Vous êtes sur la page 1sur 12

Project: ETAP Page: 1

20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

14-SUB-101_0,4KV 0.400 1.881 -5.924 6.216 1.912 -5.983 6.281 5.130 1.629 5.383 -6.102 1.392 6.259

14-SUB-101_23KV 23.000 0.470 -3.399 3.431 0.020 0.000 0.020 2.936 0.405 2.964 -2.941 -0.405 2.969

15-LCT-001_6.6kV 6.600 1.766 -4.866 5.176 0.020 0.000 0.020 4.215 1.530 4.484 -4.220 -1.530 4.489

15-PDP-001 0.400 1.436 -4.884 5.091 1.459 -4.985 5.194 4.230 1.244 4.409 3.488 3.789 5.150

15-PDP-001_0.4kV 0.400 1.436 -4.884 5.091 1.459 -4.985 5.194 4.230 1.244 4.409 3.488 3.789 5.150

21-LCT-001_6.6kV 6.600 2.457 -8.593 8.937 0.020 0.000 0.020 7.464 2.130 7.762 -7.469 -2.130 7.766

21-LDS-001_6,6kV 6.600 2.345 -8.760 9.069 0.020 0.000 0.020 7.609 2.033 7.876 -7.614 -2.033 7.881

21-MCC-001 0.400 4.340 -15.399 15.999 4.440 -15.669 16.286 13.340 3.759 13.860 -15.611 4.210 16.168

21-MMC-001 6.600 2.457 -8.593 8.937 0.020 0.000 0.020 7.464 2.130 7.762 -7.469 -2.130 7.766

23-LCT-001_0.4kV 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.307 30.970

23-LCT-001_6.6kV 6.600 2.681 -11.443 11.753 0.020 0.000 0.020 9.931 2.324 10.199 -9.936 -2.324 10.204

23-LCT-002_6.6kV 6.600 2.751 -11.349 11.678 0.020 0.000 0.020 9.848 2.386 10.133 -9.853 -2.386 10.138

23-LDS-002_6.6kV 6.600 2.588 -11.807 12.087 0.020 0.000 0.020 10.246 2.243 10.489 -10.251 -2.243 10.494

23-LVS-001 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.307 30.970

23-LVS-002 0.400 6.967 -44.378 44.922 7.161 -46.845 47.389 38.451 6.033 38.921 34.766 30.809 46.453

23-LVS-002_0.4kV 0.400 6.967 -44.378 44.922 7.161 -46.845 47.389 38.451 6.033 38.921 34.766 30.809 46.453

23-MCC-001 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.307 30.970

23-MCC-002 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.307 30.970

23-MCC-003 0.400 6.967 -44.378 44.922 7.161 -46.845 47.389 38.451 6.033 38.921 34.766 30.809 46.453

23-MCC-004 0.400 6.967 -44.378 44.922 7.161 -46.845 47.389 38.451 6.033 38.921 34.766 30.809 46.453

23-MCC-005 0.400 6.967 -44.378 44.922 7.161 -46.845 47.389 38.451 6.033 38.921 34.766 30.809 46.453

23-MMC-001 6.600 2.681 -11.443 11.753 0.020 0.000 0.020 9.931 2.324 10.199 -9.936 -2.324 10.204

23-MMC-002 6.600 2.751 -11.349 11.678 0.020 0.000 0.020 9.848 2.386 10.133 -9.853 -2.386 10.138

24-LCT-001_6.6KV 6.600 2.431 -12.647 12.879 0.020 0.000 0.020 10.901 2.088 11.099 -10.906 -2.088 11.104

24-LVS-001 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

24-LVS-001_0.4kV 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

24-MCC-001 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

24-MCC-101 0.400 1.596 -5.778 5.994 1.857 -5.596 5.896 5.004 1.382 5.191 -6.049 1.316 6.190

24-MCC-101_0,4kV 0.400 1.596 -5.778 5.994 1.857 -5.596 5.896 5.004 1.382 5.191 -6.049 1.316 6.190

24-MCC-102 0.400 1.467 -5.892 6.072 1.525 -5.909 6.103 5.103 1.270 5.258 -5.895 1.692 6.133

24-MCC-102_0.4kV 0.400 1.467 -5.892 6.072 1.525 -5.909 6.103 5.103 1.270 5.258 -5.895 1.692 6.133

24-MCC-102_6.6kV 6.600 0.499 -4.394 4.422 0.020 0.000 0.020 3.806 0.432 3.830 -3.811 -0.432 3.835

24-MMC-001 6.600 2.431 -12.647 12.879 0.020 0.000 0.020 10.901 2.088 11.099 -10.906 -2.088 11.104

24-MMC-002 6.600 0.567 -4.828 4.861 0.020 0.000 0.020 4.182 0.491 4.210 -4.187 -0.491 4.215

24-MMC-002B 6.600 0.568 -4.824 4.857 0.020 0.000 0.020 4.178 0.492 4.207 -4.183 -0.492 4.212
Project: ETAP Page: 2
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

24-MMC-101 6.600 0.499 -4.394 4.422 0.020 0.000 0.020 3.806 0.432 3.830 -3.811 -0.432 3.835

24-SUB-101_6.6kV 6.600 0.497 -4.398 4.426 0.020 0.000 0.020 3.809 0.430 3.834 -3.814 -0.430 3.839

24-SUB-101_13,2kV 13.200 0.357 -2.780 2.803 0.202 -1.502 1.516 2.408 0.309 2.428 -2.478 0.205 2.487

24-SUB-102_6,6kV 6.600 0.563 -4.872 4.904 0.020 0.000 0.020 4.219 0.488 4.248 -4.224 -0.488 4.253

24-SUB-102_13,2kV 13.200 0.395 -3.672 3.693 0.316 -2.713 2.732 3.181 0.342 3.199 -3.311 0.734 3.392

32-LCT-003_0.4kV 0.400 2.104 -9.571 9.799 2.133 -9.801 10.030 8.289 1.822 8.487 7.208 6.843 9.939

32-LCT-003_6.6kV 6.600 2.599 -8.177 8.580 0.020 0.000 0.020 7.083 2.253 7.433 -7.088 -2.253 7.437

32-LDP-003 0.400 2.540 -8.507 8.878 2.871 -8.097 8.591 7.367 2.200 7.689 -8.938 1.643 9.088

32-LDS-002_6.6kV 6.600 2.340 -8.526 8.841 0.020 0.000 0.020 7.386 2.028 7.659 -7.391 -2.028 7.664

32-LDS-002_6.6KV 6.600 2.505 -14.710 14.922 0.020 0.000 0.020 12.626 2.155 12.808 -12.631 -2.155 12.813

32-LVS-001 0.400 4.757 -27.861 28.264 4.949 -28.473 28.900 24.102 4.117 24.451 -26.692 10.470 28.672

32-MCC-001 0.400 4.509 -14.076 14.780 4.512 -13.807 14.526 12.183 3.902 12.792 -14.444 2.879 14.729

32-MCC-002 0.400 4.757 -27.861 28.264 4.949 -28.473 28.900 24.102 4.117 24.451 -26.692 10.470 28.672

32-MCC-003 0.400 4.757 -27.861 28.264 4.949 -28.473 28.900 24.102 4.117 24.451 -26.692 10.470 28.672

32-MCC-004 0.400 4.757 -27.861 28.264 4.949 -28.473 28.900 24.102 4.117 24.451 -26.692 10.470 28.672

32-MCC-101 0.400 1.252 -5.294 5.440 1.367 -5.495 5.662 4.584 1.084 4.711 -5.333 1.771 5.619

32-MCC-101_0.4kV 0.400 1.252 -5.294 5.440 1.367 -5.495 5.662 4.584 1.084 4.711 -5.333 1.771 5.619

