Vous êtes sur la page 1sur 12

Project: ETAP Page: 1

20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

14-SUB-101_0,4KV 0.400 1.881 -5.924 6.216 1.912 -5.983 6.281 5.130 1.629 5.383 -6.102 1.392 6.259

14-SUB-101_23KV 23.000 0.470 -3.399 3.431 0.020 0.000 0.020 2.936 0.405 2.964 -2.941 -0.405 2.969

15-LCT-001_6.6kV 6.600 1.766 -4.866 5.176 0.020 0.000 0.020 4.214 1.530 4.484 -4.219 -1.530 4.488

15-PDP-001 0.400 1.436 -4.884 5.091 1.459 -4.985 5.194 4.230 1.244 4.409 3.488 3.789 5.150

15-PDP-001_0.4kV 0.400 1.436 -4.884 5.091 1.459 -4.985 5.194 4.230 1.244 4.409 3.488 3.789 5.150

21-LCT-001_6.6kV 6.600 2.456 -8.592 8.937 0.020 0.000 0.020 7.463 2.129 7.761 -7.468 -2.129 7.766

21-LDS-001_6,6kV 6.600 2.345 -8.760 9.068 0.020 0.000 0.020 7.608 2.033 7.875 -7.613 -2.033 7.880

21-MCC-001 0.400 4.340 -15.399 15.999 4.440 -15.669 16.286 13.340 3.759 13.859 -15.610 4.210 16.168

21-MMC-001 6.600 2.456 -8.592 8.937 0.020 0.000 0.020 7.463 2.129 7.761 -7.468 -2.129 7.766

23-LCT-001_0.4kV 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.308 30.970

23-LCT-001_6.6kV 6.600 2.680 -11.442 11.752 0.020 0.000 0.020 9.930 2.323 10.198 -9.935 -2.323 10.203

23-LCT-002_6.6kV 6.600 2.750 -11.348 11.677 0.020 0.000 0.020 9.848 2.385 10.132 -9.853 -2.385 10.137

23-LDS-002_6.6kV 6.600 2.587 -11.806 12.086 0.020 0.000 0.020 10.246 2.242 10.488 -10.251 -2.242 10.493

23-LVS-001 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.308 30.970

23-LVS-002 0.400 6.966 -44.377 44.921 7.160 -46.844 47.388 38.450 6.032 38.920 34.766 30.808 46.452

23-LVS-002_0.4kV 0.400 6.966 -44.377 44.921 7.160 -46.844 47.388 38.450 6.032 38.920 34.766 30.808 46.452

23-MCC-001 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.308 30.970

23-MCC-002 0.400 5.465 -29.874 30.370 5.679 -30.948 31.465 25.880 4.733 26.309 -28.832 11.308 30.970

23-MCC-003 0.400 6.966 -44.377 44.921 7.160 -46.844 47.388 38.450 6.032 38.920 34.766 30.808 46.452

23-MCC-004 0.400 6.966 -44.377 44.921 7.160 -46.844 47.388 38.450 6.032 38.920 34.766 30.808 46.452

23-MCC-005 0.400 6.966 -44.377 44.921 7.160 -46.844 47.388 38.450 6.032 38.920 34.766 30.808 46.452

23-MMC-001 6.600 2.680 -11.442 11.752 0.020 0.000 0.020 9.930 2.323 10.198 -9.935 -2.323 10.203

23-MMC-002 6.600 2.750 -11.348 11.677 0.020 0.000 0.020 9.848 2.385 10.132 -9.853 -2.385 10.137

24-LCT-001_6.6KV 6.600 2.430 -12.646 12.877 0.020 0.000 0.020 10.900 2.087 11.098 -10.905 -2.087 11.103

24-LVS-001 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

24-LVS-001_0.4kV 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

24-MCC-001 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

24-MCC-101 0.400 1.596 -5.778 5.994 1.857 -5.596 5.896 5.004 1.382 5.191 -6.049 1.316 6.190

24-MCC-101_0,4kV 0.400 1.596 -5.778 5.994 1.857 -5.596 5.896 5.004 1.382 5.191 -6.049 1.316 6.190

24-MCC-102 0.400 1.467 -5.892 6.072 1.525 -5.909 6.103 5.103 1.270 5.258 -5.895 1.692 6.133

24-MCC-102_0.4kV 0.400 1.467 -5.892 6.072 1.525 -5.909 6.103 5.103 1.270 5.258 -5.895 1.692 6.133

24-MCC-102_6.6kV 6.600 0.499 -4.394 4.422 0.020 0.000 0.020 3.805 0.432 3.830 -3.810 -0.432 3.835

24-MMC-001 6.600 2.430 -12.646 12.877 0.020 0.000 0.020 10.900 2.087 11.098 -10.905 -2.087 11.103

24-MMC-002 6.600 0.567 -4.828 4.861 0.020 0.000 0.020 4.182 0.491 4.210 -4.187 -0.491 4.215

24-MMC-002B 6.600 0.568 -4.824 4.857 0.020 0.000 0.020 4.178 0.492 4.207 -4.183 -0.492 4.212
Project: ETAP Page: 2
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

24-MMC-101 6.600 0.499 -4.394 4.422 0.020 0.000 0.020 3.805 0.432 3.830 -3.810 -0.432 3.835

24-SUB-101_6.6kV 6.600 0.496 -4.398 4.426 0.020 0.000 0.020 3.809 0.430 3.834 -3.814 -0.430 3.839

24-SUB-101_13,2kV 13.200 0.357 -2.780 2.803 0.202 -1.502 1.516 2.408 0.309 2.428 -2.478 0.205 2.487

24-SUB-102_6,6kV 6.600 0.563 -4.871 4.904 0.020 0.000 0.020 4.219 0.488 4.247 -4.224 -0.488 4.252

24-SUB-102_13,2kV 13.200 0.395 -3.672 3.693 0.316 -2.713 2.732 3.180 0.342 3.199 -3.311 0.734 3.392

32-LCT-003_0.4kV 0.400 2.104 -9.571 9.799 2.133 -9.801 10.030 8.289 1.822 8.487 7.208 6.843 9.939

32-LCT-003_6.6kV 6.600 2.599 -8.176 8.579 0.020 0.000 0.020 7.083 2.252 7.432 -7.088 -2.252 7.437

32-LDP-003 0.400 2.540 -8.507 8.878 2.871 -8.097 8.591 7.367 2.200 7.689 -8.938 1.643 9.088

32-LDS-002_6.6kV 6.600 2.339 -8.525 8.841 0.020 0.000 0.020 7.385 2.027 7.658 -7.390 -2.027 7.663

32-LDS-002_6.6KV 6.600 2.504 -14.708 14.920 0.020 0.000 0.020 12.624 2.153 12.806 -12.629 -2.153 12.811

32-LVS-001 0.400 4.757 -27.860 28.263 4.948 -28.473 28.899 24.102 4.116 24.451 -26.691 10.471 28.672

32-MCC-001 0.400 4.509 -14.076 14.780 4.512 -13.807 14.526 12.183 3.902 12.792 -14.444 2.879 14.729

32-MCC-002 0.400 4.757 -27.860 28.263 4.948 -28.473 28.899 24.102 4.116 24.451 -26.691 10.471 28.672

32-MCC-003 0.400 4.757 -27.860 28.263 4.948 -28.473 28.899 24.102 4.116 24.451 -26.691 10.471 28.672

32-MCC-004 0.400 4.757 -27.860 28.263 4.948 -28.473 28.899 24.102 4.116 24.451 -26.691 10.471 28.672

32-MCC-101 0.400 1.252 -5.294 5.440 1.367 -5.495 5.662 4.584 1.084 4.711 -5.333 1.771 5.619

32-MCC-101_0.4kV 0.400 1.252 -5.294 5.440 1.367 -5.495 5.662 4.584 1.084 4.711 -5.333 1.771 5.619

