RECAPITULATIF DES INFORMATIONS DES PROFILS EN T

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Longueur Point d'axe Fichier profil Point extrême du profil


Profil n° Abscisse Côté
d'application X Y Z type X
P1 0.000 14.984 563893.240 3588823.256 964.240 G voie 8 m 563894.476
D voie 8 m 563892.000
P2 29.967 29.983 563922.525 3588816.900 964.897 G voie 8 m 563923.739
D voie 8 m 563921.326
P3 59.967 30.000 563951.841 3588810.536 966.874 G voie 8 m 563953.059
D voie 8 m 563950.637
P4 89.966 31.000 563981.159 3588804.172 968.405 G voie 8 m 563982.355
D voie 8 m 563979.975
P5 121.966 30.442 564012.430 3588797.384 969.091 G voie 8 m 564013.598
D voie 8 m 564011.252
P6 150.851 29.442 564040.658 3588791.257 968.524 G voie 8 m 564041.840
D voie 8 m 564039.491
P7 180.851 30.000 564069.975 3588784.894 968.165 G voie 8 m 564071.153
D voie 8 m 564068.807
P8 210.851 29.999 564099.292 3588778.530 967.037 G voie 8 m 564100.467
D voie 8 m 564098.122
P9 240.850 14.999 564128.608 3588772.167 965.734 G voie 8 m 564129.781
D voie 8 m 564127.438
S DES PROFILS EN TRAVERS - VOIE SECONDAIRE -23-

final 1035 voirie.dwg

Point extrême du profil Distance au pt d'axe (m) Point d'entrée en terre Distance au pt d'axe (m)
Y Z Largeur 2D Largeur 3D X Y Z Largeur 2D Largeur 3D
3588828.955 963.787 5.831 5.849 563894.476 3588828.955 963.787 5.831 5.849
3588817.546 964.799 5.843 5.870 563892.000 3588817.546 964.799 5.843 5.870
3588822.495 964.603 5.726 5.733 563923.739 3588822.495 964.603 5.726 5.733
3588811.377 965.168 5.651 5.658 563921.326 3588811.377 965.168 5.651 5.658
3588816.144 966.560 5.739 5.747 563953.059 3588816.144 966.560 5.739 5.747
3588804.988 967.185 5.678 5.686 563950.637 3588804.988 967.185 5.678 5.686
3588809.683 968.241 5.639 5.641 563982.355 3588809.683 968.241 5.639 5.641
3588798.720 968.568 5.579 5.581 563979.975 3588798.720 968.568 5.579 5.581
3588802.762 969.132 5.503 5.503 564013.598 3588802.762 969.132 5.503 5.503
3588791.954 969.051 5.557 5.557 564011.252 3588791.954 969.051 5.557 5.557
3588796.703 968.459 5.572 5.573 564041.840 3588796.703 968.459 5.572 5.573
3588785.881 968.570 5.502 5.502 564039.491 3588785.881 968.570 5.502 5.502
3588790.319 968.131 5.552 5.552 564071.153 3588790.319 968.131 5.552 5.552
3588779.512 968.198 5.507 5.507 564068.807 3588779.512 968.198 5.507 5.507
3588783.943 967.022 5.539 5.539 564100.467 3588783.943 967.022 5.539 5.539
3588773.136 967.052 5.519 5.519 564098.122 3588773.136 967.052 5.519 5.519
3588777.569 965.735 5.528 5.528 564129.781 3588777.569 965.735 5.528 5.528
3588766.773 965.749 5.519 5.519 564127.438 3588766.773 965.749 5.519 5.519
RECAPITULATIF DES EMPRISES ET DU DECAPAGE - VOIE SECONDAIRE -23-

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1
Volume total de décapage (m³) : 701.5404

Longueur Emprise (m) Décapage du TN


Profil n° Abscisse
d'application Gauche Droite Totale Epaisseur Largeur Surface (m²)
P1 0.000 14.984 5.831 5.843 11.675 0.260 11.675 174.93
P2 29.967 29.983 5.726 5.651 11.377 0.260 11.377 341.11
P3 59.967 30.000 5.739 5.678 11.416 0.260 11.416 342.49
P4 89.966 31.000 5.639 5.579 11.218 0.260 11.218 347.76
P5 121.966 30.442 5.503 5.557 11.059 0.260 11.059 336.66
P6 150.851 29.442 5.572 5.502 11.074 0.260 11.074 326.05
P7 180.851 30.000 5.552 5.507 11.059 0.260 11.059 331.77
P8 210.851 29.999 5.539 5.519 11.059 0.260 11.059 331.76
P9 240.850 14.999 5.528 5.519 11.048 0.260 11.048 165.71
2698.2322
CONDAIRE -23-

final 1035 voirie.dwg

Décapage du TN
Cumul Vol.
Volume (m³)
(m³)
45.481 45.481
88.688 134.169
89.047 223.216
90.418 313.634
87.533 401.166
84.772 485.938
86.260 572.198
86.257 658.455
43.085 701.540
RECAPITULATIF DES CUBATURES DEBLAI-REMBLAI PAR PROFIL - VOIE SECOND

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Méthode : Linéaire (Les entrées en terre sont recherchées jusqu'au TN)