32-MCC-101_6.6kV 6.600 0.227 -1.825 1.839 0.020 0.000 0.020 1.581 0.196 1.593 -1.586 -0.196 1.598

32-MCC-102 0.400 4.958 -11.645 12.657 5.164 -10.269 11.495 10.080 4.291 10.955 -12.686 0.270 12.689

32-MMC-001 6.600 2.719 -11.796 12.105 0.020 0.000 0.020 10.220 2.357 10.488 -10.225 -2.357 10.493

32-MMC-002 6.600 1.778 -8.332 8.520 0.020 0.000 0.020 7.173 1.531 7.335 -7.178 -1.531 7.340

32-MMC-002B 6.600 1.801 -8.219 8.414 0.020 0.000 0.020 7.076 1.551 7.244 -7.081 -1.551 7.249

32-MMC-003 6.600 2.599 -8.177 8.580 0.020 0.000 0.020 7.083 2.253 7.433 -7.088 -2.253 7.437

32-MMC-004 6.600 2.554 -14.413 14.638 0.020 0.000 0.020 12.369 2.197 12.562 -12.374 -2.197 12.567

32-MMC-101 6.600 0.227 -1.825 1.839 0.020 0.000 0.020 1.581 0.196 1.593 -1.586 -0.196 1.598

32-SUB-101_6,6kV 6.600 0.226 -1.827 1.841 0.020 0.000 0.020 1.582 0.196 1.594 -1.587 -0.196 1.599

32-SUB-101_6.6kV 6.600 0.226 -1.827 1.841 0.020 0.000 0.020 1.582 0.196 1.594 -1.587 -0.196 1.599

32-SUB-101_13,2kV 13.200 0.316 -2.151 2.174 0.155 -1.084 1.095 1.863 0.274 1.883 1.812 0.637 1.920

41-LCT-002_6.6KV 6.600 3.147 -17.503 17.784 0.020 0.000 0.020 15.081 2.696 15.320 -15.086 -2.696 15.325

41-LVS-001 0.400 5.503 -31.590 32.066 5.706 -32.136 32.638 27.343 4.760 27.754 -30.315 11.606 32.461

41-MCC-001 0.400 5.503 -31.590 32.066 5.706 -32.136 32.638 27.343 4.760 27.754 -30.315 11.606 32.461

41-MCC-002 0.400 5.503 -31.590 32.066 5.706 -32.136 32.638 27.343 4.760 27.754 -30.315 11.606 32.461

41-MCC-003 0.400 4.491 -16.309 16.916 4.544 -16.279 16.901 14.120 3.887 14.645 -16.422 4.241 16.961

41-MCC-003_0.4KV 0.400 4.491 -16.309 16.916 4.544 -16.279 16.901 14.120 3.887 14.645 -16.422 4.241 16.961

41-MVS-001 6.600 3.147 -17.503 17.784 0.020 0.000 0.020 15.081 2.696 15.320 -15.086 -2.696 15.325

42-LDS-001_6,6kV 6.600 2.700 -11.886 12.189 0.020 0.000 0.020 10.298 2.341 10.560 -10.303 -2.341 10.565

42-LVS-001 0.400 6.674 -45.410 45.898 6.874 -48.171 48.659 39.330 5.782 39.753 35.795 31.420 47.629
Project: ETAP Page: 3
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

42-MCC-001 0.400 6.674 -45.410 45.898 6.874 -48.171 48.659 39.330 5.782 39.753 35.795 31.420 47.629

42-MCC-101 0.400 6.674 -45.410 45.898 6.874 -48.171 48.659 39.330 5.782 39.753 35.795 31.420 47.629

43-MCC-001 0.400 5.503 -31.590 32.066 5.706 -32.136 32.638 27.343 4.760 27.754 -30.315 11.606 32.461

45-MVS-001 6.600 1.841 -21.113 21.193 0.020 0.000 0.020 18.300 1.598 18.370 -18.305 -1.598 18.375

45-MVS-001_6.6kV 6.600 1.841 -21.113 21.193 0.020 0.000 0.020 18.300 1.598 18.370 -18.305 -1.598 18.375

45-MVS-002 6.600 1.647 -20.443 20.509 0.020 0.000 0.020 17.595 1.407 17.652 -17.600 -1.407 17.657

45-MVS-002_6.6kV 6.600 1.647 -20.443 20.509 0.020 0.000 0.020 17.595 1.407 17.652 -17.600 -1.407 17.657

52-MCC-201 0.400 1.588 -6.477 6.669 1.585 -6.375 6.569 5.609 1.375 5.775 -6.400 1.764 6.639

52-MMC-201 6.600 2.624 -16.008 16.221 0.020 0.000 0.020 13.797 2.250 13.979 -13.802 -2.250 13.984

53-MCC-001 0.400 6.674 -45.410 45.898 6.874 -48.171 48.659 39.330 5.782 39.753 35.795 31.420 47.629

53-MCC-002 0.400 6.674 -45.410 45.898 6.874 -48.171 48.659 39.330 5.782 39.753 35.795 31.420 47.629

62-LCT-001_0.4kV 0.400 1.527 -7.144 7.305 1.539 -7.212 7.375 6.187 1.323 6.327 5.411 4.963 7.343

62-LCT-001_6.6kV 6.600 3.775 -15.203 15.664 0.020 0.000 0.020 13.184 3.274 13.585 -13.189 -3.274 13.590

62-PDP-001 0.400 1.527 -7.144 7.305 1.539 -7.212 7.375 6.187 1.323 6.327 5.411 4.963 7.343

62-PDP-001_Ed.Adm. 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

63-LCT-102_6.6kV 6.600 1.940 -21.458 21.545 0.020 0.000 0.020 18.600 1.683 18.676 -18.605 -1.683 18.680

63-MCC-001 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

64-PDP-001 0.400 6.309 -27.871 28.576 6.499 -27.666 28.419 24.122 5.457 24.731 -27.476 8.288 28.699

67-LCT-006_6,6kV 6.600 1.666 -0.544 1.753 0.020 0.000 0.020 0.471 1.443 1.518 -0.476 -1.443 1.520

67-LCT-101_6.6kV 6.600 2.279 -21.565 21.685 0.020 0.000 0.020 18.692 1.978 18.797 -18.697 -1.978 18.802

67-LCT-102_0,4kV 0.400 3.265 -19.365 19.639 3.380 -19.896 20.181 16.763 2.826 17.000 -18.520 7.412 19.948

67-LCT-102_0.4kV 0.400 3.265 -19.365 19.639 3.380 -19.896 20.181 16.763 2.826 17.000 -18.520 7.412 19.948

67-LCT-102_23kV 23.000 0.509 -4.151 4.182 0.020 0.000 0.020 3.574 0.438 3.601 -3.579 -0.438 3.606

67-LCT-104_0,4kV 0.400 3.262 -19.339 19.613 3.378 -19.878 20.163 16.741 2.823 16.977 -18.496 7.410 19.925

67-LCT-104_0.4kV 0.400 3.262 -19.339 19.613 3.378 -19.878 20.163 16.741 2.823 16.977 -18.496 7.410 19.925

