CROSS SECTION

PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA Kontraktor : PT PUNDI VIWI PERDANA


- MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 2 (2+200-2+600)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.805 101.805 100.00 BM 02

1 0 1.510 100.30 02+180


2 3.50 1.488 100.32
3 3.60 1.539 100.27
4 5.00 1.518 100.29
5 6.24 1.308 100.50

A 3.50 1.636 100.17


B 3.60 1.623 100.18
C 5.00 1.489 100.32
D 6.50 1.446 100.36

1 0 1.790 100.015 02+200


2 3.50 1.786 100.019
3 3.60 1.813 99.992
4 5.00 1.757 100.048
5 6.24 1.557 100.248

A 3.50 1.873 99.932


B 3.60 1.867 99.938
C 5.00 1.810 99.995
D 6.50 1.753 100.052

1 0 1.937 99.868 02+225


2 3.50 1.919 99.886
3 3.60 1.919 99.886
4 5.00 1.880 99.925
5 6.50 1.870 99.935

A 3.50 1.993 99.812


B 3.60 2.085 99.720
C 5.00 2.042 99.763
D 6.50 2.068 99.737

0.722 1.601 100.926 100.204 TP.01

1 0 1.286 99.640 02+250


2 3.50 1.256 99.670
3 3.60 1.272 99.654
4 5.00 1.225 99.701
5 6.50 1.298 99.628

A 3.50 1.379 99.547


B 3.60 1.352 99.574
C 5.00 1.268 99.658
D 6.50 1.425 99.501

1 0 1.328 99.598 02+275


2 3.50 1.343 99.583
3 3.60 1.352 99.574
4 5.00 1.342 99.584
5 6.50 1.540 99.386
A 3.50 1.379 99.547
B 3.60 1.378 99.548
C 5.00 1.348 99.578
D 6.50 1.182 99.744