Volume cumulé déblais (m³) 546.812
Volume cumulé remblais (m³) 40.691

Longueur Déblais R
Profil n° Abscisse Cumul Vol.
d'application Surf. G (m²) Surf. D (m²) Surf. Tot (m²) Volume (m³) Surf. G (m²)
(m³)
P1 0.000 14.984 0.30 2.55 2.85 42.696 42.696 0.66
P2 29.967 29.983 0.58 1.80 2.38 71.327 114.023 0.35
P3 59.967 30.000 0.54 1.91 2.44 73.251 187.274 0.39
P4 89.966 31.000 0.71 1.52 2.23 69.139 256.413 0.13
P5 121.966 30.442 1.19 0.97 2.16 65.611 322.024 0.00
P6 150.851 29.442 0.90 1.24 2.14 62.975 384.999 0.02
P7 180.851 30.000 0.99 1.17 2.16 64.657 449.656 0.02
P8 210.851 29.999 1.04 1.12 2.16 64.656 514.313 0.01
P9 240.850 14.999 1.05 1.12 2.17 32.500 546.812 0.01
ROFIL - VOIE SECONDAIRE -23-

final 1035 voirie.dwg

es jusqu'au TN)

Remblais
Cumul Vol.
Surf. D (m²) Surf. Tot (m²) Volume (m³)
(m³)
0.02 0.69 10.294 10.294
0.02 0.37 11.175 21.469
0.02 0.41 12.392 33.861
0.02 0.14 4.383 38.245
0.02 0.02 0.540 38.785
0.00 0.02 0.681 39.467
0.00 0.02 0.522 39.988
0.01 0.02 0.502 40.491
0.01 0.01 0.200 40.691
CUBATURES DEBLAI-REMBLAI (DANS L'EMPRISE DE LA LIGNE 'PROJET') - VOIE SEC

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Méthode : Linéaire (Les entrées en terre sont recherchées jusqu'au TN)


Volume cumulé déblais (m³) 546.549
Volume cumulé remblais (m³) 26.019

Longueur Déblais (dans l'emprise de la ligne Projet) Remblais (dans l'e


Profil n° Abscisse Cumul Vol.
d'application Surf. G (m²) Surf. D (m²) Surf. Tot (m²) Volume (m³) Surf. G (m²)
(m³)
P1 0.000 14.984 0.30 2.53 2.83 42.433 42.433 0.50
P2 29.967 29.983 0.58 1.80 2.38 71.327 113.760 0.25
P3 59.967 30.000 0.54 1.91 2.44 73.251 187.011 0.29
P4 89.966 31.000 0.71 1.52 2.23 69.139 256.150 0.08
P5 121.966 30.442 1.19 0.97 2.16 65.611 321.761 0.00
P6 150.851 29.442 0.90 1.24 2.14 62.975 384.736 0.00
P7 180.851 30.000 0.99 1.17 2.16 64.657 449.393 0.00
P8 210.851 29.999 1.04 1.12 2.16 64.656 514.050 0.00
P9 240.850 14.999 1.05 1.12 2.17 32.500 546.549 0.00
'PROJET') - VOIE SECONDAIRE -23-

final 1035 voirie.dwg

es jusqu'au TN)

Remblais (dans l'emprise de la ligne Projet)


Cumul Vol.
Surf. D (m²) Surf. Tot (m²) Volume (m³)
(m³)
0.00 0.50 7.465 7.465
0.00 0.25 7.633 15.098
0.00 0.29 8.594 23.692
0.00 0.08 2.327 26.019
0.00 0.00 0.000 26.019
0.00 0.00 0.000 26.019
0.00 0.00 0.000 26.019
0.00 0.00 0.000 26.019
0.00 0.00 0.000 26.019
RECAPITULATIF DE L'UTILISATION DES MATERIAUX - VOIE SECONDAIRE

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Méthode : Linéaire

Nom du matériau : BITUME GODRON (COUCHE DE ROULEMENT)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.22 55.44 3.326 0.22 55.44 3.326 0.44
P2 29.983 0.22 110.94 6.656 0.22 110.94 6.656 0.44
P3 30.000 0.22 111.00 6.660 0.22 111.00 6.660 0.44
P4 31.000 0.22 114.70 6.882 0.22 114.70 6.882 0.44
P5 30.442 0.22 112.64 6.758 0.22 112.64 6.758 0.44
P6 29.442 0.22 108.94 6.536 0.22 108.94 6.536 0.44
P7 30.000 0.22 111.00 6.660 0.22 111.00 6.660 0.44
P8 29.999 0.22 111.00 6.660 0.22 111.00 6.660 0.44
P9 14.999 0.22 55.50 3.330 0.22 55.50 3.330 0.44

Nom du matériau : FONDATION (COUCHE DE FONDATION)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.74 55.44 11.088 0.74 55.44 11.088 1.48
P2 29.983 0.74 110.94 22.188 0.74 110.94 22.188 1.48
P3 30.000 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P4 31.000 0.74 114.70 22.940 0.74 114.70 22.940 1.48
P5 30.442 0.74 112.64 22.527 0.74 112.64 22.527 1.48
P6 29.442 0.74 108.94 21.787 0.74 108.94 21.787 1.48
P7 30.000 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P8 29.999 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P9 14.999 0.74 55.50 11.100 0.74 55.50 11.100 1.48

