Node L/C Force-X kN Force-Y kN Force-Z kN Moment-X kNm Moment-Y kNm

2 10 1.733 50.972 2.407 0 0


11 0.034 -38.251 -8.97 0 0
13 1.795 98.129 7.861 0 0
14 0.366 55.976 4.073 0 0
15 0.133 98.341 8.141 0 0
16 1.364 79.631 3.528 0 0
17 0.132 -23.514 -8.58 0 0
18 0.245 30.091 -2.181 0 0
19 -0.364 82.317 0.22 0 0
4 10 2.348 29.332 -27.929 -45.09 -0.012
11 0.736 -50.205 68.348 110.128 0.001
13 1.469 49.117 -13.701 5.874 -0.016
14 -0.457 3.684 75.086 173.429 -0.007
15 -0.412 48.867 -8.177 17.318 -0.003
16 3.071 45.249 -55.736 -96.542 -0.008
17 2.116 -38.83 41.576 57.39 0.002
18 0.694 24.449 -69.584 -148.21 0
19 1.554 12.695 12.631 35.084 0.005
25 10 1.756 50.774 2.281 0 0
11 0.031 -38.203 -8.959 0 0
13 1.824 97.859 7.694 0 0
14 0.367 55.915 4.019 0 0
15 0.135 98.329 8.114 0 0
16 1.366 79.547 3.46 0 0
17 0.113 -23.41 -8.544 0 0
18 0.262 30.105 -2.18 0 0
19 -0.406 82.515 0.297 0 0
26 10 2.328 29.534 -28.553 -47.612 -0.023
11 0.717 -50.197 68.404 110.355 -0.005
13 1.47 49.367 -14.531 2.519 -0.018
14 -0.447 3.769 74.817 172.341 -0.002
15 -0.398 48.911 -8.313 16.768 0.001
16 3.028 45.375 -56.075 -97.911 -0.018
17 2.069 -38.848 41.753 58.106 -0.007
18 0.693 24.46 -69.579 -148.19 -0.007
19 1.509 12.612 13.015 36.636 0.001
27 10 2.335 29.59 -28.8 -48.611 -0.02
11 0.718 -50.209 68.359 110.171 0.002
13 1.473 49.328 -14.411 3.006 -0.024
14 -0.45 3.657 75.177 173.796 -0.006
15 -0.404 48.846 -8.102 17.62 -0.003
16 3.041 45.422 -56.318 -98.891 -0.013
17 2.079 -38.825 41.558 57.318 0.004
18 0.688 24.543 -69.901 -149.491 -0.002
19 1.518 12.59 12.984 36.511 0.01
39 10 2.713 2.093 -0.365 0 0
11 0.114 -29.354 -1.139 0 0
13 2.84 23.198 0.907 0 0
14 0.626 -0.729 2.09 0 0
15 0.278 29.146 0.888 0 0
16 2.121 5.653 -1.058 0 0
17 0.223 -25.528 -2.266 0 0
18 0.469 1.63 -2.027 0 0
19 -0.566 25.104 -1.166 0 0
40 10 2.786 8.148 -7.84 -15.388 -0.013
11 -0.77 -14.181 24.643 42.905 -0.018
13 3.532 15.343 -1.082 6.189 -0.009
14 -0.567 5.256 18.613 45.679 -0.007
15 -0.401 15.557 0.478 8.172 0.003
16 2.211 10.605 -19.495 -42.142 -0.012
17 -0.45 -13.654 14.848 20.253 -0.017
18 0.512 8.957 -27.9 -65.543 -0.001
19 -2.073 6.157 4.035 8.785 -0.007
41 10 1.787 22.248 -18.26 -32.291 -0.006
11 0.362 -33.713 46.602 77.78 0.048
13 1.021 31.632 -11.245 -10.423 -0.04
14 -0.681 2.51 39.872 85.672 0.009
15 -0.648 30.639 -7.04 0.549 -0.004
16 2.404 24.495 -30.502 -58.05 0.018
17 1.561 -26.58 31.653 48.628 0.066
18 0.329 10.947 -33.888 -74.844 0.006
19 1.05 6.309 10.034 24.297 0.075
53 10 2.389 56.607 0.018 0 0
11 0.94 19.858 -4.418 0 0
13 3.972 100.114 1.719 0 0
14 0.783 60.681 4.112 0 0
15 2.066 101.449 2.29 0 0
16 3.116 78.522 -0.848 0 0
17 1.166 24.24 -6.011 0 0
18 1.376 34.985 -3.007 0 0
19 1.415 91.278 -0.767 0 0
54 10 2.904 28.678 -23.771 -45.16 -0.028
11 -1.444 -22.235 51.755 101.056 -0.008
13 3.782 41.306 -12.253 -14.683 -0.034
14 -0.605 16.238 58.988 141.156 -0.013
15 -0.056 40.533 -5.813 2.328 -0.011
16 2.337 37.34 -45.635 -92.26 -0.024
17 -1.046 -21.307 32.799 59.184 -0.006
18 0.448 23.268 -58.073 -128.973 -0.006
19 -2.092 21.153 9.701 29.409 -0.002
55 10 2.865 19.798 -21.321 -42.14 -0.022
11 -1.577 -31.268 54.065 103.521 -0.003
13 3.761 31.384 -7.016 -0.668 -0.02
14 -0.704 7.258 61.139 142.987 -0.013
15 -0.143 30.944 -2.008 10.689 -0.002
16 2.291 28.1 -42.324 -85.846 -0.014
17 -1.17 -29.919 34.081 57.589 -0.003
18 0.354 14.274 -55.615 -125.918 0
19 -2.216 12.004 12.134 32.35 0.003
67 10 1.793 45.472 -0.259 0 0
11 0.044 -53.545 -1.871 0 0
13 1.944 89.742 2.275 0 0
14 0.376 40.568 4.001 0 0
15 0.204 90.153 2.902 0 0
16 1.424 73.849 -1.139 0 0
17 0.112 -37.853 -2.915 0 0
18 0.313 27.304 -3.66 0 0
19 -0.407 64.626 -1.073 0 0
68 10 2.797 25.936 -27.213 -53.075 -0.016
11 -1.545 -39.295 62.049 114.37 -0.01
13 3.69 41.223 -11.583 -9.467 -0.014
14 -0.698 3.198 73.654 165.036 -0.01
15 -0.147 40.46 -4.572 7.887 -0.003
16 2.227 38.649 -53.061 -104.958 -0.015
17 -1.16 -29.831 36.207 60.027 -0.011
18 0.352 22.405 -67.867 -146.825 -0.003
19 -2.204 10.616 12.532 28.724 -0.006
69 10 2.765 28.804 -26.102 -45.513 -0.021
11 -1.525 -38.766 60.59 108.547 -0.002
13 3.641 41.046 -11.018 -7.193 -0.017
14 -0.691 3.588 72.594 160.804 -0.005
15 -0.147 40.962 -5.922 2.507 0.002
16 2.204 37.404 -52.707 -104.481 -0.015
17 -1.139 -29.291 34.73 54.133 -0.005
18 0.344 22.382 -67.791 -146.515 -0.001
19 -2.17 11.489 10.141 19.181 0.004
81 10 25.137 19.742 1.244 0 0
11 -8.241 24.106 1.558 0 0
13 32.877 29.625 1.496 0 0
14 0.177 15.849 2.455 0 0
15 -0.115 32.085 0.656 0 0
16 14.28 22.249 0.494 0 0
17 -8.151 23.51 0.694 0 0
18 5.168 11.504 -0.815 0 0
19 -25.917 33.386 0.432 0 0
82 10 21.648 4.34 7.369 37.379 -0.091
11 -9.89 -3.576 28.32 66.774 -0.008
13 28.593 6.944 13.524 49.874 -0.092
14 -2.784 -1.189 35.128 98.273 -0.024
15 -1.036 14.259 6.04 21.34 -0.008
16 19.742 9.436 -6.63 3.747 -0.066
17 -14.499 1.343 13.498 29.231 -0.005
18 3.531 13.227 -23.903 -46.344 -0.015
19 -17.109 12.428 5.524 15.679 0.022
83 10 2.839 15.398 -26.145 -68.17 -0.038
11 -1.751 -36.442 63.278 144.93 -0.009
13 3.784 30.408 -18.139 -50.974 -0.036
14 -0.856 -0.467 69.052 170.872 -0.014
15 -0.274 24.407 0.471 14.565 -0.004
16 2.229 19.295 -44.228 -103.273 -0.029
17 -1.337 -32.799 36.754 72.374 -0.008
18 0.254 5.708 -50.139 -111.467 -0.007
19 -2.454 4.638 19.228 57.631 0.004
127 10 22.325 28.773 1.738 0 0
11 -7.671 17.554 1.663 0 0
13 29.402 38.758 2.062 0 0
14 -0.4 28.909 3.431 0 0
15 -0.536 34.02 0.916 0 0
16 12.414 27.577 0.755 0 0
17 -7.53 13.657 0.479 0 0
18 4.661 8.952 -1.025 0 0
19 -24.168 26.313 0.536 0 0
170 10 1.751 50.701 2.231 0 0
11 0.026 -38.228 -8.968 0 0
13 1.82 97.888 7.718 0 0
14 0.366 56.003 4.092 0 0
15 0.131 98.366 8.156 0 0
16 1.364 79.479 3.411 0 0
17 0.111 -23.472 -8.583 0 0
18 0.251 29.992 -2.244 0 0
19 -0.403 82.497 0.291 0 0
171 10 2.668 60.693 2.812 0 0
11 -0.124 -18.57 -16.055 0 0
13 2.79 84 5.647 0 0
14 0.423 32.278 -0.957 0 0
15 0.046 77.97 6.035 0 0
16 2.024 61.898 2.334 0 0
17 -0.006 -8.234 -14.585 0 0
18 0.263 12.753 -2.067 0 0
19 -0.859 56.843 -3.287 0 0
172 10 1.935 33.755 -0.433 0 0
11 -0.061 -6.849 -4.892 0 0
13 1.909 68.883 1.77 0 0
14 0.382 37.492 3.606 0 0
15 -0.008 69.05 2.085 0 0
16 1.389 48.388 -1.141 0 0
17 0.004 -3.756 -6.669 0 0
18 0.196 7.447 -3.451 0 0
19 -0.654 58.173 -1.217 0 0
173 10 1.53 53.91 0.637 0 0
11 -0.491 -51.789 -2.17 0 0
13 0.777 94.399 2.395 0 0
14 0.171 41.136 3.784 0 0
15 -0.928 94.25 2.627 0 0
16 0.461 74.506 -1.191 0 0
17 -0.51 -35.714 -3.217 0 0
18 -0.325 29.76 -3.643 0 0
19 -1.518 68.493 -1.563 0 0
174 10 1.896 32.977 -3.486 0 0
11 0.022 -50.331 1.26 0 0
13 1.94 70.411 -2.37 0 0
14 0.388 35.528 4.676 0 0
15 0.091 71.778 0.77 0 0
16 1.463 41.627 -4.207 0 0
17 0.082 -42.543 -2.188 0 0
18 0.228 9.373 -4.813 0 0
19 -0.467 59.003 0.05 0 0
182 10 14.234 20.32 1.18 0 0
11 -4.717 -3.379 8.321 0 0
13 18.592 25.807 1.408 0 0
14 0.094 6.953 11.691 0 0
15 0.078 22.705 0.611 0 0
16 7.924 21.569 0.474 0 0
17 -10.98 -0.574 0.491 0 0
18 3.123 16.523 -0.772 0 0
19 -10.425 19.455 1.95 0 0
184 10 3.381 40.87 -17.501 0 0
11 -0.908 12.132 28.48 0 0
13 4.001 20.951 -7.657 0 0
14 -0.051 18.129 34.655 0 0
15 0.043 45.231 -17.858 0 0
16 1.878 36.783 -14.621 0 0
17 -1.89 20.602 11.791 0 0
18 0.738 20.272 -5.675 0 0
19 -2.489 46.812 -10.95 0 0
186 10 12.192 1.647 1.671 0 0
11 -3.576 -25.526 29.331 0 0
13 13.486 11.567 0.208 0 0
14 -0.246 -36.133 39.289 0 0
15 -0.192 10.135 2.366 0 0
16 5.565 1.399 1.521 0 0
17 -7.935 -10.219 17.095 0 0
18 2.551 2.519 0.559 0 0
19 -11.246 2.825 9.124 0 0
188 10 6.815 44.911 2.384 0 0
11 2.246 26.406 2.841 0 0
13 5.457 48.453 2.792 0 0
14 4.88 46.242 4.766 0 0
15 3.512 54.999 1.045 0 0
16 4.608 41.287 0.824 0 0
17 0.576 27.374 1.187 0 0
18 1.638 18.679 -1.757 0 0
19 1.394 57.444 0.532 0 0
190 10 9.501 21.813 1.81 0 0
11 -5.603 61.282 14.518 0 0
13 12.116 41.312 0.24 0 0
14 -3.481 88.558 19.567 0 0
15 -2.853 63.322 2.602 0 0
16 3.378 13.319 1.64 0 0
17 -9.614 50.81 8.951 0 0
18 1.826 -3.615 0.58 0 0
19 -14.179 73.585 6.104 0 0
192 10 3.532 33.308 -0.155 0 0
11 -0.701 -10.815 2.399 0 0
13 4.078 57.387 0.927 0 0
14 0.326 37.664 4.595 0 0
15 -0.049 55.505 2.452 0 0
16 1.887 37.264 -0.487 0 0
17 -1.918 -3.31 1.425 0 0
18 0.748 18.537 -1.178 0 0
19 -2.765 56.39 3.714 0 0
194 10 3.429 27.989 -0.252 0 0
11 -0.321 -8.908 1.599 0 0
13 3.753 54.846 1.539 0 0
14 0.718 39.177 4.136 0 0
15 0.301 55.184 1.867 0 0
16 1.935 44.444 -0.441 0 0
17 -1.432 -1.416 0.96 0 0
18 0.784 16.171 -2.25 0 0
19 -2.04 58.912 2.861 0 0
196 10 4.21 38.79 -0.511 0 0
11 -0.345 -9.088 1.453 0 0
13 4.624 50.017 1.601 0 0
14 0.909 37.74 4.03 0 0
15 0.415 54.25 1.734 0 0
16 2.403 39.837 -0.5 0 0
17 -1.687 -0.249 0.812 0 0
18 1.017 14.867 -2.24 0 0
19 -2.434 60.668 2.622 0 0
198 10 2.799 33 -0.164 0 0
11 -0.21 24.72 2.643 0 0
13 3.072 50.85 4.079 0 0
14 0.62 19.267 2.753 0 0
15 0.294 44.111 4.585 0 0
16 1.606 39.3 2.452 0 0
17 -1.095 24.583 2.588 0 0
18 0.688 25.382 0.608 0 0
19 -1.585 39.428 4.74 0 0
278 10 1.767 90.893 7.334 0 0
11 -0.066 23.161 -16.321 0 0
13 1.913 103.202 11.98 0 0
14 0.362 74.956 1.715 0 0
15 0.116 99.725 8.373 0 0
16 1.28 92.48 6.162 0 0
17 -0.076 31.18 -14.705 0 0
18 0.243 64.533 -4.001 0 0
19 -0.659 83.655 -0.707 0 0
279 10 2.375 35.026 -12.099 32.427 -0.028
11 0.708 -56.748 76.626 128.083 0.002
13 1.506 45.631 2.125 73.437 -0.033
14 -0.48 4.423 73.193 163.939 -0.01
15 -0.437 52.106 -12.372 4.426 -0.005
16 3.077 41.657 -41.35 -37.092 -0.019
17 2.077 -44.471 49.501 76.429 0.004
18 0.693 19.362 -57.601 -106.119 -0.001
19 1.48 18.311 1.926 -3.678 0.011
285 10 3.684 36.788 -1.337 0 0
11 10.084 -7.726 -4.508 0 0
13 -5.787 60.345 2.071 0 0
14 0.866 28.204 5.074 0 0
15 0.756 63.494 7.101 0 0
16 15.357 42.781 -0.728 0 0
17 23.082 -0.711 -4.399 0 0
18 -0.567 15.644 -3.026 0 0
19 30.467 55.295 3.744 0 0
286 10 5.841 31.122 -34.607 -99.479 -0.074
11 12.142 -15.287 33.252 56.938 0.002
13 -5.594 40.231 -27.112 -72.641 -0.082
14 0.402 10.187 39.401 99.63 -0.023
15 0.585 32.493 -3.13 18.97 -0.012
16 19.701 33.946 -44.006 -111.772 -0.051
17 27.861 -9.27 19.085 27.472 0.005
18 0.475 19.812 -43.373 -109.773 -0.009
19 35.6 12.28 15.314 60.407 0.025
Moment-Z kNm
0
0
0
0
0
0
0
0
0
-12.783
-3.961
-8.055
2.438
2.21
-16.637
-11.394
-3.76
-8.317
0
0
0
0
0
0
0
0
0
-12.607
-3.824
-8.02
2.378
2.135
-16.342
-11.093
-3.708
-8.058
-12.675
-3.871
-8.037
2.4
2.168
-16.452
-11.2
-3.719
-8.148
0
0
0
0
0
0
0
0
0
-15.237
6.591
-19.665
3.448
1.339
-12.156
4.594
-2.281
11.507
-11.436
-3.042
-7.076
2.862
2.648
-14.977
-9.958
-2.928
-7.035
0
0
0
0
0
0
0
0
0
-15.55
8.13
-20.326
3.557
0.593
-12.456
5.974
-2.14
11.672
-15.425
8.372
-20.205
3.756
0.78
-12.332
6.194
-1.935
11.868
0
0
0
0
0
0
0
0
0
-15.517
8.526
-20.442
3.832
0.807
-12.35
6.387
-1.946
12.178
-15.331
8.385
-20.156
3.775
0.799
-12.22
6.25
-1.92
11.959
0
0
0
0
0
0
0
0
0
-71.993
37.755
-95.206
15.063
4.131
-60.332
37.623
-9.707
57.8
-15.754
9.091
-20.867
4.226
1.093
-12.457
6.88
-1.746
12.894
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-12.95
-3.963
-8.172
2.518
2.297
-16.808
-11.453
-3.797
-8.278
0
0
0
0
0
0
0
0
0
-20.882
-19.878
-1.805
1.058
0.511
-42.123
-47.013
-5.163
-53.893
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


