Vous êtes sur la page 1sur 9

Projet de deuxième terminal à conteneurs CIT Abdjian Disposition de programme classique 03-Oct-20 00:57

Identifiant d'activité Nom de l'activité Original Restant Début Terminer Schedule % Total Float020 2021 2022
Duré e Duré e Complete t
Juil Aoû t Sep Oct Nov Dec Jan Feb Mar Avr Mai Juin Juil Aoû t Sep Oct Nov Dec Jan Feb Mar Avr Mai Juin Juil Aoû t Sep

CIT-1 CIT
CIT-1 CIT Abdjian
Projet desecond
deuxiè me
container
terminal
terminal
à conteneurs
projectd'Abdjian 701 701 04-Aoû t-20 06-Jul-22 0% -2 06-Jul-22, CIT-1 CIT Ab

CIT-1.1 Signature
ract sign
du Contrat 0 0 04-Aug-20 04-Aug-20 0% -2 04-Aug-20, CIT-1.1 Signature du Contrat

CIT-1.1.1 Signature
tract sign
du contrat 0 0 04-Aoû t-20 04-Aoû t-20 0% -2 04-Aug-20, CIT-1.1.1 Signature du Contrat
A1000 Signature et dé but du contrat 0 0 04-Aoû t-20* 04-Aoû t-20 0% -2 Signature et dé but du contrat

CIT-1.2 Remise
verdu
ofsite
sitepar
by employer
l'employeur
to contractor
à l'entrepreneur 31 31 04-Aoû t-20 04-Sep-20 0% -1 04-Sep-20, CIT-1.2 Remise du site par l'employeur à l'entrepreneur

A1010 Site de remise 15 15 04-Aoû t-20 19-Aoû t-20 0% -1 Site de remise


A1020 Dé livrer un certificat de permis d'entré e 7 7 04-Aoû t-20 11-Aoû t-20 0% 7 Dé livrer un certificat de permis d'entré e
A1030 Manipulation du permis d'entré e au port 16 16 19-Aoû t-20 04-Sep-20 0% -1 Manipulation du permis d'entré e au port

CIT-1.3 Pré liminaires


minaries 695 695 04-Aoû t-20 30-Juin-22 0% 3 30-Jun-22, CIT-1.3 Prelim

CIT-1.3.1 Bons 60 60 04-Aoû t-20 03-Oct-20 0% 639 03-Oct-20, CIT-1.3.1 Bons


A1040 Garantie de bon exé cution 60 60 04-Aoû t-20 03-Oct-20 0% 639 Garantie de bon exé cution
A1050 Caution pour paiement anticipé 42 42 04-Aoû t-20 15-Sep-20 0% 657 Caution pour paiement anticipé
CIT-1.3.2 Assurances
urances 60 60 04-Aoû t-20 03-Oct-20 0% 639 03-Oct-20, CIT-1.3.2 Assurances
A1060 Assurance des travaux 60 60 04-Aoû t-20 03-Oct-20 0% 639 Assurance des travaux
A1070 Assurance responsabilité professionnelle 60 60 04-Aoû t-20 03-Oct-20 0% 639 Assurance responsabilité professionnelle
A1080 Assurance au tiers 60 60 04-Aoû t-20 03-Oct-20 0% 639 Assurance au tiers
A1090 Rémuné ration des ouvriers / vé hicule à moteur 60 60 04-Aoû t-20 03-Oct-20 0% 639 Ré muné ration des ouvriers / vé hicule à moteur
CIT-1.3.3 Programme
ramme 695 695 04-Aoû t-20 30-Juin-22 0% 4 30-Jun-22, CIT-1.3.3 Prog
A1100 Primevera P6 - initiale 30 30 04-Aoû t-20 03-Sep-20 0% 4 Primevera P6 - initiale
A1110 Primevera P6 - mensuel 665 665 03-Sep-20 30-Juin-22 0% 4 Primevera P6 - mensuel
CIT-1.3.4 Conception
ign 118 118 04-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4 Conception
CIT-1.3.4.1 Conception
esign basicde base 40 40 04-Aoû t-20 13-Sep-20 0% 659 13-Sep-20, CIT-1.3.4.1 Conception de base
A1120 Pré parer et soumettre la conception (version anglaise et française) 7 7 04-Aoû t-20 11-Aoû t-20 0% -2 Pré parer et soumettre la conception (version anglaise et française)
A1130 Avis et commentaires de l'employeur 14 14 11-Aoû t-20 25-Aug-20 0% -2 Avis et commentaires de l'employeur
A1140 Ré pondre au commentaire et resoumettre (version anglaise) 5 5 25-Aoû t-20 30-Aoû t-20 0% -2 Ré pondre au commentaire et resoumettre (version anglaise)
A1150 Approbation par l'ingé nieur et le client 7 7 30-Aoû t-20 06-Sep-20 0% -2 Approbation par l'ingé nieur et le client
A1160 Soumettre la conception approuvé e (version française) 7 7 06-Sep-20 13-Sep-20 0% 659 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2 Conception
etail d esign
dé taillé e 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2 Conception dé taillé e
CIT-1.3.4.2.1
.1 Disposition
General layoutgénérale 72 72 11-Aoû t-20 22-Oct-20 0% 620 22-Oct-20, CIT-1.3.4.2.1 Disposition gé né rale
A1170 Pré parer et soumettre le design (version anglaise et française) 30 30 11-Aoû t-20 10-Sep-20 0% 41 Pré parer et soumettre le design (version anglaise et française)
A1180 Avis et commentaires de l'employeur 14 14 10-Sep-20 24-Sep-20 0% 41 Avis et commentaires de l'employeur
A1190 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise) 7 7 24-Sep-20 01-Oct-20 0% 41 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1200 Approbation par l'ingé nieur et le client 7 7 01-Oct-20 08-Oct-20 0% 41 Approbation par l'ingé nieur et le client
A1210 Soumettre la conception approuvé e (version française) 14 14 08-Oct-20 22-Oct-20 0% 620 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.2
.2 Système
Fire fighting
de lutte
system
contre l'incendie 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.2 Système de lutte contre l'incendie
A1220 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et français
A1230 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur
A1240 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise) 7 7 03-Nov-20 10-Nov-20 0% -1 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1250 Approbation par l'ingé nieur et le client 7 7 09-Nov-20 16-Nov-20* 0% 0 Approbation par l'ingé nieur et le client
A1260 Soumettre la conception approuvé e (version française) 14 14 16-Nov-20 30-Nov-20 0% 581 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.3
.3 Approvisionnement
Potab le wat er supplyen eau pottable 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.3 Approvisionnement en eau pottable
A1270 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et française
A1280 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur
A1290 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise) 7 7 03-Nov-20 10-Nov-20 0% -1 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1300 Approbation par l'ingé nieur et le client 7 7 09-Nov-20 16-Nov-20* 0% 0 Approbation par l'ingé nieur et le client
A1310 Soumettre la conception approuvé e (version française) 14 14 16-Nov-20 30-Nov-20 0% 581 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.4 Drainage des eaux usé es 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.4 Drainage des eaux usé es
A1320 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et française
A1330 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur
A1340 Respond Comment & Resubmit (English Version) 7 7 03-Nov-20 10-Nov-20 0% -1 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1350 Approbation par l'ingé nieur et le client 7 7 09-Nov-20 16-Nov-20* 0% 0 Approbation par l'ingé nieur et le client
A1360 Soumettre la conception approuvé e (version française) 14 14 16-Nov-20 30-Nov-20 0% 581 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.5
.5 Drainage
Surface water
des eaux
drainage
de surface 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.5 Drainage des eaux de surface
A1370 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et française
A1380 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur
A1390 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise) 7 7 03-Nov-20 10-Nov-20 0% -1 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1400 Approbation par l'ingé nieur et le client 7 7 09-Nov-20 16-Nov-20* 0% 0 Approbation par l'ingé nieur et le client
A1410 Soumettre la conception approuvé e (version française) 14 14 16-Nov-20 30-Nov-20 0% 581 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.6
.6 Eletrical works 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.6 Eletrical works
A1420 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et française
A1430 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur
A1440 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise) 7 7 03-Nov-20 10-Nov-20 0% -1 Ré pondre aux commentaires et les soumettre à nouveau (version anglaise)
A1450 Approbation par l'ingé nieur et le client 7 7 09-Nov-20 16-Nov-20* 0% 0 Approbation par l'ingé nieur et le client
A1460 Soumettre la conception approuvé e (version française) 14 14 16-Nov-20 30-Nov-20 0% 581 Soumettre la conception approuvé e (version française)
CIT-1.3.4.2.7
.7 Information and communication infrastructure 111 111 11-Aoû t-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.7 Informationand communicationinfrastructure
A1470 Pré parer et soumettre le design (version anglaise et française) 70 70 11-Aoû t-20 20-Oct-20 0% -1 Pré parer et soumettre le design (version anglaise et française)
A1480 Avis et commentaires de l'employeur 14 14 20-Oct-20 03-Nov-20 0% -1 Avis et commentaires de l'employeur