67-LCT-104_23kV 23.000 0.507 -4.083 4.115 0.020 0.000 0.020 3.516 0.436 3.543 -3.521 -0.436 3.548

67-LCT-105_0,4kV 0.400 3.257 -19.323 19.595 3.374 -19.866 20.151 16.726 2.819 16.962 -18.481 7.411 19.911

67-LCT-105_0.4kV 0.400 3.257 -19.323 19.595 3.374 -19.866 20.151 16.726 2.819 16.962 -18.481 7.411 19.911

67-LCT-105_23kV 23.000 0.499 -4.040 4.071 0.020 0.000 0.020 3.479 0.429 3.506 -3.484 -0.429 3.511

67-LDS-001_6,6kV 6.600 2.681 -16.603 16.818 0.020 0.000 0.020 14.388 2.325 14.574 -14.393 -2.325 14.579

67-MCC-101 0.400 2.993 -10.068 10.504 3.241 -10.625 11.108 8.719 2.592 9.097 -10.483 3.030 10.913

67-PDP-1 0.400 2.066 -8.318 8.570 2.093 -8.383 8.640 7.202 1.789 7.421 -8.264 2.437 8.616

67-PDP-001 0.400 6.071 -14.973 16.157 5.729 -15.998 16.993 12.967 5.258 13.992 10.341 13.805 17.248

67-PDP-001_0.4kV 0.400 6.071 -14.973 16.157 5.729 -15.998 16.993 12.967 5.258 13.992 10.341 13.805 17.248

67-PDP-001_0.4KV 0.400 2.066 -8.318 8.570 2.093 -8.383 8.640 7.202 1.789 7.421 -8.264 2.437 8.616

67-PDP-2 0.400 10.021 -11.607 15.335 10.219 -14.776 17.965 10.052 8.679 13.280 5.367 18.227 19.001

67-PDP-002 0.400 2.041 -3.136 3.742 2.016 -3.311 3.876 2.716 1.767 3.240 1.727 3.515 3.917
Project: ETAP Page: 4
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

67-PDP-02_0.4kV 0.400 10.021 -11.607 15.335 10.219 -14.776 17.965 10.052 8.679 13.280 5.367 18.227 19.001

67-PDP-002_0.4kV 0.400 2.041 -3.136 3.742 2.016 -3.311 3.876 2.716 1.767 3.240 1.727 3.515 3.917

67-PDP-003 0.400 11.522 -14.532 18.546 11.575 -18.324 21.673 12.585 9.979 16.061 7.423 21.680 22.915

67-PDP-004 0.400 2.033 -3.163 3.760 2.009 -3.330 3.889 2.739 1.761 3.257 1.753 3.514 3.927

67-PDP-004_0,4kV 0.400 2.033 -3.163 3.760 2.009 -3.330 3.889 2.739 1.761 3.257 1.753 3.514 3.927

67-PDP-005 0.400 1.896 -3.607 4.075 1.905 -3.635 4.104 3.124 1.642 3.529 2.167 3.474 4.094

72-HFL-001_6.6kV 6.600 1.621 -22.131 22.190 0.020 0.000 0.020 19.184 1.407 19.235 -19.189 -1.407 19.240

72-LCT-001_6,6KV 6.600 1.664 -20.711 20.778 0.020 0.000 0.020 17.825 1.421 17.881 -17.830 -1.421 17.886

72-PDP-001 0.400 1.468 -5.124 5.330 1.481 -5.148 5.357 4.437 1.271 4.616 -5.184 1.316 5.349

72-PDP-001_0.4kV 0.400 1.468 -5.124 5.330 1.481 -5.148 5.357 4.437 1.271 4.616 -5.184 1.316 5.349

72-PDP-101 0.400 1.280 -3.391 3.625 1.312 -3.104 3.370 2.936 1.109 3.139 -3.597 0.318 3.611

72-PDS-001A 6.600 1.455 -22.526 22.573 0.020 0.000 0.020 19.526 1.263 19.567 -19.531 -1.263 19.572

72-PDS-001B 6.600 1.374 -21.416 21.460 0.020 0.000 0.020 18.427 1.173 18.465 -18.432 -1.173 18.470

72-PDS-201A 23.000 0.387 -6.691 6.702 0.020 0.000 0.020 5.765 0.332 5.774 -5.770 -0.332 5.779

72-PDS-201B 23.000 0.387 -6.691 6.702 0.020 0.000 0.020 5.765 0.332 5.774 -5.770 -0.332 5.779

72-XFR-103_0.4kV 0.400 1.280 -3.391 3.625 1.312 -3.104 3.370 2.936 1.109 3.139 -3.597 0.318 3.611

73-LDS-002_6.6KV 6.600 1.502 -21.111 21.164 0.020 0.000 0.020 18.164 1.284 18.209 -18.169 -1.284 18.214

73-SUB-101_6,6kV 6.600 1.753 -21.932 22.002 0.020 0.000 0.020 19.011 1.522 19.072 -19.016 -1.522 19.077

73-SUB-101_13.2kV 13.200 0.349 -4.592 4.606 0.367 -5.028 5.042 3.978 0.303 3.990 3.786 3.079 4.880

92-LCT-001_6.6kV 6.600 2.602 -1.063 2.811 0.020 0.000 0.020 0.921 2.254 2.434 -0.926 -2.254 2.436

92-PDP-001 0.400 7.096 -12.842 14.672 6.688 -14.473 15.944 11.122 6.146 12.707 8.166 14.296 16.464

92-PDP-001_0.4kV 0.400 7.096 -12.842 14.672 6.688 -14.473 15.944 11.122 6.146 12.707 8.166 14.296 16.464

220-MCC-101 0.400 4.966 -20.183 20.785 5.498 -20.458 21.184 17.475 4.299 17.996 -20.511 6.065 21.388

220-MMC-101 6.600 0.484 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

220-MMC-101_6,6KV 6.600 0.484 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

241-LCT-102_0.4KV 0.400 3.169 -24.406 24.610 3.632 -27.400 27.639 21.130 2.742 21.307 -23.260 12.883 26.589

241-LCT-102_6,6KV 6.600 0.484 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

241-MCC-101 0.400 4.966 -20.183 20.785 5.498 -20.458 21.184 17.475 4.299 17.996 -20.511 6.065 21.388

241-SUB-101_6,6kV 6.600 0.471 -4.531 4.555 0.020 0.000 0.020 3.920 0.408 3.941 -3.925 -0.408 3.946

241-SUB-101-23kV 23.000 0.454 -3.184 3.216 0.020 0.000 0.020 2.751 0.391 2.778 -2.756 -0.391 2.783

241-SUB-101_23KV 23.000 0.455 -3.182 3.215 0.020 0.000 0.020 2.749 0.392 2.777 -2.754 -0.392 2.782

242-LCT-102_0.4KV 0.400 1.704 -8.854 9.017 1.876 -9.463 9.647 7.667 1.475 7.808 -8.709 3.606 9.426

242-MCC-101 0.400 1.939 -8.213 8.439 2.099 -8.456 8.712 7.112 1.678 7.307 -8.251 2.677 8.674

242-MCC-101_0,4KV 0.400 1.939 -8.213 8.439 2.099 -8.456 8.712 7.112 1.678 7.307 -8.251 2.677 8.674

242-MMC-101 6.600 0.305 -2.757 2.774 0.020 0.000 0.020 2.386 0.264 2.401 -2.391 -0.264 2.406

242-SUB-101_6,6kV 6.600 0.300 -2.769 2.785 0.020 0.000 0.020 2.397 0.260 2.411 -2.402 -0.260 2.416

