REVIEW PRODUK

PRODUKSI

KURANG OPERATOR
EXCAVATOR RUSAK
LOADING COAL
Type Unit

SHIFT CHANGE
LOADING OB
No. Unit

EXCAVATOR
Date

P2H
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 15 0.25 0.25
1 AGUSTUS ET-230 DX520 14.5
ET-231 SY-500 13
ET-233 SY-500 13.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 7.5
ET-232 SY215 4.2
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 7 2
2 AGUSTUS ET-230 DX520 14.5
ET-231 SY-500 15.5
ET-233 SY-500 15.5
ET-188 DX225 22
ET-228 SY215 2.5
ET-232 SY215
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 17
ET-227 DX520 22
ET-229 DX520 8.5 0.25 0.25 2
3 AGUSTUS ET-230 DX520 13.5 0.25 0.25 2
ET-231 SY-500 19.5
ET-233 SY-500 17
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215 1
ET-187 SL340 22
ET-38 SL500 13

4 AGUSTUS
ET-40 SL500 8 0.25 0.25 1
ET-227 DX520 22
ET-229 DX520 22
4 AGUSTUS ET-230 DX520 8 0.25 0.25
ET-231 SY-500 10
ET-233 SY-500 10 0.25 0.25
ET-188 DX225 22
ET-228 SY215 2
ET-232 SY215 11
ET-187 SL340 22
ET-38 SL500 6 12
ET-40 DX520 22
ET-227 SL520 4 11
ET-229 SL520 22
5 AGUSTUS ET-230 SL520 15
ET-231 SY-500 13.5
ET-233 SY-500 13.5
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215 1.5
ET-187 SL340 22
ET-38 SL500 8 12
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 2 14
6 AGUSTUS ET-230 DX520 11.5 0.25 0.25 1
ET-231 SY-500 12 0.25 0.25 1
ET-233 SY-500 10.5 0.25 0.25 1
ET-188 DX225 22
ET-228 SY215 2
ET-232 SY215 1
ET-187 SL340 22
ET-38 SL500 12
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 16.5 0.25 0.25
7 AGUSTUS ET-230 DX520 14
ET-231 SY-500 15 0.25 0.25
ET-233 SY-500 13.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215
ET-232 SY215 12
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 18
8 AGUSTUS ET-230 DX520 17.5 0.25 0.25
8 AGUSTUS
ET-231 SY-500 18 0.25 0.25 0.5
ET-233 SY-500 15.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215
ET-187 SL340 22
ET-38 SL500 5 14
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 19.5
9 AGUSTUS ET-230 DX520 2.5 0.25 0.25 15
ET-231 SY-500 19
ET-233 SY-500 18
ET-188 DX225 22
ET-228 SY215 1.7
ET-232 SY215 9
ET-187 SL340 22
ET-38 SL500 12
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 17 0.25 0.25
10 AGUSTUS ET-230 DX520 15
ET-231 SY-500 16 0.25 0.25
ET-233 SY-500 16.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215 0.5
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 10 11
11 AGUSTUS ET-230 DX520 18.5
ET-231 SY-500 19.5
ET-233 SY-500 16
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215 0.5
ET-187 SL340 22
ET-38 SL500 3 16
ET-40 SL500 14
ET-227 DX520 22
ET-229 DX520 4.5 11
12 AGUSTUS ET-230 DX520 12 0.25 0.25
ET-231 SY-500 14.5 0.25 0.25
ET-233 SY-500 12.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 14
ET-232 SY215 5
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 13 0.25 0.25
13 AGUSTUS ET-230 DX520 14.5
ET-231 SY-500 16 0.25 0.25
ET-233 SY-500 15
ET-188 DX225 22
ET-228 SY215 1.5
ET-232 SY215
ET-187 SL340 22
ET-38 SL500 17
ET-40 SL500 22
ET-227 DX520 3 12
ET-229 DX520 12
14 AGUSTUS ET-230 DX520 6 10
ET-231 SY-500 13 0.25 0.25
ET-233 SY-500 12
ET-188 DX225 22
ET-228 SY215 6
ET-232 SY215 1
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 9 11
ET-229 DX520 16
15 AGUSTUS ET-230 DX520 3 16.5
ET-231 SY-500 15
ET-233 SY-500 15 0.25 0.25
ET-188 DX225 22
ET-228 SY215 3.5
ET-232 SY215 1.5
ET-187 SL340 22
ET-38 SL500 15.5 0.25 0.25
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 16
16 AGUSTUS ET-230 DX520 11.5
ET-231 SY-500 16 0.25 0.25
ET-233 SY-500 22
ET-188 DX225 22
ET-228 SY215 2
ET-232 SY215 1
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22

17 AGUSTUS
ET-227 DX520 22
ET-229 DX520 7.5 11
17 AGUSTUS ET-230 DX520 4.5 11
ET-231 SY-500 7.5 0.25 0.25 11
ET-233 SY-500 7 0.25 0.25 11
ET-188 DX225 22
ET-228 SY215 6
ET-232 SY215 1.5
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 9 0.25 0.25 3
18 AGUSTUS ET-230 DX520 7 0.25 0.25 3
ET-231 SY-500 6.5 0.25 0.25 3
ET-233 SY-500 8 0.25 0.25 3
ET-188 DX225 22
ET-228 SY215 7.5
ET-232 SY215 7
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 5
19 AGUSTUS ET-230 DX520 0.5
ET-231 SY-500 6
ET-233 SY-500 6.5
ET-188 DX225 22
ET-228 SY215 7
ET-232 SY215 6
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 4.5
20 AGUSTUS ET-230 DX520 4
ET-231 SY-500 6.5 0.25 0.25
ET-233 SY-500 11
ET-188 DX225 22
ET-228 SY215 12
ET-232 SY215 0.5
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 6.5
21 AGUSTUS ET-230 DX520 6
ET-231 SY-500 2.5 2
21 AGUSTUS

ET-233 SY-500 6.5


ET-188 DX225 22
ET-228 SY215 4
ET-232 SY215 3
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 13.5
22 AGUSTUS ET-230 DX520 14
ET-231 SY-500 16.5
ET-233 SY-500 13.5
ET-188 DX225 22
ET-228 SY215 22
ET-232 SY215 12.4
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 8
23 AGUSTUS ET-230 DX520 6.5
ET-231 SY-500 8 0.25 0.25
ET-233 SY-500 6
ET-188 DX225 22
ET-228 SY215 14.5
ET-232 SY215 2
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 12.5
24 AGUSTUS ET-230 DX520 13.5 0.25 0.25
ET-231 SY-500 11.5
ET-233 SY-500 5.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 3
ET-232 SY215 12
ET-187 SL340 22
ET-38 SL500 4.5 15
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 6.5 0.25 0.25 5
25 AGUSTUS ET-230 DX520 19.5
ET-231 SY-500 7 11
ET-233 SY-500 18
ET-188 DX225 22
ET-228 SY215 13.5
ET-232 SY215 11
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 18
26 AGUSTUS ET-230 DX520 14.5 0.25 0.25
ET-231 SY-500 17 0.25 0.25
ET-233 SY-500 13.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 2
ET-232 SY215 12
ET-187 SL340 22
ET-38 SL500 22
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 9.5
27 AGUSTUS ET-230 DX520 10.5
ET-231 SY-500 9
ET-233 SY-500 9
ET-188 DX225 22
ET-228 SY215 12
ET-232 SY215 1.9
ET-187 SL340 22
ET-38 SL500 7.5 11
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 1.5 10
28 AGUSTUS ET-230 DX520 14
ET-231 SY-500 13.5
ET-233 SY-500 14
ET-188 DX225 22
ET-228 SY215 11
ET-232 SY215 0.5
ET-187 SL340 22
ET-38 SL500 0.25 10
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 22
29 AGUSTUS ET-230 DX520 13
ET-231 SY-500 13
ET-233 SY-500 11.5 0.25 0.25
ET-188 DX225 22
ET-228 SY215 11
ET-232 SY215 4
ET-187 SL340 22
ET-38 SL500 6.5 12
ET-40 SL500 22
ET-227 DX520 22

30 AGUSTUS
ET-229 DX520 22
30 AGUSTUS ET-230 DX520 13.5
ET-231 SY-500 11 0.25 0.25
ET-233 SY-500 12.5
ET-188 DX225 22
ET-228 SY215 1
ET-232 SY215 11
ET-187 SL340 22
ET-38 SL500 14.5 2
ET-40 SL500 22
ET-227 DX520 22
ET-229 DX520 8.5 0.25 0.25
31 AGUSTUS ET-230 DX520 18.5 0.25 0.25
ET-231 SY-500 9 0.25 0.25 4
ET-233 SY-500 3.5 15
ET-188 DX225 22
ET-228 SY215 11
ET-232 SY215 1.5

ET-187 SL500 0 - - - 154.00 -


ET-38 SL500 14 - - - 115.00 -
ET-40 SL500 8 - 0.25 0.25 - -
ET-227 DX520 4 - - - 143.00 -
ET-229 DX520 49 - 0.75 0.75 62.00 -
week 1 ET-230 DX520 91 0 0.75 0.75 3 0
ET-231 SY-500 98.5 0 0.5 0.5 1 0
ET-233 SY-500 93.5 0 1 1 1 0
ET-188 DX225 0 0 0 0 154 0
ET-228 SY215 0 0 0 0 16 0
ET-232 SY215 0 0 0 0 30.7 0
358 0 3.25 3.25 479 0
0 0 0 0 200.7 0
ET-187 SL500 0 - - - 66.00 -
ET-38 SL500 8 - - - 103.00 -
ET-40 SL500 0 - - - 36.00 -
ET-227 DX520 3 - - - 66.00 -
ET-229 DX520 111 - 0.50 0.50 - -
week 2 ET-230 DX520 86 0 0.75 0.75 25 0
ET-231 SY-500 116 0 1.25 1.25 0.5 0
ET-233 SY-500 105.5 0 0.75 0.75 0 0
ET-188 DX225 0 0 0 0 154 0
ET-228 SY215 0 0 0 0 26.2 0
ET-232 SY215 0 0 0 0 16 0
429.5 0 3.25 3.25 296.5 -
0 0 0 0 196.2 0
ET-187 SL340 0 - - - 44.00 -
ET-38 SL500 15.5 - 0.25 0.25 22.00 -

week 3
ET-40 SL500 0 - - - 66.00 -
ET-227 DX520 9 0 - - 88.00 -
ET-229 DX520 64.5 0 0.25 0.25 3.00 -
week 3 ET-230 DX520 36.5 0 0.25 0.25 30.5 0
ET-231 SY-500 60 0 1 1 16 0
ET-233 SY-500 54 0 0.75 0.75 36 0
ET-188 DX225 0 0 0 0 154 0
ET-228 SY215 0 0 0 0 42 0
ET-232 SY215 0 0 0 0 20.5 0
239.5 0 2.5 2.5 305.5 0
0 0 0 0 216.5 0
ET-187 SL500 0 - - - 132.00 -
ET-38 SL500 12 - - - 114.00 -
ET-40 SL500 0 - - - - -
ET-227 DX520 0 - - - - -
ET-229 DX520 69.5 - 0.25 0.25 - -
week 4 ET-230 DX520 67 0 0.25 0.25 88 0
ET-231 SY-500 79 0 0.25 0.25 88 0
ET-233 SY-500 57 0 0.25 0.25 88 0
ET-188 DX225 0 0 0 0 71 0
ET-228 SY215 0 0 0 0 78 0
ET-232 SY215 0 0 0 0 51.8 0
284.5 0 1 1 510 0
0 0 0 0 200.8 0
ET-187 SL500 0 - - - 66.00 -
ET-38 SL500 21.25 - - - 24.00 -
ET-40 SL500 0 - - - 22.00 -
ET-227 DX520 0 - - - 66.00 -
ET-229 DX520 8.5 - 0.25 0.25 44.00 -
week 5 ET-230 DX520 26.5 0 0 0 0 0
ET-231 SY-500 24 0 0.25 0.25 0 0
ET-233 SY-500 24 0 0.25 0.25 0 0
ET-188 DX225 0 0 0 0 44 0
ET-228 SY215 0 0 0 0 12 0
ET-232 SY215 0 0 0 0 15 0
104.25 0 0.75 0.75 222 0
0 0 0 0 71 0

1415.75 - 10.75 10.75 6.00 0


(15.00)
EXCAVATOR TRAVEL
PINDAH LOKASI/FRONT

0.25
0.25
0.25
EXCA MELAKUKAN
PEKERJAAN GENERAL

9
4
2.5
4.5
10.5
0
5
5.5
3.5

21
21
22
19.5
4.5
3.5
10
17.8
14.5
8
2
1
PERBAIKAN JALAN PIT -
DISPOSAL

0.25
PERBAIKAN AREA FRONT
LOADING

0.25
1
0.25
0.25
PENGISIAN FUEL
IDLE TIME

0.25
0.25
0.25
0.25
REVIEW PRODUKSI MARET 2020

DI STOP OLEH BSL

DT KURANG

DOZER KURANG

TOWER LAMP RUSAK

PERBAIAKAN AREA
DISPOSAL
0.25

PORTAL/DITUTUP JALAN

SAFETY TALK

KABUT
2 0.25 0.25

3 0.25 0.25
12
1 0.25 0.25

20
11

4
4.5
5.5

21
20.5

4
6.5 0.25 0.25
0.25 6 0.25
7.5 0.25 0.25

20
21

10

0.25 4.5 0.25


8
6 0.25 0.25
7.5 0.25 0.25

22
10

4
3.5 0.25 0.25
2.5 0.25 0.25
0.25 5.5 0.25

21
22

2.5
0.25 3.5 0.25
3
4

20.3
13

10

4 0.25 0.25
7
0.25 4 0.25 0.25 0.25 0.5
0.25 4.5 0.25

21
21.5

1
3.5
2.5
6

21
21.5

3
8

1.5
4 0.25 0.25
0.25 1.5 0.25
3.5 0.25 0.25

8
17

7 0.25 0.25
6.5
0.25 3 0.5 0.25 0.5
6

20.5
22

7
9
4
5 0.25 0.25
7

16
21

2
6
2.5
6 1
0.25 5 0.25 1

18.5
20.5

5.5 0.25 0.25

5 1
10.5
5 0.25 0.25

20
21
3.5
6.5
0.25 2.5 0.25
3 0.25 0.25

16
20.5

2
4
4.5
3

14.5
15

7
11.5
7
5.5

15
16

11.5
15
7.5 0.25 0.25
9

10
21.5

3.5
4
4.5
2.5

18
19

8.5
7
3.5
5.5

9.6

8
9.5
0.25 2 0.5 0.25 0.25 0.25
8

7.5
20

9.5
0.25 7.5 0.25
8.5
15.5 0.25 0.25

19
10

2.5

0.25 9.5 0.25


2.5
4
4

8.5
11
4
6.5 0.25 0.25
4 0.25 0.25
0.25 7.5 0.25

20
10

6.5
5.5
9
8

10
20.1

3.5

6.5
5
5.5
4

11
21.5

6.75

3
3
3.5 0.25 0.25

11
18

3.5
3.5
5 0.25 0.25
5.5

21
11

5.5

0.25 12.5 0.25


2.5 0.25 0.25
8 0.25 0.25
3.5

11
20.5

- - - - - - - - - - - - -
- 25.00 - - - - - - - - - - -
- 7.00 - 0.25 0.25 - - - - - - - -
- 3.00 - - - - - - - - - - -
0.75 30.00 0.25 0.25 0.75 - - - - - - - -
0.25 33.5 0 1 1 0 0 0 0 0.25 0 0 0
0.25 42.5 0 1.25 0.5 0 0 0 0 0 0 0 0
0 33.5 0.25 0.25 0.75 0 0 0 0 0.25 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 138 0 0 0 0 0 0 0 0 0 0 0
0 123.3 0 0 0 0 0 0 0 0 0 0 0
1.25 174.5 0.5 3 3.25 0 0 0 0 0.5 0 0 0
0 261.3 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - - -
- 21.00 - - - - - - - - - - -
- 8.00 - - - - - - - - - - -
- 7.00 - - - - - - - - - - -
- 29.00 - 0.50 0.50 - - - - - - - -
0.25 32 0 0.5 0.75 0 0 0 0 0 0 0 0
0.75 21.5 0.75 0.5 1.25 0 0 0 0 1.25 0 0 0
0.5 36.5 0.25 0 0.75 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 127.8 0 0 0 0 0 0 0 0 0 0 0
0 138 0 0 0 0 0 0 0 0 0 0 0
1.5 155 1 1.5 3.25 0 0 0 0 1.25 0 0 0
0 265.8 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - - -
- 5.50 0.25 - 0.25 - - - - - - - -
- - - - - - - - - - - - -
- 2.00 - - - - - - - - - - -
- 38.50 - - - - - - 1.00 - - - -
0 54 0 0 0 0 0 0 0 0 0 0 0
0.25 37 0.25 0 0.75 0 0 0 0 1.25 0 0 0
0.25 28 0 0 0.5 0 0 1 0.25 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 112 0 0 0 0 0 0 0 0 0 0 0
0 133.5 0 0 0 0 0 0 0 0 0 0 0
0.5 165 0.5 0 1.5 0 0 1 1.25 1.25 0 0 0
0 245.5 0 0 0 0 0 0 0 0 0 0 0
- - - - - - - - - - - - -
- 6.00 - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
0.25 52.50 - - 0.25 - - - - - - - -
0 17 0.25 0 0.25 0 0 0 0 0 0 0 0
0 18.5 0 0.25 0.25 0 0 0 0 0 0 0 0
0.25 19.5 0 0 0.25 0 0 0 0 0 0 0 0
0.25 35.5 0 0 0.25 0 0 0 0 0 0 0 0
0 76 0 0 0 0 0 0 0 0 0 0 0
0 102.2 0 0 0 0 0 0 0 0 0 0 0
0.5 113.5 0.25 0.25 1 0 0 0 0 0 0 0 0
0.25 213.7 0 0 0.25 0 0 0 0 0 0 0 0
- - - - - - - - - - - - -
- 15.75 - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
0.25 12.50 - - 0.25 - - - - - - - -
0 6.5 0 0 0 0 0 0 0 0 0 0 0
0 8 0.25 0 0.25 0 0 0 0 0 0 0 0
0 9 0.25 0 0.25 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 32 0 0 0 0 0 0 0 0 0 0 0
0 29 0 0 0 0 0 0 0 0 0 0 0
0.25 51.75 0.5 0 0.75 0 0 0 0 - - - 0
0 61 0 0 0 0 0 0 0 0 0 0 0

4.25 660 2.75 4.75 10 0 0 1.00 1.25 3 0 0 0


LOST TIME
STANDBY (EKSTRIM
SLIPPERY

FRONT)
HUJAN

22
22
22
22
3.5 1 22
3.5 1 22
22
3.5 1 22
22
22
22
22
22
22
22
0.5 2.5 22
0.5 1.5 22
0.5 2.5 22
0.5 1.5 22
22
22
22
22
22
22
22
22
0.5 0.5 22
22
0.5 0.5 22
22
22
22
22
22
9 1 22
22
22
9 1 22
22
9 1 22
22
22
22
22
22
22
4 22
22
3 22
4 22
3 22
22
22
22
22
22
22
22
2 22
2 22
2 22
2 22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
3 2 22
3 2 22
3 2 22
3 2 22
22
22
22
22
22
22
22
1 22
1 22
1 22
1 22
22
22
22
22
22
22
22
1 22
2 22
2 1 22
2 1 22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
7.5 22
7.5 22
7.5 22
7.5 22
22
22
22
22
22
22
22
6.0 4.0 22
6.0 4.0 22
6.0 3.0 22
6.0 4.0 22
22
22
22
22
22
22
22
2 4 22
2 1 22
2 5 22
2 22
22
22
22
22
22
22
22
9 3 22
9 3 22
9 4 22
9 4 22
22
22
22
22
22
22
22
22
1 22
2 22
3 22
22
22
22
22
22
22
22
6 22
6 22
6 4 22
6 2 22
22
22
22
22
22
22
22
22
22
2 22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
22
3 3 22
3 3 22
3 1 22
3 2 22
22
22
22
22
22
22
22
4 22
3 22
3 22
4 22
22
22
22
22
5 22
22
22
22
5 1 22
5 1 22
5 1 22
22
22
22
22
22
22
22
22
5 22
5 22
4 22
22
22
22
22
22
22
22
22
22
22
22
22
22
22

