99.780 1.41099.800 1.450 99.760 1.470 99.740 1.480 99.730
75 1.430 99.780 1.41099.800 1.400 99.810 1.410 99.800 1.430 99.780
90 1.430 99.780 1.31099.900 1.310 99.900 1.340 99.870 1.430 99.780
105 1.270 99.940 1.23099.980 1.230 99.980 1.210 100.000 1.290 99.920
120 1.140 100.070 1.100
100.110 1.140 100.070 1.090 100.120 1.100 100.110
135 0.980 100.230 0.920
100.290 0.930 100.280 0.931 100.279 0.980 100.230
150 0.980 100.230 0.910
100.300 0.910 100.300 0.910 100.300 0.980 100.230
165 0.710 100.500 0.690
100.520 0.690 100.520 0.710 100.500 0.790 100.420
HI-1 101.210 CP-1 100.520
FS 0.690 BS 1.420
CP-1 100.520 HI-2 101.940 TBM-2 (RL=100.520)
180 1.350 100.590 1.310 100.630 1.310 100.630 1.320 100.620 1.340 100.600
195 1.350 100.590 1.350 100.590 1.370 100.570 1.370 100.570 1.380 100.560
210 1.450 100.490 1.400 100.540 1.400 100.540 1.390 100.550 1.420 100.520
0.246 101.694
225 1.470 100.470 1.430 100.510 1.460 100.480 1.430 100.510 1.390 100.550 Mandir ni wall upar
240 1.470 100.470 1.470 100.470 1.460 100.480 1.430 100.510 1.380 100.560
255 1.530 100.410 1.510 100.430 1.510 100.430 1.480 100.460 1.480 100.460
270 1.580 100.360 1.470 100.470 1.520 100.420 1.470 100.470 1.480 100.460
285 1.420 100.520 1.460 100.480 1.470 100.470 1.430 100.510 1.430 100.510
300 1.390 100.550 1.420 100.520 1.490 100.450 1.420 100.520 1.410 100.530
315 1.560 100.380 1.560 100.380 1.470 100.470 1.430 100.510 1.410 100.530
330 1.560 100.380 1.610 100.330 1.570 100.370 1.530 100.410 1.490 100.450
345 1.590 100.350 1.540 100.400 1.560 100.380 1.510 100.430 1.430 100.510
HI-2 101.940 CP-2 100.340
FS 1.600 BS 1.262
CP-2 100.340 HI-3 101.602 TBM-3 (RL=100.340)
360 1.121 100.481 1.121 100.481 1.210 100.392 1.234 100.368 1.259 100.343
375 1.179 100.423 1.161 100.441 1.193 100.409 1.210 100.392 1.214 100.388
390 1.111 100.491 1.111 100.491 1.193 100.409 1.261 100.341 1.243 100.359
405 1.198 100.404 1.240 100.362 1.256 100.346 1.274 100.328 1.283 100.319
420 1.340 100.262 1.300 100.302 1.250 100.352 1.230 100.372 1.090 100.512
435 1.370 100.232 1.370 100.232 1.540 100.062 1.310 100.292 1.173 100.429
450 1.485 100.117 1.447 100.155 1.460 100.142 1.358 100.244 1.349 100.253
465 1.530 100.072 1.430 100.172 1.420 100.182 1.470 100.132 1.432 100.170
480 1.480 100.122 1.430 100.172 1.410 100.192 1.420 100.182 1.480 100.122 On Road
HI-3 101.602 CP-3 100.452
FS 1.150 BS 0.920
CP-3 100.452 HI-4 101.372 TBM-4 (RL=100.452)
495 1.420 99.952 1.210 100.162 1.110 100.262 1.170 100.202 1.310 100.062
510 1.260 100.112 1.230 100.142 1.230 100.142 1.260 100.112 1.350 100.022
525 1.490 99.882 1.320 100.052 1.300 100.072 1.290 100.082 1.390 99.982
540 1.470 99.902 1.340 100.032 1.310 100.062 1.290 100.082 1.340 100.032
555 1.510 99.862 1.380 99.992 1.340 100.032 1.334 100.038 1.412 99.960
570 1.520 99.852 1.420 99.952 1.420 99.952 1.430 99.942 1.470 99.902
585 1.735 99.637 1.529 99.843 1.496 99.876 1.450 99.922 1.530 99.842