Actual Level of Effort Remaining Work Page 1 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A1490 Respond Comment & Resubmit (English Version) 7 7 03-Nov-20 10-Nov-20 0% -1 Respond Comment & Resubmit (English Version)
A1500 Engineer&Client Approve 7 7 09-Nov-20 16-Nov-20* 0% 0 Engineer&Client Approve
A1510 Submit Approved Design (French Version) 14 14 16-Nov-20 30-Nov-20 0% 581 Submit Approved Design (French Version)
CIT-1.3.4.2.8 STS crane landward support 111 111 11-Aug-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.8 STS crane landward support
A1520 Prepare & Submit Design (English and French Version) 70 70 11-Aug-20 20-Oct-20 0% -1 Prepare & Submit Design (English and French Version)
A1530 Employer Review & Comment 14 14 20-Oct-20 03-Nov-20 0% -1 Employer Review & Comment
A1540 Respond Comment & Resubmit (English Version) 7 7 03-Nov-20 10-Nov-20 0% -1 Respond Comment & Resubmit (English Version)
A1550 Engineer&Client Approve 7 7 09-Nov-20 16-Nov-20* 0% 0 Engineer&Client Approve
A1560 Submit Approved Design (French Version) 14 14 16-Nov-20 30-Nov-20 0% 581 Submit Approved Design (French Version)
CIT-1.3.4.2.9 Road and pavement 111 111 11-Aug-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.9 Road and pavement
A1570 Prepare & Submit Design (English and French Version) 70 70 11-Aug-20 20-Oct-20 0% -1 Prepare & Submit Design (English and French Version)
A1580 Employer Review & Comment 14 14 20-Oct-20 03-Nov-20 0% -1 Employer Review & Comment
A1590 Respond Comment & Resubmit (English Version) 7 7 03-Nov-20 10-Nov-20 0% -1 Respond Comment & Resubmit (English Version)
A1600 Engineer&Client Approve 7 7 09-Nov-20 16-Nov-20* 0% 0 Engineer&Client Approve
A1610 Submit Approved Design (French Version) 14 14 16-Nov-20 30-Nov-20 0% 581 Submit Approved Design (French Version)
CIT-1.3.4.2.10 Civil works 111 111 11-Aug-20 30-Nov-20 0% 581 30-Nov-20, CIT-1.3.4.2.10 Civil works
A1620 Prepare & Submit Design (English and French Version) 70 70 11-Aug-20 20-Oct-20 0% -1 Prepare & Submit Design (English and French Version)
A1630 Employer Review & Comment 14 14 20-Oct-20 03-Nov-20 0% -1 Employer Review & Comment
A1640 Respond Comment & Resubmit (English Version) 7 7 03-Nov-20 10-Nov-20 0% -1 Respond Comment & Resubmit (English Version)
A1650 Engineer&Client Approve 7 7 09-Nov-20 16-Nov-20* 0% 0 Engineer&Client Approve
A1660 Submit Approved Design (French Version) 14 14 16-Nov-20 30-Nov-20 0% 581 Submit Approved Design (French Version)
CIT-1.3.5 Q uality Assurance/Control 668 668 05-Aug-20 04-Jun-22 0% 30 04-Jun-22, CIT-1.3.5 Quality Assurance/Control
A1670 QA/QC Plan 28 28 05-Aug-20 02-Sep-20 0% 30 QA/QC Plan
A1680 QA/QC Plan Monthly updates 640 640 02-Sep-20 04-Jun-22 0% 30 QA/QC Plan Monthly updates
A1690 Testing of the materials 640 640 02-Sep-20 04-Jun-22 0% 30 Testing of the materials
A1700 Testing of the works 640 640 02-Sep-20 04-Jun-22 0% 30 Testing of the works
A1710 Factory acceptance testing 640 640 02-Sep-20 04-Jun-22 0% 30 Factory acceptance testing
A1720 Testing and commissioning 640 640 02-Sep-20 04-Jun-22 0% 30 Testing and commissioning
CIT-1.3.6 HSSE 28 28 05-Aug-20 02-Sep-20 0% 77 02-Sep-20, CIT-1.3.6 HSSE
A1730 Health & Safety Plan 28 28 05-Aug-20 02-Sep-20 0% 77 Health & Safety Plan
A1740 Environmental Plan 28 28 05-Aug-20 02-Sep-20 0% 77 Environmental Plan
A1750 Road Traffic Management Plan 28 28 05-Aug-20 02-Sep-20 0% 77 Road Traffic Management Plan
A1760 Site Waste Management Plan 28 28 05-Aug-20 02-Sep-20 0% 77 Site Waste Management Plan
A1770 CSR Plan/initiatives 28 28 05-Aug-20 02-Sep-20 0% 77 CSR Plan/initiatives
CIT-1.3.7 Project Execution Plan 60 60 04-Aug-20 03-Oct-20 0% 46 03-Oct-20, CIT-1.3.7 Project Execution Plan
A1780 Project Execution Plan / Method Statement 28 28 05-Aug-20 02-Sep-20 0% 77 Project Execution Plan / Method Statement
A1790 Procurement Plan 60 60 04-Aug-20 03-Oct-20 0% 46 Procurement Plan
A1800 Machinery & Equipment Plan 28 28 05-Aug-20 02-Sep-20 0% 77 Machinery & Equipment Plan
A1810 Quarry Permits/Set-up 28 28 05-Aug-20 02-Sep-20 0% 77 Quarry Permits/Set-up
CIT-1.3.8 Progress Rpor ts 28 28 05-Aug-20 02-Sep-20 0% 670 02-Sep-20, CIT-1.3.8 Progress Rports
A1820 Monthly Progress reports 28 28 05-Aug-20 02-Sep-20 0% 670 Monthly Progress reports
A1830 Weekly Progress reports 28 28 05-Aug-20 02-Sep-20 0% 670 Weekly Progress reports
A1840 Daily Progress reports 28 28 05-Aug-20 02-Sep-20 0% 670 Daily Progress reports
A1850 Daily Site Photos / Drone coverage / videos 28 28 05-Aug-20 02-Sep-20 0% 670 Daily Site Photos / Drone coverage / videos
CIT-1.3.9 Accommodation for the Employer 665 665 03-Sep-20 30-Jun-22 0% 3 30-Jun-22, CIT-1.3.9 Accommodation for the Em
A1860 Establishment of Offices 93 93 03-Sep-20 05-Dec-20* 0% 0 Establishment of Offices
A1870 Maintenance of Offices 540 540 06-Dec-20 30-May-22 0% 3 Maintenance of Offices
A1880 Removal of Offices 30 30 31-May-22 30-Jun-22 0% 3 Removal of Offices
CIT-1.3.10 Accommodation for the Engineer 665 665 03-Sep-20 30-Jun-22 0% 3 30-Jun-22, CIT-1.3.10 Accommodation for the E
A1890 Establishment of Offices 93 93 03-Sep-20 05-Dec-20* 0% 0 Establishment of Offices
A1900 Maintenance of Offices 540 540 06-Dec-20 30-May-22 0% 3 Maintenance of Offices
A1910 Removal of Offices 30 30 31-May-22 30-Jun-22 0% 3 Removal of Offices
CIT-1.3.11 Laboratory for the Engineer 665 665 03-Sep-20 30-Jun-22 0% 3 30-Jun-22, CIT-1.3.11 Laboratory for the Engin e
A1920 Establishment of Laboratory incl. equipment 93 93 03-Sep-20 05-Dec-20* 0% 0 Establishment of Laboratory incl. equipment
A1930 Maintenance of Laboratories 540 540 06-Dec-20 30-May-22 0% 3 Maintenance of Laboratories
A1940 Removal of Laboratories 30 30 31-May-22 30-Jun-22 0% 3 Removal of Laboratories
CIT-1.3.12 Services for the Enginee r 661 661 03-Sep-20 26-Jun-22 0% 8 26-Jun-22, CIT-1.3.12 Services for the Engineer
A1950 Provision of transport vehicles 90 90 03-Sep-20 02-Dec-20 0% 8 Provision of transport vehicles
A1960 Maintenance of transport vehicles 570 570 03-Dec-20 26-Jun-22 0% 8 Maintenance of transport vehicles
CIT-1.3.13 Equipment for the use by the Engineer 570 570 06-Dec-20 29-Jun-22 0% 5 29-Jun-22, CIT-1.3.13 Equipment for the use by
A1970 Provision of survey equipment 90 90 06-Dec-20 06-Mar-21 0% 5 Provision of survey equipment
A1980 Maintenance of survey equipment 480 480 06-Mar-21 29-Jun-22 0% 5 Maintenance of survey equipment
A1990 Provision of camera 90 90 06-Dec-20 06-Mar-21 0% 485 Provision of camera
CIT-1.3.14 Attendance upon the contract administration 60 60 07-Sep-20 06-Nov-20 0% 605 06-Nov-20, CIT-1.3.14 Attendance upon the contract administration
A2000 Survey Equipment 30 30 07-Sep-20 07-Oct-20 0% 605 Survey Equipment
A2010 Survey Team 30 30 07-Sep-20 07-Oct-20 0% 605 Survey Team
A2020 Vehicle for Survey Team 30 30 07-Oct-20 06-Nov-20 0% 605 Vehicle for Survey Team

Actual Level of Effort Remaining Work Page 2 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
CIT-1.3.15 Contractor's Offices & Facilities 664 664 04-Sep-20 30-Jun-22 0% 4 30-Jun-22, CIT-1.3.15 Contractor's Offices & Fa
A2030 Establishment of Site offices 93 93 04-Sep-20 06-Dec-20* 0% 0 Establishment of Site offices
A2040 Establishment of Laydown/Workshop Area 154 154 04-Sep-20 05-Feb-21* 0% 0 Establishment of Laydown/Workshop Area
A2050 Establishment of Precast Facility 154 154 04-Sep-20 05-Feb-21* 0% 0 Establishment of Precast Facility
A2060 Establishment of Batch Plant(s) 154 154 04-Sep-20 05-Feb-21* 0% 0 Establishment of Batch Plant(s)
A2070 Maintenance of Site Offices 510 510 06-Dec-20 30-Apr-22 0% 35 Maintenance of Site Offices
A2080 Maintenance of Laydown/Workshop Area 480 480 05-Feb-21 31-May-22 0% 4 Maintenance of Laydown/Workshop Area
A2090 Maintenance of Precast Facility 480 480 05-Feb-21 31-May-22 0% 4 Maintenance of Precast Facility
A2100 Maintenance of Batch Plant(s) 480 480 05-Feb-21 31-May-22 0% 4 Maintenance of Batch Plant(s)
A2110 Removal of Site offices 30 30 30-Apr-22 30-May-22 0% 35 Removal of Site offices
A2120 Removal of Laydown/Workshop Area 30 30 31-May-22 30-Jun-22 0% 4 Removal of Laydown/Workshop Area
A2130 Removal of Precast Facility 30 30 31-May-22 30-Jun-22 0% 4 Removal of Precast Facility
A2140 Removal of Batch Plant(s) 30 30 31-May-22 30-Jun-22 0% 4 Removal of Batch Plant(s)
CIT-1.3.16 Temporar y work s 60 60 04-Sep-20 03-Nov-20 0% 14 03-Nov-20, CIT-1.3.16 Temporary works
A2150 Traffic diversions 60 60 04-Sep-20 03-Nov-20 0% 14 Traffic diversions
A2160 Temporary Utility connections for Site Installations 60 60 04-Sep-20 03-Nov-20 0% 14 Temporary Utility connections for Site Installations
A2170 Access roads 60 60 04-Sep-20 03-Nov-20 0% 14 Access roads
CIT-1.3.17 Services 60 60 04-Sep-20 03-Nov-20 0% 14 03-Nov-20, CIT-1.3.17 Services
A2180 Electricity 60 60 04-Sep-20 03-Nov-20 0% 14 Electricity
A2190 Water 60 60 04-Sep-20 03-Nov-20 0% 14 Water
A2200 Security 60 60 04-Sep-20 03-Nov-20 0% 14 Security
A2210 Hoarding 60 60 04-Sep-20 03-Nov-20 0% 14 Hoarding
A2220 Site transport 60 60 04-Sep-20 03-Nov-20 0% 14 Site transport
CIT-1.3.18 Contractor's Site Managem ent & Supervision 690 690 04-Aug-20 25-Jun-22 0% 9 25-Jun-22, CIT-1.3.18 Contractor's Site Managem
A2230 Mobilisation 60 60 04-Aug-20 03-Oct-20 0% 9 Mobilisation
A2240 Monthly Costs 570 570 03-Oct-20 26-Apr-22 0% 9 Monthly Costs
A2250 De-mobilisation 60 60 26-Apr-22 25-Jun-22 0% 9 De-mobilisation