Nom du matériau : GRAVE-BITUME (COUCHE DE BASE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.74 55.44 11.088 0.74 55.44 11.088 1.48
P2 29.983 0.74 110.94 22.188 0.74 110.94 22.188 1.48
P3 30.000 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P4 31.000 0.74 114.70 22.940 0.74 114.70 22.940 1.48
P5 30.442 0.74 112.64 22.527 0.74 112.64 22.527 1.48
P6 29.442 0.74 108.94 21.787 0.74 108.94 21.787 1.48
P7 30.000 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P8 29.999 0.74 111.00 22.200 0.74 111.00 22.200 1.48
P9 14.999 0.74 55.50 11.100 0.74 55.50 11.100 1.48

Nom du matériau : CANIVEAU (Caniveau)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.06 4.50 0.832 0.06 4.50 0.832 0.11
P2 29.983 0.06 8.99 1.664 0.06 8.99 1.664 0.11
P3 30.000 0.06 9.00 1.665 0.06 9.00 1.665 0.11
P4 31.000 0.06 9.30 1.720 0.06 9.30 1.720 0.11
P5 30.442 0.06 9.13 1.690 0.06 9.13 1.690 0.11
P6 29.442 0.06 8.83 1.634 0.06 8.83 1.634 0.11
P7 30.000 0.06 9.00 1.665 0.06 9.00 1.665 0.11
P8 29.999 0.06 9.00 1.665 0.06 9.00 1.665 0.11
P9 14.999 0.06 4.50 0.832 0.06 4.50 0.832 0.11

Nom du matériau : CIMENT (PAVER)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.07 19.93 0.996 0.07 19.93 0.996 0.13
P2 29.983 0.07 39.88 1.994 0.07 39.88 1.994 0.13
P3 30.000 0.07 39.90 1.995 0.07 39.90 1.995 0.13
P4 31.000 0.07 41.23 2.061 0.07 41.23 2.061 0.13
P5 30.442 0.07 40.49 2.024 0.07 40.49 2.024 0.13
P6 29.442 0.07 39.16 1.958 0.07 39.16 1.958 0.13
P7 30.000 0.07 39.90 1.995 0.07 39.90 1.995 0.13
P8 29.999 0.07 39.90 1.995 0.07 39.90 1.995 0.13
P9 14.999 0.07 19.95 0.997 0.07 19.95 0.997 0.13

Nom du matériau : SABLE (SABLE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.13 19.93 1.993 0.13 19.93 1.993 0.27
P2 29.983 0.13 39.88 3.988 0.13 39.88 3.988 0.27
P3 30.000 0.13 39.90 3.990 0.13 39.90 3.990 0.27
P4 31.000 0.13 41.23 4.123 0.13 41.23 4.123 0.27
P5 30.442 0.13 40.49 4.049 0.13 40.49 4.049 0.27
P6 29.442 0.13 39.16 3.916 0.13 39.16 3.916 0.27
P7 30.000 0.13 39.90 3.990 0.13 39.90 3.990 0.27
P8 29.999 0.13 39.90 3.990 0.13 39.90 3.990 0.27
P9 14.999 0.13 19.95 1.995 0.13 19.95 1.995 0.27

Nom du matériau : GRAVE-BITUME (POSE CANIVEAU ET BORDURE)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.03 7.04 0.499 0.03
P2 29.983 0.03 14.09 0.998 0.03
P3 30.000 0.03 14.10 0.999 0.03
P4 31.000 0.03 14.57 1.032 0.03
P5 30.442 0.00
P6 29.442 0.03 13.84 0.980 0.03
P7 30.000 0.00
P8 29.999 0.00
P9 14.999 0.00
Nom du matériau : BORDURE (Bordure T3)
Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.05 2.55 0.682 0.05
P2 29.983 0.05 5.10 1.364 0.05
P3 30.000 0.05 5.10 1.365 0.05
P4 31.000 0.05 5.27 1.410 0.05
P5 30.442 0.00
P6 29.442 0.05 5.01 1.340 0.05
P7 30.000 0.00
P8 29.999 0.00
P9 14.999 0.00

Nom du matériau : GRAVE-BITUME (COUCHE DE BASE TROTTOIR)


Longueur Gauche Droite Total
Profil n°
d'application Coupe (m²) Aire (m²) Volume (m³) Coupe (m²) Aire (m²) Volume (m³) Coupe (m²)
P1 14.984 0.31 19.93 4.649 0.31
P2 29.983 0.31 39.88 9.303 0.31
P3 30.000 0.31 39.90 9.309 0.31
P4 31.000 0.31 41.23 9.619 0.31
P5 30.442 0.00
P6 29.442 0.31 39.16 9.136 0.31
P7 30.000 0.00
P8 29.999 0.00
P9 14.999 0.00
- VOIE SECONDAIRE -23-

final 1035 voirie.dwg

1782.29 106.937
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
110.88 6.653 110.88 6.653
221.88 13.313 332.75 19.965
222.00 13.320 554.75 33.285
229.40 13.764 784.15 47.049
225.27 13.516 1009.42 60.565
217.87 13.072 1227.30 73.638
222.00 13.320 1449.30 86.958
222.00 13.320 1671.29 100.278
111.00 6.660 1782.29 106.937