- - -
- - -
9.00 1.00 -
- 4.00 -
4.00 5.50 -
13.5 9 0
0.5 8.5 0
13.5 9 0
0 0 0
0 0 0
0 0 0
40.5 37 0 358.00 429.50 239.50 284.50 104.25
0 0 0 - - - - -
- - - 3.25 3.25 2.50 1.00 0.75
- - - 3.25 3.25 2.50 1.00 0.75
- - - - - - - -
- - - - - - - -
4.00 3.00 - 1.25 1.50 0.50 0.50 0.25
5 3 0 - - 133.50 35.50 -
5 4 0 33.50 36.50 112.00 19.50 9.00
5 4 0 - - 133.50 35.50 -
0 0 0 123.30 138.00 133.50 102.20 29.00
0 0 0 123.30 138.00 133.50 102.20 29.00
0 0 0 174.50 155.00 165.00 113.50 51.75
19 14 0 0.50 1.00 0.50 0.25 0.50
0 0 0 - - - - -
- - - - - - - -
- - - 0.50 1.25 1.25 - -
- - - - - - - -
- - -
24.50 11.00 -
24.5 8 0 - - - - -
24.5 12 0 - - - - -
24.5 8 0 - - - - -
0 0 0 - - - - -
0 0 0 - - - - -
0 0 0 - - - - -
98 39 0 37.00 14.00 39.00 23.00 17.00
0 0 0
- - -
- - -
- - -
- - -
9.00 7.00 -
3 6 0
3 4 0
3 6 0
6 0 0
0 0 0
0 0 0
18 23 0
6 0 0
- - -
5.00 - -
- - -
- - -
- - -
5 6 0
5 6 0
5 5 0
0 0 0
0 0 0
0 0 0
20 17 -
0 0 0

59.75 58.5 -
73.70 51.50 50.00 36.25 52.00
154.00 154.00 204.00 356.66 76.00
21.00 21.00 14.00 - -
- - - 0.50 1.75
117.80 195.83 40.93 6.00 9.50
117.80 195.83 40.93 6.00 9.50
- - 9.50 10.90 6.00
- - 9.50 10.90 6.00
- - 9.50 10.90 6.00
- - 9.50 10.90 6.00
- - 9.50 10.90 6.00
- - 9.50 10.90 6.00
- - 0.50 0.50 -
15.33 - - - -
- - - 0.50 -
3.00 - - 2.00 -
- - - 2.00 -

4.67 4.67 2.67 1.16 1.25


4.67 4.67 2.67 1.16 1.25
4.67 4.67 2.67 1.16 1.25
4.67 4.67 2.67 1.16 1.25
4.67 4.67 2.67 1.16 1.25
4.67 4.67 2.67 1.16 1.25
21.00 9.00 49.50 18.00 9.75

(73.70) (51.50) (50.00) (36.25) (52.00)


(150.75) (150.75) (201.50) (355.66) (75.25)
(150.75) (150.75) (201.50) (355.66) (75.25)
(17.75) (17.75) (11.50) 1.00 0.75
(150.75) (150.75) (201.50) (355.66) (75.25)
(73.70) (51.50) (50.00) (36.25) (52.00)
(150.75) (150.75) (201.50) (355.66) (75.25)
(17.75) (17.75) (11.50) 1.00 0.75
(17.75) (17.75) (11.50) 1.00 0.75
- - - (0.50) (1.75)
(116.55) (194.33) (40.43) (5.50) (9.25)
174.50 155.00 155.50 102.60 45.75
0.50 1.00 - (0.25) 0.50
(15.33) - - - -
- - - (0.50) -
- - - (0.50) -
(2.50) 1.25 1.25 (2.00) -
- - - (0.50) -
(15.33) - - - -
- - - (0.50) -
(2.50) 1.25 1.25 (2.00) -
(2.50) 1.25 1.25 (2.00) -
- - - (2.00) -
Calculation of Weight Average Distance Dumping Area
PT. Barasentosa Lestari
Contractor : PT. Lobunta Kencana Raya Location : Pit Pinang
Job Site : PT. Barasentosa Lestari - Belani Site Periode Aug-22

Volume Over Burden Removal : 291,026.73 Bcm


Tanggal Location Segment Distance Percent ( % ) Volume ( Bcm ) Remarks ET 40 ET227 ET38 21,604.11
VOLUME JARAK VOLUME JARAK VOLUME JARAK 28,924.85
1-Aug Disposal LKR 1,220.00 1.10% 3,206.48 ET 229 1 3,206.48 1,220.00 720.02 793.00 988.82 793.00 3,911,900.72 570,975.86 784,137.43
2-Aug Disposal LKR 1,060.00 0.44% 1,286.43 ET 229 2 1,286.43 1,060.00 489.61 961.00 1,257.63 937.00 1,363,615.80 470,515.21 1,178,403.06
3-Aug Disposal LKR 612.00 0.64% 1,862.45 ET 229 3 1,862.45 612.00 1,574.44 1,020.00 892.82 635.00 1,139,819.40 1,605,928.80 566,942.61
6-Aug Disposal LKR 937.00 0.10% 288.01 ET 229 10,061.05 01-07/08/22 4 288.01 937.00 - - 489.61 866.00 269,865.37 - 424,002.26
7-Aug Disposal LKR 637.00 1.17% 3,417.69 ET 229 5 3,417.69 637.00 - - 2,543.68 1,360.00 2,177,065.98 - 3,459,405.81
8-Aug Disposal LKR 768.00 1.28% 3,734.49 ET 229 6 3,734.49 768.00 - - 752.07 829.00 2,868,091.39 - 623,468.12
9-Aug Disposal LKR 928.00 1.42% 4,118.50 ET 229 7 4,118.50 928.00 - - 1,302.09 1,260.00 3,821,968.00 - 1,640,639.20
10-Aug Disposal LKR 929.00 1.17% 3,398.48 ET 229 8 3,398.48 929.00 - - 48.00 1,310.00 3,157,191.64 - 62,880.00
11-Aug Disposal LKR 929.00 0.80% 2,332.86 ET 229 9 2,332.86 929.00 - - 1,165.37 1,010.00 2,167,226.94 - 1,177,023.70
12-Aug Disposal LKR 866.00 0.31% 912.02 ET 229 10 912.02 866.00 - - 3,071.90 1,350.00 789,809.32 - 4,147,065.00
13-Aug Disposal LKR 855.00 0.79% 2,313.66 ET 229 19,018.08 08-14/08/22 11 2,313.66 855.00 - - - - 1,978,179.30 - -
14-Aug Disposal LKR 1,150.00 0.76% 2,208.06 ET 229 12 2,208.06 1,150.00 - - - - 2,539,269.00 - -
15-Aug Disposal LKR 1,260.00 1.02% 2,976.07 ET 229 13 2,976.07 1,260.00 - - - - 3,749,853.24 - -
16-Aug Disposal LKR 1,350.00 1.09% 3,177.68 ET 229 14 3,177.68 1,350.00 - - - - 50,528.97 4,289,873.40 - -
17-Aug Disposal LKR 1,350.00 0.48% 1,392.03 ET 229 15 1,392.03 1,350.00 - - - - 1,879,240.50 - -
18-Aug Disposal LKR 1,440.00 0.61% 1,776.04 ET 229 16 1,776.04 1,440.00 - - - - 2,557,497.60 - -
19-Aug Disposal LKR 1,460.00 0.27% 787.22 ET 229 787.22 1,460.00 1,149,341.20
20-Aug Disposal LKR 1,510.00 0.24% 700.82 ET 229 17 700.82 1,510.00 - - - - 1,058,238.20 - -
11,913.90
21-Aug Disposal LKR 656.00 0.38% 1,104.03 ET 229 15-21/08/22 18 1,104.03 656.00 - - - - 724,245.65 - -
22-Aug Disposal LKR 1,420.00 0.91% 2,646.25 ET 229 19 2,646.25 1,420.00 - - - - 3,757,668.13 - -
23-Aug Disposal LKR 1,040.00 0.60% 1,741.21 ET 229 20 1,741.21 1,040.00 - - - - 1,810,861.98 - -
24-Aug Disposal LKR 1,070.00 0.83% 2,413.11 ET 229 21 2,413.11 1,070.00 - - - - 12,560.71 2,582,030.48 - -
25-Aug Disposal LKR 1,150.00 0.34% 993.99 ET 229 22 993.99 1,150.00 - - - - 1,143,086.94 - -
26-Aug Disposal LKR 1,310.00 1.28% 3,716.18 ET 229 23 3,716.18 1,310.00 - - - - 2,617,313.43 - -
27-Aug Disposal LKR 1,370.00 0.66% 1,910.45 ET 229 23 1,910.45 1,370.00 - - 2,617,313.43 - -
28-Aug Disposal LKR 1,260.00 0.08% 230.41 ET 229 13,651.59 22-28/08/22 24 1,910.45 1,370.00 - - - - 290,311.26 - -
31-Aug Disposal LKR 1,370.00 0.61% 1,766.73 ET 229 25 230.41 1,260.00 - - - - 2,420,420.10 - -
Disposal LKR 0.00% ET 229 26 1,766.73 1,370.00 - - - - - - -
Disposal LKR 0.00% ET 229 27 - 1,370.00 - - - - 5,818.03 - - -
Disposal LKR 0.00% ET 229 27 - - - - #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 28 - - - - - - - - -
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! - - -
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 1,766.73 29-31/08/22 29 - - - - - - #REF! #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! - - -
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! - - -
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! #REF! #REF! #REF!
Disposal LKR 0.00% ET 229 29 - - - - - - #REF! #REF! #REF! #REF!
1-Aug Disposal LKR 1,280.00 1.04% 3,014.48 ET 230 29 #REF! #REF! - - - - #REF! #REF! #REF! -
2-Aug Disposal LKR 1,160.00 0.97% 2,832.07 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
3-Aug Disposal LKR 1,090.00 0.99% 2,889.67 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
4-Aug Disposal LKR 839.00 0.52% 1,507.24 ET 230 01-07/08/22 29 #REF! #REF! - - - - #REF! - #REF! -
5-Aug Disposal LKR 772.00 1.09% 3,164.85 ET 230 29 #REF! #REF! - - - - #REF! #REF! #REF! -
6-Aug Disposal LKR 778.00 0.74% 2,140.85 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
18,410.94
7-Aug Disposal LKR 1,200.00 0.98% 2,861.78 ET 230 29 #REF! #REF! - - - - #REF! #REF! #REF! -
8-Aug Disposal LKR 1,060.00 1.21% 3,524.92 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
9-Aug Disposal LKR 635.00 0.13% 374.41 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
10-Aug Disposal LKR 909.00 0.91% 2,649.67 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
11-Aug Disposal LKR 844.00 1.29% 3,753.69 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
12-Aug Disposal LKR 1,020.00 0.74% 2,150.45 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
13-Aug Disposal LKR 910.00 0.97% 2,832.07 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
14-Aug Disposal LKR 961.00 0.43% 1,248.03 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
15-Aug Disposal LKR 1,020.00 0.19% 547.21 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
16-Aug Disposal LKR 870.00 0.66% 1,920.96 ET 230 29 #REF! #REF! - - - - #REF! #REF! #REF! -
17-Aug Disposal LKR 870.00 0.24% 691.22 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
16,533.24
18-Aug Disposal LKR 1,110.00 0.40% 1,161.63 ET 230 08-14/08/22 29 #REF! #REF! - - - - #REF! - #REF! -
19-Aug Disposal LKR 1,110.00 0.02% 48.00 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
20-Aug Disposal LKR 1,080.00 0.18% 528.01 ET 230 29 #REF! #REF! - - - - #REF! - #REF! -
21-Aug Disposal LKR 1,610.00 0.34% 998.42 ET 230 29 #REF! #REF! #REF! #REF! - - #REF! - #REF! -
22-Aug Disposal LKR 1,630.00 1.02% 2,974.92 ET 230 29 - - #REF! #REF! - - #REF! - #REF! -
23-Aug Disposal LKR 1,420.00 0.45% 1,308.40 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
24-Aug Disposal LKR 1,280.00 0.92% 2,674.54 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
25-Aug Disposal LKR 1,280.00 1.50% 4,352.90 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
26-Aug Disposal LKR 1,510.00 1.01% 2,951.00 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
27-Aug Disposal LKR 1,370.00 0.76% 2,211.63 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
5,895.46
28-Aug Disposal LKR 1,510.00 1.01% 2,932.45 ET 230 15-21/08/22 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
29-Aug Disposal LKR 1,370.00 0.90% 2,624.11 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
30-Aug Disposal LKR 1,340.00 0.94% 2,723.13 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
31-Aug Disposal LKR 1,550.00 1.32% 3,829.41 ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! - #REF! -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 22-28/08/22 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
19,405.83
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 2,167,226.94 - -
Disposal LKR 0.00% ET 230 29 - - #REF! #REF! - - #REF! 789,809.32 - -
Disposal LKR 0.00% ET 230 29 2,332.86 929.00 - - - - 12,365.08 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 10,032.22 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 9,120.20 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 8,208.18 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 7,296.16 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29-31/08/22 29 912.02 866.00 - - - - 6,384.14 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 5,472.12 #REF! #REF! #REF!
9,176.66
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 4,560.10 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 3,648.08 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 2,736.06 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 1,824.04 #REF! #REF! #REF!
Disposal LKR 0.00% ET 230 29 912.02 866.00 - - - - 912.02 #REF! #REF! #REF!
5-Aug Disposal LKR 793.00 0.25% 720.02 ET 227 30 - - - - - -
14-Aug Disposal LKR 961.00 0.17% 489.61 ET 227 31 #REF! #REF! #REF! #REF!
15-Aug Disposal LKR 1,020.00 0.54% 1,574.44 ET 227 #REF! #REF! 12,512.01
Disposal LKR 0.00% ET 227 01-07/08/22 720.02
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
489.61
Disposal LKR 0.00% ET 227 08-14/08/22
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227 15-21/08/22 1,574.44
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227 22-28/08/22 0.00
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227 29-31/08/22 0.00
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
Disposal LKR 0.00% ET 227
1-Aug Disposal LKR 780.00 0.90% 2,611.27 ET 231
2-Aug Disposal LKR 760.00 1.04% 3,014.48 ET 231
3-Aug Disposal LKR 1,270.00 1.44% 4,204.91 ET 231
4-Aug Disposal LKR 1,260.00 0.72% 2,107.65 ET 231 20,167.16 01-07/08/22
5-Aug Disposal LKR 1,260.00 0.88% 2,549.76 ET 231
6-Aug Disposal LKR 1,250.00 0.87% 2,527.14 ET 231
7-Aug Disposal LKR 1,030.00 1.08% 3,151.97 ET 231
8-Aug Disposal LKR 1,180.00 1.07% 3,112.54 ET 231
9-Aug Disposal LKR 1,090.00 1.43% 4,156.47 ET 231
10-Aug Disposal LKR 1,140.00 1.01% 2,950.34 ET 231
11-Aug Disposal LKR 943.00 1.36% 3,956.57 ET 231 23,113.69 08-14/08/22
12-Aug Disposal LKR 730.00 1.09% 3,179.04 ET 231
13-Aug Disposal LKR 1,520.00 1.13% 3,280.91 ET 231
14-Aug Disposal LKR 1,430.00 0.85% 2,477.82 ET 231
15-Aug Disposal LKR 1,550.00 1.01% 2,949.36 ET 231
16-Aug Disposal LKR 1,040.00 1.08% 3,156.59 ET 231
17-Aug Disposal LKR 1,040.00 0.42% 1,213.58 ET 231
18-Aug Disposal LKR 1,100.00 0.39% 1,123.23 ET 231 10,775.94 15-21/08/22
19-Aug Disposal LKR 1,140.00 0.34% 981.04 ET 231
20-Aug Disposal LKR 1,080.00 0.33% 950.33 ET 231
21-Aug Disposal LKR 1,220.00 0.14% 401.82 ET 231
22-Aug Disposal LKR 1,200.00 1.15% 3,354.89 ET 231
23-Aug Disposal LKR 1,140.00 0.59% 1,717.29 ET 231
24-Aug Disposal LKR 1,030.00 0.78% 2,277.38 ET 231
25-Aug Disposal LKR 829.00 0.40% 1,170.44 ET 231
26-Aug Disposal LKR 602.00 1.33% 3,884.42 ET 231 22-28/08/22
17,027.46
27-Aug Disposal LKR 575.00 0.66% 1,907.17 ET 231
28-Aug Disposal LKR 1,190.00 0.93% 2,715.86 ET 231
29-Aug Disposal LKR 1,310.00 0.92% 2,666.57 ET 231
30-Aug Disposal LKR 1,300.00 0.79% 2,287.26 ET 231
31-Aug Disposal LKR 1,370.00 0.58% 1,675.80 ET 231
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231 29-31/08/22
6,629.64
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231
Disposal LKR 0.00% ET 231
1-Aug Disposal LKR 1,340.00 0.94% 2,746.63 ET 233
2-Aug Disposal LKR 1,160.00 1.09% 3,171.38 ET 233
3-Aug Disposal LKR 1,090.00 1.27% 3,694.44 ET 233
4-Aug Disposal LKR 828.00 0.71% 2,073.65 ET 233 18,845.97 01-07/08/22
5-Aug Disposal LKR 851.00 0.92% 2,666.95 ET 233
6-Aug Disposal LKR 937.00 0.69% 1,996.85 ET 233
7-Aug Disposal LKR 731.00 0.86% 2,496.06 ET 233
8-Aug Disposal LKR 1,020.00 1.01% 2,947.68 ET 233
9-Aug Disposal LKR 1,080.00 1.24% 3,614.24 ET 233
10-Aug Disposal LKR 666.00 1.02% 2,976.07 ET 233
11-Aug Disposal LKR 1,230.00 0.93% 2,712.83 ET 233 19,825.41 08-14/08/22
12-Aug Disposal LKR 894.00 0.83% 2,428.86 ET 233
13-Aug Disposal LKR 859.00 1.02% 2,976.07 ET 233
14-Aug Disposal LKR 1,340.00 0.75% 2,169.65 ET 233
15-Aug Disposal LKR 1,540.00 0.96% 2,796.40 ET 233
17-Aug Disposal LKR 1,360.00 0.38% 1,102.52 ET 233
18-Aug Disposal LKR 1,510.00 0.58% 1,681.29 ET 233
19-Aug Disposal LKR 1,540.00 0.38% 1,119.30 ET 233 10,174.79 15-21/08/22
20-Aug Disposal LKR 580.00 0.81% 2,371.26 ET 233
21-Aug Disposal LKR 1,220.00 0.38% 1,104.03 ET 233
22-Aug Disposal LKR 1,220.00 0.93% 2,719.05 ET 233
23-Aug Disposal LKR 1,140.00 0.40% 1,167.65 ET 233
24-Aug Disposal LKR 1,020.00 0.31% 895.89 ET 233
25-Aug Disposal LKR 1,060.00 1.30% 3,792.74 ET 233
26-Aug Disposal LKR 1,510.00 0.99% 2,873.09 ET 233
27-Aug Disposal LKR 1,350.00 0.64% 1,860.21 ET 233 22-28/08/22
16,264.72
28-Aug Disposal LKR 1,180.00 1.02% 2,956.10 ET 233
29-Aug Disposal LKR 1,390.00 0.81% 2,364.38 ET 233
30-Aug Disposal LKR 1,010.00 0.89% 2,580.18 ET 233
31-Aug Disposal LKR 1,020.00 0.24% 706.99 ET 233
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233 29-31/08/22
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233
5,651.55
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233
Disposal LKR 0.00% ET 233
4-Aug Disposal LKR 793.00 0.49% 1,420.84 ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40 1,420.84 01-07/08/22
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40 0.00 08-14/08/22
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40 0.00 15-21/08/22
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40 22-28/08/22
0.00
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40 29-31/08/22
0.00
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
Disposal LKR 0.00% ET 40
5-Aug Disposal LKR 793.00 0.34% 988.82 ET 38
6-Aug Disposal LKR 937.00 0.43% 1,257.63 ET 38
9-Aug Disposal LKR 635.00 0.31% 892.82 ET 38
12-Aug Disposal LKR 866.00 0.17% 489.61 ET 38 2,246.46 01-07/08/22
16-Aug Disposal LKR 1,360.00 0.87% 2,543.68 ET 38
25-Aug Disposal LKR 829.00 0.26% 752.07 ET 38
28-Aug Disposal LKR 1,260.00 0.45% 1,302.09 ET 38
29-Aug Disposal LKR 1,310.00 0.02% 48.00 ET 38

