KEMENTRIAN KESEHATAN REPUBLIK INDONESIA

DIREKTORAT JENDERAL TENAGA KESEHATAN


KETERANGAN : POLITEKNIK KESEHATAN KEMENKES JAYAPURA
PLAFOND
GYPSUM BOARD 1200X2400mm t=9mm
L1 RANGKA HOLLLOW GALVANIS 40x40mm
FIN. CAT INTERIOR

L2
LIST ALUMINIUM PROFIL U 10X10mm

GRC 1200x2400mm t=6mm


RANGKA HOLLLOW GALVANIS 40x40mm
AS BUILT DRAWING
FIN. CAT INTERIOR

MULTIPLEKS 1200x2400mm t=6mm LAPIS HPL


L3 RANGKA HOLLLOW GALVANIS 40x40mm
PEKERJAAN

L4 BETON EKSPOS FINISHING CAT INETRIOR


PERENCANAAN PEMBANGUNAN
GEDUNG LABORATORIUM TERPADU
POLTEKKES KEMENKES JAYAPURA
TOILET DISABILITAS
FFL -0.05 LOKASI KEGIATAN
GEDUNG
R. LINEN REKTORAT Poltekkes Kemenkes Jayapura
FFL ±0.00
Jalan Padang Bulan II Hedam
Distrik Heram, Kota Jayapura
TOILET MENYETUJUI
FFL -0.05 PEJABAT PEMBUAT KOMITMEN
KORIDOR
PENGHUBUNG
TOILET DISABILITAS
FFL -0.05 -1.00
-0.85
-0.69
-0.53 L2
-0.37 RENOLD M. MOFU, SKM., M.Kes.
-0.21 CFL.+3.80 NIP. 19740301 200003 1 002
OBSERVASI TERAS L2 MENGETAHUI
L2 L1 R. KONTROL
L2 L2 GUDANG OBAT
FFL -0.05 DIREKSI TEKNIS
CFL.+2.80 CFL.+3.00 CFL.+3.80 CFL.+3.80 FFL ±0.00
FFL ±0.00 CFL.+3.80 L1 L2
R. SAMPLE ANALIS TLM
CFL.+3.00 FFL ±0.00 CFL.+3.80
OBSERVASI L1 L2 L2
R.PIMPINAN PERACIKAN FARMASI L1
L2 L2 L2 L2
NON CFL.+3.00 CFL.+2.80 FFL ±0.00 CFL.+2.80 FFL ±0.00 CFL.+3.00
BEDAH CFL.+2.80 CFL.+2.80 L1 CFL.+2.80 CFL.+2.80 ABNER NAA, ST., M.KP.
L1 R. DOKTER TOILET WANITA CFL.+3.00 TOILET PRIA L1 NIP. 19730413 200112 1 005
L1 L1
CFL.+3.00 FFL ±0.00 L2
OBSERVASI FFL -0.05 LAKTASI FFL -0.05 CFL.+3.00 DIPERIKSA
CFL.+3.00 CFL.+3.00 R.KONSULTASI KONSULTAN SUPERVISI
CFL.+2.80 L2 FFL ±0.00
L1 L2 R. PENGAMBILAN SAMPLE PT. ARCI PRATAMA KONSULTAN-
ADMINISTRASI LAB L1
KEBIDANAN FFL ±0.00
CV. KARYA JOHAR KONSULTAN, KSO
CFL.+3.00 CFL.+2.80 R.PANEL FFL ±0.00
L2 FFL ±0.00 FFL ±0.00 CFL.+2.80
BEDAH CFL.+3.00 FFL ±0.00 L1
CFL.+2.80 PENYERAHAN OBAT CFL.+3.00
L1 ADMINISTRASI
PENYERAHAN RESEP
L2 L3 CFL.+3.00 FFL ±0.00
L1 L1 ADMINISTRASI L2
L2
CFL.+2.80 CFL.+3.30 L1 KASIR FFL ±0.00 CFL.+2.80
NURSE STATION NAIK CFL.+3.50 CFL.+3.50
CFL.+3.00 CFL.+3.00 L1
FFL ±0.00
FHATRA IRJAYAKUSUMA GUNA, ST
L1 NAIK Supervision Engineer
L2 L1
TANGGA DARURAT
CFL.+3.50 IGD
CFL.+3.00 CFL.+3.50
FFL ±0.00
FFL ±0.00
L1
KONTRAKTOR PELAKSANA
TERAS LOBBY CFL.+3.00

Ø3"
elbow
90°
FFL -0.05 L1 L1
FFL ±0.00
CFL.+3.50 CFL.+3.50 L2
TRIASE L1 L1 L1 L1
TERAS CFL.+3.80 KONTRAKTOR PELAKSANA
FFL ±0.00 CFL.+3.50 CFL.+3.00 CFL.+3.00 CFL.+3.00 FFL -0.05 PT. PUTRA UTAMA KONSTRUKSI
R.KONSULTASI R. GIZI R. SANITASI R.KONSULTASI
woble
°09

"3Ø
woble
°09

"3Ø
elbow
90°

Ø3"
elbow
90°

Ø3"

FFL ±0.00 FFL ±0.00 FFL ±0.00 FFL ±0.00 -0.20


-0.35
-0.50
L1 L1 L1 L1 L1
R.KONSULTASI R.KONSULTASI
CFL.+3.00 CFL.+3.00 CFL.+3.00 CFL.+3.00 RAMP 6° RAMP 6° CFL.+3.00
TERAS FFL ±0.00
CFL.+3.00 L1 FFL ±0.00
FFL -0.05
R. RESUSITASI R. TINDAKAN PONEK L1 R.PENYIAPAN MEDIA L1
-0.20
FFL ±0.00 FFL ±0.00 FFL ±0.00 -0.35 CFL.+3.00 FFL ±0.00 CFL.+3.00 RONAL ROBERT, ST
-0.50
Project Manager
FFL -0.05 FFL -0.05 FFL -0.05 FFL -0.05
FFL -0.05 KETERANGAN :
L2

CFL.+3.50
R.GAS MEDIS
FFL ±0.00

TANGGAL DIBUAT Oktober 2023


NAMA GAMBAR
Bangunan Utama
DENAH RENCANA PLAFOND Denah Rencana Plafond Lantai 1

1
DENAH LANTAI 1
SCALE 1 :175
SKALA KODE GAMBAR JUMLAH LBR

1 : 175 AR.A- 601