1782.29 356.458
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
110.88 22.176 110.88 22.176
221.88 44.375 332.75 66.551
222.00 44.399 554.75 110.950
229.40 45.880 784.15 156.830
225.27 45.055 1009.42 201.885
217.87 43.575 1227.30 245.460
222.00 44.400 1449.30 289.860
222.00 44.399 1671.29 334.259
111.00 22.199 1782.29 356.458

1782.29 356.458
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
110.88 22.176 110.88 22.176
221.88 44.375 332.75 66.551
222.00 44.399 554.75 110.950
229.40 45.880 784.15 156.830
225.27 45.055 1009.42 201.885
217.87 43.575 1227.30 245.460
222.00 44.400 1449.30 289.860
222.00 44.399 1671.29 334.259
111.00 22.199 1782.29 356.458

144.51 26.734
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
8.99 1.663 8.99 1.663
17.99 3.328 26.98 4.991
18.00 3.330 44.98 8.321
18.60 3.441 63.58 11.762
18.27 3.379 81.85 15.141
17.67 3.268 99.51 18.409
18.00 3.330 117.51 21.739
18.00 3.330 135.51 25.069
9.00 1.665 144.51 26.734

640.66 32.033
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
39.86 1.993 39.86 1.993
79.76 3.988 119.61 5.981
79.80 3.990 199.41 9.971
82.46 4.123 281.87 14.094
80.98 4.049 362.85 18.142
78.32 3.916 441.16 22.058
79.80 3.990 520.96 26.048
79.80 3.990 600.76 30.038
39.90 1.995 640.66 32.033

640.66 64.066
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
39.86 3.986 39.86 3.986
79.76 7.976 119.61 11.961
79.80 7.980 199.41 19.941
82.46 8.246 281.87 28.187
80.98 8.098 362.85 36.285
78.32 7.832 441.16 44.116
79.80 7.980 520.96 52.096
79.80 7.980 600.76 60.076
39.90 3.990 640.66 64.066

63.64 4.509
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
7.04 0.499 7.04 0.499
14.09 0.998 21.13 1.497
14.10 0.999 35.23 2.496
14.57 1.032 49.80 3.529
0.00 0.000 49.80 3.529
13.84 0.980 63.64 4.509
0.00 0.000 63.64 4.509
0.00 0.000 63.64 4.509
0.00 0.000 63.64 4.509
23.02 6.161
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
2.55 0.682 2.55 0.682
5.10 1.364 7.64 2.046
5.10 1.365 12.74 3.411
5.27 1.410 18.01 4.821
0.00 0.000 18.01 4.821
5.01 1.340 23.02 6.161
0.00 0.000 23.02 6.161
0.00 0.000 23.02 6.161
0.00 0.000 23.02 6.161

180.09 42.016
Total Cumul Aire Cumul Vol.
Aire (m²) Volume (m³) (m²) (m³)
19.93 4.649 19.93 4.649
39.88 9.303 59.81 13.953
39.90 9.309 99.71 23.261
41.23 9.619 140.94 32.880
0.00 0.000 140.94 32.880
39.16 9.136 180.09 42.016
0.00 0.000 180.09 42.016
0.00 0.000 180.09 42.016
0.00 0.000 180.09 42.016
RECAPITULATIF DES MATERIAUX UTILISES PAR PROFIL - VOIE SECONDAIRE -2

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Méthode : Linéaire

CANIVEAU 0 €/ml
GRAVE-
0 €/m³ 0 €/tonne
BITUME
FONDATION 0 €/m³ 0 €/tonne
BITUME
0 €/m³ 0 €/tonne
GODRON
BORDURE 0 €/m³ 0 €/tonne
CIMENT 0 €/m³ 0 €/tonne
SABLE 0 €/m³ 0 €/tonne