600 1.680 99.692 1.585 99.787 1.550 99.822 1.570 99.802 1.510 99.862
615 1.670 99.702 1.585 99.787 1.610 99.762 1.585 99.787 1.535 99.837
630 1.860 99.512 1.720 99.652 1.670 99.702 1.590 99.782 1.520 99.852
645 1.910 99.462 1.800 99.572 1.825 99.547 1.800 99.572 1.780 99.592
660 2.095 99.277 1.950 99.422 1.940 99.432 1.900 99.472 1.670 99.702
675 2.500 98.872 1.920 99.452 1.895 99.477 1.830 99.542 1.670 99.702
690 2.095 99.277 2.030 99.342 1.990 99.382 1.985 99.387 1.925 99.447
HI-4 101.372 CP-4 100.602
FS 0.770 BS 0.400
CP-4 100.602 HI-5 101.002 TBM-5 (RL=100.602)
705 1.840 99.162 1.770 99.232 1.740 99.262 1.690 99.312 1.720 99.282
720 2.150 98.852 2.130 98.872 2.070 98.932 2.000 99.002 2.000 99.002
735 2.340 98.662 2.290 98.712 2.240 98.762 2.220 98.782 2.160 98.842
750 2.630 98.372 2.550 98.452 2.510 98.492 2.470 98.532 2.560 98.442
765 2.840 98.162 2.790 98.212 2.790 98.212 2.770 98.232 2.790 98.212
780 2.990 98.012 2.930 98.072 3.000 98.002 2.990 98.012 2.950 98.052
795 3.200 97.802 3.160 97.842 3.100 97.902 3.130 97.872 3.110 97.892
810 3.420 97.582 3.470 97.532 3.470 97.532 3.420 97.582 3.420 97.582
825 3.670 97.332 3.670 97.332 3.620 97.382 3.600 97.402 3.500 97.502
840 3.700 97.302 3.720 97.282 3.690 97.312 3.620 97.382 3.590 97.412
855 3.61 97.392 3.55 97.452 3.590 97.412 3.490 97.512 3.490 97.512
859 3.61 97.392 3.55 97.452 3.590 97.412 3.490 97.512 3.490 97.512
HI-2 101.002 CP-2 97.868
FS 3.134 BS
CP-2 97.868 HI-3
Ramol-Hathijan - Baleshwar Homes To Radhe Housing
TBM-1
BS
HI-1
LHS CENTER RHS
Chainage
FS RL2 FS RL1 FS RL FS RL1 FS
0 1.470 99.740 1.470 99.740 1.470 99.740 1.490 99.720 1.510
15 1.580 99.630 1.570 99.640 1.570 99.640 1.510 99.700 1.540
30 1.540 99.670 1.510 99.700 1.530 99.680 1.530 99.680 1.540
45 1.480 99.730 1.460 99.750 1.450 99.760 1.470 99.740 1.470
60 1.430 99.780 1.410 99.800 1.450 99.760 1.470 99.740 1.480
75 1.430 99.780 1.410 99.800 1.400 99.810 1.410 99.800 1.430
90 1.430 99.780 1.310 99.900 1.310 99.900 1.340 99.870 1.430
105 1.270 99.940 1.230 99.980 1.230 99.980 1.210 100.000 1.290
120 1.140 100.070 1.100 100.110 1.140 100.070 1.090 100.120 1.100
135 0.980 100.230 0.920 100.290 0.930 100.280 0.931 100.279 0.980
150 0.980 100.230 0.910 100.300 0.910 100.300 0.910 100.300 0.980
165 0.710 100.500 0.690 100.520 0.690 100.520 0.710 100.500 0.790
HI-1 101.210 CP-1
FS 0.690 BS
CP-1 100.520 HI-2
180 1.350 100.590 1.310 100.630 1.310 100.630 1.320 100.620 1.340
195 1.350 100.590 1.350 100.590 1.370 100.570 1.370 100.570 1.380
210 1.450 100.490 1.400 100.540 1.400 100.540 1.390 100.550 1.420
0.246 101.694
225 1.470 100.470 1.430 100.510 1.460 100.480 1.430 100.510 1.390
240 1.470 100.470 1.470 100.470 1.460 100.480 1.430 100.510 1.380
255 1.530 100.410 1.510 100.430 1.510 100.430 1.480 100.460 1.480
270 1.580 100.360 1.470 100.470 1.520 100.420 1.470 100.470 1.480
285 1.420 100.520 1.460 100.480 1.470 100.470 1.430 100.510 1.430
