GUSAN CONSTRUCTION BENGAL CO.

LTD
ESTABLISHMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN (PHASE 1) PESSCM-1/W1

Polyethylene Sheet (Preliminary Treatment Works)


Foundation
Width (mm) Length (mm) Thickness (mm) Volume (m^2)
Numbering
F1 2550 X 6450 X - 16.448

F2 2550 X 6450 X - 16.448

F3 2550 X 10400 X - 26.520

F4 2550 X 2550 X - 6.503

F5 2550 X 2550 X - 6.503

F6 2550 X 2550 X - 6.503

F7 2550 X 2550 X - 6.503

F8 2550 X 2550 X - 6.503

F9 2550 X 2550 X - 6.503

F10 2550 X 10400 X - 26.520

F11 2550 X 2550 X - 6.503

F12 2550 X 6450 X - 16.448

F13 2550 X 10450 X - 26.648

F14 2550 X 10450 X - 26.648

F15 2550 X 10450 X - 26.648

F16 2550 X 10450 X - 26.648

F17 2550 X 10450 X - 26.648

F18 2550 X 10450 X - 26.648

F19 2550 X 2550 X - 6.503

F20 2550 X 2550 X - 6.503

W1 3550 X 9350 X - 33.193

Total Volume: 353.983


GUSAN CONSTRUCTION BENGAL CO. LTD
ESTABLISHMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN (PHASE 1) PESSCM-1/W1

Lean Concrete (Preliminary Treatment Works)


Foundation
Width (mm) Length (mm) Thickness (mm) Volume (m^3)
Numbering
F1 2150 X 6050 X 75 0.976

F2 2150 X 6050 X 75 0.976

F3 2150 X 10000 X 75 1.613

F4 2150 X 2150 X 75 0.347

F5 2150 X 2150 X 75 0.347

F6 2150 X 2150 X 75 0.347

F7 2150 X 2150 X 75 0.347

F8 2150 X 2150 X 75 0.347

F9 2150 X 2150 X 75 0.347

F10 2150 X 10000 X 75 1.613

F11 2150 X 2150 X 75 0.347

F12 2150 X 6050 X 75 0.976

F13 2150 X 10050 X 75 1.621

F14 2150 X 10050 X 75 1.621

F15 2150 X 10050 X 75 1.621

F16 2150 X 10050 X 75 1.621

F17 2150 X 10050 X 75 1.621

F18 2150 X 10050 X 75 1.621

F19 2150 X 2150 X 75 0.347

F20 2150 X 2150 X 75 0.347

W1 3150 X 8950 X 75 2.114

Total Volume: 21.110


10.693
GUSAN CONSTRUCTION BENGAL CO. LTD
ESTABLISHMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN (PHASE 1) PESSCM-1/W1

Foundation Concrete (Preliminary Treatment Works)


Foundation
Width (mm) Length (mm) Thickness (mm) Volume (m^3)
Numbering
F1 2000 X 5900 X 500 5.900

F2 2000 X 5900 X 500 5.900

F3 2000 X 9850 X 500 9.850

F4 2000 X 2000 X 500 2.000

F5 2000 X 2000 X 500 2.000

F6 2000 X 2000 X 500 2.000

F7 2000 X 2000 X 500 2.000

F8 2000 X 2000 X 500 2.000

F9 2000 X 2000 X 500 2.000

F10 2000 X 9850 X 500 9.850

F11 2000 X 2000 X 500 2.000

F12 2000 X 5900 X 500 5.900

F13 2000 X 9900 X 500 9.900

F14 2000 X 9900 X 500 9.900

F15 2000 X 9900 X 500 9.900

F16 2000 X 9900 X 500 9.900

F17 2000 X 9900 X 500 9.900

F18 2000 X 9900 X 500 9.900

F19 2000 X 2000 X 500 2.000

F20 2000 X 2000 X 500 2.000

W1 3000 X 8800 X 500 13.200

A1 5500 X 4000 X 700 15.400

A2 5500 X 4000 X 700 15.400

A3 5500 X 4000 X 700 15.400

Total Volume: 174.200


GUSAN CONSTRUCTION BENGAL CO. LTD
ESTABLISHMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN (PHASE 1) PESSCM-1/W1

Distribution Tank Wall (Preliminary Treatment Works)


Foundation
Width (mm) Length (mm) Thickness (mm) Volume (m^3)
Numbering
F1 2000 X 5900 X 500 5.900
F2 2000 X 5900 X 500 5.900
F3 2000 X 9850 X 500 9.850
F4 2000 X 2000 X 500 2.000
F5 2000 X 2000 X 500 2.000
F6 2000 X 2000 X 500 2.000
F7 2000 X 2000 X 500 2.000
F8 2000 X 2000 X 500 2.000
F9 2000 X 2000 X 500 2.000
F10 2000 X 9850 X 500 9.850
F11 2000 X 2000 X 500 2.000
F12 2000 X 5900 X 500 5.900
F13 2000 X 9900 X 500 9.900
F14 2000 X 9900 X 500 9.900
F15 2000 X 9900 X 500 9.900
F16 2000 X 9900 X 500 9.900
F17 2000 X 9900 X 500 9.900
F18 2000 X 9900 X 500 9.900
F19 2000 X 2000 X 500 2.000
F20 2000 X 2000 X 500 2.000
W1 3000 X 8800 X 500 13.200
Total Volume: 128.000
Work Stage Work Description

Stage - 1 Lean Concreting about (F1 to F12) & W1

Stage - 2 Foundation Concreting about (F1 to F12) & W1

Column Concreting (Max - 2.5m) about (F1 to F12) & Wall concreting
Stage - 3
(Upto 3m) of W1

Stage - 4 Lean Concreting about (F13 to F20)

Stage - 5 Foundation Concreting about (F13 to F20) & Grit Tank Base

Column Concreting about (Max - 3m) (F13 to F20) & Grit Tank wall
Stage - 6 (upto 2m)
16.43639