32-MCC-101_6.6kV 6.600 0.227 -1.825 1.839 0.020 0.000 0.020 1.581 0.196 1.593 -1.586 -0.196 1.598

32-MCC-102 0.400 4.958 -11.645 12.657 5.164 -10.269 11.495 10.080 4.291 10.955 -12.686 0.270 12.689

32-MMC-001 6.600 2.718 -11.795 12.104 0.020 0.000 0.020 10.219 2.356 10.487 -10.224 -2.356 10.492

32-MMC-002 6.600 1.777 -8.332 8.519 0.020 0.000 0.020 7.173 1.531 7.334 -7.178 -1.531 7.339

32-MMC-002B 6.600 1.801 -8.219 8.414 0.020 0.000 0.020 7.075 1.551 7.243 -7.080 -1.551 7.248

32-MMC-003 6.600 2.599 -8.176 8.579 0.020 0.000 0.020 7.083 2.252 7.432 -7.088 -2.252 7.437

32-MMC-004 6.600 2.552 -14.411 14.635 0.020 0.000 0.020 12.367 2.196 12.560 -12.372 -2.196 12.565

32-MMC-101 6.600 0.227 -1.825 1.839 0.020 0.000 0.020 1.581 0.196 1.593 -1.586 -0.196 1.598

32-SUB-101_6,6kV 6.600 0.226 -1.827 1.841 0.020 0.000 0.020 1.582 0.196 1.594 -1.587 -0.196 1.599

32-SUB-101_6.6kV 6.600 0.226 -1.827 1.841 0.020 0.000 0.020 1.582 0.196 1.594 -1.587 -0.196 1.599

32-SUB-101_13,2kV 13.200 0.316 -2.151 2.174 0.155 -1.084 1.095 1.863 0.274 1.883 1.812 0.637 1.920

41-LCT-002_6.6KV 6.600 3.145 -17.500 17.781 0.020 0.000 0.020 15.078 2.694 15.317 -15.083 -2.694 15.322

41-LVS-001 0.400 5.503 -31.590 32.065 5.706 -32.135 32.638 27.342 4.760 27.753 -30.314 11.606 32.460

41-MCC-001 0.400 5.503 -31.590 32.065 5.706 -32.135 32.638 27.342 4.760 27.753 -30.314 11.606 32.460

41-MCC-002 0.400 5.503 -31.590 32.065 5.706 -32.135 32.638 27.342 4.760 27.753 -30.314 11.606 32.460

41-MCC-003 0.400 4.491 -16.308 16.916 4.544 -16.279 16.901 14.120 3.887 14.645 -16.422 4.241 16.960

41-MCC-003_0.4KV 0.400 4.491 -16.308 16.916 4.544 -16.279 16.901 14.120 3.887 14.645 -16.422 4.241 16.960

41-MVS-001 6.600 3.145 -17.500 17.781 0.020 0.000 0.020 15.078 2.694 15.317 -15.083 -2.694 15.322

42-LDS-001_6,6kV 6.600 2.699 -11.885 12.187 0.020 0.000 0.020 10.297 2.340 10.559 -10.302 -2.340 10.564

42-LVS-001 0.400 6.674 -45.409 45.896 6.873 -48.170 48.658 39.329 5.781 39.752 35.794 31.419 47.627
Project: ETAP Page: 3
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

42-MCC-001 0.400 6.674 -45.409 45.896 6.873 -48.170 48.658 39.329 5.781 39.752 35.794 31.419 47.627

42-MCC-101 0.400 6.674 -45.409 45.896 6.873 -48.170 48.658 39.329 5.781 39.752 35.794 31.419 47.627

43-MCC-001 0.400 5.503 -31.590 32.065 5.706 -32.135 32.638 27.342 4.760 27.753 -30.314 11.606 32.460

45-MVS-001 6.600 1.839 -21.108 21.188 0.020 0.000 0.020 18.296 1.596 18.366 -18.301 -1.596 18.371

45-MVS-001_6.6kV 6.600 1.839 -21.108 21.188 0.020 0.000 0.020 18.296 1.596 18.366 -18.301 -1.596 18.371

45-MVS-002 6.600 1.645 -20.438 20.504 0.020 0.000 0.020 17.591 1.405 17.647 -17.596 -1.405 17.652

45-MVS-002_6.6kV 6.600 1.645 -20.438 20.504 0.020 0.000 0.020 17.591 1.405 17.647 -17.596 -1.405 17.652

52-MCC-201 0.400 1.588 -6.477 6.669 1.585 -6.375 6.569 5.609 1.375 5.775 -6.400 1.764 6.639

52-MMC-201 6.600 2.622 -16.005 16.219 0.020 0.000 0.020 13.794 2.248 13.976 -13.799 -2.248 13.981

53-MCC-001 0.400 6.674 -45.409 45.896 6.873 -48.170 48.658 39.329 5.781 39.752 35.794 31.419 47.627

53-MCC-002 0.400 6.674 -45.409 45.896 6.873 -48.170 48.658 39.329 5.781 39.752 35.794 31.419 47.627

62-LCT-001_0.4kV 0.400 1.527 -7.144 7.305 1.539 -7.212 7.375 6.187 1.323 6.327 5.411 4.963 7.343

62-LCT-001_6.6kV 6.600 3.773 -15.201 15.662 0.020 0.000 0.020 13.183 3.273 13.583 -13.188 -3.273 13.588

62-PDP-001 0.400 1.527 -7.144 7.305 1.539 -7.212 7.375 6.187 1.323 6.327 5.411 4.963 7.343

62-PDP-001_Ed.Adm. 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

63-LCT-102_6.6kV 6.600 1.937 -21.453 21.541 0.020 0.000 0.020 18.596 1.681 18.671 -18.601 -1.681 18.676

63-MCC-001 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

64-PDP-001 0.400 6.308 -27.870 28.575 6.499 -27.666 28.419 24.121 5.457 24.731 -27.476 8.288 28.699

67-LCT-006_6,6kV 6.600 1.666 -0.545 1.753 0.020 0.000 0.020 0.471 1.443 1.518 -0.476 -1.443 1.520

67-LCT-101_6.6kV 6.600 2.277 -21.560 21.680 0.020 0.000 0.020 18.688 1.976 18.793 -18.693 -1.976 18.798

67-LCT-102_0,4kV 0.400 3.265 -19.365 19.639 3.380 -19.896 20.181 16.763 2.825 17.000 -18.519 7.412 19.948

67-LCT-102_0.4kV 0.400 3.265 -19.365 19.639 3.380 -19.896 20.181 16.763 2.825 17.000 -18.519 7.412 19.948

67-LCT-102_23kV 23.000 0.509 -4.150 4.181 0.020 0.000 0.020 3.574 0.437 3.600 -3.579 -0.437 3.605

67-LCT-104_0,4kV 0.400 3.262 -19.339 19.612 3.377 -19.878 20.163 16.741 2.823 16.977 -18.496 7.410 19.925

67-LCT-104_0.4kV 0.400 3.262 -19.339 19.612 3.377 -19.878 20.163 16.741 2.823 16.977 -18.496 7.410 19.925

67-LCT-104_23kV 23.000 0.507 -4.083 4.114 0.020 0.000 0.020 3.516 0.436 3.543 -3.521 -0.436 3.548