1,382.43
30-Aug Disposal LKR 1,010.00 0.40% 1,165.37 ET 38
31-Aug Disposal LKR 1,350.00 1.06% 3,071.90 ET 38
Disposal LKR 0.00% ET 38 1,382.43 08-14/08/22
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38 2,543.68 15-21/08/22
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38 22-28/08/22
2,054.17
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38 29-31/08/22
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
4,285.27
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Disposal LKR 0.00% ET 38
Total Volume 100% 291,026.73 Bcm
Weight Average Distance 1,115.89 M
Note;
1. Untuk OB removal bulan Maret focus loading di Side Wall Utara, Low Wall Selatan dan
High Wall Utara sehingga jarak hauling tiap ET berbeda
2. Jarak sumproduct belum hasil final atau validasi dengan BSL, dapat berubah pada saat
reconsile dengan BSL.
PERTANGGUNG JAWABAN (AKTUAL FUEL CONSUMPTION) NO : 01

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI 18,812.00
PERIODE : TGL 01/8/2022 s.d TGL 7/8/2022

WH
FUEL CONSUMPTION
UNIT TYPE No ACTUAL BBM
PLAN ACTUAL
DEVIASI KET
OB COAL General
Dossan DX225LC-V ET-188 - - - - 22.00 - 22.00 UNIT BD 0 0
Dossan DX225LC-V ET-189 - - - - 22.00 - 22.00 UNIT BD 0 0
Sany 215 ET-228 - - 138.00 1,382.00 22.00 10.01 11.99 Hemat/perlu tinjau kembali 138.00 1,654.00
Sany 215 ET-232 - - 123.30 1,524.00 22.00 12.36 9.64 Hemat/perlu tinjau kembali 123.30 1,188.60
Dossan S340LC-V ET-187 - - - 561.00 24.00 - 24.00 UNIT BD 0 0
Dossan S500LC-V ET-38 14.00 - 25.00 855.00 32.00 21.92 10.08 Hemat/perlu tinjau kembali 39.00 393.00
Exavator Dossan S500LC-V ET-40 8.00 - 7.00 487.00 32.00 32.47 (0.47) Boros/perlu tinjau kembali 15 -7
Dossan S500LC-V ET-227 4.00 - 3.00 754.00 32.00 107.71 (75.71) UNIT BD 7 -530
Dossan S500LC-V ET-229 49.00 - 30.00 2,625.00 32.00 33.23 (1.23) Boros/perlu tinjau kembali 79 -97
Dossan S500LC-V ET-230 91.00 - 33.50 4,198.00 32.00 33.72 (1.72) Boros/perlu tinjau kembali 124.5 -214
Dossan S500LC-V ET-231 98.50 - 42.50 5,117.00 32.00 36.29 (4.29) Boros/perlu tinjau kembali 141 -605
Dossan S500LC-V ET-233 93.50 - 33.50 4,776.00 32.00 37.61 (5.61) Boros/perlu tinjau kembali 127 -712
Total EXCA 358.00 - 435.80 22,279.00 28.00 28.07 Masih dibawah plan
Sitrak C7H 390 DT-7201 51.00 5.00 606.00 16.00 10.82 5.18 Hemat/perlu tinjau kembali 56.00 290.00
Sitrak C7H 390 DT-7202 61.00 5.00 992.00 16.00 15.03 0.97 standart pemakaian 66 64.00
AXOR 2526 DT-7203 72.00 6.00 874.00 14.00 11.21 2.79 Hemat/perlu tinjau kembali 78 218.00
AXOR 2526 DT-7204 90.50 10.00 1,144.00 14.00 11.38 2.62 Hemat/perlu tinjau kembali 100.50 263.00
AXOR 2526 DT-7205 67.00 14.00 932.00 14.00 11.51 2.49 Hemat/perlu tinjau kembali 81.00 202.00
AXOR 2526 DT-7206 89.50 16.00 1,248.00 14.00 11.83 2.17 Hemat/perlu tinjau kembali 105.50 229.00
AXOR 2526 DT-7207 83.00 14.00 1,218.00 14.00 12.56 1.44 Hemat/perlu tinjau kembali 97.00 140.00
AXOR 2526 DT-7208 85.00 15.00 1,031.00 14.00 10.31 3.69 Hemat/perlu tinjau kembali 100.00 369.00
AXOR 2526 DT-7209 48.50 16.00 796.00 14.00 12.34 1.66 Hemat/perlu tinjau kembali 64.50 107.00
AXOR 2526 DT-7210 26.00 - 308.00 14.00 11.85 2.15 Hemat/perlu tinjau kembali 26.00 56.00
AXOR 2526 DT-7211 54.00 9.00 788.00 14.00 12.51 1.49 Hemat/perlu tinjau kembali 63.00 94.00
AXOR 2526 DT-7212 30.50 13.00 519.00 14.00 11.93 2.07 Hemat/perlu tinjau kembali 43.50 90.00
Sitrak C7H 390 DT-7213 74.00 14.00 1,128.00 16.00 12.82 3.18 Hemat/perlu tinjau kembali 88.00 280.00
Sitrak C7H 390 DT-7214 77.50 14.00 1,081.00 16.00 11.81 4.19 Hemat/perlu tinjau kembali 91.50 383.00
Sitrak C7H 390 DT-7215 70.60 14.00 1,075.00 16.00 12.71 3.29 Hemat/perlu tinjau kembali 84.60 278.60
AXOR 2526 DT-7216 - - - 14.00 - 14.00 UNIT BD - -
AXOR 2526 DT-7217 - - - 14.00 - 14.00 UNIT BD - -
AXOR 2526 DT-7218 - - - 14.00 - 14.00 UNIT BD - -
HAULER MAN DT- 128 - - - 14.00 - 14.00 UNIT BD - -
Mercy Actros 4043 DT-168 44.50 3.00 714.00 18.00 15.03 2.97 Hemat/perlu tinjau kembali 47.50 141.00
Mercy Actros 4043 DT-169 40.00 8.00 854.00 18.00 17.79 0.21 standart pemakaian 48.00 10.00
Mercy Actros 4043 DT-170 - - - 18.00 - 18.00 UNIT BD - -
Mercy Actros 4043 DT-171 - - - 18.00 - 18.00 UNIT BD - -
Mercy Actros 4044 DT-172 52.00 - 619.00 18.00 11.90 6.10 Hemat/perlu tinjau kembali 52.00 317.00
Mercy Actros 4043 DT-173 37.50 14.00 807.00 18.00 15.67 2.33 Hemat/perlu tinjau kembali 51.50 120.00
Mercy Actros 4043 DT-174 56.00 14.00 1,157.00 18.00 16.53 1.47 Hemat/perlu tinjau kembali 70.00 103.00
Mercy Actros 4043 DT-175 - - - 18.00 - 18.00 UNIT BD - -
Mercy Actros 4043 DT-215 - - - 18.00 - 18.00 UNIT BD - -
Mercy Actros 4043 DT-216 34.00 - 413.00 18.00 12.15 5.85 Hemat/perlu tinjau kembali 34.00 199.00
Mercy Actros 4043 DT-218 80.50 5.00 1,113.00 18.00 13.02 4.98 Hemat/perlu tinjau kembali 85.50 426.00
Mercy Actros 4043 DT-219 48.00 4.00 911.00 18.00 17.52 0.48 standart pemakaian 52.00 25.00
Mercy Actros 4042 DT-220 83.50 14.00 1,286.00 18.00 13.19 4.81 Hemat/perlu tinjau kembali 97.50 469.00
Mercy Actros 4043 DT-221 - - - 18.00 - 18.00 UNIT BD - -
Mercy Actros 4043 DT-222 79.00 12.00 1,119.00 18.00 12.30 5.70 Hemat/perlu tinjau kembali 91.00 519.00
Mercy Actros 4043 DT-223 61.00 13.00 1,145.00 18.00 15.47 2.53 Hemat/perlu tinjau kembali 74.00 187.00
Mercy Actros 4043 DT-224 - - - 18.00 - 18.00 UNIT BD - -
Total / HAULER 1,596.10 252.00 - 23,878.00 18.00 12.92 Masih dibawah plan
Sem 816D BD-001 123.00 - 123.00 2161 32.00 8.78 23.21544715447 Hemat/perlu tinjau kembali 246 5711
CAT D65P BD-002 - - - 0 32.00 - 32.00 UNIT BD 0 0
Komatsu D8R BD-100 - - - 0 32.00 - 32.00 UNIT BD 0 0
Komatsu D85E-SS BD-89 95.50 - 95.50 1732 32.00 9.07 22.93 Hemat/perlu tinjau kembali 191 4380
BD Komatsu D65P BD-177 - - - 0 32.00 - 32.00 UNIT BD - -
Komatsu D65P BD-178 77.50 - 77.50 1520 32.00 9.81 22.19 Hemat/perlu tinjau kembali 155 3440
Zoomlion BD-179 118.50 - 118.50 2904 32.00 12.25 19.75 Hemat/perlu tinjau kembali 237 4680
Zoomlion BD-180 - - - 0 32.00 - 32.00 UNIT BD 0 0
Total / DOZER 291.50 - 291.50 8,317.00 32.00 320.03 Masih dibawah plan
Grader GD 101 99.50 - 99.50 1685 18 8.47 9.53 Hemat/perlu tinjau kembali 199 1897
MG Grader MG191 - - - 0 18 - 18.00 UNIT BD 0 0
Total / M Grader - - - 1,685.00 18.00 - 18.00 Masih dibawah plan
VIBRO SV512 CM-124 - - - - 16.00 - - UNIT BD - -
VIBRO
Total / VIBRO 16.00 -
Nissan WT-09 42.00 - - 288.00 16 6.86 9.14 Hemat/perlu tinjau kembali 42 384
NISSAN FT-51 - - - - 16 - 16.00 UNIT BD 0 0
FT & WT MAN FT-131 112.00 - - 251.00 14 2.24 11.76 Hemat/perlu tinjau kembali 112 1317
Total / WT & FT 154.00 - - 539.00 16.00 9.10
GRAND TOTAL 56,698.00
LV Strada 01 0 28,459.20
LV Strada Rental 02 0
LV Strada Rental 3 0
LV Strada Rental 4 0
LV Strada Rental 001 122
LV Strada Rental 003 147
LV Strada Rental 004 194
LV Strada Rental 005 172
LV Strada Rental 006 98
Manhaul BD-7964-CZ MH 001 56
Compressor Puma (BAN) 01 15
Compressor Swan (GREASE) 02 0
Tower Lamp Terex 03 100
Tower Lamp Terex 04 102
Tower Lamp Terex 179 94
Tower Lamp Terex 180 134
UNIT SARPRAS
Tower Lamp Terex 205 98
Tower Lamp Terex 206 0
GENSET 55KVA 211 605
GENSET 16KVA 212 582
GENSET 80KVA (MESS) 213 693
MESIN LAS 01 0
MESIN LAS 207 0
Perawatan/Mekanik 0 0
Pompa MF ( Multi Flow ) 01 1613
Cummin Dongfeng 0 0
LV Rental Lainnya 0 0
DLL./TL/BSL 0 0
DLL. 0 0
DLL. 0 0
Total Fuel Sarpras - 4,825.00
Total Fuel All Unit 1,954.10 252.00 435.80 61,523.00

Belani, 7 Juli 2022

DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
PERTANGGUNG JAWABAN (AKTUAL FUEL CONSUMPTION) NO : 02

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI 19,966.00
PERIODE : TGL 08/8/2022 s.d TGL 14/8/2022

WH
FUEL CONSUMPTION
UNIT TYPE No ACTUAL BBM
PLAN ACTUAL
DEVIASI KET
OB COAL General
Dossan DX225LC-V ET-188 - - - 284.00 22.00 - 22.00 UNIT BD
Dossan DX225LC-V ET-189 - - - - 22.00 - 22.00 UNIT BD
Sany 215 ET-228 - - 127.80 1,548.00 22.00 12.11 9.89 Hemat/perlu tinjau kembali
Sany 215 ET-232 - - 138.00 1,555.00 22.00 11.27 10.73 Hemat/perlu tinjau kembali
Dossan S340LC-V ET-187 - - - - 24.00 - 24.00 UNIT BD
Dossan S500LC-V ET-38 8.00 - 21.00 682.00 32.00 23.52 8.48 Hemat/perlu tinjau kembali
Exavator Dossan S500LC-V ET-40 - - 8.00 241.00 32.00 30.13 1.88 Boros/perlu tinjau kembali
Dossan S500LC-V ET-227 3.00 - 7.00 400.00 32.00 40.00 (8.00) Boros/perlu tinjau kembali
Dossan S500LC-V ET-229 94.00 - 29.00 4,159.00 32.00 33.81 (1.81) Boros/perlu tinjau kembali
Dossan S500LC-V ET-230 86.00 - 32.00 3,737.00 32.00 31.67 0.33 standart pemakaian
Dossan S500LC-V ET-231 116.00 - 21.50 5,449.00 32.00 39.63 (7.63) Boros/perlu tinjau kembali
Dossan S500LC-V ET-233 105.50 - 36.50 5,298.00 32.00 37.31 (5.31) Boros/perlu tinjau kembali
Total EXCA 412.50 - 420.80 23,353.00 28.00 28.02 Masih dibawah plan
Sitrak C7H 390 DT-7201 45.00 - 730.00 16.00 16.22 (0.22) Boros/perlu tinjau kembali
Sitrak C7H 390 DT-7202 110.00 - 1,471.00 16.00 13.37 2.63 Hemat/perlu tinjau kembali
AXOR 2526 DT-7203 119.00 - 1,370.00 14.00 11.51 2.49 Hemat/perlu tinjau kembali
AXOR 2526 DT-7204 97.00 - 1,357.00 14.00 13.99 0.01 standart pemakaian
AXOR 2526 DT-7205 109.00 - 1,405.00 14.00 12.89 1.11 Hemat/perlu tinjau kembali
AXOR 2526 DT-7206 84.50 - 1,171.00 14.00 13.86 0.14 standart pemakaian
AXOR 2526 DT-7207 96.50 - 1,284.00 14.00 13.31 0.69 standart pemakaian
AXOR 2526 DT-7208 102.00 - 1,253.00 14.00 12.28 1.72 Hemat/perlu tinjau kembali
AXOR 2526 DT-7209 90.00 - 1,263.00 14.00 14.03 (0.03) Boros/perlu tinjau kembali
AXOR 2526 DT-7210 17.00 - 170.00 14.00 10.00 4.00 Hemat/perlu tinjau kembali
AXOR 2526 DT-7211 66.00 - 879.00 14.00 13.32 0.68 standart pemakaian
AXOR 2526 DT-7212 92.00 - 1,143.00 14.00 12.42 1.58 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7213 98.50 - 1,272.00 16.00 12.91 3.09 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7214 48.00 - 779.00 16.00 16.23 (0.23) Boros/perlu tinjau kembali
Sitrak C7H 390 DT-7215 121.00 - 1,482.00 16.00 12.25 3.75 Hemat/perlu tinjau kembali
AXOR 2526 DT-7216 - - 228.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7217 - - 229.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7218 - - 211.00 14.00 - 14.00 UNIT BD
HAULER MAN DT- 128 - - - 14.00 - 14.00 UNIT BD
Mercy Actros 4043 DT-168 31.00 - 690.00 18.00 22.26 (4.26) Boros/perlu tinjau kembali
Mercy Actros 4043 DT-169 89.50 - 1,302.00 18.00 14.55 3.45 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-170 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-171 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4044 DT-172 69.00 - 873.00 18.00 12.65 5.35 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-173 98.00 - 1,527.00 18.00 15.58 2.42 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-174 45.00 - 638.00 18.00 14.18 3.82 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-175 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-215 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-216 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-218 113.00 - 1,473.00 18.00 13.04 4.96 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-219 102.50 - 1,552.00 18.00 15.14 2.86 Hemat/perlu tinjau kembali
Mercy Actros 4042 DT-220 103.00 - 1,596.00 18.00 15.50 2.50 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-221 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-222 96.50 - 1,615.00 18.00 16.74 1.26 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-223 112.00 - 1,698.00 18.00 15.16 2.84 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-224 - - - 18.00 - 18.00 UNIT BD
Total / HAULER 2,155.00 - - 30,661.00 18.00 14.23 Masih dibawah plan
Sem 816D BD-001 50.80 - 50.80 1294 32.00 12.74 19.26377952756 Hemat/perlu tinjau kembali
CAT D65P BD-002 - - - 0 32.00 - 32 UNIT BD
Komatsu D8R BD-100 - - - 0 32.00 - 32 UNIT BD
Komatsu D85E-SS BD-89 99.00 - 99.00 2288 32.00 11.56 20.44 Hemat/perlu tinjau kembali
BD Komatsu D65P BD-177 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D65P BD-178 86.00 - 86.00 951 32.00 5.53 26.47 Hemat/perlu tinjau kembali
Zoomlion BD-179 131.70 - 131.70 2742 32.00 10.41 21.59 Hemat/perlu tinjau kembali
Zoomlion BD-180 - - - 301 32.00 - 32.00 UNIT BD
Total / DOZER 316.70 - 316.70 7,576.00 32.00 340.62 Masih dibawah plan
Grader GD 101 134.00 - 134.00 1744 18 6.51 11.49 Hemat/perlu tinjau kembali
MG Grader MG191 - - - 0 18 - 18.00 UNIT BD
Total / M Grader - - - 1,744.00 18.00 - 18.00 Masih dibawah plan
VIBRO SV512 CM-124 - - - - 16.00 - - UNIT BD
VIBRO
Total / VIBRO 16.00 -
Nissan WT-09 42.00 - - 120.00 16 2.86 13.14 Hemat/perlu tinjau kembali
NISSAN FT-51 - - - - 16 - 16.00 UNIT BD
FT & WT MAN FT-131 112.00 - - 138.00 14 1.23 12.77 Hemat/perlu tinjau kembali
Total / WT & FT 154.00 - - 258.00 16.00 4.09
GRAND TOTAL 63,592.00
LV Strada 01 0
LV Strada Rental 02 0
LV Strada Rental 3 0
LV Strada Rental 4 0
LV Strada Rental 001 96
LV Strada Rental 003 0
LV Strada Rental 004 174
LV Strada Rental 005 143
LV Strada Rental 006 43
Manhaul BD-7964-CZ MH 001 100
Compressor Puma (BAN) 01 47
Compressor Swan (GREASE) 02 136
Tower Lamp Terex 03 93
Tower Lamp Terex 04 87
Tower Lamp Terex 179 99
Tower Lamp Terex 180 30
UNIT SARPRAS
Tower Lamp Terex 205 0
Tower Lamp Terex 206 0
GENSET 55KVA 211 264
GENSET 16KVA 212 265
GENSET 80KVA (MESS) 213 300
MESIN LAS 01 0
MESIN LAS 207 0
Perawatan/Mekanik 0 0
Pompa MF ( Multi Flow ) 01 1136
Cummin Dongfeng 0 0
LV Rental Lainnya 0 0
DLL./TL/BSL 0 0
DLL. 0 0
DLL. 0 0
Total Fuel Sarpras - 3,013.00
Total Fuel All Unit 2,567.50 - 420.80 66,605.00

Belani, 14 Juli 2022

DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
PERTANGGUNG JAWABAN (AKTUAL FUEL CONSUMPTION) NO : 03

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 15/8/2022 s.d TGL 21/8/2022