242-SUB-101_23kV 23.000 0.454 -3.021 3.055 0.020 0.000 0.020 2.610 0.392 2.640 -2.615 -0.392 2.645
Project: ETAP Page: 5
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

243-LCT-102_0.4kV 0.400 2.033 -8.439 8.680 2.167 -8.607 8.876 7.307 1.760 7.516 -8.464 2.631 8.863

243-MCC-101 0.400 2.033 -8.439 8.680 2.167 -8.607 8.876 7.307 1.760 7.516 -8.464 2.631 8.863

243-MMC-101 6.600 0.383 -3.292 3.315 0.020 0.000 0.020 2.849 0.332 2.868 -2.854 -0.332 2.873

243-SUB-101_6,6kV 6.600 0.376 -3.310 3.331 0.020 0.000 0.020 2.864 0.326 2.883 -2.869 -0.326 2.888

243-SUB-101_23kV 23.000 0.434 -2.675 2.710 0.020 0.000 0.020 2.312 0.374 2.342 -2.317 -0.374 2.347

244-LCT-101_6.6kV 6.600 1.320 -3.548 3.786 0.020 0.000 0.020 3.073 1.144 3.279 -3.078 -1.144 3.284

244-MCC-101 0.400 3.486 -11.465 11.983 3.548 -11.724 12.250 9.929 3.019 10.378 8.123 9.017 12.136

244-MCC-101_0.4kV 0.400 3.486 -11.465 11.983 3.548 -11.724 12.250 9.929 3.019 10.378 8.123 9.017 12.136

244-MMC-101 6.600 1.320 -3.548 3.786 0.020 0.000 0.020 3.073 1.144 3.279 -3.078 -1.144 3.284

323-LCT-101_6.6Kv 6.600 0.350 -4.031 4.046 0.020 0.000 0.020 3.489 0.303 3.502 -3.494 -0.303 3.507

323-LCT-101_23kV 23.000 0.496 -4.358 4.386 0.020 0.000 0.020 3.762 0.426 3.786 -3.767 -0.426 3.791

323-LCT-102_0.4kV 0.400 2.105 -8.741 8.991 2.227 -8.833 9.110 7.570 1.823 7.786 -8.747 2.640 9.137

323-LCT-102_kV 6.600 0.355 -4.018 4.034 0.020 0.000 0.020 3.478 0.307 3.491 -3.483 -0.307 3.496

323-MCC-101 0.400 2.105 -8.741 8.991 2.227 -8.833 9.110 7.570 1.823 7.786 -8.747 2.640 9.137

323-MMC-101 6.600 0.355 -4.018 4.034 0.020 0.000 0.020 3.478 0.307 3.491 -3.483 -0.307 3.496

323-SUB-101_6,6kV 6.600 0.350 -4.031 4.046 0.020 0.000 0.020 3.489 0.303 3.502 -3.494 -0.303 3.507

323-SUB-101_23kV 23.000 0.539 -4.326 4.359 0.020 0.000 0.020 3.734 0.463 3.763 -3.739 -0.463 3.768

431-MMC-101 6.600 2.574 -14.288 14.518 0.020 0.000 0.020 12.261 2.215 12.459 -12.266 -2.215 12.464

434-LCT-101_6.6kV 6.600 0.688 -8.490 8.518 0.020 0.000 0.020 7.197 0.580 7.220 -7.202 -0.580 7.225

434-LCTL-102_0.4kV 0.400 1.616 -6.707 6.899 1.637 -6.641 6.840 5.802 1.397 5.968 -6.636 1.897 6.902

434-LCTL-102_6.6kV 6.600 0.693 -8.479 8.507 0.020 0.000 0.020 7.187 0.584 7.210 -7.192 -0.584 7.215

434-MCC-101 0.400 1.616 -6.707 6.899 1.637 -6.641 6.840 5.802 1.397 5.968 -6.636 1.897 6.902

434-MMC-101 6.600 0.693 -8.479 8.507 0.020 0.000 0.020 7.187 0.584 7.210 -7.192 -0.584 7.215

434-SUB-101_6,6kV 6.600 0.688 -8.490 8.518 0.020 0.000 0.020 7.197 0.580 7.220 -7.202 -0.580 7.225

434-SUB-101_23kV 23.000 0.516 -4.714 4.742 0.020 0.000 0.020 4.050 0.443 4.074 -4.055 -0.443 4.079

436-MCC-101 0.400 2.212 -9.000 9.267 2.296 -8.988 9.276 7.793 1.915 8.025 -8.985 2.573 9.346

436-MMC-101 6.600 0.445 -5.500 5.518 0.020 0.000 0.020 4.757 0.385 4.773 -4.762 -0.385 4.778

436-SUB-101_6,6kV 6.600 0.441 -5.509 5.527 0.020 0.000 0.020 4.765 0.381 4.780 -4.770 -0.381 4.785

436-SUB-101_23kV 23.000 0.459 -6.279 6.296 0.020 0.000 0.020 5.410 0.394 5.424 -5.415 -0.394 5.429

451-LCT-101_0,4kV 0.400 4.299 -12.142 12.881 4.525 -11.523 12.380 10.514 3.722 11.153 -12.864 1.748 12.982

451-MCC-101 0.400 4.299 -12.142 12.881 4.525 -11.523 12.380 10.514 3.722 11.153 -12.864 1.748 12.982

451-SUB-101_6,6kV 0.400 4.281 -13.751 14.402 4.415 -14.005 14.685 11.907 3.706 12.470 -14.187 3.430 14.595

451-SUB-101_23kV 23.000 0.519 -4.206 4.238 0.020 0.000 0.020 3.631 0.447 3.659 -3.636 -0.447 3.664

538-MCC-101 0.400 3.062 -8.456 8.993 3.199 -7.935 8.556 7.322 2.651 7.787 -8.968 1.077 9.033

538-MCC-101_0.4KV 0.400 3.062 -8.456 8.993 3.199 -7.935 8.556 7.322 2.651 7.787 -8.968 1.077 9.033

538-SUB-101_0.4KV 0.400 3.060 -9.729 10.199 3.134 -9.872 10.357 8.424 2.650 8.831 -10.031 2.361 10.305

538-SUB-101_23KV 23.000 0.515 -3.754 3.789 0.020 0.000 0.020 3.242 0.443 3.272 -3.247 -0.443 3.277
Project: ETAP Page: 6
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

630-LCT-101_6.6kV 6.600 0.602 -7.564 7.588 0.020 0.000 0.020 6.542 0.520 6.563 -6.547 -0.520 6.568

630-SUB-101_6,6kV 6.600 0.602 -7.564 7.588 0.020 0.000 0.020 6.542 0.520 6.563 -6.547 -0.520 6.568

630-SUB-101_23kV 23.000 0.560 -5.144 5.175 0.020 0.000 0.020 4.438 0.481 4.464 -4.443 -0.481 4.469

630-SUB-102_6,6kV 6.600 0.668 -11.082 11.103 0.020 0.000 0.020 9.587 0.576 9.604 -9.592 -0.576 9.609

630-SUB-102_6.6KV 6.600 0.668 -11.082 11.103 0.020 0.000 0.020 9.587 0.576 9.604 -9.592 -0.576 9.609

630-SUB-102_23kV 23.000 0.533 -5.801 5.826 0.020 0.000 0.020 5.003 0.457 5.024 -5.008 -0.457 5.029