3 COMBINATION LOAD CASE
-17.59
3 447.75 1.14 3.36 0.00 51.08
7 COMBINATION LOAD CASE
-17.64
7 500.34 8.98 24.74 0.00 51.22
8 COMBINATION LOAD CASE
-17.59
8 447.75 1.14 3.36 0.00 51.08 1
9 COMBINATION LOAD CASE
-17.64
9 448.02 1.14 3.36 0.00 51.23
9 COMBINATION LOAD CASE
-17.59
19 447.75 1.14 3.36 0.00 51.08
0 COMBINATION LOAD CASE
-17.59
20 447.76 1.14 3.36 0.00 51.09
1 COMBINATION LOAD CASE
-17.61
21 447.88 1.14 3.36 0.00 51.16 TL
2 COMBINATION LOAD CASE
-17.59
22 447.75 1.14 3.36 0.00 51.08
3 COMBINATION LOAD CASE
-17.61
23 474.54 5.14 14.25 0.00 51.15
4 COMBINATION LOAD CASE
-17.59
24 447.76 1.14 3.36 0.00 51.09
5 COMBINATION LOAD CASE
-17.61
25 447.89 1.14 3.36 0.00 51.16
6 COMBINATION LOAD CASE
-17.59
26 447.75 1.14 3.36 0.00 51.08
7 COMBINATION LOAD CASE
-17.62
27 447.90 1.14 3.36 0.00 51.16
4

Size of Column, l= 0.600 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 130 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 1.400 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 186.2 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.800 metre

Breadth, B= 2.400 metre

Projections, TL= 0.725 metre


TB= 0.725 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
3 COMBINATION LOAD CASE
633.97
3 79.30 O.K 111.88 O.K 109.38 O.K 76.80
7 COMBINATION LOAD CASE
686.57
7 95.04 O.K 127.71 O.K 109.30 O.K 76.63
8 COMBINATION LOAD CASE
633.97
8 79.30 O.K 111.88 O.K 109.38 O.K 76.80
9 COMBINATION LOAD CASE
634.25
9 79.29 O.K 111.97 O.K 109.47 O.K 76.80
9 COMBINATION LOAD CASE
633.97
19 79.30 O.K 111.88 O.K 109.38 O.K 76.80
0 COMBINATION LOAD CASE
633.99
20 79.30 O.K 111.88 O.K 109.38 O.K 76.80
1 COMBINATION LOAD CASE
634.11
21 79.30 O.K 111.92 O.K 109.43 O.K 76.80
2 COMBINATION LOAD CASE
633.97
22 79.30 O.K 111.88 O.K 109.38 O.K 76.80
3 COMBINATION LOAD CASE
660.77
23 87.32 O.K 119.94 O.K 109.34 O.K 76.72
4 COMBINATION LOAD CASE
633.99
24 79.30 O.K 111.88 O.K 109.38 O.K 76.80
5 COMBINATION LOAD CASE
634.11
25 79.30 O.K 111.92 O.K 109.43 O.K 76.80
6 COMBINATION LOAD CASE
633.97
26 79.30 O.K 111.88 O.K 109.38 O.K 76.80
7 COMBINATION LOAD CASE
634.13
27 79.30 O.K 111.93 O.K 109.43 O.K 76.80

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 127.71 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 80.55 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 100.5 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

3.625 x Ast2 - 94395 x Ast + 80.550 x1000000 = 0

Ast= 883 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 546 mm

Mini. area of reinforcement = 0.12%bd= 624.96 mm2

Providing spacing= 200 mm

Actual area providing, Ast x-x= 2413 mm2 O.K

Providing Y-16 @ 200 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 127.71 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 93.98 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 100.5 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

3.107 x Ast2 - 94395 x Ast + 93.975 x1000000 = 0

Ast= 1031 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 546 mm

Mini. area of reinforcement = 0.12%bd= 729.12 mm2

Providing spacing= 200 mm


Actual area providing, Ast z-z= 2815 mm2 O.K

Providing Y-16 @ 200 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 150 mm

Eff. Depth at critical depth, dc= 172.1 mm

x= 0.508 meter

q= 127.71 KN/m2

Vu= 155.698 KN

tv= 0.377 N/mm2

p=100As/bd= 0.584 %

tc= 0.521 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 150 mm

Eff. Depth at critical depth, dc= 172.1 mm

z= 0.508 meter

q= 127.71 KN/m2

Vu= 181.648 KN

tv= 0.377 N/mm2

p=100As/bd= 0.584 %

tc= 0.521 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 127.71 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 0.817

V1= 126.6 KN V2= 142.4

dc1= 194.6 mm dc2= 194.6

tv1= 0.797 N/mm2 tv2= 0.896

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 675 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 2.085 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -3299485.5 N

Required area of steel, As= -9849.2104 mm2

Minimum Steel, As = 0.5% of Ac

= 1800 mm2

Dia of bar= 20 mm

Ld for compression = 838 mm

The available vertical length L1 for anchorage is,

L1= 173 mm

No. of dowel bar= 20 #

Area of T20 = 6283 mm2 O.K

Provide 20- T20 as dowel bars.


