RELATÓRIO DE LOCAÇÃO E MEDIÇÃO

CLIENTE: EQUINOX GOLD ESPESSURA: 1.5


PROJETO: SANTA LUZ TÉCNICO: ABELARDO / ROGERIN
REVESTIMENTO: PEBDL BARRAGEM DE REJEITOS
PAINEL BOBINA COMPRIM. LARGURA ÁREA TOTAL
PAINEL
DATA N° N° PAINEL PAINEL l.MENOR L.MAIOR PAINEL RETO ÁREA TOTAL OBSERVAÇÕES
TRAPEZOI
M M DAL M²
10/11/2023 1 28 26.4 5.8 0 153.12 153.12
10/11/2023 2 28 26.9 5.8 0 156.02 156.02
10/11/2023 3 22 26.6 5.8 0 154.28 154.28
10/11/2023 4 28 26.8 5.8 0 155.44 155.44
10/11/2023 5 22 28.4 5.8 0 164.72 164.72
10/11/2023 6 22 29.8 5.8 0 172.84 172.84
10/13/2023 7 49 31 1 4.4 83.7 - 83.70
10/13/2023 8 49 31.5 1 4.4 85.05 - 85.05
10/13/2023 9 06 32.5 5.8 0 188.50 188.50
10/13/2023 10 06 33.8 0.4 5 91.26 - 91.26
10/13/2023 11 06 34.7 0.7 4.8 95.425 - 95.43
10/16/2023 12 50 35.3 5.8 0 204.74 204.74
10/16/2023 13 21 35.7 5.8 0 207.06 207.06
10/16/2023 14 21 36.2 5.8 0 209.96 209.96
10/16/2023 15 21 37.2 5.8 0 215.76 215.76
10/17/2023 16 45 40.7 5.8 0 236.06 236.06
10/17/2023 17 47 45.2 5.8 0 262.16 262.16
10/17/2023 18 49.9 5.8 0 289.42 289.42
10/17/2023 19 46 52 5.8 0 301.60 301.60
10/17/2023 20 46 53.7 5.8 0 311.46 311.46
10/17/2023 21 45 52.5 5.8 0 304.50 304.50
10/17/2023 22 45 51.8 5.8 0 300.44 300.44
10/18/2023 23 51 49.8 5.8 0 288.84 288.84
10/18/2023 24 51 48.6 5.8 0 281.88 281.88
10/19/2023 25 55 46.4 5.8 0 269.12 269.12
10/19/2023 26 55 44.3 5.8 0 256.94 256.94
10/19/2023 27 104 42.4 5.8 0 245.92 245.92
10/19/2023 28 40 42 5.8 0 243.60 243.60
10/19/2023 29 104 42.5 0.7 5.45 130.6875 - 130.69
10/19/2023 30 104 43 0.1 4.9 107.5 - 107.50
10/19/2023 31 103 45 5.8 0 261.00 261.00
10/19/2023 32 104 45.5 5.8 0 263.90 263.90
10/20/2023 33 SN 46,80 5.8 #VALUE! #VALUE! #VALUE!
10/20/2023 34 SN 46,10 5.8 #VALUE! #VALUE! #VALUE!
10/20/2023 35 40 44,20 5.8 #VALUE! #VALUE! #VALUE!
10/20/2023 36 33 44,10 5.8 #VALUE! #VALUE! #VALUE!
10/20/2023 37 33 44 5.8 0 255.20 255.20
10/23/2023 38 06 23.1 5.8 0 133.98 133.98
10/23/2023 39 33 23.1 5.8 0 133.98 133.98
10/23/2023 40 SN 22 5.8 0 127.60 127.60
10/23/2023 41 SN 21.5 5.8 0 124.70 124.70
10/24/2023 42 72 21.7 5.8 0 125.86 125.86
10/24/2023 43 72 22.7 5.8 0 131.66 131.66
10/24/2023 44 72 24.4 5.8 0 141.52 141.52
10/24/2023 45 72 21.1 2.1 0 44.31 44.31
10/23/2023 46 54 49 5.8 0 284.20 284.20
10/23/2023 47 54 39.7 5.8 0 230.26 230.26
10/24/2023 48 60 38.8 5.8 0 225.04 225.04