67-LCT-105_0,4kV 0.400 3.257 -19.322 19.595 3.374 -19.866 20.150 16.726 2.819 16.962 -18.481 7.411 19.911

67-LCT-105_0.4kV 0.400 3.257 -19.322 19.595 3.374 -19.866 20.150 16.726 2.819 16.962 -18.481 7.411 19.911

67-LCT-105_23kV 23.000 0.499 -4.040 4.070 0.020 0.000 0.020 3.479 0.429 3.505 -3.484 -0.429 3.510

67-LDS-001_6,6kV 6.600 2.679 -16.600 16.815 0.020 0.000 0.020 14.386 2.324 14.572 -14.391 -2.324 14.577

67-MCC-101 0.400 2.993 -10.068 10.504 3.241 -10.625 11.108 8.719 2.592 9.097 -10.483 3.030 10.913

67-PDP-1 0.400 2.066 -8.318 8.570 2.093 -8.383 8.640 7.202 1.789 7.421 -8.264 2.437 8.616

67-PDP-001 0.400 6.071 -14.973 16.156 5.728 -15.998 16.992 12.967 5.258 13.992 10.341 13.805 17.248

67-PDP-001_0.4kV 0.400 6.071 -14.973 16.156 5.728 -15.998 16.992 12.967 5.258 13.992 10.341 13.805 17.248

67-PDP-001_0.4KV 0.400 2.066 -8.318 8.570 2.093 -8.383 8.640 7.202 1.789 7.421 -8.264 2.437 8.616

67-PDP-2 0.400 10.021 -11.607 15.334 10.219 -14.776 17.965 10.052 8.679 13.280 5.368 18.227 19.001

67-PDP-002 0.400 2.041 -3.136 3.742 2.016 -3.311 3.876 2.716 1.767 3.240 1.727 3.515 3.917
Project: ETAP Page: 4
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

67-PDP-02_0.4kV 0.400 10.021 -11.607 15.334 10.219 -14.776 17.965 10.052 8.679 13.280 5.368 18.227 19.001

67-PDP-002_0.4kV 0.400 2.041 -3.136 3.742 2.016 -3.311 3.876 2.716 1.767 3.240 1.727 3.515 3.917

67-PDP-003 0.400 11.522 -14.532 18.545 11.575 -18.324 21.673 12.585 9.979 16.061 7.423 21.680 22.915

67-PDP-004 0.400 2.033 -3.163 3.760 2.009 -3.330 3.889 2.739 1.761 3.257 1.753 3.514 3.927

67-PDP-004_0,4kV 0.400 2.033 -3.163 3.760 2.009 -3.330 3.889 2.739 1.761 3.257 1.753 3.514 3.927

67-PDP-005 0.400 1.896 -3.607 4.075 1.905 -3.635 4.104 3.124 1.642 3.529 2.167 3.474 4.094

72-HFL-001_6.6kV 6.600 1.618 -22.126 22.185 0.020 0.000 0.020 19.179 1.405 19.231 -19.184 -1.405 19.236

72-LCT-001_6,6KV 6.600 1.661 -20.706 20.773 0.020 0.000 0.020 17.821 1.419 17.877 -17.826 -1.419 17.882

72-PDP-001 0.400 1.468 -5.124 5.330 1.481 -5.148 5.357 4.437 1.271 4.616 -5.184 1.316 5.349

72-PDP-001_0.4kV 0.400 1.468 -5.124 5.330 1.481 -5.148 5.357 4.437 1.271 4.616 -5.184 1.316 5.349

72-PDP-101 0.400 1.280 -3.391 3.625 1.312 -3.104 3.370 2.936 1.109 3.139 -3.597 0.318 3.611

72-PDS-001A 6.600 1.453 -22.521 22.568 0.020 0.000 0.020 19.522 1.261 19.562 -19.527 -1.261 19.567

72-PDS-001B 6.600 1.371 -21.411 21.455 0.020 0.000 0.020 18.423 1.171 18.460 -18.428 -1.171 18.465

72-PDS-201A 23.000 0.387 -6.690 6.701 0.020 0.000 0.020 5.764 0.331 5.773 -5.769 -0.331 5.778

72-PDS-201B 23.000 0.387 -6.690 6.701 0.020 0.000 0.020 5.764 0.331 5.773 -5.769 -0.331 5.778

72-XFR-103_0.4kV 0.400 1.280 -3.391 3.625 1.312 -3.104 3.370 2.936 1.109 3.139 -3.597 0.318 3.611

73-LDS-002_6.6KV 6.600 1.500 -21.106 21.159 0.020 0.000 0.020 18.159 1.282 18.205 -18.164 -1.282 18.210

73-SUB-101_6,6kV 6.600 1.751 -21.927 21.997 0.020 0.000 0.020 19.007 1.520 19.067 -19.012 -1.520 19.072

73-SUB-101_13.2kV 13.200 0.349 -4.592 4.605 0.367 -5.028 5.041 3.978 0.303 3.990 3.786 3.078 4.879

92-LCT-001_6.6kV 6.600 2.602 -1.063 2.811 0.020 0.000 0.020 0.921 2.254 2.434 -0.926 -2.253 2.436

92-PDP-001 0.400 7.096 -12.842 14.672 6.688 -14.473 15.943 11.121 6.146 12.706 8.166 14.296 16.464

92-PDP-001_0.4kV 0.400 7.096 -12.842 14.672 6.688 -14.473 15.943 11.121 6.146 12.706 8.166 14.296 16.464

220-MCC-101 0.400 4.966 -20.183 20.785 5.498 -20.458 21.184 17.475 4.299 17.996 -20.510 6.065 21.388

220-MMC-101 6.600 0.483 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

220-MMC-101_6,6KV 6.600 0.483 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

241-LCT-102_0.4KV 0.400 3.168 -24.405 24.610 3.632 -27.399 27.639 21.129 2.742 21.307 -23.260 12.883 26.589

241-LCT-102_6,6KV 6.600 0.483 -4.501 4.527 0.020 0.000 0.020 3.895 0.418 3.917 -3.900 -0.418 3.922

241-MCC-101 0.400 4.966 -20.183 20.785 5.498 -20.458 21.184 17.475 4.299 17.996 -20.510 6.065 21.388

241-SUB-101_6,6kV 6.600 0.471 -4.530 4.555 0.020 0.000 0.020 3.920 0.407 3.941 -3.925 -0.407 3.946

241-SUB-101-23kV 23.000 0.454 -3.183 3.215 0.020 0.000 0.020 2.750 0.391 2.778 -2.755 -0.391 2.783

241-SUB-101_23KV 23.000 0.455 -3.182 3.214 0.020 0.000 0.020 2.749 0.392 2.777 -2.754 -0.392 2.782

242-LCT-102_0.4KV 0.400 1.704 -8.854 9.016 1.876 -9.463 9.647 7.667 1.475 7.808 -8.709 3.607 9.426

242-MCC-101 0.400 1.938 -8.213 8.439 2.099 -8.456 8.712 7.112 1.678 7.307 -8.251 2.678 8.674

242-MCC-101_0,4KV 0.400 1.938 -8.213 8.439 2.099 -8.456 8.712 7.112 1.678 7.307 -8.251 2.678 8.674

242-MMC-101 6.600 0.305 -2.757 2.774 0.020 0.000 0.020 2.386 0.264 2.400 -2.391 -0.264 2.405

242-SUB-101_6,6kV 6.600 0.300 -2.769 2.785 0.020 0.000 0.020 2.397 0.260 2.411 -2.402 -0.260 2.416

242-SUB-101_23kV 23.000 0.454 -3.021 3.055 0.020 0.000 0.020 2.610 0.392 2.639 -2.615 -0.392 2.644
Project: ETAP Page: 5
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