Z paste ur value here
3 COMBINATI -17.587
L 2 7 COMBINATI -17.635
8 COMBINATI -17.587
9 COMBINATI -17.639
19 COMBINAT -17.587
l 20 COMBINAT -17.589
X 21 COMBINAT -17.613
b B
22 COMBINAT -17.587
23 COMBINAT -17.611
TB 24 COMBINAT -17.589
25 COMBINAT -17.613
26 COMBINAT -17.587
3 27 COMBINAT -17.615
0 0
0 0

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 125.93 kN
= 50.40 kN
= 9.90 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 0.414 Increase Depth or reduce projection T


tan aB = 0.414 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.106

MAX= 127.71
MIN= 76.63 % 0.00
Node L/C
Itensities Check for Sliding of 252 19 COMBI
Point 4,q4 Max Min footing 20 COMBI
O.K 111.88 76.80 14.4 NO SLIDING 0.0 21 COMBI
O.K 127.71 76.63 15.6 NO SLIDING 0.0 22 COMBI
O.K 111.88 76.80 14.4 NO SLIDING 0.0 23 COMBI
O.K 111.97 76.80 14.4 NO SLIDING 0.0 24 COMBI
O.K 111.88 76.80 14.4 NO SLIDING 0.0 25 COMBI
O.K 111.88 76.80 14.4 NO SLIDING 0.0 26 COMBI
O.K 111.92 76.80 14.4 NO SLIDING 0.0 27 COMBI
O.K 111.88 76.80 14.4 NO SLIDING 0.0
O.K 119.94 76.72 15.0 NO SLIDING 0.0
O.K 111.88 76.80 14.4 NO SLIDING
O.K 111.92 76.80 14.4 NO SLIDING
O.K 111.88 76.80 14.4 NO SLIDING
O.K 111.93 76.80 14.4 NO SLIDING

Any specified value)= 127.71 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
1111111
3 COMBIN
7 COMBIN
8 COMBIN
447.745 1.144 1.757 0 26.461 9 COMBIN
500.343 8.978 12.17 0 26.533 19 COMBI
447.745 1.144 1.757 0 26.461 20 COMBI
448.019 1.144 1.757 0 26.538 21 COMBI
447.745 1.144 1.757 0 26.46 22 COMBI
447.757 1.144 1.757 0 26.463 23 COMBI
447.884 1.144 1.757 0 26.5 24 COMBI
447.745 1.144 1.757 0 26.46 25 COMBI
474.54 5.135 7.062 0 26.497 26 COMBI
447.758 1.144 1.757 0 26.463 27 COMBI
447.885 1.144 1.757 0 26.5
447.745 1.144 1.757 0 26.461
447.897 1.144 1.757 0 26.503
0 0 0 0 0
0 0 0 0 0

3 COMBIN 3.21
7 COMBIN 3.268
8 COMBIN 3.21
9 COMBIN 3.208
19 COMBI 3.215
20 COMBI 3.19
21 COMBI 3.214
22 COMBI 3.215
23 COMBI 3.245
24 COMBI 3.184
25 COMBI 3.209
26 COMBI 3.21
27 COMBI 3.183

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.88 289.267 0.727 1.108 0 -4.323
2.88 289.265 0.727 1.108 0 -4.324
2.887 289.205 0.727 1.108 0 -4.335
2.832 289.505 0.727 1.108 0 -4.251
2.894 315.995 4.718 6.394 0 -4.344
2.88 289.265 0.727 1.108 0 -4.324
2.887 289.206 0.727 1.108 0 -4.335
2.832 289.505 0.727 1.108 0 -4.251
2.887 289.203 0.727 1.108 0 -4.335
3.21 532.575 2.948 4.564 0 -4.845
3.268 532.772 2.948 4.564 0 -4.933
3.21 532.575 2.948 4.564 0 -4.845
3.208 585.335 10.741 14.942 0 -4.843
3.215 532.549 2.948 4.564 0 -4.853
3.19 532.629 2.948 4.564 0 -4.815
3.214 559.427 6.918 9.851 0 -4.852
3.215 532.549 2.948 4.564 0 -4.853
3.245 532.649 2.948 4.564 0 -4.898
3.184 532.655 2.948 4.564 0 -4.807
3.209 559.453 6.918 9.851 0 -4.844
3.21 532.575 2.948 4.564 0 -4.845
3.183 559.532 6.918 9.851 0 -4.806

532.575 2.948 4.564 0 -4.845


532.772 2.948 4.564 0 -4.933
532.575 2.948 4.564 0 -4.845
585.335 10.741 14.942 0 -4.843
532.549 2.948 4.564 0 -4.853
532.629 2.948 4.564 0 -4.815
559.427 6.918 9.851 0 -4.852
532.549 2.948 4.564 0 -4.853
532.649 2.948 4.564 0 -4.898
532.655 2.948 4.564 0 -4.807
559.453 6.918 9.851 0 -4.844
532.575 2.948 4.564 0 -4.845
559.532 6.918 9.851 0 -4.806
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 1.73 50.97 2.41 2.41 0.00 1.73 Z
11 0.03 -38.25 -8.97 8.97 0.00 0.03
13 1.80 98.13 7.86 7.86 0.00 1.80 1 L 2
14 0.37 55.98 4.07 4.07 0.00 0.37
15 0.13 98.34 8.14 8.14 0.00 0.13
16 1.36 79.63 3.53 3.53 0.00 1.36
17 0.13 -23.51 -8.58 8.58 0.00 0.13 TL l
18 0.25 30.09 -2.18 2.18 0.00 0.25 X
b B
19 -0.36 82.32 0.22 0.22 0.00 0.36

TB

4 3

Size of Column, l= 0.750 metre


Soil Condition - Dry
b= 0.600 metre
Soil density = 18 KN/m3
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density = 25 KN/m3
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 1.000 metre Earth wt. = 44.73 kN
Footing Concrete wt. = 30.00 kN
Load of footing & soil, wf= 82.6 KN Column Concrete wt. = 7.88 kN

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.000 metre

Breadth, B= 2.000 metre

Projections, TL= 0.300 metre MAX= 52.43


TB= 0.300 metre MIN= 4.34

Pressure intensities at, (KN/m2) Itensities


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4 Max Min
10 133.58 33.90 O.K 36.50 O.K 32.89 O.K 30.29 O.K 36.50 30.29
11 44.35 17.79 O.K 17.84 O.K 4.39 O.K 4.34 O.K 17.84 4.34
13 180.73 49.73 O.K 52.43 O.K 40.63 O.K 37.94 O.K 52.43 37.94
14 138.58 37.43 O.K 37.97 O.K 31.87 O.K 31.32 O.K 37.97 31.32
15 180.95 51.24 O.K 51.44 O.K 39.23 O.K 39.03 O.K 51.44 39.03
16 162.24 42.18 O.K 44.23 O.K 38.94 O.K 36.89 O.K 44.23 36.89
17 59.09 21.11 O.K 21.31 O.K 8.44 O.K 8.24 O.K 21.31 8.24
18 112.70 29.63 O.K 29.99 O.K 26.72 O.K 26.35 O.K 29.99 26.35
19 164.92 41.12 O.K 41.67 O.K 41.34 O.K 40.79 O.K 41.67 40.79
BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)= 175 KN/m2

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2 Z


CRITICAL
SECTION
= 22.61 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2 X

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm TL

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS


Z
q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2


CRITICAL
= 22.61 KN-m SECTION
X
B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm


TB
Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm

Actual area providing, Ast z-z= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.


SHEAR ONE-WAY ACTION
The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)
CRITICAL
Along x-x SECTION
Shear force at critical section, Vux= q*B*x Z

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm X

x= 0.083 meter d

q= 251.25 KN/m2

Vu= 41.708 KN X

t v= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm Z

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter CRITICAL


SECTION
q= 251.25 KN/m2 X

Vu= 41.708 KN d

tv= 0.096 N/mm2


z
p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 0.967 meter

V1= 67.8 KN V2= 71.4 KN

dc1= 217.0 mm dc2= 217.0 mm

tv1= 0.382 N/mm2 tv2= 0.340 N/mm2

Shear strength of M 25 concrete,


Ks = (0.5+b c) = 1.000

tc = 0.25Ö (fck)= 1.250 N/mm2


t'c = Ks * tc= 1.250 N/mm2 O.K
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 2.35 29.33 -27.93 38.70 -0.01 -5.74
11 0.74 -50.21 68.35 315.17 0.00 -1.75
13 1.47 49.12 -13.70 46.98 -0.02 -3.65 1
14 -0.46 3.68 75.09 398.69 -0.01 3.81
15 -0.41 48.87 -8.18 41.85 0.00 3.45
16 3.07 45.25 -55.74 70.67 -0.01 -7.42
17 2.12 -38.83 41.58 182.12 0.00 -5.05 TL
18 0.69 24.45 -69.58 60.54 0.00 -1.68
19 1.55 12.70 12.63 72.98 0.01 -3.66

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.750 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 3.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 882.1 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 3.800 metre

Breadth, B= 4.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 911.40 64.38 O.K 63.18 O.K 55.55 O.K 56.74
11 831.86 86.01 O.K 85.65 O.K 23.44 O.K 23.81
13 931.18 66.28 O.K 65.52 O.K 56.25 O.K 57.01
14 885.75 97.22 O.K 98.01 O.K 19.32 O.K 18.53
15 930.93 65.02 O.K 65.73 O.K 57.47 O.K 56.76
16 927.32 68.75 O.K 67.21 O.K 53.26 O.K 54.81
17 843.24 73.97 O.K 72.92 O.K 36.98 O.K 38.03
18 906.52 65.79 O.K 65.44 O.K 53.49 O.K 53.84
19 894.76 66.45 O.K 65.69 O.K 51.28 O.K 52.04

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 130.14 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 23.43 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 42.0 mm

Adopting overall depth, D= 450 mm


Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.175 x Ast2 - 159645 x Ast + 23.426 x1000000 = 0

Ast= 147 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 5470 mm

Mini. area of reinforcement = 0.12%bd= 1761.6 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 5362 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 130.14 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 22.25 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 42.0 mm

Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

2.289 x Ast2 - 159645 x Ast + 22.255 x1000000 = 0

Ast= 140 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 5470 mm

Mini. area of reinforcement = 0.12%bd= 1673.52 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 5094 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

x= 0.000 meter

q= 130.14 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

z= 0.000 meter

q= 130.14 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 130.14 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 1.117 meter L'= 1.367

V1= 38.8 KN V2= 39.2

dc1= 367.0 mm dc2= 367.0

tv1= 0.095 N/mm2 tv2= 0.078

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.098 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -8363824.5 N

Required area of steel, As= -24966.64 mm2

Minimum Steel, As = 0.5% of Ac

= 3750 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 327 mm

No. of dowel bar= 10 #

Area of T16 = 2011 mm2 REDO, Increase dia or no. of bar

Provide 10- T16 as dowel bars.