WH
FUEL CONSUMPTION
UNIT TYPE No ACTUAL BBM
PLAN ACTUAL
DEVIASI KET
OB COAL General
Dossan DX225LC-V ET-188 - - - - 22.00 - 22.00 UNIT BD
Dossan DX225LC-V ET-189 - - - - 22.00 - 22.00 UNIT BD
Sany SY215 ET-228 - - 112.00 1,021.00 22.00 9.12 12.88 Hemat/perlu tinjau kembali
Sany SY215 ET-232 - - 133.50 1,597.00 22.00 11.96 10.04 Hemat/perlu tinjau kembali
Dossan S340LC-V ET-187 - - - - 24.00 - 24.00 UNIT BD
Dossan S500LC-V ET-38 15.50 - 5.50 510.00 32.00 24.29 7.71 Hemat/perlu tinjau kembali
Exavator Dossan S500LC-V ET-40 - - - - 32.00 - 32.00 UNIT BD
Dossan S500LC-V ET-227 9.00 - 2.00 277.00 32.00 25.18 6.82 Hemat/perlu tinjau kembali
Dossan S500LC-V ET-229 64.50 - 38.50 2,877.00 32.00 27.93 4.07 Hemat/perlu tinjau kembali
Dossan S500LC-V ET-230 36.50 - 54.00 2,739.00 32.00 30.27 1.73 Hemat/perlu tinjau kembali
Dossan S500LC-V ET-231 60.00 - 37.00 3,423.00 32.00 35.29 (3.29) Boros/perlu tinjau kembali
Dossan S500LC-V ET-233 54.00 - 28.00 3,271.00 32.00 39.89 (7.89) Boros/perlu tinjau kembali
Total EXCA 239.50 - 410.50 15,715.00 28.00 24.18 Masih dibawah plan
Sitrak C7H 390 DT-7201 8.00 - 271.00 16.00 33.88 (17.88) Boros/perlu tinjau kembali
Sitrak C7H 390 DT-7202 36.00 - 462.00 16.00 12.83 3.17 Hemat/perlu tinjau kembali
AXOR 2526 DT-7203 68.00 - 841.00 14.00 12.37 1.63 Hemat/perlu tinjau kembali
AXOR 2526 DT-7204 60.00 - 772.00 14.00 12.87 1.13 Hemat/perlu tinjau kembali
AXOR 2526 DT-7205 77.50 - 834.00 14.00 10.76 3.24 Hemat/perlu tinjau kembali
AXOR 2526 DT-7206 1.00 - 115.00 14.00 115.00 (101.00) UNIT BD
AXOR 2526 DT-7207 70.00 - 732.00 14.00 10.46 3.54 Hemat/perlu tinjau kembali
AXOR 2526 DT-7208 63.50 - 902.00 14.00 14.20 (0.20) Boros/perlu tinjau kembali
AXOR 2526 DT-7209 48.00 - 553.00 14.00 11.52 2.48 Hemat/perlu tinjau kembali
AXOR 2526 DT-7210 82.50 - 1,043.00 14.00 12.64 1.36 Hemat/perlu tinjau kembali
AXOR 2526 DT-7211 67.00 - 971.00 14.00 14.49 (0.49) Boros/perlu tinjau kembali
AXOR 2526 DT-7212 67.00 - 741.00 14.00 11.06 2.94 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7213 73.00 - 1,074.00 16.00 14.71 1.29 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7214 45.00 - 589.00 16.00 13.09 2.91 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7215 69.00 - 946.00 16.00 13.71 2.29 Hemat/perlu tinjau kembali
AXOR 2526 DT-7216 18.00 - - 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7217 12.00 - - 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7218 18.00 - - 14.00 - 14.00 UNIT BD
HAULER MAN DT- 128 - - 69.00 14.00 - 14.00 UNIT BD
Mercy Actros 4043 DT-168 37.00 - 444.00 18.00 12.00 6.00 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-169 61.50 - 1,020.00 18.00 16.59 1.41 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-170 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-171 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4044 DT-172 44.50 - 575.00 18.00 12.92 5.08 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-173 35.00 - 674.00 18.00 19.26 (1.26) Boros/perlu tinjau kembali
Mercy Actros 4043 DT-174 36.00 - 748.00 18.00 20.78 (2.78) Boros/perlu tinjau kembali
Mercy Actros 4043 DT-175 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-215 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-216 16.00 - 195.00 18.00 12.19 5.81 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-218 48.00 - 647.00 18.00 13.48 4.52 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-219 52.50 - 713.00 18.00 13.58 4.42 Hemat/perlu tinjau kembali
Mercy Actros 4042 DT-220 27.00 - 150.00 18.00 5.56 12.44 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-221 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-222 52.00 - 765.00 18.00 14.71 3.29 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-223 70.00 - 1,006.00 18.00 14.37 3.63 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-224 - - - 18.00 - 18.00 UNIT BD
Total / HAULER 1,363.00 - - 17,852.00 18.00 13.10 Masih dibawah plan
Sem 816D BD-001 - - - 0 32.00 - 32 UNIT BD
CAT D65P BD-002 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D8R BD-100 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D85E-SS BD-89 72.50 - 72.50 1092 32.00 7.53 24.47 Hemat/perlu tinjau kembali
BD Komatsu D65P BD-177 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D65P BD-178 59.50 - 59.50 876 32.00 7.36 24.64 Hemat/perlu tinjau kembali
Zoomlion BD-179 109.50 - 109.50 2168 32.00 9.90 22.10 Hemat/perlu tinjau kembali
Zoomlion BD-180 51.00 - 51.00 878 32.00 - 32.00 UNIT BD
Total / DOZER 292.50 - 292.50 5,014.00 32.00 309.64 Masih dibawah plan
Grader GD 101 94.00 - 94.00 1336 18 7.11 10.89 Hemat/perlu tinjau kembali
MG Grader MG191 - - - 0 18 - 18.00 UNIT BD
Total / M Grader - - - 1,336.00 18.00 - 18.00 Masih dibawah plan
VIBRO SV512 CM-124 - - - - 16.00 - - UNIT BD
VIBRO
Total / VIBRO 16.00 -
Nissan WT-09 42.00 - - - 16 - 16.00 Hemat/perlu tinjau kembali
NISSAN FT-51 - - - - 16 - 16.00 UNIT BD
FT & WT MAN FT-131 92.00 - - 210.00 14 2.28 11.72 Hemat/perlu tinjau kembali
Total / WT & FT 134.00 - - 210.00 16.00 2.28
GRAND TOTAL 40,127.00
LV Strada 01 0
LV Strada Rental 02 0
LV Strada Rental 3 0
LV Strada Rental 4 0
LV Strada Rental 001 202
LV Strada Rental 003 172
LV Strada Rental 004 132
LV Strada Rental 005 133
LV Strada Rental 006 0
Manhaul BD-7964-CZ MH 001 57
Compressor Puma (BAN) 01 0
Compressor Swan (GREASE) 02 0
Tower Lamp Terex 03 91
Tower Lamp Terex 04 96
Tower Lamp Terex 179 86
Tower Lamp Terex 180 68
UNIT SARPRAS
Tower Lamp Terex 205 113
Tower Lamp Terex 206 0
GENSET 55KVA 211 810
GENSET 16KVA 212 0
GENSET 80KVA (MESS) 213 900
MESIN LAS 01 0
MESIN LAS 207 0
Perawatan/Mekanik 0 0
Pompa MF ( Multi Flow ) 01 674
Cummin Dongfeng 0 0
LV Rental Lainnya 0 0
DLL./TL/BSL 0 0
DLL. 0 10
DLL. 0 0
Total Fuel Sarpras - 3,544.00
Total Fuel All Unit 1,602.50 - 410.50 43,671.00
1350.1 101 289 48897
Belani, 21 Juli 2022

DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
PERTANGGUNG JAWABAN (AKTUAL FUEL CONSUMPTION) NO : 04

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 22/8/2022 s.d TGL 28/8/2022

WH
FUEL CONSUMPTION
UNIT TYPE No ACTUAL BBM
PLAN ACTUAL
DEVIASI KET
OB COAL General
Dossan DX225LC-V ET-188 - - - - 22.00 - 22.00 UNIT BD
Dossan DX225LC-V ET-189 - - - - 22.00 - 22.00 UNIT BD
Sany 215 ET-228 - - 76.00 1,378.00 22.00 18.13 3.87 Hemat/perlu tinjau kembali
Sany 215 ET-232 - - 102.20 1,514.00 22.00 14.81 7.19 Hemat/perlu tinjau kembali
Dossan S340LC-V ET-187 - - - - 24.00 - 24.00 UNIT BD
Dossan S500LC-V ET-38 12.00 - 6.00 685.00 32.00 38.06 (6.06) Boros/perlu tinjau kembali
Exavator Dossan S500LC-V ET-40 - - - - 32.00 - 32.00 UNIT BD
Dossan S500LC-V ET-227 - - - 305.00 32.00 - 32.00 UNIT BD
Dossan S500LC-V ET-229 69.50 - 52.50 3,726.00 32.00 30.54 1.46 Hemat/perlu tinjau kembali
Dossan S500LC-V ET-230 92.50 - 43.50 4,542.00 32.00 33.40 (1.40) Boros/perlu tinjau kembali
Dossan S500LC-V ET-231 82.50 - 36.50 4,589.00 32.00 38.56 (6.56) Boros/perlu tinjau kembali
Dossan S500LC-V ET-233 79.50 - 52.50 4,530.00 32.00 34.32 (2.32) Boros/perlu tinjau kembali
Total EXCA 336.00 - 369.20 21,269.00 28.00 30.16 Masih dibawah plan
Sitrak C7H 390 DT-7201 11.00 - - 16.00 - 16.00 UNIT BD
Sitrak C7H 390 DT-7202 67.00 - 1,056.00 16.00 15.76 0.24 standart pemakaian
AXOR 2526 DT-7203 110.00 - 1,533.00 14.00 13.94 0.06 standart pemakaian
AXOR 2526 DT-7204 6.00 - 80.00 14.00 13.33 0.67 standart pemakaian
AXOR 2526 DT-7205 96.00 - 1,367.00 14.00 14.24 (0.24) Boros/perlu tinjau kembali
AXOR 2526 DT-7206 - - - 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7207 95.50 - 1,314.00 14.00 13.76 0.24 standart pemakaian
AXOR 2526 DT-7208 103.00 - 1,110.00 14.00 10.78 3.22 Hemat/perlu tinjau kembali
AXOR 2526 DT-7209 89.00 - 1,113.00 14.00 12.51 1.49 Hemat/perlu tinjau kembali
AXOR 2526 DT-7210 96.00 - 1,223.00 14.00 12.74 1.26 standart pemakaian
AXOR 2526 DT-7211 92.00 - 1,145.00 14.00 12.45 1.55 Hemat/perlu tinjau kembali
AXOR 2526 DT-7212 87.00 - 1,180.00 14.00 13.56 0.44 standart pemakaian
Sitrak C7H 390 DT-7213 103.00 - 1,365.00 16.00 13.25 2.75 standart pemakaian
Sitrak C7H 390 DT-7214 82.50 - 1,191.00 16.00 14.44 1.56 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7215 90.00 - 1,319.00 16.00 14.66 1.34 Hemat/perlu tinjau kembali
AXOR 2526 DT-7216 31.00 - 418.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7217 41.00 - 577.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7218 44.00 - 498.00 14.00 - 14.00 UNIT BD
HAULER MAN DT- 128 - - - 14.00 - 14.00 UNIT BD
Mercy Actros 4043 DT-168 - - 557.00 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-169 61.50 - 643.00 18.00 10.46 7.54 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-170 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-171 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4044 DT-172 46.00 - 763.00 18.00 16.59 1.41 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-173 51.00 - 844.00 18.00 16.55 1.45 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-174 40.50 - 353.00 18.00 8.72 9.28 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-175 - - 157.00 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-215 - - 50.00 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-216 75.00 - 1,166.00 18.00 15.55 2.45 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-218 94.50 - 1,246.00 18.00 13.19 4.81 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-219 18.00 - 257.00 18.00 14.28 3.72 Hemat/perlu tinjau kembali
Mercy Actros 4042 DT-220 98.00 - 1,318.00 18.00 13.45 4.55 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-221 6.00 - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-222 61.00 - 900.00 18.00 14.75 3.25 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-223 76.00 - 1,253.00 18.00 16.49 1.51 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-224 - - - 18.00 - 18.00 UNIT BD
Total / HAULER 1,871.50 - - 25,996.00 18.00 13.89 Masih dibawah plan
Sem 816D BD-001 - - - 0 32.00 - 32 UNIT BD
CAT D65P BD-002 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D8R BD-100 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D85E-SS BD-89 59.50 - 59.50 1015 32.00 8.53 23.47 Hemat/perlu tinjau kembali
BD Komatsu D65P BD-177 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D65P BD-178 55.00 - 55.00 1849 32.00 16.81 15.19 Hemat/perlu tinjau kembali
Zoomlion BD-179 124.10 - 124.10 2556 32.00 10.30 21.70 Hemat/perlu tinjau kembali
Zoomlion BD-180 119.50 - 119.50 1688 32.00 - 32.00 UNIT BD
Total / DOZER 358.10 - 358.10 7,108.00 32.00 377.95 Masih dibawah plan
Grader GD 101 120.00 - 120.00 1546 18 6.44 11.56 Hemat/perlu tinjau kembali
MG Grader MG191 - - - 0 18 - 18.00 UNIT BD
Total / M Grader - - - 1,546.00 18.00 - 18.00 Masih dibawah plan
VIBRO SV512 CM-124 - - - - 16.00 - - UNIT BD
VIBRO
Total / VIBRO 16.00 -
Nissan WT-09 - - - - 16 - 16.00 UNIT BD
NISSAN FT-51 - - - - 16 - 16.00 UNIT BD
FT & WT MAN FT-131 112.00 - - 295.00 14 2.63 11.37 Hemat/perlu tinjau kembali
Total / WT & FT 112.00 - - 295.00 16.00 2.63
GRAND TOTAL 56,214.00
LV Strada 01 0
LV Strada Rental 02 0
LV Strada Rental 3 0
LV Strada Rental 4 0
LV Strada Rental 001 154
LV Strada Rental 003 48
LV Strada Rental 004 136
LV Strada Rental 005 191
LV Strada Rental 006 104
Manhaul BD-7964-CZ MH 001 210
Compressor Puma (BAN) 01 10
Compressor Swan (GREASE) 02 0
Tower Lamp Terex 03 82
Tower Lamp Terex 04 91
Tower Lamp Terex 179 110
Tower Lamp Terex 180 75
UNIT SARPRAS
Tower Lamp Terex 205 89
Tower Lamp Terex 206 0
GENSET 55KVA 211 338
GENSET 16KVA 212 322
GENSET 80KVA (MESS) 213 400
MESIN LAS 01 0
MESIN LAS 207 0
Perawatan/Mekanik 0 0
Pompa MF ( Multi Flow ) 01 2376
Cummin Dongfeng 0 0
LV Rental Lainnya 0 0
DLL./TL/BSL 0 0
DLL. 0 210
DLL. 0 0
Total Fuel Sarpras - 4,946.00
Total Fuel All Unit 2,207.50 - 369.20 61,160.00

Belani, 28 Juli 2022

DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal ADM Produksi
DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
PERTANGGUNG JAWABAN (AKTUAL FUEL CONSUMPTION) NO : 05

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 29/8/2022 s.d TGL 31/8/2022

WH
FUEL CONSUMPTION
UNIT TYPE No ACTUAL BBM
PLAN ACTUAL
DEVIASI KET
OB COAL General
Dossan DX225LC-V ET-188 - - - - 22.00 - 22.00 UNIT BD
Dossan DX225LC-V ET-189 - - - - 22.00 - 22.00 UNIT BD
Sany 215 ET-228 - - 43.00 637.00 22.00 14.81 7.19 Hemat/perlu tinjau kembali
Sany 215 ET-232 - - 49.50 707.00 22.00 14.28 7.72 Hemat/perlu tinjau kembali
Dossan S340LC-V ET-187 - - - - 24.00 - 24.00 UNIT BD
Dossan S500LC-V ET-38 21.25 - 15.75 1,178.00 32.00 31.84 0.16 standart pemakaian
Exavator Dossan S500LC-V ET-40 - - - - 32.00 - 32.00 UNIT BD
Dossan S500LC-V ET-227 - - - - 32.00 - 32.00 UNIT BD
Dossan S500LC-V ET-229 8.50 - 12.50 560.00 32.00 26.67 5.33 Hemat/perlu tinjau kembali
Dossan S500LC-V ET-230 45.00 - 9.00 1,712.00 32.00 31.70 0.30 standart pemakaian
Dossan S500LC-V ET-231 33.00 - 16.00 1,911.00 32.00 39.00 (7.00) Boros/perlu tinjau kembali
Dossan S500LC-V ET-233 27.50 - 12.50 1,642.00 32.00 41.05 (9.05) Boros/perlu tinjau kembali
Total EXCA 135.25 - 158.25 8,347.00 28.00 28.44 Masih dibawah plan
Sitrak C7H 390 DT-7201 - - - 16.00 - 16.00 UNIT BD
Sitrak C7H 390 DT-7202 7.00 - 232.00 16.00 33.14 (17.14) Boros/perlu tinjau kembali
AXOR 2526 DT-7203 49.00 - 665.00 14.00 13.57 0.43 standart pemakaian
AXOR 2526 DT-7204 - - 145.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7205 39.00 - 446.00 14.00 11.44 2.56 Hemat/perlu tinjau kembali
AXOR 2526 DT-7206 - - - 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7207 43.00 - 657.00 14.00 15.28 (1.28) Boros/perlu tinjau kembali
AXOR 2526 DT-7208 35.00 - 457.00 14.00 13.06 0.94 standart pemakaian
AXOR 2526 DT-7209 13.00 - 180.00 14.00 13.85 0.15 standart pemakaian
AXOR 2526 DT-7210 - - - 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7211 27.00 - 397.00 14.00 14.70 (0.70) Boros/perlu tinjau kembali
AXOR 2526 DT-7212 42.00 - 552.00 14.00 13.14 0.86 standart pemakaian
Sitrak C7H 390 DT-7213 39.00 - 533.00 16.00 13.67 2.33 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7214 48.50 - 688.00 16.00 14.19 1.81 Hemat/perlu tinjau kembali
Sitrak C7H 390 DT-7215 27.00 - 452.00 16.00 16.74 (0.74) Boros/perlu tinjau kembali
AXOR 2526 DT-7216 41.00 - 522.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7217 50.00 - 575.00 14.00 - 14.00 UNIT BD
AXOR 2526 DT-7218 40.50 - 562.00 14.00 - 14.00 UNIT BD
HAULER MAN DT- 128 - - - 14.00 - 14.00 UNIT BD
Mercy Actros 4043 DT-168 27.00 - 468.00 18.00 17.33 0.67 standart pemakaian
Mercy Actros 4043 DT-169 29.00 - 156.00 18.00 5.38 12.62 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-170 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-171 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4044 DT-172 49.00 - 712.00 18.00 14.53 3.47 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-173 - - 130.00 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-174 43.00 - 661.00 18.00 15.37 2.63 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-175 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-215 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-216 10.00 - 66.00 18.00 6.60 11.40 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-218 22.00 - 373.00 18.00 16.95 1.05 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-219 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4042 DT-220 41.50 - 594.00 18.00 14.31 3.69 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-221 - - - 18.00 - 18.00 UNIT BD
Mercy Actros 4043 DT-222 18.00 - 508.00 18.00 28.22 (10.22) Boros/perlu tinjau kembali
Mercy Actros 4043 DT-223 26.00 - 119.00 18.00 4.58 13.42 Hemat/perlu tinjau kembali
Mercy Actros 4043 DT-224 - - - 18.00 - 18.00 UNIT BD
Total / HAULER 766.50 - - 10,850.00 18.00 14.16 Masih dibawah plan
Sem 816D BD-001 - - - 0 32.00 - 32 UNIT BD
CAT D65P BD-002 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D8R BD-100 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D85E-SS BD-89 44.50 - 44.50 1069 32.00 12.01 19.99 Hemat/perlu tinjau kembali
BD Komatsu D65P BD-177 - - - 0 32.00 - 32.00 UNIT BD
Komatsu D65P BD-178 18.00 - 18.00 487 32.00 13.53 18.47 Hemat/perlu tinjau kembali
Zoomlion BD-179 56.00 - 56.00 1041 32.00 9.29 22.71 Hemat/perlu tinjau kembali
Zoomlion BD-180 51.50 - 51.50 972 32.00 - 32.00 UNIT BD
Total / DOZER 170.00 - 170.00 3,569.00 32.00 190.99 Masih dibawah plan
Grader GD 101 59.00 - 59.00 693 18 5.87 12.13 Hemat/perlu tinjau kembali
MG Grader MG191 - - - 0 18 - 18.00 UNIT BD
Total / M Grader - - - 693.00 18.00 - 18.00 Masih dibawah plan
VIBRO SV512 CM-124 - - - - 16.00 - - UNIT BD
VIBRO
Total / VIBRO 16.00 -
Nissan WT-09 6.00 - - 247.00 16 41.17 (25.17) Boros/perlu tinjau kembali
NISSAN FT-51 - - - - 16 - 16.00 UNIT BD
FT & WT MAN FT-131 48.00 - - 160.00 14 3.33 10.67 Hemat/perlu tinjau kembali
Total / WT & FT 54.00 - - 407.00 16.00 44.50
GRAND TOTAL 23,866.00
LV Strada 01 0
LV Strada Rental 02 0
LV Strada Rental 3 0
LV Strada Rental 4 0
LV Strada Rental 001 63
LV Strada Rental 003 0
LV Strada Rental 004 47
LV Strada Rental 005 127
LV Strada Rental 006 0
Manhaul BD-7964-CZ MH 001 0
Compressor Puma (BAN) 01 0
Compressor Swan (GREASE) 02 0
Tower Lamp Terex 03 56
Tower Lamp Terex 04 47
Tower Lamp Terex 179 40
Tower Lamp Terex 180 46
UNIT SARPRAS
Tower Lamp Terex 205 46
Tower Lamp Terex 206 0
GENSET 55KVA 211 300
GENSET 16KVA 212 376
GENSET 80KVA (MESS) 213 397
MESIN LAS 01 0
MESIN LAS 207 0
Perawatan/Mekanik 0 0
Pompa MF ( Multi Flow ) 01 1453
Cummin Dongfeng 0 0
LV Rental Lainnya 0 0
DLL./TL/BSL 0 0
DLL. 0 0
DLL. 0 63
Total Fuel Sarpras - 3,061.00
Total Fuel All Unit 901.75 - 158.25 26,927.00

Belani, 31 Agustus 2022

DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal ADM Produksi
DIKETAHUI OLEH DITERIMA OLEH DIPERIKSA OLEH DISUSUN OLEH

.................... .................... .................... ....................