CIT-1.4 Preparation of Construction 336 336 04-Aug-20 06-Jul-21 0% 363 06-Jul-21, CIT-1.4 Preparation of Construction

CIT-1.4.1 Mobilization of Manpower 90 90 04-Aug-20 02-Nov-20 0% 16 02-Nov-20, CIT-1.4.1 Mobilization of Manpower


A2260 Mobilization of Management 60 60 04-Aug-20 03-Oct-20 0% 46 Mobilization of Management
A2270 Mobilization of Technical worker 90 90 04-Aug-20 02-Nov-20 0% 16 Mobilization of Technical worker
CIT-1.4.2 Mobilization of Equipment 124 124 04-Aug-20 06-Dec-20 0% 66 06-Dec-20, CIT-1.4.2 Mobilization of Equipment
A2280 Mobilization of Equipment(Local dispatc) 60 60 04-Aug-20 03-Oct-20 0% 46 Mobilization of Equipment (Local dispatc)
A2290 Mobilization of Equipment(Overseas dispatc) 124 124 04-Aug-20 06-Dec-20 0% 66 Mobilization of Equipment (Overseas dispatc)
CIT-1.4.3 Mobilization of Materials 336 336 04-Aug-20 06-Jul-21 0% 363 06-Jul-21, CIT-1.4.3 Mobilization of Materials
CIT-1.4.3.1 Construction materials 90 90 04-Aug-20 02-Nov-20 0% 16 02-Nov-20, CIT-1.4.3.1 Const ruction materials
A2300 Construction materials 90 90 04-Aug-20 02-Nov-20 0% 16 Construction materials
CIT-1.4.3.2 Materials for structures 108 108 04-Aug-20 20-Nov-20 0% -2 20-Nov-20, CIT-1.4.3.2 Mater ials for structures
A2310 Application for approval of Major Material 14 14 04-Aug-20 18-Aug-20 0% -2 Application for approval of Major Material
A2320 Engineer & Client approv the Major Material 14 14 18-Aug-20 01-Sep-20 0% -2 Engineer & Client approv the Major Material
A2330 Materials for strucures 80 80 01-Sep-20 20-Nov-20 0% -2 Materials for strucures
CIT-1.4.3.3 Electrical equipment 303 303 06-Sep-20 06-Jul-21 0% 363 06-Jul-21, CIT-1.4.3.3 Electrical equipment
A2340 Bid inviting for electrical equipment 15 15 06-Sep-20 21-Sep-20 0% -2 Bid inviting for electrical equipment
A2350 Application for approval of manufacrurer qualification 15 15 21-Sep-20 06-Oct-20 0% -2 Application for approval of manufacrurer qualification
A2360 Detail design from manufacturer 61 61 06-Oct-20 06-Dec-20 0% -2 Detail design from manufacturer
A2370 Engineer & Client approve the detail design 92 92 06-Nov-20 06-Feb-21 0% -2 Engineer & Client approve the detail design
A2380 Comfirm and sign the purchase order 62 62 06-Dec-20 06-Feb-21 0% 513 Comfirm and sign the purchase order
A2390 Manufacture for the eletrical equipment 151 151 06-Dec-20 06-May-21 0% -2 Manufacture for the eletrical equipment
A2400 Transportation for the eletrical equipment 50 50 06-May-21 25-Jun-21 0% -2 Transportation for the eletrical equipment
A2410 Customs clearance for the eletrical equipment 11 11 25-Jun-21 06-Jul-21 0% -2 Customs clearance for the eletrical equipment
CIT-1.4.4 Survey control network 90 90 04-Aug-20 02-Nov-20 0% 16 02-Nov-20, CIT-1.4.4 Survey control network
A2420 CIT handover benchmark to contractor 30 30 04-Aug-20 03-Sep-20 0% 16 CIT handover benchmark to contractor
A2430 Layout of survey control network 60 60 03-Sep-20 02-Nov-20 0% 16 Layout of survey control network
CIT-1.4.5 Concrete and CB GM mix design 59 59 04-Aug-20 02-Oct-20 0% 47 02-Oct-20, CIT-1.4.5 Concrete and CBGM mix design
A2440 Application for approval of Concrete and CBGM mix design 45 45 04-Aug-20 18-Sep-20 0% 47 Application for approval of Concrete and CBGM mix design
A2450 Engineer & Client approv Concrete and CBGM mix design 14 14 18-Sep-20 02-Oct-20 0% 47 Engineer & Client approv Concrete and CBGM mix design
CIT-1.5 Construction on site 583 583 20-Nov-20 26-Jun-22 0% 8 26-Jun-22, CIT-1.5 Construction on site

CIT-1.5.1 Start work on site 0 0 20-Nov-20 20-Nov-20 0% -2 20-Nov-20, CIT-1.5.1 Start work on site
A5910 Start work on site 0 0 20-Nov-20 20-Nov-20 0% -2 Start work on site
CIT-1.5.2 Compone nt prefa brication 436 436 20-Nov-20 30-Jan-22 0% 155 30-Jan-22, CIT-1. 5.2 Component prefabrication
A2460 Prefabrication of inspection well and valve well 182 182 20-Nov-20 21-May-21 0% -2 Prefabrication of inspection well and valve well
A2470 Prefabrication of concrete blocks 390 390 05-Jan-21 30-Jan-22 0% 84 Prefabrication of concrete blocks
A2480 Prefabrication of curbs 62 62 05-Jan-21 08-Mar-21 0% 483 Prefabrication of curbs
CIT-1.5.3 STS Er ection area 276 276 20-Nov-20 23-Aug-21 0% 315 23-Aug-21, CIT-1.5.3 STS Erection area
CIT-1.5.3.1 Surface water darinage 51 51 20-Nov-20 10-Jan-21 0% 540 10-Jan-21, CIT-1.5.3.1 Surface water darinage
A2490 Foundation trench excavation of Box Culvert 38 38 20-Nov-20 28-Dec-20 0% 78 Foundation trench excavation of Box Culvert
A2500 Crush rock sub-base 38 38 21-Nov-20 29-Dec-20 0% 78 Crush rock sub-base