243-LCT-102_0.4kV 0.400 2.033 -8.439 8.680 2.167 -8.607 8.876 7.307 1.760 7.516 -8.464 2.631 8.863

243-MCC-101 0.400 2.033 -8.439 8.680 2.167 -8.607 8.876 7.307 1.760 7.516 -8.464 2.631 8.863

243-MMC-101 6.600 0.383 -3.292 3.314 0.020 0.000 0.020 2.849 0.332 2.868 -2.854 -0.332 2.873

243-SUB-101_6,6kV 6.600 0.376 -3.310 3.331 0.020 0.000 0.020 2.864 0.325 2.883 -2.869 -0.325 2.888

243-SUB-101_23kV 23.000 0.434 -2.675 2.710 0.020 0.000 0.020 2.312 0.374 2.342 -2.317 -0.374 2.347

244-LCT-101_6.6kV 6.600 1.320 -3.548 3.786 0.020 0.000 0.020 3.073 1.144 3.279 -3.078 -1.144 3.284

244-MCC-101 0.400 3.486 -11.465 11.983 3.548 -11.724 12.249 9.929 3.019 10.378 8.123 9.016 12.136

244-MCC-101_0.4kV 0.400 3.486 -11.465 11.983 3.548 -11.724 12.249 9.929 3.019 10.378 8.123 9.016 12.136

244-MMC-101 6.600 1.320 -3.548 3.786 0.020 0.000 0.020 3.073 1.144 3.279 -3.078 -1.144 3.284

323-LCT-101_6.6Kv 6.600 0.350 -4.031 4.046 0.020 0.000 0.020 3.489 0.303 3.502 -3.494 -0.303 3.507

323-LCT-101_23kV 23.000 0.495 -4.358 4.386 0.020 0.000 0.020 3.762 0.426 3.786 -3.767 -0.426 3.791

323-LCT-102_0.4kV 0.400 2.105 -8.741 8.991 2.227 -8.833 9.110 7.569 1.823 7.786 -8.747 2.640 9.137

323-LCT-102_kV 6.600 0.355 -4.018 4.034 0.020 0.000 0.020 3.478 0.307 3.491 -3.483 -0.307 3.496

323-MCC-101 0.400 2.105 -8.741 8.991 2.227 -8.833 9.110 7.569 1.823 7.786 -8.747 2.640 9.137

323-MMC-101 6.600 0.355 -4.018 4.034 0.020 0.000 0.020 3.478 0.307 3.491 -3.483 -0.307 3.496

323-SUB-101_6,6kV 6.600 0.350 -4.031 4.046 0.020 0.000 0.020 3.489 0.303 3.502 -3.494 -0.303 3.507

323-SUB-101_23kV 23.000 0.538 -4.325 4.359 0.020 0.000 0.020 3.734 0.463 3.762 -3.739 -0.463 3.767

431-MMC-101 6.600 2.573 -14.286 14.516 0.020 0.000 0.020 12.259 2.213 12.458 -12.264 -2.213 12.463

434-LCT-101_6.6kV 6.600 0.687 -8.490 8.517 0.020 0.000 0.020 7.196 0.580 7.220 -7.201 -0.580 7.225

434-LCTL-102_0.4kV 0.400 1.616 -6.707 6.899 1.637 -6.641 6.840 5.802 1.397 5.968 -6.636 1.897 6.902

434-LCTL-102_6.6kV 6.600 0.692 -8.478 8.506 0.020 0.000 0.020 7.186 0.584 7.210 -7.191 -0.584 7.215

434-MCC-101 0.400 1.616 -6.707 6.899 1.637 -6.641 6.840 5.802 1.397 5.968 -6.636 1.897 6.902

434-MMC-101 6.600 0.692 -8.478 8.506 0.020 0.000 0.020 7.186 0.584 7.210 -7.191 -0.584 7.215

434-SUB-101_6,6kV 6.600 0.687 -8.490 8.517 0.020 0.000 0.020 7.196 0.580 7.220 -7.201 -0.580 7.225

434-SUB-101_23kV 23.000 0.515 -4.713 4.741 0.020 0.000 0.020 4.050 0.443 4.074 -4.055 -0.443 4.079

436-MCC-101 0.400 2.212 -9.000 9.267 2.296 -8.988 9.276 7.793 1.915 8.025 -8.985 2.573 9.346

436-MMC-101 6.600 0.445 -5.500 5.518 0.020 0.000 0.020 4.757 0.385 4.772 -4.762 -0.385 4.777

436-SUB-101_6,6kV 6.600 0.441 -5.509 5.527 0.020 0.000 0.020 4.765 0.381 4.780 -4.770 -0.381 4.785

436-SUB-101_23kV 23.000 0.458 -6.278 6.295 0.020 0.000 0.020 5.409 0.393 5.423 -5.414 -0.393 5.428

451-LCT-101_0,4kV 0.400 4.299 -12.142 12.880 4.525 -11.523 12.380 10.514 3.722 11.153 -12.864 1.748 12.982

451-MCC-101 0.400 4.299 -12.142 12.880 4.525 -11.523 12.380 10.514 3.722 11.153 -12.864 1.748 12.982

451-SUB-101_6,6kV 0.400 4.281 -13.751 14.402 4.415 -14.005 14.684 11.907 3.706 12.470 -14.187 3.430 14.595

451-SUB-101_23kV 23.000 0.519 -4.206 4.238 0.020 0.000 0.020 3.631 0.447 3.658 -3.636 -0.447 3.663

538-MCC-101 0.400 3.062 -8.456 8.993 3.199 -7.935 8.556 7.322 2.651 7.787 -8.968 1.077 9.033

538-MCC-101_0.4KV 0.400 3.062 -8.456 8.993 3.199 -7.935 8.556 7.322 2.651 7.787 -8.968 1.077 9.033

538-SUB-101_0.4KV 0.400 3.060 -9.729 10.199 3.134 -9.872 10.357 8.424 2.650 8.831 -10.031 2.361 10.305

538-SUB-101_23KV 23.000 0.515 -3.754 3.789 0.020 0.000 0.020 3.242 0.443 3.272 -3.247 -0.443 3.277
Project: ETAP Page: 6
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

630-LCT-101_6.6kV 6.600 0.602 -7.564 7.588 0.020 0.000 0.020 6.542 0.520 6.562 -6.547 -0.520 6.567

630-SUB-101_6,6kV 6.600 0.602 -7.564 7.588 0.020 0.000 0.020 6.542 0.520 6.562 -6.547 -0.520 6.567

630-SUB-101_23kV 23.000 0.560 -5.144 5.174 0.020 0.000 0.020 4.437 0.481 4.463 -4.442 -0.481 4.468

630-SUB-102_6,6kV 6.600 0.668 -11.082 11.102 0.020 0.000 0.020 9.586 0.576 9.604 -9.591 -0.576 9.609

630-SUB-102_6.6KV 6.600 0.668 -11.082 11.102 0.020 0.000 0.020 9.586 0.576 9.604 -9.591 -0.576 9.609

630-SUB-102_23kV 23.000 0.532 -5.801 5.825 0.020 0.000 0.020 5.002 0.457 5.023 -5.007 -0.457 5.028

630-SUB-103_23kV1 23.000 0.525 -3.351 3.392 0.020 0.000 0.020 2.895 0.452 2.930 -2.900 -0.452 2.935

1511-LCT-001_23kV 23.000 0.483 -5.394 5.416 0.020 0.000 0.020 4.653 0.415 4.671 -4.658 -0.415 4.676