Site Manager Ka. Bag. Pal Ka. Bag. Produksi ADM Produksi
PERTANGGUNG JAWABAN (AKTUAL FUEL RATIO)

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 01/8/2022 s.d TGL 7/8/2022

FUEL RATIO
VOLUME PENGUKURAN
INTERNAL JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER 0.64 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM -
OB (BCM) 71,872.430 70,476.720 1,010.59 46,157.00 LITER 0.79 L/BCM 0.83 L/BCM 0.65 L/BCM (0.05) 0.13 L/BCM 56,534.03
1 SARPORTING 10,290.00 LITER
POMPA 1,613.00 LITER
SARPRAS 3,463.00 LITER
2 CG(TON) - - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT -
3 CH(TON) LITER -
TOTAL 61,523.00 LITER 56,534.03

FUEL RATIO
VOLUME PENGUKURAN
KONTRAK JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER 0.62 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM -
OB (BCM) 71,872.430 70,476.720 1,010.59 46,157.00 LITER 0.77 L/BCM 0.83 L/BCM 0.65 L/BCM (0.07) 0.11 L/BCM 55,096.58
1 SARPORTING 10,290.00 LITER
POMPA 1,613.00 LITER
SARPRAS 3,463.00 LITER
2 CG(TON) - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT -
3 CH(TON) LITER
TOTAL 61,523.00 LITER 55,096.58
PERTANGGUNG JAWABAN (AKTUAL FUEL RATIO)

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 08/8/2022 s.d TGL 14/8/2022

FUEL RATIO
VOLUME PENGUKURAN
INTERNAL JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER 0.64 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM
OB (BCM) 80,362.47 90,977.48 999.43 54,014.00 LITER 0.78 L/BCM 0.67 L/BCM 0.59 L/BCM 0.11 0.19 L/BCM
1 SARPORTING 9,440.00 LITER #DIV/0!
POMPA 1,136.00 LITER #DIV/0!
SARPRAS 2,015.00 LITER #DIV/0!
2 CG(TON) - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 66,605.00 LITER

FUEL RATIO
VOLUME PENGUKURAN
KONTRAK JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER 0.62 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM
OB (BCM) 80,362.47 90,977.48 999.43 54,014.00 LITER 0.76 L/BCM 0.67 L/BCM 0.59 L/BCM 0.09 0.17 L/BCM
1 SARPORTING 9,440.00 LITER
POMPA 1,136.00 LITER
SARPRAS 2,015.00 LITER
2 CG(TON) - - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 66,605.00 LITER
PERTANGGUNG JAWABAN (AKTUAL FUEL RATIO)

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 15/8/2022 s.d TGL 21/8/2022

FUEL RATIO
VOLUME PENGUKURAN
INTERNAL JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER 0.64 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM
OB (BCM) 42,878.21 32,557.290 1,225.85 33,567.00 LITER 0.82 L/BCM 0.78 L/BCM 1.03 L/BCM 0.04 (0.21) L/BCM
1 SARPORTING 6,350.00 LITER #DIV/0!
POMPA 674.00 LITER #DIV/0!
SARPRAS 3,080.00 LITER #DIV/0!
2 CG(TON) - - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 43,671.00 LITER

FUEL RATIO
VOLUME PENGUKURAN
KONTRAK JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL - - - - LITER 0.62 L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM
OB (BCM) 42,878.21 32,557.290 1,225.85 33,567.00 LITER 0.80 L/BCM 0.78 L/BCM 1.03 L/BCM 0.02 (0.23) L/BCM
1 SARPORTING 6,350.00 LITER
POMPA 674.00 LITER
SARPRAS 3,080.00 LITER
2 CG(TON) - - - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 43,671.00 LITER
PERTANGGUNG JAWABAN (AKTUAL FUEL RATIO)

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 22/8/2022 s.d TGL 28/8/2022

FUEL RATIO
VOLUME PENGUKURAN
INTERNAL JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM -
OB (BCM) 68,403.770 70,567.710 1,210.99 47,265.00 LITER 0.82 L/BCM 0.69 L/BCM 0.67 L/BCM 0.13 0.15 L/BCM 55,861.84
1 SARPORTING 8,654.00 LITER #DIV/0!
POMPA 2,376.00 LITER #DIV/0!
SARPRAS 2,865.00 LITER #DIV/0!
2 CG(TON) - - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT -
3 CH(TON)
TOTAL 61,160.00 LITER

FUEL RATIO
VOLUME PENGUKURAN
KONTRAK JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL L/BCM #DIV/0! L/BCM #DIV/0! L/BCM #DIV/0! #DIV/0! L/BCM -
OB (BCM) 68,403.770 70,567.710 1,210.99 47,265.00 LITER 0.80 L/BCM 0.69 L/BCM 0.67 L/BCM 0.11 0.13 L/BCM 54,493.76
1 SARPORTING 8,654.00 LITER
POMPA 2,376.00 LITER
SARPRAS 2,865.00 LITER
2 CG(TON) - LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT -
3 CH(TON)
TOTAL 61,160.00 LITER
PERTANGGUNG JAWABAN (AKTUAL FUEL RATIO)

LOBUNTA PROYEK : TAMBANG BATU BARA PT. BSL


LOKASI : BELANI
PERIODE : TGL 29/8/2022 s.d TGL 31/8/2022

FUEL RATIO
VOLUME PENGUKURAN
INTERNAL JARAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS TC JS Satuan
TOP SOIL LITER L/BCM L/BCM L/BCM - - L/BCM
OB (BCM) 27,509.84 28,424.70 1,306.88 19,197.00 LITER 0.83 L/BCM 0.70 L/BCM 0.68 L/BCM 0.13 0.16 L/BCM
1 SARPORTING 4,509.00 LITER #DIV/0!
POMPA 1,453.00 LITER #DIV/0!
SARPRAS 1,768.00 LITER #DIV/0!
2 CG(TON) LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 26,927.00 LITER

FUEL RATIO
KONTRAK FUEL USE ACTUAL FUEL CONSUMSION DEVIASI
PLAN
TC JS TC JS Satuan
TOP SOIL LITER L/BCM L/BCM L/BCM - - L/BCM
OB (BCM) 27,509.84 28,424.70 1,306.88 19,197.00 LITER 0.81 L/BCM 0.70 L/BCM 0.68 L/BCM 0.11 0.14 L/BCM
1 SARPORTING 4,509.00 LITER
POMPA 1,453.00 LITER
SARPRAS 1,768.00 LITER
2 CG(TON) LITER - L/MT #DIV/0! L/MT #DIV/0! L/MT #DIV/0! #DIV/0! L/MT
3 CH(TON)
TOTAL 26,927.00 LITER
LAPORAN MINGGUAN RIDP VS ACTUAL
PERIODE : 01-07 Agustus 2022 BUDGET HM & FUEL -
53.5
72
AGUSTUS

BUDGET WORK HOUR (PLAN VS ACTUAL) FUEL (PLAN VS ACTUAL)

TRUCK COUNT TGL

TRUCK COUNT TGL


01/8/2022 S.D

01/8/2022 S.D
07/8/2022

07/8/2022
PLAN ACTUAL PLAN ACTUAL
No Description of Work Detail of Work Type
DEVIASI KETERANGAN DEVIASI KETERANGAN
HOUR TOTAL WORK LOGISTIK
VOLUME (ltr/hr) TOTAL FUEL WORK HOUR TIME SHEET FUEL REQ
PRODUCT HOUR (PEMAKAIAN)
Loading SL500/DX520/SY500 255,000.00 200 1,275.00 35 44,625.00### 359.36 157.05 202.31 AKTUAL PTY 202,31 12,577.68 16,930.80 (4,353.12)
General (drainage, tang SL500/DX520/SY500 350.00 -### 98.65 17.45 81.20 - 1,881.20 (1,881.20)
General (drainage, tang SL 340 350.00 -### 98.65 - 98.65 - 561.00 (561.00)
General (drainage, tang SY215,SY232/DX225 600.00 18 10,800.00### 169.11 261.30 (92.19) 3,044.01 2,906.00 138.01
Hauling 1,5 KM Sitrak C7H 390 45,000.00 55.6 809.35 15 12,140.29### 15.67 334.10 (318.43) AKTUAL PTY 318,43 235.07 4,882.00 (4,646.93)
Hauling 1,5 KM MAN -### - - - - - -
Hauling 1,5 KM AXOR 2526 75,000.00 44.6 1,681.61 18 30,269.06### 12.57 646.00 (633.43) AKTUAL PTY 633,43 226.27 8,858.00 (8,631.73)
Hauling 1,3 KM ACTROS4043 47.5 ### - - - - - - -
Hauling 1,4 KM ACTROS4043 47.5 ###
Hauling 1,5 KM ACTROS4043 135,000.00 47.5 2,842.11 13 36,947.37### 13.39 616.00 (602.61) AKTUAL PTY 602,61 174.04 10,138.00 (9,963.96)

71,872.43
Spreading Dispo 861D SEM 89,250.00 200 446.25 28 12,495.00### 359.36 123.00 236.36 - 10,062.14 2,161.00 7,901.14

7,344
Spreading Dispo Zoomlion 25,500.00 200 127.50 28 3,570.00### 359.36 118.50 240.86 - 10,062.14 2,904.00 7,158.14
Spreading Dispo D8R 38,250.00 400 95.63 50 4,781.25### 179.68 - 179.68 - 8,984.05 - 8,984.05
1 REMOVAL OB Spreading Dispo D85 102,000.00 200 510.00 28 14,280.00### 56.37 129.75 (73.38) AKTUAL PTY 73,38 1,578.37 2,439.00 (860.63)
General (front loading, r D85 300.00 28 8,400.00### 84.56 43.25 41.31 2,367.56 813.00 1,554.56
R. Maint (slippery, maint GD 101 580.00 16 9,280.00### 163.47 99.50 63.97 2,615.59 1,685.00 930.59
R. Maint (slippery, maint GD 511 -### - - - - - -
R. Maint (showering) CWB520LDN-WT 100.00 12 1,200.00### 28.19 42.00 (13.81) 338.22 288.00 50.22
Dewatering MF380 350.00 29.0 10,150.00### 98.65 121.00 (22.35) 2,860.80 1,613.00 1,247.80
Fuel Tank CWB520LDN-FT 160.00 10 1,600.00### 45.10 112.00 (66.90) 450.96 251.00 199.96
Ligh Tower 6000 Wat T. Lamp 2,400.00### - - - 528.00 (528.00)
Genset WS Genset WS 2,000.00 - - - 582.00 (582.00)
Genset MESS Genset MESS 4,700.00### - - - 1,298.00 (1,298.00)
Mesin las Mesin las 690.00### - - - - -
Compresor Compresor 250.00### - - - 15.00 (15.00)
Doble Cabin Doble Cabin 3,250.00### - - - 789.00 (789.00)
DLL -### - - - -
255,000 BCM 213,827.96### - - 13.48 - - 55,576.92 61,523.00 (5,946.08) -
- - - - 0.84### - - - - - - - 0.86 9.92 -

Cleaning 60% SY215 26.50 80.00 0.20 18.0 3.58### - - - - - - -


2 COAL GETTING

-
-
Collecting 25% DX225 26.50 70.00 0.09 18.0 1.70### - - - - - - -

Loading SL340LCV 26.50 120.00 0.22 32.0 7.07 - - - - -

Loading SL500LCV 120.00 - 32.0 -### - - - - - - -

9,622.64 26.50 12.35### - - - -


- 0.46595### - #DIV/0!
3 COAL HAULING

- - - - 10.50### - - - - - - - - - -
- - - - 10.50000### - - - - - - - - - -
LAPORAN MINGGUAN RIDP VS ACTUAL
PERIODE : 8-14 Agustus 2022 BUDGET HM & FUEL -
53.5
72
AGUSTUS

BUDGET WORK HOUR (PLAN VS ACTUAL) FUEL (PLAN VS ACTUAL)

TRUCK COUNT TGL

TRUCK COUNT TGL


08/8/2022 S.D

08/8/2022 S.D
14/8/2022

14/8/2022
PLAN ACTUAL PLAN ACTUAL
No Description of Work Detail of Work Type
DEVIASI KETERANGAN DEVIASI KETERANGAN
HOUR TOTAL WORK LOGISTIK
VOLUME (ltr/hr) TOTAL FUEL WORK HOUR TIME SHEET FUEL REQ
PRODUCT HOUR (PEMAKAIAN)
Loading SL500/DX520/SY500 255,000.00 200 1,275.00 35 44,625.00### 401.81 139.50 262.31 AKTUAL PTY 262,31 14,063.43 17,969.40 (3,905.97) -
General (drainage, tang SL500/DX520/SY500 350.00 -### 110.30 15.50 94.80 - 1,996.60 (1,996.60) -
General (drainage, tang SL 340 350.00 -### 110.30 - 110.30 - - - -
General (drainage, tang SY215,SY232/DX225 600.00 18 10,800.00### 189.09 265.80 (76.71) 3,403.59 3,387.00 16.59 -
Hauling 1,5 KM Sitrak C7H 390 45,000.00 55.6 809.35 15 12,140.29### 17.52 422.50 (404.98) AKTUAL PTY 404,98 262.83 5,734.00 (5,471.17)
Hauling 1,5 KM MAN -### - - - - - - -
Hauling 1,5 KM AXOR 2526 75,000.00 44.6 1,681.61 18 30,269.06### 14.06 873.00 (858.94) AKTUAL PTY 858,94 253.00 11,963.00 (11,710.00) -
Hauling 1,3 KM ACTROS4043 47.5 ### - - - - - - -
Hauling 1,4 KM ACTROS4043 47.5 ### -
Hauling 1,5 KM ACTROS4043 135,000.00 47.5 2,842.11 13 36,947.37### 14.97 859.50 (844.53) AKTUAL PTY 844,53 194.60 12,964.00 (12,769.40) -

80,362.47
Spreading Dispo 861D SEM 89,250.00 200 446.25 28 12,495.00### 401.81 50.80 351.01 - 11,250.75 1,294.00 9,956.75 -

8,276
Spreading Dispo Zoomlion 25,500.00 200 127.50 28 3,570.00### 401.81 131.70 270.11 - 11,250.75 3,043.00 8,207.75 -
Spreading Dispo D8R 38,250.00 400 95.63 50 4,781.25### 200.91 - 200.91 - 10,045.31 - 10,045.31 -
1 REMOVAL OB Spreading Dispo D85 102,000.00 200 510.00 28 14,280.00### 63.03 138.75 (75.72) AKTUAL PTY 75,72 1,764.82 2,429.25 (664.43) -
General (front loading, r D85 300.00 28 8,400.00### 94.54 46.25 48.29 2,647.23 809.75 1,837.48 -
R. Maint (slippery, maint GD 101 580.00 16 9,280.00### 182.79 134.00 48.79 2,924.56 1,744.00 1,180.56 -
R. Maint (slippery, maint GD 511 -### - - - - - - -
R. Maint (showering) CWB520LDN-WT 100.00 12 1,200.00### 31.51 42.00 (10.49) 378.18 120.00 258.18 -
Dewatering MF380 350.00 29.0 10,150.00### 110.30 121.00 (10.70) 3,198.74 1,136.00 2,062.74 -
Fuel Tank CWB520LDN-FT 160.00 10 1,600.00### 50.42 112.00 (61.58) 504.24 138.00 366.24 -
Ligh Tower 6000 Wat T. Lamp 2,400.00### - - - 309.00 (309.00) -
Genset WS Genset WS 2,000.00 - - - 265.00 (265.00) -
Genset MESS Genset MESS 4,700.00### - - - 564.00 (564.00) -
Mesin las Mesin las 690.00### - - - 136.00 (136.00) -
Compresor Compresor 250.00### - - - 47.00 (47.00) -
Doble Cabin Doble Cabin 3,250.00### - - - 556.00 (556.00) -
DLL -### - - - - -
255,000 BCM 213,827.96### - - - - - 62,142.03 66,605.00 (4,462.97) -
- - - - 0.84### - - - - - - - 0.83 9.92 -

Cleaning 60% SY215 26.50 80.00 0.20 18.0 3.58### - - - - - -


2 COAL GETTING
Collecting 25% DX225 26.50 70.00 0.09 18.0 1.70### - - - - -

Loading SL340LCV 26.50 120.00 0.22 32.0 7.07 - - -

Loading SL500LCV 120.00 - 32.0 -### - - - - -

9,622.64 26.50 12.35### - - - -


- 0.46595### - #DIV/0!
3 COAL HAULING

- - - - 10.50### - - - - - - - - - -
- - - - 10.50000### - - - - - - - - - -
LAPORAN MINGGUAN RIDP VS ACTUAL
PERIODE : 15-21 Agustus 2022 BUDGET HM & FUEL -
53.5
72
AGUSTUS

BUDGET WORK HOUR (PLAN VS ACTUAL) FUEL (PLAN VS ACTUAL)

TRUCK COUNT TGL

TRUCK COUNT TGL


15/8/2022 S.D

15/8/2022 S.D
21/8/2022

21/8/2022
PLAN ACTUAL PLAN ACTUAL
No Description of Work Detail of Work Type
DEVIASI KETERANGAN DEVIASI KETERANGAN
HOUR TOTAL WORK LOGISTIK
VOLUME (ltr/hr) TOTAL FUEL WORK HOUR TIME SHEET FUEL REQ
PRODUCT HOUR (PEMAKAIAN)
Loading SL500/DX520/SY500 255,000.00 200 1,275.00 35 44,625.00### 214.39 148.50 65.89 AKTUAL PTY 65,89 7,503.69 11,787.30 (4,283.61) -
General (drainage, tang SL500/DX520/SY500 350.00 -### 58.85 16.50 42.35 - 1,309.70 (1,309.70) -
General (drainage, tang SL 340 350.00 -### 58.85 - 58.85 - - - -
General (drainage, tang SY215,SY232/DX225 600.00 18 10,800.00### 100.89 245.50 (144.61) 1,816.02 2,618.00 (801.98) -
Hauling 1,5 KM Sitrak C7H 390 45,000.00 55.6 809.35 15 12,140.29### 9.35 231.00 (221.65) AKTUAL PTY 221,65 140.24 3,342.00 (3,201.76) -
Hauling 1,5 KM MAN -### - - - - 69.00 (69.00) -
Hauling 1,5 KM AXOR 2526 75,000.00 44.6 1,681.61 18 30,269.06### 7.50 652.50 (645.00) AKTUAL PTY 645,00 134.99 7,504.00 (7,369.01) -
Hauling 1,3 KM ACTROS4043 47.5 ### - - - - - - -
Hauling 1,4 KM ACTROS4043 47.5 ### -
Hauling 1,5 KM ACTROS4043 135,000.00 47.5 2,842.11 13 36,947.37### 7.99 479.50 (471.51) AKTUAL PTY 471,51 103.83 6,937.00 (6,833.17) -

42,878.21
Spreading Dispo 861D SEM 89,250.00 200 446.25 28 12,495.00### 214.39 - 214.39 - 6,002.95 - 6,002.95 -