Actual Level of Effort Remaining Work Page 3 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A2510 Cast in situ lean concrete 38 38 22-Nov-20 30-Dec-20 0% 78 Cast in situ lean concrete
A2520 Construction of Box Culvert 38 38 23-Nov-20 31-Dec-20 0% 78 Construction of Box Culvert
A2530 Foundation trench excavation of Slot Drainage 48 48 20-Nov-20 07-Jan-21 0% 72 Foundation trench excavation of Slot Drainage
A2540 Crush rock sub-base 48 48 21-Nov-20 08-Jan-21 0% 72 Crush rock sub-base
A2550 Cast in situ lean concrete 48 48 22-Nov-20 09-Jan-21 0% 72 Cast in situ lean concrete
A2560 Construction of Slot Drainage 48 48 23-Nov-20 10-Jan-21 0% 72 Construction of Slot Drainage
A2570 Construction of Manhole 33 33 20-Nov-20 23-Dec-20 0% 547 Construction of Manhole
A2580 Installation of Concrete pipe 33 33 27-Nov-20 30-Dec-20 0% 547 Installation of Concrete pipe
A2590 Encased concrete 22 22 12-Dec-20 03-Jan-21 0% 547 Encased concrete
A2600 Installation of By-pass oil separator 22 22 20-Nov-20 12-Dec-20 0% 562 Installation of By-pass oil separator
A2610 Encased concrete 22 22 27-Nov-20 19-Dec-20 0% 562 Encased concrete
CIT-1.5.3.2 Fire fighting system 53 53 20-Nov-20 12-Jan-21 0% -2 12-Jan-21, CIT-1. 5.3.2 Fire fighting system
A2620 Excavation of manhole trench 18 18 20-Nov-20 08-Dec-20 0% 25 Excavation of manhole trench
A2630 Laying of crushed rock 18 18 21-Nov-20 09-Dec-20 0% 25 Laying of crushed rock
A2640 Cast in situ lean concrete 18 18 22-Nov-20 10-Dec-20 0% 25 Cast in situ lean concrete
A2650 Installation of manhole 18 18 20-Dec-20 07-Jan-21 0% -2 Installation of manhole
A2660 Excavation of pipe trench 18 18 21-Dec-20 08-Jan-21 0% -2 Excavation of pipe trench
A2670 Pipeline Laying 18 18 22-Dec-20 09-Jan-21 0% -2 Pipeline Laying
A2680 Installation of Valve and D.I covers 18 18 23-Dec-20 10-Jan-21 0% -2 Installation of Valve and D.I covers
A2690 Pipe pressure test 18 18 24-Dec-20 11-Jan-21 0% -2 Pipe pressure test
A2700 Pipe ditch backfill 18 18 25-Dec-20 12-Jan-21 0% -2 Pipe ditch backfill
CIT-1.5.3.3 Potable water supp ly 16 16 13-Jan-21 29-Jan-21 0% -2 29-Jan-21, CIT-1.5.3.3 Potable water supply
A2710 Excavation of manhole trench 8 8 13-Jan-21 21-Jan-21 0% -2 Excavation of manhole trench
A2720 Laying of crushed rock 8 8 14-Jan-21 22-Jan-21 0% -2 Laying of crushed rock
A2730 Cast in situ lean concrete 8 8 15-Jan-21 23-Jan-21 0% -2 Cast in situ lean concrete
A2740 Installation of manhole 8 8 16-Jan-21 24-Jan-21 0% -2 Installation of manhole
A2750 Excavation of pipe trench 8 8 17-Jan-21 25-Jan-21 0% -2 Excavation of pipe trench
A2760 Pipeline Laying 8 8 18-Jan-21 26-Jan-21 0% -2 Pipeline Laying
A2770 Installation of Valve and D.I covers 8 8 19-Jan-21 27-Jan-21 0% -2 Installation of Valve and D.I covers
A2780 Pipe pressure test 8 8 20-Jan-21 28-Jan-21 0% -2 Pipe pressure test
A2790 Pipe ditch backfill 8 8 21-Jan-21 29-Jan-21 0% -2 Pipe ditch backfill
CIT-1.5.3.4 Electrical works 142 142 20-Nov-20 11-Apr-21 0% 449 11-Apr-21, CIT-1.5.3.4 Elect rical works
A2800 Excavation of manhole trench 31 31 20-Nov-20 21-Dec-20 0% -2 Excavation of manhole trench
A2810 Installation of manhole 31 31 21-Nov-20 22-Dec-20 0% -2 Installation of manhole
A2820 Excavation of pipe trench 31 31 22-Nov-20 23-Dec-20 0% -2 Excavation of pipe trench
A2830 Duct Pipe Laying 31 31 23-Nov-20 24-Dec-20 0% -2 Duct Pipe Laying
A2840 Pipe ditch backfill 31 31 24-Nov-20 25-Dec-20 0% -2 Pipe ditch backfill
A2850 Cable laying 15 15 25-Mar-21 09-Apr-21 0% 32 Cable laying
A2860 Cable Joint & Terminal 2 2 09-Apr-21 11-Apr-21 0% 449 Cable Joint & Terminal
A2870 Cast in-situ Reinforcement foundation of High lighting mast 31 31 20-Nov-20 21-Dec-20 0% 188 Cast in-situ Reinforcement foundation of High lighting mast
CIT-1.5.3.5 Information and communication infrastructure 134 134 20-Nov-20 03-Apr-21 0% 425 03-Apr-21, CIT-1.5.3.5 Information and communication infrastructur e
A2880 Excavation of manhole trench 31 31 20-Nov-20 21-Dec-20 0% 367 Excavation of manhole trench
A2890 Installation of manhole 31 31 21-Nov-20 22-Dec-20 0% 367 Installation of manhole
A2900 Excavation of pipe trench 31 31 22-Nov-20 23-Dec-20 0% 367 Excavation of pipe trench
A2910 Duct Pipe Laying 31 31 23-Nov-20 24-Dec-20 0% 367 Duct Pipe Laying
A2920 Cable laying 10 10 24-Mar-21 03-Apr-21 0% 425 Cable laying
A2930 Cast in-situ Reinforcement foundation of Camera Pole 31 31 20-Nov-20 21-Dec-20 0% 421 Cast in-situ Reinforcement foundation of Camera Pole
CIT-1.5.3.6 STS crane landward support 119 119 06-Dec-20 04-Apr-21 0% 394 04-Apr-21, CIT-1.5.3.6 STS crane landward support
CIT-1.5.3.6.1 Pile test 56 56 06-Dec-20 31-Jan-21 0% 66 31-Jan-21, CIT-1.5.3.6.1 Pile test
A2940 Test pile construction 28 28 06-Dec-20 03-Jan-21 0% 66 Test pile construction
A2950 Static load test 14 14 03-Jan-21 17-Jan-21 0% 66 Static load test
A2960 Test pile approval by engineer 14 14 17-Jan-21 31-Jan-21 0% 66 Test pile approval by engineer
CIT-1.5.3.6.2 Const ructio n of Piles 37 37 31-Jan-21 09-Mar-21 0% 66 09-Mar-21, CIT-1.5.3.6.2 Construction of Piles
A2970 Bored pile drilling 36 36 31-Jan-21 08-Mar-21 0% 66 Bored pile drilling
A2980 Fabrication and installation of reinforcement cage 36 36 01-Feb-21 09-Mar-21 0% 66 Fabrication and installation of reinforcement cage
A2990 Concrete pouring of Piles 36 36 01-Feb-21 09-Mar-21 0% 66 Concrete pouring of Piles
CIT-1.5.3.6.3 Crane Rail Beam 41 41 22-Feb-21 04-Apr-21 0% 394 04-Apr-21, CIT-1.5.3.6.3 Crane Rail Beam
A3000 Excavation of foundation trench 36 36 22-Feb-21 30-Mar-21 0% 66 Excavation of foundation trench
A3010 Concrete pile head chiseling 36 36 23-Feb-21 31-Mar-21 0% 66 Concrete pile head chiseling
A3020 Pile integrity test 36 36 24-Feb-21 01-Apr-21 0% 66 Pile integrity test
A3030 Cast in situ lean concrete 36 36 25-Feb-21 02-Apr-21 0% 66 Cast in situ lean concrete
A3040 Concrete of Crane Rail Beam 36 36 26-Feb-21 03-Apr-21 0% 66 Concrete of Crane Rail Beam
A3050 Installation of Crane Rail 36 36 27-Feb-21 04-Apr-21 0% 394 Installation of Crane Rail
CIT-1.5.3.7 Road and pavement 133 133 05-Apr-21 16-Aug-21 0% 3 16-Aug-21, CIT-1.5.3.7 Road and pavement
A3060 CBGM Placement 22 22 10-Jul-21 01-Aug-21 0% -2 CBGM Placement
A3070 Installation of CURBS 22 22 24-Jul-21 15-Aug-21 0% 3 Installation of CURBS
A3080 Sand Bedding 22 22 24-Jul-21 15-Aug-21 0% 3 Sand Bedding
A3090 Concrete blocks precast 22 22 05-Apr-21 27-Apr-21 0% 84 Concrete blocks precast

Actual Level of Effort Remaining Work Page 4 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A3100 Paving Block Placement 22 22 25-Jul-21 16-Aug-21 0% 3 Paving Block Placement
CIT-1.5.3.8 ZPMC access on site to erection STS crane 7 7 16-Aug-21 23-Aug-21 0% 315 23-Aug-21, CIT-1.5.3.8 ZPMC access on site to er ection STS crane
A5930 ZPMC access on site to erection STS crane 7 7 16-Aug-21 23-Aug-21 0% 315 ZPMC access on site to erection STS crane
CIT-1.5.4 Phase I s ection 2 302 302 20-Nov-20 18-Sep-21 0% 289 18-Sep-21, CIT-1.5.4 Phase I section 2
CIT-1.5.4.1 Surface water darinage 63 63 31-Dec-20 04-Mar-21 0% 72 04-Mar-21, CIT-1.5.4.1 Surface water darinage
A3110 Foundation trench excavation of Box Culvert 32 32 31-Dec-20 01-Feb-21 0% 78 Foundation trench excavation of Box Culvert
A3120 Crush rock sub-base 32 32 01-Jan-21 02-Feb-21 0% 78 Crush rock sub-base
A3130 Cast in situ lean concrete 32 32 02-Jan-21 03-Feb-21 0% 78 Cast in situ lean concrete
A3140 Construction of Box Culvert 32 32 03-Jan-21 04-Feb-21 0% 78 Construction of Box Culvert
A3150 Foundation trench excavation of Slot Drainage 50 50 10-Jan-21 01-Mar-21 0% 72 Foundation trench excavation of Slot Drainage
A3160 Crush rock sub-base 50 50 11-Jan-21 02-Mar-21 0% 72 Crush rock sub-base
A3170 Cast in situ lean concrete 50 50 12-Jan-21 03-Mar-21 0% 72 Cast in situ lean concrete
A3180 Construction of Slot Drainage 50 50 13-Jan-21 04-Mar-21 0% 72 Construction of Slot Drainage
CIT-1.5.4.2 Fire fighting system 27 27 30-Jan-21 26-Feb-21 0% -2 26-Feb-21, CIT-1.5.4.2 Fir e fighting system
A3190 Excavation of manhole trench 19 19 30-Jan-21 18-Feb-21 0% -2 Excavation of manhole trench
A3200 Laying of crushed rock 19 19 31-Jan-21 19-Feb-21 0% -2 Laying of crushed rock
A3210 Cast in situ lean concrete 19 19 01-Feb-21 20-Feb-21 0% -2 Cast in situ lean concrete
A3220 Installation of manhole 19 19 02-Feb-21 21-Feb-21 0% -2 Installation of manhole
A3230 Excavation of pipe trench 19 19 03-Feb-21 22-Feb-21 0% -2 Excavation of pipe trench
A3240 Pipeline Laying 19 19 04-Feb-21 23-Feb-21 0% -2 Pipeline Laying
A3250 Installation of Valve and D.I covers 19 19 05-Feb-21 24-Feb-21 0% -2 Installation of Valve and D.I covers
A3260 Pipe pressure test 19 19 06-Feb-21 25-Feb-21 0% -2 Pipe pressure test
A3270 Pipe ditch backfill 19 19 07-Feb-21 26-Feb-21 0% -2 Pipe ditch backfill
CIT-1.5.4.3 Potable water supp ly 16 16 27-Feb-21 15-Mar-21 0% -2 15-Mar-21, CIT-1.5.4.3 Potable water supply
A3280 Excavation of manhole trench 8 8 27-Feb-21 07-Mar-21 0% -2 Excavation of manhole trench
A3290 Laying of crushed rock 8 8 28-Feb-21 08-Mar-21 0% -2 Laying of crushed rock
A3300 Cast in situ lean concrete 8 8 01-Mar-21 09-Mar-21 0% -2 Cast in situ lean concrete
A3310 Installation of manhole 8 8 02-Mar-21 10-Mar-21 0% -2 Installation of manhole
A3320 Excavation of pipe trench 8 8 03-Mar-21 11-Mar-21 0% -2 Excavation of pipe trench
A3330 Pipeline Laying 8 8 04-Mar-21 12-Mar-21 0% -2 Pipeline Laying
A3340 Installation of Fire Hydrant and D.I covers 8 8 05-Mar-21 13-Mar-21 0% -2 Installation of Fire Hydrant and D.I covers
A3350 Pipe pressure test 8 8 06-Mar-21 14-Mar-21 0% -2 Pipe pressure test
A3360 Pipe ditch backfill 8 8 07-Mar-21 15-Mar-21 0% -2 Pipe ditch backfill
CIT-1.5.4.4 Foul water drainage 13 13 20-Nov-20 03-Dec-20 0% 522 03-Dec-20, CIT-1.5.4.4 Foul water drainage
A3370 Excavation of manhole trench 7 7 20-Nov-20 27-Nov-20 0% 522 Excavation of manhole trench
A3380 Laying of crushed rock 7 7 21-Nov-20 28-Nov-20 0% 522 Laying of crushed rock
A3390 Cast in situ lean concrete 7 7 22-Nov-20 29-Nov-20 0% 522 Cast in situ lean concrete
A3400 Installation of manhole 7 7 23-Nov-20 30-Nov-20 0% 522 Installation of manhole
A3410 Excavation of pipe trench 7 7 24-Nov-20 01-Dec-20 0% 522 Excavation of pipe trench
A3420 Pipeline Laying 7 7 25-Nov-20 02-Dec-20 0% 522 Pipeline Laying
A3430 Installation of D.I covers 7 7 26-Nov-20 03-Dec-20 0% 522 Installation of D.I covers
CIT-1.5.4.5 Electrical works 132 132 21-Dec-20 02-May-21 0% 428 02-May-21, CIT-1.5.4.5 Electr ical works
A3440 Excavation of manhole trench 40 40 26-Dec-20 04-Feb-21 0% -2 Excavation of manhole trench
A3450 Installation of manhole 40 40 27-Dec-20 05-Feb-21 0% -2 Installation of manhole
A3460 Excavation of pipe trench 40 40 28-Dec-20 06-Feb-21 0% -2 Excavation of pipe trench
A3470 Duct Pipe Laying 40 40 29-Dec-20 07-Feb-21 0% -2 Duct Pipe Laying
A3480 Pipe ditch backfill 40 40 30-Dec-20 08-Feb-21 0% -2 Pipe ditch backfill
A3490 Cable laying 20 20 10-Apr-21 30-Apr-21 0% 32 Cable laying
A3500 Cable Joint & Terminal 2 2 30-Apr-21 02-May-21 0% 428 Cable Joint & Terminal
A3510 Cast in-situ Reinforcement foundation of High lighting mast 31 31 21-Dec-20 21-Jan-21 0% 188 Cast in-situ Reinforcement foundation of High lighting mast
CIT-1.5.4.6 Information and communication infrastructure 114 114 21-Dec-20 14-Apr-21 0% 446 14-Apr-21, CIT-1.5.4.6 Information and communication infrastructur e
A3520 Excavation of manhole trench 40 40 25-Dec-20 03-Feb-21 0% 367 Excavation of manhole trench
A3530 Installation of manhole 40 40 26-Dec-20 04-Feb-21 0% 367 Installation of manhole
A3540 Excavation of pipe trench 40 40 27-Dec-20 05-Feb-21 0% 367 Excavation of pipe trench
A3550 Duct Pipe Laying 40 40 28-Dec-20 06-Feb-21 0% 513 Duct Pipe Laying
A3560 Pose de câbles 10 10 04-Apr-21 14-Apr-21 0% 425 Cable laying
A3570 Pipe ditch backfill 40 40 28-Dec-20 06-Feb-21 0% 367 Pipe ditch backfill
A3580 Cast in-situ Renforcement de la fondation de Camera Pole 31 31 21-Dec-20 21-Jan-21 0% 421 Cast in-situ Reinforcement foundation of Camera Pole
CIT-1.5.4.7 STS crane landward support 93 93 09-Mar-21 10-Jun-21 0% 363 10-Jun-21, CIT-1. 5.4.7 STS crane landward support
CIT-1.5.4.7.1 Const ructio n of Piles 52 52 09-Mar-21 30-Apr-21 0% 363 30-Apr-21, CIT-1.5.4.7.1 Construction of Piles
A3590 Bored pile drilling 50 50 09-Mar-21 28-Apr-21 0% 348 Bored pile drilling
A3600 Fabrication and installation of reinforcement cage 50 50 10-Mar-21 29-Apr-21 0% 363 Fabrication and installation of reinforcement cage
A3610 Concrete pouring of Piles 50 50 11-Mar-21 30-Apr-21 0% 363 Concrete pouring of Piles
CIT-1.5.4.7.2 Crane Rail Beam 70 70 01-Apr-21 10-Jun-21 0% 363 10-Jun-21, CIT-1. 5.4.7.2 Crane Rail Beam
A3620 Excavation of foundation trench 31 31 01-Apr-21 02-May-21 0% 363 Excavation of foundation trench
A3630 Concrete pile head chiseling 31 31 02-Apr-21 03-May-21 0% 363 Concrete pile head chiseling
A3640 Pile integrity test 31 31 03-Apr-21 04-May-21 0% 363 Pile integrity test
A3650 Cast in situ lean concrete 36 36 04-Apr-21 10-May-21 0% 363 Cast in situ lean concrete