1511-SUB-001_23kV 0.400 5.237 -38.905 39.255 5.539 -40.587 40.963 33.675 4.531 33.979 -36.625 16.700 40.253

1511-SUB-001_kV 23.000 0.493 -5.387 5.410 0.020 0.000 0.020 4.646 0.423 4.666 -4.652 -0.423 4.671

1609-MCC-001 0.400 5.665 -39.280 39.687 5.920 -44.792 45.182 33.960 4.903 34.312 30.956 31.046 43.842

1609-MCC-001_0.4kV 0.400 5.665 -39.280 39.687 5.920 -44.792 45.182 33.960 4.903 34.312 30.956 31.046 43.842

ACIDULADO_0.4KV 0.400 2.342 -7.744 8.090 2.217 -8.084 8.383 6.704 2.028 7.004 5.672 6.252 8.442

Acidulado_ROM 0.400 2.342 -7.744 8.090 2.217 -8.084 8.383 6.704 2.028 7.004 5.672 6.252 8.442

BARRIO CIVICO 0.4kV 0.400 2.993 -10.068 10.504 3.241 -10.625 11.108 8.719 2.592 9.097 -10.483 3.030 10.913

BARRIO CIVICO_13.2kV 13.200 0.321 -1.907 1.934 0.151 -0.957 0.969 1.652 0.278 1.675 1.602 0.597 1.710

Bus1 0.370 7.636 -97.360 97.659 8.231 -105.304 105.625 84.197 6.592 84.455 79.750 64.107 102.322

Bus2 0.400 1.095 -5.589 5.696 1.196 -5.956 6.075 4.841 0.949 4.933 -5.498 2.238 5.936

Bus3 6.600 0.689 -4.758 4.807 0.020 0.000 0.020 4.121 0.597 4.164 -4.126 -0.597 4.169

Bus4 6.600 1.772 -20.108 20.186 0.020 0.000 0.020 17.309 1.514 17.375 -17.314 -1.514 17.380

Bus5 13.200 0.388 -3.681 3.701 0.312 -2.721 2.739 3.189 0.337 3.206 -3.318 0.742 3.400

Bus6 13.200 0.356 -2.781 2.804 0.202 -1.503 1.517 2.409 0.309 2.429 -2.479 0.206 2.488

Bus7 13.200 0.388 -3.681 3.701 0.312 -2.721 2.739 3.189 0.337 3.206 -3.318 0.742 3.400

Bus8 6.600 0.599 -4.329 4.371 0.020 0.000 0.020 3.750 0.519 3.785 -3.755 -0.519 3.790

Bus9 6.600 1.970 -20.754 20.847 0.020 0.000 0.020 17.989 1.709 18.070 -17.994 -1.709 18.075

Bus10 6.600 0.608 -4.324 4.367 0.020 0.000 0.020 3.745 0.526 3.782 -3.750 -0.526 3.787

Bus11 6.600 0.563 -4.834 4.867 0.020 0.000 0.020 4.187 0.487 4.215 -4.192 -0.487 4.220

Bus12 6.600 0.599 -4.329 4.371 0.020 0.000 0.020 3.750 0.519 3.785 -3.755 -0.519 3.790

Bus13 6.600 0.695 -4.751 4.802 0.020 0.000 0.020 4.115 0.602 4.159 -4.120 -0.602 4.164

Bus14 6.600 0.529 -4.327 4.359 0.020 0.000 0.020 3.747 0.458 3.775 -3.752 -0.458 3.780

Bus15 6.600 0.551 -4.345 4.380 0.020 0.000 0.020 3.764 0.477 3.794 -3.769 -0.477 3.799

Bus16 6.600 1.725 -4.906 5.200 0.020 0.000 0.020 4.249 1.494 4.504 -4.254 -1.494 4.509

Bus17 0.400 1.278 -6.266 6.395 1.333 -6.451 6.587 5.427 1.107 5.538 -6.123 2.216 6.512

Bus18 13.200 0.358 -2.779 2.802 0.202 -1.502 1.515 2.407 0.310 2.427 -2.477 0.204 2.485

Bus19 6.600 3.185 -4.139 5.223 0.020 0.000 0.020 3.577 2.744 4.508 -3.582 -2.744 4.512

Bus20 13.200 0.316 -2.152 2.175 0.155 -1.085 1.096 1.864 0.274 1.884 1.813 0.636 1.921

Bus21 13.200 0.320 -1.908 1.935 0.151 -0.957 0.969 1.652 0.278 1.676 1.603 0.597 1.711
Project: ETAP Page: 7
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus22 6.600 2.430 -16.215 16.396 0.020 0.000 0.020 13.974 2.083 14.128 -13.979 -2.083 14.133

Bus23 6.600 1.570 -22.243 22.299 0.020 0.000 0.020 19.282 1.363 19.330 -19.287 -1.363 19.335

Bus24 6.600 1.757 -21.786 21.857 0.020 0.000 0.020 18.884 1.525 18.946 -18.889 -1.525 18.951

Bus25 6.600 2.625 -15.832 16.048 0.020 0.000 0.020 13.731 2.275 13.918 -13.736 -2.275 13.923

Bus26 6.600 3.245 -10.803 11.280 0.020 0.000 0.020 9.374 2.815 9.788 -9.379 -2.815 9.793

Bus27 6.600 3.773 -15.201 15.662 0.020 0.000 0.020 13.183 3.273 13.583 -13.188 -3.273 13.588

Bus28 0.400 4.858 -31.172 31.548 4.993 -32.983 33.359 27.005 4.207 27.330 24.438 21.703 32.684

Bus29 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus30 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus31 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus32 6.600 0.234 -1.818 1.833 0.020 0.000 0.020 1.574 0.203 1.587 -1.579 -0.203 1.592

Bus35 13.200 0.306 -1.916 1.941 0.145 -0.960 0.971 1.660 0.265 1.681 1.612 0.586 1.716

Bus36 13.200 0.327 -2.145 2.170 0.160 -1.082 1.094 1.858 0.283 1.879 1.805 0.645 1.917

Bus37 6.600 1.998 -21.137 21.231 0.020 0.000 0.020 18.321 1.734 18.403 -18.326 -1.734 18.408

Bus38 6.600 3.264 -10.737 11.222 0.020 0.000 0.020 9.316 2.832 9.737 -9.321 -2.832 9.742

Bus39 6.600 2.582 -11.717 11.998 0.020 0.000 0.020 10.169 2.238 10.412 -10.174 -2.238 10.417

Bus40 0.400 6.095 -47.035 47.428 6.137 -51.290 51.656 40.754 5.277 41.094 37.704 33.436 50.394

Bus42 6.600 3.210 -10.831 11.297 0.020 0.000 0.020 9.398 2.785 9.802 -9.403 -2.785 9.807

Bus43 6.600 2.698 -7.947 8.392 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus44 6.600 0.305 -2.757 2.774 0.020 0.000 0.020 2.386 0.264 2.400 -2.391 -0.264 2.405

Bus45 6.600 1.522 -21.054 21.109 0.020 0.000 0.020 18.118 1.299 18.165 -18.123 -1.299 18.170

Bus46 0.400 3.616 -6.688 7.603 3.689 -6.905 7.828 5.791 3.130 6.582 3.907 6.700 7.756

Bus47 0.400 4.145 -16.173 16.696 4.289 -16.816 17.354 14.011 3.590 14.464 11.788 12.339 17.065

Bus48 6.600 2.746 -8.201 8.648 0.020 0.000 0.020 7.124 2.380 7.511 -7.129 -2.380 7.516