4,394
Spreading Dispo Zoomlion 25,500.00 200 127.50 28 3,570.00### 214.39 160.50 53.89 - 6,002.95 3,046.00 2,956.95 -
Spreading Dispo D8R 38,250.00 400 95.63 50 4,781.25### 107.20 - 107.20 - 5,359.78 - 5,359.78 -
1 REMOVAL OB Spreading Dispo D85 102,000.00 200 510.00 28 14,280.00### 33.63 99.00 (65.37) AKTUAL PTY 65,37 941.64 1,476.00 (534.36) -
General (front loading, r D85 300.00 28 8,400.00### 50.44 33.00 17.44 1,412.46 492.00 920.46 -
R. Maint (slippery, maint GD 101 580.00 16 9,280.00### 97.53 94.00 3.53 1,560.43 1,336.00 224.43 -
R. Maint (slippery, maint GD 511 -### - - - - - - -
R. Maint (showering) CWB520LDN-WT 100.00 12 1,200.00### 16.81 42.00 (25.19) 201.78 - 201.78 -
Dewatering MF380 350.00 29.0 10,150.00### 58.85 121.00 (62.15) 1,706.72 674.00 1,032.72 -
Fuel Tank CWB520LDN-FT 160.00 10 1,600.00### 26.90 92.00 (65.10) 269.04 210.00 59.04 -
Ligh Tower 6000 Wat T. Lamp 2,400.00### - - - 454.00 (454.00) -
Genset WS Genset WS 2,000.00 - - - - - -
Genset MESS Genset MESS 4,700.00### - - - 1,710.00 (1,710.00) -
Mesin las Mesin las 690.00### - - - - - -
Compresor Compresor 250.00### - - - - - -
Doble Cabin Doble Cabin 3,250.00### - - - 696.00 (696.00) -
DLL -### - - 10.00 (10.00) -
255,000 BCM 213,827.96### - 33,156.51 43,671.00 (10,514.49)
0.84### - 1.02 9.92

Cleaning 60% SY215 26.50 80.00 0.20 18.0 3.58### - - - - -


2 COAL GETTING
Collecting 25% DX225 26.50 70.00 0.09 18.0 1.70### - - - -

Loading SL340LCV 26.50 120.00 0.22 32.0 7.07 - - -

Loading SL500LCV 120.00 - 32.0 -### - - - -

9,622.64 26.50 12.35### - - -


0.46595### #DIV/0!
3 COAL HAULING

- 10.50###
- - - 10.50000###
LAPORAN MINGGUAN RIDP VS ACTUAL
PERIODE : 22-28 Agustus 2022 BUDGET HM & FUEL -
53.5
72
AGUSTUS

BUDGET WORK HOUR (PLAN VS ACTUAL) FUEL (PLAN VS ACTUAL)

TRUCK COUNT TGL

TRUCK COUNT TGL


22/8/2022 S.D

22/8/2022 S.D
28/8/2022

28/8/2022
PLAN ACTUAL PLAN ACTUAL
No Description of Work Detail of Work Type
DEVIASI KETERANGAN DEVIASI KETERANGAN
HOUR TOTAL WORK LOGISTIK
VOLUME (ltr/hr) TOTAL FUEL WORK HOUR TIME SHEET FUEL REQ
PRODUCT HOUR (PEMAKAIAN)
Loading SL500/DX520/SY500 255,000.00 200 1,275.00 35 44,625.00### 342.02 171.90 170.12 AKTUAL PTY 170,12 11,970.66 16,539.30 (4,568.64)
General (drainage, tang SL500/DX520/SY500 350.00 -### 93.89 19.10 74.79 - 1,837.70 (1,837.70)
General (drainage, tang SL 340 350.00 -### 93.89 - 93.89 - - -
General (drainage, tang SY215,SY232/DX225 600.00 18 10,800.00### 160.95 178.20 (17.25) 2,897.10 2,892.00 5.10
Hauling 1,5 KM Sitrak C7H 390 45,000.00 55.6 809.35 15 12,140.29### 14.91 353.50 (338.59) AKTUAL PTY 338,59 223.72 4,931.00 (4,707.28)
Hauling 1,5 KM MAN -### - 0 - - 0 -
Hauling 1,5 KM AXOR 2526 75,000.00 44.6 1,681.61 18 30,269.06### 11.96 890.50 (878.54) AKTUAL PTY 878,54 215.35 11,558.00 (11,342.65)
Hauling 1,3 KM ACTROS4043 47.5 ### - - - - - -
Hauling 1,4 KM ACTROS4043 47.5 ###
Hauling 1,5 KM ACTROS4043 135,000.00 47.5 2,842.11 13 36,947.37### 12.74 627.50 (614.76) AKTUAL PTY 614,76 165.64 9,507.00 (9,341.36)

68,403.77
Spreading Dispo 861D SEM 89,250.00 200 446.25 28 12,495.00### 342.02 - 342.02 - 9,576.53 - 9,576.53

6,923
Spreading Dispo Zoomlion 25,500.00 200 127.50 28 3,570.00### 342.02 243.60 98.42 - 9,576.53 4,244.00 5,332.53
Spreading Dispo D8R 38,250.00 400 95.63 50 4,781.25### 171.01 - 171.01 - 8,550.47 - 8,550.47
1 REMOVAL OB Spreading Dispo D85 102,000.00 200 510.00 28 14,280.00### 53.65 85.88 (32.22) AKTUAL PTY 32,22 1,502.20 2,148.00 (645.80)
General (front loading, r D85 300.00 28 8,400.00### 80.48 28.63 51.85 2,253.30 716.00 1,537.30
R. Maint (slippery, maint GD 101 580.00 16 9,280.00### 155.59 120.00 35.59 2,489.36 1,546.00 943.36
R. Maint (slippery, maint GD 511 -### - - - - - -
R. Maint (showering) CWB520LDN-WT 100.00 12 1,200.00### 26.83 - 26.83 321.90 - 321.90
Dewatering MF380 350.00 29.0 10,150.00### 93.89 121.00 (27.11) 2,722.74 2,376.00 346.74
Fuel Tank CWB520LDN-FT 160.00 10 1,600.00### 42.92 112.00 (69.08) 429.20 295.00 134.20
Ligh Tower 6000 Wat T. Lamp 2,400.00### - - - 447.00 (447.00)
Genset WS Genset WS 2,000.00 - - - 322.00 (322.00)
Genset MESS Genset MESS 4,700.00### - - - 738.00 (738.00)
Mesin las Mesin las 690.00### - - - - -
Compresor Compresor 250.00### - - - 10.00 (10.00)
Doble Cabin Doble Cabin 3,250.00### - - - 843.00 (843.00)
DLL -### - - 210.00 (210.00)
255,000 BCM 213,827.96### 52,894.70 61,160.00 (8,265.30)
0.84### 0.89 9.92

Cleaning 60% SY215 26.50 80.00 0.20 18.0 3.58### - - - -


2 COAL GETTING
Collecting 25% DX225 26.50 70.00 0.09 18.0 1.70### - - - -

Loading SL340LCV 26.50 120.00 0.22 32.0 7.07 - - -

Loading SL500LCV 120.00 - 32.0 -### - - - -

9,622.64 26.50 12.35### - - -


0.46595### #DIV/0!
3 COAL HAULING

- 10.50###
- - - 10.50000###
LAPORAN MINGGUAN RIDP VS ACTUAL
PERIODE : 29-31 Agustus 2022 BUDGET HM & FUEL -
53.5
72
AGUSTUS

BUDGET WORK HOUR (PLAN VS ACTUAL) FUEL (PLAN VS ACTUAL)

TRUCK COUNT TGL

TRUCK COUNT TGL


29/8/2022 S.D

29/8/2022 S.D
31/8/2022

31/8/2022
PLAN ACTUAL PLAN ACTUAL
No Description of Work Detail of Work Type
DEVIASI KETERANGAN DEVIASI KETERANGAN
HOUR TOTAL WORK LOGISTIK
VOLUME (ltr/hr) TOTAL FUEL WORK HOUR TIME SHEET FUEL REQ
PRODUCT HOUR (PEMAKAIAN)
Loading SL500/DX520/SY500 255,000.00 200 1,275.00 35 44,625.00### 137.55 59.18 78.37 AKTUAL PTY 78,37 4,814.22 6,302.70 (1,488.48)
General (drainage, tang SL500/DX520/SY500 350.00 -### 37.76 6.58 31.18 - 700.30 (700.30)
General (drainage, tang SL 340 350.00 -### 37.76 - 37.76 - - -
General (drainage, tang SY215,SY232/DX225 600.00 18 10,800.00### 64.73 92.50 (27.77) 1,165.12 1,344.00 (178.88)
Hauling 1,5 KM Sitrak C7H 390 45,000.00 55.6 809.35 15 12,140.29### 6.00 121.50 (115.50) AKTUAL PTY 115,50 89.97 1,905.00 (1,815.03)
Hauling 1,5 KM MAN -### - 0 - - 0 -
Hauling 1,5 KM AXOR 2526 75,000.00 44.6 1,681.61 18 30,269.06### 4.81 379.50 (374.69) AKTUAL PTY 374,69 86.61 5,158.00 (5,071.39)
Hauling 1,3 KM ACTROS4043 47.5 ### - - - - - - -
Hauling 1,4 KM ACTROS4043 47.5 ###
Hauling 1,5 KM ACTROS4043 135,000.00 47.5 2,842.11 13 36,947.37### 5.12 265.50 (260.38) AKTUAL PTY 260,38 66.62 3,787.00 (3,720.38)

27,509.84
Spreading Dispo 861D SEM 89,250.00 200 446.25 28 12,495.00### 48.14 - 48.14 - 1,347.98 - 1,347.98

2,777
Spreading Dispo Zoomlion 25,500.00 200 127.50 28 3,570.00### 13.75 107.50 (93.75) - 385.14 2,013.00 (1,627.86)
Spreading Dispo D8R 38,250.00 400 95.63 50 4,781.25### 10.32 - 10.32 - 515.81 - 515.81
1 REMOVAL OB Spreading Dispo D85 102,000.00 200 510.00 28 14,280.00### 21.58 46.88 (25.30) AKTUAL PTY 25,30 604.14 1,167.00 (562.86)
General (front loading, r D85 300.00 28 8,400.00### 32.36 15.63 16.74 906.21 389.00 517.21
R. Maint (slippery, maint GD 101 580.00 16 9,280.00### 62.57 59.00 3.57 1,001.14 693.00 308.14
R. Maint (slippery, maint GD 511 -### - - - - - -
R. Maint (showering) CWB520LDN-WT 100.00 12 1,200.00### 10.79 6.00 4.79 129.46 247.00 (117.54)
Dewatering MF380 350.00 29.0 10,150.00### 37.76 121.00 (83.24) 1,095.00 1,453.00 (358.00)
Fuel Tank CWB520LDN-FT 160.00 10 1,600.00### 17.26 48.00 (30.74) 172.61 160.00 12.61
Ligh Tower 6000 Wat T. Lamp 2,400.00### - - - 235.00 (235.00)
Genset WS Genset WS 2,000.00 - - - 376.00 (376.00)
Genset MESS Genset MESS 4,700.00### - - - 697.00 (697.00)
Mesin las Mesin las 690.00### - - - - -
Compresor Compresor 250.00### - - - - -
Doble Cabin Doble Cabin 3,250.00### - - - 237.00 (237.00)
DLL -### - - 63.00 (63.00)
255,000 BCM 213,827.96### 12,380.03 26,927.00 (14,546.97)
0.84### 0.98 9.92

Cleaning 60% SY215 26.50 80.00 0.20 18.0 3.58### - - - -


2 COAL GETTING
Collecting 25% DX225 26.50 70.00 0.09 18.0 1.70### - - - -

Loading SL340LCV 26.50 120.00 0.22 32.0 7.07 - - -

Loading SL500LCV 120.00 - 32.0 -### - - - -

9,622.64 26.50 12.35### - - -


0.46595### #DIV/0!
3 COAL HAULING

- 10.50###
- - - 10.50000###
RESUME REPORT PRODUKSI
PERIODE BULAN AGUSTUS 2022
SITE BELANI (26,927.00)

VOLUME

WEEK 1

WEEK 2

WEEK 3

WEEK 4

WEEK 5

DEVIASI
NO ITEM URAIAN PENJELASAN

TOTAL

PLAN
SATUAN

7 day 7 day 7 day 7 day 2 day


1. Produksi Tidak Tercapai karena Jam Hujan yang Tinggi sebesar 59,75 Jam
2. Produksi Tidak Tercapai karena Jam slippery yang Tinggi sebesar 58,5 Jam
ET40 1,420.84 0.00 0.00 0.00 0.00 1,420.84 1,680.00 (259.16) -15.43% BCM 3. Waktu Idle time karena Shift change sebesar 10,75 jam

4. Waktu Idle time karena P2H sebesar 10,75 jam


5. Waktu Idle time karena Excavator rusak sebesar 6 jam
6. Waktu Idle time karena Kurang operator sebesar 0 jam
ET38 2,246.46 1,382.43 2,543.68 2,054.17 4,285.27 12,512.01 14,857.50 (2,345.49) -15.79% BCM 7. Waktu Idle time karena Excavator Travel sebesar 4,25 jam
8. Waktu Idle time karena Excavator produksi melakukan general sebesar 660 jam

9. Waktu Idle time karena disposal crowded sebesar 2.75 jam


10. Waktu Idle time karena perbaikan front loading sebesar 4,75 jam
11. Waktu Idle time karena pengisian fuel sebesar 10 jam
12. Waktu Idle time karena distop bsl sebesar 0 jam
ET 229 10,061.05 19,018.08 11,913.90 13,651.59 1,766.73 56,411.35 63,525.00 (7,113.65) -11.20% BCM
13. Waktu Idle time karena DT Kurang sebesar 0 jam
AKTUAL OB
PRODUKSI 14. Waktu Idle time karena Dozer Rusak sebesar 1,25 jam

15. Waktu Idle time perbaikan area disposal 9 jam

ET 231 20,167.16 23,113.69 10,775.94 17,027.46 6,629.64 77,713.89 79,275.00 (1,561.11) -1.97% BCM 16. Tingginya jam hujan menyebabkan front manuver DT yang lambat sehingga mempengaruhi Produksi OB

ET 230 18,410.94 16,533.24 5,895.46 19,405.83 9,176.66 69,422.13 64,470.00 4,952.13 7.68% BCM 17. Bulan ini terkendala operator sem hanya 1 dan dozer sering Ready hanya 2 unit, sehingga menyebabkan pty perjam terganggu

ET 233 18,845.97 19,825.41 10,174.79 16,264.72 5,651.55 70,762.44 70,140.00 622.44 0.89% BCM 18. Bulan Ini terkendala Driver Banyak yang cuti dan Molor onsite sehingga terjadi kurang driver

ET 227 720.02 489.61 1,574.44 0.00 0.00 2,784.07 3,360.00 (575.93) -17.14% BCM
LOSE TIME LOSE COAL ET 227 - - - - - - - - #DIV/0! MT
1 ET38 14.00 8.00 15.50 12.00 21.25 70.75 55.61 (15.14) -27.23% JAM
PRODUKSI
ET 40 8.00 0.00 0.00 0.00 0.00 8.00 250.72 242.72 96.81% JAM
ET 230 91.00 86.00 36.50 67.00 26.50 307.00 - (307.00) #DIV/0! JAM
OB ET 227 4.00 3.00 9.00 0.00 0.00 16.00 12.37 (3.63) -29.31% JAM
EWH
ET 229 49.00 111.00 64.50 69.50 8.50 302.50 250.72 (51.78) -20.65% JAM
ET 231 98.50 116.00 60.00 79.00 24.00 377.50 - (377.50) #DIV/0! JAM
ET 233 93.50 105.50 54.00 57.00 24.00 334.00 345.40 11.40 3.30% JAM
COAL ET 227 - - - - - - - - #DIV/0! JAM
DIGUNAKAN LOADING COAL - - - - - - JAM
EXCAVATOR RUSAK 62.00 - 22.00 114.00 24.00 222.00 JAM
OPERATOR TERLAMBAT BERANGKAT 3.25 3.25 2.50 1.00 0.75 10.75 JAM
EXCA TRAVEL PINDAH LOKASI / FRONT 1.25 1.50 0.50 0.50 0.25 4.00 JAM
EXCA MELAKUKAN PEKERJAAN GENERAL 174.50 155.00 165.00 113.50 51.75 659.75 JAM
PERBAIKAN AREA FRONT LOADING 3.00 1.50 - 1.00 - 5.50 JAM
LOSE TIME PERBAIKAN JALAN PIT - DISPOSAL 0.50 1.00 0.50 0.25 0.50 2.75 JAM
PRODUKSI OB DI STOP OLEH WARGA 8.00 4.00 - - - 12.00 JAM
UNTUK ET 40, DI STOP OLEH BSL - - - - - - JAM
ET227, ET38, DT KURANG - - - - - - JAM
STANDBY 0.50 1.25 1.25 - - 3.00 JAM
229, 230, 231 SAFETY TALK - - - - - - JAM
FAKTOR : KABUT - - - - - - JAM
HUJAN 16.25 5.00 24.50 9.00 5.00 59.75 JAM
SLIPPERY 14.00 4.00 15.50 19.00 6.00 58.50 JAM
HM POMPA 66.00 25.00 45.00 71.00 31.00 238.00 JAM
CONSUMSI0N POMPA - - - - - - LTR
VOLUME SUMP - - - - - - VOL

LOSE PRODUKSI OB AKIBAT PTY PER FLEET TIDAK


(6,021.61) BCM Karena sering terjadi tidak matching fleet, DT sering keluar masuk workshop hampir setiap jam :
TERCAPAI
LOSE PRODUKSI COAL AKIBAT PTY PER FLEET TIDAK
- MT
TERCAPAI
LOSE PROSUKSI COAL AKIBAT WH ALAT TIDAK
BCM UA alat rendah karena jam slippery tinggi
TERCAPAI Untuk mencapai target produksi bulan Agustus 2022 faktor kesiapan alat tidak terkendala kalau PTY per fleet
LOSE PROSUKSI COAL AKIBAT WH ALAT TIDAK dicapai
MT UA alat rendah karena jam slippery tinggi
TERCAPAI
ET-38 160.46 172.80 164.11 171.18 201.66 176.85 225.00 (48.15) -21.40% BCM/JAM 1.Untuk OB karena matching fleet , kurang unit support untuk perbaikan jalan
ET-40 177.61 - - - - 177.61 225.00 (47.40) -21.06% BCM/JAM 2. DT kita sering tidak matching karena kemungkinan sering terjadi kerusakan minor maupun mayor
ET-227 180.01 163.20 174.94 - - 174.00 225.00 (51.00) -22.66% BCM/JAM 3.Untuk Bulan ini kita main jarak jauh tetapi dt yg ready tidak cukup sehingga mempengaruhi Productivity
ET-230 202.32 192.25 161.52 289.64 346.29 226.13 225.00 1.13 0.50% BCM/JAM 4. Front loading ygn lembek menyebabkan Manuver dt yg lambat sehingga mempengaruhi Productivity OB
OB
TARGET ET-231 204.74 199.26 179.60 215.54 276.23 205.86 225.00 (19.14) -8.50% BCM/JAM
2 (38.52) -17.12% BCM/JAM
PRODUCTIVITY ET-229 205.33 171.33 184.71 196.43 207.85 186.48 225.00
ET-233 201.56 187.92 188.42 285.35 235.48 211.86 225.00 (13.14) -5.84% BCM/JAM
RATA -RATA 756.81 225.00 531.81 236.4% BCM/JAM
ET-227 - - - - - - 165.00 (165.00) -100.00% MT/JAM
COAL Untuk BB PTY perjam kita diatas dari plan
RATA -RATA - 165.00 (165.00) -100.00% MT/JAM
ET-188 - - - - - - 18.00 18.00 100.00% LITER/JAM
ET-189 - - - - - - 18.00 18.00 100.00% LITER/JAM
ET-228 10.01 12.11 9.12 18.13 14.81 12.84 18.00 5.16 28.68% LITER/JAM
ET-232 12.36 11.27 11.96 14.81 14.28 12.94 18.00 5.06 28.12% LITER/JAM Berdasarkan data bahwa ada penghematan fuel dari target fuel consumpton liter per jam, namun data ini masih belum dapat jadi acuan karena
ET-187 - - - - - - 32.00 32.00 100.00% LITER/JAM
ET-38 21.92 23.52 24.29 38.06 31.84 27.92 32.00 4.08 12.74% LITER/JAM
EXCAVATOR
ET-40 32.47 30.13 - - - 12.52 32.00 19.48 60.88% LITER/JAM
ET-227 107.71 40.00 25.18 - - 34.58 32.00 (2.58) -8.06% LITER/JAM
ET-229 33.23 33.81 27.93 30.54 26.67 30.44 32.00 1.56 4.89% LITER/JAM
ET-230 33.72 31.67 30.27 33.40 31.70 32.15 32.00 (0.15) -0.47% LITER/JAM
3 FUEL CONSUMPTION ET-231 36.29 39.63 35.29 38.56 39.00 37.75 32.00 (5.75) -17.98% LITER/JAM
ET-233 37.61 37.31 39.89 34.32 41.05 38.03 32.00 (6.03) -18.86% LITER/JAM
PALING BOROS 17.79 16.23 16.59 16.49 17.33 16.89 17.00 0.11 0.67% LITER/JAM 2.Jam kerja ALAT SUPPORT masih rendah,karena banyak alat support yg rusak
DUMP TRUCK PALING HEMAT 12.71 12.42 12.87 12.51 11.44 12.39 17.00 4.61 27.13% LITER/JAM
RATA-RATA 15.03 15.58 14.71 15.55 14.70 15.12 17.00 1.88 11.09% LITER/JAM 3. Jam kerja pemakaian alat di Workshop belum dibuat time sheet
BULLDOZER RATA-RATA 8.78 12.74 7.53 8.53 - 7.52 30.00 22.48 74.95% LITER/JAM
MOTOR GRADER RATA-RATA 8.47 6.51 7.11 6.44 5.87 6.88 14.00 7.12 50.86% LITER/JAM 4. LKR Menanggung beban fuel pompa sump TSM
WT & FT RATA-RATA 2.24 1.23 2.28 2.63 3.33 2.34 14.00 11.66 83.25% LITER/JAM