300 1.390 100.550 1.420 100.520 1.490 100.450 1.420 100.520 1.410
315 1.560 100.380 1.560 100.380 1.470 100.470 1.430 100.510 1.410
330 1.560 100.380 1.610 100.330 1.570 100.370 1.530 100.410 1.490
345 1.590 100.350 1.540 100.400 1.560 100.380 1.510 100.430 1.430
HI-2 101.940 CP-2
FS 1.600 BS
CP-2 100.340 HI-3
360 1.121 100.481 1.121 100.481 1.210 100.392 1.234 100.368 1.259
375 1.179 100.423 1.161 100.441 1.193 100.409 1.210 100.392 1.214
390 1.111 100.491 1.111 100.491 1.193 100.409 1.261 100.341 1.243
405 1.198 100.404 1.240 100.362 1.256 100.346 1.274 100.328 1.283
420 1.340 100.262 1.300 100.302 1.250 100.352 1.230 100.372 1.090
435 1.370 100.232 1.370 100.232 1.540 100.062 1.310 100.292 1.173
450 1.485 100.117 1.447 100.155 1.460 100.142 1.358 100.244 1.349
465 1.530 100.072 1.430 100.172 1.420 100.182 1.470 100.132 1.432
480 1.480 100.122 1.430 100.172 1.410 100.192 1.420 100.182 1.480
HI-3 101.602 CP-3
FS 1.150 BS
CP-3 100.452 HI-4
495 1.420 99.952 1.210 100.162 1.110 100.262 1.170 100.202 1.310
510 1.260 100.112 1.230 100.142 1.230 100.142 1.260 100.112 1.350
525 1.490 99.882 1.320 100.052 1.300 100.072 1.290 100.082 1.390
540 1.470 99.902 1.340 100.032 1.310 100.062 1.290 100.082 1.340
555 1.510 99.862 1.380 99.992 1.340 100.032 1.334 100.038 1.412
570 1.520 99.852 1.420 99.952 1.420 99.952 1.430 99.942 1.470
585 1.735 99.637 1.529 99.843 1.496 99.876 1.450 99.922 1.530
600 1.680 99.692 1.585 99.787 1.550 99.822 1.570 99.802 1.510
615 1.670 99.702 1.585 99.787 1.610 99.762 1.585 99.787 1.535
630 1.860 99.512 1.720 99.652 1.670 99.702 1.590 99.782 1.520
645 1.910 99.462 1.800 99.572 1.825 99.547 1.800 99.572 1.780
660 2.095 99.277 1.950 99.422 1.940 99.432 1.900 99.472 1.670
675 2.500 98.872 1.920 99.452 1.895 99.477 1.830 99.542 1.670
690 2.095 99.277 2.030 99.342 1.990 99.382 1.985 99.387 1.925
HI-4 101.372 CP-4
FS 0.770 BS
CP-4 100.602 HI-5
705 1.840 99.162 1.770 99.232 1.740 99.262 1.690 99.312 1.720
720 2.150 98.852 2.130 98.872 2.070 98.932 2.000 99.002 2.000
735 2.340 98.662 2.290 98.712 2.240 98.762 2.220 98.782 2.160
750 2.630 98.372 2.550 98.452 2.510 98.492 2.470 98.532 2.560
765 2.840 98.162 2.790 98.212 2.790 98.212 2.770 98.232 2.790
780 2.990 98.012 2.930 98.072 3.000 98.002 2.990 98.012 2.950
795 3.200 97.802 3.160 97.842 3.100 97.902 3.130 97.872 3.110
810 3.420 97.582 3.470 97.532 3.470 97.532 3.420 97.582 3.420
825 3.670 97.332 3.670 97.332 3.620 97.382 3.600 97.402 3.500
840 3.700 97.302 3.720 97.282 3.690 97.312 3.620 97.382 3.590
855 3.61 97.392 3.55 97.452 3.590 97.412 3.490 97.512 3.490
859 3.61 97.392 3.55 97.452 3.590 97.412 3.490 97.512 3.490
HI-2 101.002 CP-2
FS 3.134 BS
CP-2 97.868 HI-3
using
100.000 TBM-1 (RL=100)
1.210
101.210
HS
Remarks
RL2
99.700
99.670
99.670
99.740
99.730
99.780
99.780
99.920
100.110
100.230
100.230
100.420
100.520
1.420
101.940 TBM-2 (RL=100.520)
100.600
100.560
100.520

