G- 42 Hoja de Trabajo: No. OBRA: OBRA:
No. PAQ NIVEL ELEMENTO #ELEMENTO VARIACIÓN COLUMNA 1 COLUMNA 2 COLUMNA 3 COLUMNA 4 INFO EXTRA V# G1 R G2 Ø @ A1 A2 V B x H + T C1 # C2 ## DES PZAS
PZAS 08 CARCAMO KG
KG PAQ
KG
TOT. VAR TOTAL
01 1 CIM TRANSVERSAL 15 800 2668 1500 3 1200 1200 2668 2668 1,200 6.72 17928.96 17928.96
02 1 CIM TRANSVERSAL 15 800 2668 3 350 350 2668 2668 350 1.96 5229.28 5229.28
03 1 CIM LONGITUDINAL 15 800 51 80250 3 1200 1200 51 51 1,200 6.72 342.72 342.72
No. PAQ NIVEL ELEMENTO #ELEMENTO VARIACIÓN COLUMNA 1 COLUMNA 2 COLUMNA 3 COLUMNA 4 INFO EXTRA V# G1 R G2 Ø @ A1 A2 V B x H + T C1 # C2 ## DES PZAS
PZAS 08 CARCAMO KG
KG PAQ
KG
TOT. VAR TOTAL
15
73 1 CIM SILLETA INFERIOR 290 29400 6 853 4 SILLETA 50 7.5 x 15 + 10.0 50 850 850
10.0
7.5 0.50 422.45 422.45
90°
74 2 CIM DETALLE 2 800 2667.666666667 ESTRIBO 30X45 3 ESTRIBO 22 X 37 + 18 136 2668 5336 22 37 0.76 2031.95 4063.90
75 2 CIM DETALLE 2 15 800 51 80120 4 1200 1200 6 12 1,200 11.93 71.57 143.14
No. PAQ NIVEL ELEMENTO #ELEMENTO VARIACIÓN COLUMNA 1 COLUMNA 2 COLUMNA 3 COLUMNA 4 INFO EXTRA V# G1 R G2 Ø @ A1 A2 V B x H + T C1 # C2 ## DES PZAS
PZAS 08 CARCAMO KG
KG PAQ
KG
TOT. VAR TOTAL
100 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
101 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
102 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
103 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
104 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
105 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
106 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
107 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
108 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
109 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
110 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
111 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
112 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
113 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
114 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
115 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
116 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
117 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
118 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
119 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
120 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
ENTREGA: SERVICIO: CLIENTE:
HABILITADO VIAXPRES
G- 42 Hoja de Trabajo: No. OBRA: OBRA:
No. PAQ NIVEL ELEMENTO #ELEMENTO VARIACIÓN COLUMNA 1 COLUMNA 2 COLUMNA 3 COLUMNA 4 INFO EXTRA V# G1 R G2 Ø @ A1 A2 V B x H + T C1 # C2 ## DES PZAS
PZAS 08 CARCAMO KG
KG PAQ
KG
TOT. VAR TOTAL
121 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
122 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
123 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
124 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
125 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
126 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
127 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
128 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
129 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
130 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
131 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
132 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
133 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
134 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
135 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
136 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
137 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
138 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
139 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
140 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
141 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