Longueur Cumul Aire


Profil n° Matériau Largeur Coupe (m²) Aire (m²) Volume (m³)
d'application (m²)
P1 14.984 BITUME GODRON 7.400 0.44 6.653
14.984 FONDATION 7.400 1.48 22.176
14.984 GRAVE-BITUME 7.400 1.48 22.176
14.984 CANIVEAU 0.600 0.11 8.99 8.99 1.663
14.984 CIMENT 2.660 0.13 1.993
14.984 SABLE 2.660 0.27 3.986
14.984 GRAVE-BITUME 0.470 0.03 0.499
14.984 BORDURE 0.170 0.05 0.682
14.984 GRAVE-BITUME 1.330 0.31 4.649
P2 29.983 BITUME GODRON 7.400 0.44 13.313
29.983 FONDATION 7.400 1.48 44.375
29.983 GRAVE-BITUME 7.400 1.48 44.375
29.983 CANIVEAU 0.600 0.11 17.99 26.98 3.328
29.983 CIMENT 2.660 0.13 3.988
29.983 SABLE 2.660 0.27 7.976
29.983 GRAVE-BITUME 0.470 0.03 0.998
29.983 BORDURE 0.170 0.05 1.364
29.983 GRAVE-BITUME 1.330 0.31 9.303
P3 30.000 BITUME GODRON 7.400 0.44 13.320
30.000 FONDATION 7.400 1.48 44.399
30.000 GRAVE-BITUME 7.400 1.48 44.399
30.000 CANIVEAU 0.600 0.11 18.00 44.98 3.330
30.000 CIMENT 2.660 0.13 3.990
30.000 SABLE 2.660 0.27 7.980
30.000 GRAVE-BITUME 0.470 0.03 0.999
30.000 BORDURE 0.170 0.05 1.365
30.000 GRAVE-BITUME 1.330 0.31 9.309
P4 31.000 BITUME GODRON 7.400 0.44 13.764
31.000 FONDATION 7.400 1.48 45.880
31.000 GRAVE-BITUME 7.400 1.48 45.880
31.000 CANIVEAU 0.600 0.11 18.60 63.58 3.441
31.000 CIMENT 2.660 0.13 4.123
31.000 SABLE 2.660 0.27 8.246
31.000 GRAVE-BITUME 0.470 0.03 1.032
31.000 BORDURE 0.170 0.05 1.410
31.000 GRAVE-BITUME 1.330 0.31 9.619
P5 30.442 BITUME GODRON 7.400 0.44 13.516
30.442 FONDATION 7.400 1.48 45.055
30.442 GRAVE-BITUME 7.400 1.48 45.055
30.442 CANIVEAU 0.600 0.11 18.27 81.85 3.379
30.442 CIMENT 2.660 0.13 4.049
30.442 SABLE 2.660 0.27 8.098
P6 29.442 BITUME GODRON 7.400 0.44 13.072
29.442 FONDATION 7.400 1.48 43.575
29.442 GRAVE-BITUME 7.400 1.48 43.575
29.442 CANIVEAU 0.600 0.11 17.67 99.51 3.268
29.442 CIMENT 2.660 0.13 3.916
29.442 SABLE 2.660 0.27 7.832
29.442 GRAVE-BITUME 0.470 0.03 0.980
29.442 BORDURE 0.170 0.05 1.340
29.442 GRAVE-BITUME 1.330 0.31 9.136
P7 30.000 BITUME GODRON 7.400 0.44 13.320
30.000 FONDATION 7.400 1.48 44.400
30.000 GRAVE-BITUME 7.400 1.48 44.400
30.000 CANIVEAU 0.600 0.11 18.00 117.51 3.330
30.000 CIMENT 2.660 0.13 3.990
30.000 SABLE 2.660 0.27 7.980
P8 29.999 BITUME GODRON 7.400 0.44 13.320
29.999 FONDATION 7.400 1.48 44.399
29.999 GRAVE-BITUME 7.400 1.48 44.399
29.999 CANIVEAU 0.600 0.11 18.00 135.51 3.330
29.999 CIMENT 2.660 0.13 3.990
29.999 SABLE 2.660 0.27 7.980
P9 14.999 BITUME GODRON 7.400 0.44 6.660
14.999 FONDATION 7.400 1.48 22.199
14.999 GRAVE-BITUME 7.400 1.48 22.199
14.999 CANIVEAU 0.600 0.11 9.00 144.51 1.665
14.999 CIMENT 2.660 0.13 1.995
14.999 SABLE 2.660 0.27 3.990
OIE SECONDAIRE -23-

nal 1035 voirie.dwg

Cumul Vol.
Coût Cumul Coût
(m³)
6.653 0.00 0.00
22.176 0.00 0.00
22.176 0.00 0.00
1.663 0.00 0.00
1.993 0.00 0.00
3.986 0.00 0.00
22.675 0.00 0.00
0.682 0.00 0.00
27.324 0.00 0.00
19.965 0.00 0.00
66.551 0.00 0.00
71.699 0.00 0.00
4.991 0.00 0.00
5.981 0.00 0.00
11.961 0.00 0.00
72.698 0.00 0.00
2.046 0.00 0.00
82.001 0.00 0.00
33.285 0.00 0.00
110.950 0.00 0.00
126.401 0.00 0.00
8.321 0.00 0.00
9.971 0.00 0.00
19.941 0.00 0.00
127.400 0.00 0.00
3.411 0.00 0.00
136.708 0.00 0.00
47.049 0.00 0.00
156.830 0.00 0.00
182.588 0.00 0.00
11.762 0.00 0.00
14.094 0.00 0.00
28.187 0.00 0.00
183.620 0.00 0.00
4.821 0.00 0.00
193.239 0.00 0.00
60.565 0.00 0.00
201.885 0.00 0.00
238.294 0.00 0.00
15.141 0.00 0.00
18.142 0.00 0.00
36.285 0.00 0.00
73.638 0.00 0.00
245.460 0.00 0.00
281.869 0.00 0.00
18.409 0.00 0.00
22.058 0.00 0.00
44.116 0.00 0.00
282.849 0.00 0.00
6.161 0.00 0.00
291.985 0.00 0.00
86.958 0.00 0.00
289.860 0.00 0.00
336.385 0.00 0.00
21.739 0.00 0.00
26.048 0.00 0.00
52.096 0.00 0.00
100.278 0.00 0.00
334.259 0.00 0.00
380.784 0.00 0.00
25.069 0.00 0.00
30.038 0.00 0.00
60.076 0.00 0.00
106.937 0.00 0.00
356.458 0.00 0.00
402.983 0.00 0.00
26.734 0.00 0.00
32.033 0.00 0.00
64.066 0.00 0.00
RECAPITULATIF GLOBAL DES MATERIAUX - VOIE SECONDAIRE -23-
D:\les 04 phase 05.09.2020\pos garet taam 13-
Nom du dessin
04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Méthode : Linéaire