Z paste ur value here
4 10 2.348
L 2 11 0.736
13 1.469
14 -0.457
15 -0.412
l 16 3.071
X 17 2.116
b B
18 0.694
19 1.554
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 663.26 kN
= 171.00 kN
= 47.81 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.500 O.K


tan aB = 1.500 O.K
0.9 √{(100qo/fck)+1}= 1.062

MAX= 98.01
MIN= 18.53 % 0.00
Node L/C
Itensities Check for Sliding of 4 10
Point 4,q4 Max Min footing 11
O.K 64.38 55.55 13.1 NO SLIDING 0.0 13
O.K 86.01 23.44 4.9 NO SLIDING 0.0 14
O.K 66.28 56.25 27.2 NO SLIDING 0.0 15
O.K 98.01 18.53 4.7 NO SLIDING 0.0 16
O.K 65.73 56.76 45.5 NO SLIDING 0.0 17
O.K 68.75 53.26 6.7 NO SLIDING 0.0 18
O.K 73.97 36.98 8.1 NO SLIDING 0.0 19
O.K 65.79 53.49 5.2 NO SLIDING 0.0
O.K 66.45 51.28 28.3 NO SLIDING 0.0

Any specified value)= 0 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
29.332 -27.929 -45.09 -0.012 -12.783
-50.205 68.348 110.128 0.001 -3.961
49.117 -13.701 5.874 -0.016 -8.055
3.684 75.086 173.429 -0.007 2.438
48.867 -8.177 17.318 -0.003 2.21
45.249 -55.736 -96.542 -0.008 -16.637
-38.83 41.576 57.39 0.002 -11.394
24.449 -69.584 -148.21 0 -3.76
12.695 12.631 35.084 0.005 -8.317
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.348 29.332 -27.929 -45.09 -0.012 -12.783
0.736 -50.205 68.348 110.128 0.001 -3.961
1.469 49.117 -13.701 5.874 -0.016 -8.055
-0.457 3.684 75.086 173.429 -0.007 2.438
-0.412 48.867 -8.177 17.318 -0.003 2.21
3.071 45.249 -55.736 -96.542 -0.008 -16.637
2.116 -38.83 41.576 57.39 0.002 -11.394
0.694 24.449 -69.584 -148.21 0 -3.76
1.554 12.695 12.631 35.084 0.005 -8.317
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 5.84 31.12 -34.61 -12.96 -0.07 -6.28
11 12.14 -15.29 33.25 140.07 0.00 10.48
13 -5.59 40.23 -27.11 -4.86 -0.08 12.18 1
14 0.40 10.19 39.40 198.13 -0.02 2.06
15 0.59 32.49 -3.13 26.80 -0.01 1.97
16 19.70 33.95 -44.01 -1.76 -0.05 7.13
17 27.86 -9.27 19.09 75.18 0.01 22.64 TL
18 0.48 19.81 -43.37 -1.34 -0.01 -3.98
19 35.60 12.28 15.31 98.69 0.03 35.11

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 404.9 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.800 metre

Breadth, B= 3.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 436.00 50.42 O.K 47.22 O.K 53.39 O.K 56.59
11 389.59 77.06 O.K 82.40 O.K 15.70 O.K 10.36
13 445.11 48.72 O.K 54.94 O.K 57.25 O.K 51.04
14 415.07 96.06 O.K 97.11 O.K 2.76 O.K 1.71
15 437.37 57.94 O.K 58.95 O.K 46.19 O.K 45.19
16 438.83 50.00 O.K 53.64 O.K 54.48 O.K 50.84
17 395.61 59.22 O.K 70.77 O.K 34.97 O.K 23.42
18 424.69 51.25 O.K 49.23 O.K 49.86 O.K 51.89
19 417.16 64.20 O.K 82.12 O.K 35.12 O.K 17.21

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 33.92 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.900 x Ast2 - 94395 x Ast + 33.919 x1000000 = 0

Ast= 363 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 781.2 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 4021 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 31.66 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

3.107 x Ast2 - 94395 x Ast + 31.658 x1000000 = 0

Ast= 339 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 729.12 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 3753 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 62.561 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 58.391 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 1.217

V1= 91.8 KN V2= 96.6

dc1= 217.0 mm dc2= 217.0

tv1= 0.518 N/mm2 tv2= 0.366

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.101 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6689653.5 N

Required area of steel, As= -19969.115 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 10 #

Area of T16 = 2011 mm2 REDO, Increase dia or no. of bar

Provide 10- T16 as dowel bars.


Z paste ur value here
286 10 5.841
L 2 11 12.142
13 -5.594
14 0.402
15 0.585
l 16 19.701
X 17 27.861
b B
18 0.475
19 35.6
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 308.88 kN
= 63.00 kN
= 33.00 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.060

MAX= 97.11
MIN= 1.71 % 0.00
Node L/C
Itensities Check for Sliding of 286 10
Point 4,q4 Max Min footing 11
O.K 56.59 47.22 5.0 NO SLIDING 0.0 13
O.K 82.40 10.36 4.7 NO SLIDING 0.0 14
O.K 57.25 48.72 6.6 NO SLIDING 0.0 15
O.K 97.11 1.71 4.2 NO SLIDING 0.0 16
O.K 58.95 45.19 55.9 NO SLIDING 0.0 17
O.K 54.48 50.00 4.0 NO SLIDING 0.0 18
O.K 70.77 23.42 5.7 NO SLIDING 0.0 19
O.K 51.89 49.23 3.9 NO SLIDING 0.0
O.K 82.12 17.21 4.7 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
31.122 -34.607 -99.479 -0.074 -20.882
-15.287 33.252 56.938 0.002 -19.878
40.231 -27.112 -72.641 -0.082 -1.805
10.187 39.401 99.63 -0.023 1.058
32.493 -3.13 18.97 -0.012 0.511
33.946 -44.006 -111.772 -0.051 -42.123
-9.27 19.085 27.472 0.005 -47.013
19.812 -43.373 -109.773 -0.009 -5.163
12.28 15.314 60.407 0.025 -53.893

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
5.841 31.122 -34.607 -99.479 -0.074 -20.882
12.142 -15.287 33.252 56.938 0.002 -19.878
-5.594 40.231 -27.112 -72.641 -0.082 -1.805
0.402 10.187 39.401 99.63 -0.023 1.058
0.585 32.493 -3.13 18.97 -0.012 0.511
19.701 33.946 -44.006 -111.772 -0.051 -42.123
27.861 -9.27 19.085 27.472 0.005 -47.013
0.475 19.812 -43.373 -109.773 -0.009 -5.163
35.6 12.28 15.314 60.407 0.025 -53.893
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 3.68 36.79 -1.34 2.67 0.00 7.37
11 10.08 -7.73 -4.51 9.02 0.00 20.17
13 -5.79 60.35 2.07 4.14 0.00 11.57 1
14 0.87 28.20 5.07 10.15 0.00 1.73
15 0.76 63.49 7.10 14.20 0.00 1.51
16 15.36 42.78 -0.73 1.46 0.00 30.71
17 23.08 -0.71 -4.40 8.80 0.00 46.16 TL
18 -0.57 15.64 -3.03 6.05 0.00 1.13
19 30.47 55.30 3.74 7.49 0.00 60.93

Size of Column, l= 0.750 metre


Soil Condition -
b= 0.450 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 965.8 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 5.800 metre

Breadth, B= 4.200 metre

Projections, TL= 2.600 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 1002.55 41.00 O.K 41.63 O.K 41.31 O.K 40.69
11 958.04 39.00 O.K 40.71 O.K 39.66 O.K 37.94
13 1026.11 41.87 O.K 42.86 O.K 42.37 O.K 41.39
14 993.97 41.32 O.K 41.47 O.K 40.28 O.K 40.13
15 1029.26 43.02 O.K 43.15 O.K 41.48 O.K 41.35
16 1008.54 40.18 O.K 42.79 O.K 42.62 O.K 40.01
17 965.05 38.17 O.K 42.09 O.K 41.06 O.K 37.14
18 981.41 40.59 O.K 40.69 O.K 39.98 O.K 39.88
19 1021.06 39.77 O.K 44.94 O.K 44.06 O.K 38.89

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 118.11 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 1676.69 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 346.5 mm

Adopting overall depth, D= 500 mm


Providing eff. Depth of footing = 417.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.071 x Ast2 - 181395 x Ast + 1676.690 x1000000 = 0

Ast= 10503 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 80 mm

Mini. area of reinforcement = 0.12%bd= 2101.68 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 5630 mm2 REDO

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 118.11 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 30.83 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 40.0 mm

Providing eff. Depth of footing = 417.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

1.500 x Ast2 - 181395 x Ast + 30.827 x1000000 = 0

Ast= 170 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 6852 mm

Mini. area of reinforcement = 0.12%bd= 2902.32 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 7774 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 500 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 384.9 mm

x= 2.183 meter

q= 118.11 KN/m2

Vu= 1082.903 KN

tv= 0.670 N/mm2

p=100As/bd= 0.348 %

tc= 0.421 N/mm2 REDO

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 500 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 139.0 mm

z= 0.000 meter

q= 118.11 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.964 %

tc= 0.633 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 118.11 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.498 meter L'= 4.364

V1= 663.5 KN V2= 54.9

dc1= 401.0 mm dc2= 278.0

tv1= 3.322 N/mm2 tv2= 0.045

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 REDO

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 2550 mm > Ld (O.K)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.282 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -3701634 N

Required area of steel, As= -11049.654 mm2

Minimum Steel, As = 0.5% of Ac

= 1687.5 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 377 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
285 10 3.684
L 2 11 10.084
13 -5.787
14 0.866
15 0.756
l 16 15.357
X 17 23.082
b B
18 -0.567
19 30.467
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 648.61 kN
= 304.50 kN
= 12.66 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 0.192 Increase Depth or reduce projection T


tan aB = 1.667 O.K
0.9 √{(100qo/fck)+1}= 0.978

MAX= 44.94
MIN= 37.14 % 0.00
Node L/C
Itensities Check for Sliding of 285 10
Point 4,q4 Max Min footing 11
O.K 41.63 40.69 108.9 NO SLIDING 0.0 13
O.K 40.71 37.94 38.0 NO SLIDING 0.0 14
O.K 42.86 41.39 70.9 NO SLIDING 0.0 15
O.K 41.47 40.13 78.4 NO SLIDING 0.0 16
O.K 43.15 41.35 58.0 NO SLIDING 0.0 17
O.K 42.79 40.01 26.3 NO SLIDING 0.0 18
O.K 42.09 37.14 16.7 NO SLIDING 0.0 19
O.K 40.69 39.88 129.7 NO SLIDING 0.0
O.K 44.94 38.89 13.4 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
36.788 -1.337 0 0 0
-7.726 -4.508 0 0 0
60.345 2.071 0 0 0
28.204 5.074 0 0 0
63.494 7.101 0 0 0
42.781 -0.728 0 0 0
-0.711 -4.399 0 0 0
15.644 -3.026 0 0 0
55.295 3.744 0 0 0

pth or reduce projection TL


Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3.684 36.788 -1.337 0 0 0
10.084 -7.726 -4.508 0 0 0
-5.787 60.345 2.071 0 0 0
0.866 28.204 5.074 0 0 0
0.756 63.494 7.101 0 0 0
15.357 42.781 -0.728 0 0 0
23.082 -0.711 -4.399 0 0 0
-0.567 15.644 -3.026 0 0 0
30.467 55.295 3.744 0 0 0
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 2.34 29.59 -28.80 23.39 -0.02 -6.84
11 0.72 -50.21 68.36 281.07 0.00 -2.08
13 1.47 49.33 -14.41 39.03 -0.02 -4.35 1
14 -0.45 3.66 75.18 361.74 -0.01 3.53
15 -0.40 48.85 -8.10 37.88 0.00 3.18
16 3.04 45.42 -56.32 41.90 -0.01 -8.85
17 2.08 -38.83 41.56 5.00 -0.01 -11.25 TL
18 0.69 24.54 -69.90 75.86 -0.01 -14.73
19 1.52 12.59 12.98 -66.43 -0.01 -12.66

Size of Column, l= 0.600 metre


Soil Condition -
b= 1.000 metre
Soil density =
Safe Bearing capacity of soil, p= 160 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 598.2 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 3.200 metre

Breadth, B= 3.800 metre

Projections, TL= 1.300 metre


TB= 1.400 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 627.75 55.72 O.K 53.61 O.K 47.53 O.K 49.64
11 547.95 81.88 O.K 81.24 O.K 8.25 O.K 8.89
13 647.49 58.99 O.K 57.64 O.K 47.51 O.K 48.85
14 601.82 95.92 O.K 97.01 O.K 3.06 O.K 1.98
15 647.01 57.64 O.K 58.62 O.K 48.78 O.K 47.80
16 643.58 59.73 O.K 57.00 O.K 46.12 O.K 48.85
17 559.34 48.38 O.K 44.91 O.K 43.61 O.K 47.08
18 622.70 63.33 O.K 58.79 O.K 39.09 O.K 43.63
19 610.75 43.55 O.K 39.65 O.K 56.90 O.K 60.80