10/24/2023 49 60 43 5.8 0 249.40 249.40
10/24/2023 50 59 42.9 5.8 0 248.82 248.82
10/24/2023 51 72/59 44.7 5.8 0 259.26 259.26
10/24/2023 52 63 46.1 5.8 0 267.38 267.38
10/24/2023 53 66 47.7 0.7 4.47 123.3045 - 123.30
10/24/2023 54 66 48.3 1.1 5 147.315 - 147.31
10/24/2023 55 87 46.6 5.8 0 270.28 270.28
10/24/2023 56 87 45 5.8 0 261.00 261.00
10/25/2023 57 85 44.7 5.25 0.5 128.5125 - 128.51
10/25/2023 58 85 44.7 5.25 0.47 127.842 - 127.84
10/25/2023 59 85 44.5 5.8 0 258.10 258.10
10/25/2023 60 82 44.2 5.8 0 256.36 256.36
10/25/2023 61 82 42.5 5.8 0 246.50 246.50
10/25/2023 62 82 44.8 5.8 0 259.84 259.84
10/25/2023 63 83 38.3 5.8 0 222.14 222.14
10/25/2023 64 42 38 5.8 0 220.40 220.40
10/25/2023 65 42 42.8 5.8 0 248.24 248.24
10/25/2023 66 43 44.6 5.8 0 258.68 258.68
10/25/2023 67 43 47.7 5.8 0 276.66 276.66
10/26/2023 68 SN 49.9 5.8 0 289.42 289.42
10/26/2023 69 SN 48.8 5.8 0 283.04 283.04
10/26/2023 70 SN 15.5 3.7 0 57.35 57.35
10/26/2023 71 SN 5.7 3.4 0 19.38 19.38
10/26/2023 72 73 26.5 5.8 0 153.70 153.70
10/26/2023 73 73 33.5 5.8 0 194.30 194.30
10/26/2023 74 73 15.6 5.8 0 90.48 90.48
10/26/2023 75 73 19.4 5.8 0 112.52 112.52
10/27/2023 76 84 19 5.8 0 110.20 110.20
10/27/2023 77 84 21.2 5.8 0 122.96 122.96
10/27/2023 78 84 23.6 5.8 0 136.88 136.88
10/27/2023 79 84 25.7 5.8 0 149.06 149.06
10/27/2023 80 81 28.6 5.8 0 165.88 165.88
10/27/2023 81 81 32.4 5.8 0 187.92 187.92
10/27/2023 82 81 34.7 0.56 5.2 99.936 - 99.94
10/27/2023 83 81 32 0.38 5.3 90.88 - 90.88
10/27/2023 84 74 29 5.8 0 168.20 168.20
10/27/2023 85 74 29.5 5.8 0 171.10 171.10
10/27/2023 86 74 31 0.57 5 86.335 - 86.34
10/30/2023 87 74 32 0.78 5.43 99.36 - 99.36
10/30/2023 88 71 33.7 5.8 0 195.46 195.46
10/30/2023 89 71 36.7 0.66 5.33 109.9165 - 109.92
10/30/2023 90 71 37.7 0.5 5.2 107.445 - 107.45
10/30/2023 91 62 38.8 1 4.76 111.744 - 111.74
10/30/2023 92 62 40.3 1.1 4.73 117.4745 - 117.47
10/30/2023 93 62 41.1 5.8 0 238.38 238.38
10/30/2023 94 97 40.2 5.8 0 233.16 233.16
10/31/2023 95 97 38.5 0.68 5.7 122.815 - 122.82
10/31/2023 96 97 37 0.4 5.1 101.75 - 101.75
10/31/2023 97 96 36.4 5.8 0 211.12 211.12
10/31/2023 98 96 35.2 0.66 5 99.616 - 99.62
10/31/2023 99 96 34.5 0.7 5.1 100.05 - 100.05
10/31/2023 100 62 34.9 5.8 0 202.42 202.42
10/31/2023 101 SN 36.1 5.8 0 209.38 209.38
Subtotal #VALUE! #VALUE!