100.550 Mandir ni wall upar


100.560
100.460
100.460
100.510
100.530
100.530
100.450
100.510
100.340
1.262
101.602 TBM-3 (RL=100.340)
100.343
100.388
100.359
100.319
100.512
100.429
100.253
100.170
100.122 On Road
100.452
0.920
101.372 TBM-4 (RL=100.452)
100.062
100.022
99.982
100.032
99.960
99.902
99.842
99.862
99.837
99.852
99.592
99.702
99.702
99.447
100.602
0.400
101.002 TBM-5 (RL=100.602)
99.282
99.002
98.842
98.442
98.212
98.052
97.892
97.582
97.502
97.412
97.512
97.512
97.868
Ramol-Hathijan - Baleshwar Homes To Radhe Housing
Chainage OGL Excavation Top Subgrade Top GSB WMM DBM FRL Diff.
0 99.740 98.775 99.275 99.425 99.675 99.750 99.8 0.80000
15 99.640 98.803 99.303 99.453 99.703 99.778 99.828 0.02759
45 99.760 98.830 99.330 99.480 99.730 99.805 99.855 0.02759
60 99.760 98.858 99.358 99.508 99.758 99.833 99.883 0.02759
75 99.810 98.885 99.385 99.535 99.785 99.860 99.910 0.02759
90 99.900 98.913 99.413 99.563 99.813 99.888 99.938 0.02759
105 99.980 98.941 99.441 99.591 99.841 99.916 99.966 0.02759
120 100.070 98.968 99.468 99.618 99.868 99.943 99.993 0.02759
135 100.280 98.996 99.496 99.646 99.896 99.971 100.021 0.02759
150 100.300 99.023 99.523 99.673 99.923 99.998 100.048 0.02759
165 100.520 99.051 99.551 99.701 99.951 100.026 100.076 0.02759
180 100.630 99.078 99.578 99.728 99.978 100.053 100.103 0.02759
195 100.570 99.106 99.606 99.756 100.006 100.081 100.131 0.02759
210 100.540 99.134 99.634 99.784 100.034 100.109 100.159 0.02759
225 100.480 99.161 99.661 99.811 100.061 100.136 100.186 0.02759
240 100.480 99.189 99.689 99.839 100.089 100.164 100.214 0.02759
255 100.430 99.216 99.716 99.866 100.116 100.191 100.241 0.02759 120.000
270 100.420 99.244 99.744 99.894 100.144 100.219 100.269 0.02759
285 100.470 99.272 99.772 99.922 100.172 100.247 100.297 0.02759
300 100.450 99.299 99.799 99.949 100.199 100.274 100.324 0.02759 100.000
315 100.470 99.327 99.827 99.977 100.227 100.302 100.352 0.02759
330 100.370 99.354 99.854 100.004 100.254 100.329 100.379 0.02759
345 100.380 99.382 99.882 100.032 100.282 100.357 100.407 0.02759 80.000
360 100.392 99.409 99.909 100.059 100.309 100.384 100.434 0.02759
375 100.409 99.437 99.937 100.087 100.337 100.412 100.462 0.02759
390 100.409 99.465 99.965 100.115 100.365 100.440 100.490 0.02759 60.000
405 100.346 99.492 99.992 100.142 100.392 100.467 100.517 0.02759
420 100.352 99.520 100.020 100.170 100.420 100.495 100.545 0.02759
435 100.062 99.575 100.075 100.225 100.475 100.550 100.6 2.60000 40.000
450 100.142 99.485 99.985 100.135 100.385 100.460 100.510 0.08966
465 100.182 99.396 99.896 100.046 100.296 100.371 100.421 0.08966
480 100.192 99.306 99.806 99.956 100.206 100.281 100.331 0.08966 20.000
495 100.262 99.216 99.716 99.866 100.116 100.191 100.241 0.08966
510 100.142 99.127 99.627 99.777 100.027 100.102 100.152 0.08966
525 100.072 99.037 99.537 99.687 99.937 100.012 100.062 0.08966 0.000
540 100.062 98.947 99.447 99.597 99.847 99.922 99.972 0.08966 0 1
555 100.032 98.858 99.358 99.508 99.758 99.833 99.883 0.08966
570 99.952 98.768 99.268 99.418 99.668 99.743 99.793 0.08966 -20.000
585 99.876 98.678 99.178 99.328 99.578 99.653 99.703 0.08966
600 99.822 -0.700 -0.200 -0.050 0.200 99.564 99.614 0.08966
615 99.762 98.499 98.999 99.149 99.399 99.474 99.524 0.08966
630 99.702 98.409 98.909 99.059 99.309 99.384 99.434 0.08966
645 99.547 98.320 98.820 98.970 99.220 99.295 99.345 0.08966
660 99.432 98.230 98.730 98.880 99.130 99.205 99.255 0.08966
675 99.477 98.141 98.641 98.791 99.041 99.116 99.166 0.08966
690 99.382 98.051 98.551 98.701 98.951 99.026 99.076 0.08966
705 99.262 97.961 98.461 98.611 98.861 98.936 98.986 0.08966
720 98.932 97.872 98.372 98.522 98.772 98.847 98.897 0.08966
735 98.762 97.782 98.282 98.432 98.682 98.757 98.807 0.08966
750 98.492 97.692 98.192 98.342 98.592 98.667 98.717 0.08966
765 98.212 97.603 98.103 98.253 98.503 98.578 98.628 0.08966
780 98.002 97.513 98.013 98.163 98.413 98.488 98.538 0.08966
795 97.902 97.423 97.923 98.073 98.323 98.398 98.448 0.08966
810 97.532 97.334 97.834 97.984 98.234 98.309 98.359 0.08966
825 97.382 97.244 97.744 97.894 98.144 98.219 98.269 0.08966
840 97.312 97.154 97.654 97.804 98.054 98.129 98.179 0.08966
855 97.412 97.065 97.565 97.715 97.965 98.040 98.090 0.08966
859 97.412 96.975 97.475 97.625 97.875 97.950 98.000
0.602