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 97.01 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 311.49 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 12 mm

cover= 75 mm

Required Depth of Footing, d= 157.0 mm

Adopting overall depth, D= 500 mm


Providing eff. Depth of footing = 419.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.289 x Ast2 - 182265 x Ast + 311.486 x1000000 = 0

Ast= 1747 mm2

Dia of bar, f = 12 mm

Spacing of Y-12= 246 mm

Mini. area of reinforcement = 0.12%bd= 1910.64 mm2

Providing spacing= 200 mm

Actual area providing, Ast x-x= 2149 mm2 O.K

Providing Y-12 @ 200 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 97.01 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 304.21 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 169.1 mm

Providing eff. Depth of footing = 419.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

2.719 x Ast2 - 182265 x Ast + 304.211 x1000000 = 0

Ast= 1713 mm2

Dia of bar, f = 12 mm

Spacing of Y-12= 211 mm

Mini. area of reinforcement = 0.12%bd= 1608.96 mm2

Providing spacing= 200 mm


Actual area providing, Ast z-z= 1810 mm2 O.K

Providing Y-12 @ 200 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 500 mm

Depth of footing at end, Dend= 150 mm

Eff. Depth at critical depth, dc= 306.2 mm

x= 0.881 meter

q= 97.01 KN/m2

Vu= 324.757 KN

tv= 0.279 N/mm2

p=100As/bd= 0.185 %

tc= 0.319 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 500 mm

Depth of footing at end, Dend= 150 mm

Eff. Depth at critical depth, dc= 314.3 mm

z= 0.981 meter

q= 97.01 KN/m2

Vu= 304.521 KN

tv= 0.303 N/mm2

p=100As/bd= 0.180 %

tc= 0.316 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 97.01 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 1.451 meter L'= 0.989

V1= 277.8 KN V2= 241.9

dc1= 362.6 mm dc2= 366.6

tv1= 0.528 N/mm2 tv2= 0.667

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 12 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 816 mm

Actual embedment provided from face of the column is

= 1250 mm > Ld (O.K)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.123 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6676008 N

Required area of steel, As= -19928.382 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 385 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
27 10 2.335
L 2 11 0.718
13 1.473
14 -0.45
15 -0.404
l 16 3.041
X 17 2.079
b B
18 0.688
19 1.518
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 416.16 kN
= 152.00 kN
= 30.00 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 0.385 Increase Depth or reduce projection T


tan aB = 0.357 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.060

MAX= 97.01
MIN= 1.98 % 0.00
Node L/C
Itensities Check for Sliding of 27 10
Point 4,q4 Max Min footing 11
O.K 55.72 47.53 8.7 NO SLIDING 0.0 13
O.K 81.88 8.25 3.2 NO SLIDING 0.0 14
O.K 58.99 47.51 18.0 NO SLIDING 0.0 15
O.K 97.01 1.98 3.2 NO SLIDING 0.0 16
O.K 58.62 47.80 31.9 NO SLIDING 0.0 17
O.K 59.73 46.12 4.6 NO SLIDING 0.0 18
O.K 48.38 43.61 5.4 NO SLIDING 0.0 19
O.K 63.33 39.09 3.6 NO SLIDING 0.0
O.K 60.80 39.65 18.8 NO SLIDING 0.0

Any specified value)= 97.01 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
29.59 -28.8 -48.611 -0.02 -12.675
-50.209 68.359 110.171 0.002 -3.871
49.328 -14.411 3.006 -0.024 -8.037
3.657 75.177 173.796 -0.006 2.4
48.846 -8.102 17.62 -0.003 2.168
45.422 -56.318 -98.891 -0.013 -16.452
-38.825 41.558 -98.891 -0.013 -16.452
24.543 -69.901 -98.891 -0.013 -16.452
12.59 12.984 -98.891 -0.013 -16.452

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.335 29.59 -28.8 -48.611 -0.02 -12.675
0.718 -50.209 68.359 110.171 0.002 -3.871
1.473 49.328 -14.411 3.006 -0.024 -8.037
-0.45 3.657 75.177 173.796 -0.006 2.4
-0.404 48.846 -8.102 17.62 -0.003 2.168
3.041 45.422 -56.318 -98.891 -0.013 -16.452
2.079 -38.825 41.558 57.318 0.004 -11.2
0.688 24.543 -69.901 -149.491 -0.002 -3.719
1.518 12.59 12.984 36.511 0.01 -8.148
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 1.75 50.70 2.23 5.58 0.00 4.38
11 0.03 -38.23 -8.97 22.42 0.00 0.07
13 1.82 97.89 7.72 19.30 0.00 4.55 1
14 0.37 56.00 4.09 10.23 0.00 0.92
15 0.13 98.37 8.16 20.39 0.00 0.33
16 1.36 79.48 3.41 8.53 0.00 3.41
17 0.11 -23.47 -8.58 21.46 0.00 0.28 TL
18 0.25 29.99 -2.24 5.61 0.00 0.63
19 -0.40 82.50 0.29 0.73 0.00 1.01

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 178.8 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 1.800 metre

Breadth, B= 2.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 229.50 64.34 O.K 72.45 O.K 63.16 O.K 55.05
11 140.57 57.67 O.K 57.79 O.K 20.42 O.K 20.30
13 276.69 88.72 O.K 97.15 O.K 64.99 O.K 56.57
14 234.80 72.90 O.K 74.60 O.K 57.55 O.K 55.85
15 277.17 93.68 O.K 94.29 O.K 60.30 O.K 59.70
16 258.28 75.69 O.K 82.01 O.K 67.80 O.K 61.48
17 155.33 60.77 O.K 61.28 O.K 25.52 O.K 25.01
18 208.79 62.09 O.K 63.25 O.K 53.90 O.K 52.74
19 261.30 72.26 O.K 74.12 O.K 72.91 O.K 71.04

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 22.61 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 20.35 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

4.833 x Ast2 - 94395 x Ast + 20.351 x1000000 = 0

Ast= 218 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 468.72 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 2413 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 41.708 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 37.537 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 1.217

V1= 67.8 KN V2= 72.6

dc1= 217.0 mm dc2= 217.0

tv1= 0.382 N/mm2 tv2= 0.275

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.246 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6602451 N

Required area of steel, As= -19708.809 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
170 10 1.751
L 2 11 0.026
13 1.82
14 0.366
15 0.131
l 16 1.364
X 17 0.111
b B
18 0.251
19 -0.403
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 118.80 kN
= 27.00 kN
= 33.00 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.061

MAX= 97.15
MIN= 20.30 % 0.00
Node L/C
Itensities Check for Sliding of 170 10
Point 4,q4 Max Min footing 11
O.K 72.45 55.05 41.1 NO SLIDING 0.0 13
O.K 57.79 20.30 6.3 NO SLIDING 0.0 14
O.K 97.15 56.57 14.3 NO SLIDING 0.0 15
O.K 74.60 55.85 23.0 NO SLIDING 0.0 16
O.K 94.29 59.70 13.6 NO SLIDING 0.0 17
O.K 82.01 61.48 30.3 NO SLIDING 0.0 18
O.K 61.28 25.01 7.2 NO SLIDING 0.0 19
O.K 63.25 52.74 37.2 NO SLIDING 0.0
O.K 74.12 71.04 259.4 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
50.701 2.231 0 0 0
-38.228 -8.968 0 0 0
97.888 7.718 0 0 0
56.003 4.092 0 0 0
98.366 8.156 0 0 0
79.479 3.411 0 0 0
-23.472 -8.583 0 0 0
29.992 -2.244 0 0 0
82.497 0.291 0 0 0

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1.751 50.701 2.231 0 0 0
0.026 -38.228 -8.968 0 0 0
1.82 97.888 7.718 0 0 0
0.366 56.003 4.092 0 0 0
0.131 98.366 8.156 0 0 0
1.364 79.479 3.411 0 0 0
0.111 -23.472 -8.583 0 0 0
0.251 29.992 -2.244 0 0 0
-0.403 82.497 0.291 0 0 0
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 1.79 22.25 -18.26 13.36 -0.01 -6.97
11 0.36 -33.71 46.60 194.29 0.05 -2.14
13 1.02 31.63 -11.25 17.69 -0.04 -4.52 1
14 -0.68 2.51 39.87 185.35 0.01 4.56
15 -0.65 30.64 -7.04 18.15 0.00 4.27
16 2.40 24.50 -30.50 18.21 0.02 -8.97
17 1.56 -26.58 31.65 21.08 0.02 -11.07 TL
18 0.33 10.95 -33.89 26.67 0.02 -14.15
19 1.05 6.31 10.03 -32.97 0.02 -12.35

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 442.0 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 3.000 metre

Breadth, B= 3.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 464.21 56.10 O.K 53.00 O.K 47.06 O.K 50.16
11 408.25 89.01 O.K 88.06 O.K 1.71 O.K 2.66
13 473.59 57.56 O.K 55.55 O.K 47.69 O.K 49.70
14 444.47 89.56 O.K 91.59 O.K 9.21 O.K 7.18
15 472.60 55.60 O.K 57.49 O.K 49.43 O.K 47.53
16 466.46 57.87 O.K 53.88 O.K 45.79 O.K 49.78
17 415.38 53.30 O.K 48.38 O.K 39.01 O.K 43.93
18 452.91 59.40 O.K 53.10 O.K 41.25 O.K 47.54
19 448.27 45.23 O.K 39.74 O.K 54.39 O.K 59.88

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 245.63 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 33.16 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 57.7 mm

Adopting overall depth, D= 450 mm


Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.900 x Ast2 - 159645 x Ast + 33.159 x1000000 = 0

Ast= 208 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1321.2 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 4021 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 245.63 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 33.16 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 57.7 mm

Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

2.900 x Ast2 - 159645 x Ast + 33.159 x1000000 = 0

Ast= 208 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1321.2 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 4021 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

x= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

z= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 245.63 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.967 meter L'= 1.367

V1= 56.8 KN V2= 62.5

dc1= 367.0 mm dc2= 367.0

tv1= 0.160 N/mm2 tv2= 0.125

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.079 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6702552 N