Bus49 0.400 2.460 -4.604 5.220 2.494 -4.705 5.325 3.986 2.130 4.520 2.722 4.537 5.291

Bus50 23.000 0.443 -3.030 3.062 0.020 0.000 0.020 2.618 0.382 2.646 -2.623 -0.382 2.651

Bus51 6.600 1.710 -4.975 5.260 0.020 0.000 0.020 4.309 1.481 4.557 -4.314 -1.481 4.561

Bus52 6.600 2.061 -6.735 7.044 0.020 0.000 0.020 5.834 1.786 6.101 -5.839 -1.786 6.106

Bus53 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus54 0.400 3.152 -12.847 13.228 3.268 -13.845 14.226 11.126 2.730 11.456 9.436 10.233 13.919

Bus55 6.600 0.060 -0.172 0.182 0.114 -0.049 0.124 0.162 0.053 0.171 -0.196 -0.048 0.202

Bus56 6.600 0.060 -0.172 0.182 0.114 -0.049 0.124 0.162 0.053 0.171 -0.196 -0.048 0.202

Bus57 0.330 6.971 -87.253 87.531 7.478 -94.270 94.566 75.578 6.040 75.819 71.544 57.274 91.646

Bus58 220.000 0.943 -7.014 7.077 0.905 -5.415 5.490 6.071 0.816 6.125 -6.486 1.388 6.633

Bus59 6.600 6.993 -9.098 11.475 0.020 0.000 0.020 7.880 6.061 9.941 -7.885 -6.061 9.945

Bus60 6.600 1.457 -21.214 21.264 0.020 0.000 0.020 18.254 1.244 18.297 -18.259 -1.244 18.302

Bus61 0.330 6.971 -87.253 87.531 7.478 -94.270 94.566 75.578 6.040 75.819 71.544 57.274 91.646
Project: ETAP Page: 8
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus62 0.330 3.644 -21.708 22.011 3.747 -22.115 22.430 18.800 3.156 19.063 -20.727 8.111 22.258

Bus63 6.600 4.461 -2.548 5.137 0.020 0.000 0.020 2.206 3.864 4.449 -2.211 -3.864 4.452

Bus64 6.600 2.401 -3.947 4.620 0.020 0.000 0.020 3.419 2.080 4.002 -3.424 -2.079 4.006

Bus65 6.600 2.329 -12.972 13.179 0.020 0.000 0.020 11.179 2.000 11.356 -11.184 -2.000 11.361

Bus66 6.600 2.941 -1.278 3.206 0.020 0.000 0.020 1.107 2.547 2.777 -1.112 -2.547 2.779

Bus69 0.380 7.842 -99.991 100.298 8.454 -108.150 108.480 86.473 6.771 86.737 81.906 65.839 105.087

Bus70 0.330 3.626 -21.670 21.971 3.732 -22.083 22.396 18.760 3.138 19.021 -20.687 8.125 22.226

Bus71 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus73 6.600 4.456 -2.547 5.133 0.020 0.000 0.020 2.205 3.860 4.445 -2.210 -3.860 4.448

Bus74 6.600 1.313 -3.568 3.802 0.020 0.000 0.020 3.090 1.137 3.293 -3.095 -1.137 3.297

Bus75 0.400 4.798 -33.026 33.373 4.937 -34.319 34.673 28.584 4.150 28.884 26.042 22.033 34.112

Bus76 23.000 0.395 -6.670 6.682 0.020 0.000 0.020 5.747 0.338 5.757 -5.752 -0.338 5.762

Bus77 0.400 4.260 -17.173 17.694 4.369 -17.515 18.052 14.868 3.687 15.318 -17.114 5.253 17.902

Bus78 23.000 0.395 -6.669 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus79 23.000 0.394 -6.671 6.683 0.020 0.000 0.020 5.748 0.338 5.758 -5.753 -0.338 5.763

Bus80 0.400 1.294 -6.314 6.446 1.345 -6.485 6.623 5.469 1.121 5.582 -6.168 2.211 6.553

Bus81 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus82 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus83 6.600 2.013 -0.737 2.144 0.020 0.000 0.020 0.638 1.744 1.857 -0.643 -1.744 1.859

Bus84 0.400 1.454 -6.876 7.028 1.469 -6.935 7.089 5.954 1.259 6.085 -6.697 2.240 7.061

Bus85 6.600 3.195 -15.305 15.635 0.020 0.000 0.020 13.195 2.740 13.476 -13.200 -2.740 13.481

Bus87 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus88 6.600 1.668 -0.543 1.755 0.020 0.000 0.020 0.470 1.445 1.520 -0.475 -1.445 1.521

Bus89 6.600 2.011 -0.736 2.141 0.020 0.000 0.020 0.637 1.742 1.854 -0.642 -1.742 1.856

Bus90 6.600 2.699 -11.885 12.187 0.020 0.000 0.020 10.297 2.340 10.559 -10.302 -2.340 10.564

Bus91 6.600 3.208 -15.291 15.624 0.020 0.000 0.020 13.183 2.752 13.467 -13.188 -2.752 13.472

Bus92 6.600 1.500 -21.106 21.159 0.020 0.000 0.020 18.159 1.282 18.205 -18.164 -1.282 18.210

Bus93 0.400 4.701 -31.643 31.990 4.870 -33.307 33.661 27.384 4.066 27.684 24.860 21.673 32.981

Bus94 0.400 5.973 -47.453 47.828 6.037 -51.604 51.956 41.100 5.174 41.425 38.091 33.437 50.684

Bus95 23.000 0.395 -6.670 6.681 0.020 0.000 0.020 5.746 0.338 5.756 -5.751 -0.338 5.761

Bus96 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus97 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus98 23.000 0.416 -2.690 2.722 0.020 0.000 0.020 2.325 0.359 2.353 -2.330 -0.359 2.358

Bus99 6.600 0.091 -0.303 0.317 0.182 -0.071 0.195 0.287 0.082 0.298 -0.338 -0.074 0.346

Bus100 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus101 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus102 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510
Project: ETAP Page: 9
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus103 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus104 6.600 0.092 -0.303 0.317 0.182 -0.071 0.195 0.286 0.082 0.298 -0.338 -0.075 0.346

Bus105 6.600 2.339 -8.525 8.841 0.020 0.000 0.020 7.385 2.027 7.658 -7.390 -2.027 7.663

Bus106 6.600 0.091 -0.303 0.317 0.182 -0.071 0.195 0.287 0.082 0.298 -0.338 -0.074 0.346

Bus107 6.600 0.092 -0.303 0.317 0.182 -0.071 0.195 0.286 0.082 0.298 -0.338 -0.075 0.346

Bus108 0.400 4.208 -28.969 29.273 4.344 -30.171 30.482 25.060 3.642 25.323 22.824 19.418 29.966

Bus109 6.600 2.698 -7.947 8.392 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus111 6.600 2.698 -7.947 8.392 0.020 0.000 0.020 6.884 2.338 7.270 -6.889 -2.338 7.275

Bus112 23.000 0.468 -3.400 3.432 0.020 0.000 0.020 2.937 0.403 2.965 -2.942 -0.403 2.970

Bus113 6.600 2.982 -13.855 14.172 0.020 0.000 0.020 11.891 2.563 12.164 -11.896 -2.563 12.169

Bus114 23.000 0.487 -3.832 3.863 0.020 0.000 0.020 3.309 0.419 3.336 -3.314 -0.419 3.341

Bus116 6.600 0.133 -0.512 0.529 0.266 -0.098 0.283 0.444 0.115 0.458 -0.524 -0.107 0.535

Bus117 6.600 0.133 -0.512 0.529 0.266 -0.098 0.284 0.443 0.116 0.458 -0.524 -0.108 0.535

