Span Section Span Span Section Span Span Section Span

Length (m) Length (m) Length (m)

1 P1-P2 28 37 P37-P38 34 72 P73-P74 32


2 P2-P3 28 38 P39-P40 34 73 P74-P75 30
3 P3-P4 30 39 P40-P41 34 74 P75-P76 25
4 P4-P5 30 40 P41-P42 34 75 P76-P77 26
5 P5-P6 33 41 P42-P43 28 76 P77-P78 26
6 P6-P7 33 42 P43-P44 29 77 P78-P79 27
7 P7-P8 35 43 P44-P45 38 78 P79-P80 27
8 P8-P9 31 44 P45-P46 30 79 P80-P81 34
9 P9-P10 25 45 P46-P47 25 80 P81-P82 34
10 P10-P11 26 46 P47-P48 35 81 P82-P83 28
11 P11-P12 25 47 P48-P49 35 82 P83-P84 28
12 P12-P13 27 48 P49-P50 26 83 P84-P85 28
13 P13-P14 25 48 P50-P51 34 84 P85-P86 27
14 P14-P15 27 50 P51-P52 29 85 P86-P87 26
15 P15-P16 27 51 P52-P53 35 86 P87-P88 26
16 P16-P17 27 52 P53-P54 35 87 P88-P89 26
17 P17-P18 25 53 P54-P55 35 88 P89-P90 30
18 P18-P19 25 54 P55-P56 31 89 P90-P91 29
19 P19-P20 29 55 P56-P57 35 100 P91-P92 31
20 P20- P21 25 56 P57-P58 35 101 P92-P93 29
21 P21-P22 26 57 P58-P59 33 102 P93-P94 26
22 P22-P23 24 58 P59-P60 34 103 P94-P95 26
23 P23-P24 35 59 P60-P61 29 104 P95-P96 27
24 P24-P25 29 60 P61-P62 33 105 P96-P97 26
25 P25-P26 30 61 P62-P63 35 106 P97-P98 27
26 P26-P27 32 62 P63-P64 29
27 P27-P28 26 63 P64-P65 34 THEORETICAL RULING SPAN
28 P28-P29 25 64 P65-P66 37 COMPUTATION:
29 P29-P30 34 65 P66-P67 29
30 P30-P31 34 66 P67-P68 34 SR = sqrt. [sum((Span Length)^3)] / [sum(Span
31 P31-P32 32 67 P68-P69 28 Length)]
32 P32-P33 32 68 P69-P70 30
33 P33-P34 34 69 P70-P71 30 SR = sqrt.[(2,710,394) / (2882)]
34 P34-P35 34 70 P71-P72 30
35 P35-P36 34 71 P72-P73 29 SR = 30.67 m
36 P36-P37 34

PROJECT TITLE: PROJECT ENGINEERS: SHEET CONTENTS: SHEET NO.:

02
E
ELECTRICAL DISTRIBUTION PLAN:
HOWARD VILLAGE AUMENTADO, MARY KIMBERLY
POLE LOCATIONS AND SPANS (ELEVATION)
FACTOR, ARNEL JR.
STA. ROSA, LAGUNA, PHILIPPINES 03
KILAKIGA, KENNETH
SITE PLAN: GENERAL ELECTRICAL VICENTE, KYLE LEIGHZANDER DESIGN BY: APPROVED BY: PROJECT ID NO.:
LAYOUT VILLANUEVA, ACERIEL B.
CADD BY: PLOT DATE: March 9, 2022