Required area of steel, As= -20007.618 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 327 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
41 10 1.787
L 2 11 0.362
13 1.021
14 -0.681
15 -0.648
l 16 2.404
X 17 1.561
b B
18 0.329
19 1.05
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 309.96 kN
= 101.25 kN
= 30.75 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.500 O.K


tan aB = 1.500 O.K
0.9 √{(100qo/fck)+1}= 1.052

MAX= 91.59
MIN= 1.71 % 0.00
Node L/C
Itensities Check for Sliding of 41 10
Point 4,q4 Max Min footing 11
O.K 56.10 47.06 10.2 NO SLIDING 0.0 13
O.K 89.01 1.71 3.5 NO SLIDING 0.0 14
O.K 57.56 47.69 16.8 NO SLIDING 0.0 15
O.K 91.59 7.18 4.5 NO SLIDING 0.0 16
O.K 57.49 47.53 26.9 NO SLIDING 0.0 17
O.K 57.87 45.79 6.1 NO SLIDING 0.0 18
O.K 53.30 39.01 5.2 NO SLIDING 0.0 19
O.K 59.40 41.25 5.3 NO SLIDING 0.0
O.K 59.88 39.74 17.9 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
22.248 -18.26 -32.291 -0.006 -11.436
-33.713 46.602 77.78 0.048 -3.042
31.632 -11.245 -10.423 -0.04 -7.076
2.51 39.872 85.672 0.009 2.862
30.639 -7.04 0.549 -0.004 2.648
24.495 -30.502 -58.05 0.018 -14.977
-26.58 31.653 -58.05 0.018 -14.977
10.947 -33.888 -58.05 0.018 -14.977
6.309 10.034 -58.05 0.018 -14.977
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1.787 22.248 -18.26 -32.291 -0.006 -11.436
0.362 -33.713 46.602 77.78 0.048 -3.042
1.021 31.632 -11.245 -10.423 -0.04 -7.076
-0.681 2.51 39.872 85.672 0.009 2.862
-0.648 30.639 -7.04 0.549 -0.004 2.648
2.404 24.495 -30.502 -58.05 0.018 -14.977
1.561 -26.58 31.653 48.628 0.066 -9.958
0.329 10.947 -33.888 -74.844 0.006 -2.928
1.05 6.309 10.034 24.297 0.075 -7.035
CRITICAL
SECTION
CRITICAL
SECTION

d/2
B B' d/2

2 L'

L
a
CRITICAL
SECTION

TL
CRITICAL
SECTION

TB
CRITICAL
SECTION

CRITICAL
SECTION

z
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 2.79 8.15 -7.84 4.21 -0.01 -8.27
11 -0.77 -14.18 24.64 104.51 -0.02 8.52
13 3.53 15.34 -1.08 8.89 -0.01 -10.84 1
14 -0.57 5.26 18.61 92.21 -0.01 4.87
15 -0.40 15.56 0.48 9.37 0.00 2.34
16 2.21 10.61 -19.50 6.60 -0.01 -6.63
17 -0.45 -13.65 14.85 -5.02 -0.01 -11.03 TL
18 0.51 8.96 -27.90 27.61 -0.01 -10.88
19 -2.07 6.16 4.04 -32.05 -0.01 -6.97

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 303.6 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.500 metre

Breadth, B= 2.500 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 311.76 54.68 O.K 48.32 O.K 45.09 O.K 51.44
11 289.43 83.17 O.K 89.71 O.K 9.45 O.K 2.91
13 318.96 58.61 O.K 50.29 O.K 43.46 O.K 51.78
14 308.87 82.96 O.K 86.70 O.K 15.88 O.K 12.14
15 319.17 53.77 O.K 55.56 O.K 48.37 O.K 46.57
16 314.22 55.35 O.K 50.26 O.K 45.20 O.K 50.29
17 289.96 48.70 O.K 40.23 O.K 44.09 O.K 52.56
18 312.57 64.79 O.K 56.44 O.K 35.23 O.K 43.59
19 309.77 39.93 O.K 34.58 O.K 59.19 O.K 64.55

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 28.27 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

3.480 x Ast2 - 94395 x Ast + 28.266 x1000000 = 0

Ast= 303 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 651 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 3351 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 28.27 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

3.480 x Ast2 - 94395 x Ast + 28.266 x1000000 = 0

Ast= 303 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 651 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 3351 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 52.134 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 52.134 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 1.217

V1= 79.8 KN V2= 89.4

dc1= 217.0 mm dc2= 217.0

tv1= 0.450 N/mm2 tv2= 0.339

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.039 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6726664.5 N

Required area of steel, As= -20079.596 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
40 10 2.786
L 2 11 -0.77
13 3.532
14 -0.567
15 -0.401
l 16 2.211
X 17 -0.45
b B
18 0.512
19 -2.073
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 223.74 kN
= 46.88 kN
= 33.00 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.049

MAX= 89.71
MIN= 2.91 % 0.00
Node L/C
Itensities Check for Sliding of 40 10
Point 4,q4 Max Min footing 11
O.K 54.68 45.09 15.9 NO SLIDING 0.0 13
O.K 89.71 2.91 4.7 NO SLIDING 0.0 14
O.K 58.61 43.46 36.1 NO SLIDING 0.0 15
O.K 86.70 12.14 6.6 NO SLIDING 0.0 16
O.K 55.56 46.57 267.1 NO SLIDING 0.0 17
O.K 55.35 45.20 6.4 NO SLIDING 0.0 18
O.K 52.56 40.23 7.8 NO SLIDING 0.0 19
O.K 64.79 35.23 4.5 NO SLIDING 0.0
O.K 64.55 34.58 30.7 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
8.148 -7.84 -15.388 -0.013 -15.237
-14.181 24.643 42.905 -0.018 6.591
15.343 -1.082 6.189 -0.009 -19.665
5.256 18.613 45.679 -0.007 3.448
15.557 0.478 8.172 0.003 1.339
10.605 -19.495 -42.142 -0.012 -12.156
-13.654 14.848 -42.142 -0.012 -12.156
8.957 -27.9 -42.142 -0.012 -12.156
6.157 4.035 -42.142 -0.012 -12.156

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.786 8.148 -7.84 -15.388 -0.013 -15.237
-0.77 -14.181 24.643 42.905 -0.018 6.591
3.532 15.343 -1.082 6.189 -0.009 -19.665
-0.567 5.256 18.613 45.679 -0.007 3.448
-0.401 15.557 0.478 8.172 0.003 1.339
2.211 10.605 -19.495 -42.142 -0.012 -12.156
-0.45 -13.654 14.848 20.253 -0.017 4.594
0.512 8.957 -27.9 -65.543 -0.001 -2.281
-2.073 6.157 4.035 8.785 -0.007 11.507
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 2.71 2.09 -0.37 0.37 0.00 2.71
11 0.11 -29.35 -1.14 1.14 0.00 0.11
13 2.84 23.20 0.91 0.91 0.00 2.84 1
14 0.63 -0.73 2.09 2.09 0.00 0.63
15 0.28 29.15 0.89 0.89 0.00 0.28
16 2.12 5.65 -1.06 1.06 0.00 2.12
17 0.22 -25.53 -2.27 2.27 0.00 0.22 TL
18 0.47 1.63 -2.03 2.03 0.00 0.47
19 -0.57 25.10 -1.17 1.17 0.00 0.57

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 1.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 83.3 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.000 metre

Breadth, B= 2.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 85.43 19.60 O.K 23.67 O.K 23.12 O.K 19.05
11 53.99 14.27 O.K 14.44 O.K 12.73 O.K 12.56
13 106.54 25.18 O.K 29.44 O.K 28.08 O.K 23.82
14 82.61 21.75 O.K 22.69 O.K 19.55 O.K 18.62
15 112.49 28.58 O.K 29.00 O.K 27.66 O.K 27.25
16 88.99 21.45 O.K 24.63 O.K 23.05 O.K 19.86
17 57.81 15.99 O.K 16.32 O.K 12.92 O.K 12.59
18 84.97 22.41 O.K 23.11 O.K 20.07 O.K 19.37
19 108.44 27.56 O.K 28.41 O.K 26.66 O.K 25.81

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 22.61 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 22.61 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 41.708 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 41.708 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.817 meter L'= 1.217

V1= 67.8 KN V2= 77.4

dc1= 217.0 mm dc2= 217.0

tv1= 0.382 N/mm2 tv2= 0.293

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.073 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6706281 N

Required area of steel, As= -20018.749 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
39 10 2.713
L 2 11 0.114
13 2.84
14 0.626
15 0.278
l 16 2.121
X 17 0.223
b B
18 0.469
19 -0.566
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 42.84 kN
= 30.00 kN
= 10.50 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 O.K


tan aB = 1.000 O.K
0.9 √{(100qo/fck)+1}= 0.952

MAX= 29.44
MIN= 12.56 % 0.00
Node L/C
Itensities Check for Sliding of 39 10
Point 4,q4 Max Min footing 11
O.K 23.67 19.05 12.6 NO SLIDING 0.0 13
O.K 14.44 12.56 19.0 NO SLIDING 0.0 14
O.K 29.44 23.82 15.0 NO SLIDING 0.0 15
O.K 22.69 18.62 15.8 NO SLIDING 0.0 16
O.K 29.00 27.25 50.7 NO SLIDING 0.0 17
O.K 24.63 19.86 16.8 NO SLIDING 0.0 18
O.K 16.32 12.59 10.2 NO SLIDING 0.0 19
O.K 23.11 19.37 16.8 NO SLIDING 0.0
O.K 28.41 25.81 37.2 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
2.093 -0.365 0 0 0
-29.354 -1.139 0 0 0
23.198 0.907 0 0 0
-0.729 2.09 0 0 0
29.146 0.888 0 0 0
5.653 -1.058 0 0 0
-25.528 -2.266 0 0 0
1.63 -2.027 0 0 0
25.104 -1.166 0 0 0
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.713 2.093 -0.365 0 0 0
0.114 -29.354 -1.139 0 0 0
2.84 23.198 0.907 0 0 0
0.626 -0.729 2.09 0 0 0
0.278 29.146 0.888 0 0 0
2.121 5.653 -1.058 0 0 0
0.223 -25.528 -2.266 0 0 0
0.469 1.63 -2.027 0 0 0
-0.566 25.104 -1.166 0 0 0
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 2.77 28.80 -26.10 19.74 -0.02 -8.42
11 -1.53 -38.77 60.59 260.02 0.00 12.20
13 3.64 41.05 -11.02 20.35 -0.02 -11.05 1
14 -0.69 3.59 72.59 342.29 -0.01 5.50
15 -0.15 40.96 -5.92 17.31 0.00 1.17
16 2.20 37.40 -52.71 27.29 -0.02 -6.71
17 -1.14 -29.29 34.73 -17.66 -0.02 -9.37 TL
18 0.34 22.38 -67.79 65.00 -0.02 -11.36
19 -2.17 11.49 10.14 -79.13 -0.02 -6.80

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 598.4 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 3.500 metre

Breadth, B= 3.500 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 627.25 55.15 O.K 52.79 O.K 47.26 O.K 49.62
11 559.68 80.37 O.K 83.78 O.K 11.01 O.K 7.59
13 639.49 56.60 O.K 53.50 O.K 47.81 O.K 50.90
14 602.04 96.28 O.K 97.82 O.K 2.02 O.K 0.48
15 639.41 54.46 O.K 54.78 O.K 49.94 O.K 49.61
16 635.85 56.66 O.K 54.79 O.K 47.15 O.K 49.03
17 569.16 45.30 O.K 42.68 O.K 47.62 O.K 50.24
18 620.83 61.37 O.K 58.19 O.K 39.99 O.K 43.17
19 609.94 39.67 O.K 37.77 O.K 59.91 O.K 61.82

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 245.63 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 38.69 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 57.7 mm

Adopting overall depth, D= 450 mm


Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.486 x Ast2 - 159645 x Ast + 38.686 x1000000 = 0

Ast= 243 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1541.4 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 4691 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 245.63 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 38.69 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 57.7 mm

Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

2.486 x Ast2 - 159645 x Ast + 38.686 x1000000 = 0

Ast= 243 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1541.4 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 4691 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

x= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

z= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 245.63 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.967 meter L'= 1.367

V1= 63.9 KN V2= 69.6

dc1= 367.0 mm dc2= 367.0

tv1= 0.180 N/mm2 tv2= 0.139

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.103 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6688431 N