Masse Coût
Nom du matériau Quantité Coût Prix (€/tonne)
(tonne) (masse*prix)
CANIVEAU 481.70 m 0.00 €
GRAVE-BITUME 402.98 m³ 0.00 €
FONDATION 356.46 m³ 0.00 €
BITUME GODRON 106.94 m³ 0.00 €
BORDURE 6.16 m³ 0.00 €
CIMENT 32.03 m³ 0.00 €
SABLE 64.07 m³ 0.00 €

Type de couche Volume (m³)


<Indéfini> 968.6384

Couche (Matériau) Volume (m³)


COUCHE DE ROULEMENT (BITUME
106.9374
GODRON)
SABLE (SABLE) 64.0661
COUCHE DE FONDATION (FONDATION) 356.4579
COUCHE DE BASE (GRAVE-BITUME) 356.4579
Bordure T3 (BORDURE) 6.1611
PAVER (CIMENT) 32.0330
POSE CANIVEAU ET BORDURE
4.5091
(GRAVE-BITUME)
COUCHE DE BASE TROTTOIR (GRAVE-
42.0159
BITUME)
RECAPITULATIF DES TABULATIONS - VOIE SECONDAIRE -23-

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Elément Longueur d'application Altitude


Profil n° Abscisse
Origine Axe Projet Avant Après Total TN
P1 0.000 Extremité AD AD 0.000 14.984 14.984 964.241
P2 29.967 Passage AD AD 14.984 15.000 29.983 964.897
P3 59.967 Passage AD AD 15.000 15.000 30.000 966.874
P4 89.966 Passage AD AD 15.000 16.000 31.000 968.405
P5 121.966 Passage AD AD 16.000 14.442 30.442 969.091
P6 150.851 Passage AD AD 14.442 15.000 29.442 968.524
P7 180.851 Passage AD AD 15.000 15.000 30.000 968.165
P8 210.851 Passage AD AD 15.000 14.999 29.999 967.037
P9 240.850 Extremité AD AD 14.999 0.000 14.999 965.734
NDAIRE -23-

final 1035 voirie.dwg

Altitude Point d'axe


Projet X Y
964.240 563893.240 3588823.256
964.897 563922.525 3588816.900
966.874 563951.841 3588810.536
968.405 563981.159 3588804.172
969.091 564012.430 3588797.384
968.524 564040.658 3588791.257
968.165 564069.975 3588784.894
967.037 564099.292 3588778.530
965.734 564128.608 3588772.167
RECAPITULATIF DES INFORMATIONS DES POINTS TYPES - VOIE S

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Point d'axe
Profil n° Abscisse Côté Fichier profil type
X Y Z
P1 0.000 563893.240 3588823.256 964.240 G voie 8 m
D voie 8 m
P2 29.967 563922.525 3588816.900 964.897 G voie 8 m
D voie 8 m
P3 59.967 563951.841 3588810.536 966.874 G voie 8 m
D voie 8 m
P4 89.966 563981.159 3588804.172 968.405 G voie 8 m
D voie 8 m
P5 121.966 564012.430 3588797.384 969.091 G voie 8 m
D voie 8 m
P6 150.851 564040.658 3588791.257 968.524 G voie 8 m
D voie 8 m
P7 180.851 564069.975 3588784.894 968.165 G voie 8 m
D voie 8 m
P8 210.851 564099.292 3588778.530 967.037 G voie 8 m
D voie 8 m
P9 240.850 564128.608 3588772.167 965.734 G voie 8 m
D voie 8 m
S DES POINTS TYPES - VOIE SECONDAIRE -23-

aret etaam final 1035 voirie.dwg

Devers (%) / Largeur (m) / Denivelé (m) /


Type Dist. axe (m) Altitude (m)
pt de ref pt de ref pt de ref
Fil d'eau 4.000 -10.000 0.300 -0.030 964.118
Fil d'eau 4.000 -10.000 0.300 -0.030 964.118
Fil d'eau 4.000 -10.000 0.300 -0.030 964.775
Fil d'eau 4.000 -10.000 0.300 -0.030 964.775
Fil d'eau 4.000 -10.000 0.300 -0.030 966.752
Fil d'eau 4.000 -10.000 0.300 -0.030 966.752
Fil d'eau 4.000 -10.000 0.300 -0.030 968.283
Fil d'eau 4.000 -10.000 0.300 -0.030 968.283
Fil d'eau 4.000 -10.000 0.300 -0.030 968.969
Fil d'eau 4.000 -10.000 0.300 -0.030 968.969
Fil d'eau 4.000 -10.000 0.300 -0.030 968.401
Fil d'eau 4.000 -10.000 0.300 -0.030 968.401
Fil d'eau 4.000 -10.000 0.300 -0.030 968.042
Fil d'eau 4.000 -10.000 0.300 -0.030 968.042
Fil d'eau 4.000 -10.000 0.300 -0.030 966.914
Fil d'eau 4.000 -10.000 0.300 -0.030 966.914
Fil d'eau 4.000 -10.000 0.300 -0.030 965.611
Fil d'eau 4.000 -10.000 0.300 -0.030 965.611
RECAPITULATIF DES INFORMATIONS DES POINTS TYPES - VOIE SECONDAIRE -2