630-SUB-103_23kV1 23.000 0.525 -3.351 3.392 0.020 0.000 0.020 2.895 0.452 2.930 -2.900 -0.452 2.935

1511-LCT-001_23kV 23.000 0.484 -5.395 5.417 0.020 0.000 0.020 4.653 0.415 4.672 -4.658 -0.415 4.677

1511-SUB-001_23kV 0.400 5.238 -38.905 39.256 5.539 -40.587 40.963 33.676 4.531 33.979 -36.626 16.700 40.254

1511-SUB-001_kV 23.000 0.493 -5.388 5.410 0.020 0.000 0.020 4.647 0.424 4.666 -4.652 -0.424 4.671

1609-MCC-001 0.400 5.666 -39.281 39.687 5.920 -44.793 45.182 33.961 4.903 34.313 30.956 31.046 43.843

1609-MCC-001_0.4kV 0.400 5.666 -39.281 39.687 5.920 -44.793 45.182 33.961 4.903 34.313 30.956 31.046 43.843

ACIDULADO_0.4KV 0.400 2.342 -7.744 8.090 2.217 -8.084 8.383 6.704 2.028 7.004 5.672 6.252 8.442

Acidulado_ROM 0.400 2.342 -7.744 8.090 2.217 -8.084 8.383 6.704 2.028 7.004 5.672 6.252 8.442

BARRIO CIVICO 0.4kV 0.400 2.993 -10.068 10.504 3.241 -10.625 11.108 8.719 2.592 9.097 -10.483 3.030 10.913

BARRIO CIVICO_13.2kV 13.200 0.321 -1.907 1.934 0.151 -0.957 0.969 1.652 0.278 1.675 1.602 0.597 1.710

Bus1 0.370 7.638 -97.365 97.664 8.233 -105.308 105.629 84.201 6.595 84.459 79.754 64.110 102.327

Bus2 0.400 1.095 -5.589 5.696 1.196 -5.956 6.075 4.841 0.949 4.933 -5.498 2.238 5.936

Bus3 6.600 0.689 -4.758 4.807 0.020 0.000 0.020 4.121 0.597 4.164 -4.126 -0.597 4.169

Bus4 6.600 1.774 -20.112 20.190 0.020 0.000 0.020 17.313 1.516 17.379 -17.318 -1.516 17.384

Bus5 13.200 0.389 -3.681 3.702 0.312 -2.721 2.739 3.189 0.337 3.206 -3.318 0.742 3.400

Bus6 13.200 0.357 -2.781 2.804 0.202 -1.503 1.517 2.409 0.309 2.429 -2.479 0.206 2.488

Bus7 13.200 0.389 -3.681 3.702 0.312 -2.721 2.739 3.189 0.337 3.206 -3.318 0.742 3.400

Bus8 6.600 0.599 -4.329 4.371 0.020 0.000 0.020 3.750 0.519 3.785 -3.755 -0.519 3.790

Bus9 6.600 1.972 -20.758 20.852 0.020 0.000 0.020 17.993 1.711 18.074 -17.998 -1.711 18.079

Bus10 6.600 0.608 -4.324 4.367 0.020 0.000 0.020 3.745 0.526 3.782 -3.750 -0.526 3.787

Bus11 6.600 0.563 -4.834 4.867 0.020 0.000 0.020 4.187 0.487 4.215 -4.192 -0.487 4.220

Bus12 6.600 0.599 -4.329 4.371 0.020 0.000 0.020 3.750 0.519 3.785 -3.755 -0.519 3.790

Bus13 6.600 0.695 -4.752 4.802 0.020 0.000 0.020 4.116 0.602 4.159 -4.121 -0.602 4.164

Bus14 6.600 0.529 -4.327 4.359 0.020 0.000 0.020 3.747 0.458 3.775 -3.752 -0.458 3.780

Bus15 6.600 0.551 -4.346 4.380 0.020 0.000 0.020 3.764 0.477 3.794 -3.769 -0.477 3.799

Bus16 6.600 1.725 -4.906 5.200 0.020 0.000 0.020 4.249 1.494 4.504 -4.254 -1.494 4.509

Bus17 0.400 1.278 -6.266 6.395 1.333 -6.451 6.587 5.427 1.107 5.538 -6.123 2.216 6.512

Bus18 13.200 0.358 -2.779 2.802 0.202 -1.502 1.515 2.407 0.310 2.427 -2.477 0.204 2.486

Bus19 6.600 3.185 -4.139 5.223 0.020 0.000 0.020 3.577 2.744 4.508 -3.582 -2.744 4.512

Bus20 13.200 0.316 -2.152 2.175 0.155 -1.085 1.096 1.864 0.274 1.884 1.813 0.636 1.921

Bus21 13.200 0.320 -1.908 1.935 0.151 -0.957 0.969 1.652 0.278 1.676 1.603 0.597 1.711
Project: ETAP Page: 7
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus22 6.600 2.432 -16.218 16.399 0.020 0.000 0.020 13.976 2.085 14.131 -13.981 -2.085 14.136

Bus23 6.600 1.572 -22.248 22.304 0.020 0.000 0.020 19.286 1.365 19.334 -19.291 -1.365 19.339

Bus24 6.600 1.759 -21.791 21.862 0.020 0.000 0.020 18.888 1.527 18.950 -18.893 -1.527 18.955

Bus25 6.600 2.626 -15.834 16.051 0.020 0.000 0.020 13.733 2.277 13.920 -13.738 -2.277 13.925

Bus26 6.600 3.246 -10.804 11.281 0.020 0.000 0.020 9.375 2.816 9.789 -9.380 -2.816 9.793

Bus27 6.600 3.775 -15.203 15.664 0.020 0.000 0.020 13.184 3.274 13.585 -13.189 -3.274 13.590

Bus28 0.400 4.858 -31.172 31.548 4.993 -32.983 33.359 27.005 4.207 27.331 24.438 21.703 32.684

Bus29 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus30 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus31 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus32 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus35 13.200 0.306 -1.916 1.941 0.145 -0.961 0.971 1.660 0.265 1.681 1.612 0.586 1.716

Bus36 13.200 0.327 -2.145 2.170 0.160 -1.082 1.094 1.858 0.283 1.880 1.805 0.645 1.917

Bus37 6.600 2.000 -21.141 21.235 0.020 0.000 0.020 18.324 1.736 18.407 -18.329 -1.736 18.411

Bus38 6.600 3.265 -10.738 11.223 0.020 0.000 0.020 9.317 2.833 9.738 -9.322 -2.833 9.743

Bus39 6.600 2.583 -11.718 11.999 0.020 0.000 0.020 10.169 2.239 10.413 -10.174 -2.239 10.418

Bus40 0.400 6.096 -47.036 47.429 6.137 -51.291 51.657 40.755 5.278 41.095 37.705 33.437 50.395

Bus42 6.600 3.211 -10.832 11.297 0.020 0.000 0.020 9.399 2.786 9.803 -9.404 -2.786 9.808

Bus43 6.600 2.698 -7.947 8.393 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus44 6.600 0.305 -2.757 2.774 0.020 0.000 0.020 2.386 0.264 2.401 -2.391 -0.264 2.406

Bus45 6.600 1.524 -21.059 21.114 0.020 0.000 0.020 18.122 1.301 18.169 -18.127 -1.301 18.174