142 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
143 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
144 2 CIM DETALLE 2 15 800 51 4 1200 1200 6 12 1,200 11.93 71.57 143.14
145 2 CIM DETALLE 2 15 800 51 4 200 200 6 12 200 1.99 11.93 23.86
10
03 10 1180 10 ANGULOS 0 90 ° 1200 0 10 #N/A #N/A #N/A
1180
135°
07 3 ESTRIBO 100 X 100 + 20 420 0 100 100 2.35 0.00 0.00
90° 80
08 4 ESTRIBO INT= 40 80 X 20 + 20 340 0 40 20 3.38 0.00 0.00
60
135° 80
09 4 ESTRIBO INT= 40 80 X 20 + 22 342 0 40 20 3.40 0.00 0.00
60
90° 80
10 3 ESTRIBO INT= 43 80 X 22 + 18 394 0 42.985 22 2.21 0.00 0.00
135° 80
11 3 ESTRIBO INT= 43 80 X 22 + 20 396 0 42.985 22 2.22 0.00 0.00
15 3 DES 1210 FIGURA ESPECIAL 1210 0 VARILLA RECTA FIGURA = 1 6.78 0.00 0.00
16 3 DES 132 ESTRIBO ESPECIAL 132 0 ESTRIBO FIGURA = 1 0.74 0.00 0.00
8 9 10 12
8/8" 9/8" 10/8" 12/8"
1" 9/8" 1 1/4" 1 1/2"
8 9 10 12
70 80 90 105
105 115 130 155
8 9 10 12
120 135 150 180
155 175 195 230
8 9 10 12
37.0
25.0
23.0
8 9 10 12
4 5 6 6
8 9 10 12
3.973 5.037 6.225 8.938
5.10 6.45 8.19 11.40
2.54 2.87 3.18 3.81
36.35 46.30 58.60 81.78
47.68 60.72 76.85 107.26
8 9 10 12 No. Varilla
2.54 2.87 3.18 3.81 Diametro (cm)
25.4 28.65 31.8 38.1 Diametro (mm)
25 29 32 32 No. Barra
15.24 22.92 25.44 30.48 Diam. Interno
30.48 34.38 38.16 45.72 Circunferencia Diam. Interno
42.4495 52.3813 58.1405 69.6589 L ext
40 52 60 70 90° Longitud Gancho Planta 90°
20 25 25 Long. Estándar Gancho Planta
L ext
135° Longitud Gancho Planta 135°
Long. Estándar Gancho Planta
L ext
180° Longitud Gancho Planta 180°
Long. Estándar Gancho Planta
1 2 3 4 5
TRANSICION GTM GTF BG FR SL
1 32 8 8 188 288 388 488 588
3 36 8 10 1810 2810 3810 4810 5810
5 40 8 12 1812 2812 3812 4812 5812
9 45 10 8 1108 2108 3108 4108 5108
11 50 10 10 11010 21010 31010 41010 51010
14 55 10 12 11012 21021 21021 21021 21021
21 12 8 1128 2128 3128 4128 5128
32 12 10 11210 21210 31210 41210 51210
45 12 12 11212 21212 31212 41212 51212
03.- Longitud de Desarrollo
2 2.5 3 4 5 6 7 8
0.64 0.80 0.95 1.27 1.59 1.91 2.22 2.54
6.35 8 9.52 12.7 15.88 19.05 22.22 25.4
6 8 10 13 16 19 22 25
2.54 3.20 3.81 5.08 6.35 11.43 13.33 15.24
7.98 10.05 11.96 15.96 19.96 35.91 41.88 47.88
7.50 7.50 7.50 7.62 9.53 22.86 26.66 30.48
8.50 8.76 9.00 9.61 12.02 27.35 31.90 36.46
9.0 9.0 9.0 11.0 14.0 28.0 32.0 37.0
7.50 7.50 7.50 7.62 9.53 11.43 13.33 15.24
9.00 9.38 9.74 10.61 13.27 18.16 21.19 24.22
9.0 10.0 10.0 11.0 16.0 19.0 22.0 25.0
6.50 6.50 6.50 6.50 6.50 7.62 8.89 10.16
8.49 9.01 9.49 10.49 11.49 16.60 19.36 22.13
9.0 9.0 10.0 12.0 14.0 17.0 20.0 23.0
tud de Desarrollo
F'C 25
FY 420
No. Varilla 2
Diametro (cm) 0.64
Diametro (mm) 6.35
No. Barra 6
Ld (Factores = 1) 25.4
06.- Longitud de Anclaje para el Gancho Estándar
Factores 1 F'C 25
Var 5 FY 420
Diam 1.588
a) 7.308 cm Ldh 15
b) 12.704 cm
c) 15 cm
MPA
MPA
2.5 3 4 5 6 7 8 9 10
0.80 0.95 1.27 1.59 1.91 2.22 2.54 2.87 3.18
8 9.52 12.7 15.88 19.05 22.22 25.4 28.65 31.8
8 10 13 16 19 22 25 29 32
32 38.08 50.8 63.52 76.2 109.7929 125.5059 141.5647 157.1294
07.- Traslape en Estribo Espiral
MPA
MPA
cm
ENTREGA: SERVICIO: CLIENTE:
01 HABILITADO VIAXPRES
G- 52 Hoja de Trabajo: No. OBRA: OBRA:
% DESPERDICIO STATUS:
NOTA: XXX Total (Kgs): 0
0.0% PRODUCIR
ENTREGA: SERVICIO: CLIENTE:
01 HABILITADO VIAXPRES
G- 52 Hoja de Trabajo: No. OBRA: OBRA:
REVISION PESO
DESPIEZO: ING/ARQ. NOMBRE PLANO(S) DONDE SE DESPIEZO
DE PLANO
TRANSICIÓN GTM GTF BG FR SL Σ GRADO V# (Kgs)
V8.2019 1 8 8 0 42 Roll 2 0
2 8 10 0 42 Roll 2.5 0
3 8 12 0 42 Roll 3 0
UNA VEZ RECIBIDO EL MATERIAL SE CONSIDERA COMO REVISADO Y 4 10 8 0 52 Roll 4 0
ACEPTADO LAS CANTIDADES ENTREGADAS. 5 10 10 0 52 3 0
RECIBIO TRANSPORTE: 6 10 12 0 52 4 0
FERRALLA 7 12 8 0 52 5 0
ENTREGO FERRALLA NOMBRE 8 12 10 0 52 6 0
9 12 12 0 52 8 0
10 TOTAL 0 0 0 0 0 52 10 0
11 52 12 0
12
PONCHADO GTM GTF BG FR SL Σ
ENTREGA EN OBRA: REMISION: EN PLANTA 0
EN OBRA 0
FIRMA FIRMA RECIBIDO
00/00/2019 12354
TOTAL 0 0 0 0 0 TOTAL (Kgs) G- 52 0