120.000

100.000

80.000

60.000

40.000

20.000

0.000
0 1 5 45 6 0 75 9 0 0 5 2 0 3 5 5 0 6 5 8 0 9 5 1 0 2 5 4 0 5 5 7 0 8 5 0 0 1 5 3 0 4 5 6 0 7 5 9 0 0 5 2 0 3 5 5 0 6 5 8 0 9 5
1 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 4 4 4 4 4

-20.000
OGL
FRL
DBM
WMM
GSB
Subgrade
Excavation

7 5 39 0 40 5 42 0 4 3 5 4 5 0 4 6 5 48 0 4 9 5 51 0 5 2 5 54 0 5 5 5 57 0 5 8 5 60 0 61 5 63 0 64 5 6 6 0 67 5 6 9 0 70 5 7 2 0 73 5 7 5 0 76 5 7 8 0 79 5 8 1 0 82 5 84 0 85 5 85 9
OGL
FRL
DBM
WMM
GSB
Subgrade
Excavation

0 4 5 60 7 5 90 0 5 20 3 5 50 6 5 80 95 10 25 4 0 55 5 9
6 6 6 6 7 7 7 7 7 7 7 8 8 8 8 8
AHMEDABAD MUNICIPAL CORPORATION
NAHANAGAR SEVA SADAN - EAST ZONE
MEASUREMENT SHEET
Regrade & Resurface of Radheshyam housing to Devkrupa devine road in Ramol Hathijan ward in East zone

Item Items
No. No. Length Breath Depth Quantity Total Quantity Unit

1 Carry out complete alignment


survey work using total station
for the length and width as 1 860 7 6020.00 0.602 Hectare
decided by Engineer in charge
2 Extra rate over item of excavation
of earth for excavation of asphalt
pavement / RCC

up to 0.20 meter thickness 1 800 5.00 4000.00 4000.00 Smt.


Up to 0.30 meter 1 50 1 50.00 50.00 Smt.
0.30 meter & above 1 50 1 50.00 50.00 Smt.
3 Barricading the entire break down
or excavated area on lumsum 1 860 860.00 860.00 Rmt
rental basis using wooden
4 ballies / M.S.
Box cutting theangles at max.in2.0
read surface all 1 860 9.00 1 7740.00
meter
sortsFor center
of Road to
soil, &murrum center, C.G.I
to fenning
proper
sheet, Side road
slope &reflective
camber for paint out side
making aworkto
base Approximate 15 % 1161.00
avoided accident and for
for road work including removing smooth
traffic diversion and movement Total 8901.00 8901.00 Cmt.
the excavated
including stuff & board
cautionary depositing
etc.
5 on
the the road
Conveyance
same sidebeasremoved
charge
shall directed
of upto
earth, lime,
after 10681.20
50.00
murrum, mt. Lead
completion ofbuilding
work. rubbish,
For
(ARCRCC Pipe Line
Breakdown Item No.-19) 1620.00 12301.20 Cmt.
manure, garbage, sludge,
a Lead up to 1 Km.
excavated rock, fly ash, 0.00 0.00 Cmt.
b aggregates
Lead From 1Kmof any kind Including
to 2 Km. 3690.36 3691.00 Cmt.
c spreading
Lead From 2 Km & to 3levelling
Km. etc. 3690.36 3691.00 Cmt.
d complete.
Lead From 3 Km to 4 Km. 4920.48 4921.00 Cmt.
e Lead From 4 Km to 5 Km. 0.00 0.00 Cmt.
f Lead From 5 Km to 10 Km. 0.00 0.00 Cmt.
g Lead From 10 Km to 15 Km. 0.00 0.00 Cmt.
6 Rolling of Earth Work 1 860 9.00 0.15 1161.00
Approximate 15 % 174.15
Total 1335.15 1336.00 Cmt.
7 Watering of Earth as Directed. 1 860 9.00 0.15 1161.00
Approximate 15 % 174.15
Total 1335.15 1336.00 Cmt.
8 Earthwork for embankment
including breaking 1 860 9.00 0.50 3870.00
Side Shoulder 2 860 2.00 0.20 688.00
Approximate 15 % 580.50
Total 5138.50 5139.00 Cmt.
9 Construction of granular Sub
base using crusher run, spreading
in uniform layers with motor 1 860 8.00 0.2 1376.00
grader on prepared surface mixing

Approximate 15 % 206.40
Total 1582.40 1583.00 Cmt.
10 Providing and Laying Wet Mix
Macadam
For Road work 1 860 8.00 0.25 1720.00
For Fanning 15 % 258.00
Total 1978.00 1978.00 Cmt.
11 Prime coat
For Road 1 860 7.50 6450.00
For Fanning 15 % 967.50
Total 7417.50 7418.00 Smt
12 Providing and applying tack coat