Bus46 0.400 3.616 -6.688 7.603 3.689 -6.905 7.828 5.791 3.130 6.582 3.907 6.700 7.756

Bus47 0.400 4.145 -16.173 16.696 4.289 -16.816 17.354 14.011 3.590 14.464 11.788 12.339 17.065

Bus48 6.600 2.746 -8.201 8.649 0.020 0.000 0.020 7.124 2.380 7.512 -7.129 -2.380 7.516

Bus49 0.400 2.460 -4.604 5.220 2.494 -4.705 5.325 3.986 2.130 4.520 2.722 4.537 5.291

Bus50 23.000 0.443 -3.030 3.063 0.020 0.000 0.020 2.619 0.382 2.646 -2.624 -0.382 2.651

Bus51 6.600 1.710 -4.975 5.261 0.020 0.000 0.020 4.309 1.482 4.557 -4.314 -1.482 4.562

Bus52 6.600 2.062 -6.735 7.044 0.020 0.000 0.020 5.834 1.787 6.102 -5.839 -1.787 6.106

Bus53 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus54 0.400 3.152 -12.847 13.228 3.268 -13.845 14.226 11.127 2.730 11.457 9.436 10.233 13.919

Bus55 6.600 0.060 -0.172 0.182 0.114 -0.049 0.124 0.162 0.053 0.171 -0.196 -0.048 0.202

Bus56 6.600 0.060 -0.172 0.182 0.114 -0.049 0.124 0.162 0.053 0.171 -0.196 -0.048 0.202

Bus57 0.330 6.973 -87.257 87.535 7.480 -94.273 94.570 75.582 6.042 75.823 71.547 57.277 91.650

Bus58 220.000 0.957 -7.036 7.101 0.905 -5.368 5.444 6.090 0.829 6.146 -6.501 1.340 6.637

Bus59 6.600 6.994 -9.098 11.476 0.020 0.000 0.020 7.880 6.062 9.942 -7.885 -6.062 9.946

Bus60 6.600 1.460 -21.219 21.269 0.020 0.000 0.020 18.259 1.246 18.301 -18.264 -1.246 18.306

Bus61 0.330 6.973 -87.257 87.535 7.480 -94.273 94.570 75.582 6.042 75.823 71.547 57.277 91.650
Project: ETAP Page: 8
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus62 0.330 3.644 -21.708 22.012 3.747 -22.115 22.430 18.801 3.156 19.064 -20.727 8.111 22.258

Bus63 6.600 4.461 -2.548 5.137 0.020 0.000 0.020 2.206 3.864 4.449 -2.211 -3.864 4.452

Bus64 6.600 2.401 -3.947 4.620 0.020 0.000 0.020 3.419 2.080 4.002 -3.424 -2.080 4.006

Bus65 6.600 2.331 -12.973 13.181 0.020 0.000 0.020 11.180 2.001 11.358 -11.185 -2.001 11.363

Bus66 6.600 2.941 -1.278 3.206 0.020 0.000 0.020 1.107 2.547 2.777 -1.112 -2.547 2.779

Bus69 0.380 7.845 -99.996 100.304 8.456 -108.154 108.484 86.477 6.773 86.742 81.910 65.843 105.093

Bus70 0.330 3.626 -21.670 21.971 3.732 -22.083 22.396 18.760 3.138 19.021 -20.688 8.125 22.226

Bus71 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus73 6.600 4.456 -2.547 5.133 0.020 0.000 0.020 2.205 3.860 4.445 -2.210 -3.860 4.448

Bus74 6.600 1.313 -3.568 3.802 0.020 0.000 0.020 3.090 1.137 3.293 -3.095 -1.137 3.298

Bus75 0.400 4.798 -33.027 33.374 4.938 -34.320 34.673 28.585 4.150 28.885 26.043 22.033 34.113

Bus76 23.000 0.395 -6.671 6.683 0.020 0.000 0.020 5.748 0.339 5.758 -5.753 -0.339 5.763

Bus77 0.400 4.260 -17.173 17.694 4.369 -17.516 18.052 14.868 3.687 15.319 -17.114 5.253 17.902

Bus78 23.000 0.396 -6.670 6.681 0.020 0.000 0.020 5.747 0.339 5.757 -5.752 -0.339 5.762

Bus79 23.000 0.395 -6.673 6.684 0.020 0.000 0.020 5.749 0.338 5.759 -5.754 -0.338 5.764

Bus80 0.400 1.294 -6.315 6.446 1.345 -6.485 6.623 5.469 1.121 5.582 -6.168 2.211 6.553

Bus81 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus82 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus83 6.600 2.013 -0.737 2.144 0.020 0.000 0.020 0.638 1.744 1.857 -0.643 -1.744 1.859

Bus84 0.400 1.454 -6.876 7.028 1.469 -6.935 7.089 5.954 1.259 6.085 -6.697 2.240 7.061

Bus85 6.600 3.197 -15.307 15.637 0.020 0.000 0.020 13.196 2.742 13.478 -13.201 -2.742 13.483

Bus87 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus88 6.600 1.668 -0.543 1.755 0.020 0.000 0.020 0.470 1.445 1.520 -0.475 -1.445 1.521

Bus89 6.600 2.011 -0.736 2.141 0.020 0.000 0.020 0.637 1.742 1.854 -0.642 -1.742 1.856

Bus90 6.600 2.700 -11.886 12.189 0.020 0.000 0.020 10.298 2.341 10.560 -10.303 -2.341 10.565

Bus91 6.600 3.210 -15.293 15.627 0.020 0.000 0.020 13.185 2.754 13.469 -13.190 -2.754 13.474

Bus92 6.600 1.502 -21.111 21.164 0.020 0.000 0.020 18.164 1.284 18.209 -18.169 -1.284 18.214

Bus93 0.400 4.701 -31.643 31.991 4.870 -33.308 33.662 27.384 4.066 27.684 24.860 21.673 32.981

Bus94 0.400 5.974 -47.454 47.829 6.038 -51.605 51.957 41.101 5.175 41.426 38.092 33.437 50.686

Bus95 23.000 0.395 -6.671 6.682 0.020 0.000 0.020 5.747 0.339 5.757 -5.752 -0.339 5.762

Bus96 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus97 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus98 23.000 0.416 -2.691 2.723 0.020 0.000 0.020 2.326 0.359 2.353 -2.331 -0.359 2.358

Bus99 6.600 0.091 -0.303 0.317 0.182 -0.071 0.195 0.287 0.082 0.298 -0.338 -0.074 0.346

Bus100 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus101 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus102 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510
Project: ETAP Page: 9
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus103 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus104 6.600 0.092 -0.303 0.317 0.182 -0.071 0.195 0.286 0.082 0.298 -0.338 -0.075 0.346

Bus105 6.600 2.340 -8.526 8.841 0.020 0.000 0.020 7.386 2.028 7.659 -7.391 -2.028 7.664

Bus106 6.600 0.091 -0.303 0.317 0.182 -0.071 0.195 0.287 0.082 0.298 -0.338 -0.074 0.346

Bus107 6.600 0.092 -0.303 0.317 0.182 -0.071 0.195 0.286 0.082 0.298 -0.338 -0.075 0.346

Bus108 0.400 4.208 -28.970 29.274 4.344 -30.171 30.482 25.061 3.643 25.324 22.824 19.418 29.967

Bus109 6.600 2.698 -7.947 8.393 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus111 6.600 2.698 -7.947 8.393 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus112 23.000 0.468 -3.400 3.432 0.020 0.000 0.020 2.937 0.403 2.965 -2.942 -0.403 2.970