Actual Level of Effort Remaining Work Page 5 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A3660 Concrete of Crane Rail Beam 36 36 05-Apr-21 11-May-21 0% 363 Concrete of Crane Rail Beam
A3670 Installation of Crane Rail 36 36 05-May-21 10-Jun-21 0% 363 Installation of Crane Rail
CIT-1.5.4.8 Road and pavement 144 144 27-Apr-21 18-Sep-21 0% 2 18-Sep-21, CIT-1.5.4.8 Road and pavement
A3680 CBGM Placement 32 32 02-Aug-21 03-Sep-21 0% -2 CBGM Placement
A3690 Installation of CURBS 32 32 16-Aug-21 17-Sep-21 0% 2 Installation of CURBS
A3700 Sand Bedding 32 32 16-Aug-21 17-Sep-21 0% 2 Sand Bedding
A3710 Concrete blocks precast 32 32 27-Apr-21 29-May-21 0% 84 Concrete blocks precast
A3720 Paving Block Placement 32 32 17-Aug-21 18-Sep-21 0% 2 Paving Block Placement
CIT-1.5.5 RTG Erection area 312 312 04-Dec-20 12-Oct-21 0% 265 12-Oct-21, CIT-1.5.5 RTG Erection area
CIT-1.5.5.1 Surface water darinage 57 57 04-Feb-21 02-Apr-21 0% 72 02-Apr-21, CIT-1. 5.5.1 Surface water darinage
A3730 Foundation trench excavation of Box Culvert 10 10 04-Feb-21 14-Feb-21 0% 78 Foundation trench excavation of Box Culvert
A3740 Crush rock sub-base 10 10 05-Feb-21 15-Feb-21 0% 78 Crush rock sub-base
A3750 Cast in situ lean concrete 10 10 06-Feb-21 16-Feb-21 0% 78 Cast in situ lean concrete
A3760 Construction of Box Culvert 10 10 07-Feb-21 17-Feb-21 0% 78 Construction of Box Culvert
A3770 Foundation trench excavation of Slot Drainage 25 25 05-Mar-21 30-Mar-21 0% 72 Foundation trench excavation of Slot Drainage
A3780 Crush rock sub-base 25 25 06-Mar-21 31-Mar-21 0% 72 Crush rock sub-base
A3790 Cast in situ lean concrete 25 25 07-Mar-21 01-Apr-21 0% 72 Cast in situ lean concrete
A3800 Construction of Slot Drainage 25 25 08-Mar-21 02-Apr-21 0% 72 Construction of Slot Drainage
CIT-1.5.5.2 Foul water drainage 13 13 04-Dec-20 17-Dec-20 0% 522 17-Dec-20, CIT-1.5.5.2 Foul water drainage
A3810 Excavation of manhole trench 7 7 04-Dec-20 11-Dec-20 0% 522 Excavation of manhole trench
A3820 Laying of crushed rock 7 7 05-Dec-20 12-Dec-20 0% 522 Laying of crushed rock
A3830 Cast in situ lean concrete 7 7 06-Dec-20 13-Dec-20 0% 522 Cast in situ lean concrete
A3840 Installation of manhole 7 7 07-Dec-20 14-Dec-20 0% 522 Installation of manhole
A3850 Excavation of pipe trench 7 7 08-Dec-20 15-Dec-20 0% 522 Excavation of pipe trench
A3860 Pipeline Laying 7 7 09-Dec-20 16-Dec-20 0% 522 Pipeline Laying
A3870 Installation of D.I covers 7 7 10-Dec-20 17-Dec-20 0% 522 Installation of D.I covers
CIT-1.5.5.3 Electrical works 68 68 08-Feb-21 17-Apr-21 0% 443 17-Apr-21, CIT-1. 5.5.3 Electrical works
A3880 Excavation of manhole trench 7 7 08-Feb-21 15-Feb-21 0% 500 Excavation of manhole trench
A3890 Installation of manhole 7 7 09-Feb-21 16-Feb-21 0% 500 Installation of manhole
A3900 Excavation of pipe trench 7 7 10-Feb-21 17-Feb-21 0% 500 Excavation of pipe trench
A3910 Duct Pipe Laying 7 7 11-Feb-21 18-Feb-21 0% 500 Duct Pipe Laying
A3920 Cable laying 7 7 09-Apr-21 16-Apr-21 0% 443 Cable laying
A3930 Cable Joint & Terminal 1 1 16-Apr-21 17-Apr-21 0% 443 Cable Joint & Terminal
A3940 Pipe ditch backfill 7 7 12-Feb-21 19-Feb-21 0% 500 Pipe ditch backfill
CIT-1.5.5.4 Road and pavement 161 161 27-Apr-21 05-Oct-21 0% 1 05-Oct-21, CIT-1.5.5.4 Road and pavement
A3950 CBGM Placement 16 16 04-Sep-21 20-Sep-21 0% -2 CBGM Placement
A3960 Installation of CURBS 16 16 18-Sep-21 04-Oct-21 0% 1 Installation of CURBS
A3970 Sand Bedding 16 16 18-Sep-21 04-Oct-21 0% 1 Sand Bedding
A3980 Concrete blocks precast 16 16 27-Apr-21 13-May-21 0% 116 Concrete blocks precast
A3990 Paving Block Placement 16 16 19-Sep-21 05-Oct-21 0% 1 Paving Block Placement
CIT-1.5.5.5 ZPMC access on site to erection RTG 7 7 05-Oct-21 12-Oct-21 0% 265 12-Oct-21, CIT-1.5.5.5 ZPMC access on site to erection RTG
A5920 ZPMC access on site to erection RTG 7 7 05-Oct-21 12-Oct-21 0% 265 ZPMC access on site to erection RTG
CIT-1.5.6 Phase I s ection 4 345 345 04-Dec-20 14-Nov-21 0% 232 14-Nov-21, CIT-1.5.6 Phase I section 4
CIT-1.5.6.1 Surface water darinage 90 90 18-Feb-21 19-May-21 0% 72 19-May-21, CIT-1.5.6.1 Surface water darinage
A4000 Foundation trench excavation of Box Culvert 64 64 18-Feb-21 23-Apr-21 0% 78 Foundation trench excavation of Box Culvert
A4010 Crush rock sub-base 64 64 19-Feb-21 24-Apr-21 0% 78 Crush rock sub-base
A4020 Cast in situ lean concrete 64 64 20-Feb-21 25-Apr-21 0% 78 Cast in situ lean concrete
A4030 Construction of Box Culvert 64 64 21-Feb-21 26-Apr-21 0% 78 Construction of Box Culvert
A4040 Foundation trench excavation of Slot Drainage 43 43 03-Apr-21 16-May-21 0% 72 Foundation trench excavation of Slot Drainage
A4050 Crush rock sub-base 43 43 04-Apr-21 17-May-21 0% 72 Crush rock sub-base
A4060 Cast in situ lean concrete 43 43 05-Apr-21 18-May-21 0% 72 Cast in situ lean concrete
A4070 Construction of Slot Drainage 43 43 06-Apr-21 19-May-21 0% 72 Construction of Slot Drainage
CIT-1.5.6.2 Fire fighting ststem 49 49 16-Mar-21 04-May-21 0% -2 04-May-21, CIT-1.5.6.2 Fire fight ing ststem
A4080 Excavation of manhole trench 41 41 16-Mar-21 26-Apr-21 0% -2 Excavation of manhole trench
A4090 Laying of crushed rock 41 41 17-Mar-21 27-Apr-21 0% -2 Laying of crushed rock
A4100 Cast in situ lean concrete 41 41 18-Mar-21 28-Apr-21 0% -2 Cast in situ lean concrete
A4110 Installation of manhole 41 41 19-Mar-21 29-Apr-21 0% -2 Installation of manhole
A4120 Excavation of pipe trench 41 41 20-Mar-21 30-Apr-21 0% -2 Excavation of pipe trench
A4130 Pipeline Laying 41 41 21-Mar-21 01-May-21 0% -2 Pipeline Laying
A4140 Installation of Valve and D.I covers 41 41 22-Mar-21 02-May-21 0% -2 Installation of Valve and D.I covers
A4150 Pipe pressure test 41 41 23-Mar-21 03-May-21 0% -2 Pipe pressure test
A4160 Pipe ditch backfill 41 41 24-Mar-21 04-May-21 0% -2 Pipe ditch backfill
CIT-1.5.6.3 Potable water supp ly 20 20 05-May-21 25-May-21 0% -2 25-May-21, CIT-1.5.6.3 Potable water supply
A4170 Excavation of manhole trench 12 12 05-May-21 17-May-21 0% -2 Excavation of manhole trench
A4180 Laying of crushed rock 12 12 06-May-21 18-May-21 0% -2 Laying of crushed rock
A4190 Cast in situ lean concrete 12 12 07-May-21 19-May-21 0% -2 Cast in situ lean concrete
A4200 Installation of manhole 12 12 08-May-21 20-May-21 0% -2 Installation of manhole
A4210 Excavation of pipe trench 12 12 09-May-21 21-May-21 0% -2 Excavation of pipe trench