1 0 1.288 99.638 02+300


2 3.50 1.335 99.591
3 3.60 1.325 99.601
4 5.00 1.334 99.592
5 6.50 1.462 99.464

A 3.50 1.381 99.545


B 3.60 1.365 99.561
C 5.00 1.421 99.505
D 6.50 1.372 99.554

1 0 1.371 99.555 02+325


2 3.50 1.395 99.531
3 3.60 1.392 99.534
4 5.00 1.480 99.446
5 6.50 1.486 99.440

A 3.50 1.433 99.493


B 3.60 1.458 99.468
C 5.00 1.220 99.706
D 6.50 1.236 99.690

1.608 1.429 101.105 99.497 TP.02

1 0 1.607 99.498 02+350


2 3.50 1.605 99.500
3 3.60 1.625 99.480
4 5.00 1.588 99.517
5 6.50 1.705 99.400

A 3.50 1.589 99.516


B 3.60 1.579 99.526
C 5.00 1.575 99.530
D 6.50 1.570 99.535

1 0 1.501 99.604 02+375


2 3.50 1.585 99.520
3 3.60 1.610 99.495
4 5.00 1.560 99.545
5 6.50 1.615 99.490

A 3.50 1.561 99.544


B 3.60 1.451 99.654
C 5.00 1.395 99.710
D 6.50 1.397 99.708

1 0 1.530 99.575 02+400


2 3.50 1.552 99.553
3 3.60 1.547 99.558
4 5.00 1.462 99.643
5 6.50 1.548 99.557

A 3.50 1.591 99.514


B 3.60 1.592 99.513
C 5.00 1.576 99.529
D 6.50 1.295 99.810

1 0 1.560 99.545 02+425


2 3.50 1.580 99.525
3 3.60 1.569 99.536
4 5.00 1.405 99.700
5 6.50 1.357 99.748

A 3.50 1.619 99.486


B 3.60 1.585 99.520
C 5.00 1.486 99.619
D 6.15 1.467 99.638

1 0 1.665 99.440 02+450


2 3.50 1.672 99.433
3 3.60 1.662 99.443
4 5.00 1.539 99.566
5 5.95 1.435 99.670

A 3.50 1.740 99.365


B 3.60 1.722 99.383
C 5.00 1.779 99.326
D 6.20 1.698 99.407

1.539 1.880 100.764 99.225 TP.03

1 0 1.369 99.395 02+475


2 3.50 1.357 99.407
3 3.60 1.355 99.409
4 5.00 1.362 99.402
5 5.90 1.472 99.292

A 3.50 1.428 99.336


B 3.60 1.417 99.347
C 5.00 1.584 99.180
D 6.40 1.190 99.574

1 0 1.398 99.366 02+500


2 3.50 1.484 99.280
3 3.60 1.466 99.298
4 5.00 1.440 99.324
5 5.90 1.441 99.323

A 3.50 1.405 99.359


B 3.60 1.428 99.336
C 5.00 1.328 99.436
D 6.50 1.486 99.278

1 0 1.354 99.410 02+525


2 3.50 1.450 99.314
3 3.60 1.475 99.289
4 5.00 1.379 99.385
5 6.50 1.339 99.425

A 3.50 1.387 99.377


B 3.60 1.379 99.385
C 5.00 1.881 98.883
D 6.50 1.348 99.416

1 0 1.390 99.374 02+550


2 3.50 1.429 99.335
3 3.60 1.423 99.341
4 5.00 1.539 99.225
5 5.10 1.584 99.180

A 3.50 1.427 99.337


B 3.60 1.468 99.296
C 5.00 1.462 99.302
D 6.50 1.412 99.352

1 0 1.565 99.199 02+575


2 3.50 1.562 99.202
3 3.60 1.562 99.202
4 5.00 1.529 99.235
5 6.00 1.515 99.249

A 3.50 1.530 99.234


B 3.60 1.558 99.206
C 5.00 1.680 99.084
D 6.50 1.490 99.274

1 0 1.515 99.249 02+600


2 3.50 1.602 99.162
3 3.60 1.655 99.109
4 5.00 1.415 99.349
5 6.35

A 3.50 1.611 99.153


B 3.60 1.598 99.166
C 5.00 1.600 99.164
D 6.50 1.610 99.154
0.28
0.298
0.274
0.239
0.249

0.237
0.244
0.321
0.307
CROSS SECTION
PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA Kontraktor : PT PUNDI VIWI PERDANA
- MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 2 (2+200-2+600)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.805 101.805 100.00 BM 02