Bus113 6.600 2.984 -13.857 14.174 0.020 0.000 0.020 11.893 2.565 12.166 -11.898 -2.565 12.171

Bus114 23.000 0.487 -3.833 3.863 0.020 0.000 0.020 3.310 0.419 3.336 -3.315 -0.419 3.341

Bus116 6.600 0.133 -0.512 0.529 0.266 -0.098 0.283 0.444 0.115 0.458 -0.524 -0.107 0.535

Bus117 6.600 0.133 -0.512 0.529 0.266 -0.098 0.284 0.443 0.116 0.458 -0.524 -0.108 0.535

Bus118 23.000 0.486 -3.777 3.808 0.020 0.000 0.020 3.261 0.419 3.288 -3.266 -0.419 3.293

Bus119 0.400 5.238 -38.905 39.256 5.539 -40.587 40.963 33.676 4.531 33.979 -36.626 16.700 40.254

Bus120 0.400 1.178 -2.939 3.166 1.186 -2.950 3.180 2.545 1.020 2.742 -3.143 0.461 3.176

Bus121 6.600 2.997 -13.735 14.059 0.020 0.000 0.020 11.789 2.576 12.067 -11.794 -2.576 12.072

Bus122 23.000 0.512 -5.184 5.209 0.020 0.000 0.020 4.472 0.440 4.494 -4.477 -0.440 4.499

Bus123 0.400 1.925 -5.597 5.919 1.918 -5.531 5.854 4.847 1.667 5.126 -5.802 1.066 5.900

Bus125 6.600 2.997 -13.735 14.059 0.020 0.000 0.020 11.789 2.576 12.067 -11.794 -2.576 12.072

Bus128 6.600 1.911 -8.137 8.359 0.020 0.000 0.020 7.006 1.645 7.197 -7.011 -1.645 7.202

Bus131 6.600 1.925 -8.032 8.259 0.020 0.000 0.020 6.913 1.658 7.110 -6.918 -1.658 7.114

Bus132 6.600 1.928 -8.028 8.256 0.020 0.000 0.020 6.912 1.660 7.108 -6.917 -1.660 7.113

Bus133 0.400 4.025 -16.241 16.733 4.212 -16.898 17.415 14.055 3.483 14.481 -16.271 5.334 17.123

Bus134 23.000 0.469 -3.398 3.430 0.020 0.000 0.020 2.935 0.404 2.963 -2.940 -0.404 2.968

Bus135 6.600 1.912 -8.136 8.358 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus136 6.600 1.912 -8.136 8.358 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus137 6.600 1.912 -8.136 8.358 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus138 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus139 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus140 6.600 1.779 -8.352 8.539 0.020 0.000 0.020 7.190 1.532 7.352 -7.195 -1.532 7.357

Bus141 23.000 0.469 -3.438 3.470 0.020 0.000 0.020 2.970 0.404 2.997 -2.975 -0.404 3.002

Bus142 6.600 3.176 -5.986 6.776 0.020 0.000 0.020 5.164 2.731 5.842 -5.169 -2.731 5.846

Bus144 6.600 1.751 -7.914 8.106 0.020 0.000 0.020 6.816 1.508 6.980 -6.821 -1.508 6.985

Bus145 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus146 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus147 6.600 2.970 -2.309 3.762 0.020 0.000 0.020 2.000 2.563 3.251 -2.005 -2.563 3.254
Project: ETAP Page: 10
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus148 6.600 3.401 -5.183 6.199 0.020 0.000 0.020 4.475 2.926 5.347 -4.480 -2.926 5.351

Bus149 6.600 0.873 -7.241 7.294 0.020 0.000 0.020 6.263 0.754 6.309 -6.268 -0.754 6.314

Bus150 6.600 1.693 -7.235 7.430 0.020 0.000 0.020 6.233 1.458 6.401 -6.238 -1.458 6.406

Bus151 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus152 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus153 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus154 6.600 1.474 -6.337 6.506 0.020 0.000 0.020 5.463 1.270 5.609 -5.468 -1.270 5.614

Bus156 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus157 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus158 23.000 0.497 -4.223 4.252 0.020 0.000 0.020 3.646 0.427 3.671 -3.651 -0.427 3.676

Bus159 23.000 0.454 -3.193 3.225 0.020 0.000 0.020 2.758 0.391 2.786 -2.763 -0.391 2.791

Bus160 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus161 0.400 1.292 -4.029 4.231 1.300 -4.042 4.246 3.489 1.118 3.664 -4.144 0.909 4.242

Bus162 6.600 3.201 -4.152 5.242 0.020 0.000 0.020 3.588 2.758 4.525 -3.593 -2.758 4.529

Bus163 6.600 2.975 -11.386 11.769 0.020 0.000 0.020 9.865 2.579 10.196 -9.870 -2.579 10.201

Bus164 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus165 6.600 1.666 -0.544 1.753 0.020 0.000 0.020 0.471 1.443 1.518 -0.476 -1.443 1.520

Bus166 6.600 0.130 -0.361 0.384 0.231 -0.105 0.254 0.313 0.113 0.333 -0.391 -0.102 0.404

Bus167 6.600 0.131 -0.361 0.384 0.231 -0.105 0.254 0.313 0.113 0.333 -0.391 -0.103 0.404

Bus168 0.400 3.169 -24.406 24.610 3.632 -27.400 27.639 21.130 2.742 21.307 -23.260 12.883 26.589

Bus171 23.000 0.437 -6.292 6.307 0.020 0.000 0.020 5.421 0.375 5.434 -5.426 -0.375 5.439

Bus172 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus173 23.000 0.496 -4.422 4.450 0.020 0.000 0.020 3.817 0.427 3.841 -3.822 -0.427 3.846

Bus174 6.600 0.586 -4.437 4.475 0.020 0.000 0.020 3.839 0.506 3.872 -3.844 -0.506 3.877

Bus176 0.400 1.842 -9.474 9.651 1.988 -9.941 10.138 8.204 1.595 8.358 -9.282 3.634 9.968

Bus178 23.000 0.496 -4.325 4.354 0.020 0.000 0.020 3.734 0.427 3.758 -3.739 -0.426 3.763

Bus179 23.000 0.492 -4.091 4.120 0.020 0.000 0.020 3.532 0.424 3.557 -3.537 -0.424 3.562

Bus181 6.600 1.455 -22.526 22.573 0.020 0.000 0.020 19.526 1.263 19.567 -19.531 -1.263 19.572

Bus184 6.600 0.132 -0.400 0.422 0.241 -0.104 0.263 0.347 0.114 0.365 -0.426 -0.105 0.438

Bus185 6.600 0.133 -0.400 0.421 0.242 -0.104 0.263 0.346 0.115 0.365 -0.425 -0.105 0.438

Bus187 23.000 0.494 -5.005 5.029 0.020 0.000 0.020 4.318 0.425 4.339 -4.323 -0.425 4.344

Bus191 0.400 1.938 -9.782 9.972 2.054 -10.141 10.347 8.471 1.678 8.635 -9.563 3.586 10.214

Bus192 23.000 0.494 -4.044 4.074 0.020 0.000 0.020 3.483 0.424 3.509 -3.488 -0.424 3.514

Bus193 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus194 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus195 23.000 0.396 -6.669 6.681 0.020 0.000 0.020 5.746 0.339 5.756 -5.751 -0.339 5.761