Actual Level of Effort Remaining Work Page 6 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A4220 Pipeline Laying 12 12 10-May-21 22-May-21 0% -2 Pipeline Laying
A4230 Installation of Valve and D.I covers 12 12 11-May-21 23-May-21 0% -2 Installation of Valve and D.I covers
A4240 Pipe pressure test 12 12 12-May-21 24-May-21 0% -2 Pipe pressure test
A4250 Pipe ditch backfill 12 12 13-May-21 25-May-21 0% -2 Pipe ditch backfill
CIT-1.5.6.4 Foul water drainage 13 13 18-Dec-20 31-Dec-20 0% 550 31-Dec-20, CIT-1.5.6.4 Foul water drainage
A4260 Excavation of manhole trench 7 7 18-Dec-20 25-Dec-20 0% 522 Excavation of manhole trench
A4270 Laying of crushed rock 7 7 19-Dec-20 26-Dec-20 0% 522 Laying of crushed rock
A4280 Cast in situ lean concrete 7 7 20-Dec-20 27-Dec-20 0% 522 Cast in situ lean concrete
A4290 Installation of manhole 7 7 21-Dec-20 28-Dec-20 0% 522 Installation of manhole
A4300 Excavation of pipe trench 7 7 22-Dec-20 29-Dec-20 0% 522 Excavation of pipe trench
A4310 Pipeline Laying 7 7 23-Dec-20 30-Dec-20 0% 522 Pipeline Laying
A4320 Installation of D.I covers 7 7 24-Dec-20 31-Dec-20 0% 522 Installation of D.I covers
A4330 Installation of By-pass oil separator 7 7 18-Dec-20 25-Dec-20 0% 556 Installation of By-pass oil separator
CIT-1.5.6.5 Electrical works 132 132 21-Jan-21 02-Jun-21 0% 397 02-Jun-21, CIT-1.5.6.5 Electrical works
A4340 Excavation of manhole trench 88 88 09-Feb-21 08-May-21 0% -2 Excavation of manhole trench
A4350 Installation of manhole 88 88 10-Feb-21 09-May-21 0% -2 Installation of manhole
A4360 Excavation of pipe trench 88 88 11-Feb-21 10-May-21 0% -2 Excavation of pipe trench
A4370 Duct Pipe Laying 88 88 12-Feb-21 11-May-21 0% -2 Duct Pipe Laying
A4380 Pipe ditch backfill 88 88 13-Feb-21 12-May-21 0% -2 Pipe ditch backfill
A4390 Cable laying 30 30 01-May-21 31-May-21 0% 32 Cable laying
A4400 Cable Joint & Terminal 1 1 01-Jun-21 02-Jun-21 0% 397 Cable Joint & Terminal
A4410 Cast in-situ Reinforcement foundation of High lighting mast 60 60 21-Jan-21 22-Mar-21 0% 188 Cast in-situ Reinforcement foundation of High lighting mast
CIT-1.5.6.6 Information and communication infrastructure 109 109 21-Jan-21 10-May-21 0% 420 10-May-21, CIT-1.5.6.6 Information and communication infrastructure
A4420 Excavation of manhole trench 88 88 07-Feb-21 06-May-21 0% 367 Excavation of manhole trench
A4430 Installation of manhole 88 88 08-Feb-21 07-May-21 0% 367 Installation of manhole
A4440 Excavation of pipe trench 88 88 09-Feb-21 08-May-21 0% 367 Excavation of pipe trench
A4450 Duct Pipe Laying 88 88 10-Feb-21 09-May-21 0% 367 Duct Pipe Laying
A4460 Pipe ditch backfill 88 88 11-Feb-21 10-May-21 0% 367 Pipe ditch backfill
A4470 Cable laying 20 20 15-Apr-21 05-May-21 0% 425 Cable laying
A4480 Cast in-situ Reinforcement foundation of Camera Pole 60 60 21-Jan-21 22-Mar-21 0% 421 Cast in-situ Reinforcement foundation of Camera Pole
CIT-1.5.6.7 STS crane landward support 83 83 29-Apr-21 21-Jul-21 0% 348 21-Jul-21, CIT-1.5.6.7 STS crane landward support
CIT-1.5.6.7.1 Const ructio n of Piles 47 47 29-Apr-21 15-Jun-21 0% 348 15-Jun-21, CIT-1. 5.6.7.1 Construction of Piles
A4490 Bored pile drilling 45 45 29-Apr-21 13-Jun-21 0% 348 Bored pile drilling
A4500 Fabrication and installation of reinforcement cage 45 45 30-Apr-21 14-Jun-21 0% 348 Fabrication and installation of reinforcement cage
A4510 Concrete pouring of Piles 45 45 01-May-21 15-Jun-21 0% 348 Concrete pouring of Piles
CIT-1.5.6.7.2 Crane Rail Beam 60 60 22-May-21 21-Jul-21 0% 348 21-Jul-21, CIT-1.5.6.7.2 Crane Rail Beam
A4520 Excavation of foundation trench 26 26 22-May-21 17-Jun-21 0% 348 Excavation of foundation trench
A4530 Concrete pile head chiseling 26 26 23-May-21 18-Jun-21 0% 348 Concrete pile head chiseling
A4540 Pile integrity test 26 26 24-May-21 19-Jun-21 0% 348 Pile integrity test
A4550 Cast in situ lean concrete 26 26 25-May-21 20-Jun-21 0% 348 Cast in situ lean concrete
A4560 Concrete of Crane Rail Beam 26 26 26-May-21 21-Jun-21 0% 348 Concrete of Crane Rail Beam
A4570 Installation of Crane Rail 26 26 25-Jun-21 21-Jul-21 0% 348 Installation of Crane Rail
CIT-1.5.6.8 Road and pavement 169 169 29-May-21 14-Nov-21 0% 0 14-Nov-21, CIT-1.5.6.8 Road and pavement
A4580 CBGM Placement 39 39 21-Sep-21 30-Oct-21 0% -2 CBGM Placement
A4590 Installation of CURBS 39 39 05-Oct-21 13-Nov-21 0% 0 Installation of CURBS
A4600 Sand Bedding 39 39 05-Oct-21 13-Nov-21 0% 0 Sand Bedding
A4610 Concrete blocks precast 39 39 29-May-21 07-Jul-21 0% 100 Concrete blocks precast
A4620 Paving Block Placement 39 39 06-Oct-21 14-Nov-21 0% 0 Paving Block Placement
CIT-1.5.6.9 Reefer steel structure 331 331 04-Dec-20 31-Oct-21 0% 42 31-Oct-21, CIT-1.5.6.9 Reefer steel structure
A4630 Manufacture and delivery of Reefer Structure 241 241 04-Dec-20 02-Aug-21 0% 42 Manufacture and delivery of Reefer Structure
A4640 Reefer access tower structure-Civil Works 91 91 02-Jul-21 01-Oct-21 0% 42 Reefer access tower structure-Civil Works
A4650 Erection of Reefer Frame Structure 61 61 31-Aug-21 31-Oct-21 0% 42 Erection of Reefer Frame Structure
CIT-1.5.7 Phase I s ection 5 389 389 04-Dec-20 28-Dec-21 0% 188 28-Dec-21, CIT-1.5.7 Phase I section 5
CIT-1.5.7.1 Surface water darinage 80 80 26-Apr-21 15-Jul-21 0% 78 15-Jul-21, CIT-1.5.7.1 Surface water darinage
A4660 Foundation trench excavation of Box Culvert 77 77 26-Apr-21 12-Jul-21 0% 78 Foundation trench excavation of Box Culvert
A4670 Crush rock sub-base 77 77 27-Apr-21 13-Jul-21 0% 78 Crush rock sub-base
A4680 Cast in situ lean concrete 77 77 28-Apr-21 14-Jul-21 0% 78 Cast in situ lean concrete
A4690 Construction of Box Culvert 77 77 29-Apr-21 15-Jul-21 0% 78 Construction of Box Culvert
A4700 Foundation trench excavation of Slot Drainage 51 51 19-May-21 09-Jul-21 0% 72 Foundation trench excavation of Slot Drainage
A4710 Crush rock sub-base 51 51 20-May-21 10-Jul-21 0% 72 Crush rock sub-base
A4720 Cast in situ lean concrete 51 51 21-May-21 11-Jul-21 0% 72 Cast in situ lean concrete
A4730 Construction of Slot Drainage 51 51 22-May-21 12-Jul-21 0% 72 Construction of Slot Drainage
CIT-1.5.7.2 Fire fighting ststem 28 28 26-May-21 23-Jun-21 0% -2 23-Jun-21, CIT-1.5.7.2 Fire fighting ststem
A4740 Excavation of manhole trench 17 17 26-May-21 12-Jun-21 0% -2 Excavation of manhole trench
A4750 Laying of crushed rock 17 17 27-May-21 13-Jun-21 0% -2 Laying of crushed rock
A4760 Cast in situ lean concrete 17 17 28-May-21 14-Jun-21 0% -2 Cast in situ lean concrete
A4770 Installation of manhole 17 17 29-May-21 15-Jun-21 0% -2 Installation of manhole
A4780 Excavation of pipe trench 17 17 30-May-21 16-Jun-21 0% -2 Excavation of pipe trench