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Fil d'eau
Gauche Droite
Profil n° Abscisse Devers (%) /
X Y Z Dist. axe (m) X Y
pt de ref
P1 0.000 563894.088 3588827.165 964.118 4.000 -10.000 563892.391 3588819.347
P2 29.967 563923.373 3588820.809 964.775 4.000 -10.000 563921.676 3588812.991
P3 59.967 563952.690 3588814.445 966.752 4.000 -10.000 563950.993 3588806.627
P4 89.966 563982.007 3588808.081 968.283 4.000 -10.000 563980.310 3588800.263
P5 121.966 564013.279 3588801.293 968.969 4.000 -10.000 564011.582 3588793.476
P6 150.851 564041.506 3588795.166 968.401 4.000 -10.000 564039.809 3588787.348
P7 180.851 564070.824 3588788.803 968.042 4.000 -10.000 564069.127 3588780.985
P8 210.851 564100.141 3588782.439 966.914 4.000 -10.000 564098.444 3588774.621
P9 240.850 564129.457 3588776.076 965.611 4.000 -10.000 564127.760 3588768.258

Fil d'eau Gauche Droite


Longueur 2D 240.850 240.850
Longueur 3D 241.026 241.026
VOIE SECONDAIRE -23-

final 1035 voirie.dwg

Droite
Devers (%) /
Z Dist. axe (m)
pt de ref
964.118 4.000 -10.000
964.775 4.000 -10.000
966.752 4.000 -10.000
968.283 4.000 -10.000
968.969 4.000 -10.000
968.401 4.000 -10.000
968.042 4.000 -10.000
966.914 4.000 -10.000
965.611 4.000 -10.000
RECAPITULATIF DES EXTREMITES DES LIGNES DES PROFILS EN TRAVERS - VOI

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Longueur Point d'axe Extrémité de la ligne Projet


Profil n° Abscisse Côté
d'application X Y Z Projet Z TN Déport (m)
P1 0.000 14.984 563893.240 3588823.256 964.240 964.241 G 5.500
D 5.500
P2 29.967 29.983 563922.525 3588816.900 964.897 964.897 G 5.500
D 5.500
P3 59.967 30.000 563951.841 3588810.536 966.874 966.874 G 5.500
D 5.500
P4 89.966 31.000 563981.159 3588804.172 968.405 968.405 G 5.500
D 5.500
P5 121.966 30.442 564012.430 3588797.384 969.091 969.091 G 5.500
D 5.500
P6 150.851 29.442 564040.658 3588791.257 968.524 968.524 G 5.500
D 5.500
P7 180.851 30.000 564069.975 3588784.894 968.165 968.165 G 5.500
D 5.500
P8 210.851 29.999 564099.292 3588778.530 967.037 967.037 G 5.500
D 5.500
P9 240.850 14.999 564128.608 3588772.167 965.734 965.734 G 5.500
D 5.500
LS EN TRAVERS - VOIE SECONDAIRE -23-

final 1035 voirie.dwg

Extrémité de la ligne Projet Extrémité de la ligne FdF Extrémité de la ligne Talus


Altitude (m) Déport (m) Altitude (m) Déport (m) Altitude (m)
964.284 5.500 964.284 5.831 963.787
964.284 5.500 964.284 5.843 964.799
964.941 5.500 964.941 5.726 964.603
964.941 5.500 964.941 5.651 965.168
966.918 5.500 966.918 5.739 966.560
966.918 5.500 966.918 5.678 967.185
968.450 5.500 968.450 5.639 968.241
968.450 5.500 968.450 5.579 968.568
969.136 5.500 969.136 5.503 969.132
969.136 5.500 969.136 5.557 969.051
968.568 5.500 968.568 5.572 968.459
968.568 5.500 968.568 5.502 968.570
968.209 5.500 968.209 5.552 968.131
968.209 5.500 968.209 5.507 968.198
967.081 5.500 967.081 5.539 967.022
967.081 5.500 967.081 5.519 967.052
965.778 5.500 965.778 5.528 965.735
965.778 5.500 965.778 5.519 965.749
RECAPITULATIF DES SURFACES 2D ET 3D DES LIGNES - VOIE SECONDAIRE -23-
D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035
Nom du dessin
voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Ligne Projet
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 11.000 164.82 164.82 11.232 168.30 168.30
P2 29.967 29.983 11.000 329.82 494.64 11.232 336.78 505.08
P3 59.967 30.000 11.000 330.00 824.63 11.232 336.96 842.04
P4 89.966 31.000 11.000 341.00 1165.63 11.232 348.20 1190.24
P5 121.966 30.442 11.000 334.87 1500.50 11.232 341.93 1532.17
P6 150.851 29.442 11.000 323.87 1824.36 11.232 330.70 1862.87
P7 180.851 30.000 11.000 330.00 2154.36 11.232 336.97 2199.84
P8 210.851 29.999 11.000 329.99 2484.36 11.232 336.96 2536.80
P9 240.850 14.999 11.000 164.99 2649.35 11.232 168.48 2705.27