For Road 2 860 7.00 12040.00


For Fanning 15 % 1806.00
Total 13846.00 13846.00 Smt
13 DBM (Grading II)
For Road 1 860 7.00 0.075 451.50
For Fanning 15 % 67.73
Total 519.23
Density as per mix design 2.480
Total 1287.68
Approach road @ 10 % 128.77
Total 1416.45 1417.00 MT
14 BC
For Road 1 860 7.00 0.050 301.00
For Fanning 15 % 45.15
Total 346.15
Density as per mix design 2.500
Total 865.38
Approach road @10 % 86.54
951.91 952.00 M.T.
15 Providing and laying Asphalt
painting on B.T. surface with
bitumen grade 60/70 (VG-30) @ 1 860 7.00 6020.00
rate of 5 kg/10 smt

For Fanning 15 % 903.00


Total 6923.00 6923.00 Smt
16 Repairing damaged M.H. and
rasing M.H
(A) up to 0.15 mt. (@ Two Coarse) 30 30.00 30.00 Nos.
(B) up to 0.35mt. (@ Four Coarse) 15 15.00 15.00 Nos.
(C) up to 0.65 mt. (@ Seven Coarse)
5 5.00 5.00 Nos.
(D) up to 0.90 mt. (@ Ten Coarse )
0 0.00 0.00 Nos.

17 Raising of Existing manhole.


Item includes, cutting of existing
road surround by Manhole by Lum sum 50.00 50.00 Nos.
diamond cutter machine,

18 Excavation for pipe line


trenches for sewerage line,
manhole a)In all sorts 1 500 1.5 1.5 1125.00 1125.00 Cmt
of soil and soft murrum
b)In hard murrum, boulders
including macadam road 1 100 1.5 1.5 225.00 225.00 Cmt

19 Providing & Supplying ISI


Standard RCC pipes 1 500 500.00 500.00 Rmt

21 Providing F.R.C. MH seat


cover incl. Lum sum 50.00 50.00 Nos.

22 Providing and fixing cast iron


manhole frame of weight 80 to 50 85 4250.00 4250.00 Kgs
85 kg

23 Constructing Bombay Pattern


Type Catch Pit of size 0.60 x 0.60 50 50.00 50.00 Nos
depth up to 1 mt including

24 CatchPit Jali (Heavy duty) Fixing


P/F FRC catch 50 50.00 50.00 Nos

A.E.
Ramol Hathijan
AHMEDABAD MUNICIPAL CORPORATION
East Zone
Abstract Sheet
Regrade & Resurface of Radheshyam housing to Devkrupa devine road in Ramol Hathijan ward in East
zone

Tender Estimate Item


Sr. No. Sr No Quantity Unit Rate Amount
Carry out complete alignment survey work using total
station for the length and width as decided by Engineer
in charge for complete length of road and additional
length as required. The width to be surveyed will be up
to TP Boundary and beyond that as required,
including marking of TBM, its coordinates, station
points, their coordinates, center line of alignment,
taking ground level details of existing structures, details
of all utilities below GL, manholes, catch pits, existing
utility services, light poles, trees, over head electrical
lines, BSNL section pillar/ box, Torrent electrical
boxes, including any number marked on them, road
dividers, foot paths, etc. within complete working area
and additional areas Rate includes submission of
longitudianlsections, cross sections, Detailed drawing
in AUTOCAD, Reports of survey work in three hard
colour copies with soft copy of AUTOCAD drawing, in
CD to Engineer incharge as directed for each road
Submission of drawing in hard copy and soft copy as per
specification.

1 1 0.60 Hectare 3168.00 1,907.14


Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness up to
0.20 meter including demolishing the asphalt carpet,
metal,s oiling/cutting Reinforcement etc.comp. with
stacking the material as directed. (Based on Previously
approved rate by C E sir)

3 2 -
a a up to 0.20 meter thickness (By Manual) 4000.00 7 71.10 284,400.00
0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
b b transportation etc complete. 50.00 Smt 177.76 8,888.00
0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel,
c c & transportation etc complete. 50.00 Smt 311.08 15,554.00
Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident & for smooth
traffic diversion & movement including cautionary
board etc. Item also includes for making temporary
sufficient nos of lighting arrangement through out the
work with necessary required arrangement. ..The same
shall be removed after completion of work.

4 3 860.00 Rmt 79.99 68,791.40


Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope
as directed upto 200 Mt.lead
7 4 8901.00 Cmt 127.13 1,131,584.13
Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind executed outside the road site.
Rate also includes spreading & levelling etc complete.
Internal conveyance above 50 mt done within the work
site is not payable.