Actual Level of Effort Remaining Work Page 7 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A4790 Pipeline Laying 17 17 31-May-21 17-Jun-21 0% -2 Pipeline Laying
A4800 Installation of Valve and D.I covers 17 17 01-Jun-21 18-Jun-21 0% -2 Installation of Valve and D.I covers
A4810 Pipe pressure test 7 7 02-Jun-21 09-Jun-21 0% -2 Pipe pressure test
A4820 Overall pressure of Potable Water System 3 3 03-Jun-21 06-Jun-21 0% -2 Overall pressure of Potable Water System
A4830 Pipe ditch backfill 17 17 06-Jun-21 23-Jun-21 0% -2 Pipe ditch backfill
CIT-1.5.7.3 Potable water supp ly 36 36 24-Jun-21 30-Jul-21 0% 339 30-Jul-21, CIT-1.5.7.3 Potable water supply
A4840 Excavation of manhole trench 27 27 24-Jun-21 21-Jul-21 0% -2 Excavation of manhole trench
A4850 Laying of crushed rock 27 27 25-Jun-21 22-Jul-21 0% -2 Laying of crushed rock
A4860 Cast in situ lean concrete 27 27 26-Jun-21 23-Jul-21 0% -2 Cast in situ lean concrete
A4870 Installation of manhole 27 27 27-Jun-21 24-Jul-21 0% -2 Installation of manhole
A4880 Excavation of pipe trench 27 27 28-Jun-21 25-Jul-21 0% -2 Excavation of pipe trench
A4890 Pipeline Laying 27 27 29-Jun-21 26-Jul-21 0% -2 Pipeline Laying
A4900 Installation of Valve and D.I covers 27 27 30-Jun-21 27-Jul-21 0% -2 Installation of Valve and D.I covers
A4910 Pipe pressure test 27 27 01-Jul-21 28-Jul-21 0% -2 Pipe pressure test
A4920 Overall pressure of fire fighting system 1 1 02-Jul-21 03-Jul-21 0% -2 Overall pressure of fire fighting system
A4930 Pipe ditch backfill 27 27 03-Jul-21 30-Jul-21 0% 339 Pipe ditch backfill
CIT-1.5.7.4 Foul water drainage 27 27 01-Jan-21 28-Jan-21 0% 522 28-Jan-21, CIT-1. 5.7.4 Foul water drainage
A4940 Excavation of manhole trench 21 21 01-Jan-21 22-Jan-21 0% 522 Excavation of manhole trench
A4950 Laying of crushed rock 21 21 02-Jan-21 23-Jan-21 0% 522 Laying of crushed rock
A4960 Cast in situ lean concrete 21 21 03-Jan-21 24-Jan-21 0% 522 Cast in situ lean concrete
A4970 Installation of manhole 21 21 04-Jan-21 25-Jan-21 0% 522 Installation of manhole
A4980 Excavation of pipe trench 21 21 05-Jan-21 26-Jan-21 0% 522 Excavation of pipe trench
A4990 Pipeline Laying 21 21 06-Jan-21 27-Jan-21 0% 522 Pipeline Laying
A5000 Installation of D.I covers 21 21 07-Jan-21 28-Jan-21 0% 522 Installation of D.I covers
A5010 Construction of Collection chamber 21 21 01-Jan-21 22-Jan-21 0% 528 Construction of Collection chamber
A5020 Installation of Full retention oil separator 21 21 01-Jan-21 22-Jan-21 0% 528 Installation of Full retention oil separator
A5030 Installation of Water Treatment Facilities 21 21 01-Jan-21 22-Jan-21 0% 528 Installation of Water Treatment Facilities
CIT-1.5.7.5 Electrical works 259 259 22-Mar-21 06-Dec-21 0% 21 06-Dec-21, CIT-1.5.7.5 Electrical works
A5040 Excavation of manhole trench 48 48 13-May-21 30-Jun-21 0% -2 Excavation of manhole trench
A5050 Installation of manhole 48 48 14-May-21 01-Jul-21 0% -2 Installation of manhole
A5060 Excavation of pipe trench 48 48 15-May-21 02-Jul-21 0% -2 Excavation of pipe trench
A5070 Duct Pipe Laying 48 48 16-May-21 03-Jul-21 0% -2 Duct Pipe Laying
A5080 Pipe ditch backfill 48 48 17-May-21 04-Jul-21 0% -2 Pipe ditch backfill
A5090 Cable laying 20 20 04-Jul-21 24-Jul-21 0% -2 Cable laying
A5100 Cable Joint & Terminal 1 1 24-Jul-21 25-Jul-21 0% -2 Cable Joint & Terminal
A5110 Cast in-situ Reinforcement foundation of High lighting mast 30 30 22-Mar-21 21-Apr-21 0% 188 Cast in-situ Reinforcement foundation of High lighting mast
A5120 Installation of Lighting mast/pole and lamp 30 30 22-Mar-21 21-Apr-21 0% 188 Installation of Lighting mast/pole and lamp
A5130 Installation of mechanical and electrical equipment 46 46 07-Jul-21 22-Aug-21 0% -2 Installation of mechanical and electrical equipment
A5140 Cable connection 28 28 25-Jul-21 22-Aug-21 0% -2 Cable connection
CIT-1.5.7.5.1 Phase I Commissioning and trial operation 46 46 20-Aug-21 05-Oct-21 0% 0 05-Oct-21, CIT-1.5.7.5.1 Phase I Commissioning and trial operat ion
A5150 Networking test 46 46 20-Aug-21 05-Oct-21* 0% 0 Networking test
A5160 MS of the main substation is completed and connected to the network 46 46 20-Aug-21 05-Oct-21* 0% 0 MS of the main substation is completed and connected to the network
A5170 Shore bridge STS and field bridge ertg equipment power supply 46 46 20-Aug-21 05-Oct-21* 0% 0 Shore bridge STS and field bridge ertg equipment power supply
A5180 Provide networking and connection services for all buildings, including medium voltage
46 power supply
46 20-Aug-21 05-Oct-21* 0% 0 Provide networking and connection services for all buildings, including medium voltage power supply
A5190 All IT and Wi-Fi networking 46 46 20-Aug-21 05-Oct-21* 0% 0 All IT and Wi-Fi networking
CIT-1.5.7.5.2 Low voltage side power supply 62 62 05-Oct-21 06-Dec-21 0% 21 06-Dec-21, CIT-1.5.7.5.2 Low voltage side power supply
A5200 Area lighting 62 62 05-Oct-21 06-Dec-21 0% 21 Area lighting
A5210 Indoor building lighting 62 62 05-Oct-21 06-Dec-21 0% 21 Indoor building lighting
A5220 Reefer power supply and Area lighting 46 46 05-Oct-21 20-Nov-21 0% 37 Reefer power supply and Area lighting
CIT-1.5.7.6 Information and communication infrastructure 102 102 22-Mar-21 02-Jul-21 0% 367 02-Jul-21, CIT-1.5.7.6 Information and communication infrastructure
A5230 Excavation of manhole trench 48 48 11-May-21 28-Jun-21 0% 367 Excavation of manhole trench
A5240 Installation of manhole 48 48 12-May-21 29-Jun-21 0% 367 Installation of manhole
A5250 Excavation of pipe trench 48 48 13-May-21 30-Jun-21 0% 367 Excavation of pipe trench
A5260 Duct Pipe Laying 48 48 14-May-21 01-Jul-21 0% 367 Duct Pipe Laying
A5270 Pipe ditch backfill 48 48 15-May-21 02-Jul-21 0% 367 Pipe ditch backfill
A5280 Cast in-situ Reinforcement foundation of Camera Pole 48 48 22-Mar-21 09-May-21 0% 421 Cast in-situ Reinforcement foundation of Camera Pole
A5290 Installation of CCTV Camera Pole 30 30 22-Mar-21 21-Apr-21 0% 439 Installation of CCTV Camera Pole
CIT-1.5.7.7 Road and pavement 174 174 07-Jul-21 28-Dec-21 0% -1 28-Dec-21, CIT-1.5.7.7 Road and pavement
A5300 CBGM Placement 43 43 31-Oct-21 13-Dec-21 0% -2 CBGM Placement
A5310 Installation of CURBS 43 43 14-Nov-21 27-Dec-21 0% -1 Installation of CURBS
A5320 Sand Bedding 43 43 14-Nov-21 27-Dec-21 0% -1 Sand Bedding
A5330 Concrete blocks precast 43 43 07-Jul-21 19-Aug-21 0% 100 Concrete blocks precast
A5340 Paving Block Placement 43 43 15-Nov-21 28-Dec-21 0% -1 Paving Block Placement
CIT-1.5.7.8 Fence 66 66 21-Sep-21 26-Nov-21 0% 31 26-Nov-21, CIT-1.5.7.8 Fence
A5350 Metal crash barriers 66 66 21-Sep-21 26-Nov-21 0% 31 Metal crash barriers
A5360 Metal post and wire 45 45 21-Sep-21 05-Nov-21 0% 52 Metal post and wire
CIT-1.5.7.9 Line Marking and Traffic Sign 55 55 06-Oct-21 30-Nov-21 0% 27 30-Nov-21, CIT-1.5.7.9 Line Marking and Traffic Sig n
A5370 Line Marking 55 55 06-Oct-21 30-Nov-21 0% 27 Line Marking