Required area of steel, As= -19965.466 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 327 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
69 10 2.765
L 2 11 -1.525
13 3.641
14 -0.691
15 -0.147
l 16 2.204
X 17 -1.139
b B
18 0.344
19 -2.17
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 429.89 kN
= 137.81 kN
= 30.75 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.500 O.K


tan aB = 1.500 O.K
0.9 √{(100qo/fck)+1}= 1.062

MAX= 97.82
MIN= 0.48 % 0.00
Node L/C
Itensities Check for Sliding of 69 10
Point 4,q4 Max Min footing 11
O.K 55.15 47.26 9.6 NO SLIDING 0.0 13
O.K 83.78 7.59 3.7 NO SLIDING 0.0 14
O.K 56.60 47.81 23.2 NO SLIDING 0.0 15
O.K 97.82 0.48 3.3 NO SLIDING 0.0 16
O.K 54.78 49.61 43.2 NO SLIDING 0.0 17
O.K 56.66 47.15 4.8 NO SLIDING 0.0 18
O.K 50.24 42.68 6.6 NO SLIDING 0.0 19
O.K 61.37 39.99 3.7 NO SLIDING 0.0
O.K 61.82 37.77 24.1 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
28.804 -26.102 -45.513 -0.021 -15.331
-38.766 60.59 108.547 -0.002 8.385
41.046 -11.018 -7.193 -0.017 -20.156
3.588 72.594 160.804 -0.005 3.775
40.962 -5.922 2.507 0.002 0.799
37.404 -52.707 -104.481 -0.015 -12.22
-29.291 34.73 -104.481 -0.015 -12.22
22.382 -67.791 -104.481 -0.015 -12.22
11.489 10.141 -104.481 -0.015 -12.22
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
2.765 28.804 -26.102 -45.513 -0.021 -15.331
-1.525 -38.766 60.59 108.547 -0.002 8.385
3.641 41.046 -11.018 -7.193 -0.017 -20.156
-0.691 3.588 72.594 160.804 -0.005 3.775
-0.147 40.962 -5.922 2.507 0.002 0.799
2.204 37.404 -52.707 -104.481 -0.015 -12.22
-1.139 -29.291 34.73 54.133 -0.005 6.25
0.344 22.382 -67.791 -146.515 -0.001 -1.92
-2.17 11.489 10.141 19.181 0.004 11.959
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 21.65 4.34 7.37 55.80 -0.09 -17.87
11 -9.89 -3.58 28.32 137.57 -0.01 62.48
13 28.59 6.94 13.52 83.68 -0.09 -23.72 1
14 -2.78 -1.19 35.13 186.09 -0.02 22.02
15 -1.04 14.26 6.04 36.44 -0.01 6.72
16 19.74 9.44 -6.63 20.32 -0.07 -10.98
17 -14.50 1.34 13.50 37.49 -0.07 -24.08 TL
18 3.53 13.23 -23.90 63.50 -0.07 -51.50
19 -17.11 12.43 5.52 17.56 -0.07 -17.56

Size of Column, l= 1.000 metre


Soil Condition -
b= 0.600 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.500 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 442.0 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 3.000 metre

Breadth, B= 3.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 446.30 65.96 O.K 58.02 O.K 33.22 O.K 41.16
11 438.38 65.40 O.K 93.17 O.K 32.02 O.K 4.25
13 448.90 73.75 O.K 63.20 O.K 26.01 O.K 36.55
14 440.77 85.43 O.K 95.22 O.K 12.51 O.K 2.73
15 456.22 57.30 O.K 60.28 O.K 44.09 O.K 41.10
16 451.40 57.11 O.K 52.23 O.K 43.20 O.K 48.08
17 443.30 62.94 O.K 52.24 O.K 35.57 O.K 46.28
18 455.19 76.13 O.K 53.24 O.K 25.02 O.K 47.91
19 454.39 58.29 O.K 50.49 O.K 42.68 O.K 50.49

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 245.63 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 33.16 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 57.7 mm

Adopting overall depth, D= 450 mm


Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

2.900 x Ast2 - 159645 x Ast + 33.159 x1000000 = 0

Ast= 208 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1321.2 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 4021 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 245.63 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 33.16 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 57.7 mm

Providing eff. Depth of footing = 367.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

2.900 x Ast2 - 159645 x Ast + 33.159 x1000000 = 0

Ast= 208 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 2893 mm

Mini. area of reinforcement = 0.12%bd= 1321.2 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 4021 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

x= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 450 mm

Depth of footing at end, Dend= 450 mm

Eff. Depth at critical depth, dc= 367.0 mm

z= 0.000 meter

q= 245.63 KN/m2

Vu= 0.000 KN

tv= 0.000 N/mm2

p=100As/bd= 0.365 %

tc= 0.429 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 245.63 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.967 meter L'= 1.367

V1= 56.8 KN V2= 62.5

dc1= 367.0 mm dc2= 367.0

tv1= 0.160 N/mm2 tv2= 0.125

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.036 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -6728611.5 N

Required area of steel, As= -20085.407 mm2

Minimum Steel, As = 0.5% of Ac

= 3000 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 327 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
82 10 21.648
L 2 11 -9.89
13 28.593
14 -2.784
15 -1.036
l 16 19.742
X 17 -14.499
b B
18 3.531
19 -17.109
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 309.96 kN
= 101.25 kN
= 30.75 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.500 O.K


tan aB = 1.500 O.K
0.9 √{(100qo/fck)+1}= 1.058

MAX= 95.22
MIN= 2.73 % 0.00
Node L/C
Itensities Check for Sliding of 82 10
Point 4,q4 Max Min footing 11
O.K 65.96 33.22 8.2 NO SLIDING 0.0 13
O.K 93.17 4.25 6.2 NO SLIDING 0.0 14
O.K 73.75 26.01 6.3 NO SLIDING 0.0 15
O.K 95.22 2.73 5.0 NO SLIDING 0.0 16
O.K 60.28 41.10 30.2 NO SLIDING 0.0 17
O.K 57.11 43.20 9.1 NO SLIDING 0.0 18
O.K 62.94 35.57 12.2 NO SLIDING 0.0 19
O.K 76.13 25.02 7.6 NO SLIDING 0.0
O.K 58.29 42.68 10.6 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
4.34 7.369 37.379 -0.091 -71.993
-3.576 28.32 66.774 -0.008 37.755
6.944 13.524 49.874 -0.092 -95.206
-1.189 35.128 98.273 -0.024 15.063
14.259 6.04 21.34 -0.008 4.131
9.436 -6.63 3.747 -0.066 -60.332
1.343 13.498 3.747 -0.066 -60.332
13.227 -23.903 3.747 -0.066 -60.332
12.428 5.524 3.747 -0.066 -60.332
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
21.648 4.34 7.369 37.379 -0.091 -71.993
-9.89 -3.576 28.32 66.774 -0.008 37.755
28.593 6.944 13.524 49.874 -0.092 -95.206
-2.784 -1.189 35.128 98.273 -0.024 15.063
-1.036 14.259 6.04 21.34 -0.008 4.131
19.742 9.436 -6.63 3.747 -0.066 -60.332
-14.499 1.343 13.498 29.231 -0.005 37.623
3.531 13.227 -23.903 -46.344 -0.015 -9.707
-17.109 12.428 5.524 15.679 0.022 57.8
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 1.53 53.91 0.64 1.27 0.00 3.06
11 -0.49 -51.79 -2.17 4.34 0.00 0.98
13 0.78 94.40 2.40 4.79 0.00 1.55 1
14 0.17 41.14 3.78 7.57 0.00 0.34
15 -0.93 94.25 2.63 5.25 0.00 1.86
16 0.46 74.51 -1.19 2.38 0.00 0.92
17 -0.51 -35.71 -3.22 6.43 0.00 1.02 TL
18 -0.33 29.76 -3.64 7.29 0.00 0.65
19 -1.52 68.49 -1.56 3.13 0.00 3.04

Size of Column, l= 0.750 metre


Soil Condition -
b= 0.450 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 127.5 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 1.800 metre

Breadth, B= 1.800 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 181.37 54.14 O.K 60.44 O.K 57.82 O.K 51.52
11 75.67 26.81 O.K 28.83 O.K 19.90 O.K 17.88
13 221.86 71.80 O.K 75.00 O.K 65.15 O.K 61.95
14 168.60 59.47 O.K 60.17 O.K 44.60 O.K 43.90
15 221.71 71.92 O.K 75.74 O.K 64.93 O.K 61.11
16 201.97 63.84 O.K 65.73 O.K 60.83 O.K 58.94
17 91.75 33.89 O.K 35.99 O.K 22.75 O.K 20.65
18 157.22 55.35 O.K 56.69 O.K 41.70 O.K 40.36
19 195.95 60.57 O.K 66.82 O.K 60.39 O.K 54.14

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 20.35 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

4.833 x Ast2 - 94395 x Ast + 20.351 x1000000 = 0

Ast= 218 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 468.72 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2413 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 20.35 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

4.833 x Ast2 - 94395 x Ast + 20.351 x1000000 = 0

Ast= 218 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 468.72 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 2413 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 37.537 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 37.537 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.667 meter L'= 0.967

V1= 59.3 KN V2= 66.6

dc1= 217.0 mm dc2= 217.0

tv1= 0.410 N/mm2 tv2= 0.317

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.420 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -3655276.5 N

Required area of steel, As= -10911.273 mm2

Minimum Steel, As = 0.5% of Ac

= 1687.5 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
173 10 1.53
L 2 11 -0.491
13 0.777
14 0.171
15 -0.928
l 16 0.461
X 17 -0.51
b B
18 -0.325
19 -1.518
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 88.82 kN
= 24.30 kN
= 14.34 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.027

MAX= 75.74
MIN= 17.88 % 0.00
Node L/C
Itensities Check for Sliding of 173 10
Point 4,q4 Max Min footing 11
O.K 60.44 51.52 47.4 NO SLIDING 0.0 13
O.K 28.83 17.88 13.9 NO SLIDING 0.0 14
O.K 75.00 61.95 37.1 NO SLIDING 0.0 15
O.K 60.17 43.90 17.8 NO SLIDING 0.0 16
O.K 75.74 61.11 33.8 NO SLIDING 0.0 17
O.K 65.73 58.94 67.8 NO SLIDING 0.0 18
O.K 35.99 20.65 11.4 NO SLIDING 0.0 19
O.K 56.69 40.36 17.3 NO SLIDING 0.0
O.K 66.82 54.14 50.1 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
53.91 0.637 0 0 0
-51.789 -2.17 0 0 0
94.399 2.395 0 0 0
41.136 3.784 0 0 0
94.25 2.627 0 0 0
74.506 -1.191 0 0 0
-35.714 -3.217 0 0 0
29.76 -3.643 0 0 0
68.493 -1.563 0 0 0

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1.53 53.91 0.637 0 0 0
-0.491 -51.789 -2.17 0 0 0
0.777 94.399 2.395 0 0 0
0.171 41.136 3.784 0 0 0
-0.928 94.25 2.627 0 0 0
0.461 74.506 -1.191 0 0 0
-0.51 -35.714 -3.217 0 0 0
-0.325 29.76 -3.643 0 0 0
-1.518 68.493 -1.563 0 0 0
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 4.21 38.79 -0.51 1.02 0.00 8.42
11 -0.35 -9.09 1.45 2.91 0.00 0.69
13 4.62 50.02 1.60 3.20 0.00 9.25 1
14 0.91 37.74 4.03 8.06 0.00 1.82
15 0.42 54.25 1.73 3.47 0.00 0.83
16 2.40 39.84 -0.50 1.00 0.00 4.81
17 -1.69 -0.25 0.81 1.62 0.00 3.37 TL
18 1.02 14.87 -2.24 4.48 0.00 2.03
19 -2.43 60.67 2.62 5.24 0.00 4.87

Size of Column, l= 0.750 metre


Soil Condition -
b= 0.450 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 89.7 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 1.500 metre

Breadth, B= 1.500 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 128.53 43.97 O.K 73.91 O.K 70.28 O.K 40.34
11 80.65 39.79 O.K 42.24 O.K 31.91 O.K 29.45
13 139.76 51.37 O.K 84.25 O.K 72.86 O.K 39.98
14 127.48 67.76 O.K 74.22 O.K 45.56 O.K 39.10
15 143.99 68.69 O.K 71.64 O.K 59.31 O.K 56.36
16 129.58 50.82 O.K 67.91 O.K 64.36 O.K 47.27
17 89.49 36.66 O.K 48.66 O.K 42.89 O.K 30.89
18 104.61 50.84 O.K 58.07 O.K 42.14 O.K 34.91
19 150.41 67.52 O.K 84.83 O.K 66.18 O.K 48.87