8 5 -
a a a) Lead up to 1 Km. 0.00 Cmt 23.38 -
b b b) Lead From 1Km to 2 Km. 3691.00 Cmt 30.94 114,199.54
c c c) Lead From 2 Km to 3 Km. 3691.00 Cmt 38.37 141,623.67
d d d) Lead From 3 Km to 4 Km. 4921.00 Cmt 45.52 224,003.92
e e e) Lead From 4 Km to 5 Km. 0.00 Cmt 52.42 -
f f f) Lead From 5 Km to 10 Km. 0.00 Cmt 78.54 -
g g g) Lead From 10 Km to 15 Km. 0.00 Cmt 104.65 -
Rolling of Earth Work in layers with power roller
including spreading of earthwork and filling in
depressions which occurs during the process.
14 6 1336.00 Cmt 11.16 14,909.76
15 7 Watering of Earth as Directed. 1336.00 Cmt 5.35 7,147.60
Earthwork for embankment including breaking clods,
dressing with all lead and lift. From Borrow area with all
lead and lifts. (Including watering and
consolidation) From Borrow area with all lead
and lifts.
17 8 5139.00 Cmt 265.00 1,361,835.00
Construction of granular Sub base using crusher run,
spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with
front end loader at OMC and compacting with
vibratory roller to achieve the desired density, complete
as per tender specification. For all grade.

18 9 -
Production & Supply of GSB (Crusher Run) 1583.00 Cmt 1694.80 2,682,868.40
Laying of GSB (Crusher Run) 1583.00 Cmt 30.36 48,059.88
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting with
vibratory roller to achieve the desired density as per
Codal Provision.

19 10 -
Production & Supply of WMM 1978.00 Cmt 1708.13 3,378,681.14
Laying of WMM 1978.00 Cmt 31.25 61,812.50
Providing and applying primer coat with cationic
bitumen emulsion SS1 grade conforming to ASTM
GRADE on prepared surface of wet mix macadam
including clearing of Wet mix macadam surface with air
compressor to remove all loose material other foreign
material. The primer shall be sprayed uniformly at the
rate of 0.70-1.0 kg/sqm. It shall be applied by a self-
propelled or towed bitumen pressure sprayer, equipped
for spraying the material uniformly at a specified rate. No
dilution or heating at site of SS1 bitumen emulsion shall
be permitted.

20 11 7418.00 Smt 40.24 298,500.32


Providing & applying Tack coat with VG-30 Grade
bitumen using bitumen pressure distributor at the rate of
0.20-0.30 kg/sqm on the existing bituminous surface
cleaned with Air Compressor etc complete. For D.B.M.
or B.C.
21 12 13846.00 Smt 11.21 155,213.66
Dense Graded Bituminous Macadam (Providing,
Carting and laying of dense bituminous macadam with
100-120 TPH batch type HMP producing an average
output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder VG-
30 grade @ min 4.5% by weight of total mix,
transporting the hot mix to work site, laying with a self-
propelled paving machine equipped with an electronic
sensing device to the required grade, level and
alignment, rolling with 8-10 tonne static weight or
vibratory roller or with a pneumatic tyre roller of 12 to 15
tonne weight to achieve the desired compaction as per
approved design mix .for Grading- II. (26.5 mm
nominal size) Note:- In case the minimum binder
content is reduced proportionately to achieve the
optimum binder content, then the amount/rate reduction
due to difference in binder content will be recovered
from the DBM item. Also no extra payment will be
paid if the binder content will be more than specified
minimun binder content of 4.5%.

22 13 -
a a Producton of DBM as above (GRADE - II) 1417.00 MT 3094.05 4,384,268.85
b b Carting of DBM from Plant to Paver Site 1417.00 MT 70.54 99,955.18
Only Laying of DBM using hydrostatic paver finisher
with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
tender specification in all respects.

c c 1417.00 MT 239.29 339,073.93


Bituminous Concrete (Providing, Carting and laying of
bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading,
premixed with bituminous binder VG-30 @ min. 5.4 %
of mix, transporting the hot mix to work site, laying with
a self-propelled paving machine equipped with an
electronic sensing device to the required grade, level
and alignment, rolling with 8-10 tonne static weight or
vibratory roller or with a pneumatic tyre roller of 12 to 15
tonne weight to achieve the desired compaction as per
approved design mix. for Grading- II (13.2 mm
nominal size) Note:- In case the minimum binder
content is reduced proportionately to achieve the
optimum binder content, then the amount/rate reduction
due to difference in binder content will be recovered
from the BC item. Also no extra payment will be paid
if the binder content will be more than specified minimun
binder content of
5.4%.