Bus118 23.000 0.486 -3.776 3.807 0.020 0.000 0.020 3.261 0.419 3.288 -3.266 -0.419 3.293

Bus119 0.400 5.237 -38.905 39.255 5.539 -40.587 40.963 33.675 4.531 33.979 -36.625 16.700 40.253

Bus120 0.400 1.178 -2.939 3.166 1.186 -2.950 3.180 2.545 1.020 2.742 -3.143 0.461 3.176

Bus121 6.600 2.995 -13.734 14.057 0.020 0.000 0.020 11.787 2.575 12.065 -11.792 -2.575 12.070

Bus122 23.000 0.512 -5.183 5.209 0.020 0.000 0.020 4.472 0.440 4.493 -4.477 -0.440 4.498

Bus123 0.400 1.925 -5.597 5.919 1.918 -5.531 5.854 4.847 1.667 5.126 -5.802 1.066 5.900

Bus125 6.600 2.995 -13.734 14.057 0.020 0.000 0.020 11.787 2.575 12.065 -11.792 -2.575 12.070

Bus128 6.600 1.911 -8.137 8.358 0.020 0.000 0.020 7.006 1.645 7.196 -7.011 -1.645 7.201

Bus131 6.600 1.924 -8.031 8.259 0.020 0.000 0.020 6.913 1.658 7.109 -6.918 -1.658 7.114

Bus132 6.600 1.928 -8.027 8.256 0.020 0.000 0.020 6.911 1.660 7.108 -6.916 -1.660 7.113

Bus133 0.400 4.025 -16.241 16.733 4.212 -16.898 17.415 14.055 3.483 14.481 -16.271 5.334 17.123

Bus134 23.000 0.469 -3.398 3.430 0.020 0.000 0.020 2.935 0.404 2.963 -2.940 -0.404 2.968

Bus135 6.600 1.912 -8.136 8.357 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus136 6.600 1.912 -8.136 8.357 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus137 6.600 1.912 -8.136 8.357 0.020 0.000 0.020 7.005 1.646 7.196 -7.010 -1.646 7.201

Bus138 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus139 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus140 6.600 1.779 -8.351 8.539 0.020 0.000 0.020 7.190 1.532 7.351 -7.195 -1.532 7.356

Bus141 23.000 0.469 -3.438 3.469 0.020 0.000 0.020 2.969 0.404 2.997 -2.974 -0.404 3.002

Bus142 6.600 3.175 -5.986 6.776 0.020 0.000 0.020 5.164 2.731 5.841 -5.169 -2.731 5.846

Bus144 6.600 1.750 -7.914 8.105 0.020 0.000 0.020 6.815 1.507 6.980 -6.820 -1.507 6.985

Bus145 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus146 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus147 6.600 2.970 -2.309 3.762 0.020 0.000 0.020 2.000 2.563 3.251 -2.005 -2.563 3.254
Project: ETAP Page: 10
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus148 6.600 3.400 -5.183 6.199 0.020 0.000 0.020 4.475 2.926 5.347 -4.480 -2.926 5.351

Bus149 6.600 0.873 -7.241 7.294 0.020 0.000 0.020 6.263 0.754 6.308 -6.268 -0.754 6.313

Bus150 6.600 1.692 -7.234 7.430 0.020 0.000 0.020 6.233 1.458 6.401 -6.238 -1.458 6.406

Bus151 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus152 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus153 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus154 6.600 1.473 -6.336 6.505 0.020 0.000 0.020 5.463 1.270 5.609 -5.468 -1.270 5.613

Bus156 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus157 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus158 23.000 0.496 -4.223 4.252 0.020 0.000 0.020 3.646 0.427 3.671 -3.651 -0.427 3.676

Bus159 23.000 0.454 -3.192 3.225 0.020 0.000 0.020 2.758 0.391 2.786 -2.763 -0.391 2.791

Bus160 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus161 0.400 1.292 -4.029 4.231 1.300 -4.042 4.246 3.489 1.118 3.664 -4.144 0.909 4.242

Bus162 6.600 3.201 -4.152 5.242 0.020 0.000 0.020 3.588 2.757 4.525 -3.593 -2.757 4.529

Bus163 6.600 2.974 -11.386 11.768 0.020 0.000 0.020 9.864 2.578 10.195 -9.869 -2.578 10.200

Bus164 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus165 6.600 1.666 -0.545 1.753 0.020 0.000 0.020 0.471 1.443 1.518 -0.476 -1.443 1.520

Bus166 6.600 0.130 -0.361 0.384 0.231 -0.105 0.254 0.313 0.113 0.333 -0.391 -0.102 0.404

Bus167 6.600 0.131 -0.361 0.384 0.231 -0.105 0.254 0.313 0.113 0.333 -0.391 -0.103 0.404

Bus168 0.400 3.168 -24.405 24.610 3.632 -27.399 27.639 21.129 2.742 21.307 -23.260 12.883 26.589

Bus171 23.000 0.437 -6.291 6.306 0.020 0.000 0.020 5.420 0.375 5.433 -5.425 -0.375 5.438

Bus172 0.400 0.348 -5.190 5.202 0.019 0.000 0.019 4.495 0.302 4.505 -4.500 -0.302 4.510

Bus173 23.000 0.496 -4.422 4.450 0.020 0.000 0.020 3.817 0.427 3.841 -3.822 -0.427 3.846

Bus174 6.600 0.586 -4.437 4.475 0.020 0.000 0.020 3.839 0.506 3.872 -3.844 -0.506 3.877

Bus176 0.400 1.842 -9.474 9.651 1.988 -9.941 10.138 8.204 1.595 8.358 -9.282 3.634 9.968

Bus178 23.000 0.496 -4.325 4.353 0.020 0.000 0.020 3.733 0.426 3.758 -3.738 -0.426 3.763

Bus179 23.000 0.492 -4.090 4.120 0.020 0.000 0.020 3.532 0.423 3.557 -3.537 -0.423 3.562

Bus181 6.600 1.453 -22.521 22.568 0.020 0.000 0.020 19.522 1.261 19.562 -19.527 -1.261 19.567

Bus184 6.600 0.132 -0.400 0.422 0.241 -0.104 0.263 0.347 0.114 0.365 -0.426 -0.105 0.438

Bus185 6.600 0.133 -0.400 0.421 0.242 -0.104 0.263 0.346 0.115 0.365 -0.425 -0.105 0.438

Bus187 23.000 0.494 -5.004 5.028 0.020 0.000 0.020 4.317 0.424 4.338 -4.322 -0.424 4.343

Bus191 0.400 1.938 -9.782 9.972 2.054 -10.141 10.347 8.471 1.678 8.635 -9.563 3.586 10.214

Bus192 23.000 0.493 -4.044 4.074 0.020 0.000 0.020 3.483 0.424 3.508 -3.488 -0.424 3.513

Bus193 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus194 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus195 23.000 0.395 -6.668 6.680 0.020 0.000 0.020 5.745 0.339 5.755 -5.750 -0.339 5.760

Bus196 6.600 1.875 -20.839 20.923 0.020 0.000 0.020 17.932 1.603 18.003 -17.937 -1.603 18.008
Project: ETAP Page: 11
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus197 23.000 0.499 -4.406 4.435 0.020 0.000 0.020 3.793 0.429 3.817 -3.798 -0.429 3.822

Bus198 23.000 0.532 -4.212 4.245 0.020 0.000 0.020 3.626 0.457 3.655 -3.631 -0.457 3.660