2 3.50 1.488 100.32 02+180


3 3.60 1.628 100.18
4 5.00 1.618 100.19

A 3.50 1.636 100.17


B 3.60 1.766 100.04
C 5.00 1.756 100.05

2 3.50 1.786 100.019 02+200


3 3.60 1.926 99.879
4 5.00 1.926 99.879

A 3.50 1.873 99.932


B 3.60 1.983 99.822
C 5.00 2.003 99.802

2 3.50 1.919 99.886 02+225


3 3.60 2.059 99.746
4 5.00 2.069 99.736

A 3.50 1.993 99.812


B 3.60 2.113 99.692
C 5.00 2.113 99.692

0.722 1.601 100.926 100.204 TP.01

2 3.50 1.256 99.670 02+250


3 3.60 1.416 99.510
4 5.00 1.406 99.520

A 3.50 1.379 99.547


B 3.60 1.509 99.417
C 5.00 1.499 99.427

2 3.50 1.343 99.583 02+275


3 3.60 1.483 99.443
4 5.00 1.478 99.448

A 3.50 1.379 99.547


B 3.60 1.489 99.437
C 5.00 1.484 99.442

2 3.50 1.335 99.591 02+300


3 3.60 1.495 99.431
4 5.00 1.485 99.441

A 3.50 1.381 99.545


B 3.60 1.501 99.425
C 5.00 1.491 99.435
2 3.50 1.395 99.531 02+325
3 3.60 1.555 99.371
4 5.00 1.550 99.376

A 3.50 1.433 99.493


B 3.60 1.553 99.373
C 5.00 1.558 99.368

1.608 1.429 101.105 99.497 TP.02

2 3.50 1.605 99.500 02+350


3 3.60 1.745 99.360
4 5.00 1.745 99.360

A 3.50 1.589 99.516


B 3.60 1.719 99.386
C 5.00 1.709 99.396

2 3.50 1.585 99.520 02+375


3 3.60 1.715 99.390
4 5.00 1.725 99.380

A 3.50 1.561 99.544


B 3.60 1.671 99.434
C 5.00 1.686 99.419

2 3.50 1.552 99.553 02+400


3 3.60 1.692 99.413
4 5.00 1.687 99.418

A 3.50 1.591 99.514


B 3.60 1.721 99.384
C 5.00 1.711 99.394

2 3.50 1.580 99.525 02+425


3 3.60 1.730 99.375
4 5.00 1.725 99.380

A 3.50 1.619 99.486


B 3.60 1.749 99.356
C 5.00 1.759 99.346

2 3.50 1.672 99.433 02+450


3 3.60 1.822 99.283
4 5.00 1.812 99.293

A 3.50 1.740 99.365


B 3.60 1.870 99.235
C 5.00 1.870 99.235

1.539 1.880 100.764 99.225 TP.03

2 3.50 1.357 99.407 02+475


3 3.60 1.497 99.267
4 5.00 1.497 99.267

A 3.50 1.428 99.336


B 3.60 1.568 99.196
C 5.00 1.588 99.176

2 3.50 1.484 99.280 02+500


3 3.60 1.624 99.140
4 5.00 1.634 99.130

A 3.50 1.405 99.359


B 3.60 1.535 99.229
C 5.00 1.535 99.229

2 3.50 1.450 99.314 02+520


3 3.60 1.580 99.184
4 5.00 1.585 99.179

A 3.50 1.387 99.377


B 3.60 1.517 99.247
C 5.00 1.527 99.237
0.298
0.14 0.274
0.13 0.239

0.237
0.13 0.244
0.12 0.321

0.14
0.14

0.11
0.13

0.14
0.15

0.12
0.12

0.16
0.15

0.13
0.12

0.14
0.135

0.11
0.105

0.16
0.15

0.12
0.11
0.16
0.155

0.12
0.125

0.14
0.14

0.13
0.12

0.13
0.14

0.11
0.125

0.14
0.135

0.13
0.12

0.15
0.145

0.13
0.14

0.15
0.14

0.13
0.13

0.14
0.14

0.14
0.16

0.14
0.15

0.13
0.13

0.13
0.135

0.13
0.14
REKAPITULASI
DATA OPNEME LAPANGAN

KONTRAKTOR : PT. Pundi Viwi Perdana


NO. KONTRAK : PB.0201/KTR-SBM/Bb27PJNWI-BTN/PPK.1.2/V/97
TGL. KONTRAK : 21 Mei 2021 No. Item : 3.1.(1)
KONSULTAN : PT. Purnajasa Bimapratama Pekerjaan : Galian Biasa

: PT. Wesitan Konsultasi Pembangunan (KSO)


: PT. Astakona Dutasarana Dimensi (KSO)

QUANTITY
NO URAIAN KIRI / KANAN SAT KET
(M3)

1 STA 02+180 s/d STA 02+520 KANAN M3 64.191 Segmen 2

2 STA 02+180 s/d STA 02+520 KIRI M3 71.716 Segmen 2

JUMLAH TOTAL VOLUME M³ 135.907

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Koordinator Lapangan Konsultan Supervisi Penyedia Jasa
PT. Purnajasa Bimapratama (KSO) PT. Pundi Viwi Perdana

Heri Sutana, ST Michael Rajagukguk, ST Sunandar, ST


Koordinator Lapangan Chief Inspector Quantity Engineer
CROSS SECTION
PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA Kontraktor : PT PUNDI VIWI PERDANA
- MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 2 (2+200-2+600)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.805 101.805 100.00 BM 02