Bus196 6.600 1.878 -20.844 20.928 0.020 0.000 0.020 17.936 1.605 18.007 -17.941 -1.605 18.012
Project: ETAP Page: 11
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus197 23.000 0.499 -4.407 4.435 0.020 0.000 0.020 3.793 0.429 3.818 -3.798 -0.429 3.823

Bus198 23.000 0.533 -4.212 4.246 0.020 0.000 0.020 3.627 0.458 3.656 -3.632 -0.458 3.661

Bus199 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus201 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus202 0.400 12.444 -133.186 133.766 0.020 0.000 0.020 114.974 10.738 115.475 -114.979 -10.738 115.480

Bus203 0.330 4.330 -9.163 10.135 4.481 -7.006 8.316 7.934 3.748 8.774 -10.068 -0.982 10.116

Bus204 0.400 1.789 -9.120 9.294 1.941 -9.657 9.850 7.898 1.549 8.048 -8.958 3.581 9.647

Bus205 6.600 0.130 -0.361 0.384 0.231 -0.106 0.254 0.313 0.113 0.333 -0.391 -0.102 0.404

Bus206 6.600 0.131 -0.361 0.384 0.231 -0.106 0.254 0.313 0.113 0.332 -0.391 -0.103 0.404

Bus207 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus208 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus209 0.330 4.335 -9.170 10.143 4.484 -7.008 8.320 7.939 3.753 8.782 -10.075 -0.987 10.123

Bus213 6.600 0.532 -4.321 4.354 0.020 0.000 0.020 3.743 0.461 3.771 -3.748 -0.461 3.776

Bus214 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus215 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus218 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus219 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus220 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus221 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus222 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus223 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus225 23.000 0.413 -6.518 6.531 0.020 0.000 0.020 5.615 0.354 5.626 -5.620 -0.354 5.631

Bus235 23.000 0.394 -6.675 6.687 0.020 0.000 0.020 5.751 0.337 5.761 -5.756 -0.337 5.766

Bus236 23.000 0.470 -5.837 5.856 0.020 0.000 0.020 5.034 0.403 5.050 -5.039 -0.403 5.055

Bus256 23.000 0.494 -4.052 4.082 0.020 0.000 0.020 3.490 0.424 3.516 -3.495 -0.424 3.521

Bus264 23.000 0.495 -4.096 4.126 0.020 0.000 0.020 3.527 0.425 3.553 -3.532 -0.425 3.558

Bus270 23.000 0.496 -4.164 4.193 0.020 0.000 0.020 3.586 0.426 3.611 -3.591 -0.426 3.616

Bus300 23.000 0.491 -5.138 5.162 0.020 0.000 0.020 4.419 0.422 4.439 -4.424 -0.422 4.444

Bus301 23.000 0.502 -4.727 4.754 0.020 0.000 0.020 4.062 0.432 4.085 -4.067 -0.432 4.090

Bus304 0.400 1.468 -7.133 7.282 1.507 -7.249 7.404 6.170 1.269 6.300 -6.950 2.422 7.360

Bus312 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.069 0.723 7.106 -7.074 -0.723 7.111

Bus315 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.069 0.723 7.106 -7.074 -0.723 7.111

Bus316 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.069 0.723 7.106 -7.074 -0.723 7.111

CASINO 6.6kv 6.600 2.011 -0.736 2.141 0.020 0.000 0.020 0.637 1.742 1.854 -0.642 -1.742 1.856

Celda 21-LDS-001 6.600 2.345 -8.760 9.069 0.020 0.000 0.020 7.609 2.033 7.876 -7.614 -2.033 7.881

Celda 23-LDS-001 6.600 2.583 -11.718 11.999 0.020 0.000 0.020 10.169 2.239 10.413 -10.174 -2.239 10.418

Celda 23-LDS-002 6.600 2.588 -11.807 12.087 0.020 0.000 0.020 10.246 2.243 10.489 -10.251 -2.243 10.494
Project: ETAP Page: 12
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: ERV Alta
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Celda 32-LDS-001 6.600 1.779 -8.352 8.539 0.020 0.000 0.020 7.190 1.532 7.352 -7.195 -1.532 7.357

Celda 32-LDS-003 6.600 2.505 -14.710 14.922 0.020 0.000 0.020 12.626 2.155 12.808 -12.631 -2.155 12.813

Celda 51-LDS-001 6.600 1.693 -7.235 7.430 0.020 0.000 0.020 6.233 1.458 6.401 -6.238 -1.458 6.406

Celda 67-LDS-001 6.600 6.997 -9.144 11.514 0.020 0.000 0.020 7.920 6.064 9.975 -7.925 -6.064 9.979

Celda_Pala_202 6.600 2.397 -8.759 9.081 0.020 0.000 0.020 7.588 2.078 7.867 -7.593 -2.078 7.872

FORTUNA_220kV 220.000 0.957 -7.036 7.101 0.905 -5.368 5.444 6.090 0.829 6.146 -6.501 1.340 6.637

LABERINTO_220kV 220.000 1.063 -11.063 11.114 1.451 -10.766 10.864 9.577 0.920 9.621 -10.479 4.312 11.332

LOMAS_BAYAS_220kV 220.000 1.033 -8.207 8.272 1.109 -6.675 6.766 7.104 0.894 7.160 -7.651 1.916 7.887

Orica 0.400 1.126 -2.572 2.808 1.132 -2.399 2.653 2.228 0.975 2.432 -2.792 0.147 2.796

PATIO CONT 0.4KV 0.400 1.865 -3.511 3.975 1.884 -3.569 4.036 3.040 1.614 3.442 2.088 3.430 4.015

Patio_Cont. 0.400 1.865 -3.511 3.975 1.884 -3.569 4.036 3.040 1.614 3.442 2.088 3.430 4.015

Planta Tratamiento 6,6kV 6.600 1.582 -0.500 1.660 0.020 0.000 0.020 0.433 1.370 1.437 -0.438 -1.370 1.439

Planta_Piloto 0.400 2.316 -9.315 9.598 2.283 -9.620 9.887 8.063 2.005 8.309 6.943 6.980 9.845

PLANTA_PILOTO_0.4kV 0.400 2.316 -9.315 9.598 2.283 -9.620 9.887 8.063 2.005 8.309 6.943 6.980 9.845

POLICLINICO 6.6kV 6.600 1.668 -0.543 1.755 0.020 0.000 0.020 0.470 1.445 1.520 -0.475 -1.445 1.521

T._Elect 0.4kV 0.400 1.221 -5.788 5.915 1.231 -5.819 5.948 5.012 1.057 5.123 -5.633 1.868 5.935

T._Eléct. 0.400 1.221 -5.788 5.915 1.231 -5.819 5.948 5.012 1.057 5.123 -5.633 1.868 5.935

Trafo_0.4kV 0.400 1.126 -2.572 2.808 1.132 -2.399 2.653 2.228 0.975 2.432 -2.792 0.147 2.796

TRUCK SHOP BUS 0.400 1.164 -20.828 20.861 0.019 0.000 0.019 18.039 1.009 18.067 -18.043 -1.009 18.072

TRUCK SHOP BUS 0.4kV 0.400 1.164 -20.828 20.861 0.019 0.000 0.019 18.039 1.009 18.067 -18.043 -1.009 18.072

All fault currents are symmetrical (1/2 Cycle network) values in rms kA.
* LLG fault current is the larger of the two faulted line currents.