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 16.96 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

5.800 x Ast2 - 94395 x Ast + 16.959 x1000000 = 0

Ast= 182 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 390.6 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2011 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 16.96 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

5.800 x Ast2 - 94395 x Ast + 16.959 x1000000 = 0

Ast= 182 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 390.6 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 2011 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 31.281 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 31.281 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.667 meter L'= 0.967

V1= 52.1 KN V2= 59.3

dc1= 217.0 mm dc2= 217.0

tv1= 0.360 N/mm2 tv2= 0.283

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.270 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -3705873 N

Required area of steel, As= -11062.307 mm2

Minimum Steel, As = 0.5% of Ac

= 1687.5 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
196 10 4.21
L 2 11 -0.345
13 4.624
14 0.909
15 0.415
l 16 2.403
X 17 -1.687
b B
18 1.017
19 -2.434
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 58.52 kN
= 16.88 kN
= 14.34 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.042

MAX= 84.83
MIN= 29.45 % 0.00
Node L/C
Itensities Check for Sliding of 196 10
Point 4,q4 Max Min footing 11
O.K 73.91 40.34 12.2 NO SLIDING 0.0 13
O.K 42.24 29.45 22.2 NO SLIDING 0.0 14
O.K 84.25 39.98 12.1 NO SLIDING 0.0 15
O.K 74.22 39.10 12.7 NO SLIDING 0.0 16
O.K 71.64 56.36 33.2 NO SLIDING 0.0 17
O.K 67.91 47.27 21.6 NO SLIDING 0.0 18
O.K 48.66 30.89 21.2 NO SLIDING 0.0 19
O.K 58.07 34.91 18.7 NO SLIDING 0.0
O.K 84.83 48.87 22.9 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
38.79 -0.511 0 0 0
-9.088 1.453 0 0 0
50.017 1.601 0 0 0
37.74 4.03 0 0 0
54.25 1.734 0 0 0
39.837 -0.5 0 0 0
-0.249 0.812 0 0 0
14.867 -2.24 0 0 0
60.668 2.622 0 0 0

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
4.21 38.79 -0.511 0 0 0
-0.345 -9.088 1.453 0 0 0
4.624 50.017 1.601 0 0 0
0.909 37.74 4.03 0 0 0
0.415 54.25 1.734 0 0 0
2.403 39.837 -0.5 0 0 0
-1.687 -0.249 0.812 0 0 0
1.017 14.867 -2.24 0 0 0
-2.434 60.668 2.622 0 0 0
ISOLATED FOOTING

L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm


10 9.50 21.81 1.81 3.62 0.00 19.00
11 -5.60 61.28 14.52 29.04 0.00 11.21
13 12.12 41.31 0.24 0.48 0.00 24.23 1
14 -3.48 88.56 19.57 39.13 0.00 6.96
15 -2.85 63.32 2.60 5.20 0.00 5.71
16 3.38 13.32 1.64 3.28 0.00 6.76
17 -9.61 50.81 8.95 17.90 0.00 19.23 TL
18 1.83 -3.62 0.58 1.16 0.00 3.65
19 -14.18 73.59 6.10 12.21 0.00 28.36

Size of Column, l= 0.750 metre


Soil Condition -
b= 0.450 metre
Soil density =
Safe Bearing capacity of soil, p= 100 KN/m2 Concrete density =
Projection of column above GL = 0.000 metre
Depth of footing bottom, Dp= 2.000 metre Earth wt.
Footing Concrete wt.
Load of footing & soil, wf= 171.7 KN Column Concrete wt.

P/A +/- Mx*z/Ix +/- Mz*x/Iz < p


OR
P/L*B +/- 6Mx/LB2 +/- 6Mz/BL2 < p

Size of footing,

Length, L= 2.200 metre

Breadth, B= 2.000 metre

Projections, TL= 0.300 metre


TB= 0.300 metre

Pressure intensities at, (KN/m2)


L/C W(KN)
Point 1,q1 Point 2,q2 Point 3,q3 Point 4,q4
10 193.47 34.66 O.K 58.22 O.K 53.28 O.K 29.72
11 232.94 65.79 O.K 79.68 O.K 40.09 O.K 26.20
13 212.97 33.71 O.K 63.75 O.K 63.09 O.K 33.05
14 260.21 81.51 O.K 90.14 O.K 36.77 O.K 28.14
15 234.98 53.42 O.K 60.49 O.K 53.39 O.K 46.32
16 184.98 40.09 O.K 48.46 O.K 43.99 O.K 35.62
17 222.47 50.85 O.K 74.68 O.K 50.27 O.K 26.44
18 168.04 36.72 O.K 41.25 O.K 39.66 O.K 35.14
19 245.24 46.48 O.K 81.64 O.K 64.99 O.K 29.84

BENDING MOMENT ALONG X-X AXIS Pressure (Any specified value)=

q= 251.25 KN/m2

Moment at critical sectiion, M= q*B*TL2/2

= 22.61 KN-m

B.M= 0.133 *fck*bd2 (For Fe 500)

fck= 25 N/mm2

fy= 500 N/mm2

Dia of bar, f = 16 mm

cover= 75 mm

Required Depth of Footing, d= 58.3 mm

Adopting overall depth, D= 300 mm


Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along x-x

B.M= 0.87*fy*Ast* (d - fy*Ast/fck*b)

4.350 x Ast2 - 94395 x Ast + 22.613 x1000000 = 0

Ast= 242 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 520.8 mm2

Providing spacing= 150 mm

Actual area providing, Ast x-x= 2681 mm2 O.K

Providing Y-16 @ 150 mm c/c along x-x direction.

BENDING MOMENT ALONG Z-Z AXIS

q= 251.25 KN/m2

Moment at critical sectiion, M= q*L*TB2/2

= 24.87 KN-m

B.M= 0.138*fck*bd2 (for Fe 415)

Required Depth of Footing, d= 58.3 mm

Providing eff. Depth of footing = 217.0 mm O.K

Reinforcement along Z-Z

B.M= 0.87*fy*At* (d - fy*At/fck*b)

3.955 x Ast2 - 94395 x Ast + 24.874 x1000000 = 0

Ast= 266 mm2

Dia of bar, f = 16 mm

Spacing of Y-16= 1660 mm

Mini. area of reinforcement = 0.12%bd= 572.88 mm2

Providing spacing= 150 mm


Actual area providing, Ast z-z= 2949 mm2 O.K

Providing Y-16 @ 150 mm c/c along z-z direction.

SHEAR ONE-WAY ACTION


The critical section is taken at a distance 'd' away from the face of column.
(Refer IS: 456-2000, Cl-34.2.4.1)

Along x-x
Shear force at critical section, Vux= q*B*x

Depth of footing at centre, Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

x= 0.083 meter

q= 251.25 KN/m2

Vu= 41.708 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

Along z-z
Shear force at critical section, Vuz= q*L*z

Depth of footing at centre,Dcen= 300 mm

Depth of footing at end, Dend= 300 mm

Eff. Depth at critical depth, dc= 217.0 mm

z= 0.083 meter

q= 251.25 KN/m2

Vu= 45.878 KN

tv= 0.096 N/mm2

p=100As/bd= 0.618 %

tc= 0.532 N/mm2 O.K

SHEAR TWO-WAY ACTION


The critical section is taken at a distance 0.5d away from the face of column.
(Refer IS: 456-2000, Cl-31.6)

CRITICAL
SECTION

d/2
B B' d/2

q= 251.25 KN/m2
1

2 L'

L
Force under '1' Force under '2'
V1= 1/2*q*(B+B')*(TL-d/2) V2= 1/2*q*(L+L')*(TB-d/2)

B'= 0.667 meter L'= 0.967

V1= 64.2 KN V2= 76.2

dc1= 217.0 mm dc2= 217.0

tv1= 0.443 N/mm2 tv2= 0.363

Shear strength of M 25 concrete,


Ks = (0.5+bc) = 1.000

tc = 0.25Ö(fck)= 1.250 N/mm2

t'c = Ks * tc= 1.250 N/mm2 O.K

DEVELOPMENT OF REINFORCEMENT-

Development length for 16 mm bars

Ld= fs*f/4*tbd

tbd = 1 N/mm2 (Refer IS:456-2000, Cl-26.2.1.1)

Ld= 1088 mm

Actual embedment provided from face of the column is

= 250 mm < Ld (REDO)

LOAD TRANSFER FROM COLUMN TO FOOTING-

Nominal bearing stress in the column concrete


s br
=P/Ac = 0.394 N/mm2

Allowable bearing stress= 0.45*fck

= 11.250 N/mm2 O.K


NO NEED TO GO FURTHER
Excess Load P= -3664038 N

Required area of steel, As= -10937.427 mm2

Minimum Steel, As = 0.5% of Ac

= 1687.5 mm2

Dia of bar= 16 mm

Ld for compression = 670 mm

The available vertical length L1 for anchorage is,

L1= 177 mm

No. of dowel bar= 8#

Area of T16 = 1608 mm2 REDO, Increase dia or no. of bar

Provide 8- T16 as dowel bars.


Z paste ur value here
190 10 9.501
L 2 11 -5.603
13 12.116
14 -3.481
15 -2.853
l 16 3.378
X 17 -9.614
b B
18 1.826
19 -14.179
TB

Soil Condition - Dry Dry


Submerged
Soil density = 18 KN/m3
Concrete density = 25 KN/m3

= 124.31 kN
= 33.00 kN
= 14.34 kN
a

tan a ≥ 0.9 √{(100qo/fck)+1}

tan aL = 1.000 Increase Depth or reduce projection T


tan aB = 1.000 Increase Depth or reduce projection T
0.9 √{(100qo/fck)+1}= 1.050

MAX= 90.14
MIN= 26.20 % 0.00
Node L/C
Itensities Check for Sliding of 190 10
Point 4,q4 Max Min footing 11
O.K 58.22 29.72 8.1 NO SLIDING 0.0 13
O.K 79.68 26.20 6.4 NO SLIDING 0.0 14
O.K 63.75 33.05 7.0 NO SLIDING 0.0 15
O.K 90.14 28.14 5.3 NO SLIDING 0.0 16
O.K 60.49 46.32 32.9 NO SLIDING 0.0 17
O.K 48.46 35.62 21.9 NO SLIDING 0.0 18
O.K 74.68 26.44 9.3 NO SLIDING 0.0 19
O.K 41.25 35.14 36.8 NO SLIDING 0.0
O.K 81.64 29.84 6.9 NO SLIDING 0.0

Any specified value)= 175 KN/m2

Z
CRITICAL
SECTION

TL
Z

CRITICAL
SECTION
X

TB
CRITICAL
SECTION
Z

CRITICAL
SECTION
X

z
L')*(TB-d/2)

meter

KN

mm

N/mm2

456-2000, Cl-26.2.1.1)
or no. of bar
1111111
21.813 1.81 0 0 0
61.282 14.518 0 0 0
41.312 0.24 0 0 0
88.558 19.567 0 0 0
63.322 2.602 0 0 0
13.319 1.64 0 0 0
50.81 8.951 0 0 0
-3.615 0.58 0 0 0
73.585 6.104 0 0 0

pth or reduce projection TL


pth or reduce projection TB
Horizontal Vertical Horizontal Moment
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
9.501 21.813 1.81 0 0 0
-5.603 61.282 14.518 0 0 0
12.116 41.312 0.24 0 0 0
-3.481 88.558 19.567 0 0 0
-2.853 63.322 2.602 0 0 0
3.378 13.319 1.64 0 0 0
-9.614 50.81 8.951 0 0 0
1.826 -3.615 0.58 0 0 0
-14.179 73.585 6.104 0 0 0

Vous aimerez peut-être aussi