2 3.50 1.488 100.32 02+180


3 3.60 1.498 100.31
4 5.00 1.508 100.30

A 3.50 1.636 100.17


B 3.60 1.646 100.16
C 5.00 1.646 100.16

2 3.50 1.786 100.019 02+200


3 3.60 1.801 100.004
4 5.00 1.806 99.999

A 3.50 1.873 99.932


B 3.60 1.893 99.912
C 5.00 1.883 99.922

2 3.50 1.919 99.886 02+225


3 3.60 1.929 99.876
4 5.00 1.939 99.866

A 3.50 1.993 99.812


B 3.60 2.018 99.787
C 5.00 2.003 99.802

0.722 1.601 100.926 100.204 TP.01

2 3.50 1.256 99.670 02+250


3 3.60 1.256 99.670
4 5.00 1.266 99.660

A 3.50 1.379 99.547


B 3.60 1.394 99.532
C 5.00 1.389 99.537

2 3.50 1.343 99.583 02+275


3 3.60 1.358 99.568
4 5.00 1.363 99.563

A 3.50 1.379 99.547


B 3.60 1.389 99.537
C 5.00 1.389 99.537

2 3.50 1.335 99.591 02+300


3 3.60 1.335 99.591
4 5.00 1.350 99.576

A 3.50 1.381 99.545


B 3.60 1.401 99.525
C 5.00 1.391 99.535
2 3.50 1.395 99.531 02+325
3 3.60 1.415 99.511
4 5.00 1.395 99.531

A 3.50 1.433 99.493


B 3.60 1.443 99.483
C 5.00 1.438 99.488

1.608 1.429 101.105 99.497 TP.02

2 3.50 1.605 99.500 02+350


3 3.60 1.605 99.500
4 5.00 1.610 99.495

A 3.50 1.589 99.516


B 3.60 1.599 99.506
C 5.00 1.599 99.506

2 3.50 1.585 99.520 02+375


3 3.60 1.605 99.500
4 5.00 1.600 99.505

A 3.50 1.561 99.544


B 3.60 1.561 99.544
C 5.00 1.566 99.539

2 3.50 1.552 99.553 02+400


3 3.60 1.552 99.553
4 5.00 1.552 99.553

A 3.50 1.591 99.514


B 3.60 1.601 99.504
C 5.00 1.601 99.504

2 3.50 1.580 99.525 02+425


3 3.60 1.585 99.520
4 5.00 1.590 99.515

A 3.50 1.619 99.486


B 3.60 1.639 99.466
C 5.00 1.629 99.476

2 3.50 1.672 99.433 02+450


3 3.60 1.682 99.423
4 5.00 1.682 99.423

A 3.50 1.740 99.365


B 3.60 1.740 99.365
C 5.00 1.750 99.355

1.539 1.880 100.764 99.225 TP.03

2 3.50 1.357 99.407 02+475


3 3.60 1.357 99.407
4 5.00 1.372 99.392

A 3.50 1.428 99.336


B 3.60 1.428 99.336
C 5.00 1.438 99.326

2 3.50 1.484 99.280 02+500


3 3.60 1.504 99.260
4 5.00 1.504 99.260

A 3.50 1.405 99.359


B 3.60 1.415 99.349
C 5.00 1.435 99.329

2 3.50 1.450 99.314 02+520


3 3.60 1.460 99.304
4 5.00 1.475 99.289

A 3.50 1.387 99.377


B 3.60 1.487 99.277
C 5.00 1.397 99.367
0.298
0.01 0.274
0.02 0.239

0.237
0.01 0.244
0.01 0.321

0.015
0.02

0.02
0.01

0.01
0.02

0.025
0.01

0
0.01

0.015
0.01

0.015
0.02

0.01
0.01

0
0.015

0.02
0.01
0.02
0

0.01
0.005

0
0.005

0.01
0.01

0.02
0.015

0
0.005

0
0

0.01
0.01

0.005
0.01

0.02
0.01

0.01
0.01

0
0.01

0
0.015

0
0.01

0.02
0.02

0.01
0.03

0.01
0.025

0.1
0.01
REKAPITULASI
DATA OPNEME LAPANGAN

KONTRAKTOR : PT. Pundi Viwi Perdana


NO. KONTRAK : PB.0201/KTR-SBM/Bb27PJNWI-BTN/PPK.1.2/V/97
TGL. KONTRAK : 21 Mei 2021 No. Item : 3.1.(1)
KONSULTAN : PT. Purnajasa Bimapratama Pekerjaan : Galian Biasa

: PT. Wesitan Konsultasi Pembangunan (KSO)


: PT. Astakona Dutasarana Dimensi (KSO)

QUANTITY
NO URAIAN KIRI / KANAN SAT KET
(M3)

1 STA 02+180 s/d STA 02+520 KANAN M3 57.793 Segmen 2

2 STA 02+180 s/d STA 02+520 KIRI M3 67.843 Segmen 2

JUMLAH TOTAL VOLUME M³ 125.636

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Koordinator Lapangan Konsultan Supervisi Penyedia Jasa
PT. Purnajasa Bimapratama (KSO) PT. Pundi Viwi Perdana

Heri Sutana, ST Michael Rajagukguk, ST Sunandar, ST


Koordinator Lapangan Chief Inspector Quantity Engineer