PENGHEMATAN FUEL DARI FUEL CONSUMPTION 115,643.60 LITER

OB 0.79 0.78 0.82 0.82 0.83 0.81 LTR/BCM


PLAN FR INTERNAL 1. Fuel Ratio naik karena kita menangung beban fuel pompa sump
COAL - - - - - - LTR/MT
OB 0.77 0.76 0.80 0.80 0.81 0.79 LTR/BCM
PLAN FR KONTRAK 2. Jumlah jam General yg tinggi
COAL - - - - - - LTR/MT
OB 0.83 0.67 0.78 0.69 0.70 0.74 0.81 0.07 LTR/BCM
AKTUAL FR 3. Jam Sliperry yg tinggi sehingga banyak pekerjaan hanya melakukan pekerjaan general
COAL - - - - - - - - LTR/MT
4 FUEL RATIO PLAN FUEL USE (INTERNAL) 56,534.03 63,077.67 35,112.00 55,861.84 22,861.56 233,447.09 488.09 LITER
4. Tidak Matching fleet dikarenakan banyak DT yang masuk ke workshop sehingga minyak yg sudah diisi tidak digunakan untuk produksi
PLAN FUEL USE (KONTRAK) 55,096.58 61,470.42 34,254.44 54,493.76 22,311.36 227,626.56 (5,332.44) LITER
ACTUAL FUEL USE 61,523.00 66,605.00 43,671.00 61,160.00 26,927.00 232,959.00 LITER

488.09 LITER
PEMBOROSAN FUEL TERHADAP FUEL PLAN RIDP
Lose fuel bulan Juni harus ditutup pada periode bulan berikutnya
(5,332.44) LITER
PEMBOROSAN FUEL TERHADAP FUEL PLAN KONTRAK
Loading SL500/DX520/SY500 16,930.80 17,969.40 11,787.30 16,539.30 6,302.70 69,529.50 50,929.68 (18,599.82) -36.52% LITER
General (drainage, tanggul,dll) SL500/DX520/SY500 1,881.20 1,996.60 1,309.70 1,837.70 700.30 7,725.50 0.00 (7,725.50) 0.00% LITER
General (drainage, tanggul,dll) SL 340 561.00 0.00 0.00 0.00 0.00 561.00 0.00 (561.00) 0.00% LITER
General (drainage, tanggul,dll) SY215,SY232/DX225 2,906.00 3,387.00 2,618.00 2,892.00 1,344.00 13,147.00 12,325.84 (821.16) 0.00% LITER Frekuensi hujan yg tinggi mengakibatkan sehabis slipeery hujan kembali
Hauling 1,5 KM Sitrak C7H 390 4,882.00 5,734.00 3,342.00 4,931.00 1,905.00 20,794.00 951.83 (19,842.17) 0.00% LITER
Fuel Ratio naik karena kita menangung beban fuel pompa sump
Hauling 1,5 KM MAN 0.00 0.00 69.00 0.00 0.00 69.00 0.00 (69.00) #DIV/0! LITER
Hauling 1,5 KM AXOR 2526 8,858.00 11,963.00 7,504.00 11,558.00 5,158.00 45,041.00 916.22 (44,124.78) 0.00% LITER
Tidak Matching fleet dikarenakan banyak DT yang masuk ke workshop sehingga minyak yg sudah diisi tidak digunakan untuk produksi
Hauling 1,3 KM ACTROS4043 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% LITER
Hauling 1,4 KM ACTROS4043 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% LITER
Hauling 1,5 KM ACTROS4043 10,138.00 12,964.00 6,937.00 9,507.00 3,787.00 43,333.00 704.74 (42,628.26) 0.00% LITER
Spreading Dispo 861D SEM 2,161.00 1,294.00 0.00 0.00 0.00 3,455.00 38,240.35 34,785.35 90.97% LITER
Spreading Dispo Zoomlion 2,904.00 3,043.00 3,046.00 4,244.00 2,013.00 15,250.00 37,277.50 22,027.50 59.09% LITER
Spreading Dispo D8R 0.00 0.00 0.00 0.00 0.00 0.00 33,455.42 33,455.42 100.00% LITER
FUEL OB
Spreading Dispo D85 2,439.00 2,429.25 1,476.00 2,148.00 1,167.00 9,659.25 6,391.18 (3,268.07) -51.13% LITER
TERHADAP
PLAN General (front loading, road, dll) D85 813.00 809.75 492.00 716.00 389.00 3,219.75 9,586.76 6,367.01 66.41% LITER
R. Maint (slippery, maint., dll) GD 705 1,685.00 1,744.00 1,336.00 1,546.00 693.00 7,004.00 10,591.09 3,587.09 33.87% LITER
R. Maint (slippery, maint., dll) GD 511 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! LITER
R. Maint (showering) CWB520LDN-WT 288.00 120.00 0.00 0.00 247.00 655.00 1,369.54 714.54 52.17% LITER
Dewatering MF380 1,613.00 1,136.00 674.00 2,376.00 1,453.00 7,252.00 11,584.00 4,332.00 37.40% LITER
Fuel Tank CWB520LDN-FT 251.00 138.00 210.00 295.00 160.00 1,054.00 1,826.05 772.05 42.28% LITER
Ligh Tower 6000 Wat T. Lamp 528.00 309.00 454.00 447.00 235.00 1,973.00 0.00 (1,973.00) #DIV/0! LITER
Genset WS Genset WS 582.00 265.00 0.00 322.00 376.00 1,545.00 0.00 (1,545.00) #DIV/0! LITER
Genset MESS Genset MESS 1,298.00 564.00 1,710.00 738.00 697.00 5,007.00 0.00 (5,007.00) #DIV/0! LITER
Mesin las Mesin las 0.00 136.00 0.00 0.00 0.00 136.00 0.00 (136.00) #DIV/0! LITER
Compresor Compresor 15.00 47.00 0.00 10.00 0.00 72.00 0.00 (72.00) #DIV/0! LITER
REVIEW RIDP vs Doble Cabin Doble Cabin 789.00 556.00 696.00 843.00 237.00 3,121.00 0.00 (3,121.00) #DIV/0! LITER
5 0.00 0.00% LITER
1. Jumlah DT Hauling yg tidak matching
ACTUAL DLL 0.00 0.00 10.00 210.00 63.00 283.00 0.00
Cleaning 60% SY215 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! LITER
FUEL COAL
Collecting 25% DX225 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! LITER 2. Agar dilakukan percepatan penamabahan DT Hauling dan kontrol muatan ob
TERHADAP
Loading SL340LCV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! LITER
PLAN
Loading SL500LCV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #DIV/0! LITER Semua alat yang digunakan (alat produksi & alat support) terjadi pemborosan jam kerja dari RIDP, penyebab utama PTY per fleet perjam jauh
dibawah RIDP, untuk itu agar :
TOTAL DELAY JUMLAH CURAH
NO MTD TANGGAL SHIFT LOKASI RAIN SLIPPERY FOGGY
CUACA HUJAN (mm)

1 MTD 1-Aug D PIT ALL 0.25 - 0.25


2 MTD 1-Aug N PIT ALL 3.00 1.00 - 4.00 17.50
3 MTD 2-Aug D PIT ALL 2.00 - 2.00
4 MTD 2-Aug N PIT ALL 0.50 0.50 - 1.00 0.50
5 MTD 3-Aug D PIT ALL 0.50 0.50 - 1.00
6 MTD 3-Aug N PIT ALL - -
7 MTD 4-Aug D PIT ALL - -
8 MTD 4-Aug N PIT ALL 9.00 1.00 - 10.00 57.50
9 MTD 5-Aug D PIT ALL 4.00 - 4.00
10 MTD 5-Aug N PIT ALL - -
11 MTD 6-Aug D PIT ALL - -
12 MTD 6-Aug N PIT ALL 3.00 3.00 - 6.00 43.50
13 MTD 7-Aug D PIT ALL 2.00 2.00
14 MTD 7-Aug N PIT ALL - -
15 MTD 8-Aug D PIT ALL -
16 MTD 8-Aug N PIT ALL - -
17 MTD 9-Aug D PIT ALL - -
18 MTD 9-Aug N PIT ALL - -
19 MTD 10-Aug D PIT ALL - -
20 MTD 10-Aug N PIT ALL - -
21 MTD 11-Aug D PIT ALL - -
22 MTD 11-Aug N PIT ALL - -
23 MTD 12-Aug D PIT ALL - -
24 MTD 12-Aug N PIT ALL 3.00 2.00 - 5.00 3.00
25 MTD 13-Aug D PIT ALL 1.00 - 1.00
26 MTD 13-Aug N PIT ALL - -
27 MTD 14-Aug D PIT ALL - -
28 MTD 14-Aug N PIT ALL 2.00 1.00 - 3.00 0.50
29 MTD 15-Aug D PIT ALL - -
30 MTD 15-Aug N PIT ALL - -
31 MTD 16-Aug D PIT ALL - -
32 MTD 16-Aug N PIT ALL - -
33 MTD 17-Aug D PIT ALL - -
34 MTD 17-Aug N PIT ALL - -
35 MTD 18-Aug D PIT ALL 0.50 - 0.50
36 MTD 18-Aug N PIT ALL 7.00 - 7.00 28.50
37 MTD 19-Aug D PIT ALL 3.50 - 3.50
38 MTD 19-Aug N PIT ALL 6.00 3.00 - 9.00 34.00
39 MTD 20-Aug D PIT ALL 2.00 5.00 - 7.00 2.50
40 MTD 20-Aug N PIT ALL - -
41 MTD 21-Aug D PIT ALL 2.00 1.00 - 3.00
42 MTD 21-Aug N PIT ALL 7.00 3.00 - 10.00 31.00
43 MTD 22-Aug D PIT ALL 4.00 - 4.00
44 MTD 22-Aug N PIT ALL - -
45 MTD 23-Aug D PIT ALL 2.00 - 2.00
46 MTD 23-Aug N PIT ALL 4.00 4.00 - 8.00 33.00
47 MTD 24-Aug D PIT ALL 4.00 - 4.00
48 MTD 24-Aug N PIT ALL - -
49 MTD 25-Aug D PIT ALL - -
50 MTD 25-Aug N PIT ALL - -
51 MTD 26-Aug D PIT ALL - -
52 MTD 26-Aug N PIT ALL - -
53 MTD 27-Aug D PIT ALL - -
54 MTD 27-Aug N PIT ALL 3.00 3.00 - 6.00 64.50
55 MTD 28-Aug D PIT ALL 4.00 - 4.00
56 MTD 28-Aug N PIT ALL - -
57 MTD 29-Aug D PIT ALL - -
58 MTD 29-Aug N PIT ALL 5.00 1.00 - 6.00 47.50
59 MTD 30-Aug D PIT ALL 5.00 - 5.00
60 MTD 30-Aug N PIT ALL - -
61 MTD 31-Aug D PIT ALL - -
62 MTD 31-Aug N PIT ALL - -
TOTAL TOTALALL 59.75 58.50 - 118.25 27.96
1 MTD 1-Aug D PIT PINANG - - - -
2 MTD 1-Aug N PIT PINANG - - - -
3 MTD 2-Aug D PIT PINANG - - - -
4 MTD 2-Aug N PIT PINANG - - - -
5 MTD 3-Aug D PIT PINANG - - - -
6 MTD 3-Aug N PIT PINANG - - - -
7 MTD 4-Aug D PIT PINANG - - - -
8 MTD 4-Aug N PIT PINANG - - - -
9 MTD 5-Aug D PIT PINANG - - - -
10 MTD 5-Aug N PIT PINANG - - - -
11 MTD 6-Aug D PIT PINANG - - - -
12 MTD 6-Aug N PIT PINANG - - - -
13 MTD 7-Aug D PIT PINANG - - - -
14 MTD 7-Aug N PIT PINANG - - - -
15 MTD 8-Aug D PIT PINANG - - - -
16 MTD 8-Aug N PIT PINANG - - - -
17 MTD 9-Aug D PIT PINANG - - - -
18 MTD 9-Aug N PIT PINANG - - - -
19 MTD 10-Aug D PIT PINANG - - - -
20 MTD 10-Aug N PIT PINANG - - - -
21 MTD 11-Aug D PIT PINANG - - - -
22 MTD 11-Aug N PIT PINANG - - - -
23 MTD 12-Aug D PIT PINANG - - - -
24 MTD 12-Aug N PIT PINANG - - - -
25 MTD 13-Aug D PIT PINANG - - - -
26 MTD 13-Aug N PIT PINANG - - - -
27 MTD 14-Aug D PIT PINANG - - - -
28 MTD 14-Aug N PIT PINANG - - - -
29 MTD 15-Aug D PIT PINANG - - - -
30 MTD 15-Aug N PIT PINANG - - - -
31 MTD 16-Aug D PIT PINANG - - - -
32 MTD 16-Aug N PIT PINANG - - - -
33 MTD 17-Aug D PIT PINANG - - - -
34 MTD 17-Aug N PIT PINANG - - - -
35 MTD 18-Aug D PIT PINANG - - - -
36 MTD 18-Aug N PIT PINANG - - - -
37 MTD 19-Aug D PIT PINANG - - - -
38 MTD 19-Aug N PIT PINANG - - - -
39 MTD 20-Aug D PIT PINANG - - - -
40 MTD 20-Aug N PIT PINANG - - - -
41 MTD 21-Aug D PIT PINANG - - - -
42 MTD 21-Aug N PIT PINANG - - - -
43 MTD 22-Aug D PIT PINANG - - - -
44 MTD 22-Aug N PIT PINANG - - - -
45 MTD 23-Aug D PIT PINANG - - - -
46 MTD 23-Aug N PIT PINANG - - - -
47 MTD 24-Aug D PIT PINANG - - - -
48 MTD 24-Aug N PIT PINANG - - - -
49 MTD 25-Aug D PIT PINANG - - - -
50 MTD 25-Aug N PIT PINANG - - - -
51 MTD 26-Aug D PIT PINANG - - - -
52 MTD 26-Aug N PIT PINANG - - - -
53 MTD 27-Aug D PIT PINANG - - - -
54 MTD 27-Aug N PIT PINANG - - - -
55 MTD 28-Aug D PIT PINANG - - - -
56 MTD 28-Aug N PIT PINANG - - - -
57 MTD 29-Aug D PIT PINANG - - - -
58 MTD 29-Aug N PIT PINANG - - - -
59 MTD 30-Aug D PIT PINANG - - - -
60 MTD 30-Aug N PIT PINANG - - - -
61 MTD 31-Aug D PIT PINANG - - - -
62 MTD 31-Aug N PIT PINANG - - - -
TOTAL TOTALPINANG - - - - -
INTENSITAS FREKUENSI
r
(mm/jam) HUJAN

-
5.83 1.00
-
1.00 1.00
- 1.00
-
-
6.39 1.00
-
-
-
14.50 1.00
-
-

-
-
-
-
-
-
-
-
1.00 1.00
-
-
-
0.25 1.00
-
-
-
-
-
-
-
4.07 1.00
-
5.67 2.00
1.25 2.00
-
- 2.00
4.43 2.00
-
-
- 1.00
8.25 2.00
-
-
-
-
-
-
-
21.50 2.00
-
-
-
9.50 1.00
-
-
-
- hujan
0.47 1-7/4/2021 8-14/4/2021 15-21/4/2021
16.25 5.00 24.50

slippery
1-7/4/2021 8-14/4/2021 15-21/4/2021
14.00 4.00 15.50
-
hujan
22-28/4/2021 29-30/4/2021
9.00 5.00

slippery
22-28/4/2021 29-30/4/2021
19.00 6.00
SHIFT I
NO TGL ELV VOL (BCM) TOTAL HM
START END
1-Aug 17,899.00 17,899.00 -
2-Aug 17,899.00 17,899.00 -
3-Aug 17,899.00 17,899.00 -
4-Aug 17,905.00 17,909.00 4.00
5-Aug 17,909.00 17,917.00 8.00
6-Aug 17,927.00 17,936.00 9.00
7-Aug 17,947.00 17,955.00 8.00
8-Aug 17,965.00 17,966.00 1.00
9-Aug 17,966.00 17,971.00 5.00
10-Aug 17,982.00 17,985.00 3.00
11-Aug 17,985.00 17,985.00 -
12-Aug 17,985.00 17,986.00 1.00
13-Aug 17,989.00 17,990.00 1.00
14-Aug 17,990.00 17,990.00 -
15-Aug 17,990.00 17,990.00 -
16-Aug 17,992.00 17,992.00 -
17-Aug 17,992.00 17,992.00 -
18-Aug 17,992.00 17,994.00 2.00
19-Aug 17,996.00 17,996.00 -
20-Aug 18,000.00 18,008.00 8.00
21-Aug 18,012.00 18,021.00 9.00
22-Aug 18,035.00 18,045.00 10.00
23-Aug 18,054.00 18,058.00 4.00
24-Aug 18,070.00 18,073.00 3.00
25-Aug 18,073.00 18,078.00 5.00
26-Aug 18,078.00 18,078.00 -
27-Aug 18,078.00 18,083.00 5.00
28-Aug 18,090.00 18,096.00 6.00
29-Aug 18,106.00 18,115.00 9.00
30-Aug 18,127.00 18,137.00 10.00
31-Aug 18,137.00 18,137.00 -

VOLUME
1-7/4/2021 8-14/4/2021 15-21/4/2021 22-28/4/2021 29-30/4/2021
- - - - -
CONSUMSION POMPA
1-7/4/2021 8-14/4/2021 15-21/4/2021 22-28/4/2021 29-30/4/2021
- - - - -

