Proposed Infrastructure Levels
Proposed Infrastructure Levels
Utility
SW SW Trench SW Trench
Proposed Road Depth of Width of Utility Trench
Chainage Top Level Trench SW Trench Bottom Bottom SW SW C/S area of Road Trench Top Bottom Remarks
Top Level Invert Level Level (PCC Level (PCC SW Trench Chainage
(South Edge) (Slab top) Bottom) Top) Trench Trench Level Level (PCC
Top)
Designed 350
Slope 1 in
0 98.800 98.900 Starting point @ Fem
2.5 West Wall
10 98.800 98.900
16.5 98.800 98.900 97.400 97.125 97.200 1.500 1.000 1.500 Invert level of existing
drain 97.60
20 98.800 98.900 97.390 97.115 97.190 1.510 1.000 1.510
210.000