24 14 -
a a Producton of BC as Above. 952.00 MT 3515.02 3,346,299.04
b b Carting of BC from Plant to Paver Site. 952.00 MT 70.54 67,154.08
Only Laying of BC using hydrostatic paver finisher
with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per
tender specification complete in all respects.

c c 952.00 MT 239.29 227,804.08


Providing and laying Asphalt painting on B.T. surface
immediately after laying work complete with all
respect, using bitumen VG-30 @ rate of 5 kg/10 smt by
Mechanical sprayer and spreading the stone dust on
prepared surface at the rate of 0.03 cum/10 smt. and
rolling with smooth wheeled and penumatic roller and
brushing etc. comp

25 15 6923.00 Smt 38.83 268,820.09


Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover, removing
the debris from MH and carting the same as directed.

27 16 -
a a (A) up to 0.15 mt. (@ Two Coarse) 30.00 Nos. 728.82 21,864.60
b b (B) up to 0.35mt. (@ Four Coarse) 15.00 Nos. 0.20 3.00
c c (C) up to 0.65 mt. (@ Seven Coarse) 5.00 Nos. 1786.49 8,932.45
d d (D) up to 0.90 mt. (@ Ten Coarse ) 0.00 Nos. 2150.90 -
Raising of Existing manhole. Item includes, cutting of
existing road surround by Manhole by diamond cutter
machine, dismantling of road in confined area by
breaker machine and carting of dismantled material.
Item also included necessary brick work to raise the
manhole at road level in CM 1:3. Item also included
fixing of Manhole frame at exact road level by using fibre
reinforced thixotropic repair mortar material,
Laying of concrete made from special bonding
chemical flowable micro concrete material in desired
thickness and laying of hot mix bituminous material in
upper layer and compaction of hot mix bituminous
material by Plate compactor machine. Rate also
included necessary plaster at inside of manhole in CM 1:3
in 20 mm thickness on raised brickwork.

29 17 50.00 Nos. 6815.32 340,766.00


Excavation for pipe line trenches for sewerage line,
manhole etc all with shoring and struting if required as
per required gardient and line including safety
provisions using site railes and stacking excavated stuff
including upto all required lead cleaning the site etc.
Complete for all leads and strata as specified.

30 18 -
Excavation upto 1.5mt depth -
a) a) In all sorts of soil and soft murrum 1125.00 Cmt 84.10 94,612.50
b) b) In hard murrum, boulders including macadam road 225.00 Cmt 127.56 28,701.00
Providing & Supplying ISI Standard RCC pipes (of
sulphate resisting cement) in a standard lengths of
following class & dia meter suitable for socket-spigot
type including all taxes , insurance, transporation,
freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, staking
etc complete (IS 458:1989) Class NP-3, test pressure
0.7/kg/sqcm. Rate also includes supplying RCC collar for
RCC pipes including taxes, carting, loading, unloading,
etc complete. Including labour work for lowering, laying,
jointing, RCC pipes in CM 1:1 1/2 of following
diameters in proper position, grade and alignent at
all as directed by engineer in charge. inlcuding
conveyance from store to site of work labour giving
hydraulic testing and all necessary testing as per IS code
(RCC pipe Horizontal cast)

32 19 -
a) a) 300 mm internal diameter 500.00 Rmt 888.37 444,185.00
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed. (Based on rate of
central store circular 01/2021-22, Dt. 13-08-21)
37 21 -
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers.
Cover : 728mm ø & 100 mm thick circular cover, 35.00
MT load design, 100x2mm MS flat allround, 16mm ø
plain round bar for lifting the cover & should be fitted
with plastic cups.
a a 50.00 Nos. 1368.75 68,437.50
Providing and fixing cast iron manhole frame of weight
80 to 85 kg suitable for existing EHD-35 FRC MH
cover, rate also incl. loading, unloading and fixing the
frame in line and level to match exisisting road level in
C.C. 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as per instruction by
engg. in charge.
39 22 4250.00 Kg 71.10 302,175.00
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the
prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.

40 23 50.00 Nos. 3110.80 155,540.00


CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali
with frame 600mm x 600mm clear opening etc.
41 24 comp.. As directed by engineer in charge. 50.00 Nos. 1377.64 68,882.00
(A)-Total 20267454.36
(B)-As per above Contractor Rate 26.5 % 5370875.40
(C )- Total Amount Rs. 25638329.76
(D)-Total amount of Provision for Price variation of
MT 120.00 600000.00
Bitumen 5000.00 MT
( E )- Total Amount Rs. 26238329.76
(F)-PMC charges 1.19% 312236.12
(G)-TOTAL 26550565.88
(H)-18% GST 4779101.86
(I)-TOTAL 31329667.74
(J)-2%Sup & Consultancy charges 626593.35
(K)-TOTAL 31956261.10
Says Total 31956262.00

A.E A.C.E. Dy.C.E.