Ligne FdF
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 11.000 164.82 164.82 12.196 182.73 182.73
P2 29.967 29.983 11.000 329.82 494.64 12.196 365.66 548.39
P3 59.967 30.000 11.000 330.00 824.63 12.196 365.86 914.26
P4 89.966 31.000 11.000 341.00 1165.63 12.196 378.06 1292.32
P5 121.966 30.442 11.000 334.87 1500.50 12.196 371.26 1663.57
P6 150.851 29.442 11.000 323.87 1824.36 12.196 359.06 2022.64
P7 180.851 30.000 11.000 330.00 2154.36 12.196 365.87 2388.51
P8 210.851 29.999 11.000 329.99 2484.36 12.196 365.86 2754.36
P9 240.850 14.999 11.000 164.99 2649.35 12.196 182.93 2937.29

Ligne Talus
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 0.675 10.11 10.11 1.216 18.22 18.22
P2 29.967 29.983 0.377 11.29 21.40 0.679 20.36 38.58
P3 59.967 30.000 0.416 12.49 33.89 0.751 22.52 61.10
P4 89.966 31.000 0.218 6.76 40.65 0.393 12.19 73.29
P5 121.966 30.442 0.059 1.80 42.45 0.106 3.24 76.53
P6 150.851 29.442 0.074 2.18 44.63 0.133 3.93 80.46
P7 180.851 30.000 0.059 1.77 46.40 0.106 3.19 83.65
P8 210.851 29.999 0.059 1.77 48.16 0.106 3.18 86.83
P9 240.850 14.999 0.048 0.72 48.88 0.086 1.29 88.12

base
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 3.700 55.44 55.44 4.101 61.45 61.45
P2 29.967 29.983 3.700 110.94 166.38 4.101 122.97 184.42
P3 59.967 30.000 3.700 111.00 277.38 4.101 123.03 307.45
P4 89.966 31.000 3.700 114.70 392.08 4.101 127.14 434.58
P5 121.966 30.442 0.000 0.00 392.08 0.000 0.00 434.58
P6 150.851 29.442 3.700 108.94 501.01 4.101 120.75 555.33
P7 180.851 30.000 0.000 0.00 501.01 0.000 0.00 555.33
P8 210.851 29.999 0.000 0.00 501.01 0.000 0.00 555.33
P9 240.850 14.999 0.000 0.00 501.01 0.000 0.00 555.33

caniveau
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 0.600 8.99 8.99 0.940 14.08 14.08
P2 29.967 29.983 0.600 17.99 26.98 0.940 28.18 42.27
P3 59.967 30.000 0.600 18.00 44.98 0.940 28.20 70.47
P4 89.966 31.000 0.600 18.60 63.58 0.940 29.14 99.61
P5 121.966 30.442 0.600 18.27 81.85 0.940 28.62 128.22
P6 150.851 29.442 0.600 17.67 99.51 0.940 27.68 155.90
P7 180.851 30.000 0.600 18.00 117.51 0.940 28.20 184.10
P8 210.851 29.999 0.600 18.00 135.51 0.940 28.20 212.30
P9 240.850 14.999 0.600 9.00 144.51 0.940 14.10 226.40

pose bordure et caniveau


Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 0.000 0.00 0.00 0.090 1.35 1.35
P2 29.967 29.983 0.000 0.00 0.00 0.090 2.70 4.05
P3 59.967 30.000 0.000 0.00 0.00 0.090 2.70 6.75
P4 89.966 31.000 0.000 0.00 0.00 0.090 2.79 9.54
P5 121.966 30.442 0.000 0.00 0.00 0.000 0.00 9.54
P6 150.851 29.442 0.000 0.00 0.00 0.090 2.65 12.19
P7 180.851 30.000 0.000 0.00 0.00 0.000 0.00 12.19
P8 210.851 29.999 0.000 0.00 0.00 0.000 0.00 12.19
P9 240.850 14.999 0.000 0.00 0.00 0.000 0.00 12.19

roulement
Longueur 2D 3D
Profil n° Abscisse Surface Surface
d'application Largeur Surf. Tot (m²) Largeur Surf. Tot (m²)
partielle (m²) partielle (m²)
P1 0.000 14.984 7.400 110.88 110.88 7.522 112.71 112.71
P2 29.967 29.983 7.400 221.88 332.75 7.522 225.54 338.25
P3 59.967 30.000 7.400 222.00 554.75 7.522 225.67 563.92
P4 89.966 31.000 7.400 229.40 784.15 7.522 233.19 797.11
P5 121.966 30.442 7.400 225.27 1009.42 7.522 229.00 1026.11
P6 150.851 29.442 7.400 217.87 1227.30 7.522 221.47 1247.58
P7 180.851 30.000 7.400 222.00 1449.30 7.522 225.67 1473.25
P8 210.851 29.999 7.400 222.00 1671.29 7.522 225.66 1698.92
P9 240.850 14.999 7.400 111.00 1782.29 7.522 112.83 1811.75
RECAPITULATIF DES POINTS DE CONTROLE DES PROFILS

Nom du dessin D:\les 04 phase 05.09.2020\pos garet taam 13-04-2020\pos garet etaam final 1035 voirie.dwg
Date du listing 09/10/2020 à 13:59:37
Profil en long VOIE SECONDAIRE -23-
Courbe projet Proj 1

Fichier profil Pente (%)


Profil n° Abscisse Côté N° point Type
type min max calculé
TROLE DES PROFILS TYPES

final 1035 voirie.dwg

dX (m) dZ (m)
min max calculé min max calculé