HM POMPA
1-7/4/2021 8-14/4/2021 15-21/4/2021 22-28/4/2021 29-30/4/2021
66.00 25.00 45.00 71.00 31.00
SHIFT II GRAND
TOTAL HM STANDBY DOWN Putaran (rpm)
START END TOTAL
17,899.00 17,899.00 0.00 - 0.0 24.0 1,700
17,899.00 17,899.00 0.00 - 0.0 24.0 1,700
17,899.00 17,905.00 6.00 6.00 14.0 4.0 1,700
17,909.00 17,909.00 0.00 4.00 20.0 0.0 1,700
17,917.00 17,927.00 10.00 18.00 6.0 0.0 1,700
17,936.00 17,947.00 11.00 20.00 4.0 0.0 1,700
17,955.00 17,965.00 10.00 18.00 4.0 2.0 1,700
17,966.00 17,966.00 0.00 1.00 0.0 23.0 1,700
17,971.00 17,982.00 11.00 16.00 2.0 6.0 1,700
17,985.00 17,985.00 0.00 3.00 21.0 0.0 1,700
17,985.00 17,985.00 0.00 - 24.0 0.0 1,700
17,986.00 17,989.00 3.00 4.00 20.0 0.0 1,700
17,990.00 17,990.00 0.00 1.00 23.0 0.0 1,700
17,990.00 17,990.00 0.00 - 10.0 14.0 1,700
17,990.00 17,992.00 2.00 2.00 22.0 0.0 1,700
17,992.00 17,992.00 0.00 - 24.0 0.0 1,700
17,992.00 17,992.00 0.00 - 24.0 0.0 1,700
17,994.00 17,996.00 2.00 4.00 20.0 0.0 1,700
17,996.00 18,000.00 4.00 4.00 20.0 0.0 1,700
18,008.00 18,012.00 4.00 12.00 2.0 10.0 1,700
18,021.00 18,035.00 14.00 23.00 1.0 0.0 1,700
18,045.00 18,054.00 9.00 19.00 5.0 0.0 1,700
18,058.00 18,070.00 12.00 16.00 8.0 0.0 1,700
18,073.00 18,073.00 0.00 3.00 0.0 21.0 1,700
18,078.00 18,078.00 0.00 5.00 0.0 19.0 1,700
18,078.00 18,078.00 0.00 - 0.0 24.0 1,700
18,083.00 18,090.00 7.00 12.00 1.0 11.0 1,700
18,096.00 18,106.00 10.00 16.00 0.0 8.0 1,700
18,115.00 18,127.00 12.00 21.00 3.0 0.0 1,700
18,137.00 18,137.00 0.00 10.00 0.0 14.0 1,700
18,137.00 18,137.00 0.00 - 0.0 24.0 1,700

238.00 278.00 204.00

238.00 October 1900 July 1900


Debit (L/Detik) Jam pengukuran

140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
140.7 10:00:00 AM
Keterangan

Breakdown
Breakdown
Breakdown/Pompa Running
Pompa Running/Standby
Pompa Running/Standby
Pompa Running/Standby p2h dan pengisian fuel
Pompa Running/Standby p2h dan pengisian fuel
Pompa Running/pipa HDPE pecah
Pompa Running/pipa HDPE pecah
Pompa Running/Standby Lumpur
Pompa Standby Lumpur
Pompa Running/Standby Lumpur
Pompa Running/Standby Lumpur
instal pipa/Standby Lumpur
Pompa Running/Standby Lumpur
Pompa Standby Lumpur
Pompa Standby Lumpur
Pompa Running/Standby Lumpur
Pompa Running/Standby Lumpur
Pompa Running/pipa HDPE pecah
Pompa Running
Pompa Running
Pompa Running
Pompa Running/Breakdown Compresor Bocor
Pompa Running/Breakdown Radiator Bocor
Pompa Breakdown Radiator Bocor
Pompa Breakdown Radiator Bocor/Pompa Running
Pompa Breakdown/Pompa Running
Pompa Running
Pompa Running/Breakdown
Breakdown
PEMAKAIAN PENGEMBALIAN
NO TANGGAL SALDO Dari BSL
LITER/DAY PEMINJAMAN Stock awal Agustus
1 01-Aug-22 10,355 27,667 38022
2 02-Aug-22 8,931 18,736
3 03-Aug-22 9,596 29,140 20,000
4 04-Aug-22 5792 23,348
5 05-Aug-22 8,898 34,450 20,000
6 06-Aug-22 9,199 45,251 20,000
7 07-Aug-22 8,752 46,499 10,000
8 08-Aug-22 9,949 46,550 10,000
9 09-Aug-22 9680 46,870 10,000
10 10-Aug-22 10,225 46,645 10,000
11 11-Aug-22 10,014 46,627 9,996
12 12-Aug-22 10,479 46,148 10,000
13 13-Aug-22 8,456 37,692
14 14-Aug-22 7,802 29,890
15 15-Aug-22 9,239 30,651 10,000
16 16-Aug-22 9,376 21,275
17 17-Aug-22 3980 27,295 10,000
18 18-Aug-22 5,089 38,206 16,000
19 19-Aug-22 3657 34,549
20 20-Aug-22 7,346 27,203
21 21-Aug-22 4,984 32,219 10,000
22 22-Aug-22 10,060 32,159 10,000
23 23-Aug-22 5,967 26,192
24 24-Aug-22 8,666 17,526
25 25-Aug-22 9,345 28,181 20,000
26 26-Aug-22 11,487 46,691 29,997
27 27-Aug-22 6,119 40,572
28 28-Aug-22 9,516 41,056 10,000
29 29-Aug-22 9,284 41,772 10,000
30 30-Aug-22 7,861 33,911
31 31-Aug-22 9,782 24,129
TOTAL 259,886 245,993 -
8/1/2022 8/2/2022
NO TYPE UNIT NO UNIT FUEL FUEL
DAY NIGHT DAY NIGHT
1 Sitrak C7H 390 DT-7201 18 71
2 Sitrak C7H 390 DT-7202 82 141 183
3 AXOR 2526 DT-7203 138 96 155
4 AXOR 2526 DT-7204 117 138 167
5 AXOR 2526 DT-7205 113 148 79 61
6 AXOR 2526 DT-7206 161 144 37 117
7 AXOR 2526 DT-7207 113 149 44 100
8 AXOR 2526 DT-7208 122 112 79 69
9 AXOR 2526 DT-7209 139 119 77 128
10 AXOR 2526 DT-7210 80 140 88
11 AXOR 2526 DT-7211 83 149 140
12 AXOR 2526 DT-7212
13 Sitrak C7H 390 DT-7213 118 127 74
14 Sitrak C7H 390 DT-7214 112 112 158
15 Sitrak C7H 390 DT-7215 89 49 109
16 AXOR 2526 DT-7216
17 AXOR 2526 DT-7217
18 AXOR 2526 DT-7218
19 MAN DT- 128
20 Mercy Actros 4043 DT-168 181 97
21 Mercy Actros 4043 DT-169 118 112 70 87
22 Mercy Actros 4043 DT-170
23 Mercy Actros 4043 DT-171
24 Mercy Actros 4043 DT-172 140
25 Mercy Actros 4043 DT-173 138 130 70
26 Mercy Actros 4043 DT-174 61 152 100
27 Mercy Actros 4043 DT-175
28 Mercy Actros 4043 DT-215
29 Mercy Actros 4043 DT-216 148
30 Mercy Actros 4043 DT-218 96 107 150
31 Mercy Actros 4043 DT-219 157 175
32 Mercy Actros 4043 DT-220 103 118 124
33 Mercy Actros 4043 DT-221
34 Mercy Actros 4043 DT-222 139 118
35 Mercy Actros 4043 DT-223 100 109
36 Mercy Actros 4043 DT-224
2371 2501 997 2276
UNIT EXCAVATOR (DOOSAN)
37 Dossan DX225LC-V ET-188
38 Dossan DX225LC-V ET-189
39 SANY 215 ET - 228 161 90
40 SANY 215 ET - 232 167 152 284
41 Dossan S340LC-V ET-187
42 Dossan S500LC-V ET-38
43 Dossan S500LC-V ET-40
44 Dossan S520LC-V ET-227
45 Dossan S520LC-V ET-229 349 437 190 322
46 Dossan S520LC-V ET-230 361 375 168 343
47 SANY 500 ET-231 378 512 348 439
48 SANY 500 ET-233 359 458 520
1614 1637 1254 1908
UNIT GRADER
49 Grader 705A GD 101 202 215
50 Grader 511A MG191
202 215
UNIT BULLDOZER
51 Sem 816D BD-001 179 164 162 155
52 CAT D65P BD-002
53 Caterpillar D8R BD-100
54 Komatsu D85E-SS BD-89 196 197 170 152
55 Komatsu D65P BD-177
56 Komatsu D65P BD-178 167 128 147
57 Zoomlion BD-179 228 237 149 206
58 Zoomlion BD-180
770 598 609 660
UNIT COMPACTOR
59 SAKAI SV 512 CM-204

UNIT OPERASIONAL
60 Nissan CWB45A WT-09 179
61 Nissan CWB45A FT-51
62 MAN PT-131 88
63 LV Strada 01
64 LV Strada Rental 02
65 LV Strada Rental 03
66 LV Strada Rental 04
67 LV Strada Rental 001 34
68 LV Strada Rental 003 47
69 LV Strada Rental 004 44
70 LV Strada Rental 005 38
70 LV Strada Rental 006
71 LV Strada Rental 007
72 ISUZU ELF MH FT-52
73 Manhaul BD-7964-CZ MH 001
74 Compressor Puma (BAN) 01 15
75 Compressor Swan (GREASE) 02
76 Tower Lamp Terex 03
77 Tower Lamp Terex 04
78 Tower Lamp Terex 179
79 Tower Lamp Terex 180 66
80 Tower Lamp Terex 205
81 Tower Lamp Terex 206
82 GENSET 55KVA 211 400
83 GENSET 16KVA 212 370
84 GENSET 80KVA (MESS) 213 393
85 MESIN LAS 01
86 MESIN LAS 207
87 Perawatan/Mekanik 0
88 Pompa Sump Sykes 01
89 Cummin Dongfeng 0
90 LV Rental Lainnya 0
91 DLL./TL/BSL 0
92 DLL. 0
93 DLL. 0
662 0 1012 0

5619 4736 4087 4844


TOTAL
10355 8931
8/3/2022 8/4/2022 8/5/2022 8/6/2022 8/7/2022
FUEL FUEL FUEL FUEL FUEL
DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY
123 90 105 109 90
75 129 86 107 48
73 85 44 93 72 118
97 86 107 87 99 102 54
77 107 46 88 47 103
117 80 129 88 85 107
132 120 116 52 75 97 104
88 88 88 154 107
63 72 94 104

93 88 119 116
170 98 103
130 123 101 66 127 104 87
120 65 128 154 128
120 93 100 89 90 95 96

110 170 50
100 60 141 93

173 7 32 82 84
81 130 129 65 64
124 55 67 98 51 159 122 50

104 95 66
120 65 37 103 51 130 108 31
165 57 60 115 132
195 75 76 148 91 100 56 35

272 49 101 60 104 130 33


154 96 50 138 56 138 151

2,216 1832 1613 1851 1487 2072 1803 680

135 162 100 150 125 205 91


118 243 185 145
561
576 279
487
615 139
125 380 334 130
470 290 276 245 410 379 411
403 460 432 329 426 354 599
412 433 428 360 428 399 402 143
2278 1563 2346 1416 2175 1681 941 1374

160 168 140 144 160 157 130

160 168 140 144 160 157 130

147 116 210 120 177 176 173 178

212 147 113 226 207

165 219 238 170 189 97


188 225 221 214 127 200 269 220 210

565 519 669 424 485 773 634 600 485

109

163

37 51
49 51
67 31 52
44 48 42
51 47

56

50 50
45 57
51 43
40 28
57 41

205
212
300

295 320 474 524

295 0 491 109 376 31 1181 0 1207

5514 4082 5259 533 4272 4626 5725 3474 3746


9596 5792 8898 9199 8752

0 61

1769
8/7/2022 8/8/2022 8/9/2022 8/10/2022 8/11/2022
FUEL FUEL FUEL FUEL FUEL
NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT
164 128 136 144
141 120 127 113 150 143 121
131 107 124 113 121 119 114
90 132 121 102 136 69 123 158
63 105 131 119 115 97 103 124 139
183 149 113 108 154 138 131 100 163
116 148 124 71 83 124 139
124 143 100 104 124 108 86 130
88 117 136 103 129

70 127 122 108


148 113 114 121 66 70 109 140
71 117 126 151 89 123
104 114 151 77 118
145 112 105 74 153 104 134 85 120

106 140 134 109


73 136 121 140 195 123 175 80

101 140 132 107 125 81


77 124 100 78 88 142 150 173
118 180 118 140 200

115 115 160 106 130 78 169 33


50 139 120 102 136 103 172
165 101 131 115 164 113 149 103 152

113 118 151 148 50 150 108 126


153 111 110 164 136 154 118 211

2179 2482 2084 2031 2589 2095 2124 2199 2525

284

163 117 152 119 135 244


230 196 228 98 174 279

358
358 387 368 450 348 334 397 378
470 219 368 230 242 299 317 365
437 419 466 442 450 417 394 407 444
434 404 331 438 412 427 449 376 417
2092 1546 1881 1688 1668 1637 1848 1762 1749

209 143 151 132 200 129 245

209 143 151 132 200 129 245

204 198 207 228 199 177 127 158

112 174 185 132 211 140 213 56 228

105 81 240
210 297 227 330 212 162 168 270

526 669 392 587 845 529 502 463 738

120

138

51

47 45
42 40 31

56 44
47
42
32
47
52

265
545 591

0 601 0 140 0 1161 0 333 0

5006 5441 4508 4578 5102 5622 4603 5002 5012


8752 9949 9680 10225 10014
8/12/2022 8/13/2022 8/14/2022 8/15/2022 8/16/2022
FUEL FUEL FUEL FUEL FUEL
DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY
128 30 163 108
157 122 67 163 96 92 124
86 121 73 140 121 118 136 119
126 129 139 122 56 109
125 150 87 110 104 125
115
124 111 55 112 98 95 98 107 50
96 129 49 86 98 88 103 106
109 126 68 118 124 145 75 109
50 120 83 132 125
143 83 126 100 124 133
117 107 90 96 148 106 89
136 109 85 125 112 99 134 100 126
104 67 148 129 93 97
148 129 52 127 49 90 113 92 136
228
229
211

169 108 30 105 128


147 15 170 238 135 132

100 188 161 139 67


152 50 193 50 150 78 98 168

127 109 32 127 195 92 108 158 120


155 173 165 145 142 109 121
95 123 30 171 149

352 208 204 199


101 151 193 151 98 109 151

2004 2598 1553 2429 1999 1949 2122 2139 2121

174 208 164 235 200 84 143


132 150 168 130 282 190

324 240
241
400 277
431 184 385 221 276 304 300 331
414 315 244 380 344 352 236
333 453 215 417 332 260 311 387 410
412 354 284 373 381 240 375 372
1856 1877 927 1931 1628 1355 1749 1685 1360

182 123 231 208 161 146 135

182 123 231 208 161 146 135

142 148 137 189 162 171 109 95 142

62 240 105 118 182 105


195 234 118 270 40 219 232 188 178
301
399 622 661 577 202 390 523 283 425

210

45 47

41 41 47
30 42
43

94
31 30
40 51
47
30 28
45

264 263 299


300 500

10

818 0 147 0 71 0 431 0 1111

5259 5220 3288 5168 4108 3694 4986 4253 5152


10479 8456 7802 9239 9376
8/16/2022 8/17/2022 8/18/2022 8/19/2022 8/20/2022
FUEL FUEL FUEL FUEL FUEL
NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT

56 80
146 78 99 145
135 122 96 144 34
125 140 138 97 105
115
87 107 99 147
105 116 215
110 70 100 89
132 108 103 145 103 73
98 125 89 113 171
99 112 112
135 135 140 136 103
140 130
81 129 117 127

69
61 150
131 113 101 98

60 148
189 141
224 123 165 137 99

124
161
142 137 100
114

125 131 137


162 130 142 145 114

2177 0 1752 2121 1413 935 1531

105 168 110 211


273 186 171 295

270
333 380 315 239 190
310 286 349 263 410 241
387 350 424 287 432
450 358 350 463 493
1405 0 1739 1800 110 1310 1790 945

180 169 192 184

180 169 192 184

180 200 156 210

184 165 134


250 200 196 242 315 218
164 210 225 153
614 0 400 516 662 705 505

59 51
68
40 45
43 48

45 59

57

21 30 40
45
28 10 18 15
40
38
341

28 0 89 362 0 103 0 559 0

4224 0 3980 4979 110 3657 0 4181 3165


9376 3980 5089 3657 7346
8/21/2022 8/22/2022 8/23/2022 8/24/2022 8/25/2022
FUEL FUEL FUEL FUEL FUEL
DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY

202 90 115 100 95 143


126 113 153 72 105 113
76 80
122 108 130 109 129

37 73 128 119 104 86 82


169 62 113 135 97 81
103 119 185 137
39 93 96 135 91 95 143
118 126 95 119 165
75 62 110 138 165 149
65 92 77 140 93 89 147
117 78 143 104
151 80 93 79 101 94 89
127

72 229 152 109 153

157 92
35 100 99
254 99
157
50
71 147 116 248 183
100 103 113 98 90 148
104 129 128
36 88 147 193 57 101

173 92 165 139 215


53 130 184 127 190 104

1541 0 1822 2673 2628 0 922 2012 2116

257 268
200 242 251 179

258
485 310 283 468 328 410 281
292 278 341 459 387 456 432
435 272 433 559 389 393
410 249 368 380 284 482
1822 0 1351 1425 1866 0 1896 1438 1721

169 127 190 137 146 140 242

169 127 190 137 0 146 140 242

106 311 148 227 169 223


149 257 276 168 343 227
126 195 205 204 247 125
381 0 452 792 520 0 817 396 348

295

45 56

47
40 50
47
48

76 67

39
55 36
15 15 15 15 14
37
30 48

248
322
400

333 672 544 398

210

1071 0 1228 0 816 0 899 0 203

4984 0 4980 5080 5967 0 4680 3986 4630


4984 10060 5967 8666 9345
8/25/2022 8/26/2022 8/27/2022 8/28/2022 8/29/2022
FUEL FUEL FUEL FUEL FUEL
NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT

154 171 188 143


129 111 193 144 165 109 137 168

142 80 150 137 132 128 133 159

143 59 142 120 150 108 129


132 145 110 107 128 134 146
172 133 112 61 91 122
107 130 126 107 100
150 145 129 128 88 170
113 55 158 104 126 79 128
113 85 126 156 125 122 150 113
111 158 112 114 156 98 135 140
158 150 110 139 145 81 152 105
89 105 97 95
105 98 138 138 98 127 123
134 141 120 103 112

201 188 168

85 171
80 200 178 118 155
150 122 138 130
143 172

150 190 132


79 175 114 178 40 108 160

108 101 135 121 140 127 111 179

140 149 113 180


118 162 100 138

2080 2397 2979 2205 548 1620 1994 2038 2323

121 218 248 266 227


240 262 175 165 197

427 292

305
359 184 392 367 344
384 322 403 377 308 395 380
414 425 394 397 483 430 465
547 391 455 427 472 475 354
1825 1867 1862 1816 262 2048 1892 1623 292

126 116 120 202 217 112

126 116 120 0 0 202 0 217 112

274 198 191 187 165 179 203

192 246 184 149 232 166


218 197 160 184 192 147 187 220
185 166 99 262 144 120
684 641 535 705 358 411 449 775 489

160

54 44 30

42 47 47
56 45 42
57

67
10

43

13 11 27 12
38
41

338
376
400

762 748

0 970 0 180 45 833 67 1225 190

4715 5991 5496 4906 1213 5114 4402 5878 3406


9345 11487 6119 9516 9284
8/30/2022 8/31/2022
FUEL FUEL
DAY NIGHT DAY NIGHT

89
95 134 131
145
40 114

158 92 132 146


177
58

136 91
87 107 151
128 142
108 158 147
195
159 127 141
101 104 120
179 150 121

177 91 200
156

140 102 197

61 121 164

66
213

54 250

215
119

334 2013 1383 2759

205 205
250 260

282 292 312


213 347
371 305 320 336
378 415 326 327
484 440 364
1688 1647 1515 1582

168 196

0 168 196 0

118 168 193 208

89
302 183 192 144
209 130 188 181
629 481 573 622

247

33

33 52

56
47
14 14
46
46

300
397

705

63

868 33 757 395

3519 4342 4424 5358


7861 9782 259,886

,
BERIKUT TREND DT YANG OPERASI PERSHIFT DI B
TANGGAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14

21 21 20 21 20 20 16 20 18 18 21 21 21 18
SHIFT 1 RFU
17 16 17 18 12 18 15 17 15 16 19 19 15 16
20 22 20 0 17 19 19 17 19 16 16 20 16 18
SHIFT 2 RFU
18 15 11 0 14 18 17 14 13 13 12 19 15 15
RASI PERSHIFT DI BULAN AGUSTUS 2022
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

19 19 0 17 14 19 18 20 20 19 18 20 19 16 17 17 15
10 15 0 15 7 6 13 16 15 17 15 15 14 15 16 9 12
18 16 17 0 17 16 0 20 0 15 18 21 17 18 17 18 18
11 14 12 0 17 5 0 18 0 13 14 16 17 17 15 16 12