Bus199 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus201 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus202 0.400 12.440 -133.178 133.758 0.020 0.000 0.020 114.967 10.734 115.467 -114.972 -10.734 115.472

Bus203 0.330 4.330 -9.163 10.135 4.481 -7.006 8.316 7.934 3.748 8.774 -10.068 -0.982 10.116

Bus204 0.400 1.789 -9.120 9.294 1.941 -9.657 9.850 7.898 1.549 8.048 -8.958 3.581 9.647

Bus205 6.600 0.130 -0.361 0.384 0.231 -0.106 0.254 0.313 0.113 0.333 -0.391 -0.102 0.404

Bus206 6.600 0.131 -0.361 0.384 0.231 -0.106 0.254 0.313 0.113 0.332 -0.391 -0.103 0.404

Bus207 6.600 0.125 -0.256 0.285 0.195 -0.102 0.220 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus208 6.600 0.125 -0.256 0.285 0.195 -0.102 0.221 0.222 0.108 0.247 -0.297 -0.096 0.312

Bus209 0.330 4.335 -9.170 10.143 4.484 -7.008 8.320 7.939 3.753 8.782 -10.075 -0.987 10.123

Bus213 6.600 0.532 -4.321 4.354 0.020 0.000 0.020 3.743 0.461 3.771 -3.748 -0.461 3.776

Bus214 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus215 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus218 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus219 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus220 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus221 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus222 6.600 0.138 -0.512 0.530 0.257 -0.101 0.276 0.403 0.116 0.420 -0.491 -0.110 0.504

Bus223 6.600 0.139 -0.511 0.530 0.257 -0.101 0.276 0.403 0.117 0.419 -0.491 -0.110 0.503

Bus225 23.000 0.413 -6.517 6.530 0.020 0.000 0.020 5.614 0.354 5.625 -5.619 -0.354 5.630

Bus235 23.000 0.393 -6.674 6.685 0.020 0.000 0.020 5.750 0.337 5.760 -5.755 -0.337 5.765

Bus236 23.000 0.470 -5.836 5.855 0.020 0.000 0.020 5.033 0.403 5.049 -5.038 -0.403 5.054

Bus256 23.000 0.494 -4.052 4.082 0.020 0.000 0.020 3.489 0.424 3.515 -3.494 -0.424 3.520

Bus264 23.000 0.495 -4.096 4.126 0.020 0.000 0.020 3.527 0.425 3.553 -3.532 -0.425 3.558

Bus270 23.000 0.496 -4.164 4.193 0.020 0.000 0.020 3.585 0.426 3.610 -3.590 -0.426 3.615

Bus300 23.000 0.491 -5.138 5.161 0.020 0.000 0.020 4.418 0.421 4.438 -4.423 -0.421 4.443

Bus301 23.000 0.502 -4.726 4.753 0.020 0.000 0.020 4.061 0.431 4.084 -4.066 -0.431 4.089

Bus304 0.400 1.468 -7.133 7.282 1.507 -7.249 7.404 6.170 1.269 6.300 -6.950 2.422 7.360

Bus312 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.068 0.723 7.105 -7.074 -0.723 7.110

Bus315 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.068 0.723 7.105 -7.074 -0.723 7.110

Bus316 6.600 0.857 -8.338 8.382 0.020 0.000 0.020 7.068 0.723 7.105 -7.074 -0.723 7.110

CASINO 6.6kv 6.600 2.011 -0.736 2.141 0.020 0.000 0.020 0.637 1.742 1.854 -0.642 -1.742 1.856

Celda 21-LDS-001 6.600 2.345 -8.760 9.068 0.020 0.000 0.020 7.608 2.033 7.875 -7.613 -2.033 7.880

Celda 23-LDS-001 6.600 2.582 -11.717 11.998 0.020 0.000 0.020 10.169 2.238 10.412 -10.174 -2.238 10.417

Celda 23-LDS-002 6.600 2.587 -11.806 12.086 0.020 0.000 0.020 10.246 2.242 10.488 -10.251 -2.242 10.493
Project: ETAP Page: 12
20.5.0C
Location: Date: 18-05-2021
Contract: SN: GPAINGENIE
Engineer: Revision: Laboral DM
Study Case: SC
Filename: LomasBayas Config.: CASO 2

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Celda 32-LDS-001 6.600 1.779 -8.351 8.539 0.020 0.000 0.020 7.190 1.532 7.351 -7.195 -1.532 7.356

Celda 32-LDS-003 6.600 2.504 -14.708 14.920 0.020 0.000 0.020 12.624 2.153 12.806 -12.629 -2.153 12.811

Celda 51-LDS-001 6.600 1.692 -7.234 7.430 0.020 0.000 0.020 6.233 1.458 6.401 -6.238 -1.458 6.406

Celda 67-LDS-001 6.600 6.996 -9.144 11.513 0.020 0.000 0.020 7.920 6.063 9.974 -7.925 -6.063 9.978

Celda_Pala_202 6.600 2.397 -8.759 9.081 0.020 0.000 0.020 7.587 2.077 7.867 -7.592 -2.077 7.871

FORTUNA_220kV 220.000 0.943 -7.014 7.077 0.905 -5.415 5.490 6.071 0.816 6.125 -6.486 1.388 6.633

LABERINTO_220kV 220.000 1.030 -11.003 11.051 1.439 -10.952 11.046 9.525 0.892 9.567 -10.448 4.547 11.394

LOMAS_BAYAS_220kV 220.000 1.013 -8.176 8.238 1.109 -6.747 6.837 7.076 0.877 7.131 -7.632 1.991 7.887

Orica 0.400 1.126 -2.572 2.808 1.132 -2.399 2.653 2.228 0.975 2.432 -2.792 0.147 2.796

PATIO CONT 0.4KV 0.400 1.865 -3.511 3.975 1.884 -3.569 4.036 3.040 1.614 3.442 2.088 3.430 4.015

Patio_Cont. 0.400 1.865 -3.511 3.975 1.884 -3.569 4.036 3.040 1.614 3.442 2.088 3.430 4.015

Planta Tratamiento 6,6kV 6.600 1.582 -0.500 1.660 0.020 0.000 0.020 0.433 1.370 1.437 -0.438 -1.370 1.439

Planta_Piloto 0.400 2.316 -9.315 9.598 2.283 -9.620 9.887 8.063 2.005 8.309 6.943 6.980 9.845

PLANTA_PILOTO_0.4kV 0.400 2.316 -9.315 9.598 2.283 -9.620 9.887 8.063 2.005 8.309 6.943 6.980 9.845

POLICLINICO 6.6kV 6.600 1.668 -0.543 1.755 0.020 0.000 0.020 0.470 1.445 1.520 -0.475 -1.445 1.521

T._Elect 0.4kV 0.400 1.221 -5.788 5.915 1.231 -5.819 5.948 5.012 1.057 5.123 -5.633 1.868 5.935

T._Eléct. 0.400 1.221 -5.788 5.915 1.231 -5.819 5.948 5.012 1.057 5.123 -5.633 1.868 5.935

Trafo_0.4kV 0.400 1.126 -2.572 2.808 1.132 -2.399 2.653 2.228 0.975 2.432 -2.792 0.147 2.796

TRUCK SHOP BUS 0.400 1.164 -20.828 20.860 0.019 0.000 0.019 18.039 1.008 18.067 -18.043 -1.008 18.071

TRUCK SHOP BUS 0.4kV 0.400 1.164 -20.828 20.860 0.019 0.000 0.019 18.039 1.008 18.067 -18.043 -1.008 18.071

All fault currents are symmetrical (1/2 Cycle network) values in rms kA.
* LLG fault current is the larger of the two faulted line currents.