GEOMARCA CLIENTE
GEOMARCA ENGENHARIA CONSTRUÇÃO E CONSULTORIA EIRELI
RELATÓRIO DE LOCAÇÃO E MEDIÇ

CLIENTE: EQUINOX GOLD


PROJETO: SANTA LUZ
REVESTIMENTO: PEBDL
PAINEL BOBINA COMPRIM. LARGURA ÁREA TOTAL
PAINEL
DATA N° N° PAINEL PAINEL l.MENOR L.MAIOR PAINEL RETO
TRAPEZOI
M M DAL M²
11/1/2023 102 110 36.9 0.45 4.9 98.7075 -
11/1/2023 103 110 36.6 0.7 5.2 107.97 -
11/1/2023 104 110 37.7 5.8 0 218.66
11/1/2023 105 100 39.7 0.2 4.7 97.265 -
11/1/2023 106 100 41 0.9 5.5 131.2 -
11/1/2023 107 100 43.7 5.8 0 253.46
11/1/2023 108 70 49 5.8 0 284.20
11/1/2023 109 70 54.4 5.8 0 315.52
11/1/2023 110 70 58.5 5.8 0 339.30
11/1/2023 111 110 60.5 5.8 0 350.90
11/1/2023 112 124 64 5.8 0 371.20
11/3/2023 113 114 67.5 5.8 0 391.50
11/3/2023 114 152 67.2 5.8 0 389.76
11/3/2023 115 147 67 5.8 0 388.60
11/3/2023 116 148 77 5.8 0 446.60
11/3/2023 117 152 64.35 5.8 0 373.23
11/3/2023 118 124 66.55 5.8 0 385.99
11/6/2023 119 171 64.5 5.8 0 374.10
11/6/2023 120 172 63.9 5.8 0 370.62
11/6/2023 121 172 62.97 5.8 0 365.23
11/7/2023 122 153 59.67 5.8 0 346.09
11/7/2023 123 058 57.43 5.8 0 333.09
11/8/2023 124 075 53.4 5.8 0 309.72
11/8/2023 125 075 57.6 5.8 0 334.08
11/8/2023 126 145 57.5 5.8 0 333.50
11/8/2023 127 145 54.7 5.8 0 317.26
11/8/2023 128 109 51.1 5.8 0 296.38
11/8/2023 129 109 49.1 5.8 0 284.78
11/8/2023 130 SN 47.4 5.8 0 274.92
11/8/2023 131 45.9 0.64 5.6 143.208 -
11/7/2023 132 55.5 5.8 0 321.90
11/7/2023 133 061 54.34 5.8 0 315.17
11/7/2023 134 149 47.5 5.8 0 275.50
11/7/2023 135 149 42.8 5.8 0 248.24
11/7/2023 136 156 41.1 5.8 0 238.38
11/7/2023 137 156 40.4 5.8 0 234.32
11/7/2023 138 150 39.4 5.8 0 228.52
11/7/2023 139 150 34.8 5.8 0 201.84
11/8/2023 140 156/150 27.2 5.8 0 157.76
11/8/2023 141 16 1.4 0 22.40
11/8/2023 142 140 31.4 5.8 0 182.12
11/8/2023 143 140 27.3 5.8 0 158.34
11/8/2023 144 140 24.7 5.8 0 143.26
11/8/2023 145 131 21.3 5.8 0 123.54
11/8/2023 146 131 18.8 5.8 0 109.04
11/8/2023 147 131 17.6 5.8 0 102.08
11/8/2023 148 131 15.5 5.8 0 89.90
11/9/2023 149 131 14 5.8 0 81.20
150 5.8 0 -
151 5.8 0 -
152 5.8 0 -
153 5.8 0 -
154 5.8 0 -
155 5.8 0 -
Subtotal 11,682.20

GEOMARCA
GEOMARCA ENGENHARIA CONSTRUÇÃO E CONSULTORIA EIRELI
LOCAÇÃO E MEDIÇÃO

ESPESSURA: 1.5
TÉCNICO: ABELARDO / ROGERIN
BARRAGEM DE REJEITOS
TOTAL
PAINEL RETO ÁREA TOTAL OBSERVAÇÕES

- 98.71
- 107.97
218.66 218.66
- 97.27
- 131.20
253.46 253.46
284.20 284.20
315.52 315.52
339.30 339.30
350.90 350.90
371.20 371.20
391.50 391.50
389.76 389.76
388.60 388.60
446.60 446.60
373.23 373.23
385.99 385.99
374.10 374.10
370.62 370.62
365.23 365.23
346.09 346.09
333.09 333.09
309.72 309.72
334.08 334.08
333.50 333.50
317.26 317.26
296.38 296.38
284.78 284.78
274.92 274.92
- 143.21
321.90 321.90
315.17 315.17
275.50 275.50
248.24 248.24
238.38 238.38
234.32 234.32
228.52 228.52
201.84 201.84
157.76 157.76
22.40 22.40
182.12 182.12
158.34 158.34
143.26 143.26
123.54 123.54
109.04 109.04
102.08 102.08
89.90 89.90
81.20 81.20
- -
- -
- -
- -
- -
- -
11,682.20 12,260.55

CLIENTE
SULTORIA EIRELI

31242.39
220,000.00 100
RELATÓRIO DE LOCAÇÃO E MEDIÇ

CLIENTE: EQUINOX GOLD


PROJETO: SANTA LUZ
REVESTIMENTO: PEBDL
PAINEL BOBINA COMPRIM. LARGURA ÁREA TOTAL
PAINEL
DATA N° N° PAINEL PAINEL l.MENOR L.MAIOR PAINEL RETO
TRAPEZOI
M M DAL M²
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
5.8 0 -
Subtotal -

GEOMARCA
GEOMARCA ENGENHARIA CONSTRUÇÃO E CONSULTORIA EIRELI
LOCAÇÃO E MEDIÇÃO

ESPESSURA: 1.5
TÉCNICO: ABELARDO / ROGERIN
BARRAGEM DE REJEITOS
TOTAL
PAINEL RETO ÁREA TOTAL OBSERVAÇÕES

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

CLIENTE
SULTORIA EIRELI