Actual Level of Effort Remaining Work Page 8 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation
CIT Abdjian second container terminal project Classic Schedule Layout 03-Oct-20 00:57
Activity ID Activity Name Original Remaining Start Finish Schedule % Total Float
2020 2021 2022
Duration Duration Complete
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepOct
A5380 Traffic Sign 55 55 06-Oct-21 30-Nov-21 0% 27 Traffic Sign
CIT-1.5.7.10 Civel works 364 364 04-Dec-20 03-Dec-21 0% 213 03-Dec-21, CIT-1.5.7.10 Civel works
A5390 Construction of Main Power substation 240 240 04-Dec-20 01-Aug-21 0% 19 Construction of Main Power substation
A5400 Construction of Back-up Station 20 20 02-Feb-21 22-Feb-21 0% 115 Construction of Back-up Station
A5410 Cast in situ concrete pavement 30 30 22-Feb-21 24-Mar-21 0% 115 Cast in situ concrete pavement
A5420 Construction of In/Out Gate(Fabrication and deliver of steel structure) 151 151 04-Dec-20 04-May-21 0% 426 Construction of In/Out Gate(Fabrication and deliver of steel structure)
A5430 Construction of In/Out Gate(Civil work) 40 40 24-Mar-21 03-May-21 0% 115 Construction of In/Out Gate(Civil work)
A5440 Gate Operating System / IT vendor access on site 7 7 03-May-21 10-May-21 0% 420 Gate Operating System / IT vendor access on site
A5450 Construction of Weight Bridge 31 31 03-May-21 03-Jun-21 0% 115 Construction of Weight Bridge
A5460 Construction of Gate House(Fabrication and deliver of steel structure) 151 151 04-Dec-20 04-May-21 0% 191 Construction of Gate House(Fabrication and deliver of steel structure)
A5470 Construction of Gate House(Civil work) 46 46 03-Jun-21 19-Jul-21 0% 115 Construction of Gate House(Civil work)
A5480 Construction of Gate House(Steel structure installation ) 46 46 19-Jul-21 03-Sep-21 0% 115 Construction of Gate House(Steel structure installation )
A5490 Construction of R.C aboveground potable water tank 92 92 04-Dec-20 06-Mar-21 0% 214 Construction of R.C aboveground potable water tank
A5500 Construction of Potable water pump station 89 89 06-Mar-21 03-Jun-21 0% 214 Construction of Potable water pump station
A5510 Construction of Fire pump station 60 60 03-Jun-21 02-Aug-21 0% 214 Construction of Fire pump station
A5520 Construction of Fuel Station(Fabrication and deliver of steel structure) 151 151 02-Feb-21 03-Jul-21 0% 304 Construction of Fuel Station(Fabrication and deliver of steel structure)
A5530 Construction of Fuel Station(Civil work) 30 30 02-Aug-21 01-Sep-21 0% 214 Construction of Fuel Station(Civil work)
A5540 Construction of Fuel Station(Steel structure installation ) 62 62 01-Oct-21 02-Dec-21 0% 214 Construction of Fuel Station(Steel structure installation )
A5550 Construction of Reefer & Equipment Washing& leaking Area 45 45 01-Sep-21 16-Oct-21 0% 261 Construction of Reefer & Equipment Washing& leaking Area
A5560 Construction of Rail Tracks 60 60 02-Jun-21 01-Aug-21 0% 148 Construction of Rail Tracks
A55601 Track installation contractor Access on site 7 7 01-Aug-21 08-Aug-21 0% 330 Track installation contractor Access on site
A5570 Construction of pinning station 121 121 04-Aug-21 03-Dec-21 0% 24 Construction of pinning station
CIT-1.5.8 Phase I Completion Handover 9 9 27-Dec-21 05-Jan-22 0% 0 05-Jan-22, CIT-1.5.8 Phase I Completion Handover
A5580 Phase I Completion Handover 9 9 27-Dec-21 05-Jan-22* 0% 0 Phase I Completion Handover
CIT-1.5.9 Phase II section1 261 261 13-Jul-21 31-Mar-22 0% 47 31-Mar-22, CIT-1.5.9 Phase II section1
CIT-1.5.9.1 Surface Water Drainage System 80 80 13-Jul-21 01-Oct-21 0% 72 01-Oct-21, CIT-1.5.9.1 Surface Water Drainage System
A5590 Foundation trench excavation of Box Culvert 68 68 16-Jul-21 22-Sep-21 0% 78 Foundation trench excavation of Box Culvert
A5600 Crush rock sub-base 68 68 17-Jul-21 23-Sep-21 0% 78 Crush rock sub-base
A5610 Cast in situ lean concrete 68 68 18-Jul-21 24-Sep-21 0% 78 Cast in situ lean concrete
A5620 Construction of Box Culvert 68 68 19-Jul-21 25-Sep-21 0% 78 Construction of Box Culvert
A5630 Foundation trench excavation of Slot Drainage 77 77 13-Jul-21 28-Sep-21 0% 72 Foundation trench excavation of Slot Drainage
A5640 Crush rock sub-base 77 77 14-Jul-21 29-Sep-21 0% 72 Crush rock sub-base
A5650 Cast in situ lean concrete 77 77 15-Jul-21 30-Sep-21 0% 72 Cast in situ lean concrete
A5660 Construction of Slot Drainage 77 77 16-Jul-21 01-Oct-21 0% 72 Construction of Slot Drainage
CIT-1.5.9.2 Road and pavement 202 202 19-Aug-21 09-Mar-22 0% -1 09-Mar-22, CIT-1.5.9.2 Road and pavement
A5670 CBGM Placement 70 70 14-Dec-21 22-Feb-22 0% -2 CBGM Placement
A5680 Installation of CURBS 70 70 28-Dec-21 08-Mar-22 0% -1 Installation of CURBS
A5690 Sand Bedding 70 70 28-Dec-21 08-Mar-22 0% -1 Sand Bedding
A5700 Concrete blocks precast 70 70 19-Aug-21 28-Oct-21 0% 101 Concrete blocks precast
A5710 Paving Block Placement 70 70 29-Dec-21 09-Mar-22 0% -1 Paving Block Placement
CIT-1.5.9.3 Line Marking and Traffic Sign 22 22 09-Mar-22 31-Mar-22 0% 47 31-Mar-22, CIT-1.5.9.3 Line Marking and Traffic Sig n
A5720 Line Marking 22 22 09-Mar-22 31-Mar-22 0% 47 Line Marking
A5730 Traffic Sign 22 22 09-Mar-22 31-Mar-22 0% 47 Traffic Sign
CIT-1.5.10 Phase II section2 258 258 26-Sep-21 11-Jun-22 0% -2 11-Jun-22, CIT-1. 5.10 Phase II section2
CIT-1.5.10.1 Surface Water Drainage System 74 74 26-Sep-21 09-Dec-21 0% 74 09-Dec-21, CIT-1.5.10.1 Surface Water Drainage System
A5740 Foundation trench excavation of Box Culvert 57 57 26-Sep-21 22-Nov-21 0% 88 Foundation trench excavation of Box Culvert
A5750 Crush rock sub-base 57 57 27-Sep-21 23-Nov-21 0% 88 Crush rock sub-base
A5760 Cast in situ lean concrete 57 57 28-Sep-21 24-Nov-21 0% 88 Cast in situ lean concrete
A5770 Construction of Box Culvert 57 57 29-Sep-21 25-Nov-21 0% 88 Construction of Box Culvert
A5780 Foundation trench excavation of Slot Drainage 65 65 02-Oct-21 06-Dec-21 0% 74 Foundation trench excavation of Slot Drainage
A5790 Crush rock sub-base 65 65 03-Oct-21 07-Dec-21 0% 74 Crush rock sub-base
A5800 Cast in situ lean concrete 65 65 04-Oct-21 08-Dec-21 0% 74 Cast in situ lean concrete
A5810 Construction of Slot Drainage 65 65 05-Oct-21 09-Dec-21 0% 74 Construction of Slot Drainage
CIT-1.5.10.2 Road and pavement 203 203 28-Oct-21 19-May-22 0% -2 19-May-22, CIT-1.5.10.2 Road and pavement
A5820 CBGM Placement 70 70 23-Feb-22 04-May-22 0% -2 CBGM Placement
A5830 Installation of CURBS 70 70 09-Mar-22 18-May-22 0% -2 Installation of CURBS
A5840 Sand Bedding 70 70 09-Mar-22 18-May-22 0% -2 Sand Bedding
A5850 Concrete blocks precast 70 70 28-Oct-21 06-Jan-22 0% 101 Concrete blocks precast
A5860 Paving Block Placement 70 70 10-Mar-22 19-May-22 0% -2 Paving Block Placement
CIT-1.5.10.3 Line Marking and Traffic Sign 23 23 19-May-22 11-Jun-22 0% -2 11-Jun-22, CIT-1. 5.10.3 Line M arking and Traff ic Sign
A5870 Line Marking 23 23 19-May-22 11-Jun-22 0% -2 Line Marking
A5880 Traffic Sign 23 23 19-May-22 11-Jun-22 0% -2 Traffic Sign
CIT-1.5.11 Phase II Completion Handover 15 15 11-Jun-22 26-Jun-22 0% -2 26-Jun-22, CIT-1.5.11 Phase II Completion Hand
A5890 Phase II Completion Handover 15 15 11-Jun-22 26-Jun-22 0% -2 Phase II Completion Handover

CIT-1.6 Completion of the project 10 10 26-Jun-22 06-Jul-22 0% -2 06-Jul-22, CIT-1.6 Completion of the project

A5900 Completion of the project 10 10 26-Jun-22 06-Jul-22* 0% -2 Completion of the project

Actual Level of Effort Remaining Work Page 9 of 9 TASK filter: All Activities
Actual Work Critical Remaining ... © Oracle Corporation